KARNATAKA POWER TRANSM

Interruption details of 220kV and a


Sl. No. Time of Location / Station fault initiation Line/Equipment involved Load , generation,vo ltage, Hz, weather proir to the event 245 MW

Date

Cause of the event

12.09.13

0:05. hrs

500MVA ICT-1

Tripped on Trip coil 1 & 2 faulty Due to cascade trip of ICT-1

12.09.13

0:05. hrs 400KV Hoody

220kV HSR

90 MW

12.09.13

13:07 hrs

220kV HSR

Tripped while testing by RT staff Tripped on Distance Protection Relay

116 MW

16.09.13

13:20 hrs

220kV HAL-2

145 MW

16.09.13

23.16hrs 400kV Nelamangala

400kV NelamangalaGooty line

Fault trip

257MW

16.09.13

23.16hrs

400kV ,Gooty 50MVAR Shunt reactor

Reactor tripped on Back up impedance 50MVAR consequent to tripping of line fault.

7 01.09.13

22.45

400/220kV Station, Guttur

400kV Narendra-II

Over Voltage

26 MW, 62A, 24 MVAr, 419 kV, 58.12 Hz, Clowdy weather

8 02.09.13

11.45

400/220kV Station, Guttur

All 220kV Lines & 315 MVA ICT-I & II, 400kV GutturKaiga-II

LBB operation of 220kV Haveri-II Line

434 MW, 218 kV, 49.85 Hz, Clowdy weather

9 02.09.13

11.45

400/220kV Station, Guttur

220kV Davangere-I

LBB operation of 220kV Haveri-II Line

35 MW, 90 A 5 MVAr, 218 kV, 49.05 Hz, Clowdy weather 15 MW, 50 A 0 MVAr, 218 kV, 49.85 Hz, Clowdy weather 67 MW, 190 A 24 MVAr, 218 kV, 49.85 Hz, Clowdy weather

10 02.09.13

11.45

400/220kV Station, Guttur

220kV Davangere-II

LBB operation of 220kV Haveri-II Line

11 02.09.13

11.45

400/220kV Station, Guttur

220kV Chitradurga

LBB operation of 220kV Haveri-II Line

12 02.09.13

11.45

400/220kV Station, Guttur

220kV Itagi

LBB operation of 220kV Haveri-II Line

15 MW, 140 A 40 MVAr, 218 kV, 49.85 Hz, Clowdy weather 5 MW, 60 A 15 MVAr, 218 kV, 49.85 Hz, Clowdy weather

13 02.09.13

11.45

400/220kV Station, Guttur

220kV Ranebennur

LBB operation of 220kV Haveri-II Line

14 02.09.13

11.45

400/220kV Station, Guttur

220kV Haveri-I

LBB operation of 220kV Haveri-II Line

35 MW, 90 A 5 MVAr Clear weather

15 02.09.13

11.45

400/220kV Station, Guttur

220kV Haveri-II

LBB operation of 220kV Haveri-II Line

35 MW, 70A, __ MVAr Clear weather

16 02.09.13

11.45

400/220kV Station, Guttur

315 MVA ICT-I

LBB operation of 220kV Haveri-II Line

98 MW, 282A, 40 MVAr Clear weather

17 02.09.13

11.45

400/220kV Station, Guttur

315 MVA ICT-II

LBB operation of 220kV Haveri-II Line

89 MW, 254A, 35 MVAr Clear weather

18 02.09.13

23.35

400/220kV Station, Guttur

400kV Narendra-II

Over Voltage

3.5 MW, 46A, 21 MVAr, 415 kV, 49.63 Hz, Clear weather

19 03.09.13

08.00

400/220kV Station, Guttur

220kV Chitradurga

56 MW, 144 A 13 MVAr, Distance Protection 223 kV, 49.99 Hz, Clear weather 75 MW, 180 A 15 MVAr, 222 kV, 49.91 Hz, Clear weather 80 MW, 170 A -120 MVAr, 420 kV, 50.00 Hz, Clear weather

20 03.09.13

10.20

400/220kV Station, Guttur

220kV Haveri-I

Hand-Trip

21 08.09.13

23.08

400/220kV Station, Guttur

400kV Beeranahalli-I

Over voltage

22 08.09.13

23.08

400/220kV Station, Guttur

400kV Beeranahalli-I

Hand-Trip

80 MW, 170 A 120 MVAr, 421 kV, 50.19 Hz, Clear weather

23 10.09.13

00.23

400/220kV Station, Guttur

400kV Kaiga-I

Over voltage

100 MW, 130 A 30 MVAr, 422 kV, 50.15 Hz, Clear weather

24 10.09.13

00.23

400/220kV Station, Guttur

400kV Kaiga-I

Hand-Trip

100 MW, 130 A 30 MVAr, 422 kV, 58.15 Hz, Clear weather

25 12.09.13

00.06

400/220kV Station, Guttur

400kV Beeranahalli-I

Hand-Trip

120 MW, 240 A 120 MVAr, 420 kV, 50.12 Hz, Clear weather

26 12.09.13

00.06

400/220kV Station, Guttur

400kV Beeranahalli-I

Over Voltage

105 MW, 190 A 10 MVAr, 425 kV, 50.20 Hz, Clear weather

27 13.09.13

00.05

400/220kV Station, Guttur

400kV Kaiga-II

Over voltage

109 MW, 250 A 0 MVAr, 422 kV, 50.30 Hz, Clear weather

28 13.09.13

13.35

400/220kV Station, Guttur

220kV Ranebennur

CB Trouble

30 MW, 150 A 20 MVAr, 220 kV, 50.02 Hz, Clear weather

29 13.09.13

22.46

400/220kV Station, Guttur

400kV Kaiga-I

Hand-Trip

120 MW, 180 A 40 MVAr, 419 kV, 50.22 Hz, Clear weather

30 13.09.13

23.49

400/220kV Station, Guttur

400kV Beeranahalli-I

Hand-Trip

130 MW, 220 A 130 MVAr, 420 kV, 49.98 Hz, Clear weather

31 14.09.13

24.00

400/220kV Station, Guttur

400kV Narendra-I

Over Voltage

81 MW, 114 A 18 MVAr, 418 kV, 49.90 Hz, Clear weather

32 16.09.13

01.50

400/220kV Station, Guttur

400kV Beeranahalli-I

Over voltage

110 MW, 210 A 130 MVAr, 424 kV, 50.16 Hz, Clear weather

33 16.09.13

11.10

400/220kV Station, Guttur

220kV Davangere-I

Hand-Trip

50 MW, 120 A 10 MVAr, 203 kV, 49.94 Hz, Clear weather

34 16.09.13

22.55

400/220kV Station, Guttur

400kV Beeranahalli-I

Hand-Trip

120 MW, 200 A 130 MVAr, 420 kV, 50.00 Hz, Clear weather

35 21.09.13

02.12

400/220kV Station, Guttur

400kV Beeranahalli-I

Hand-Trip

160 MW, 270 A 130 MVAr, 422 kV, 50.23 Hz, Clear weather

36 21.09.13

15.20

400/220kV Station, Guttur

220kV Itagi

Hand-Trip

50 MW, 180 A 25 MVAr, 220 kV, 50.04 Hz, Clear weather

37 21.09.13

23.19

400/220kV Station, Guttur

400kV Beeranahalli-I

Hand-Trip

180 MW, 280 A 130 MVAr, 422 kV, 50.23 Hz, Clear weather

38 23.09.13

10.50

400/220kV Station, Guttur

220kV Itagi

40 MW, 160 A 25 MVAr, Distance Protection 220 kV, 50.14 Hz, Clear weather

39 23.09.13

23.59

400/220kV Station, Guttur

400kV Kaiga-I

Over Voltage

80 MW, 120 A 20 MVAr, 422 kV, 50.11 Hz, Clear weather

40 24.09.13

16.31

400/220kV Station, Guttur

315 MVA ICT-II

Hand-Trip

39 MW, 65 A 22 MVAr, 412 kV, 49.72 Hz, Clear weather

41 24.09.13

22.14

400/220kV Station, Guttur

400kV Narendra-II

Over-Voltage

22 MW, 109 A 47 MVAr, 418 kV, 50.05 Hz, Clear weather

42 26.09.13

17.05

400/220kV Station, Guttur

315 MVA ICT-II

Hand-Trip

64 MW, 98 A 22 MVAr, 412 kV, 49.94 Hz, Clear weather

43 28.09.13

12.01

400/220kV Station, Guttur

400kV Kaiga-II

Hand-Trip

80 MW, 170 A 0 MVAr, 405 kV, 49.83 Hz, Clear weather

44 28.09.13

23.03

400/220kV Station, Guttur

400kV Kaiga-I

Hand-Trip

80 MW, 110 A 10 MVAr, 417 kV, 50.09 Hz, Clear weather

45 29.09.13

15.12

400/220kV Station, Guttur

400kV Kaiga-II

Over-Voltage

70 MW, 140 A 0 MVAr, 413 kV, 49.66 Hz, Clear weather

46 29.09.13

20.22

400/220kV Station, Guttur

220kV Haveri-II

10 MW, 40 A 10 MVAr, 228 kV, Distance Protection 50.04 Hz, Clear weather

47 30.09.13

0.09

400/220kV Station, Guttur

400kV Beeranahalli-I

Hand-Trip

80 MW, 150 A 130 MVAr, 410 kV, 50.01 Hz, Clear weather

48 30.09.13

00.07

400/220kV Station, Guttur

400kV Kaiga-I

Hand-Trip

50 MW, 110 A 0 MVAr, 412 kV, 50.15 Hz, Clear weather

KA POWER TRANSMISSION CORPORATION LIMITED

ails of 220kV and above voltage class lines and equipments


Details of relay flags Duration in hrs. Relavent Sequence of system Data tripping with time From station B' phase Buccholtz trip To station Remedial measure taken --

0:05:00

--

--

--

0:15:00

--

--

Tripped on Group Tripped on Distance Protection 'A' relay Relay

--

0:58:00

--

--

Tripped while testing by RT staff Tripped on Distance Protection Relay Carrier send,DT send line Auto reclosed ans subsequently tripped on DTR

--

--

1:22:00

--

--

Tripped on 86B, 67N, 67B relays

--

0:27

Line tripped at both ends

Direct trip receive

0:27

Nil

Back up impedance

Nil

14.39

__

__

Hand Tripped vide SRLDC Code : 09/27 CPCC Code : 09/30

Test Charged at 13.24 Hrs. on 02.09.2013 vide SRLDC Code : 09/51 & CPCC Code : 09/50

1.56

__

220kV Haveri-II : DPR, R&B phase All 220kV Lines & OCR, LBB, ICTs, 400kV 220kV Bus-bar Guttur-Kaiga-II 315 MVA ICT-I & II Line are tripped at : same time. Non-directional EFR 51N,

_______

Attended Shor-circuit problem of DC CIrcuit of Haveri-II Line & tested the Circuit Breaker & found OK.

0.55

__

__

Bus-bar protection operated

__

Line was Test charged at 12.40 Hrs. on 02.09.2013 & Stood OK Line was Test charged at 12.40 Hrs. on 02.09.2013 & Stood OK Line was Test charged at 13.00 Hrs. on 02.09.2013 & Stood OK

0.55

__

__

Bus-bar protection operated

__

1.15

__

__

Bus-bar protection operated

__

0.43

__

__

Bus-bar protection operated

__

Line was Test charged at 12.28 Hrs. on 02.09.2013 & Stood OK Line was Test charged at 12.42 Hrs. on 02.09.2013 & Stood OK Line was Test charged at 12.45 Hrs. on 02.09.2013 & Stood OK Line was Test charged at 14.41 Hrs. on 04.09.2013 & Stood OK Line was Test charged at 14.20 Hrs. on 02.09.2013 & Stood OK Line was Test charged at 12.37 Hrs. on 02.09.2013 & Stood OK Test Charged at 08.11 Hrs. on 15.09.2013 vide SRLDC Code : 09/416 & CPCC Code : 09/557 & Stood OK

0.57

__

__

Bus-bar protection operated

__

1.00

__

__

Bus-bar protection operated

__

50.56

__

__

DPR, OCR, LBB

__

2.35

__

__

Bus-bar protection operated

__

0.52

__

__

Bus-bar protection operated

__

224.36

__

__

Hand Tripped vide SRLDC Code : 09/61 CPCC Code : 09/66

_______

0.45

__

__

DPR, Zone-II , Fault Loop : B-N, Fault Current : 1.800 kA Duration : Not measured Distance : Not measured

Not Tripped

Line was Test charged at 08.45Hrs. on 03.09.2013 & stood OK.

08.40

__

__

Hand-tripped to issue Line Clear to AEE, TLM, Davangere.

Line was Test charged at 19.10 Hrs. on 03.09.2013 & stood OK Charged on 10.09.2013 at 10.35 Hrs. vide SRLDC Code : 09/269 & CPCC Code : 09/337 & Stood OK Line was Test charged at 10.35 Hrs. on 10.09.2013 vide SRLDC Code : 09/269 & CPCC Code : 09/337 & stood OK.

35.27

__

__

Hand-tripped dueto Over Voltage vide SRLDC Code : 09/227 & CPCC Code : 09/291

Hand Trip

35.27

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/227 & CPCC Code : 09/219

__

_____

__

__

Hand-tripped dueto Over Voltage vide SRLDC Code : 09/249 & CPCC Code : 09/315

Hand Trip

Kept open due to Over Voltage

68.07

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/249 & CPCC Code : 09/315

__

Line was Test charged at 19.30 Hrs. on 13.09.2013 vide SRLDC Code : 09/353 & CPCC Code : 09/456 & stood OK. Line was Test charged at 07.44 Hrs. on 12.09.2013 vide SRLDC Code : 09/321 & CPCC Code : 09/407 & stood OK. Line was Test charged at 07.44 Hrs. on 12.09.2013 vide SRLDC Code : 09/321 & CPCC Code : 09/407 & stood OK. Line was Test charged at 09.05 Hrs. on 13.09.2013 vide SRLDC Code : 09/362 & CPCC Code : 09/469 & Stood OK Line was Test charged at 16.50 Hrs. on 13.09.2013 & stood OK

7.38

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/313 & CPCC Code : 09/399

__

7.28

__

__

Hand-tripped vide SRLDC Code : 09/313 CPCC Code : 09/399

__

9.00

__

__

DT Received

__

3.15

__

__

CB Lock-out, Autotrip

Not Tripped

227.13

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/379 & CPCC Code : 09/502

__

Line was Test charged at 09.59 Hrs. on 23.09.2013 vide SRLDC Code : 09/613 & CPCC Code : 09/863 & stood OK. Line was Test charged at 09.20 Hrs. on 14.09.2013 vide SRLDC Code : 09/393 & CPCC Code : 09/521 & stood OK. Line was Test charged at 07.30 Hrs. on 24.09.2013 vide SRLDC Code : 09/644 & CPCC Code : 09/914 & stood OK. Line was Test charged at 07.25Hrs. on 16.09.2013 vide SRLDC Code : 09/564 & CPCC Code : 09/426 & Line Stood OK

09.31

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/384 & CPCC Code : 09/507

__

235.30

__

__

Tripped on Overvoltage Stage-I Protection

DT Received

5.25

__

__

Tripped on Overvoltage Stage-I Protection

DT Received

4.27

__

__

Hand-tripped to issue LC AEE/M-II/ Guttur

__

Line was Test charged at 15.37 Hrs. on 16.09.2013 & OK Line was Test charged at 19.08 Hrs. on 19.09.2013 vide SRLDC Code : 09/516 & CPCC Code : 09/720 & stood OK. Line was Test charged at 07.57 Hrs. on 21.09.2013 vide SRLDC Code : 09/554 & CPCC Code : 09/775 & stood OK. Line was Test charged at 20.50 Hrs. on 21.09.2013 & stood OK Line was Test charged at 07.45 Hrs. on 23.09.2013 vide SRLDC Code : 09/601 & CPCC Code : 09/846 & stood OK.

68.13

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/441 & CPCC Code : 09/590

__

05.45

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/547 & CPCC Code : 09/768

__

5.55

__

__

Hand-tripped to issue LC AEE/MWD/ Davangere

__

32.26

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/577 & CPCC Code : 09/817

__

2.41

__

__

DPR, Y-ph-N, Fault Current : 10.74 kA, Distance : 3.70 Kms.

DPR, Y-ph-N, Distance : 58.73 Kms.

Line was Test charged at 13.31 Hrs. on 23.09.2013 & stood OK Line was Test charged at 09.00 Hrs. on 26.09.2013 vide SRLDC Code : 09/738 & CPCC Code : 09/1050 & stood OK. ICT-II 220kV Side Charged through Buscoupler Circuit Breaker. Line was Test charged at 08.07 Hrs. on 30.09.2013 vide SRLDC Code : 09/879 & CPCC Code : 09/1210 & stood OK.

57.01

__

__

Tripped on Overvoltage Stage-I Protection

__

00.52

__

__

Hand-tripped for attending 220kV CB Trouble

129.53

__

__

Hand-tripped vide SRLDC Code : 09/675 CPCC Code : 09/954

__

0.22

__

__

Hand-tripped for taking ICT-II on 220kV Regular Circuit Breaker

__

6.47

__

__

Hand-tripped to issue LC for Relay Testing at Guttur

___

Line was Test charged at 18.48 Hrs. on 28.09.2013 vide SRLDC Code : 09/835 & CPCC Code : 09/1165 & stood OK. Line was Test charged at 08.38 Hrs. on 29.09.2013 vide SRLDC Code : 09/848 & CPCC Code : 09/1180 & stood OK. Line was Test charged at 18.30 Hrs. on 29.09.2013 vide SRLDC Code : 09/854 & CPCC Code : 09/1186 & stood OK. Line was Test charged at 13.30 Hrs. on 30.09.2013 & stood OK Line was Test charged at 07.18 Hrs. on 30.09.2013 vide SRLDC Code : 09/877 & CPCC Code : 09/1207 & stood OK.

09.35

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/843 & CPCC Code : 09/1173

__

3.18

__

Tripped along Tripped on Overwith 220kV Haveri- voltage Stage-I/II I Line Protection

DT Received

17.08

__

__

DPR, Zone-I, Rph, Distance : 50.20 Kms.

Bus CVT Busted

07.09

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/872 & CPCC Code : 09/1202

__

07.45

__

__

Hand-tripped due to Over Voltage vide SRLDC Code : 09/867 & CPCC Code : 09/1197

__

Line was Test charged at 07.52 Hrs. on 30.09.2013 vide SRLDC Code : 09/878 & CPCC Code : 09/1208 & stood OK.

Catagorisation

Generation/load interrupted

Remarks

Un-forseen

245 MW

Un-forseen

90 MW

Un-forseen

116 MW

Un-forseen Auto reclosed due to line fault,But line tripped due to Nil malfunctioning of reactor back up protection Malfunctioning of reactor back up protection

145 MW

UnForeseen

No Load affected

UnForeseen

434 MW

Due to snapping of ground wire at location no.: 11 & 12 of 220kV HaveriII line which is 3.4 Kms. from 400kV Station, Guttur. At the same time, insulation failure of Synchronising socket of 220kV HaveriII Line has blowned-up DC Fuse of the line. Hence, 220kV Haveri-II line Circuit Breaker has not cleared the line fault. Due to which, LBB of the line has operated & cleared the fault.

Un-Foreseen

35 MW

Foreseen

Foreseen

Foreseen

Foreseen

No Load affected

Un-Foreseen

56 MW of Load was interrupted to 220kV Chitradurga Station.

Foreseen

Stringing of Earth-wire near Location No.12

Foreseen

No Load effected

Foreseen

No Load effected

Foreseen

No Load effected

Foreseen

No Load effected

Foreseen

No Load effected

Foreseen

No load was interrupted due other parallel line Beeranahalli-II is under charged condition.

Un-foreseen

__

Foreseen

Rectified Airleakage problem in CB & tested CB & found OK

Foreseen

No Load effected

Foreseen

No Load effected

Foreseen

No Load effected

Un-foreseen

No load was interrupted due other parallel line Beeranahalli-II is under charged condition.

Foreseen

No Load effected

Foreseen

No Load effected

Foreseen

Foreseen

No Load effected

Un-Foreseen

Foreseen

No Load effected

Foreseen

No Load effected

Un-Foreseen

No Load affected

Foreseen

No Load effected

Foreseen

No Load affected

Foreseen

No Load effected

Un-Foreseen

No Load affected

Foreseen

Foreseen

No Load effected

Foreseen

No Load effected