URNP-SANA
2004-03-08
Revision record
Date Revision version Jan 10, 2004 1.00 Initial transmittal Feb 06, 2004 1.01 Mar 08, 2004 1.10 Description Author Zhou Xinjie Zhou Xinjie
Modify based on the UAE ABU single site Zhou Xinjie function verification process: Adjust the document framework; Give a particular description of single site function verification operate steps and add part of test items; Update single site function test data checklist
Page 2 of total 21
Contents
1 Overview .................................................................................................................................................... 6 2 Single Site Function Verification Preparation work .................................................................................. 7 2.1 Alarm Check ......................................................................................................................................... 7 2.2 Cell Status Check .................................................................................................................................. 8 2.3 Radio Part Parameters Configuration Check......................................................................................... 8 2.3.1 Scrambling Code Check ................................................................................................................. 8 2.3.2 Algorithm Switch Check ................................................................................................................ 8 2.3.3 Algorithm Parameters Check .......................................................................................................... 9 2.4 Neighbor cell list check ......................................................................................................................... 9 3 Single Site Function Verification ............................................................................................................. 10 3.1 Test Preparation .................................................................................................................................. 10 3.2 Test Process......................................................................................................................................... 11 3.3 Troubleshooting .................................................................................................................................. 15 3.4 Notice items ........................................................................................................................................ 16 3.4.1 Site choose .................................................................................................................................... 16 3.4.2 Test Point Choose ......................................................................................................................... 16 3.4.3 Test Route Choose ........................................................................................................................ 16 3.4.4 Diversity Receiver (DRX) check method ..................................................................................... 17 3.5 Delivery of the Test Results ................................................................................................................ 18 4 Appendixes............................................................................................................................................... 20 4.1 Data Record Table of the Single Site Function Verification (template) ............................................. 20
Page 3 of total 21
Table of Figures
figure 1 figure 2 figure 3 figure 4 figure 5 figure 6 figure 7 figure 8 Radio Network Optimization Flow .......................................................................................... 7 Agilent UMTS CPICH View.................................................................................................. 12 Agilent UMTS Status View ................................................................................................... 13 Agilent UMTS CPICH View (Handover) .............................................................................. 14 Agilent UMTS Protocol Messages View (Handover) ............................................................ 15 Test points and test route ........................................................................................................ 17 DRX verification .................................................................................................................... 17 Switch Transmitter Antenna ................................................................................................... 18
Page 4 of total 21
Page 5 of total 21
1 Overview
The single site function verification test is a part of the WCDMA network optimization to ensure that the basic functions of the cells of a cluster, such as call access, call communication, handover and so on, are normal before each is separately optimized. The equipment function acceptance test can tell what proportion of the call drops, access failures and the like problems are caused by poor network coverage and what are caused by equipment faults, helping us to better locate the problems to solve by optimization for a higher network optimization efficiency. figure 1 is the network optimization flow extracted from WCDMA RNO Radio Network Optimization Operation Guide. As the figure shows, the single site function verification is performed at the stage prior to the cell-based optimization and after the Cluster partitioning and team construction in the network optimization flow. The single site function verification is the cell-based equipment function acceptance test to verify if the equipment of each cell is sound. Through the single site function verification, the following functions for each cell shall be checked as normal: Verify coverage ( CPICH RSCP & Ec/Io ) Verify scrambling code Verify no installation faults (e.g. crossed feeders) Make service call test
In the following text, the preparation work of single site function verification is first described (Section 2), and then, the single site function verification method and process (Section 3). Finally, the relevant data tables and check list used for the function acceptance test are presented (appendixes).
Page 6 of total 21
figure 1
2.1
Alarm Check
The focus is on the board faults and the transmission faults of various NEs (RNC, NODEB,
MSC, SGSN and the like) using LMT or M2000. For all the alarms, analyze the causes and try to eliminate all of them. Usually, the product support engineer will be responsible for checking and resolving all the alarms. It is important for the optimization engineer prior to any field test to check with product support engineer regarding any alarms especially intermittent alarms ( for example: transmission
Page 7 of total 21
alarms which can be automatically recovered as these indicate network instability and will negatively impact the service).
2.2
cell has been created, whether the valid data indication of the cell is valid, and whether the background management state of the cell is in the unblocked state. Running the DSP CELL MML command on RNC LMT can check the cell state. For an abnormal state, analyze the cause and try to eliminate the faults. Usually, the product support engineer will be responsible for checking and resolving all the cell state problems. It is important for the network optimization engineer prior to any field test to confirm with product support engineer regarding cell state.
2.3
code, algorithm switch, power setting, neighbor cell list, handover parameter, access threshold and syn/asyn parameters. As for neighbor list, the check must be done not only to intra-frequency neighbor list, but also to inter-frequency neighbor list and inter-RAT neighbor list. Please refer to WCDMA RNP Radio Parameter Configuration List for the parameters to be checked, and WCDMA RNO 3GOT User's Guide for the methods to obtain the parameters. It is the network optimization engineer who checks and analyzes the radio part parameters. The following items shall be included in the parameter checking.
produce default setting. The algorithm switch shall be queried by the 3GOT software or by the RNC LMT. Notes: The algorithm switch is not provided to the operator. And the algorithm switch parameters are not shown in the radio parameter configuration list.
2.4
inter-frequency neighbor cell list checking and the inter-RAT neighbor cell list checking. Pay attention to whether the neighbor cell list is in reason. The neighbor cell list checking shall be done by the 3GOT software. If the pilot test data has been obtained, the pilot test result shall be referenced in the neighbor cell checking. The optimization engineer shall check the neighbor cell list with the operator engineer. Especially for the inter-RAT neighbor cell list checking, since the network optimization engineer doesnt know the 2G cell configuration parameters, this work shall be done by the operator engineer leading.
After all the parameter checking has been finished, the optimization engineer shall export the parameter check analyze report to the operator, and tidy the whole XXX project WCDMA RNP Radio Parameter Configuration List for using in the single site function verification.
Page 9 of total 21
For single site function verification, the following tools and software shall be needed. Drive test scanner, used for collection the pilot signal data. The Agilent E6455C is used as the drive test scanner now; Test UE, used for service verification and system message collection. The Qualcomm 6200 mobile is used for voice and PS service test. Since the Qualcomm mobile could not support the VP service, the Motolora A830 mobile or the Siemens U15 mobile is used for the VP service test. Data collection software, used to display and log the signal strength, UE status, signal message and so on in time. The Agilent E6474A is being used now. Data analyze software, used to resolve message, analysis signal, solve problem and so on. The Actix Analyzer and DataAssistant is being used now. The single site function verification is often carried out on per-NODEB basis. According to the experiences of the CDMA optimization, the function verification of one site usually takes about two to four hours [2]. So we could choose part of sites (10% to 15% sites) for testing if the time be limited. The network optimization engineer shall be the principal body for the work. They should cooperate with the product support engineer for the troubleshooting of the equipment.
3.1
Test Preparation
The following work should be done in the test preparation stage.
Page 10 of total 21
Confirm with the customer's optimization engineer if the power of all sites is suitable for transmission.
Realize the alarm problem and cell current status of verified site from product support engineer.
Get the idle terminal number and the PSTN telephone number for the test. Check the drive test tools (UE + Scanner) working normal. Copy the checklist into paper, the checklist table is shown in appendix. The whole XXX Project WCDMA RNP Radio Parameter Configuration List is going to being used.
Learn the instance of verified site before the verification, such as cell ID, scrambling code, omni site or directional site, azimuth and down tilt of antenna, antenna height, propagation environment and so on.
Determine the test points and test route on the map and make sure that one test point is selected for one sector. The method of determining the test point and test route shall be found in the following chapters.
3.2
Test Process
The following work should be done for the test: 1. 2. Arrive the test point of sector 1. Power on the Qualcomm mobile, the WCP indication is shown on the mobile screen. Mobile setup process is complete. It means the LA update procedure is OK, the RA update procedure is OK, the PS attach is OK. (If the WC is shown on the mobile, it means the LA update is OK. If the P is shown on the mobile, it means the RA update and the PS attach is OK. ) 3. 4. Choose Menu -> 5 -> 9 -> 2 on Qualcomm mobile, PS detach is OK. Setup the Agilent E6474A software, start data logging. Observe the Qualcomm mobile logging data from Agilent software: Observe cell frequency and scrambling code from UMTS CPICH View window, shown in figure 2; Observe CPICH RSCP and Ec/Io, shown in figure 3. (Notes: The CPICH RSCP and Ec/Io shall be got from scanner or Qualcomm mobile. The difference between the scanner and Qualcomm mobile is the antenna of scanner is out-car but the antenna of Qualcomm mobile is in-car. Commend to use the Qualcomm mobile to check the CPICH RSCP and CPICH Ec/Io. When we use the Qualcomm mobile to check the CPICH RSCP and CPICH Ec/Io, the Io and Ec/Io shall be obtained, the CPICH RSCP shall be obtained through calculation: Ec = Ec/Io + Io.)
Page 11 of total 21
figure 2
Page 12 of total 21
figure 3 5.
Make the dialing test of 3G speech service, which include mobile terminating call and mobile originating call. Each dialing test should be tried five times and kept at least 10 seconds for each time at least. Test the speech communication quality by your feel.
6.
Make the dialing test of 3G VP service, which include mobile terminating call and mobile originating call. Each dialing test should be tried five times and kept at least 10 seconds for each time at least. Test the speech and photo communication quality by your feel.
7.
Make the dialing test of 3G PS service, which include WWW browsing and file downloading. Each dialing test should be tried five times and browsed at least one web page for each time at least. Test the PS connection quality by your feel.
Page 13 of total 21
(Optional) Diversity receiver check, the method shall be found in the following chapters. Take a speech service or VP service or PS service call and keep it. Verify the soft handover along the test route (from the test point of sector 1 to that of the sector 2). During the process, observe the CPICH scrambling code changing from Agilent UMTS CPICH View, and observe the active set update message from UMTS Protocol Messages View. Notes: Since the Agilent UMTS Active Set View is updated very slowly, we suggest that it is no use to observe the handover form the UMTS Active Set View.
figure 4
Page 14 of total 21
figure 5
10. Terminate the conversation, stop the log file and close the Agilent E6474A software. 11. Repeat the steps 2 to 9 in the new sector. 12. After all the drive test has been finished, check the system information parameters by background analysis software ANALYZER. The checked parameters are included: the cell selection and reselection parameters in SIB3, LAC/RAC in SIB1, neighbor cells in SIB11. The configured parameters shall be found in XXX Project WCDMA RNP Radio Parameter Configuration List.
Optional check items: Cell reselection between 2G and 3G, voice handover from 3G to 2G. Notes: If the cell reselection between 2G and 3G or the voice handover from 3G to 2G need to be verified, the test place shall be confirmed by operator.
3.3
Troubleshooting
Page 15 of total 21
The problems found in the function verification drive test include: call failure of the calling or called party, call drop, the quality of conversation, handover failure. As the problem happened, the test should be made again to make sure if they are repeatable. The problem recording list should be filled in and the product support engineer should be encouraged to solve the problems. Track the problems until they are solved.
3.4
Notice items
Page 16 of total 21
figure 6
figure 7
DRX verification
If the receive antenna crossed, the uplink diversity receive gain is loss, and the uplink interfere is doubled. It will affect the uplink capability. And this problem is hard to be checked out by general downlink pilot test. So in the single site verification test the DRX check shall be needed. The possible test methods for DRX check include:
Page 17 of total 21
Method 1: Switch the transmitter of verified cell from one antenna to another, check the downlink transmission power changed or not. If no change happened, it means that there is no crossed-DRX problem.
figure 8
Method 2: Add the CW transmitter on Rx2, set the same Tx power as the cell. Check the cell downlink transmission power and the CW downlink transmission power are same or not. If no change happened, it means that there is no crossed-DRX problem.
Method 3: Close the Rx1 and leave the Rx2, log the mobile transmission power; Close the Rx2 and leave the Rx1, log the mobile transmission power. Compare the two uplink transmission power. If no change happened, it means that there is no crossed-DRX problem. Notes: We has checked the DRX by method 3 and found that it is not feasible, since the mobile transmission power is fluctuated in 20 dBs at the same place.
3.5
Page 18 of total 21
WCDMA RNO Single Site Verification Guidance The completed cell function test data table; The drive test files (Optional).
Page 19 of total 21
4 Appendixes 4.1 Data Record Table of the Single Site Function Verification (template)
Please refer to Attachment 1 Data Record Table Template of the Single Site Function Verification.xls
Page 20 of total 21
[1] Xie Zhibin, WCDMA RNO Radio Network Optimization Operation Guide, 2003/12 [2] Motorola, Optimization Steps for Commercial Deployment of a CDMA System, 1996/08
Page 21 of total 21