Sl
Particulars
No

Unit

No

Qty

Asst. Exce Engineer


Contractor

Asst. Engineer

Page 2 of 7

Providing and constructing precast concrete solid blocks with compressive strength not less than
35kg/sqm with cement mortar 1:4 (quoin,jamb and closer blocks) with solid concrete blocks of size
40x20x20 cms conforming to IS 2185/1965 in superstructure including cost of scaffolding and curing,
37 cost and conveyance of all materials, cost of labour and equipment, with all lead, lifts, loading,
unloading & HOM Chargesand all other incidental charges required for successful completion of
work as per approved specification, designs, drawings etc,. complete and directions of the Engineer
in-charge of the work.
ii

Ground Floor
Admin Block NE Side (Side Wall)
Transformer wall (Dormetry NE Side)
short wall
long wall
DG Wall (Dormetry NE Side)
short wall
long wall
Total Qty

sqm
"
"
"
"
"
"
"
"

1
1
1
1
1
1
1
1
1

Present Qty to be Paid


Tender Qty
Tender Rate

1
2
2
2
2
2
2
2
2

3.35
3.70
3.60
5.90
5.90
1.65
1.55
5.20
5.20

34.17
1264.00
563.81

cum
sqm
Rs

0.45
0.40
0.60
0.40
0.60
0.40
0.60
0.40
0.60

1.51
2.96
4.32
4.72
7.08
1.32
1.86
4.16
6.24
34.17

Providing 18mm thick cement plaster (Outside Walls) in single coat with cement mortar 1:6, to
solid block/brick masonry including rounding off corners whereever required, smooth
rendering,providing and removing scaffolding,including curing, cost and conveyance of all
43 materials, cost of labour and equipment with all lead, lifts, loading, unloading & HOM
Chargesand all other incidental charges required for successful completion of work as per
approved specification, designs, drawings etc,. complete and directions of the Engineer in-charge
of the work
v

Terrace Floor
Admin Block NE Side (Side Wall)
Transformer wall (Dormetry NE Side)
DG Wall (Dormetry NE Side)

sqm
"
"
"
"

1
1
1
1
1

2
2
2
2
2

3.35
3.60
5.90
1.55
5.20

22.52
924.00
123.07

cum
sqm
Rs

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

8.90
8.30
8.90
25.30
3.30
30.00
2.00
8.00
45.60
5.00
1.70
30.00
23.00
24.40
16.90
10.50
19.50
25.30
4.15
1.60
16.30

0.45
0.60
0.60
0.60
0.60

3.02
4.32
7.08
1.86
6.24
22.52

2.75
2.48
5.00
4.50
4.93
4.50
6.60
5.03
4.60
8.23
5.85
5.70
5.70
9.85
8.30
4.70
4.70
6.15
1.70
1.90
2.80

24.48
20.54
44.50
113.85
16.25
135.00
13.20
40.20
209.76
41.13
9.95
171.00
131.10
240.34
140.27
49.35
91.65
155.60
7.06
3.04
45.64

Total Qty
Present Qty to be Paid
Tender Qty
Tender Rate
EIRL 3
10 Cobble Stone
Hostel Portica

Hostel side to Cantten (S/S to N/S)


Canteen E/S Steps
Hostel Canteen Back W/S to E/S
Hostel N/S parking side
Hostel Back NW side
Hostel back side E/S
Hostel Back SE side
Hostel S/S parking side
Hostel S/S
Canteen and dormetry fornt side
Canteen S/S
Canteen E/S
Canteen right side
Canteen W/S
Canteen W/S near steps
Canteen N/S

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Asst. Exce Engineer


Contractor

Asst. Engineer

Page 3 of 7

Total Qty

Sqm
Sqm

13.90

4.60

63.94
1767.83

Asst. Exce Engineer


Contractor

Asst. Engineer

Page 4 of 7

EIRL 3
11 SDBC 40 mm
laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation
cum
Main Road of CH: 0.0 to 25.0m
1
1
25.00
7.50
0.04
7.50
cum
Main Road of CH: 25.0 to 50.0m
1
1
25.00
7.50
0.04
7.50
cum
Main Road of CH: 50.0 to 75.0m
1
1
25.00
7.50
0.04
7.50
cum
Main Road of CH: 75.0 to 100.0m
1
1
25.00
7.50
0.04
7.50
cum
Main Road of CH: 100.0 to 125.0m
1
1
25.00
7.50
0.04
7.50
cum
Main Road of CH: 125.0 to 150.0m
1
1
25.00
8.00
0.04
8.00
cum
Main Road of CH: 150.0 to 175.0m
1
1
25.00
8.00
0.04
8.00
cum
Main Road of CH: 175.0 to 200.0m
1
1
25.00
8.00
0.04
8.00
cum
Main Road of CH: 200.0 to 225.0m
1
1
25.00
8.00
0.04
8.00
cum
Main Road of CH: 225.0 to 240.0m
1
1
15.00
8.00
0.04
4.80
Admin Portica Road area W/S to E/S
Cum 1
1
38.00
7.50
11.40
0.04
Admin Arch Portica side S/S to N/S
Cum 1
1
36.00
7.50
10.80
0.04
Admin Back Side W/S to E/S
Cum 1
1
24.50
7.00
6.86
0.04
Admin Arch Portica Side
Cum 1
1
10.00
5.00
2.00
0.04
Admin Back ramp side
cum
1
1
8.60
8.80
0.04
3.03
Deduction Admin Portica area
Cum -1
1
10.95
3.80
0.04
-1.66
Total Qty
Cum
106.72
cum
2668.07
10 Tack coat
cum
213.45
12 BM
2

KSRRB M400-17 Providing laying, spreading and compacting graded stones aggregate to wet mix
cum
Main Road of CH: 0.0 to 25.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 25.0 to 50.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 50.0 to 75.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 75.0 to 100.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 100.0 to 125.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 125.0 to 150.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 150.0 to 175.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 175.0 to 200.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 200.0 to 225.0m
1
1
25.00
8.00
0.2
40.00
cum
Main Road of CH: 225.0 to 240.0m
1
1
15.00
8.00
0.2
24.00
Admin Portica Road area W/S to E/S
Cum 1
1
38.00
7.50
57.00
0.2
Admin Arch Portica side S/S to N/S
Cum 1
1
36.00
8.50
61.20
0.2
Admin Back Side W/S to E/S
Cum 1
1
24.50
7.00
34.30
0.2
Admin Arch Portica Side
Cum 1
1
10.00
5.00
10.00
0.2
Arch Portion
cum
1
1
13.00
8.60
0.2
22.36
cum
1
0.5
3.90
3.60
0.2
1.40
Near Gate
cum
1
1
12.30
7.00
0.2
17.22
Admin Back ramp side
cum
1
1
8.60
8.80
0.2
15.14
Total Qty
Cum
602.62

95 concrete
Admin Portica area
Arch Portion
Near Gate
total qty

Cum

11.00

7.50

cum
cum
cum
Cum

1
1
1

1
0.5
1

13.00
3.90
12.30

8.60
3.60
7.00

sqm
sqm
sqm

1
1

8
8

1.50
2.00

0.50
0.50

sqm

3.14

5.20

0.2
0.2
0.2
0.2

16.50
22.36
1.40
17.22
57.48

84 grill wrok

total

6.00
8.00
14.00
280.00
500.00

84 soak pit channel

Eirl 2
soak pit truss

5.20

21.23

Asst. Exce Engineer


Contractor

Asst. Engineer

Page 5 of 7

424.53

Eirl 1
ACP board
total qty

sqm
sqm
sqm

1
1

1
1

20.00
10.00

0.60
0.60

cum
Cum

1
1

1
1

12.30
10.95

7.00
3.80

cum
cum
Cum

1
1

1
1

10.00
7.20

8.45
3.00

12.00
6.00
18.00

25 oct conc dtls


95
Near Gate
Admin Portica area
Arch Portion
Total Qty

0.20
0.20
0.20
0.20

17.22
8.32
16.90
4.32
46.76

Asst. Exce Engineer


Contractor

Asst. Engineer

Name of work: Construction of Traffic Training Institute & Road Institute at Thanisandra, Bangalore

Pre measurement
Description

Dia

NOS

C/L

08 mm

10 mm

#REF!

Description
Admin Block Cellar Sump R/S
Side Wall Vertical rod
Distribution
Bed
L rod
Sump Top Roof
Main rod
Distribution
Top extra rod
Total

Dia

NOS

C/L

12
12
10
10
12
12
10
10

2
2
2
2
1
1
2
2

22
22
14
14
22
20
20
22

2.15
2.15
2.65
2.45
2.45
2.65
1.50
1.50

12
12
12

1
1
1

18
18
18

2.50
2.50
1.00

10mm
12mm

08 mm

10
8
Total

1
1

2000
10

16 mm

20 mm

25 mm

32 mm

16 mm

20 mm

25 mm

32 mm

#REF!

10 mm

12 mm
94.60
94.60

74.20
68.60
53.90
53.00
60.00
66.00

268.80
404.10

0.62
0.89

1.90
300.00

3000.00

268.80
Kg/Rmtr
Kg/Rmtr

Admin Block Cellar Sump L/S

Drain
U bars
Distribution

12 mm

3800.00
3000.00

3800.00

45.00
45.00
18.00
404.10
166.66
359.65
526.31
526.31
1052.61
10.53 Qtl

8 mm
10mm

6 0.75
6.96969697 *75

3000.00
3800.00

0.39
0.62

Kg/Rmtr
Kg/Rmtr

1170.00
2356.00
3526.00
35.26 Qtl

45.79 Qtl

Вам также может понравиться