Академический Документы
Профессиональный Документы
Культура Документы
www.edocuments.co.uk
5 MAINTENANCE PROCEDURES
5 MAINTENANCE PROCEDURES......................................................................................................1
5.1 INTRODUCTION.............................................................................................................................................................................1
5.2 MAINTENANCE MATRIX...............................................................................................................................................................1
5.3 RAINWATER DRAINAGE SYSTEM...............................................................................................................................................2
5.3.1 COLD WATER STORAGE TANK................................................................................................................................2
5.3.2 FLOAT OPERATED LEVER VALVES.........................................................................................................................2
5.1 INTRODUCTION
It should be remembered that remotely controlled systems items of equipment may become
energised without warning. It is therefore imperative to ensure that any such item of equipment is fully
isolated before maintenance work is carried out.
ITEM
1M
3M
6M
12M
24M
36M
NOTES
AS REQUIRED
FLUES
PUMPS
PRESSURISATION UNIT
X
X
SEE BROAG
MANUAL PAGE 20
LOCATED IN
SECTION 7
X
X
X
X
For more specific maintenance frequencies and maintenance instructions refer to Maintenance
Providers maintenance information.
Section: 5
MAINTENANCE PROCEDURES
Page: 1
www.edocuments.co.uk
DETAIL
FREQUENCY
NOTES
6 MONTHS
6 MONTHS
6 MONTHS
6 MONTHS
6 MONTHS
DETAIL
FREQUENCY
NOTES
3 MONTHS
6 MONTHS
6 MONTHS
6 MONTHS
6 MONTHS
12 MONTHS
DETAIL
FREQUENCY
12 MONTHS
12 MONTHS
12 MONTHS
Section: 5
MAINTENANCE PROCEDURES
NOTES
Page: 2