Objective:
The following testing will be performed on the system to check for operation of different components including
cables, yaw shaft control box, dogvane and anemometer to be able to troubleshoot the “commerr” fault displayed
on the inverter.
3
4
2 2
4
1 1
1 1
2 3 2 3
Dogvane Anemometer
MUTLTIMETER SETTING ‐‐
_____________________________________________________________________________________
If “ commerr” seen on LCD Display measure 1‐2 PIN to PIN TEST for DC240V. If no DC240v, the replace fuse. If there is DC
240V, then the problem with the control box on yaw shaft, please change a new yaw shaft control system.
MUTLTIMETER SETTING ‐‐
_____________________________________________________________________________________
MUTLTIMETER SETTING ‐‐
_____________________________________________________________________________________
Wiring Testing
MUTLTIMETER SETTING ‐‐
_____________________________________________________________________________________
1—4 Null 0Ω
ON
2—3 Null 0Ω
2—4 Null 0Ω
1—3 Null Null
Turbine
MUTLTIMETER SETTING ‐‐
_____________________________________________________________________________________