Project : HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT TR FOR HST MICROTURBINE HOUSING

Document Number HST-A-TS-M-TR-0020

Rev F01

Page 1 of 24

Thang Long Joint Operating Company

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT
SPECIFICATION TECHNICAL REQUISITION FOR HST MICROTURBINE GENERATOR HOUSING

Prepared By:

PetroVietnam Technical Services Corporation

This cover page is a total record of all the revisions of this document identified by number and title. Each of the pages that follow this cover page in this document records only the latest revision for that page. This document has been prepared on behalf of and for the exclusive use of PTSC/TLJOC and is subject to and issue in accordance with the agreement between PTSC/TLJOC and MARINE ENGINEERING SERVICES PTE LTD (MESPL). MESPL accepts no liability or responsibility whatsoever for it in respect of any use of or reliance upon this document by any third party.

F01 A01 REV

1617-Dec-13 04-Dec-13 DATE

NQ NQ BY

DDM/NDK DDM/NDK CHKD

THS THS PTSC M&CS APPV TLJOCS APPV

ISSUED FOR REVIEW ISSUED FOR IDC DESCRIPTION

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING F01

Page 2 of 24

CONTENTS
1. 2. 3. TECHNICAL DATA ...................................................................................................................................... 3 SCOPE OF SUPPLY FOR EQUIPMENT AND MATERIAL ................................................................................. 5 ITEM LISTING............................................................................................................................................. 7

APPENDIX A - INSPECTION AND TEST REQUIREMENTS ..................................................................................... 8 APPENDIX B - SUPPLIER DEVIATION FORM ....................................................................................................... 9 APPENDIX C - VENDOR DATA REQUIREMENT LIST - VDRL ............................................................................... 10

Formatted: Check spelling and grammar Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING F01

Page 3 of 24

1.

TECHNICAL DATA
HST-A-TS-M-TR-0020

Technical Requisition No.:

THE SCOPE OF SUPPLY SHALL BE IN ACCORDANCE WITH THE DOCUMENTATION LISTED BELOW : REFERENCE SPECIFICATION / DRAWING NUMBER HST-A-TS-M-SP-0001 HST-A-TS-M-DS-0030 SPEC. / DWG. REV. F01 F01 SPECIFICATION / DRAWING TITLE Specification for Microturbine Generator Housing Datasheet for MTG Housing Louver

GEN-A-TS-P-SP-0007 GEN-A-TS-P-SP-0004 GEN-0-00-S-SP-0002 GEN-0-00-S-SP-0003 GEN-0-00-S-DB-1001 GEN-0-00-S-SP-0001 GEN-0-00-S-SP-0005 GEN-A-TS-M-SP-0007 HST-A-TS-V-DB-0001

G01 G01 G01 G01 G01 G01 G01 G01 G02

Painting and Protective Coating Specification Insulation Specification Welding Procedure and Performance Quality Welding & Fabrication Offshore Structures Structural Basis of Design Structural Steel Material Specification Specification for Structural Skid for Packaged Equipment Specification for Microturbine Generator Safety Basis of Design

HST-A-TS-M-DW-0010-01 to 06 HST-A-TS-P-DW-1001-00 HST-A-TS-P-DW-1008 HST-A-TS-P-DW-1007 HST-A-TS-M-DW-0001-02

F01 G01 G01 G01 G03

GA Drawings for MTG Housing HST - Equipment Layout - Main Deck HST Equipment Layout Elevation View - East HST Equipment Layout Elevation View - South HST Wellhead Platform Mechanical Handling Layout Main Deck Sheet 2

HSTD-TS-M-2004 Microturbine Generator Package Vendor Data: D01-001-Microturbine O&I Drawings (01G-8101)-D-1 D01-002-Fire & Gas System O&I (01G-8101)-F-1 D01-003-Hazloc Controller O&I (01PN-8101A)-D-1 D01-005-Microturbine O&I Drawings (Exhaust)-A-1 D01-006-Microturbine O&I Drawings (Rainhood)-A-1 D01-007-Fire & Gas System O&I (CO2 Cabinet)-A-1 Engine Removal Procedure

(APPENDIX A) GEN-A-GE-Q-PR-0001 GEN-A-GE-Q-PR-0002 GEN-A-GE-Q-PR-0003 GEN-A-GE-Q-PR-0004 GEN-A-GE-Q-PR-0005

G01 G01 G01 G01 G01

Inspection and Test Requirements Project Vendor Surveillance Plan for Bulk Material Specification General Quality Requirements Specification Vendor Data Requirement Specification Identification, Traceability, and Certification Requirement Specification Storage and Handling of Equipment and Materials Specification Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING F01
F01 G01 G01

Page 4 of 24

GEN-A-GE-Q-PR-0006 GEN-A-GE-Q-PR-0007 GEN-A-GE-Q-PR-0008

Master Vendor Data Requirement List (VDRL) Specification Equipment Protection and Preservation Project Vendor Surveillance Plan for Tagged Equipment Specification

(APPENDIX C)

Vendor Data Requirement List

The revision of the above document/s may be updated subjected to Company's requirement. Vendor is required to check/request for the latest copies from the Contractor.

Formatted: Check spelling and grammar Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING F01

Page 5 of 24

2.

SCOPE OF SUPPLY FOR EQUIPMENT AND MATERI AL


HST-A-TS-M-TR-0020 Technical Requisition for HST Microturbine Generator Housing BLK 15-2 Development HST WHSP, Offshore Vietnam. Refer Page 3. Manufacture, test and supply of Microturbine Generator Housing

Technical Requisition No.: Title or Description : Location of Use : Reference Drawings and / or Specification : Scope of Supply :

ITEM 1.0 1.01 1.02 1.03

QTY

DESCRIPTION Housing for HST Microturbine Generator Mechanical and structural design of the housing, including all attached components (doors, louvers, etc.) Heat insulation for all roof and walls panel Calculation and sizing for all louvers to ensure proper operation of Microturbine with requirements of airflow, water ingress protection, temperature and pressure drop to be strictly met. Development of shop drawings for fabrication and erection, including interfacing with PURCHASERs design staff (on various aspects of Mechanical, Structural) and interpretation on developing shop fabrication drawings and documents. Procurement of all the housing components including doors, louvers, etc., per approved design/drawings. This procurement by VENDOR shall include all the required welding consumables and related items like jigs/fixtures etc., to assemble all the loose supplies. Shop fabrication, assembly, heat-treatment (where required), testing and certifications of all other shop fabricated components. Progress reporting on all procurement, fabrication and erection activities. Guarantee and warranty complete for the package and supplied items Lifting lugs for housing 2 switchable on/off lights. One at the front, the other at the rear of MTG Relocate F&G lamp and horn to outside of the housing Installation bolting set spare (10%)Start-up and commissioning spares (200% Washers, 10% Boltings).
Formatted: Font: Font color: Text 1 Formatted: Font: Font color: Text 1

1.04

1.05

1.06 1.07 1.08 1.09 1.10 1.11 1.120

Formatted: Left, Indent: Left: 0", First line: 0" Formatted: Font: 10 pt, Font color: Text 1 Formatted Table Formatted: Font color: Text 1 Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING F01

Page 6 of 24

ITEM

QTY

DESCRIPTION Surface preparation, painting, packing, freight, transport, sea fastening secure, delivery to vesselSurface preparation, painting, packing, freight, transport, delivery to site offshore Offshore installation Testing & Commissioning Guarantee and warranty complete for the package and supplied items All the identified certification and issue of certificate of conformance Complete inspection, QA/QC and testing requirements including performance acceptance test

Formatted: Space Before: 12 pt, After: 0 p

2.0

3.0 43.0 4.0 5.0 6.0

The HST Microturbine Generator Housing shall be provided in accordance with the Purchaser's documents as listed on Technical Data. The VENDOR shall be responsible to submit, together with the Tender, a list of deviations or exceptions to this Specification, referenced Project Datasheets and Drawings. In the absence of any exceptions, it will be construed that the VENDOR fully complies with this Specification. The scope of supply for the Housing is further detailed in the Project Specification and Drawings. The PURCHASER shall indicate the package envelope and interface points in the bid documents, and no changes shall be made unless by mutual agreement. The equipment shall be delivered in the minimum practical number of assemblies and to suit transportation and receipt at site The Vendor must provide all information requested, including a list of any exceptions and nonconformities to the specifications listed herein.

Formatted: Check spelling and grammar Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING F01

Page 7 of 24

3.

ITEM LISTING
HST-A-TS-M-TR-0020

Technical Requisition No.:

THE SCOPE OF SUPPLY SHALL BE IN ACCORDANCE WITH THE ITEMS LISTED BELOW : ITEM No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Formatted: Check spelling and grammar Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing TAG No. DESCRIPTION HST Microturbine Generator Housing SUPPLIER QTY 1

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING F01

Page 8 of 24

APPENDIX A - INSPECTION AND TEST REQUIREMENTS


RFQ Document No.: Technical Requisition No.: Equipment Description: Rev.: Tag No.: HST-A-TS-M-TR-0020 HST Microturbine Housing F01

Item No. 1 2 3a

Description / Inspection Activity Approval of Vendor Data Schedule (VDS) Approval of Vendor Documentation Dimensional Checks, General Appearance, Workmanship Painting Inspection Inspection / NDT / Testing Preparation for Shipment / Inspection Release Final Documentation (IOM / MDR)

Inspection Code R R W, H M, H R, H H R

Comments

To Vendor Supplied Approved FAT Procedures Refer to GEN-0-TS-M-SP-0002 for further details

4 5 6 7

NOTES: 1. Inspection and testing requirements shall be compliant with the Specification for HST
Microturbine Generator Housing HST-A-TS-M-SP-0001.

2. The items listed above are the minimum requirements for the ITR. Vendor shall
include these items inside their ITP. This shall be submitted as part of bidding documents.

INSPECTION CODES: H = Hold W = Witness Point R = Review Point M = Monitor Point

Formatted: Check spelling and grammar Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING F01

Page 9 of 24

APPENDIX B - SUPPLIER DEVIATION FORM

APPENDIX B - SUPPLIER DEVIATION FORM


(*) TO BE COMPLETED BY SUPPLIER

SUPPLIER NAME: * P.O. NO.: * DESCRIPTION: *

REQUEST NO.: * Drawing/ Spec.No: * TR NO.: HST-A-TS-M-TR-0020 EQPT TAG NO.:

DESCRIPTION OF DEVIATION : ( List of attachment to support request )

Effect on delivery: a) If deviation granted:Number of week/Day: (OR) N/A b) If not granted:Number of week/Day: (OR) N/A

SUPPLIER REP.NAME:

SIGN:

DATE :

TO BE COMPLETED BY PTSC AND TLJOC TECHNICAL RESPONSE (TO BE FILLED BY LEAD DISCIPLINE/REQUISITION ENGINEER)

FACTORS AFFECTED: CODE COMPLIANCE MATERIAL WEIGHT MAINTENANCE DESIGN COST PERFORMANCE APPROVAL STATUS: BACK CHARGEABLE TO SUPPLIER ACCEPTED REQUISITION ENGINEER NAME: REVIEWED BY

3 PARTY APPROVAL INTER-CHANGEABILITY RELIABILITY ACCEPTED WITH COMMENTS SIGN:

RD

LIFE OF ITEM OPERATION SAFETY REJECTED DATE :

PTSC (SIGN/DATE)

TLJOC (SIGN/DATE)

LEAD DISCIPLINE ENGINEER QA ENGINEER APPROVED BY ENGINEERING MANAGER ( SIGN/DATE) :


IMPORTANT NOTE TO SUPPLIER :

This form is intended to control post-order deviations and/or post-approval revisions and/or to request concessions. Specifications issued with P.O. and approved KEY SUPPLIER Data are treated as "FROZEN" by both parties, supplier and buyer. POST-ORDER DEVIATIONS OR POST-APPROVAL REVISIONS INITIATED BY SUPPLIER, NEED SPECIFIC APPROVAL. Under no circumstances vendor shall revise frozen documents/drawings without receipt of prior approval on this form. DISTRIBUTION: Please Tick () in Appropriate box
Formatted: Check spelling and grammar Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 10 of 24

APPENDIX C - VENDOR DATA REQUIREMENT LIST - VDRL


MASTER VDRL ASSIGNMENT
C - Calculations D - Drawings E - Equipment Performance Data G - General M - Operations and Maintenance P - Procedures R - Records and Certificates (NOTE 2) Each category has an "alpha" code identifier and individual data items are numbered consecutively within each category. Recommended selections of required data submittals (i.e., "Q"--with quotation, "A"--approval, "C"--certified and "R"--record) for project use are provided below with the standard data codes and data descriptions/definitions.

Notes: 1. Vendor shall be responsible for liaising with 3 party Certifying Authority with regards to the requirement for certified documents, in order to achieve full certification of this package. Purchaser will not be indicating a full list of C requirements in this VDRL 2. Bidder shall fully comply to the requirements as per latest revision of Master Vendor Data Requirement list (VDRL) specification, Doc. No. GEN-A-GE-Q-PR-0006.
rd

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01
RECOMMENDED DATA SUBMITTALS A C

Page 11 of 24

DATA CODE

REMARKS

DATA DESCRIPTION/DEFINITION C CALCULATIONS

C3

STRUCTURAL STEEL CALCULATIONS Calculations shall determine that the structure and any lifting aids are suitable for all phases of lifting, transportation, installation and operation without overstressing any member. This shall include fatigue calculations, if applicable.

A X weeks after PO C X weeks after Approval

C10 C16

WIND LOAD CALCULATIONS

A X weeks after PO C X weeks after Approval A X weeks after PO C X weeks after Approval

4 ACOUSTIC ENCLOSURE VENTILATION SYSTEM CALCULATIONS Calculation of air flow requirements and power requirement to substantiate design and sizing criteria. Taking into account the following: a.) Air mass flows b.) Inlet and exhaust pressure drops c.) Temperature rise, heat loads and temperature gradients d.) Filtration requirements e.) Back pressure at worst wind conditions f.) Fire protection system requirements for extinguishing medium concentrations, etc. Drawing of system to be provided. Full details of all assumptions shall be stated

A X weeks after PO C29 INTAKE AND EXHAUST LOUVERS SIZING CALCULATIONS 4 2 C X weeks after Approval
Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 12 of 24

DATA CODE

DATA DESCRIPTION/DEFINITION D DRAWINGS OUTLINE DRAWINGS Plan/elevation drawings with overall dimensions, connection dimensions and ratings, and required clearances for assembly, operation, and maintenance access.

RECOMMENDED DATA SUBMITTALS A C

REMARKS

D1

Q Typically w/ Quote A X weeks after PO C X weeks after Approval

D2

SHOP DETAIL DRAWINGS 6 2 2

A X weeks after PO C X weeks after Approval Q Typically w/ Quote A X weeks after PO C X weeks after Approval A X weeks after PO C X weeks after Approval

D3

EQUIPMENT ARRANGEMENT DRAWINGS Relative dimensioned location of VENDOR supplied components.

D4

ASSEMBLY DRAWINGS Relative location and dimensions of components and subassemblies required for field assembly.

D5

EXPLODED VIEW DRAWINGS Show parts of an assembly, separated, but in proper relative position in relation to each other

2 A X weeks after PO C X weeks after Approval

D6

SUPPORT LOADING DIAGRAM Identify/show distribution of loads and moments on support structures. Show maximum, design, and normal operating conditions.

Q Typically w/ Quote A X weeks after PO


Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01
4 2

Page 13 of 24
A X weeks after PO C X weeks after Approval

D7

ANCHOR BOLT LOCATION DRAWINGS Show size and dimensioned locations of anchor/ support bolts to equipment centerlines in three planes. Include bolt length and projection and detail of installation.

D9

FLOOR PLAN DRAWINGS Show location of conduit areas, ventilation ducts, plumbing runs, and other similar data with dimensions

Q Typically w/ Quote A X weeks after PO

D18

DETAIL DRAWINGS

Q Typically w/ Quote A X weeks after PO

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01
RECOMMENDED DATA SUBMITTALS A C

Page 14 of 24

DATA CODE

REMARKS

DATA DESCRIPTION/DEFINITION G GENERAL

G1

VENDOR DATA SCHEDULE Itemized list of VENDOR data with document titles and numbers referenced to COMPANYS VDRL data item code numbers; include submittal dates/timing for issue. Preliminary List to be submitted with Proposal. FABRICATION/PRODUCTION SCHEDULE

Q Typically w/ Quote A X weeks after PO Submit with quote and monthly after PO

G2

Q Typically w/ Quote A X weeks after PO R X weeks after PO R X weeks after PO

G3

ACKNOWLEDGEMENT OF PURCHASE ORDER VENDOR shall provide a signed acknowledgement copy of the formal Purchase Order and all Change Orders as a condition of payment. BILL OF INSTALLATION/ASSEMBLY MATERIALS List of items, fasteners, doors, louvers, bearings, and subassemblies (with quantities and material specifications) required for field assembly/ installation. Identify items supplied. X 6

G4

Q Typically w/ Quote A X weeks after PO

G6

EQUIPMENT WEIGHTS AND CENTER OF GRAVITY Empty, operating and shipping weight. The center of gravity shall also be defined as well as projected allowances. Estimated weight and max. not to exceed weight submitted with proposal

Q Typically w/ Quote A X weeks after PO C X weeks after Approval

G8

COMPLETED VENDORS DATA SHEETS

Q Typically w/ Quote
Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 15 of 24
A X weeks after PO

Detail characteristics of completed item (if not covered under G7 above). G9 CATALOG DATA X 4

Q Typically w/ Quote A X weeks after PO A X weeks after PO

G12

BOLT / FASTENER AND GASKET SCHEDULES Bill of material for bolts / fasteners and gaskets.

G13

ASSEMBLY/DISASSEMBLY SIZES AND WEIGHTS Overall dimensions/weights of main components to be moved in assembly/ disassembly for construction or major overhaul.

Q-Typically w/ Quote A X weeks after PO C X weeks after Approval Q Typically w/ Quote

G21

VENDOR EXPERIENCE LIST VENDOR to provide equipment model number, time in service, user contact name and contact number for all equipment of similar size and rating.

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01
RECOMMENDED DATA SUBMITTALS A C

Page 16 of 24

DATA CODE

REMARKS

DATA DESCRIPTION/DEFINITION M OPERATIONS AND MAINTENANCE DATA OPERATING INSTRUCTIONS Instructions for pre-commissioning, startup, normal operation, off-design operation, emergency operation, and shutdown.

M1

12

A X weeks after PO

M3

PRICED, RECOMMENDED COMMISSIONING

SPARE

PARTS

FOR

STARTUP/ X 2 2

For commissioning spares and for special maintenance/ handling tools. Include wearing parts such as bushings, seals, gaskets which need replacement after startup, test and shutdown prior to production start. Include gaskets and other similar components replaced after testing.

Q Typically w/ Quote A X weeks after PO R X weeks after PO

M4

PRICED, RECOMMENDED SPARE PARTS FOR TWO (2) YEARS OPERATION

Q Typically w/ Quote A X weeks after PO R X weeks after PO Q Typically w/ Quote A X weeks after PO R X weeks after PO Q Typically w/ Quote A X weeks after PO R X weeks after PO

M5

MINIMUM SPECIFIED OPERATING SPARES X 2 2

M6

SPECIFIED CAPITAL SPARES X 2 2

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 17 of 24

DATA CODE

DATA DESCRIPTION/DEFINITION P PROCEDURES QUALITY CONTROL PROCEDURES VENDORS Quality Plan/Procedure shall be job specific and shall clearly identify all Quality Control activities performed by the VENDOR including all holds points and witness points for COMPANY to comment and indicate those activities to be witnessed by COMPANY Surveillance Representative.

RECOMMENDED DATA SUBMITTALS A C

REMARKS

P1

Q Typically w/ Quote A X weeks after PO

P3

NON-DESTRUCTIVE TEST PROCEDURES Provide procedures as applicable for radiographic, dye penetrant, magnetic particle, or ultrasonic testing.

A X weeks after PO C X weeks after Approval

P4

WELDING PROCEDURE FOR SHOP, FIELD AND REPAIR WELDS, WELDER QUALIFICATION FACTORY/FIELD ACCEPTANCE TEST PROCEDURE VENDOR and SUB-VENDOR procedure to determine that specified equipment components and total package operates according to purchase requirements. Including all major components to be tested and package testing.

4 4

2 2

A X weeks after PO C X weeks after Approval A X weeks after PO C X weeks after Approval

P5

P7

SURFACE PREPARATION AND PAINTING PROCEDURE Procedure used for cleaning and preparing surfaces for welding, corrosion protection, and painting.

A X weeks after PO C X weeks after Approval

P8

FIELD SUPPORT RECOMMENDATIONS Procedure for VENDORS recommendation equipment/skid to COMPANYS deck.

4 for supporting

A X weeks after PO C X weeks after Approval


Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 18 of 24

P9

SHIPPING, HANDLING AND STORAGE PROCEDURES For equipment shipped in more than one piece, a schedule is to be submitted which identifies all the major components of the package for use as a Check List at the receiving point to ensure all items have been received. Copy of documents shall accompany shipment. VENDOR to propose techniques. Indicate size of container, number, weight, identification and contents, include detailed preservation procedure detailing inspection periods, materials required, etc. both prior to installation and post installation but prior to commissioning. Any special unpacking / handling requirements shall be stated. Material Safety Data Sheets (MSDS) shall be included. Export Control Compliance Number (ECCN) documents shall be included if applicable for shipment. VENDOR to provide typical packing list with bid proposal.

Q Typically w/ Quote A X weeks after PO R X weeks after PO

P10

INSTALLATION/ERECTION PROCEDURE Detailed description and procedures for installation of equipment to be supplied and to be used at the fabrication site. The following information shall be included: a.) Lifting points b.) Lifting weights c.) Shipping break points for panels and switchboard assemblies d.) Erection match markings e.) Fixing points f.) Leveling procedures g.) Alignment procedures h.) Erection fasteners summary list i.) Details of any special unpacking/handling requirements shall be stated.

A X weeks after PO C X weeks after Approval

P13

QUALITY CONTROL INSPECTION AND TEST PLANS

Q Typically w/ Quote A X weeks after PO C X weeks after Approval R X weeks after PO

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01
4 4 4 2

Page 19 of 24

P19 P21 P22

DIMENSIONAL CHECK PROCEDURES MANUFACTURING PROCEDURE WEIGHT AND CENTER OF GRAVITY CONTROL Procedure for weight and center of gravity estimating, reporting and control.

A X weeks after PO A X weeks after PO A X weeks after PO C X weeks after Approval

P23

POSITIVE MATERIAL IDENTIFICATION PROCEDURE

A X weeks after PO C X weeks after Approval

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 20 of 24

DATA CODE

DATA DESCRIPTION/DEFINITION R RECORDS AND CERTIFICATES MECHANICAL COMPLETION CERTIFICATE

RECOMMENDED DATA SUBMITTALS A C

REMARKS

R1

A X weeks after PO C X weeks after Approval R X weeks before Shipment A X weeks after PO C X weeks after Approval R X weeks before Shipments A X weeks after PO C X weeks after Approval R X weeks before Shipment

R2

CODE COMPLIANCE CERTIFICATE

R8

NAMEPLATE RUBBINGS OR PHOTOGRAPH

R11

PERFORMANCE/ACCEPTANCE TEST REPORT 4 2 After Test A X weeks after PO C X weeks after Approval (R - Not to exceed 1 week after Testing) C X weeks after Approval R X weeks after PO

R19

WELDING ROD CHEMICAL ANALYSIS CERTIFICATE

R20

WELDER CODE QUALIFICATION CERTIFICATE

A X weeks after PO C X weeks after Approval R X weeks after PO A X weeks after PO

R21

WELDING PROCEDURE QUALIFICATION CERTIFICATE

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 21 of 24
C X weeks after Approval R X weeks after PO

R22

INSPECTORS QUALIFICATION CERTIFICATE NON DESTRUCTIVE TESTING

A X weeks after PO C X weeks after Approval R X weeks after PO A X weeks after PO C X weeks after Approval (R - Not to exceed 1 week after Testing) A X weeks after PO C X weeks after Approval (R - Not to exceed 1 week after Heat Treatment) C X weeks after Approval (R - Not to exceed 1 week after Checking) A X weeks after PO C X weeks after Approval (R - Not to exceed 1 week after Checking) A X weeks after PO C X weeks after Approval

R23

TEST RECORDS FOR NONDESTRUCTIVE TESTING Including all radiographic sheets.

After Test

R24

HEAT TREATMENT RECORDS 4 2

After Heat Treatment

R25

DIMENSIONAL CHECK REPORT 2

After Check

R26

SURFACE PREPARATION AND PAINTING REPORTS 4 2

After Check

R27

MATERIAL TEST CERTIFICATES (MILL CERTIFICATES) 4 2

As Required

R29

LIFTING EQUIPMENT TEST CERTIFICATES Required for all: a.) Hoists b.) Cranes c.) Wire ropes

C X weeks after Approval R X weeks after Test

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 22 of 24

d.) Shackles e.) Padeyes R30 POSITIVE MATERIAL IDENTIFICATION DATA 4 2 After Test A X weeks after PO C X weeks after Approval (R - Not to exceed 1 week after Testing)

R40

CHEMICAL COMPOSITION CERTIFICATE

As Required

(R - Not to exceed 1 week after Testing) A X weeks after PO C X weeks after Approval

R50

WELD MAP To be submitted with Weld Procedures. Include welder identification code and WPS number for each structural and process weld.

R54

INSPECTION AND TEST PLAN

Q Typically w/ Quote A X weeks after PO C X weeks after Approval R X weeks after PO Q Typically w/ Quote A X weeks after PO C X weeks after Approval R X weeks before Shipment C X weeks after Testing R X weeks after Testing R X weeks after PO
Formatted: Check spelling and grammar

R59

LIST OF MATERIALS FOR COMPONENTS

R60

NON-CONFORMITY REPORTS

R61

RADIOGRAPHIC INSPECTORS QUALIFICATION CERTIFICATE

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 23 of 24

R62

RADIOGRAPHIC TEST RECORDS After Test

(R - Not to exceed 1 week after Testing) (R - Not to exceed 1 week after Testing) (R - Not to exceed 1 week after Testing)

R63

NON-DESTRUCTIVE INSPECTION RESULTS AND CALIBRATION RECORDS DESTRUCTIVE TEST RESULTS/CERTIFICATES (if applicable)

After Test

R64

After Test

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing

Project

HST FULL FIELD DEVELOPMENT & HSD EARLY PRODUCTION SYSTEM DEVELOPMENT Rev TR FOR HST MICROTURBINE GENERATOR HOUSING A01F01

Page 24 of 24

DATA CODE

DATA DESCRIPTION/DEFINITION DB DATA BOOKS DATA BOOKS Data Book shall compile all design data (DD), fabrication data (FD), and operating and maintenance manuals (OM). DD DESIGN DATA DESIGN DATA Design Data shall compile all calculations (C). FD FABRICATION DATA FABRICATION DATA Fabrication Data shall compile all procedures (P), records (R) , certificates (R), and some required detail drawings (D). OM OPERATING AND MAINTENANCE MANUAL OPERATING AND MAINTENANCE MANUAL Operating and Maintenance Manual shall compile all drawings (D), equipment performance data (E), general document (G), operations and maintenance data (M), and some of required procedures (P).

RECOMMENDED DATA SUBMITTALS A C

REMARKS

DB-1

R X weeks after Shipment

DD-1

R X weeks before shipment

FD-1

R X weeks before shipment

OM-1

R X weeks before shipment

Formatted: Check spelling and grammar

Document1HST-A-TS-M-TR-0020_Rev-F01 TR for Microturbine Generator HousingHST-A-TS-M-TR-0020_Rev-A01 TR for Microturbine GeneratorHousing