Summary Report
2013 Trading Week 16: 08-14 April 2013
MARKET HIGHLIGHTS
Tight supply conditions still manifested throughout the week, particularly during the middle of the week, given the high de mand requirement
observed in Luzon.
The systems hourly aggregate energy offers peaked at a level of 9,723 MW (1400H, 08 April 2013), whereas the systems ex -ante demand
reached a high of 9,327 MW (1400H, 10 April 2013), which is the highest to date. The same hour also reflected the highest ac tual system demand
recorded at 9,435 MW, by far the highest for the year, largely because Luzon had a demand requirement of 8,014 MW during this period.
Although high prices often cleared the market during the peak demand periods of the week, the price levels were lower as op posed to the previous
week, resulting in a lower system-wide hourly load-weighted average price (LWAP) of PhP 5,970/MWh. It ranged from a low of PhP 1,622/MWh
(0700H, 14 April 2013) to a high of PhP 30,926/MWh (1600H, 08 April 2013).
On a regional perspective, the hourly LWAP reached highs of PhP 24,877/MWh (1100H, 10 April 2013) and PhP 64,934/MWh (1600H, 08 April
2013) in Luzon and the Visayas, respectively. The significantly high regional Visayas LWAP of PhP 64,934/MWh resulted from t he clearing of a
coal-fired plant in Cebu as a result of the tight supply conditions on 08 April 2013. Although the same price set was initial ly reflected in Luzon
during this hour, a congestion-related pricing error notice was issued in Luzon because of network congestion at the Bauang -BPPC 230 kV line,
hence, its prices were replaced by prices derived through the Price Substitution Methodology (PSM) for congestion.
The transfer capacity of the 350 kV HVDC link from the Visayas to Luzon was still limited up to 200 MW because of the maint enance activities at its
converter station, resulting in occasional price separations between the Luzon and Visayas grids, most of which occurred duri ng off-peak demand
periods.
The number of must-run units (MRUs) was still significant during the week most of which were designated for the commercial operation
requirements of Petron and Therma Mobile (TMO). However, some generating plants in Luzon were utilized as MRUs because of in adequate
reserve levels from 10-12 April 2013 as a result of the high demand requirement in the grid. As with the previous week, no MR Us were utilized in
the Visayas this week.
Price separations were observed within the Luzon grid in some trading intervals during the week because of congestions at t he Bauang-BPPC
230 kV line, Amadeo-Calaca 230 kV line, Calauan-Makban 230 kV line, or at the Dasmarias 500/230 kV Substation. In the Visayas, congestions
only occurred at the Negros-Panay 138 kV submarine cables.
MAX
RTD DEMAND, MW
AVE
MIN
MAX
OFFER
AVAILABLE SUPPLY
SYSTEM RTD
12000
AVE
Apr-08
9,042
9,723
9,337
6,330
9,183
7,955
Apr-09
9,102
9,429
9,302
6,431
8,617
7,675
Apr-10
8,898
9,469
9,180
6,388
9,327
8,025
Apr-11
8,450
9,248
8,798
6,534
9,193
8,020
Apr-12
8,400
9,215
8,823
6,366
9,212
7,962
Apr-13
8,299
9,038
8,772
6,469
8,327
7,494
Apr-14
8,882
9,250
9,080
5,901
8,480
7,266
8,299
9,723
9,042
5,901
9,327
7,771
10000
MW
OFFER, MW
DATE
8000
6000
4000
SYSTEM RTD
SYSTEM ACTUAL
12000
MINIMUM
MAXIMUM
MAPE
Apr-08
0.09
2.28
0.66
Apr-09
0.01
2.13
0.83
Apr-10
0.01
1.94
0.79
Apr-11
0.03
1.93
0.72
Apr-12
0.06
2.16
0.67
Apr-13
0.04
2.37
0.87
Apr-14
0.03
2.00
0.83
0.01
2.37
0.77
10000
MW
DATE
8000
6000
4000
COAL
DIESEL/OIL
2.8%
GEO
HYDRO
NAT GAS
DIESEL /
OIL
WIND AND
BIO
Apr-08
49.1
14.3
4.1
29.3
3.3
Apr-09
51.4
14.5
3.2
29.7
1.1
0.1
Apr-10
48.9
14.2
3.6
28.9
4.3
0.1
Apr-11
48.4
14.2
3.2
29.0
5.1
0.2
Apr-12
48.8
14.3
3.5
29.2
4.0
0.2
Apr-13
51.0
14.4
3.3
30.8
0.5
0.1
Apr-14
50.9
15.6
3.6
29.3
0.5
49.7
14.5
3.5
29.5
2.8
0.1
NAT GAS
29.5%
COAL
49.7%
HYDRO
3.5%
GEO
14.5%
GEO
HYDRO
NAT GAS
WIND AND
BIO
Apr-08
45.4
12.2
3.9
29.1
9.3
Apr-09
46.2
12.3
3.5
29.2
8.8
0.1
Apr-10
46.9
12.6
3.7
29.6
7.2
0.1
Apr-11
47.8
13.0
3.5
28.0
7.6
0.1
Apr-12
47.8
13.0
3.9
28.2
7.0
0.1
Apr-13
47.6
13.0
3.5
28.1
7.8
0.1
Apr-14
46.8
12.7
3.3
29.9
7.2
46.9
12.7
3.6
28.9
7.9
0.1
HVDC FLOW
OTHERS
NAT GAS
GEO
DIESEL/OIL
HYDRO
COAL
10000
8000
MW
DATE
12000
DIESEL /
OIL
6000
4000
2000
1200
RTD
DATE
NO FLOW
VL
LV
NO FLOW
VL
LUZON-TO-VISAYAS
VISAYAS-TO-LUZON
ACTUAL
1000
LV
800
Apr-08
100.0
100.0
Apr-09
100.0
100.0
Apr-10
100.0
100.0
Apr-11
100.0
4.2
83.3
12.5
Apr-12
95.8
4.2
4.2
83.3
12.5
50.0
-200
Apr-13
54.2
45.8
4.2
45.8
Apr-14
100.0
100.0
92.9
7.1
1.8
87.5
10.7
MW
600
200
-400
70000
RTD
DATE
400
RTD LWAP
RTX LWAP
RTX
60000
MIN
MAX
AVE
MIN
MAX
AVE
50000
2,126
30,926
9,401
2,108
24,982
9,266
Apr-09
2,127
13,709
4,412
2,101
16,702
5,037
Apr-10
1,887
23,658
8,175
1,786
20,475
7,629
Apr-11
2,171
11,529
6,254
2,113
10,961
6,131
Apr-12
2,004
23,691
6,475
1,998
22,678
5,854
Apr-13
2,055
8,640
2,906
1,994
8,625
2,874
10000
Apr-14
1,622
14,308
3,699
1,707
11,077
3,499
1,622
30,926
5,970
1,707
24,982
5,818
40000
30000
20000
100
Apr-08
70000
RTX
LUZON
VISAYAS
60000
80
PERCENT OF TIME
50000
60
40
40000
30000
20000
20
10000
0
0 and Below
0 - 2000
8000 10000
Above
10000
RTD, PhP/MWh
DATE
MIN
MAX
RTX, PhP/MWh
AVE
MIN
MAX
RTD LWAP
RTX LWAP
70000
AVE
60000
Apr-08
2,123
24,869
9,108
2,191
26,183
9,263
Apr-09
2,217
13,709
4,403
2,218
16,730
5,046
Apr-10
1,999
24,877
8,273
1,889
21,000
7,762
Apr-11
2,170
11,026
6,131
2,110
11,026
6,147
Apr-12
2,046
24,819
6,492
2,046
23,606
5,914
Apr-13
2,050
8,611
2,871
1,990
8,611
2,833
10000
Apr-14
1,701
14,308
3,704
1,803
11,000
3,503
1,701
24,877
5,923
1,803
26,183
5,850
DATE
50000
40000
30000
20000
RTX, PhP/MWh
RTX LWAP
70000
MIN
MAX
AVE
MIN
MAX
AVE
60000
Apr-08
2,142
64,934
11,041
1,608
23,027
9,283
Apr-09
1,325
13,709
4,467
1,323
16,553
4,981
Apr-10
1,156
23,537
7,630
1,160
17,517
6,883
Apr-11
2,179
16,255
6,945
2,128
10,589
6,040
Apr-12
1,762
21,487
6,381
1,723
17,652
5,526
Apr-13
2,082
8,793
3,093
2,016
8,695
3,087
10000
Apr-14
1,177
14,308
3,674
1,178
11,475
3,475
1,156
64,934
6,229
1,160
23,027
5,644
LUZON
50000
40000
30000
20000
VISAYAS
24
Apr-09
24
Apr-10
24
Apr-11
24
Apr-12
24
Apr-13
24
24
168
Apr-14
TOTAL
Apr-08
VISAYAS
DATE
TOTAL
Apr-08
27
24
Apr-08
Apr-09
25
25
Apr-09
Apr-10
41
16
24
Apr-10
Apr-11
49
24
24
Apr-11
Apr-12
51
21
30
Apr-12
Apr-13
30
30
Apr-13
Apr-14
24
24
Apr-14
247
61
181
Note:
THERMAL
RESERVE
VOLTAGE
COMM/REG
OTHERS
RTD
AP
VALID
RTX
PEN
VALID
DATE
RTD
AP
MRR
VALID
RTX
PEN
VALID
MRR
Apr-08
10
14
20
Apr-08
21
22
Apr-09
12
12
24
Apr-09
15
24
Apr-10
10
14
22
Apr-10
22
23
Apr-11
11
13
23
Apr-11
24
24
Apr-12
10
14
24
Apr-12
23
24
Apr-13
13
11
24
Apr-13
23
24
Apr-14
10
14
22
Apr-14
11
13
24
76
92
159
139
29
165
AP
VALID
PEN/MRR
DATE
UGEN
VOLL
CONT
BC
PSM
ERR
DATE
UGEN
VOLL
CONT
BC
PSM
ERR
Apr-08
14
Apr-08
Apr-09
10
Apr-09
Apr-10
14
Apr-10
Apr-11
13
Apr-11
Apr-12
14
Apr-12
Apr-13
10
Apr-13
Apr-14
14
Apr-14
13
78
31
26
UGEN
CONT
BC
PSM
ERR
DATE
UGEN
VOLL
CONT
BC
PSM
ERR
Apr-08
Apr-08
Apr-09
Apr-09
Apr-10
Apr-10
Apr-11
Apr-11
Apr-12
Apr-12
Apr-13
Apr-13
Apr-14
Apr-14
UGEN
Under-generation
BC
VOLL
PSM
CONT
Contingency CVC
ERR