Description Of work
Brick work 230mm thick in Ground Floor
Brick work 230mm thick in 3rd Floor
115mm Thick Brick work in ground floor
115mm Thick Brick work in 3rd floor
Rough plastering in ground floor
Rough plastering in 3rd floor
Chicken mesh in 3rd floor
Inverted beam in 3rd floor
chipping of Plastering in ground floor
chipping of Plastering in 3rd floor
Room door frame pocket in all floors
Vertical concrete
Precast lintel
Dust filling in ground floor bathroom
PCC in ground floor area
PCC in sunkan portion
Door frame fixing
GF
First floor
Second floor
3rd Floor
Soffits for doors
GF
First floor
Second floor
3rd Floor
Plastering of windows Soffits
GF
First floor
Second floor
3rd Floor
Plastering finishing ground floor
Plastering finishing 3rd floor
Plastering ventilator Soffits
GF
First floor
Second floor
3rd Floor
Band for windows
GF
First floor
Second floor
3rd Floor
Band for ventilators
GF
First floor
Quanity
Rate
146.20 290.00
96.07 130.00
257.74 154.00
329.79
28.00
532.53
28.00
553.49
15.00
16.50 350.00
453.53
20.00
201.42
20.00
72.00 125.00
3.00 3060.00
3.75 1310.00
86.00
32.00
578.72
55.00
200.59
65.00
Unit
CFT
CFT
SFT
SFT
SFT
SFT
RFT
SFT
SFT
Nos
Nos
CFT
SFT
SFT
SFT
3.00
3.00
3.00
3.00
350.00
400.00
450.00
500.00
Nos
Nos
Nos
Nos
36.00
57.00
57.00
57.00
55.00
60.00
65.00
70.00
Nos
Nos
Nos
Nos
95.99
60.00
60.00
60.00
578.45
1692.29
55.00
60.00
65.00
70.00
35.00
35.00
RFT
RFT
RFT
RFT
SFT
SFT
2.00
3.00
3.00
3.00
250.00
300.00
350.00
400.00
Nos
Nos
Nos
Nos
2.00
3.00
3.00
3.00
300.00
350.00
400.00
450.00
Nos
Nos
Nos
Nos
2.00
3.00
200.00
250.00
Nos
Nos
25
26
27
28
29
30
31
32
Second floor
3rd Floor
Pocket for inverted beam in 3rd floor
Dismantling brick work in ground floor & 3rd floor
Scaffolding balance 5.00/25.00
Outside plastering in all floors
Outer plastering in ground floor
Touch up works in 101 & 102
Toilet door frame finishing
Windows soffits brick work for plastering to proper plumb
3.00 300.00
3.00 350.00
2.00 200.00
34.07
95.00
2454.00
5.00
186.50
45.00
282.50
35.00
2.00 2100.00
4.00 200.00
3.75 154.00
Total
Nos
Nos
Nos
CFT
SFT
SFT
SFT
Nos
Nos
SFT
Rs
(-)
Rebate 5% less
Net Total
(Rupees: Three lakh sixty two thousand eight hundred and seventy six only)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
290.85
20.00
419.38
30.00
216.34
30.00
690.73
28.00
710.23
35.00
126.63
95.00
166.83 130.00
3.00 250.00
73.00
15.00
2.00 3500.00
7.00 577.50
3.00 924.00
7.00 2100.00
SFT
SFT
SFT
SFT
SFT
CFT
CFT
Nos
Nos
Nos
Nos
Nos
Nos
9.00 1200.00
438.72
45.00
438.72
40.00
9.00 2280.00
729.20
30.00
8.75 130.00
5.00 200.00
1.00 900.00
1907.66
18.00
1408.57
20.00
1101.00
30.00
1101.00
28.00
1101.00
35.00
383.00
45.00
Nos
SFT
SFT
Nos
SFT
SFT
Nos
Nos
SFT
SFT
SFT
SFT
SFT
SFT
Net Total
(Rupees: Four lakh eight thousand eight hundred and twenty six only)
Amount
42398.00
12489.10
39691.96
9234.12
14910.84
8302.35
5775.00
9070.60
4028.40
9000.00
9180.00
4912.50
2752.00
31829.60
13038.35
1050.00
1200.00
1350.00
1500.00
1980.00
3420.00
3705.00
3990.00
5279.45
3600.00
3900.00
4200.00
20245.75
59230.15
500.00
900.00
1050.00
1200.00
600.00
1050.00
1200.00
1350.00
400.00
750.00
900.00
1050.00
400.00
3236.65
12270.00
8392.50
9887.50
4200.00
800.00
577.50
381977.00
-19099.00
362878.00
5817.00
12581.40
6490.20
19340.44
24858.05
12029.85
21687.90
750.00
1095.00
7000.00
4042.50
2772.00
14700.00
10800.00
19742.40
17548.80
20520.00
21876.00
1137.50
1000.00
900.00
34337.88
28171.40
33030.00
30828.00
38535.00
17235.00
408826.32