Вы находитесь на странице: 1из 39

ILF-SPC-AOT-CI-002-B

THE HASHEMITE KINGDOM OF JORDAN MINISTRY OF ENERGY AND MINERAL RESOURCES

Aqaba Oil Storage Terminal Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK
25.10.2013

ILF CONSULT ING ENG INEERS

Werner-Eckert-Str. 7, 81829 Munich, GERMANY Phone: +49-89-25 55 94 - 0 Fax: +49-89-25 55 94 - 144 E-mail: info.muc@ilf.com

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

REVISION

B A Rev.

25.10.2013

Issue for IFR

F. Jiricny F. Jiricny Prepared

D.Hoz S. Zanon Checked

S. Buchegger S. Buchegger Approved

23.10.2013 Issue for IDC Date Issue, Modification

ILF CONSULTING ENGINEERS

P a g e 2 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

TABLE OF CONTENTS 1 GENERAL 1.1 1.2 2 Purpose of the Document Scope of Work 7 7 7 7 7 8 9 9 10 10 11 11 12 12 12 12 12 12 13 14 14 15 18 18 21 21 21 22 22
P a g e 3 of 38

ABBREVIATIONS AND DEFINITIONS 2.1 2.2 Definitions Abbreviation

3 4 5

PARTICULAR CONDITIONS FOR THE EXECUTION OF THE SERVICES PROJECT DESCRIPTION EXTENT OF INVESTIGATION WORKS 5.1 5.2 General Field Investigations 5.2.1 5.2.2 5.2.3 5.2.4 5.2.5 5.2.6 5.2.7 5.2.8 5.3 5.4 5.5 Drilling Standard penetration test Dynamic Probing Super-Heavy Screw Plate Load Test Trial Pits Soil resistivity measurement Sampling Laboratory Tests

Deliverables Quality Control and HSE Investigation Locations

TECHNICAL SPECIFICATION 6.1 6.2 Codes and Standards Specification of Field Works 6.2.1 6.2.2 6.2.3 6.2.4 Building site equipment Drillings Storage of Core Samples Groundwater Monitoring

ILF CONSULTING ENGINEERS

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

6.2.5 6.2.6 6.2.7 6.2.8 6.2.9

Sampling Soil/Rock Samples Groundwater Samples Logging Photo Documentation

23 23 24 24 24 24 24 24 25 25 25 25 25 25 25 26 26 26 26 26 27 27 27 27 27 28 28 28 28 29 29
P a g e 4 of 38

6.2.10 Standard Penetration Test (SPT) 6.2.11 Dynamic Probing Super-Heavy (DPSH) 6.2.12 Screw Plate Load Test 6.2.13 Soil Resistivity Measurements 6.3 Specification of Laboratory Tests 6.3.1 6.3.2 6.3.3 6.3.4 6.3.5 6.3.6 6.3.7 6.3.8 6.3.9 Unit Weight Natural Moisture Content Particle Size Distribution Atterberg Limits Organic Matter Content Clay Mineral Analysis Swelling Tests Consolidation Tests Compaction Tests

6.3.10 Direct Shear Tests (effective shear parameters) 6.3.11 Triaxial Compression Tests 6.3.12 Unconfined Compression Tests 6.3.13 Poisson Ratio 6.3.14 Water Chemical Analyses (optional) 6.3.15 Soil Chemical Analyses 6.4 Report and Recommendation 6.4.1 6.4.2 6.4.3 6.4.4 6.4.5 General Daily Logs Weekly Reports Draft Factual Report Preliminary Report for the Tank Area

ILF CONSULTING ENGINEERS

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

6.4.6 7 SCHEDULE 7.1 7.2 8

Final Report

30 32 32 32 33 33

General Investigation in the Tank Area

BILL OF QUANTITIES 8.1 Bill of Quantities / Unit Prices

ILF CONSULTING ENGINEERS

P a g e 5 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

TABLES Table 1: List of definitions Table 2: List of abbreviations Table 3: List of samples Table 4: List of laboratory test Table 5: Coordinates of boreholes Table 6: Coordinates of dynamic probing super heavy Table 7: Coordinates of trial pits Table 8: Coordinates of screw plate load test

APPENDICES Appendix 1: Plot Plan - Investigation Locations

ILF CONSULTING ENGINEERS

P a g e 6 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

1 1.1

GENERAL Purpose of the Document The purpose of this document is to define the scope of work for the detail geotechnical investigation for the construction of the Aqaba Oil Storage Terminal.

1.2

Scope of Work The aim of the geotechnical investigations is to obtain the geological and geotechnical data basis for the detail design works and construction activities of the Aqaba Oil Storage Terminal including the following items: Geological underground built up Characteristic geotechnical parameters for the detail design of the tank foundations and all other buildings and structures Hydraulic properties of the relevant geotechnical section Aggressiveness and contamination of soil and groundwater to steel and concrete.

The works to be carried out include the following: Desk study of all existing data Field exploration by means of rotational core drillings and in-situ testing Laboratory testing Data evaluation and preparation of a geotechnical report and recommendations as defined in this specification.

In the course of the investigation works the scope may be adjusted depending on the results obtained in the course of the investigations, i.e. in case of very homogeneous or inhomogeneous conditions across the Aqaba Oil Storage Terminal.

2 2.1

ABBREVIATIONS AND DEFINITIONS Definitions In the present document the following definitions were used. Their meaning is explained in the table below.

ILF CONSULTING ENGINEERS

P a g e 7 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Definition Client

Explanation China Dalian International Economic & Cooperation Group Co., Ltd (EPC contractor) ILF MEMRs engineering contractor Contractor for ground investigation works The whole Aqaba Storage Terminal Any legal entity except the Client and Contractor for ground investigation works. Technical

Consultant Contractor Terminal Third Party

Table 1: List of definitions 2.2 Abbreviation In the present document the following abbreviations were used. Their meaning is explained in the table below. Abbreviation AASHTO Explanation American Association Transportation Officials Aqaba Oil Terminal ASTM International Standard Borehole British Standard China Dalian International Economic & Cooperation Group Co., Ltd (EPC Contractor) Dynamic Probing Super-Heavy East Health Safety Environmental ILF Consulting Engineers Jordanian Dinar Ministry of Energy and Mineral Resources North Technical of State Highway and

AOT ASTM BH BS-EN CDIG

DPSH E HSE ILF JD MEMR N

ILF CONSULTING ENGINEERS

P a g e 8 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Abbreviation S SPLT SPT TP W Table 2: List of abbreviations

Explanation South Screw Plate Load Test Standard Penetration Test Trial Pit West

PARTICULAR CONDITIONS FOR THE EXECUTION OF THE SERVICES The investigation works shall be performed by an experienced company appointed by the Client, which is familiar with the execution of the works mentioned below. The results of the geotechnical investigation will be used by CDIG, MEMR and/or contracted consultants for the preparation of the construction design and the authority permit applications (construction, operation or others).

PROJECT DESCRIPTION The Aqaba Oil Terminal where the soil investigation works shall be carried out is situated approx. 20 km south of Aqaba. For the Aqaba Oil Terminal the following main structures will be constructed: 6 crude oil tanks, storage capacity of 20.000 m, diameter of 40 m 2 fire water tanks, diameter of 16 m Fire brigade building 2 fire fighting foam buildings Workshop house Electrical substation Office building Load and transfer pump house Slop tanks Slop tank pump shelter
P a g e 9 of 38

ILF CONSULTING ENGINEERS

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Metering shelter Evaporation ponds with total volume of 3000 m Vapour recovery unit shelter Truck loading shelter Gate house 2 Weighbridges Roads and parking areas.

5 5.1

EXTENT OF INVESTIGATION WORKS General It is expected that the underground is built up of loose to medium dense alluvium deposits. Prior to the commencement of any investigation works the Contractor shall visit the investigation site in order to make himself familiar with the conditions on site. The Contractor shall conduct necessary field investigation work, laboratory testing, perform engineering analyses and write detailed recommendations in the form of a report in accordance with relevant standards and this specification. This includes gaining access to the drilling sites and performing any preparations necessary. The correctness of each investigation location has to be confirmed by the Client representative before mobilization to location. The Contractor is responsible for any site clearing and work platforms that may be required for accessing the investigation locations. He is also responsible for reinstatement of the investigation sites. In this regard the Contractor shall keep a photo-documentation of all investigation sites and access roads including photos prior investigation works and after reinstatement. All investigation points shall be surveyed with an accuracy of +/- 0,01 m in location and elevation. The Contractor is responsible for all logistics involved with any investigation activities including personnel transport, storage, equipment movements and supplies. Uniformity of substrata may permit the elimination of some investigations. Non-uniformity of substrata may warrant the addition or relocation of investigations. The Contractor shall propose modifications to program to maximize its engineering value to the project prior to the commencement of investigations. If during commencement of

ILF CONSULTING ENGINEERS

P a g e 10 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

the fieldwork, prevailing geotechnical conditions indicate to the Contractor that the proposed work requires modification, he shall recommend work necessary to provide the data required for construction. The Contractor shall submit such recommendations to the Client. Should the Client agree, the scope shall be altered accordingly and price agreed, prior to the commencement of the revised scope. Particular emphasis shall be placed by the Contractor on: The number of drillings, depths and locations The number and types of samples, tests etc. taken in boreholes and trial pits An estimate of the time and costs required to complete the Site Investigation.

Any change of the investigation program requires prior written approval by the Client. All investigation works shall be carried out with modern and fully functional equipment. The Contractor shall keep oil binders at every investigation site in case of damage. Leaking oil-, fuel and hydraulic pipes have to be repaired immediately in order to prevent environmental pollution. The Client reserves the right to intervene if the Contractor is performing to the Clients dissatisfaction or in an unsafe manner. The Client can refuse the deployment of equipment if it does not meet the requested technical standards. The Contractor shall replace defective equipment as soon as possible. Furthermore he shall take all necessary measures in order to make up the lost time. 5.2 5.2.1 Field Investigations Drilling A total number of 37 rotational core drillings with continuous coring with a total length of about 900 m shall be carried out: 6 drillings of 35 m depth 24 drillings of 25 m depth 2 drillings of 20 m depth 5 drillings of 10 m.

The applied method shall be rotary core drilling using air flush and front casing to avoid borehole collaps. Continuous coring has to be performed using a double tube core barrel with a minimum inner diameter of 100 mm. Due to the presence of non-cohesive soils, an appropriate core catcher has to be applied in order to allow core recovery in cohesionless soils such as sand and gravel. In the case that large boulders or solid rock are encountered during the drillings, water flushing may be used in order to penetrate boulders and solid rock.
ILF CONSULTING ENGINEERS P a g e 11 of 38
ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

5.2.2

Standard penetration test Standard Penetration Tests (SPT) shall be performed every 2 m in the borehole, from top to the final depth of the borehole. In solid rock, SPTs shall not be performed. A total number of 450 SPT shall be carried out.

5.2.3

Dynamic Probing Super-Heavy A total number of 44 Dynamic Probing Super-Heavy (DPSH) with a total length of about 825 m shall be carried out: 24 DPSH of 25 m depth 5 DPSH of 15 m depth 15 DPSH of 10 m depth.

5.2.4

Screw Plate Load Test A total number of 14 Screw Plate Load Tests (SPLT) to depth of 4 m below the existing ground surface shall be carried out.

5.2.5

Trial Pits A total number of 4 Trial Pits (TP) excavated to a depth of 4 m below the existing ground surface shall be carried out. The trial pits serve for the determination of the soil profile and for the collection of soil samples.

5.2.6

Soil resistivity measurement The soil resistivity measurements serve as a basis for the design of a cathodic protection. The soil resistivity measurement shall be performed in the vicinity of the following boreholes: BH01, BH06, BH11, BH16, BH21, BH26, BH31, BH32, BH33, BH35, BH37. A total amount of 11 soil resistivity measurements up to depth of 5 m below ground surface shall be carried out using the Wenner Four-Electrode Method.

5.2.7

Sampling The following table lists the proposed type and number of samples.

ILF CONSULTING ENGINEERS

P a g e 12 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Sample Type

Location

Proposed no. of samples 200 100 30

Disturbed Samples Undisturbed Samples Water Samples (if encountered)

BH/TP/SPLT BH BH

Table 3: List of samples Disturbed soil samples (non-cohesive soils) shall be taken from borehole cores, trial pits and from the SPT split-spoon sampler. Undisturbed samples shall be taken in the boreholes by means of a thin-walled sampling tube from cohesive soil (if encountered). Sampling shall cover all ground layers/types encountered in the course of the field investigation. The Contractor shall verify whether the proposed amount of samples is sufficient to execute all proposed laboratory tests. If the proposed amount of samples is not sufficient the contractor shall propose an increase of the samples. The change of amount of the samples shall be approved by the Client. 5.2.8 Laboratory Tests Laboratory tests shall be conducted on samples taken from the boreholes. Laboratory Test Unit Weight Natural Moisture Content Particle Size Analysis (sieve and hydrometer) Atterberg Limits (LL, PL, PI) Organic Matter Contents Clay Mineral Analysis (X-ray Diffractometry) Swell or Settlement Potential of Cohesive Soils Consolidation Test (Oedometer Test) Compaction Test (Modified Proctor Test) Consolidated Undrained Direct Shear Test on Cohesive Soils Triaxial Compression Tests (consolidated, undrained) test on
ILF CONSULTING ENGINEERS P a g e 13 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Laboratory Test cohesive soil including determination of Poisson ratio Unconfined Compression Test on rock Unconfined Compressive Strength of Cohesive Soil Optional: Water Chemical Analysis (standard parameters according to national standards valid in the Hashemite Kingdom of Jordan), only if groundwater encountered Optional: Water Chemical Analysis on Steel and Concrete Aggressiveness, only if groundwater encountered Soil Chemical Analysis on Steel and Concrete Aggressiveness. Table 4: List of laboratory test In case of heterogeneous geotechnical conditions the laboratory tests can differ. 5.3 Deliverables The Contractor shall prepare and issue the following reports: 5.4 Weekly report including the daily logs Preliminary report for the tank area Draft factual geotechnical Investigation report Final report.

Quality Control and HSE The Contractor shall employ experienced and sufficient staff, familiar with the utilized equipment. The Contractor shall provide a minimum of one experienced geotechnical engineer or geologist in the field full time during the field investigation. The geotechnical engineer/geologist shall supervise and observe all surface exploration operations, classify samples, define the extend of laboratory tests to be carried out on the individual samples, make and record site observations, and prepare logs of drillings, soundings, etc. The acceptance of the Contractors geotechnical engineer/geologist for the job depends on approval of the CV by the Client prior to commencement of any work on site. The Contractor shall prepare a detailed execution plan with his bid for approval by the Client prior to field work. The execution plan shall include exhaustive treatment of the following aspects of execution:

ILF CONSULTING ENGINEERS

P a g e 14 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

logistics health and safety plan risk assessment protection of environment interfaces human-resource allocation plan which shall list key personnel, responsibilities, qualifications, and experience all major items of equipment and operating procedures work method statement for all investigation activities.

The work plan shall comply with all pertinent local laws, regulations, and codes. The Contractor shall keep daily records of all activities on site. Furthermore the Contractor shall provide weekly reports including investigation progress and status of the work relative to the planned time schedule. He shall identify reasons if progress in the field work is slower than originally planned, and steps taken to make up the lost time. The laboratory performing the laboratory tests has to be authorised by the state authority for carrying out the respective tests. The laboratory performing the tests requires approval by the Client prior to the commencement of any tests, and shall be identified in the report. All applied testing equipment shall be in good condition and fully functional. The equipment shall have the legally obligated inspections. The inspection reports shall be available at the laboratory and shall be presented on request to the Client representative during visits of the laboratory. The final report must be submitted with a seal and signature of a geotechnical engineer/geologist who is legally entitled to practice in the Hashemite Kingdom of Jordan. 5.5 Investigation Locations In Appendix 1 is provided the plot plan of the proposed investigation locations. The following tables list the coordinates of the boreholes (BH), the dynamic probing super heavy (DPSH), the screw plate load test (SPLT) and the trial pits (TP) including the depth below the ground surface to be reached. The coordinates are given in the Palestine Belt coordinate system.
Borehole BH1 BH2 BH3 BH4 BH5 Location Tank AOT-T4, Centre Tank AOT-T4, Rand N Tank AOT-T4, Rand E Tank AOT-T4, Rand S Tank AOT-T4, Rand W East 303 345.57 303 346.04 303 365.56 303 345.09 303 325.59 North 252 606.41 252 626.41 252 605.94 252 586.42 252 606.88 Depth [m] 35 25 25 25 25
P a g e 15 of 38

ILF CONSULTING ENGINEERS

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Borehole BH6 BH7 BH8 BH9 BH10 BH11 BH12 BH13 BH14 BH15 BH16 BH17 BH18 BH19 BH20 BH21 BH22 BH23 BH24 BH25 BH26 BH27 BH28 BH29 BH30 BH31 BH32 BH33 BH34 BH35 BH36 BH37

Location Tank AOT-T5, Centre Tank AOT-T5, Rand N Tank AOT-T5, Rand E Tank AOT-T5, Rand S Tank AOT-T5, Rand W Tank AOT-T6, Centre Tank AOT-T6, Rand N Tank AOT-T6, Rand E Tank AOT-T6, Rand S Tank AOT-T6, Rand W Tank AOT-T3, Centre Tank AOT-T3, Rand N Tank AOT-T3, Rand E Tank AOT-T3, Rand S Tank AOT-T3, Rand W Tank AOT-T1, Centre Tank AOT-T1, Rand N Tank AOT-T1, Rand E Tank AOT-T1, Rand S Tank AOT-T1, Rand W Tank AOT-T2, Centre Tank AOT-T2, Rand N Tank AOT-T2, Rand E Tank AOT-T2, Rand S Tank AOT-T2, Rand W Loading and Transfer Pump House Office Building Slop Tanks Fire Water Tank Fire Water Tank Truck Loading Shelter Truck Loading Shelter

East 303 343.91 303 344.39 303 363.91 303 343.44 303 323.94 303 342.26 303 342.73 303 362.25 303 341.79 303 322.26 303 271.56 303 272.03 303 291.56 303 271.09 303 251.58 303 253.52 303 253.99 303 273.51 303 252.20 303 233.52 303 203.97 303 204.44 303 223.96 303 203.49 303 183.99 303 173.93 303 109.52 303 135.08 303 055.53 303 075.15 303 076.78 303 085.66

North 252 536.43 252 556.43 252 535.96 252 516.44 252 536.90 252 466.45 252 486.44 252 465.98 252 446.46 252 466.92 252 638.85 252 658.85 252 638.38 252 618.86 252 639.32 252 571.22 252 591.21 252 570.74 252 551.22 252 571.69 252 620.66 252 640.65 252 620.19 252 600.67 252 621.13 252 554.67 252 612.41 252 505.57 252 550.13 252 553.99 252 525.01 252 479.87

Depth [m] 35 25 25 25 25 35 25 25 25 25 35 25 25 25 25 35 25 25 25 25 35 25 25 25 25 10 10 10 20 20 10 10

Table 5: Coordinates of boreholes

DPSH DPSH1 DPSH2 DPSH3 DPSH4 DPSH5 DPSH6 DPSH7 DPSH8 DPSH9 DPSH10 DPSH11 DPSH12 DPSH13

Location Tank AOT-T4, NW Tank AOT-T4, NE Tank AOT-T4, SE Tank AOT-T4, SW Tank AOT-T5, NW Tank AOT-T5, NE Tank AOT-T5, SE Tank AOT-T5, SW Tank AOT-T6, NW Tank AOT-T6, NE Tank AOT-T6, SE Tank AOT-T6, SW Tank AOT-T3, NW

East 303 335.21 303 356.42 303 355.92 303 334.71 303 334.06 303 354.77 303 353.77 303 333.06 303 331.90 303 353.11 303 352.61 303 331.40 303 261.21

North 252 617.27 252 616.76 252 595.56 252 596.06 252 547.27 252 546.78 252 525.59 252 526.08 252 477.30 252 476.80 252 455.60 252 456.10 252 649.71

Depth [m] 25 25 25 25 25 25 25 25 25 25 25 25 25
P a g e 16 of 38

ILF CONSULTING ENGINEERS

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

DPSH DPSH14 DPSH15 DPSH16 DPSH17 DPSH18 DPSH19 DPSH20 DPSH21 DPSH22 DPSH23 DPSH24 DPSH25 DPSH26 DPSH27 DPSH28 DPSH29 DPSH30 DPSH31 DPSH32 DPSH33 DPSH34 DPSH35 DPSH36 DPSH37 DPSH38 DPSH39 DPSH40 DPSH41 DPSH42 DPSH43 DPSH44

Location Tank AOT-T3, NE Tank AOT-T3, SE Tank AOT-T3, SW Tank AOT-T1, NW Tank AOT-T1, NE Tank AOT-T1, SE Tank AOT-T1, SW Tank AOT-T2, NW Tank AOT-T2, NE Tank AOT-T2, SE Tank AOT-T2, SW Loading and Transfer Pump House Loading and Transfer Pump House Office Building Office Building Workshop Workshop Slop Tanks Pump Shelter Slop Tanks Evaporation Pond Evaporation Pond Fire Water Tank Fire Water Tank Fire Water Tank Fire Water Tank Fire Water Tank Truck Loading Shelter Truck Loading Shelter AOT Substation Building Foam Building Fire Brigade Building

East 303 282.42 303 260.71 303 281.91 303 243.16 303 264.37 303 263.87 303 242.66 303 193.61 303 214.82 303 214.32 303 193.11 303 161.14 303 186.63 303 107.21 303 111.92 303 120.48 303 117.90 303 131.67 303 138.29 303 136.82 303 178.54 303 050.50 303 052.91 303 066.03 303 076.87 303 080.27 303 081.22 303 087.88 303 156.39 303 177.29 303 052.50

North 252 649.20 252 628.50 252 628.00 252 582.07 252 581.57 252 560.36 252 560.86 252 631.51 252 631.01 252 609.81 252 610.31 252 567.50 252 542.13 252 624.81 252 600.26 252 592.71 252 550.73 252 515.85 252 490.01 252 416.75 252 415.80 252 556.34 252 542.57 252 552.19 252 561.80 252 547.84 252 502.44 252 468.59 252 539.40 252 520.68 252 573.46

Depth [m] 25 25 25 25 25 25 25 25 25 25 25 10 10 10 10 10 10 10 10 10 10 15 15 15 15 15 10 10 10 10 10

Table 6: Coordinates of dynamic probing super heavy

TP TP1 TP2 TP3

Location Metering Shelter Evaporation Pond Fire Brigade Building

East 303 141.66 303 158.77 303 069.23

North 252 611.46 252 432.78 252 570.62

Depth [m] 4 4 4

Table 7: Coordinates of trial pits

ILF CONSULTING ENGINEERS

P a g e 17 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

SPLT SPLT1 SPLT2 SPLT3 SPLT4 SPLT5 SPLT6 SPLT7 SPLT8 SPLT9 SPLT10 SPLT11 SPLT12 SPLT13 SPLT14

East 303 141.66 303 158.77 303 069.23 303 302.84 303 230.76 303 172.66 303 131.90 303 140.29 303 153.83 303 083.57 303 097.17 303 106.13 303 034.42 303 053.05

North 252 611.46 252 432.78 252 570.62 252 534.01 252 536.79 252 593.24 252 576.33 252 533.70 252 464.88 252 590.10 252 540.45 252 494.80 252 579.56 252 484.88

Depth [m] 4 4 4 4 4 4 4 4 4 4 4 4 4 4

Table 8: Coordinates of screw plate load test Detailed locations and depth may only be varied as the work proceeds after written instruction by the Client representative. The Contractor shall study all the above information before visiting the site to determine that sufficient information has been presented to enable him to submit an economical and professional report.

6 6.1

TECHNICAL SPECIFICATION Codes and Standards All geotechnical field investigation work, laboratory testing, and performing engineering analyses shall be in accordance with the relevant British Standard (BS-EN), AASHTO, ASTM standards in their latest editions and specification and with this specification. Other standards or specifications may be acceptable only with prior approval by the Client. The following documents are applicable standards and form part of this Specification. Current editions shall be applied unless otherwise indicated. Where the work performed is not covered by the below mentioned standards, the procedures followed shall be approved by the Client prior to utilization.

ILF CONSULTING ENGINEERS

P a g e 18 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) AASHTO T267 Determination of Organic Content of Soils by Loss on Ignition

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM D420 Standard Guide to Site Characterization for Engineering Design and Construction Purposes Standard Test Method for Particle-Size Analysis of Soils Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort Standard Test for Amount of Material in Soils finer than the No. 200 Sieve Standard Penetration Test and Split-Barrel Sampling of Soils Standard Method for Thin-walled Tube Sampling of Soils for Geotechnical Purposes Standard Method for Thick Wall, Ring-lined, Split Barrel, Drive Sampling of Soils Standard Practice for Rock Core Drilling and Sampling of Rock for Site Investigation Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass Standard Test Methods for One-Dimensional Consolidation Properties of Soils Using Incremental Loading Standard Classification of Soils for Engineering Purposes (Uniform Soil Classification System) Standard Practice for Description and Identification of Soil (Visual Manual Procedure) Standard Test Methods for Moisture, Ash, and Organic Matter of Peat and Other Organic Soils Standard Practice for Preserving and Transporting Soil Samples Standard Test Methods for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density
P a g e 19 of 38

ASTM D422 ASTM D1557

ASTM D1140

ASTM D1586 ASTM D1587

ASTM D3550

ASTM D2113

ASTM D2216

ASTM D2435

ASTM D2487

ASTM D2488

ASTM D2974

ASTM D4220 ASTM D4254

ILF CONSULTING ENGINEERS

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

ASTM D4318

Standard Test Methods for Liquid Limit, Plastic Limit and Plasticity Index of Soils Standard Test Method for Consolidated Compression Test for Cohesive Soils Undrained Triaxial

ASTM D4767

ASTM D5434

Standard Guide for Field Logging of Subsurface Explorations of Soil and Rock Standard Test Method for Consolidated Undrained Direct Simple Shear Testing of Cohesive Soils Standard Test Method for Direct Shear Test of Soils under Consolidated Drained Conditions Compressive Strength and Elastic Moduli of Intact Rock Core Specimens under Varying States of Stress and Temperatures Standard Test Method for Unconfined Compressive Strength of Cohesive Soil One-dimensional Swell or Settlement Potential of Cohesive Soils Standard Test Method for Field Measurement of Soil Resistivity Using the Wenner Four-Electrode Method Suggested Method for Screw-Plate Load Test Standard Method for Conducting and Evaluating Laboratory Corrosion Tests in Soils

ASTM D6528

ASTM D3080

ASTM D7012

ASTM D2166

ASTM D4546 ASTM G57 95a

STP 38477S ASTM G162

BRITISH STANDARD BS 5930 Code of practice for site investigations

BS EN ISO 22476-2 Geotechnical investigation and testing-Field testing-dynamic probing (DPSH)

GERMAN INDUSTRIAL STANDARD DIN 4030-1 Assessment of water, soil and gases for their aggressiveness to concrete Part 1: Principles and limiting values Assessment of water, soil and gases for their aggressiveness to concrete Part 2: Sampling and analysis of water and soil samples

DIN 4030-2

ILF CONSULTING ENGINEERS

P a g e 20 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Units of Measurement The SI units of measurement shall be used exclusively.

6.2 6.2.1

Specification of Field Works Building site equipment This item includes as follows: Mobilization to the building site, the installation and preparation for commencement of construction works of all devices, tools, drilling rigs and other equipment necessary to fulfil all construction works according to contract Mobilization, installation and operation of supply and disposal facilities. The cost of preparation, maintenance and operation of devices and plants including hire charges and fees have to be included in the unit prices (drillings, probings, etc.) Demobilization of all construction devices, equipment, plants Rebuilding of all spaces and roads in use for construction works to their initial condition Clearance of any contamination caused by the Contractor Compensation money for entering private places, for use of access roads, working and storing places, costs and compensations for clearings, fences and crop damages have to be included.

Additional difficulties caused by adverse weather conditions have to be included. 6.2.2 Drillings Rotational core drilling with double core barrel for drilling in soil and weathered rock, vertical, with continuous sampling in all soil types (cohesive and non-cohesive), for drilling in soil continuous front casing has to be applied, aligned to drilling diameter. Excessive boring pressure has to be avoided in order to prevent core compaction. The drilling equipment shall enable the change of drilling rods and drilling bits at any time. Loss of drilling rod is on the Contractors account. A core catcher has to be applied for core recovery in non-cohesive soils (sand and gravel). In soil, a minimum total core recovery (TCR) of 70% has to be achieved. The maximum planned drilling depth is 35 m. If massive rock is encountered the drilling depth may be reduced to min. 5 m of solid rock.
ILF CONSULTING ENGINEERS P a g e 21 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

A minimum sample diameter of 100 mm at any drilling depth has to be guaranteed In case of technical difficulties during production of the borehole which hinder reaching the minimum diameter. The required minimum diameter may be undershot with approval by the Client. Water flushing may not be used for drilling in soil and weathered rock in order to preserve the natural moisture content and the sample quality. If massive rock or huge boulders are encountered the use of water flushing is allowed. Drilling rig, drilling method and drilling diameter have to be chosen in a way that all requirements specified in this document and the standards are guaranteed. All boreholes have to be backfilled immediately after all drilling works and in-situ testing is completed. Backfill works have to be carried out carefully to avoid settlements. The backfill material shall be adequate soil material available in the vicinity of the site. The Contractor is responsible for the provision and transport of the material. As an option, some boreholes may require backfill using cement based grout or Bentonite pellets (Compactonit). The Contractor is responsible for the provision and transport of the material. Due to the amount of drillings, Contractor shall be ready to employ more than one drill rig for simultaneous drilling. 6.2.3 Storage of Core Samples All recovered drilling cores shall be stored in wooden core boxes with a length of approximately 1 m. The cores shall be covered by plastic foil sleeves to maintain the natural moisture content. Sections where samples for laboratory testing were taken shall be marked on the core box. The core boxes shall be labelled adequately with project name, name of drilling, total depth, the respective depth of core in the box and date of commencement in order to avoid mix up. Core boxes shall be stored in a shady, dry place to maintain sample quality. 6.2.4 Groundwater Monitoring If groundwater is encountered during drilling the groundwater table elevation shall be measured within the boreholes on a regular basis. The following measurements shall be carried out: Initial groundwater elevation encountered in the borehole Groundwater elevation at the beginning of the day Groundwater elevation at the end of the day Additional groundwater observations during the day: type and depth Groundwater elevation upon completion of the borehole
ILF CONSULTING ENGINEERS P a g e 22 of 38
ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

The measurements shall be carried out with an adequate measuring device allowing for an accuracy of 0,01 m (reference point is ground elevation). Groundwater observations shall be documented in the daily logs with indication of the depth below ground elevation (see also chapter 6.4.2 daily logs). The initial and final groundwater elevation, if significantly different, as well as any additional groundwater horizons identified shall be presented in the borehole logs. 6.2.5 Sampling Sampling of soil, rock and water shall be carried out according to ASTM D213 and ASTM D4220. Contractor has to make sure that sufficient soil sampling material is taken from trial pits and boreholes to carry out all laboratory tests specified in this document according to the applicable standards. Size of samples shall be large enough so that retain samples will be still available after completion of laboratory testing. In case cohesive soils will be encountered special emphasis shall be placed on taking undisturbed samples which are necessary for soil mechanical tests such as triaxial tests and consolidation tests. 6.2.6 Soil/Rock Samples Disturbed samples shall be taken at each change in strata or at every approx. 4 m depth of borehole, whichever is the lesser. Disturbed samples shall be taken from borehole cores, SPT split-spoon sampler and from trial pits. Special care shall be taken on the amount of sampling material necessary for the specified laboratory tests. Undisturbed samples of cohesive soil shall be taken from boreholes at each change in strata or at approx. 9 m centres. Undisturbed sampling of cohesive soils shall be performed according to ASTM D1587. Sample diameter has to be at least 100 mm, the lengths minimum 2 times the diameter. Three times the diameter is recommended. The size of sample material has to be sufficient to commence laboratory tests in an appropriate manner and to keep retain samples. Preservation and transport of samples shall be in accordance with the relevant ASTM standard. Preservation of samples shall be carried out immediately after sampling in order to preserve sample quality. In the time between sampling and transport to the laboratory the samples shall be stored in a shady, dry place (preferably an air-conditioned room) to preserve sample quality.

ILF CONSULTING ENGINEERS

P a g e 23 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

6.2.7

Groundwater Samples Samples of groundwater shall be taken if groundwater is encountered within the boreholes. Samples from boreholes shall be taken after the groundwater has been cleared by pumping to avoid a negative influence from drilling works. Water samples shall be filled into clean containers that shall be provided by the analysing laboratory. Inappropriate sample containers will be rejected.

6.2.8

Logging Logs of drillings have to be made according to ASTM D5434.

6.2.9

Photo Documentation Coloured photos shall be taken from all recovered core samples. Each photo (minimum camera resolution 6 megapixel photos in best quality) shall include a label indicating the title of the drilling and sample, a scale, a colour bar, and depth of the sample at each side of the core box. The photos shall be taken vertically down on the samples to avoid distortion. The light conditions shall be carefully chosen to avoid over- / underexposure or shadow. The photos shall be submitted in hard copy and digital format (.jpg) on CD. Photos of poor quality will not be accepted.

6.2.10

Standard Penetration Test (SPT) SPT shall be carried out in all bore holes in soil up to the full depth of boring at 2 m centres. In case a SPT cannot be conducted in a borehole at the desired depth, the Contractor shall identify and remediate the problem and conduct another test immediately below the desired depth. The test shall be carried out according to ASTM D1586.

6.2.11

Dynamic Probing Super-Heavy (DPSH) The test shall be carried out according to BS EN ISO 22476-2 (DPSH).

6.2.12

Screw Plate Load Test 14 screw plate load test setups with an average depth of 4 m shall be performed. Tests shall be performed every 1 m in the borehole. The first test shall be performed at depth=1 m below ground surface, the last test in depth=4 m below ground surface. A total of 56 tests shall be performed. Depending on the soil layers encountered during the screw plate load test, the depth and number of screw plate load tests can be increased optionally.

ILF CONSULTING ENGINEERS

P a g e 24 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

The boreholes produced by the screw shall be backfilled immediately after performance of the tests. For backfilling, the natural soil furthered by the screw shall be used. The tests shall be carried out according to American Standard STP 38477S 6.2.13 Soil Resistivity Measurements Soil resistivity measurements shall be carried out with the Wenner 4-electrode method. The tests shall be carried out according to ASTM G57 95a. 6.3 6.3.1 Specification of Laboratory Tests Unit Weight Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers. The tests shall be carried out according to ASTM D4254. 6.3.2 Natural Moisture Content Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers. The tests shall be carried out according to ASTM D2216. 6.3.3 Particle Size Distribution Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers. The test shall include both sieve and hydrometer tests. The tests shall be carried out according to ASTM D422 and ASTM D1140. 6.3.4 Atterberg Limits The test shall include Liquid limit (LL), Plastic limit (PL) and plasticity index (PI). Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers. The tests shall be carried out according to ASTM D4318. 6.3.5 Organic Matter Content Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers, especially cohesive material. The tests shall be carried out according to AASHTO T267.
ILF CONSULTING ENGINEERS P a g e 25 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

6.3.6

Clay Mineral Analysis If clay is encountered, clay mineral analyses have to be carried out at representative samples. Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers and an assessment of potentially swelling clay minerals shall be made. The clay mineral analyses shall be carried out by means of X-ray diffractometry.

6.3.7

Swelling Tests If clay is encountered, swelling tests have to be carried out at representative samples. Tests shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers containing cohesive material. The tests shall be carried out according to ASTM D4546.

6.3.8

Consolidation Tests Depth of samples shall be distributed lower than foundation level of the planned constructions and cover the total depth of the investigations. Tests shall be applied to all characteristic soil layers. The tests shall be carried out according to ASTM D2435.

6.3.9

Compaction Tests Compaction tests with determination of dry unit weight and optimum moisture content. The test shall be applied to excavation material for use as back fill and to excavation material used for construction of bund walls. Samples for testing shall be taken equal to or higher than foundation level. Tests shall be applied to all characteristic soil layers in this section. The tests shall be carried out according to ASTM D1557.

6.3.10

Direct Shear Tests (effective shear parameters) Depth of samples shall cover the total depth of the investigations. Tests shall be applied to all characteristic soil types. The tests shall be carried out according to ASTM D6528 for cohesive soils and according to ASTM D3080 for non-cohesive soils.

ILF CONSULTING ENGINEERS

P a g e 26 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

6.3.11

Triaxial Compression Tests Depth of samples shall cover the total depth of the investigations. Tests shall be applied to all cohesive soil types. The tests shall be carried out according to ASTM D4767 (consolidated-undrained).

6.3.12

Unconfined Compression Tests If soils of high cohesion and/or rock are encountered unconfined compression tests shall be carried out. The tests shall be carried out in a way that the Poisson ratio is also determined with the test. Depth of samples shall cover the total depth of the investigations. Tests shall be applied to all characteristic rock types and soils of high cohesion. The test shall be carried out according to ASTM D2166 for cohesive soils and according to ASTM D7012 for rock.

6.3.13

Poisson Ratio Poisson ratio shall be determined by means of: Unconfined compression tests (rock) Empiric estimations (soil)

6.3.14

Water Chemical Analyses (optional) If groundwater is encountered in a borehole chemical analysis shall be carried out. The investigations shall include: In-situ measurement of electrical conductivity, water temperature and pHvalue Laboratory determination of steel and concrete aggressiveness of ground water (according to DIN 4030-1 and DIN 4030-2).

6.3.15

Soil Chemical Analyses On selected soil samples, chemical analyses of soil aggressiveness to steel and concrete shall be carried out. Chemical analyses of soil corrosivity on metals shall be carried out according to ASTM G162. Chemical analyses on soil aggressiveness to concrete shall be carried out according to DIN 4030-1 and 4030-2.

ILF CONSULTING ENGINEERS

P a g e 27 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

6.4 6.4.1

Report and Recommendation General All submitted reports shall be in English language. The SI units of measurement system shall be used exclusively.

6.4.2

Daily Logs The Contractor shall keep daily records of the activities on site. One log shall be kept per drilling / screw plate load test / sounding and other field exploration / testing activity per day. The logs shall be available on site and shall be submitted on a weekly basis to the Client (see chapter 6.4.3). The log shall contain in minimum the following information but must not be limited to: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. Project, title and location of drilling, sounding or any other exploration / test Date, time of start and time of closure Weather conditions Drilling rig, sounding rig and any other exploration/testing equipment Operators Drilling depth at the beginning and at the end of the day Position of the casing at the beginning and at the end of the day Depth of the screw plate load test and number of tests performed Initial groundwater elevation encountered in the borehole or screw plate load test Groundwater elevation at the beginning and at the end of the day Additional groundwater observations during the day: type and depth Final groundwater elevation upon completion of the borehole Conducted tests and testing depth Samples: sample description and sampling depth Problems / incidents / still stand occurring during the day

All daily reports per boring, sounding or any other exploration / test shall be numbered consecutively. A blueprint of the daily log shall be submitted to the Client for review, prior to the commencement of any investigation works on site. 6.4.3 Weekly Reports Weekly reports shall include in minimum the following:
ILF CONSULTING ENGINEERS P a g e 28 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Complete daily reports of each BH, DPSH, SPLT of the previous week Borehole logs in accordance with ASTM D5434 Written progress reports including summary of work completed, description of un-usual or unanticipated conditions encountered, assessment of adequacy of work scope and any recommended modifications, and statement of progress related to the planned schedule. This shall also include all laboratory works. Reasons if progress in the field and laboratory work is slower than originally planned, and steps taken to make up the lost time.

A blue print of the weekly report shall be submitted to the Client for review prior to the commencement of the soil investigations. The Contractor shall submit a soft copy in .pdf format of the draft report. All coloured drawings and photos shall be submitted as coloured copy. 6.4.4 Draft Factual Report The draft factual report summarizing all field works and preliminary results shall be submitted 1 week after finalization of the field works. The draft factual report shall include in minimum the following content but is not limited to: Summary of all conducted field work Geological cross sections including spatial distribution of soil / rock layers, groundwater table, boreholes Final logs of drillings including SPT results, and other field exploration / testing activity (DPSH, SPLT), containing all field log information Presentation of the in-situ test results in tables and graphs including soil classification (according to ASTM D2487).

6.4.5

Preliminary Report for the Tank Area The design of the storage tanks foundation is on the critical time path. Therefore it is necessary get information needed for the design of the tanks foundation as quick as possible. The preliminary report for the tank area shall include in minimum the following content but is not limited to: Final logs of drillings including SPT results, and logs of DPSH at the tank area (BH01, BH06, BH11, BH16, BH21, BH26 and DPSH01 DPSH24) Records, tables and graphs of laboratory tests done on samples taken at the tank area (from the boreholes: BH01, BH06, BH11, BH16, BH21 and BH26)
P a g e 29 of 38

ILF CONSULTING ENGINEERS

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Presentation of the test results in tables and graphs including soil classification (according to ASTM D2487) Geological cross sections below the tanks including spatial distribution of soil / rock layers, groundwater table, boreholes, geotechnical parameters etc. Characteristic geotechnical soil parameters (strength and stiffness properties) for each soil / rock layer encountered at the tank area.

6.4.6

Final Report The final report shall consist of two parts and shall include in minimum the following content but is not limited to: Part one: Geotechnical Data Section: Brief description of the applied methodology Summary of all conducted field work and laboratory testing Presentation of the test results in tables and graphs including soil classification (according to ASTM D2487), grading curves, water levels Test results shall be grouped according to the geotechnical relevant soil layers. All individual soil / rock layers shall be characterized with in-situ and laboratory test geotechnical parameters Final logs of drillings including SPT results, and other field exploration / testing activity (DPSH, SPLT), containing all field log information plus results of analysis, laboratory descriptions of samples as determined by the Contractor, and shall include technical information concerning the lithology, mineralogical composition, groundwater elevation and structural relations of soils and rocks Records, tables and graphs of all laboratory tests Geological cross sections including spatial distribution of soil / rock layers, groundwater table, boreholes, geotechnical parameters etc. Photo documentation including all coloured photos of the borehole core samples and the investigation site Map of all investigation locations (drillings, probing, any other tests) with adequate titles for identification Other environmental information such as prevailing wind direction and wind velocities, level seismic hazard, peak ground acceleration and velocity etc.

Part two: Geotechnical Interpretative Section: Recapitulating description of all findings


P a g e 30 of 38

ILF CONSULTING ENGINEERS

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Comprehensive description of the geological / geotechnical / hydrogeological conditions Comprehensive description interpretations / conclusions and recommendations Geological / geotechnical / hydrogeological cross sections.

On the basis of a comprehensive description of the geological / geotechnical / hydrogeological conditions, engineering recommendations have to be developed. In order to guide the geotechnical design for the foundations and earth works of the proposed facilities the interpretative part of the draft / final report shall comprise of the following results: Characteristic geotechnical soil parameters for each soil / rock layer Estimation of load bearing capacity of soils Estimation of settlement behaviour of soils Evaluation of chemical aggressiveness of soil/groundwater to concrete and buried constructions Coefficient of sliding concrete to soil Active, passive and at rest soil pressure coefficients Permeability of surface soak-aways Evaluation of collapse and swelling potential of soils Evaluation of the suitability of the on-site excavated material for structural fill, pipe bedding, bund wall, drainage layers etc. including lift depth and methods of compaction and potential for use as concrete aggregates.

The Contractor shall submit five hard copies and one electronic copy (in .pdf format on CD) of the final report. Submitted electronic copy/data shall have the same structure as the hard copy. All coloured drawings and photos shall be submitted as coloured copy. In addition all drawing shall be submitted in .dwg format, all photos in .jpg format and all data and analysis of field, in situ and laboratory tests in .xls format.

ILF CONSULTING ENGINEERS

P a g e 31 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

7 7.1

SCHEDULE General The Contractor shall prepare a detailed schedule for performing the work on site and in the laboratory. The plan shall be reviewed and approved by the Client. The field works shall be performed and finalized within a time span of 6 weeks. A Draft Factual Report summarizing all field works and preliminary results shall be submitted 1 week after finalization of the field works. All deliverables including the Final Report shall be submitted 2 weeks after submittal of the Draft Factual Report.

7.2

Investigation in the Tank Area The design of the storage tanks foundation is on the critical time path. Therefore it is necessary get information needed for the design of the tanks foundation as quick as possible. For this reason the sequence of works shall be as follows: 1) Execute one borehole per tank (BH01, BH06, BH11, BH16, BH21, BH26) and DPSH01-DPSH24 2) 3) Then execute the remaining boreholes for each tank Start with the laboratory tests on samples taken from the boreholes BH01, BH06, BH11, BH16, BH21, BH26 immediately Supply the results in the preliminary report for the tank area in the extend as specified in the chapter 6.4.5.

4)

The preliminary report for the tank area shall be submitted within two weeks after enter of the contract.

ILF CONSULTING ENGINEERS

P a g e 32 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

8 8.1

BILL OF QUANTITIES Bill of Quantities / Unit Prices

Item

Description

Unit

Unit Price in JD

Quantity

Total Price in JD

0.0

Installation of Construction Site Installation of building site as pointed out in chapter 6.2.1 Field Work Drilling in soil and weathered rock Rotary core drilling with casing in soil and weathered rock, core diameter min. 100 mm, depth from 0 to 10m Rotary core drilling with casing in soil and weathered rock, core diameter min. 100 mm, depth from 10 to 20m Rotary core drilling with casing in soil and weathered rock, core diameter min. 100 mm, depth from 20 to 30m Rotary core drilling with casing in soil and weathered rock, core diameter min. 100 mm, depth from 30 to 40m m 370 pcs. 1

0.1

1.0 1.1

1.1.1

1.1.2

320

1.1.3

180

1.1.4

30

ILF CONSULTING ENGINEERS

P a g e 33 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Item

Description

Unit

Unit Price in JD

Quantity

Total Price in JD

1.2

Storage of borehole cores in wooden core boxes Borehole backfill

900

1.3

1.3.1

Borehole backfill and sealing with earth material Borehole backfill and sealing with concrete grout (optional) Borehole backfill and sealing with bentonite pellets (Compactonite) (optional) SPT

900

1.3.2

1.3.3

1.4

pcs.

450

1.5

DPSH

1.5.1

DPSH depth from 0-10m

440

1.5.2

DPSH depth from 10-20m

265

1.5.3

DPSH depth from 20-30m

120

1.6

Screw Plate Load Test in pcs. average 4 m deep including backfill, testing interval 1m Excavation of Trial pits in average 4 m deep including backfill Survey pcs.

14

1.7

1.8

ILF CONSULTING ENGINEERS

P a g e 34 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Item

Description

Unit

Unit Price in JD

Quantity

Total Price in JD

1.8.1

Survey of drillings and DPSH, accuracy +/0,01 m in position and elevation respectively

pcs.

81

1.8.2

Survey of trial pits and pcs. screw plate load tests by means of handheld GPS Sampling Disturbed samples Undisturbed samples Water samples Soil resistivity measurements Laboratory Tests Unit weight Natural Moisture Content Particle size analysis (sieve and hydrometer) Atterberg limits (LL,PL,PI) Organic matter content Clay mineral analysis (Xray diffractometry) pcs. pcs. pcs. pcs. pcs. pcs. pcs.

17

1.9 1.9.1 1.9.2 1.9.3 1.10

200 100 30 11

2.0 2.1 2.2 2.3

90 90 90

2.4 2.5 2.6

pcs. pcs. pcs.

30 20 15

2.7

Swell or Settlement Poten- pcs. tial of Cohesive Soils Consolidation test pcs.

15

2.8 2.9

40 15

Compaction test / Optipcs. mum moisture content test

ILF CONSULTING ENGINEERS

P a g e 35 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Item

Description

Unit

Unit Price in JD

Quantity

Total Price in JD

2.10

Consolidated Undrained pcs. Direct Shear test on Cohesive Soils Direct Shear test of Soils pcs. under Consolidated Drained Conditions Triaxial Compression test (consolidated, undrained) on Cohesive Soil Unconfined compressive strength on Cohesive Soil Unconfined compressive strength on Rock Water chemical analysis (standard parameters according to national Standard of Jordan) (optional) Water chemical analysis on steel aggressiveness (optional) pcs.

40

2.11

40

2.12

30

2.13

pcs.

30

2.14

pcs.

30

2.15

pcs.

15

2.16

pcs.

15

2.17

Water chemical analysis pcs. on concrete aggressiveness (optional) Soil chemical analysis on steel aggressiveness Soil chemical analysis on concrete aggressiveness Report and recommendation Weekly reports Preliminary report for the tank area pcs. pcs.

15

2.18

15

2.19

pcs.

15

3.0

3.1 3.2

6 1

ILF CONSULTING ENGINEERS

P a g e 36 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Item

Description

Unit

Unit Price in JD

Quantity

Total Price in JD

3.3

Draft Factual Geotechnical pcs. Investigation Report Final report Costs on hourly base Site geologist drilling operator labourer Laydown time of drilling / sounding / excavator operator including staff h h h h pcs.

3.4 4.0 4.1 4.2 4.3 4.4

1 1 1 1

ILF CONSULTING ENGINEERS

P a g e 37 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013

Aqa ba O il St or a ge Te rm i na l Project AQABA OIL TERMINAL GEOTECHNICAL INVESTIGATION SPECIFICATION AND SCOPE OF WORK

I L F- SPC- AO T- CI- 0 0 2 - B 25.10.2013

Appendix 1: Plot Plan - Investigation Locations

ILF CONSULTING ENGINEERS

P a g e 38 of 38

ILF/P:\G Projects\G297 Aqaba TF PMC\Docs for Client\CI Civil\editable\02 AOT - Aqaba Oil Terminal\ILF-SPC-AOT-CI-002 Geotechnical Investigation Specification and SoWork\Rev B\ILF-SPC-AOT-CI-002-B
Geotechnical Investigation Specification.docx

2013