Techbpm
Complete Info on BPM

Pega Architecture Pega 7 Features Quick comparison with Pega 6.x

December 2, 2012

techbpm Knowledge Center, Pegasystems Pega Implementation Methodology, PRPC Implementation Methodology, SmartBPM Implementation Methodology Leave a comment

Pegasystems proposes two methodologies - 1) SmartBPM and 2)PegaScrum In this post, we will look into the SmartBPM methodology and understand the various phases involved, the kind of activities and deliverables in each phase. SmartBPM resembles the agile methodology where we break the requirements into smaller independent deployable modules (which are called as Slivers by Pega) and iterate the elaboration and construction cycle.

Inception Phase Activities: Kick off discussion with key stakeholders and define the scope of work. Understand and Capture the Business Objectives & High level requirements in the Application Profile. Prioritize the requirements based on the business needs and break them into slivers (small functional modules to be delivered in 4-6 weeks of time) High Level requirements would include high level use cases, reporting requirements and upstream/downstream applications that need to be integrated with. Do the project effort sizing using the DCO estimation template that comes within the Application Profile Do the flow and UI drafting within PRPC environment and gain acceptance Align the design and coding standards with the clients corporate standards (if any) Elaboration Phase Activities Accelerate the application profile with the Application Accelerator Elaborate the high level use cases into atomic level use cases Define class structure, rule hierarchy; design DB schema Setup the environment Create test plan and deployment strategy

1 of 2

12/3/2013 5:09 PM

Overview: Pega Implementation Methodology | Techbpm

http://techbpm.wordpress.com/2012/12/02/overview-pega-implementati...

Construction Phase Activities Design process flows, User interface; implement business rules (decision logic), routing logic, SLAs Build reports (Report definition wizard)
Blog at WordPress.com. The Notepad Theme

Use connectors/services to connect with external systems Unit Testing

Transition Phase Activities System Integration Testing (SIT) User Acceptance Test (UAT) Deployment and Release Notes documentation In my next post, I would write on the PegaScrum which as the name suggests adopts the Scrum methodology.
About these ads

Share this: Like this: Be the first to like this.

Leave a Reply

Pega Architecture Pega 7 Features Quick comparison with Pega 6.x

2 of 2

12/3/2013 5:09 PM

Вам также может понравиться