M4 Junction 33 Capacity Improvement

IWA Scheme Overview and Task List


Scheme Overview
The M4 J unction 33 links the M4 motorway, a dual three lane motorway (120kph) with the
A4232, a dual two lane trunk road (120kph).
The junction is to the West of Cardiff in South Wales and is the strategic western route into
Cardiff and designated route to Cardiff Airport.

Junction33
Junction33
M4 Junction 33 Capacity Improvement
IWA Scheme Overview and Task List

The junction struggles with capacity issues and, as part of the South Wales Trunk Road
Agent (SWTRA) Framework, we have been commissioned to investigate opportunities to
improve these problems, develop the detailed design and support a contractor in achieving
an opening of the scheme by the end of March 2015.

M4WestboundCarriagewayLookingEast
Junction33
M4 Junction 33 Capacity Improvement
IWA Scheme Overview and Task List

M4WestboundCarriagewayLookingWest,startofdivergeforJunction33

A4232SouthboundCarriagewayLookingSouth

A4232SouthboundCarriagewayLookingNorth
M4 Junction 33 Capacity Improvement
IWA Scheme Overview and Task List
Early stage assessment work has identified options to provide a dedicated lane for vehicles
leaving the M4 from the east to travel south on the A4232 and for vehicles travelling north on
the A4232 joining the M4 in a westerly direction. It is believed that these improvements can
be delivered within the proposed timescale for road opening assuming a zero landtake and
an alternative option that would require land acquisition by negotiation. All options art likely
to include some form of retainment. These options are shown in the following plans;
B1844701/TO075/D/012 Western Option
B1844701/TO075/D/035 East Quadrant 1 in 2 Slopes
B1844701/TO075/D/052 East Quadrant Varying Slopes up to 70
o
These drawing are contained in Appendix A and are at outline stage that will be liable to
change as the scheme develops.
Task List
The following list identifies those areas of project delivery that we currently believe will
require ID support in the delivery;
MX
- Alignment Design

Design Specification
- To be done to the Manual of Contract Documents for Highway Works and cover the
following series;
100 Series Preliminaries Numbered Appendices
200 Series Site Clearance Numbered Appendices
300 Series Fencing Numbered Appendices
400 Series Road Restraint Systems Numbered Appendices
500 Series Drainage and Service Ducts Numbered Appendices
600 Series Earthworks Numbered Appendices
700 Series Road Pavement Numbered Appendices
1100 Series Kerbs, Footways and Paved Areas Numbered Appendices
1200 Series Traffic Signs Numbered Appendices
1300 Series Road Lighting Columns Numbered Appendices
1400 Series Electrical Works Numbered Appendices
1500 Series Motorway Communications Numbered Appendices
1600 Series Structures Numbered Appendices
2500 Series Special Structures Numbered Appendices
3000 Series Landscape and Ecology Numbered Appendices

AutoCAD
- Production of drawings to support design specification

Traffic Modelling
- Updating of existing modelling to include output from CCTV survey

Drainage Modelling
- Using WinDes by Microdrainage to model existing and proposed drainage

M4 Junction 33 Capacity Improvement
IWA Scheme Overview and Task List
KeySigns
- Production of sign face details and post and foundation design

KeyLines
- Production of lining design

ArcGIS
- Environmental Plans

Slope Stability
- Analysis of earthworks slopes

Structural Design
- Design of any retaining structures and/or modification to existing structures
- Application of Eurocodes may be required
All design must be compliant with the requirements of the Manual of Contract Documents for
Highway Works (MCDHW) and the Design Manuals for Roads and Bridges (DMRB).
The delivery of the project will be managed in accordance with the requirements of the
SWTRA Integrated Delivery Briefing Document attached for information.
SWTRA - Integrated
Delivery Briefing Docu

M4 Junction 33 Capacity Improvement
IWA Scheme Overview and Task List

Appendix A
Drawings
M4 Junction 33 Capacity Improvement
IWA Scheme Overview and Task List

IC
IC
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
RS
RS
RS
RS
RS
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
TL
IC
JB
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
ST15
ST151
ST14
ST13
ST12
ST11
ST10
ST069
ST068
ST070
ST841
ST85
ST86
ST87
ST88
ST89
ST067
ST063
ST064 Mkr
ST16
ST84
RS
RS
Mkr
Mkr
Mkr
Mkr
Mkr
ST16
ST17
ST18
ST19
ST84
ST83
ST82
ST81
ELG
Existing slope
Highway
Boundary
1
2
Strengthened Earth Option 6
VRS
Benching
Class 1 Selected
Granular Fill
O
O = 30
ELG
Existing slope
Highway
Boundary
1
2
Strengthened Earth Option 7
VRS
Benching
Class 1 Selected
Granular Fill
O
O = 30 to 45
T/S Retention Mat
Secondary Geogrids
ELG
Existing slope
Highway
Boundary
1
2
Strengthened Earth Option 8
VRS
Benching
Class 1 Selected
Granular Fill
O
O = 45 to 70
T/S Retention Mat
Primary Geogrids
This drawing is not to be used in whole or part other than for the intended
purpose and project as defined on this drawing. Refer to the contract for full
terms and conditions.
Drawing status
Drawing number
Scale
Drawing title
DO NOT SCALE
Rev
Apprv'd Purpose of revision Rev Rev. Date Drawn Check
Newby House, Neath Abbey Business Park, Neath, SA10 7DF
Tel:+44(0)1792 812333 Fax:+44(0)1792 817447
SWTRA CENTRAL AREA
Rev'd
M
:\H
IG
\B
1
8
4
4
7
0
0
S
W
T
R
A
F
r
a
m
e
w
o
r
k
\B
1
8
4
4
7
0
1
-
H
ig
h
w
a
y
s
\0
7
5
M
4
J
3
3
C
a
p
a
c
ity
S
tu
d
y
\0
0
5
D
e
liv
e
r
a
b
le
\D
r
a
w
in
g
s
\B
1
8
4
4
7
0
1
_
T
O
7
5
_
D
_
0
1
2
D
0
O
p
tio
n
P
C
3
.d
w
g
South Wales Trunk Road Agent
Asiant Cefnffyrdd De Cymru
Managing and Improving Motorways and Trunk Roads through South Wales
Rheoli a Gwella'r Traffyrdd a'r Cefnffyrdd yn Ne Cymru SWTRA TASK 075
M4 J UNCTION 33 CAPACITY STUDY
STAGE 2 APPRAISAL
OPTION PC3
DRAFT
1:1000@ A1
B1844701/TO075/D/012 D0
D0 20-06-13 DRAFT GE J T J T RHT
Crown Copyright and database right 2012. Ordnance Survey 100021874.
Welsh Government.
Hawlfraint a hawliau cronfa ddata'r Goron 2012. Rhif Trwydded yr Arolwg
Ordnans 100021874.
C
o
n
tin
u
e
d
b
e
lo
w
C
o
n
tin
u
e
d
fr
o
m
a
b
o
v
e
Strengthened Earthworks Option 7
Strengthened Earthworks Option 6
Strengthened Earthworks Option 7
Strengthened Earthworks Option 8
Strengthened Earthworks Option 7
Strengthened Earthworks Option 8
Strengthened Earthworks Option 7
Strengthened Earthworks Option 8
Strengthened Earthworks Option 7
U
n
c
h
e
c
k
e
d
LP
LP
LP
LP
LP
LP LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
RS
RS
RS
RS
RS
RS
RS
TL
TL
TL
TL
TL
TL
TL
IC
JB
JB
JB
JB
JB
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
A
A
C
B
C
D
D
E
E
B
Widening for proposed
Direction Sign
5
N2/W2
0.6
Cardiff (W) Caerdydd (Gn) A4232
Services
0.6
1
2
0.6
1
2 0.6
1
2
1mH/S
Diverge 7.3mCarriageway
1mH/S
2mVerge 2.5mVerge
Proposed:
0.2mH/S
6mCarriageway
0.2mH/S
5.725mVerge 2.5mVerge
Existing:
4.748
5
Proposed filter drain/ batter drain
to be employed through widening
0.6 0.6
1
2
5
17.903
0.75 x 0.8 (W2)=0.6m Set back to rear of through visibility envelope 7.2mSegregated Left Turn Lane Roundabout Entry Lanes
0.75 x 0.8 (W2)=0.6m
1
2
7.2mSegregated Left Turn Lane
11.444
5
3.534
5
0.75 x 0.8 (W2)=0.6m
This drawing is not to be used in whole or part other than for the intended
purpose and project as defined on this drawing. Refer to the contract for full
terms and conditions.
Drawing status
Drawing number
Scale
Drawing title
DO NOT SCALE
Rev
Apprv'd Purpose of revision Rev Rev. Date Drawn Check
Newby House, Neath Abbey Business Park, Neath, SA10 7DF
Tel:+44(0)1792 812333 Fax:+44(0)1792 817447
SWTRA CENTRAL AREA
Rev'd
M
:\H
IG
\B
1
8
4
4
7
0
0
S
W
T
R
A
F
r
a
m
e
w
o
r
k
\B
1
8
4
4
7
0
1
-
H
ig
h
w
a
y
s
\0
7
5
M
4
J
3
3
C
a
p
a
c
ity
S
tu
d
y
\0
0
5
D
e
liv
e
r
a
b
le
\D
r
a
w
in
g
s
\B
1
8
4
4
7
0
1
_
T
O
7
5
_
D
_
0
3
5
D
0
E
a
s
t Q
u
a
d
r
a
n
t 1
in
2
s
lo
p
e
s
.d
w
g
South Wales Trunk Road Agent
Asiant Cefnffyrdd De Cymru
Managing and Improving Motorways and Trunk Roads through South Wales
Rheoli a Gwella'r Traffyrdd a'r Cefnffyrdd yn Ne Cymru SWTRA TASK 075
M4 J UNCTION 33 CAPACITY STUDY
EASTERN QUADRANT
TD 51 COMPLIANT WITH 1 IN 2 SLOPES
DRAFT
Plan: 1:1000 Sections: 1:200
B1844701/TO075/D/035 D0
D0 16-09-13 DRAFT FP J T J T RHT
Crown Copyright and database right 2012. Ordnance Survey 100021874.
Welsh Government.
Hawlfraint a hawliau cronfa ddata'r Goron 2012. Rhif Trwydded yr Arolwg
Ordnans 100021874.
U
n
c
h
e
c
k
e
d
LP
LP
LP
LP
LP
LP LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
RS
RS
RS
RS
RS
RS
RS
TL
TL
TL
TL
TL
TL
TL
IC
JB
JB
JB
JB
JB
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
Mkr
A
A
C
B
C
D
D
E
E
B
Widening for proposed
Direction Sign
5
1.806
5
5
N2/W2
0.6
Cardiff (W) Caerdydd (Gn) A4232
Services
0.6
1
2
0.6 0.6
1mH/S
Diverge 7.3mCarriageway
1mH/S
2mVerge 2.5mVerge
Proposed:
0.2mH/S
6mCarriageway
0.2mH/S
5.725mVerge 2.5mVerge
Existing:
1
2
1
2
0.6 0.6
Proposed filter drain/ batter drain
to be employed through widening
7.736
0.75 x 0.8 (W2)=0.6m Set back to rear of through visibility envelope 7.2mSegregated Left Turn Lane Roundabout Entry Lanes
0.75 x 0.8 (W2)=0.6m 7.2mSegregated Left Turn Lane
3
1
4
3
1
2
1
1.2
1
2
0.75 x 0.8 (W2)=0.6m
5.865
5.077
This drawing is not to be used in whole or part other than for the intended
purpose and project as defined on this drawing. Refer to the contract for full
terms and conditions.
Drawing status
Drawing number
Scale
Drawing title
DO NOT SCALE
Rev
Apprv'd Purpose of revision Rev Rev. Date Drawn Check
Newby House, Neath Abbey Business Park, Neath, SA10 7DF
Tel:+44(0)1792 812333 Fax:+44(0)1792 817447
SWTRA CENTRAL AREA
Rev'd
M
:\H
IG
\B
1
8
4
4
7
0
0
S
W
T
R
A
F
r
a
m
e
w
o
r
k
\B
1
8
4
4
7
0
1
-
H
ig
h
w
a
y
s
\0
7
5
M
4
J
3
3
C
a
p
a
c
ity
S
tu
d
y
\0
0
5
D
e
liv
e
r
a
b
le
\D
r
a
w
in
g
s
\B
1
8
4
4
7
0
1
_
T
O
7
5
_
D
_
0
5
2
D
0
E
a
s
t Q
u
a
d
r
a
n
t v
a
r
y
in
g
s
lo
p
e
s
u
p
to
7
0
d
e
g
r
e
e
s
.d
w
g
South Wales Trunk Road Agent
Asiant Cefnffyrdd De Cymru
Managing and Improving Motorways and Trunk Roads through South Wales
Rheoli a Gwella'r Traffyrdd a'r Cefnffyrdd yn Ne Cymru SWTRA TASK 075
M4 J UNCTION 33 CAPACITY STUDY
EASTERN QUADRANT
TD 51 COMPLANT WTH SLOPES UP TO 70
DRAFT
Plan: 1:1000 Sections: 1:200
B1844701/TO075/D/052 D0
D0 16-09-13 DRAFT FP J T J T RHT
Crown Copyright and database right 2012. Ordnance Survey 100021874.
Welsh Government.
Hawlfraint a hawliau cronfa ddata'r Goron 2012. Rhif Trwydded yr Arolwg
Ordnans 100021874.

Вам также может понравиться