May-12
Cane Farmers Category Planned (Hectares) Month To date 43.00 43.00 24.00 24.00 5.00 5.00 30.00 30.00 9.00 29.00 3.00 15.00 18.00 58.00 6.00 30.00 10.00 20.00 Actual (Hectares) Month To date 8.00 8.00 67.00 67.00 1.00 1.00 8.00 55.00 10.80 60.00 55.00 10.80 15.00 30.00 114.00 77.00 10.00 30.00 60.00 Planned (Hectares) Month To date -
Estates Remarks Actual (Hectares) c/fwd Month To date 367.00 367.00 53.00 155.00 88.00 193.00 30.00 130.00 30.00 130.00 30.00 64.00 70.00 -
c/fwd
Forecast
c/fwd
c/fwd
Forecast
BERNARD LODGE
New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other 9.00 29.00 3.00 15.00
MONYMUSK
52.00
ST. THOMAS
WORTHY PARK
30.00 25.00
#VALUE! #VALUE!
20.00 25.00
73.00 75.00
Page 1
222
LOANS
APPLICATION Category New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other BERNARD LODGE # 4 7 3 1 9 12 0 7 2 0 9 9 10,581,539.38 4,222,821.00 7,424,817.00 11,232,000.00 1,420,634.00 1,175,563.00 9 12 0 7 2 0 10,581,539.38 4,222,821.35 7,424,816.64 11,232,000.00 ACTUAL $ # Y-T-D $ # 4 7 3 1 ACTUAL $ # APPROVAL Y-T-D $ # ACTUAL $ # DISBURSEMENT Y-T-D $ Remarks
WORTHY PARK
MONYMUSK
ST. THOMAS
12 1
20 5
Page 2
333 FARMERS
ste d
lan t
ed
See
Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners
BERNARD LODGE
12 31 42 1,230
9 19 26 840
1 3 4 26
8 17 22 385
7 19 28 260
4 7 12 260
3 2 78 23
6 237
2 1 7 120
MONYMUSK
9 11 38 38
5 10 38 37
5 7 71 29
4 4 16 12
6 24 40 84
WORTHY PARK
86 116 15 30
23 76
18
ST. THOMAS
19 78
19 10 243 23
19 8
19 6 103 13
19 5
180,248 20,832 10 9
Remarks Both Golden Grove and Monymusk Factories have finished the crop.
Page 3
Dri
Ap
Ap
En
SIRI
AIJCFA
Ne wP
int ere
370
N/A
Category
Re pla nt
pli ed
gag e
pro v
dca ne
Notified
Remarks
ed
rs ed
re d
en tif ie
pr ov e
ist er
en
rs ed
it to
Re pa i
Re g
km
Id
Planned Actual Forecast Planned Actual Forecast Planned Actual Forecast Planned Actual Forecast 15 15 1.25 1.25 1.25 9.5 9.5 1.25 1.25
Actual To date Forecast Actual To date Forecast Actual To date Forecast Actual To date Forecast
5 1228 8
5 1228 8
5 1228 8
12.5
0 708 0
0 708 0
0 708 0
BERNARD LODGE
MONYMUSK
WORTHY PARK
ST. THOMAS
ne d
ne d
ne d
ne d
nd e
nd e
nd e
nd e
Cl os ed
bm
Di sb u
Di sb u
W rit t
Ap
Su
st
st
st
Pl an
Pl an
Pl an
Pl an
te
te
te
st
PROGRAMME MANAGEMENT Meetings: Quarterly review SAC Harvesting Committee Road Repairs Committee Seminars Other Administration:
Ho
Ho
Ho
Ho
At
At
At
1 1 2 3 1 1
1 1 1 1
1 1
1 2
Relocation of Monymusk Office over two (2) - Updating of Files days Visiting with factory personnel
4 2 Meetings are being held with Cane farming Groups and FM Jones to determine % of planting targets to be apportioned
At
te
Remarks
ed
ed
ed
ed
- Planned Quarterly Review and field day in Clarendon. Revised the Monthly Report format - Attended Project Appraisal Comm meetings'
pe nd e da d to te $
ed
te d
ec eiv
ur se
ple te
Co st
Fo re ca s
Ap pr ov
Projects
# of Projects
ho us eh
m en
ed
ol ds of
t
Vi sit ed
EO Ir
ple
ne
Co m
Di sb
Ex
Remarks
Sig
Im
BERNARD LODGE
Actual
Page 4
BERNARD LODGE
Social: Environmental: Barracks: Actual Social: Environmental: Barracks: Actual Social: Environmental: Barracks: Actual Social: Environmental: Barracks:
14
239,490,000.00
14
13
555
MONYMUSK
12 2 1 5
12 2
12 2 1 5
WORTHY PARK
ST. THOMAS
8 1 2 45.00
3 1 12.00 1.00 -
TOTAL
May 30,2012
Page 5
666
Remarks
Page 6
777
Remarks
Page 7
888
ks
Page 8
999
Cl os ed
Ou t
Remarks
Remarks
Remarks
Page 9
101010
Page 10
111111
Page 11
121212
Jun-12
Cane Farmers Category Planned (Hectares) Month To date 43.00 24.00 5.00 30.00 17.94 57.00 5.98 30.70 70.00 70.00 16.00 Actual (Hectares) Month To date 8.00 67.00 2.00 60.00 55.00 10.80 73.00 73.00 114.00 77.00 10.00 Planned (Hectares) Month To date 30.00 30.00 -
Estates
BERNARD LODGE
New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other
Forecast
c/fwd 8.00 67.00 2.00 60.00 55.00 10.80 114.00 77.00 10.00 -
c/fwd
Forecast
Actual (Hectares) c/fwd Month To date 60.00 130.00 30.00 64.00 70.00 87.93 192.85 60.00 130.00 30.00 64.00 70.00 -
MONYMUSK
30.00 30.00 -
WORTHY PARK
ST. THOMAS
Page 12
131313
LOANS
APPLICATION Category # New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other BERNARD LODGE ACTUAL $ # 4.00 7.00 3.00 1.00 9 12 0 7 2 0 9 9 1,420,634.00 1,175,563.00 9 9 0 0 0 0 20 5 0 0 0 0 Y-T-D $ 7,500,000.00 10,581,539.38 4,222,821.35 7,424,816.64 11,232,000.00 1,420,634.00 1,175,563.00 17,686,000.00 2,110,000.00 # 4 7 3 1 ACTUAL $ # 4.00 7.00 3.00 1.00 0 0 0 28 1 0 0 42 0 0 0 0 0 0 0 0 0 0 APPROVAL Y-T-D $ 37,421,611.96 2,533,370.00 25,919,856.00 # ACTUAL $ # 34.00 DISBURSEMENT Y-T-D $ 21,293,479.00 Remarks
MONYMUSK
28 1
37,421,611.96 2,533,370.00
WORTHY PARK
42
25,919,856.00
34
21,293,479.00
ST. THOMAS
Page 13
141414 FARMERS
est ed
ed
nt
Notified
Ap pro v
En gag e
int er
Ne w
Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners
ST. THOMAS
WORTHY PARK
MONYMUSK
BERNARD LODGE
13
MONYMUSK
WORTHY PARK
GOLDEN GROVE
Remarks
Page 14
Dri p
See
SIRI
AIJCFA
Re pla n
Category
Ap pli ed
dca n
Pla
Remarks
SADP 1
HO
ntif i ed
aire d
er e
rit te n
bm it
pr ov e
se
Rep
Ide
km
Re
Planned Actual Forecast Planned Actual Forecast Planned Actual Forecast Planned Actual Forecast
Actual To date Forecast Actual To date Forecast Actual To date Forecast Actual To date Forecast
e da d to te $
eiv ed
te d
te d
m en
us eh
ol
ds
nd
ve
se
Co s
ed
ple
ec
Ex pe
Im ple
EO Ir
Co m
Vi sit
Di sb
Sig
Ap
of
Actual Social: Environmental: Barracks: Actual Social: Environmental: Barracks: Actual Social: Environmental: Barracks: Actual Social: Environmental:
BERNARD LODGE
14
239,490,000.00
14
13
MONYMUSK
12 2 1 5
204,801,654.83 21,410,703.70
12 2
12 2 1
88 2
WORTHY PARK
96,500,000
ST. THOMAS
8 1
128,645,541 3,196,550 1
3 1
Page 15
Fo
re ca
ur
pr o
ne
ho
st
Projects
# of Projects
Remarks
Cl os ed
gi st
Di sb
Ap
Su
ur
ou t
to
ST. THOMAS
Barracks:
TOTAL
BERNARD LODGE
MONYMUSK
WORTHY PARK
ST. THOMAS
At te nd ed
At te nd ed
At te nd ed
At te nd ed
Pl an ne d
Pl an ne d
Pl an ne d
Pl an ne d
te d
te d
te d
Ho s
Ho s
Ho s
PROGRAMME MANAGEMENT Meetings: Quarterly review SAC Harvesting Committee Road Repairs Committee Seminars Other Administration:
Page 16
Ho s
te d
Remarks
171717
Remarks
Page 17
181818
Remarks
Page 18
191919
Page 19
202020
arks
Cl os ed
ou t
Remarks
Page 20
212121
Remarks
Page 21
222222
Page 22
232323
CANE EXPANSION FUND Cane Farmers Category c/fwd BERNARD LODGE New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other New planting Replanting Seed cane Drip irrigation Equipment ( number ) Other 43.00 24.00 5.00 30.00 17.94 57.00 5.98 30.70 70.00 70.00 16.00 Planned (Hectares) Month To date 65.00 108.00 36.00 60.00 15.00 20.00 30.00 8.97 28.50 2.99 15.35 26.91 85.50 8.97 46.05 109.00 95.00 32.00 Forecast 20.00 59.00 10.00 30.00 Actual (Hectares) c/fwd Month To date 8.00 8.00 67.00 2.00 69.00 2.00 2.00 2.00 2.00 60.00 55.00 10.80 73.00 114.00 77.00 10.00 3.00 5.00 63.00 60.00 10.80 20.00 114.00 114.00 77.00 10.00 c/fwd 30.00 30.00 15.00 30.00 Planned (Hectares) Month To date 45.00 60.00 Estates Forecast Actual (Hectares) c/fwd Month To date 400.00 400.00 87.93 192.85 60.00 130.00 30.00 64.00 70.00 6.25 34.75 94.18 227.60 90.00 130.00 30.00 64.00 70.00 -
MONYMUSK
WORTHY PARK
34.00 13.00
20.00 41.00
30.00
20.00
ST. THOMAS
Page 23
242424
LOANS
APPLICATION Category # New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other New planting Replanting Seed cane Drip irrigation Equipment Other BERNARD LODGE 8 7 10 1 3 16 2 4 0 4 2 8 ACTUAL $ 45,952,758.00 22,229,566.00 100,652,248.00 12,083,038.00 1,815,016.16 16,102,208.80 1,202,440.40 11,681,458.00 1,145,000.00 # 12.00 14.00 13.00 2.00 12.00 28.00 2.00 11.00 2.00 4.00 11 17 0 0 2 0 22 19 0 0 0 0 Y-T-D $ 45,952,758.00 22,229,566.00 100,652,248.00 19,583,038.00 12,396,555.54 20,325,030.15 1,202,440.40 19,106,274.64 11,232,000.00 1,145,000.00 1,420,634.00 1,175,563.00 11,736,016.86 19,368,078.00 18,241,102.00 # 12 18 14 2 ACTUAL $ # 16.00 25.00 17.00 3.00 0 0 0 28 1 0 0 55 0 0 0 0 0 0 0 0 0 0 APPROVAL Y-T-D $ 37,421,611.96 2,533,370.00 27,704,929.00 # ACTUAL $ # 0 0 0 0 0 0 0 50 0 0 0 0 0 0 0 0 0 0 DISBURSEMENT Y-T-D $ 34,778,568.00 Remarks
WORTHY PARK
MONYMUSK
13
1,785,073.00
16
13,485,089.00
2 2 14
ST. THOMAS
Page 24
252525 FARMERS
est ed
ed
nt
Notified
Ap pro v
En gag e
int er
Ne w
Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners Number of new farmers Number of Existing farmers Hectares for new farmers Hectares for Existing farmers New equipment owners Existing equipment owners
BERNARD LODGE
11 13 137 85
8 6 111 28
2 27
6 6 84 22
4 4 111 8
3 2 8 12
6 1 103 10
2 5 8 12
MONYMUSK
2 2 4 1 8 11 15.38 13
2 2
2 40.42 10.12
WORTHY PARK
1 2
13
13
12
Dri p
See
SIRI
AIJCFA
Re pla n
Category
Ap pli ed
dca n
Pla
Remarks 4 4 103 12
SIRI?AIJCFA have not completed processing interested farmers previously submitted 16 14 3 13 3 81.45 9.8 13 16 1 3 81.45 12 9.8
ST. THOMAS
MONYMUSK WORTHY PARK 297,314.00 189,959.00 26,329.00 21,680.00 11.24 11.77 11.29 8.76 Closure of factories are as follows: - Monymusk - 26.5.12 - Worthy Park -10.6.12 - Golden Grove -17.5.12
Remarks
Page 25
ntif i ed
aire d
HO
er e
rit te n
bm it
pr ov e
se
Rep
Ide
km
Re
Planned Actual Forecast Planned Actual Forecast Planned Actual Forecast Planned Actual Forecast
15 70
Actual To date Forecast Actual To date Forecast Actual To date Forecast Actual To date Forecast
1.25
1 1250
1 1244
1 1244
6 1239
3 1228
5 1228 8
12.5 37
151
144
141
134
134
85
15
745
743
743
710
709
708
dt o $ date
Sig n pr ed b op os y er (# ) Ap pr ov ed b (# y PS )
(# )
(# )
Im ple m en te d
eiv ed
#)
d(
ple te d
Co s
nd e
ed (
ec
ur
Ex pe
EO Ir
Co m
Vi sit
Di sb
of
ho
us eh
#)
Projects
# of Projects to date
se
ol
ds
Remarks
MONYMUSK
Actual
Page 26
Cl os ed
gi st
Di sb
Ap
Su
ur
ou t
to
MONYMUSK
Social: Environmental: Barracks: Actual Social: Environmental: Barracks: Actual Social: Environmental: Barracks: TOTAL
WORTHY PARK
96,500,000
ST. THOMAS
8 1 2 47.00
128,645,541
8 1
3 1 24.00 1 6.00 222 310.00 Total cost ($) does not inclide barracks
269,555,379 731,224,228.03
1.00
1 46.00
BERNARD LODGE
MONYMUSK
WORTHY PARK
ST. THOMAS
de
de
de
te d
te d
te d
At te n
At te n
At te n
te d
ne
ne
ne
ne
PROGRAMME MANAGEMENT Meetings: Quarterly review SAC Harvesting Committee Road Repairs Committee Seminars Other
1 2 3 - Assessment of 14 cane roads and a gully was done on June 21, 2012 - The CARDI Sensitization meeting on Small Ruminant training was held on June 14, 2012 1 1 1 - The CARDI Sensitization meeting on Small Ruminant training was held on June 7, 2012
1 1 1 5
At te n
1
Pl an
Pl an
Pl an
Pl an
Ho s
Ho s
Ho s
Administration:
- Identification of cane roads was done on June 16, 2012. Updating Cane Farmers' Database
Page 27
Ho s
de
282828
Remarks
Page 28
292929
Remarks
Page 29
303030
nterested farmers
Page 30
313131
Cl os ed
ou t
Remarks
5 1228 8
85
708
rks
Page 31
323232
Page 32
333333
Page 33
343434
MINISTRY OF AGRICULTURE & FISHERIES SUGAR TRANSFORMATION UNIT ENGINEERING MONTHLY REPORT 4th quarter
Name of Roads Maggie off Road (Lancaster - Two Mile Wood) Fish Street Clarks Street Back Street (Bogue - Elim) Shed Bug Grass Land Dobson Road Mint Road - Mount Eagle St. Paul Road Black Ants - Hertford Llandillo Glaze Norton Bull Head Fish River Road Hyde Shirley - Corn House Road Hampden Land Road Fontabelle Back Road Fontabelle -Hampstead Road Duncan - Clarks Town Hyde Campbells - Sugar Road Brompton - Hopewell road Amity Hall Road Hartlands Road Smallwood Road Woodlands Road Bushy Park Road Hillrun Road
Priority Ranking 1 2 3 4 5 6 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6
CANE ROADS Total KM to Estimated Cost Rehabilitate ($) 3.14 $34,767,011.00 2.45 $2,194,730.00 1.17 $1,732,660.00 1.78 $12,535,875.00 2 $11,484,000.00 1.1 $3,712,500.00 1.4 $2,079,000.00 2.1 ############# 5.5 ############# 1.85 ############# 9.45 ############# 2.35 ############# 2.5 ############# 4.1 ############# 8.95 ############# $10,973,513.00 1.31 $16,058,543.00 1.53 $16,848,625.00 2.01 $17,569,125.00 5.47 $23,571,840.00 5.94 $23,021,022.00 5.31 4.99 $8,746,946.00 2.98 $30,102,975.00 6.28 $30,882,899.00 5.96 $19,390,518.00 1.05 $2,452,433.00 3.06 2.21 $5,465,628.00 $11,172,670.00
Page 34
Remarks
9/16/2013
35%
9/11/2013
9/16/2013
9/11/2013
9/11/2013
Survey completed
353535
Name of Roads Fowl Basket Road Ramble Crossing - Osbourne Store New Yarmouth - Rowington Crossing Oscar Gordon - Garvy Comfort - Zeddy Saw Mill Road Rhymesbury Internal Road 58A Rhymesbury Internal Road 58B Rhymesbury Internal Road 58C Rhymesbury Internal Road 58D Rhymesbury Internal Road 58G Rhymesbury Internal Road 58H Rhymesbury Internal Road 58I Rhymesbury Internal Road 58J Rhymesbury Internal Road 57 Oscar Gordon - Deep Well Summerfield- Thompson Town Main Road Dr. Wright Farm _Content Road Old Pera - New Pera Road Stokes Hall - Cross Road ST. THOMAS Spanish Wood - Belgium Hampton Court - Cross Road - Airy Mount Stanton Feeder Road Pleasant Hill - Dam Road Mornt Bay - Stanton MONYMOSK
Priority Ranking 1
CANE ROADS Total KM to Estimated Cost rehabilitate ($) 4.1 10.14 4.4 $29,136,003.52 $37,341,000.00 $22,966,400.00 $30,497,454.00 $40,511,044.48 ############# $10,397,790.00 $6,522,318.40 ############# $10,188,464.00 $9,040,928.00 $47,557,014.96 $9,416,342.00 $7,954,700.00 $7,730,086.00 $34,265,729.68 $59,366,857.68 $37,775,556.00 $2,670,143.00 $49,048,594.40 $89,494,293.40 $45,176,625.00 $6,125,625.00 $5,519,250.00 $7,903,546.00 $22,893,750.00 $11,880,000.00 $4,198,500.00
Page 35
Remarks
1 2 2 3 3 3 3 3 3 3 3 4 5 6 1 2 3 4 5 6
4.26 4.43 1.29 0.89 1.47 0.97 1.21 5.83 0.97 0.99 0.97 3.82 6.75 3.9 1.95 4.55 10.4 4.85 1.08 3.15 1.95 1.85 1.4 2.4
9/16/2013
9/30/2013
1 2 3 4 5 6
$11,958,139.00 $19,770,897.00 $9,532,553.00 $12,367,336.00 $14,251,815.00 $12,124,184.00 9/23/2013 9/16/2013 9/16/2013 9/16/2013
363636
Lluidas Vale - Juan De Boias Crofts Hill Main - Pond via Corner Crofts Hill Via Ludlow Kellits Main - Sevens Ground Crofts Hill- Hickley Road
REGIONAL DRAINS ( Flood Mitigation Programme) Length to be logged/cleaned (M) Package No 1 Masemure via New Savannah to Broughton Barham via Frome to Big bridge (Ricketts River) Geneva Drain Package No 2 Shrewsbury to Petersfield (Deans Valley) Petersfield to Paradise (Sweey River) Upper Rock Spring via Jerusalem Mtn. to Paul Island Package No 3 Glascow via Grange Hill to Cabaritta River (Morgan's River) 4500, / 2500 Three Miles River 600, / 2000 D.R FOOTE CONSTR. $8,071,680.00 29-Jan 100 $49,278,547.00 0000 / 20,000 CABINET SUBMISSION WAS SENT TO MINISTRY OF FINANCE ON 19/3/2013 Package No 4 Pennycooke via Barham & Frome to Llandilo (Cabaritta River) 5700, / 3000 Package 1 Plantain Garden River from Bath to Sea at Holland Bay 1500, / 2250 1200, / 1500 1200 ,/ 2000 N.R DIARAM $7,765,200 29-Jan 100 100 1,240, / 2,500 182,7, / 2500 0000 / 1000 C.J'S ASPHALTING $6,189,480.00 29-Jan 100 100 100
Remarks
Package 2 PGR tributary via Golden Grove to sea at Holland Bay Eatrh swale at Stokes Hall site to box culvert at Spring Piec 0000 / 9448 0000 / 500
$49,852,000.00
P G River from Phillipsfield via Spring Piece to Sea at Holland Bay 0000 / 12000
Page 36
373737
BARRACKS - Infrastructure % Complete Total Cost (1+2+3+4+5) ($) Road (1) Sewer (2) Water (3) Light (4) Bio Digester (5) TOTAL % COMPLETE
Project
Start Date
Masemure (Share Con Construction) Shrewbury (D.R. Foote Construction) Barham (D.R. Foote Construction)
$59,996,365
22-Oct-12
90%
98%
98%
20%
95%
80%
$160,413,628
20-Nov-12
60%
55%
0%
0%
0%
23%
Hampton Court (Pavement & Structures Ltd.) Stokes Hall (Alcar Construction & Haulage)
$147,406,614 $158,384,792
28-Nov-12 22-Oct-12
50% 60%
60% 25%
10% 10%
0% 0%
5% 0%
25% 19%
BARRACKS - House Construction % Complete Project Contract Sum No. of Houses Start Date Sub-structure Structure Finishing Total % Complete
Inclement Remarks weather and supplier's late deliery retard progress
$71,599,700.00
22.00
68%
68%
68%
68%
Page 37
383838
$50,102,395.00
17.00
100%
100%
100%
100%
$19,964,830.00
6.00
100%
100%
100%
100%
$155,900,685.00
39.00
100%
100%
80%
93%
Springfield
Hampton Court
Stokes Hall
Page 38
393939
MINISTRY OF AGRICULTURE & FISHERIES SUGAR TRANSFORMATION UNIT ENGINEERING MONTHLY REPORT
8
Page 39
404040
Page 40
414141
Page 41
424242
Remarks
The contractor has not performed satisfactorilly, and is way behind his original schedule, due to excessive rock excavation encountered. Erection of site office and fencing.
Page 42
434343
Page 43
444444
Page 44
454545
Page 45
464646
Page 46
474747
Page 47
484848
Page 48
494949
Page 49
505050
Page 50
515151
Page 51
525252
Page 52
535353
Page 53