SECTION 15081 Sheet Metal Ducts - Acoustical Lining Insulation PART 1.00 - GENERAL 1.01 Summary A.

The work covered by this specification consists of furnishing all labor e!uip"ent "aterials and accessories and perfor"ing all operations re!uired for correct fabrication and installation of air duct syste"s of sheet "etal lined with fibrous glass duct liner in accordance with applicable pro#ect drawings and specifications sub#ect to ter"s and conditions of the contract$ B. All air duct syste"s operating at internal air velocities not e%ceeding rated duct liner li"itations as listed below and internal air te"perature not e%ceeding &'() *+&+,-. ,. Duct liner products shall confor" to the re!uire"ents of ASTM ,+(.+. D. The "anufacturers product identification shall appear on the air strea" surface. /. Duct liner adhesive shall confor" to the re!uire"ents of ASTM , 0+1. ). The finished duct syste" shall "eet the re!uire"ents of 2)3A 0(A and 0(4. 5. Duct di"ensions shown on the plans are finished inside di"ensions. 6. )abrication and installation shall confor" to "anufacturer7s reco""endations and to the re!uire"ents of the latest edition of the 2orth A"erican Insulation Manufacturers Association8s Fibrous Glass Duct Liner Standard *hereinafter referred to as 2AIMA )5DLS- or of the Sheet Metal and Air ,onditioning ,ontractors 2ational Association HVAC Duct Construction Standards - Metal and Flexible *hereinafter referred to as SMA,2A 69A, D,S- or the "anufacturers reco""endations. 1.02 References A. A"erican Society of Testing and Materials* ASTM+. ASTM ,+(.+ &. ASTM ,0+1 :. ASTM 5&+ ;. ASTM 5&& '. ASTM ,;&: 1. ASTM , '+< 4. 2ational )ire 3rotection Association *2)3A+. 2)3A 0(A &. 2)3A 0(4 :. 2)3A &'0 ,. Sheet Metal and Air ,onditioning ,ontractor7s 2ational Association *SMA,2A+. 69A, Duct ,onstruction Standards Metal and )le%ible *69A, D,SD. 2orth A"erican Insulation Manufacturers Association *2AIMA+. )ibrous 5lass Duct Liner Standard *)5DLS/. International 2onwovens = Disposables Association *I2DA+. IST <(.1 1.03 e!"#ery$ S%&ra'e an( )an(!"n'

A. Deliver all "aterials and>or fabricated insulated duct sections and fittings to the #ob site and store in a safe dry place. 4. 3rotect "aterials fro" dust dirt "oisture and physical abuse before and during installation startup and co""issioning. ?et or conta"inated duct liner shall be replaced. PART 2.00 - PRO *CTS 2.01 Insu!a%e( uc% Sys%em A. All supply ducts return ducts and fittings indicated on drawings shall be insulated with duct liner "eeting the re!uire"ents of ASTM ,+(.+ and the additional following re!uire"ents$

197792531.doc

+. 6ave a li!uid water repellency rating not less than ; when tested in accordance with I2DA IST <(.1. &. 6ave a potential heat value not e%ceeding :'(( btu>lb when tested in accordance with 2)3A &'0 and "eeting the classification of @Li"ited ,o"bustibleA as defined by 2)3A 0(A. :. Ma%i"u" rated velocity not less than 1((( )3M when tested in accordance with ASTM , +(.+. ;. Besistant to "icrobial growth using a @no growth criteriaA when tested in accordance with ASTM , ++:< 5 &+ and 5&&. '. Type I - 4lanket "aterial in roll for" a. ++>&C *+:""- +C*&'""- +-+>&C *:<""- &C *'+""- , thick +Type+'( Type &(( Type :((, shall have a "a%i"u" ther"al conductivity*k-value- at .' ) *&;,- "ean te"perature of +.&< 4tu.in>hr.s!.ft. ) *(.(;( ?>". ,- .&. 4tu. in>hr.s!.ft. ) *(.(:0 ?>". ,- .&; 4tu.in>hr.s!.ft. ) *(.(:' ?>". ,,. when tested in accordance with ASTM , '+<. b. Sound absorption coefficients and 2B, rating shall "eet or e%ceed the following when tested in accordance with ASTM , ;&: using an @AA "ounting. Thickness +C +-+>&C &C +>&C +C +-+>&C +>&C +C Type +'( +'( +'( &(( &(( &(( :(( :(( Absorption ,oeficients D Ectave 4and )re!uencies *6F+&' &'( '(( +((( &((( ;((( .+( .&< .'( ..( .<& .<: .&( .;( ..+ .<1 .0+ .<' .&& .;0 .<: .<0 .<0 .0+ .(; .+( .&; .;+ .'1 ..: .+( .&0 .': ..& .<: .<; .&( .;& .<( .0: .0: .<< .(' .+& .&0 .'+ .1< .<( .(' .&' .'. ..< .<. .<0 2B, .1( ..( .<( .:' .1( ..' .;( .1(

". Cer%a"nTee( T&u'-Gar( 3002

uc% L"ner ./En-ance( Surface 0Ty1e 150$ Ty1e 200$ &r Ty1e

+. Type II - 4oard in sheet for" a. G+-+>&C *:<""- &C *'+""-H Thick GType &(( Type :((H shall have "a%i"u" ther"al conductivity at .') *&;,- "ean te"perature of G.&. 4tu. in>hr.s!.ft. ) *(.(:0 ?>". ,- .&; 4tu.in>hr.s!.ft. ) *(.(:' ?>". ,H when tested in accordance with ASTM , '+<. b. Sound absorption coefficients shall "eet or e%ceed the following when tested in accordance with ASTM , ;&: using an @AA "ounting$ Thickness &C +-+>&C &C ". Type &(( :(( :(( Absorption ,oefficients D Ectave 4and )re!uencies *6F+&' &'( '(( +((( &((( ;((( .&; .'. .0( .0' .0' .01 .&( .;1 .<& .0; .0' .0+ .&. ..& +.(; +.(& .01 .0& 2B, .<' .<( .0'

Cer%a"nTee( T&u'-Gar( 1/2 &r 242

uc% L"ner ./En-ance( Surface 0Ty1e 200 324$ Ty1e 300-1-

PART 3.00 - E5EC*TION 3.01 E6am"na%"&n A. 9erify that the duct liner products is installed in accordance with pro#ect drawings duct liner operating perfor"ance para"eters and li"itations and provisions of 2AIMA )5DLS or SMA,2A 69A, D,S or "anufactures reco""endations. 3.02 Insu!a%"&n

197792531.doc

A. All portions of duct designated to receive duct liner shall be co"pletely covered with duct liner. All #oints shall be neatly butted and there shall be no interruptions or gaps. Duct liner shall be installed with the 3rinted air strea" surface treat"ent e%posed to the air strea". 4. Duct liner shall be adhered to the sheet "etal with 0(I *"ini"u"- coverage of adhesive co"plying with the re!uire"ents of ASTM , 0+1. ,. All transverse edges that are not to receive sheet "etal nosing shall be coated. Longitudinal #oints shall occur at the corners of ducts. If duct siFe and standard duct liner product di"ensions "ake e%posed longitudinal #oints necessary such #oints shall be coated with adhesive designated for duct liner application and which "eets the re!uire"ents of ASTM , 0+1. Such #oints shall be additionally secured with "echanical fasteners in accordance with 2AIMA )5DLS or SMA,2A 69A, D,S as if they were transverse #oints. D. Duct liner shall be additionally secured with "echanical fasteners co"plying with the re!uire"ents 2AIMA )5DLS or SMA,2A 69A, D,S and of the correct type for the duct liner being installed. )asteners "ay be either weld-secured or i"pact-driven and shall be installed perpendicular to the duct surface.. Mechanical fasteners shall not co"press the insulation "ore than +><C *: ""- based on no"inal insulation thickness. )astener spacing with respect to interior duct di"ensions shall be in accordance with 2AIMA )5DLS or SMA,2A 69A, D,S. )astener heads or washers shall have a "ini"u" area of (..' in & *;<; "" &), with beveled or cupped edges to prevent their cutting into the duct liner. /. ?here air velocities e%ceed ;((( fp" *&(.: ">sec- "etal nosing *either channel or CFeeC profileshall be installed on upstrea" edges of liner duct sections. ). Metal nosing shall be securely installed over transverse liner edges facing the airstrea" at fan discharge and at any point where lined duct is preceded by unlined duct. 5. Duct liner in roll for" shall be folded and co"pressed in the corners of rectangular duct sections or shall be cut and fit to assure a lapped co"pressed corner #oint 6. Duct liner in sheet for" shall be cut and fit to assure tight over-lapped corner #oints. Top pieces of liner shall be supported at the edges by the side pieces I. Any da"age to the air strea" surface "ust be repaired by coating the da"aged area with adhesive or coating designed for duct liner application. Adhesive or coating shall "eet re!uire"ents of ASTM,0+1 3.03 7"e!( 8ua!"%y C&n%r&! A. Jpon co"pletion of installation of lined duct and before 69A, syste" start-up visually inspect the ductwork and verify that duct liner has been correctly installed. ,onfir" that the duct syste" is free fro" construction debris. 4. After the lined duct syste" is co"pletely installed and ready for service conduct a final inspection of the entire syste". This inspection should include at "ini"u" the following steps$ +. ,heck all registers grilles and diffusers to ensure that they are clean and free fro" construction debris. &. ,heck all filters in accordance with their "anufacturer8s instructions. Jse specified grade of filters at all ti"es that syste" is operating. :. ,over supply openings with filter "edia prior to syste" start-up to catch any loose "aterial that "ay re"ain inside the ductwork. ;. Turn the 69A, syste" on and allow it to run until steady state operation is reached. '. Be"ove the te"porary filter "edia fro" supply openings and along with it any loose "aterial blown downstrea" and caught by the filter "edia. 1. ,heck to ensure that air delivery perfor"ance "eets all re!uire"ents and co"plies with SMA,2A leakage specifications. 3.09 Pr&%ec%"&n

197792531.doc

A. ,ontractor7 e"ployees shall be properly protected during installation of all insulation. 3rotection shall include proper attire when handling and applying insulation "aterials and shall include *but not be li"ited to- disposable dust respirators gloves hard hats and eye protection. 4. The contractor shall conduct all #ob site operations in co"pliance with applicable provisions of the Eccupational Safety and 6ealth Act as well as with all state and>or local safety and health codes and regulations that "ay apply to the work.

197792531.doc