What are the Documents Required to start a packaged drinking water plant in India
Once you have taken a decision to start Mineral Water Plant In India, you will need to comply some government authorities :-

The List of Documents required to start a packaged drinking water plant in India:1. SSI REGISTRATION :The most basic Document needed for any small scale industry in India. Once you have an SSI registration , you can avail many government facilities. Usually this is available at the District Industries Centre , just check. It is not very difficult to get this. 2. BIS Registration [ISI Mark Certificate] This is mandatory for Packaged Drinking Water. The Standard is IS 14543. We have compiled a collection of all ISI Documents in one single place besides other very useful material. Just check the contents of our

Packaged Drinking Water Plant Training course


http: mineral!aterpro"ectinformation.org #ourse course$%.html

3.

POLLUCTION CONTROL CERTIFACATE. :This is available from the Local Pollution Board Office. Simple Procedure.

4.

ALL REQUIRED TEST REPORTS OF RAW AND PURE WATER. Can be had from a local Test Laboratory , just locate a Water Testing Lab ;

Check at the Local Drinking Water Testing Laboratory. Just go with your sample Water of 1 Ltr. Take sample from 2-3 locations & get it tested for Packaged Drinking Water.

http://mineralwaterprojectinformation.org/

5.

PEST CONTROL CERTIFICATE.

Approach a local pest Control guy, he will provide this.


6. 7. 8. 9.
10.

CHEMIST-DEGREE AND MEDICAL CERTIFICATE. MICROBIOLOGIST DEGREE AND MEDICAL CERTIFICATE. MEDICAL CERTIFICATE FOR WORKERS 4. N.O.C. OF GRAMPANCHAYAT (IF APPLICABLE) REGISTRATION OF TRADEMARK. (http://ipindia.nic.in/tmr_new/default.htm)

This will be very important. Approach some of the trademark consultants in your are. It is a lengthy procedure, start early.
11. 12. DOCUMENT REGARDING OWNERSHIP/LEASE OF LAND. MEMORANDUM OF ASSOCIATION OF COMPANIES/PARTNERSHIP DEED IF APPLICABLE. 13. 14. 15. Electrical load Sanction Sanction Layout Plan Land if not in Indl Area Should be NA #onsult local e&perts for 'dditional Documents as per your local (overning )odies

There will be many agencies with whom you will be required to work at a time. So , you will need to make a proper plan with crystal clear laid out duties & responsibilities for all of them. I suggest you make an excel sheet & make use of Google Calendar
.

*****