POSSIBLE STRATEGIES
Planning 3+5+6+7
Decommissioning 6+7
1. PROCUREMENT !
Procurement is a term which describes the activities undertaken by a client or employer who is seeking to bring about the construction or refurbishment of a building. It is a mechanism which provides a solution to the question: "how do I get my project built? (The Joint Contracts Tribunal Limited, London)
1. PROCUREMENT ! (cont.)
USE SUSTAINABLE PROCUREMENT Sustainable procurement helps ensure value for money and lower operational costs whilst protecting the environment and bringing us wider societal benefits.
Lord de Mauley, Parliamentary Under-Secretary for Resource Management, the Local Environment and Environmental Science (at the Department for Environment, Food and Rural Affairs), 2012, London.
1. PROCUREMENT ! (cont.)
Processes of Sustainable Procurement (based on London Olympic 2012): a. Pre-procurement: Early engagement with the supply chain: communication of opportunities, which allowed identification of best practice as well as innovative products, materials and suppliers; Communication of contract opportunities to potential suppliers. b. Tender Specifications: Developing a comprehensive design brief with sustainability requirements fully integrated. c. Pre-qualification: Use of appropriate selection criteria: it focused on past contractors/suppliers performance but it helped on some aspects of sifting bidders. d. Award Stage: All tenders had a set of award criteria that included sustainability and were evaluated on the basis of most economically advantageous tender (MEAT). The environmental sustainability assessment formed part of the technical evaluation. e. Contract Stage: Contract requirements, including detailed sustainability requirements (may integrate GBI).
(Further reading: London 2012 Olympic and Paralympic Games; The Legacy: Sustainable Procurement for Construction Projects: A Guide)
2. SITE / ENVIRONMENT !
SHIFT of excavation and pre-fabricated part transportation to site from truck to railway.
90% or more avoided truck kilometers (transport of excavation and pre-fabricated parts), reduction of 54 to 67% in Nox-emissions.
3. MATERIAL SELECTION !
USE LOCALLY AVAILABLE:
Building materials, components, and systems found locally or regionally saving energy and resources in transportation to the project site.
Department of Resources Recycling and Recovery (CalRecycle), 2012, & INFORM, Inc., 2012)
4. WASTE PREVENTION !
Design for durability and adaptability:
Ensure a building's maximum ability to accommodate future technological advances and other changing needs.
5. RECYCLING !
Construction waste recycling is the separation and recycling of recoverable waste materials generated during construction and remodeling.
Fact: 8,000 lbs (3,628kg) of waste are typically thrown into the landfill during the construction of a 2,000 square foot (28x72) home.
6. ENERGY !
Energy Efficiency can be maximized by utilizing materials and systems that meet the following criteria:
Materials, components, and systems that help reduce energy consumption in buildings and facilities. Ex.: use LOW VOC (Volatile Organic Compound) Paints.
(Further reading: EPA Energy Star, USA, 2013, & Silicon Valley Home Real Estate Experts Inc., 2013)
(Further reading: United States Office of Solid Waste Agency, Environmental Protection and Emergency, October 2009)
BEFORE
DURING THROUGHOUT
AFTER
22
23
24
6. Innovation (IN):
Innovative design and initiatives that meet the objectives of the GBI.
27
28
29
CONSTRUCTABILITY
Constructability is the capability of a design to be constructed. (from The Construction Management Committee, 1991; by Koskela, 1992). One of a project management technique for reviewing construction processes from start to finish during the design/pre-construction phase. It will identify obstacles before a project is actually built to reduce or prevent error, delays, cost overruns, wastages, etc.. Sustainable construction can be implemented within constructability with better outcomes.
CONSTRUCTABILITY (cont.)
Constructability reviews are easily managed for projects where the contractor is determined beforehand. The preferred contractor is engaged at the first client briefing stage and is involved all the way through the design phases. The contractor is an integral part of all design meetings and reviews all documents, plans, drawings, specifications, tender documents and procurement schedules. Further reading:
R. Mohamad Zin et.al., APSEC-ICCER 2012, 2 4 October 2012, Surabaya, Indonesia. The Institution of Professional Engineers New Zealand Incorporated (IPENZ), Practice Notes: Constructability, 2008.
However it was then decided to go for 90 in height. The purposed building was 12 storey of 12 blocks. There was a saving of RM1.0 Million per block with the overall saving of RM12.0 Million.
LEAN CONSTRUCTION
The word lean was defined by Howell (2001) as Give customers what they want, deliver it instantly with no waste. Generally, construction project based on a cyclic processes. Therefore, the need to identify the wasteful activities in the processes and to make special consideration for them is crucial. Then, compress the cycle time by eliminating nonvalue-adding time (Koskela, 1999). Cycle time includes process time, inspection time, wait time and move time. This concept may assist on sustainable construction objective. (Further reading: Proceedings IGLC-7, Seventh Conference of the International
Group for Lean Construction, University of California, Berkeley, USA, 1999)