Вы находитесь на странице: 1из 15

N O RT H S O U T H UNIVERSITY

COURSE: MGT 314


Team Project Section: 2

P R E PA R E D B Y :
THE

Strategist
ID.0910923530 ID.1030927030 ID.1110443030 ID.1120788030 ID.1230907030

Oeshwik Ahmed Md.Osman Goni Sourav Shuvro Saha Maha Ahmed Sara Seraj

Acknowledgement
First and foremost, we would like to thank to our supervisor of this project, Adeyl Khan for the valuable guidance and advice. He inspired us greatly to work in this project. His willingness to motivate us contributed tremendously to our project. We also would like to thank him for showing us some example that related to the topic of our project. We also acknowledge that the whole report has been done by us and no part has been infringed. Various informations have been taken from various research websites and has been cited in the bibliography. Finally, an honorable mention goes to our families and friends for their understandings and supports on us in completing this project. Without helps of the particular that mentioned above, we would face many difficulties while doing this.

Thanking Here, Oeshwik Ahmed Md.Osman Goni Sourav Shuvro Saha Maha Ahmed Sara Seraj

2|Page

DECLARATION

I hereby declare that the project work entitled [PRODUCTION MANAGEMENT MGT - 314]submitted to the [North South University], is a record of an original work done by me under the guidance of [Giusuddin Ahmed ]

Faculty Member,[Adeyl Khan(Ayn) ] School Of Business , and this project work has not performed the basis for the award of any Degree or diploma.

__________________________ _
Giusuddin Ahmed Production Supervisor

Thats It sweater limited

3|Page

Executive Summery

In this report, Thats it sweater ltds Operation has been focused. We first went to the company, to get the basic idea. There we got the very basic idea of their Operation and Operation Management; how did they manage their operation and how they are plan for the operation. On that report we are going in depth their operation. First we selected 10 critical operations, then analysis one critical operation that we want to improve. In a sequence there are many process required for an operation. To selection a critical operation we are giving some kind of idea how we are going to improve their operation and if they improve their operation how they get in Benefited. This is our unlimited focus on that project.

4|Page

Introduction
One big name of Countrys garment sector is Ha-meem Group .The yearly turnover of this group is 350 million Dollars. It produces 40 lacks cloths in every month. It has 15 woven factories in six different area of the Dhaka city and that has more than 12,500 machines. Approximately more than 30,000 workers work there. Thats It sweaters limited is the largest sweater manufacturing unit of Ha-meem Group. Its situated in Gazipur .Its owned by the famous Businessman A.K. Azad. They produce sweaters for famous companies like H & M, JC Penny, GAP etc.

Critical operations
Ten Critical operations of Thats It sweaters are given below: 1. Import thread The Operations starts from here .First they import the thread .Unload it from the trucks and send them to the quality control department for the quality check. 2. Quality Control

5|Page

Quality control unit checks the quality of the threads, since threads are the basic materials of the sweater, its very important to have the proper quality threads. After the green signal from QC department, these threads are forwarded to the winding unit. 3. Winding Winding units works with these threads .They have both small and large machines which are automated.

4. Knitting and Linking Knitting is the most important and largest unit of Thats It sweaters Limited. Knitting unit produces all the parts of a sweater .They have 4000 knitting machines, recently they introduced automated jacquard knitting machines. This is four times faster than manually operated knitting machines. However the knitting unit is still dominated by manually operated knitting machines as they are labor intensive. Linking department works with the parts of sweaters produced by knitting unit. They merge the parts and complete a sweater. 5. Trimming Trimming unit cut the excess edges of the sweaters. 6. Lighting Lighting department Checks the ready sweaters to see whether these sweaters have any defects or not. If they find any defect then they directly send it to the mending department for the repair and if the product is okay, they forward it to the washing unit. 7. Mending Mending unit works with the defected sweaters examined by lighting unit, they repair the sweater and send them back to the lighting unit again for the re-check. 8. Washer and Dryer
6|Page

When a sweater gets certified by lighting unit, it goes directly to washer and dryer unit. Here the sweater gets washed by maintaining international standard and after that they dry the sweater via drying machine. 9. Ironing Ironing unit iron the sweaters and make them ready for packaging.

10. Packaging The very last operation of Thats It sweaters. Here the sweaters get packaged under the name of the selected buyer and loaded to the trucks for sending them to the port Those were the 10 most Critical operations of Thats It Sweaters. Our star critical operation is

Knitting and Linking

Three Support for the improvement needed 1. It is a bottleneck operation since production capacity in the linking department exceeds the production capacity in knitting department. 2. The efficiency in terms of time of the entire process of making sweater depends on the operation of Knitting and linking unit 3. The utilization of the resources (e.g. raw materials, labor) depends on the operation of Knitting and linking unit.

Three Support of it being Critical 1. Process layout Breakdown 2. How a sweater will be made, how fast the sweater will be completed; all these depend on the knitting and linking unit.
7|Page

3. It requires a robust operation system that include human and machine both used very intensively.

Ten ways to improve the operation

1. Adjusting the capacity of Linking unit By Downsizing the capacity of linking unit, we can adjust the capacity of linking unit with the knitting unit. Linking unit needs less time to merge the sweater parts together rather than Knitting unit in knitting those sweater parts. In Thats It sweater factory they have 1400 linking machines and most of them often gets a 2 hours day off, due to the less supply from knitting unit.

2. Increase the capacity of the knitting unit


Knitting unit has 4000 manual machines and 50 automated jacquard machines, this capacity cant supply enough materials to the linking unit to keep them into work for the full time. So in order to remove this problem, knitting unit needs higher capacity, which will result into higher output. If we transfer some workers to the knitting unit, then the output rate of the knitting unit will increase which will help the linking unit to achieve the higher efficiency.

3. Automated machines for knitting unit New technologies are available now and its proven that automated machines are more efficient than manual machines. The automated jacquard machines can work four times faster than manual machines. Thats it Sweaters Limited still using the old manual machineries in large extent. In this competitive industry we must bring automated machines more into the operation.

4. Use of Computer Integrated manufacturing Computer integrated manufacturing created a new era in the field of production management. It refers to the use of computers in process control. We can use CIM in both knitting and linking unit in order to boost up and synchronize the speed of the process of these units.

5. Use of RFID
8|Page

RFID means Radio frequency identification. Management can use the RFID technology to maintain the work-in-process inventory and track movements of the semi-finished goods between linking and knitting unit which again is a suggested method for synchronizing the departments in order increase efficiency and reduce delay.

6. Movable lifts Management can introduce movable lifts among departments to enable fast movements of inventory. Thus will reduce significant time and reduce handling.

7. Process auditing Regular process auditing to search for bottleneck operations and process that could be improved. Thus the efficiency of various operations can be increased to a large extent.

8. Training Program Labors are the heart of the operations, they play a vital role. Most of the labors are semi skilled and unskilled, unaware of new techniques and machineries. Management can introduce regular training program, in such a way labors will be more skilled and their output rate will increase and thus the operation will be improved and efficient.

9. Introduction of labor incentives to motivate labor Labor incentives motivate the labors and that results in higher productivity. Incentives like best performer of the month award, maximum production of the day bonus can be introduced

10. Quality Control and monitoring Team For all of the process management can hire a team of specialist whose duty is only to observe the whole process of linking and knitting. The whole process of quality and productivity level will definitely increase under the observation of a specialist team.
9|Page

Because the team knows which thing has to be done where. In any critical circumstances they can handle the situation so that the process wouldnt be hampered. An expert opinion is always important for any production and procession process. They can also set a benchmark of what type of quality they need and check the process if the quality is standards are being met. If not, they can adjust the process accordingly in order to achieve their benchmarked standard.

Comprehensive solution The critical process of Linking and knitting requires to be synchronized in order for the entire operation of making sweaters to be efficient. For the achievement of such objective we believe at the very beginning we should buy more automated machines and start training our employee about using those machines in order to increase the capacity of knitting department. Simultaneously we should also set up a Quality Control and monitoring team which will be responsible for the overseeing of the entire operation and management/ supervision at the floor level. Furthermore we should introduce a system of movable lift among the departments which will reduce the time for handling. After all this we should introduce a system of bonus for the best performing employees. All these solutions are targeted at reducing the time wastage between departments and increasing capacity and ultimately synchronizing both departments. The expected solution should take place in the year 2013 between the months of January to September, detailed time line is provided in Appendix C.

Conclusion The whole project gave us a significant idea on the operation management of the Thats It Sweater Limited With the completion of the report we were not only able to fulfill the course requirement but also get a practical experience of the lessons taught by our faculty throughout the semester. We were able to explore various problems of the company and at the same time come up with various solutions. With its completion we can proudly conclude that all our efforts and time spent behind the report was worth it.

10 | P a g e

Appendix A

Operation Department Basic Operation department for producing Particle Board are as follows:

Production Department

Maintenance Department

Procurement Department

Quality Control Department

Scope of Function of Operation Manager The scope of operations manager ranges across the organization. Operations manager are involved in product and service design, process selection, selection and management of technology, design of work systems, location planning, facilities planning, and quality improvement of the organizations products or services. The operations function includes many interrelated activities, such as forecasting, capacity planning, scheduling, managing inventories, assuring quality, motivating employees, deciding where to locate facilities, and more. In a Particle furniture most of the activities performed by manager and employees fall into the realm of operations management: Forecasting Such things as product demand by consumer, availability of raw material, weather condition (Moisture in weather) etc. Capacity planning, Take right decision when to increase price of raw material or decrease.

11 | P a g e

Scheduling The production and for routine maintenance; scheduling of labor attendants; and scheduling of raw material receiving. Managing inventories Managing inventories of such items as product, first-aid equipment, raw material, maintenance equipment etc. Assuring quality Assuring quality is the first because it is impossible to produce good furniture without good quality board.. Motivating and training employees in all phases of operations.

Locating facilities According to managers decisions on which purpose boards are producing for for, where to locate maintenance facilities, and where to locate major and minor breakdown. Appendix B

Winding

12 | P a g e

Linking

Lighting

13 | P a g e

Washing & Drying

Ironing

Appendix 3 Timeline
Operation JAN FEB MAR APR MAY JUN JUL AUG SEPT

A1 B2 C3 D4 E5

1 2

Purchase of Automated Jacquard Machines Training of Employees 3 Assembling Quality control team 4 Moveable lifts 5 Introduction of motivation packages for employees
14 | P a g e

References www.iteach.com www.mc-growhills .com

15 | P a g e

Вам также может понравиться