SINGAPORE TENDER 1361 - noise barrier along elevated tracks at existing MRT viaducts, in East, West and North

part of Singapo TASK Contract Award Date: The Contractor shall prepare and submit a detailed statement on the public relations aspects of the project for the SOs approval. The Contractor shall submit a QA and QC Programme Plan to the SO for acceptance. The Contractor shall provide for the SOs acceptance a list of sources from which materials requiring acceptance, certification, or testing shall be obtained. Quality Procedures The Contractor shall meet with the SO to explain his intended drawing office procedures including his processes for CAD quality control. The Contractor shall submit a Project Management Plan The Contractor shall prepare and submit sample drawings to indicate the general format. The Contractor shall then meet with the SO to explain his intended drawing office processes and programme to produce the required drawings, and in particular his processes for CAD. The Contractor shall submit a preliminary Project Quality Plan (PQP). Prior to commencement of Works, the contractor shall submit for the SO' sapproval a comprehensive PreConstruction Condition Survey Report Submit Visual inspection and structural assessment of the existing viaduct structures shall be carried out and endorsed by the appointed Professional Engineer The Contractor shall provide the SO with a detailed Quality Plan taking into account any directions or requirements from the SO on the preliminary submission.

Commencement Date (Letter of Acceptance) Detailed photographic records, survey and inventory of existing conditions, shall be prepared in advance prior to the commencement of work on existing facilities, to the satisfaction of the SO. The Contractor shall submit a comprehensive method statement for all temporary and permanent works to the SO. The Contractor shall submit a site responsibility chart to show the functions and responsibilities of various personnel from the Project Manager to the workmen responsible for executing the Works, as well as the functions and responsibilities of the sub-contractors involved. The Contractor shall carry out a presentation on overall scope appreciation, methodology and sequence of work. The Contractor shall submit the Programming Plan and Baseline Programme to the SO for acceptance. Approval-in-Principle (AIP) submission - DESIGN PHASE Final Design Submission

The Contractor shall obtained acceptance of the Programming Plan and Baseline Programme The Contractor shall submit monthly reports to the SO, delivered not later than the 5th day of the month following the month of the report.

Construction or Fabrication of the part of the works. Submit all Working and Shop Drawings for the SO's acceptance Submit all Working and Shop Drawings for the relevant authorities' acceptance The Contractor shall provide samples and mock ups, as required by the SO or the relevant authorities for acceptance

Date of Completion of Works The Contractor shall submit to the SO as-built drawings endorsed by the Professional Engineer (PE) The Contractor shall update existing As-built drawings (in Sepia or paperprint) in LTAs record centre. Completion of whole of the Works

ducts, in East, West and North part of Singapore to mitigate railway noise. DUE DATE COMPLETED?

aspects of the

within 2 weeks after Contract award Fourteen 14 days after Contract award Fourteen14 days after Contract award Fourteen14 days after Contract award Within three (3) weeks of Contract award within 28 days after Contract award Within four (4) weeks after Contract award within 4 weeks after Contract award within 3 months after Contract award within 3 months after Contract award Within twelve (12) weeks after Contract award or within 8 weeks of the SO's response to the preliminary PQP

13.7.3 6.2 6.4 6.2 4.4 13.2.1 4.7.2 13.11.2.1 5.3 5.4 13.11.2.3

terials requiring

ures including his processes for

mat. The Contractor gramme to produce the

a comprehensive Preshall be carried out and

any directions or requirements

prepared in advance prior to the

prior to the commencement of work at least fourteen (14) days in advance of the Works within 15 days after the Commencement Date (Letter of Accept) within 30 calendar days after the Commencement Date (Letter of Accept) within 60 calendar days after the Commencement Date (Letter of Accept) Two (2) months after the Commencement Date Letter of Accept) Five (5) months after the Commencement Date Letter of Accept)

5.11 5.2

nd permanent works to the SO.

onsibilities of various personnel well as the functions and

13.1.1

ology and sequence of work.

3.6.1 3.6.2 3.9.1 3.9.1

O for acceptance.

within Six (6) months after the Commencement Date Letter of Accept) withing the 5th of every month during the Works

3.6.3 3.7.1

th day of the month following

evant authorities for acceptance

minimum of four (4) weeks before construction or fabrication of the part of the works. minimum of four (4) weeks before construction or fabrication of the part of the works. at least 6 weeks before construction or fabrication of the part of the works to which they are related.

4.7.6 4.7.6 4.7.6

Engineer (PE)

s record centre.

within three (3) months after completion of Works within three (3) months after completion of Works 30-Apr-16

5.22.1 5.22.1 3.9