DOCUMENT CONTROL
Document Status Record Status Issue1 Revision3 Date 09 Aug 04 Prepared Standards and Systems Reviewed Section Managers Endorsed GM ISP Approved Safety Committee
2.
Scope
The scope of this procedure is limited to a general description of the annual reporting of the condition of track, civil , signalling and communications infrastructure
4.
Responsibility
The Engineering Performance Manager is responsible for the compilation and analysis of data for the Asset Condition Report Section Managers are responsible for the supply of data jointly with the Strategic Planners and others.
5.
The ACR provides a summary of the current physical condition of the ARTC Network based on data extracted from the following sources:
Rail Access Management System (RAMS) for assessment of the performance of
the infrastructure against Key Performance Indicators (KPI), including speed restrictions and train delays;
Infrastructure Management System Asset Condition and Fault Reports (IMS or
Ultra- sonic Recording Car surveys of Rail Flaws; Corrugation Car surveys of Rail Surface Roughness, conducted to develop the
The ACR examines the Asset Condition of the major corridors owned or leased by ARTC, and compares the condition of the infrastructure at June in the reporting year to that reported one year ago. The ACR describes the condition of assets in the following Asset Categories:
Track and Civil including turnouts and at grade crossings Bridges and Structures including culverts and right of way Signalling and Communications Systems Rolling Stock (mobile plant)
6.
Procedure
The process of development and production of the Asset Condition Report is illustrated in the attached flow chart. The key steps in the process are: 1. 2. 3. 4. 5. 6. Asset Maintainers conduct routine and corrective maintenance activities, including condition surveys. Asset Maintainers submit condition assessment reports and survey data as required. The Strategic Planner extracts the relevant data for interpretation of current physical condition, and projection of likely future condition. The Strategic Planner prepares the summary Asset Condition Report for a designated geographical area. The Management Team reviews, interprets and comments on the asset condition report Management Teams develop project submissions and maintenance plan amendments to rectify serious problems.
7.
Flow Chart
Refer overleaf.
START
Strategic Planner
Extract data, Project trends, Interpret trends Identify probable requirements
IMS
RAMS
No
Yes AMT recommends actions required to sustain or improve asset condition (PP-141
Strategic Long Term Planning (PP-27) Corporate Plan Review (PP-26) 5 & 25 Year AMP (PP-29)