Goals G l for f Seawater S t Intake, I t k Outfall O tf ll and d Pretreatment Improvement for Membrane and Thermal Desalination Systems y
OVERVIEW 1 Seawater 1. S t System S t Classification Cl ifi ti 2. General Engineering Methodology 3 Hydraulic 3. H d li P Problems bl and dS Solutions l ti 4. Typical Intake Layouts 5. Goals
Open Channel Buried Pipes/Culverts Tunnel Combinations of above Beach Well None (direct intake)
Open Pit/ wet Well Closed Piping Combinations of above Screening Filtration Both in Combination
Open Pit/ wet Well Closed Piping Combinations None (gravity flow)
Open p Channel Buried Pipes/Culverts Tunnel Combinations of above None ( (direct outfall) )
Costs
Process
CAPEX Analysis of Capital Expenditures OPEX Analysis of Operational Expenditures (over Plant Life Time, Contract Duration)
Seawater Screening and Pumping Plants for Medium to Large Scale Installations
5. Goals
Investment cost reduction Operational O ti l cost t reduction d ti No maintenance for offshore work for e.g. 20 years g environmental impacts p Minimizing Increase in availability to 99% Optimization of pumping power Optimum solution for each individual location and project required
(considering pollution, algae, seaweed, mussels, oil, wastewater contamination, etc.)