Вы находитесь на странице: 1из 30

MAKATI

OLD NATIONAL
HIGHWAY

SOUTH LAKE VILLAGE

ETON CITY
EXIT
RIVERBEND

CALAMBA
 20-
20-hectares affordable to middle residential
development
 Located at Bgy.
Bgy. Malitlit,
Malitlit, Sta. Rosa, Laguna
Time and Distance:
- 40 kms.
kms. from Makati (<1 hour)
- 20 kms.
kms. from Alabang (30 mins.)
mins.)
- 15 kms.
kms. from Tagaytay (20 mins.)
mins.)
- 10 kms.
kms. from Calamba (10 mins.)
mins.)
- 2 kms.kms. from Old National
Highway via Asia Brewery’
Brewery’s
exclusive future access
SOUTH LUZON CARMONA LEISURE:
EXPRESSWAY EXIT * Sta. Elena Golf
* San Lazaro Leisure
Park
* Splash Island
* Enchanted Kingdom
* Tagaytay Highlands

STA. ROSA
EXIT

OLD
SCHOOLS:
NATIONAL
* De La Salle Canlubang
HIGHWAY
* Don Bosco
* St. Scholastica
* Ateneo Graduate School of
Business WEST
WEST WING
WING
* UST & Xavier (future site) ETON CITY RESIDENCES
RESIDENCES
EXIT CHURCH & HOSPITALS:
* Sta. Rosa de Lima Church
* Don Bosco Church
* Chair of St. Peter Parish Church
Balibago
* South Luzon Medical Center
* Perpetual Help Medical Center Binan
* Binan Doctors Hospital
* Asian Hospital and Medical Center
COMMERCIAL
COMPLEX:
* SM Sta. Rosa
* Robinson’
Robinson’s Place
* Paseo de Sta. Rosa
* Alabang Town
Center
SITE DEVELOPMENT PLAN
- 1.2 hectare area:
• Clubhouse
• Basketball Court
• Swimming Pool
• Kiddie Pool
• Landscaped Gardens
• Children’s Playground
• Jogging Path
• Open Field (outdoor
activities like football,
baseball, kite-flying, etc.)
PHASE 1
Lot Area : 80 sqm
Floor Area: 50 sqm

2BR + maid’s room


2 T&B

Available colors: BEIGE, BLUE, BROWN & YELLOW


Lot Area : 100 sqm
Floor Area: 70 sqm

3BR + maid’s room


2 T&B

Available colors: BEIGE, BLUE, BROWN & YELLOW


Lot Area : 130 sqm
Floor Area: 90 sqm

3BR + maid’s room


3 T&B

Available colors: BEIGE, BLUE, BROWN & YELLOW


Lot Area : 130 sqm
Floor Area: 110 sqm

4BR + maid’s room


3 T&B

Available colors: BEIGE, BLUE, BROWN & YELLOW


House Details
Unit Type Jefferson Mckinley Roosevelt Eisenhower
House House House House

Lot Area 80 sq. m. 100 sq. m. 130 sq. m. 130 sq. m.


Floor Area 50 sq. m. 70 sq. m. 90 sq. m. 110 sq. m.
Floors/Levels 2 2 2 2

Bedrooms 2 3 3 4
Toilet & Bath 2 2 3 3
Car Port/s 1 1 1 2
Others • Maid’s room • Maid’s room • Maid’s room • Maid’s room
• Kitchen • Kitchen • Kitchen • Kitchen
• Dining area • Dining area • Dining area • Dining area
• Living area • Living area • Living area • Living area
• Laundry & • Laundry & • Laundry & • Laundry &
drying areas drying areas drying areas drying areas
• Pocket • Pocket garden • Pocket garden • Garden
garden • Master’s • Master’s • Master’s
• Master’s bedroom w/ bedroom w/ bedroom w/
bedroom w/ terrace terrace terrace
terrace
Unit Finishes
Ground floor
Living/Dining Area Floor Ceramic tiles
Wall Painted finish
Ceiling Painted plain cement finish
Maids’ Room Floor Vinyl Tiles
Wall Painted finish
Ceiling Painted plain cement finish
Toilet & Bath Floor Ceramic tiles
Wall Painted plain cement finish above tiles
Ceiling Painted plain cement finish
Kitchen Countertop Postform laminate
Cabinet Counter laminated cabinet w/ stainless steel sink
Laundry area Counter Ceramic tiles
Floor Cement finish
Doors Wood finish
Garage Cement finish
Unit Finishes
2nd floor
Bedrooms Floor Wood laminate
Wall Painted finish
Ceiling Gypsum board / drop ceiling
Toilet & Bath Floor Ceramic tiles
Wall Painted plain cement finish above tiles
Ceiling Painted plain cement finish
Doors Wood finish
PAYMENT TERMS
As of 27 August 2009

FOR BLOCK 1 TO 6
STANDARD TERMS
PAYMENT Reservation Downpayment Monthly Amortization (MA) Balance
DISCOUNTS(per Unit Type)
TERM Fee (net of RF) Term for MA
Amount Amount Term
(RF) Amount Term No. of Mos. Jefferson Mckinley Roosevelt Eisenhower
1 mo. after
CASH NOT APPLICABLE
100% RF 12% of TCP
10(1) / 20 / 70 P50,000 10% 1 mo. 20% 11 mos. 70% 13th mo. P150,000 P200,000 P290,000 P330,000
20(1) / 40 / 40 20% 1 mo. 40% 23 mos. 40% 26th mo. P60,000 P100,000 P150,000 P170,000
30(24) / 70 30% 24 mos. 70% 26th mo. P5,000 P5,000 P5,000 P5,000

TURNOVER: ON THE 26TH MONTH


Notes:
1. In-house financing shall be the automatic payment term until the buyer can obtain Bank or Pag-ibig take
out/payment.
2. Any Term of Payment (TOP) outside of the standard terms shall be subject to PV computation and
approval from the President.
3. The prices, rates and payment schemes herein are subject to change without prior notice.
4. Price increase for every fifty (50) units sold.
SAMPLE COMPUTATION DATE: 26 AUGUST 2009
BLK 3
LOT # 3
HOUSE MODEL JEFFERSON
LOT AREA 80
FLOOR AREA 50
TOTAL CONTRACT PRICE 2,359,000.00

STANDARD PAYMENT TERMS


DETAILS
CASH 10(1) / 20(11) / 70 20(1) / 40(23) / 40 30(24) / 70
TOTAL CONTRACT PRICE (with VAT) 2,359,000.00 2,359,000.00 2,359,000.00 2,359,000.00
Less : Discount 283,080.00 150,000.00 60,000.00 5,000.00
Net Contract Price 2,075,920.00 2,209,000.00 2,299,000.00 2,299,000.00

RESERVATION FEE (RF) 50,000.00 50,000.00 50,000.00 50,000.00

DOWNPAYMENT
% of TCP 100% 10% 20% 0%
Total Downpayment (net of RF) 2,025,920.00 170,900.00 409,800.00 -
# of Months to Pay 1 1 1 -
Monthly Amortization (MA) 2,025,920.00 170,900.00 409,800.00 -
INSTALLMENT
% of TCP 0% 20% 40% 30%
Total Installment - 441,800.00 919,600.00 674,700.00
# of Months to Pay - 11 23 24
Monthly Amortization (MA) - 40,163.64 39,982.61 28,112.50
BALANCE
% of TCP 0% 70% 40% 70%
Total Balance upon Turnover - 1,546,300.00 919,600.00 1,609,300.00
MA of Bank Financing @ 11% for 10 yrs - 21,300.28 12,667.49 22,168.11
MA of In-House Financing @ 16% for 10 yrs - 25,902.55 15,404.51 26,957.89
NOTES
1. This Sample Computation inly intends to show an indicative pricing and payment term for West Wing at Eton City. Prices, interest rates and payment
terms are subject to change without prior notice.
2. Lot and floor areas are only estimates and are subject to change without prior notice.
3. In-house financing shall be the automatic payment term until the buyer can obtain Bank or Pag-ibig take out/ payment.
4. Amounts indicated are exclusive of transfer and registration expenses and other required costs identified in the Project Information Sheet to be
shouldered by the Buyer.
5. This document is for information purposes only and does not constitute nor form part of any contract.
END
Thank You

Вам также может понравиться