IFC Issued for Construction

Jan 31, 2013

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 2 of 15

PIPING SUPPORT STANDARD AND DETAILS Record of Revisions

This specification has been revised as indicated below and described in the revision record on the following page. Please destroy all previous revisions.

Date Revision No.

Description

08-May-12

Issued for Design Issued for construction

07-Dec-12

24-Jan-13

Reissued for construction Changes in this revision are as follows:1) 5CSL- Added saddle support for FRP piping. 2) 5CP - Addition of concrete pad 5CP5, 5CP6, 5CP7, 5CP8. 3) 5FSX8A, B &C- Added new supports for FRP lines. 4) TR- Steam trap assembly revised based on SHE-REVIEW. 5) Span chart revised for FRP lines.

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 3 of 15

PIPING SUPPORT STANDARD AND DETAILS

DISCLAIMER: THIS SPECIFICATION DEVELOPED BY FLUOR DANIEL INDIA PRIVATE LIMITED, IS THE PROPERTY OF BASF INDIA LIMITED AND THIS SPECIFICATION CANNOT BE REPRODUCED, COPIED, DISTRIBUTED DIRECTLY OR INDIRECTLY OR OTHERWISE USED WITHOUT EXPRESS WRITTEN PERMISSION OF BASF INDIA LIMITED FOR ANY PURPOSE OTHER THAN FOR THE PROJECT FOR WHICH IT IS FURNISHED.

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 4 of 15

PIPING SUPPORT STANDARD AND DETAILS TABLE OF CONTENTS

GENERAL........................................................................................................................................ 5 1.1 1.2 1.3 Summary............................................................................................................................ 5 References......................................................................................................................... 5 Quality Assurance............................................................................................................. 6

PRODUCTS ..................................................................................................................................... 6 2.1 2.2 Materials............................................................................................................................. 6 Fabrication......................................................................................................................... 6

EXECUTION .................................................................................................................................... 7 3.1 3.2 3.3 Inspection .......................................................................................................................... 7 Field Erection and Installation......................................................................................... 7 Inspection after Installation ............................................................................................. 7

ATTACHMENTS.............................................................................................................................. 8

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 5 of 15

PIPING SUPPORT STANDARD AND DETAILS 1 GENERAL 1.1 Summary 1.1.1. Scope of Specification This specification prescribes the design application, drawing presentation and fabrication details of piping supports, instrument connections and miscellaneous piping details for Infrastructure Unit. 1.1.2. Related Specifications The following Specifications prescribe items of related work: G3IR-1000-50-SP-9011: G3IR-1000-50-SP-9002: G3IR-0000-50-SP-9015: G3IR-1000-55-SP-9001: Field fabrication and process and utility piping installation-

Piping Material Specification line classprocess and utility piping Welding/ND specification for shop and field fabricated pipe Painting Protective Coating.

Coordinate Work prescribed by this specification with Work prescribed by the above listed specifications. 1.1.3. Terminology The following terms are defined as stated, unless otherwise indicated: 1. Pre- Engineered Supports: Includes all standardized, predesigned, load rated supports whose intended use encompasses multiple applications.

1.2

References The publications listed below form part of this specification. Each publication shall be the latest revision and addendum in effect on the date this specification is issued for construction unless noted otherwise. Except as modified by the requirements specified herein or the details of the drawings, Work included in this specification shall conform to the applicable provisions of these publications. A. ASME (American Society of Mechanical Engineers) 1. B31.3 - 2008 Process Piping 2. ANSI/MSS (American National Standards Institute / Manufacturer's Standardization Society)

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 6 of 15

PIPING SUPPORT STANDARD AND DETAILS B. C. 1.3 NFPA: National Fire Protection Association. IS: Indian Standard.

Quality Assurance 1.3.1. Approved department design guidelines and methods are used in compliance with project requirements. Project piping engineers and piping design supervisors monitor, review and control the design to ensure that applicable codes, practices and specifications are being followed to meet project quality goals. Quality criteria are constantly reviewed during planning activity.

1.3.2.

1.3.3. 2 PRODUCTS 2.1

Materials 2.1.1. Piping materials shall be in accordance with Piping Engineering Specification G3IR-100050-SP-9002 unless specific materials are indicated on the standard detail drawing. Welding, weld examination, and weld heat treatment shall be in strict accordance with welding Engineering Specification G3IR-0000-50-SP-9015. Carbon steel flats, IS: 2062, may be substituted for carbon steel plate, IS-2062, without approval. Other substitutions, including thicker wall materials, are not permitted without written authorization from Fluor. Galvanized material shall not be used on lines operating above 315 degrees C.

2.1.2.

2.1.3.

2.1.4. 2.2

Fabrication 2.2.1. Fabrication shall be in accordance with Piping Engineering Specification G3IR-1000-50SP-9011 Carbon steel components shall be painted/galvanized in accordance with Engineering Specification G3IR-1000-55-SP-9001. For Vendor fabricated items, the vendor shall package and tag with respective assembly tag numbers. Kwik-bolts shall be supplied by the field.

2.2.2.

2.2.3.

2.2.4.

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 7 of 15

PIPING SUPPORT STANDARD AND DETAILS 3 EXECUTION 3.1 Inspection 3.1.1. Each piping support element and assembly shall be inspected for conformance to it respective contract drawing and this specification. Verify that all contact surfaces and all piping support elements and assemblies are free of all foreign matter prior to installation. Check the alignment of all piping support elements and assemblies prior to making any permanent attachments to any piping or structures.

3.1.2.

3.1.3.

3.2

Field Erection and Installation 3.2.1. Location Piping support elements and assemblies shall be installed at the locations shown on the piping drawings. 3.2.2. Procedure Welding performed in the installation of all piping support elements/assemblies shall be in accordance with the welding specifications referenced in Section 1.1.2 3.2.3. Concrete pad for base supports at grade 1) Concrete pad along with suitable 12mm thick CS bearing plate shall be provided for all base supports in field by piping contractor. 2) If base support load exceeds 1000 Kgs, the concrete pad along with 12mm thick CS bearing plate will be provided by civil contractor.

3.3

Inspection after Installation Piping support elements and assemblies upon completion of installation shall be inspected for proper location and alignment, hot and cold load settings, quality of installation, cleanliness, and completeness of work, painting damage, and any other damage which might have occurred during installation. Any deficiencies should be brought to the Buyer's attention in writing.

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 8 of 15

PIPING SUPPORT STANDARD AND DETAILS 4 ATTACHMENTS

Attachment 01 Attachment 02 Attachment 03 Attachment 04 Attachment 05

Allowable Span Charts Guide Spacing Chart Pipe Support Selection Guide Miscellaneous Engineering Standards Fabrication Details for Pre-Engineered Supports

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 9 of 15

PIPING SUPPORT STANDARD AND DETAILS ATTACHMENT 01 ALLOWABLE SPAN CHART

Maximum recommended Support Spacing (in millimeters) for Straight Runs.

NOTE 5

Carbon Steel (NB) 15NB 20NB 25NB 40NB L I N E S I Z E 50NB 65NB 80NB 100NB 150NB 200NB 250NB 300NB 350NB 400NB 450NB 500NB 600NB 750NB (MM) 2400 3000 3900 4800 5100 5700 6000 6000 6000 6000 6000 6000 7500 7500 7500 7500 7500 7500

Stainless S10S Steel (MM) 2400 3000 3900 4500 5100 5400 5700 6000 6000 6000 6000 6000 -------

CS Lined Pipe (MM) 2400 3000 3900 4500 5100 5700 6000 6000 6000 6000 ---------

FRP Pipe (MM) --1000 2000 2000 2000 2500 2500 -----------

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 10 of 15

PIPING SUPPORT STANDARD AND DETAILS

Note:
1. For maximum recommended span of Case 1 multiply maximum straight span by the factor K=0.64. 2. For maximum recommended span of Case 2 multiply maximum straight span by the factor K=0.75. 3. Any span longer than the recommended maximum must be approved by a Stress Engineer. 4. Maximum span shall be reduced if the line has concentrated load such as valves, flanges, or instruments. 5. Pipe size 300 NB and larger on the pipe rack can be spanned up to 9000mm and pipe size between 100 NB thru 250 NB spanned up to 7000mm

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 11 of 15

PIPING SUPPORT STANDARD AND DETAILS

ATTACHMENT 02

GUIDE SPACING CHART

RECOMMENDED GUIDE SPACING (MM) (Note 2)

HORIZ. RUN 15NB 20NB 25NB 40NB L I N E S I Z E 50NB 65NB 80NB 100NB 150NB 200NB 250NB 300NB 350NB 400NB 450NB 500NB 600NB 6000 6000 12000 12000 12000 15000 15000 15000 18000 18000 18000 18000 24000 24000 24000 24000 24000

VERT. RUN 3000 3000 6000 6000 6000 9000 9000 9000 12000 12000 12000 12000 15000 15000 18000 18000 18000

Note:
1. All values are in millimeters unless noted otherwise. 2. Extra guides shall be added in order to make the line stable.

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 12 of 15

PIPING SUPPORT STANDARD AND DETAILS ATTACHMENT 03 PIPE SUPPORT SELECTION GUIDE

INDEX: PIPE SUPPORT SELECTION GUIDE S.No. 1 2 3 4 5 6 7 8 9 10 DESCRIPTION Anchors, Base Anchors, Concrete Pads and Base Guide Shoes for Hot Insulated Pipe Directional Anchors And Guide Base Supports Dummy Supports, Riser Clamps and Support Trunnions Field Supports Hanger Rods and Lugs U Bolts and Pick -Ups Miscellaneous Gusset and Slide Plate Support Drawing No G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 1 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 2 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 3 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 4 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 5 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 6 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 7 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 8 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 9 OF 10) G3IR-1000-50-SP-9003 (ATTACH. 03, SHT 10 OF 10) REV. 3 3 3 3 3 3 3 3 3 3 REMARKS

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 13 of 15

PIPING SUPPORT STANDARD AND DETAILS

ATTACHMENT 04

MISCELLANEOUS ENGINEERING STANDARD

INDEX: MISCELLANEOUS ENGINEERING STANDARD

S.No. 1 2 3 4 5 6 7 8 9

DESCRIPTION Level Glass Piping Orifice Flange Tap Piping Pressure Connection Piping Steam Trap Piping Temperature Connection Piping Utility Hose Rack Utility Station Piping Vents And Drains Level Switch

ATTACHMENT LG FE PI TR TI 5UHR US VD LS

SHTS. 1-2 1-3 1-2 1-3 1-2 1-2 1-3 1-2 1

REV. 3 3 3 3 3 3 3 3 3

REMARKS NOTE 1 NOTE 1 NOTE 1 NOTE 1 NOTE 1

NOTE 1

1.NOTE : INSTRUMENT TAGGING AS PER JOB BULLETIN JB-08-002.

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 14 of 15

PIPING SUPPORT STANDARD AND DETAILS ATTACHMENT -05

INDEX: FABRICATION DETAILS FOR PRE-ENGINEERED SUPPORTS

S.No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

SUPPORT TAG 5A 5ABS 5AF 5BA 5BG 5BS 5BSA 5BSL 5CI 5CP 5DA 5DS 5FS 5FST 5FSX 5G 5GS 5HE Anchors

DESCRIPTION

ATTACHMENT 5A 5ABS 5AF 5BA 5BG 5BS 5BSA 5BSL 5CI 5CP 5DA 5DS 5FS 5FST 5FSX 5G 5GS 5HE

SHTS. 1-2 1-4 1-2 1-2 1-2 1-2 1-2 1-3 1-2 1-4 1-5 1-3 1-5 1-5 1-14 1-3 1-4 1-4

REV. 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

REMARKS

Angle Base Supports Anchor for FRP PIPE Base Anchors Base Guide Base Supports Base Support Adjustable Base Support -Lined Pipe Isolation Cradles Concrete Pads Directional Anchors Dummy Support Field Supports Field Support Tees Field Supports for extra loading Guides Gusset Supports Hand Wheel extension

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc

Client Name : Project Name : Project Number :

BASF India Limited Project GIR G3IR

Document No. : G3IR-1000-50-SP-9003 Date 24-JAN-13 Page 15 of 15

PIPING SUPPORT STANDARD AND DETAILS 19 20 21 22 23 24 25 26 27 28 29 30 31 31 5HR 5IS 5LP 5PU 5RC 5S 5SL 5SPA 5SPL 5ST 5U 5UF 5WL 5CSL Hanger Rods Insulation Support Load Pads Pick Ups Riser Clamps Shoes Shear Lugs For Riser Clamp Stiffener Plates Slide Plates Support Trunnions U-Bolts(except FRP pipe & copper tubing) U-Bolts(For FRP pipe ) Welding Lug Clamp shoe(For FRP pipe) 5HR 5IS 5LP 5PU 5RC 5S 5SL 5SPA 5SPL 5ST 5U 5UF 5WL 5CSL 1-5 1-2 1-2 1-4 1-2 1-5 1-2 1-2 1-2 1-3 1-2 1 1-4 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3

X:\250_PIPING\250E_ENGINEERING_DESIGN_DATA\250E_002_Specs\Working\G3IR-1000-50-SP-9003\Rev 3\G3IR-1000-50-SP-9003_Cover\G3IR-1000-50-SP-9003_R3.doc