BILLEST COMPUTER AIDED ESTIMATING SYSTEM

Southern Province Engineering Services

BSR Class

BRASS FOUNDER.

BSR Reference

10-00-01

Description

Removing and refixing of bolts, casement fastners or satays, including making good to holts

Unit

Nos.

in frames and sashes.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Material Rate

0.00

Unit Rate(Direct Labour)

22.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

21.38

BSR Reference

10-00-02

Description

Supplying and fixing polished of 63mm heavy quaLitery brass barrel bolts with brass

Unit

Nos.

screws.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

Bolt barrel brass 63mm Nos.

0.0%

1.00

35.00

35.00

Brass screws 25mm Nos.

0.0%

6.00

1.80

10.80

45.80
0.00

Unit Rate(Direct Labour)

60.65

Unit Rate (Labour Sub Con)

59.91

Wednesday, March 29, 2006

Page 1 of 395

Southern Province Engineering Services

BSR Reference

10-00-03

Description

Supplying fixing and polishing of 75mm heavy quaLitery brass barrel bolts with brass

Unit

Nos.

screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

Bolt barrel brass 75mm Nos.

0.0%

1.00

45.00

45.00

Brass screws 25mm Nos.

0.0%

6.00

1.80

10.80

Material Rate

55.80

Plant Rate

0.00

Unit Rate(Direct Labour)

70.65

Unit Rate (Labour Sub Con)

69.91

BSR Reference

10-00-04

Description

Supplying fixing and polishing of 100mm heavy quaLitery brass barrel bolts with brass

Unit

Nos.

screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

Bolt barrel brass 100m Nos.

0.0%

1.00

55.00

55.00

Brass screws 25mm Nos.

0.0%

6.00

1.80

10.80

Material Rate

65.80

Plant Rate

0.00

Unit Rate(Direct Labour)

80.65

Unit Rate (Labour Sub Con)

79.91

BSR Reference

10-00-05

Description

Supplying fixing and polishing of 125mm heavy quaLitery brass barrel bolts with brass

Unit

Nos.

screws.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

Bolt barrel brass 125mm Nos.

0.0%

1.00

66.00

66.00

Brass screws 25mm Nos.

0.0%

6.00

1.80

10.80

76.80
0.00

Unit Rate(Direct Labour)

91.65

Unit Rate (Labour Sub Con)

90.91

Wednesday, March 29, 2006

Page 2 of 395

Southern Province Engineering Services

BSR Reference

10-00-06

Description

Supplying fixing and polishing of 150mm heavy quaLitery brass barrel bolts with brass

Unit

Nos.

screws.

Resource Unit

Wastag

Quantit

Rate Type

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

Nos.

0.0%

1.00

70.00

70.00

Brass screws 25mm Nos.

0.0%

6.00

1.80

10.80

Bolt barrel brass 150mm

Material Rate

80.80

Plant Rate

0.00

Unit Rate(Direct Labour)

95.65

Unit Rate (Labour Sub Con)

94.91

BSR Reference

10-00-07

Description

Supplying and fixing of 200mm brass skeleten bolts with brass screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Bolt skeleton brass 200mm Nos.

0.0%

1.00

75.00

75.00

Brass screws 16mm gauge 8 Nos.

0.0%

9.00

1.50

13.50

Material Rate

88.50

Plant Rate

0.00

Unit Rate(Direct Labour)

111.00

Unit Rate (Labour Sub Con)

109.88

BSR Reference

10-00-08

Description

Supplying and fixing of 250mm brass skeleten bolts with brass screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Bolt skeleton brass 250mm Nos.

0.0%

1.00

85.00

85.00

Brass screws 16mm gauge 8 Nos.

0.0%

9.00

1.50

13.50

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

98.50
0.00

Unit Rate(Direct Labour)

121.00

Unit Rate (Labour Sub Con)

119.88

Wednesday, March 29, 2006

Page 3 of 395

Southern Province Engineering Services

BSR Reference

10-00-09

Description

Supplying and fixing of 300mm brass skeleten bolts with brass screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Bolt skeleton brass 300mm Nos.

0.0%

1.00

90.00

90.00

Brass screws 16mm gauge 8 Nos.

0.0%

9.00

1.50

13.50

Material Rate

103.50

Plant Rate

0.00

Unit Rate(Direct Labour)

126.00

Unit Rate (Labour Sub Con)

124.88

BSR Reference

10-00-10

Description

Supplying of 450mm brass skeleten bolts fixing with brass screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Bolt skeleton brass 450mm Nos.

0.0%

1.00

220.00

220.00

Brass screws 16mm gauge 8 Nos.

0.0%

12.00

1.50

18.00

Material Rate

238.00

Plant Rate

0.00

Unit Rate(Direct Labour)

260.50

Unit Rate (Labour Sub Con)

259.38

BSR Reference

10-00-11

Description

Supplying, fixing polished of 50mm heavy quaLitery brass cabin hooks, fixing with brass

Unit

Nos.

screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Cabin hook brass 50mm Nos.

0.0%

1.00

25.00

25.00

Screws Brass 12mm Gauge 6mm Nos.

0.0%

9.00

0.80

7.20

Material Rate
Plant Rate

32.20
0.00

Unit Rate(Direct Labour)

54.70

Unit Rate (Labour Sub Con)

53.58

Wednesday, March 29, 2006

Page 4 of 395

Southern Province Engineering Services

BSR Reference

10-00-12

Description

Supplying, fixing polishing of 75mm heavy quaLitery brass cabin hooks, fixing with brass

Unit

Nos.

screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Cabin hook brass 75mm Nos.

0.0%

1.00

30.00

30.00

Screws Brass 12mm Gauge 6mm Nos.

0.0%

9.00

0.80

7.20

Material Rate

37.20

Plant Rate

0.00

Unit Rate(Direct Labour)

59.70

Unit Rate (Labour Sub Con)

58.58

BSR Reference

10-00-13

Description

Supplying, fixing polishing of 150mm heavy quaLitery brass cabin hooks, fixing with

Unit

Nos.

brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Cabin hook brass 150mm Nos.

0.0%

1.00

40.00

40.00

Screws Brass 12mm Gauge 6mm Nos.

0.0%

9.00

0.80

7.20

Material Rate

47.20

Plant Rate

0.00

Unit Rate(Direct Labour)

69.70

Unit Rate (Labour Sub Con)

68.58

BSR Reference

10-00-14

Description

Supplying, fixing polishing of 200mm heavy quaLitery brass cabin hooks, fixing with

Unit

Nos.

brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Cabin hook brass 200mm Nos.

0.0%

1.00

50.00

50.00

Screws Brass 12mm Gauge 6mm Nos.

0.0%

9.00

0.80

7.20

Material Rate
Plant Rate

57.20
0.00

Unit Rate(Direct Labour)

79.70

Unit Rate (Labour Sub Con)

78.58

Wednesday, March 29, 2006

Page 5 of 395

Southern Province Engineering Services

BSR Reference

10-00-15

Description

Supplying, fixing polishing of 225mm heavy quaLitery brass cabin hooks, fixing with

Unit

Nos.

brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Cabin Hook Brass 225mm Nos.

0.0%

1.00

60.00

60.00

Screws Brass 12mm Gauge 6mm Nos.

0.0%

9.00

0.80

7.20

Material Rate

67.20

Plant Rate

0.00

Unit Rate(Direct Labour)

89.70

Unit Rate (Labour Sub Con)

88.58

BSR Reference

10-00-16

Description

Supplying, fixing polishing of 250mm heavy quaLitery brass cabin hooks, fixing with

Unit

Nos.

brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Cabin hook brass 250mm Nos.

0.0%

1.00

70.00

70.00

Screws Brass 12mm Gauge 6mm Nos.

0.0%

9.00

0.80

7.20

Material Rate

77.20

Plant Rate

0.00

Unit Rate(Direct Labour)

99.70

Unit Rate (Labour Sub Con)

98.58

BSR Reference

10-00-17

Description

Supplying, fixing polishing of 300mm heavy quaLitery brass cabin hooks, fixing with

Unit

Nos.

brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Cabin hok brass 300mm Nos.

0.0%

1.00

80.00

80.00

Screws Brass 12mm Gauge 6mm Nos.

0.0%

9.00

0.80

7.20

Material Rate
Plant Rate

87.20
0.00

Unit Rate(Direct Labour)

109.70

Unit Rate (Labour Sub Con)

108.58

Wednesday, March 29, 2006

Page 6 of 395

Southern Province Engineering Services

BSR Reference

10-00-18

Description

Supplying of Brass heavy quaLitery casement fastners with mortice plate polished, and

Unit

Nos.

fixing with brass screws.

Resource Unit

Wastag

Quantit

Rate Type

0.0%

32.06

1.00

32.06

Carpenter Nos.

0.0%

0.75

45.00

33.75

Brass screws 16mm gauge 8 Nos.

0.0%

4.00

1.50

6.00

Casement fastener brass Nos.

0.0%

1.00

40.00

40.00

Material Rate

46.00

Plant Rate

0.00

Unit Rate(Direct Labour)

79.75

Unit Rate (Labour Sub Con)

78.06

BSR Reference

10-00-19

Description

Supplying, fixing polishing of 250mm heavy quaLitery casement stays.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Brass screws 16mm gauge 8 Nos.

0.0%

4.00

1.50

6.00

Casement stay Brass 250mm Nos.

0.0%

1.00

40.00

40.00

Material Rate

46.00

Plant Rate

0.00

Unit Rate(Direct Labour)

68.50

Unit Rate (Labour Sub Con)

67.38

BSR Reference

10-00-20

Description

Supplying, fixing polishing of 300mm heavy quaLitery casement stays.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Brass screws 16mm gauge 8 Nos.

0.0%

4.00

1.50

6.00

Casement stay brass 300mm Nos.

0.0%

1.00

55.00

55.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

61.00
0.00

Unit Rate(Direct Labour)

83.50

Unit Rate (Labour Sub Con)

82.38

Wednesday, March 29, 2006

Page 7 of 395

Southern Province Engineering Services

BSR Reference

10-00-21

Description

Supplying and fixing of heavy quaLitery brass fanlight catches complete with brass screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

32.06

1.00

32.06

Carpenter Nos.

0.0%

0.75

45.00

33.75

Brass screws 16mm gauge 8 Nos.

0.0%

4.00

1.50

6.00

Fanlight catch brass Nos.

0.0%

1.00

35.00

35.00

Material Rate

41.00

Plant Rate

0.00

Unit Rate(Direct Labour)

74.75

Unit Rate (Labour Sub Con)

73.06

BSR Reference

10-00-22

Description

Supplying , fixing and polishing of heavy quaLitery brass door handles , fixing with brass

Unit

Nos.

screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

10.69

1.00

10.69

Carpenter Nos.

0.0%

0.25

45.00

11.25

Brass screws 50mm gauge 10 Nos.

0.0%

4.00

4.50

18.00

Door handle Nos.

0.0%

1.00

60.00

60.00

Material Rate

78.00

Plant Rate

0.00

Unit Rate(Direct Labour)

89.25

Unit Rate (Labour Sub Con)

88.69

BSR Reference

10-00-23

Description

Supplying , fixing and polishing of 150mm brass safety type heavy quaLitery hasf and

Unit

Nos.

staple, fixing with brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Brass screws 16mm gauge 8 Nos.

0.0%

7.00

1.50

10.50

Hasp & Staple safety type brass 150mm Nos.

0.0%

1.00

75.00

75.00

Material Rate
Plant Rate

85.50
0.00

Unit Rate(Direct Labour)

108.00

Unit Rate (Labour Sub Con)

106.88

Wednesday, March 29, 2006

Page 8 of 395

Southern Province Engineering Services

BSR Reference

10-00-24

Description

Supplying , fixing and polishing of 100mm brass safety type heavy quaLitery hasf and

Unit

Nos.

staple, fixing with brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Brass screws 16mm gauge 8 Nos.

0.0%

7.00

1.50

10.50

Hasp& staple safwely type brass 100mm Nos.

0.0%

1.00

45.00

45.00

Material Rate

55.50

Plant Rate

0.00

Unit Rate(Direct Labour)

78.00

Unit Rate (Labour Sub Con)

76.88

BSR Reference

10-00-25

Description

Supplying and fixing of Brass hat hoots with brass screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Brass screws 25mm Nos.

0.0%

4.00

1.80

7.20

hat hook brass Nos.

0.0%

1.00

20.00

20.00

Material Rate

27.20

Plant Rate

0.00

Unit Rate(Direct Labour)

49.70

Unit Rate (Labour Sub Con)

48.57

BSR Reference

10-00-26

Description

Supplying , fixing and polishing of 50mm heavy quaLitery brass butt hinges, fixing with

Unit

Nos.

brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

20.66

1.00

20.66

Carpenter Nos.

0.0%

0.25

45.00

11.25

Unskilled Labour Nos.

0.0%

0.35

30.00

10.50

Hinge butt brass 50mm*38mm Nos.

0.0%

1.00

20.00

20.00

Screws brass 20mm* gauge 6 Nos.

0.0%

0.50

12.00

6.00

Material Rate
Plant Rate

26.00
0.00

Unit Rate(Direct Labour)

47.75

Unit Rate (Labour Sub Con)

46.66

Wednesday, March 29, 2006

Page 9 of 395

Southern Province Engineering Services

BSR Reference

10-00-27

Description

Supplying , fixing and polishing of 75*38*2.03mm (0.066kg) heavy quaLitery brass butt

Unit

Nos.

hinges, fixing with brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

27.07

1.00

27.07

Carpenter Nos.

0.0%

0.38

45.00

17.10

Unskilled Labour Nos.

0.0%

0.38

30.00

11.40

Brass screws 25mm Nos.

0.0%

6.00

1.80

10.80

Hinge butt brass 75mm*38mm Nos.

0.0%

1.00

35.00

35.00

Material Rate

45.80

Plant Rate

0.00

Unit Rate(Direct Labour)

74.30

Unit Rate (Labour Sub Con)

72.87

BSR Reference

10-00-28

Description

Supplying , fixing and polishing of 87*60*2.67mm (0.144kg) heavy quaLitery brass butt

Unit

Nos.

hinges, fixing with brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

27.07

1.00

27.07

Carpenter Nos.

0.0%

0.38

45.00

17.10

Unskilled Labour Nos.

0.0%

0.38

30.00

11.40

Brass screws 25mm Nos.

0.0%

6.00

1.80

10.80

Hinge butt brass 89mm*63mm Nos.

0.0%

1.00

30.00

30.00

Material Rate

40.80

Plant Rate

0.00

Unit Rate(Direct Labour)

69.30

Unit Rate (Labour Sub Con)

67.87

BSR Reference

10-00-29

Description

Supplying, fixing and polishing of 100x63x3.05mm(0.218Kg) heavy quality brass butt

Unit

Nos.

hinges, fixing with brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

27.07

1.00

27.07

Carpenter Nos.

0.0%

0.38

45.00

17.10

Unskilled Labour Nos.

0.0%

0.38

30.00

11.40

Hinge butt brass 100mm 63mm Nos.

0.0%

1.00

40.00

40.00

Screws Brass 40mm x gauge8 Nos.

0.0%

8.00

2.50

20.00

Material Rate
Plant Rate

60.00
0.00

Unit Rate(Direct Labour)

88.50

Unit Rate (Labour Sub Con)

87.07

Wednesday, March 29, 2006

Page 10 of 395

Southern Province Engineering Services

BSR Reference

10-00-30

Description

Supplying, fixing and polishing of 125x100x3.96mm(0.380Kg) heavy quality brass butt

Unit

Nos.

hinges, fixing with brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

27.07

1.00

27.07

Carpenter Nos.

0.0%

0.38

45.00

17.10

Unskilled Labour Nos.

0.0%

0.38

30.00

11.40

Hinge butt brass 125mm*100mm Nos.

0.0%

1.00

60.00

60.00

Screws Brass 40mm x gauge8 Nos.

0.0%

8.00

2.50

20.00

Material Rate

80.00

Plant Rate

0.00

Unit Rate(Direct Labour)

108.50

Unit Rate (Labour Sub Con)

107.07

BSR Reference

10-00-31

Description

Supplying, fixing and polishing of heavy quality Brass center pivot hinges(consisting of 2

Unit

Nos.

piece), fixing with brass screws

Resource Unit

Wastag

Quantit

Amount

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Hinge centre pivot brass Nos.

0.0%

1.00

25.00

25.00

Screws Brass 25mm X gauge8 Nos.

0.0%

5.00

1.80

9.00

Material Rate

34.00

Plant Rate

0.00

Unit Rate(Direct Labour)

71.50

Unit Rate (Labour Sub Con)

69.62

BSR Reference

10-00-32

Description

Supplying of Brass gravity hinges and fixing with brass screws

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Hinge gavity brass Nos.

0.0%

1.00

50.00

50.00

Screws Brass 40mm x gauge8 Nos.

0.0%

8.00

2.50

20.00

Material Rate
Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

70.00
0.00

Unit Rate(Direct Labour)

107.50

Unit Rate (Labour Sub Con)

105.63

Wednesday, March 29, 2006

Page 11 of 395

Southern Province Engineering Services

BSR Reference

10-00-33

Description

Supplying,fixing and polishing of 100x90x2.67mm brass parliamentary heavy quality

Unit

Nos.

hinges, fixing with brass screws complete

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

27.07

1.00

27.07

Carpenter Nos.

0.0%

0.38

45.00

17.10

Unskilled Labour Nos.

0.0%

0.38

30.00

11.40

Hinge parliamentary brass 100mm Nos.

0.0%

1.00

46.00

46.00

Screws Brass 40mm x gauge8 Nos.

0.0%

8.00

2.50

20.00

Material Rate

66.00

Plant Rate

0.00

Unit Rate(Direct Labour)

94.50

Unit Rate (Labour Sub Con)

93.07

BSR Reference

10-00-34

Description

Supplying,fixing and polishing of 125x150x3.05mm brass parliamentary heavy quality

Unit

Nos.

hinges, fixing with brass screws complete.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

27.07

1.00

27.07

Carpenter Nos.

0.0%

0.38

45.00

17.10

Unskilled Labour Nos.

0.0%

0.38

30.00

11.40

Hinge parliamentary brass 125mm Nos.

0.0%

1.00

56.00

56.00

Screws Brass 40mm x gauge8 Nos.

0.0%

8.00

2.50

20.00

Material Rate

76.00

Plant Rate

0.00

Unit Rate(Direct Labour)

104.50

Unit Rate (Labour Sub Con)

103.07

BSR Reference

10-00-35

Description

Supplying,fixing and polishing of 150x180x3.05mm brass parliamentary heavy quality

Unit

Nos.

hinges, fixing with brass screws complete

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

27.07

1.00

27.07

Carpenter Nos.

0.0%

0.38

45.00

17.10

Unskilled Labour Nos.

0.0%

0.38

30.00

11.40

Hinge parlimentary brass 150mm Nos.

0.0%

1.00

60.00

60.00

Screws Brass 40mm x gauge8 Nos.

0.0%

10.00

2.50

25.00

Material Rate
Plant Rate

85.00
0.00

Unit Rate(Direct Labour)

113.50

Unit Rate (Labour Sub Con)

112.07

Wednesday, March 29, 2006

Page 12 of 395

Southern Province Engineering Services

BSR Reference

10-00-36

Description

Repairing and re-fixing of available spring hinges.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

118.75

1.00

118.75

Black Smith Nos.

0.0%

2.00

40.00

80.00

Carpenter Nos.

0.0%

1.00

45.00

45.00

Screws etc Nos.

0.0%

20.00

1.00

20.00

Material Rate

0.00

Unit Rate(Direct Labour)

145.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

138.75

BSR Reference

10-00-37

Description

Supplying and fixing of 100mm brass, double acting spring hinges.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Hinge Spring double acting brass Nos.

0.0%

1.00

200.00

200.00

Screws Brass 40mm x gauge8 Nos.

0.0%

8.00

2.50

20.00

Material Rate

220.00

Plant Rate

0.00

Unit Rate(Direct Labour)

257.50

Unit Rate (Labour Sub Con)

255.63

BSR Reference

10-00-38

Description

Fixing of hinges in position with brass screws.9hinges supplied by Client)

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Screws Brass 40mm x gauge8 Nos.

0.0%

8.00

2.50

20.00

Material Rate
Plant Rate

Unit

20.00
0.00

Unit Rate(Direct Labour)

57.50

Unit Rate (Labour Sub Con)

55.63

Wednesday, March 29, 2006

Page 13 of 395

Southern Province Engineering Services

BSR Reference

10-00-39

Description

Making and supplying brass keys for door locks.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

95.00

1.00

95.00

Black Smith Nos.

0.0%

2.50

40.00

100.00

Blank key Nos.

0.0%

20.00

1.00

20.00

Material Rate

0.00

Unit Rate(Direct Labour)

120.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

115.00

BSR Reference

10-00-40

Description

Supplying fixing and polishing good quaLitery brass door kNosbs.

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

10.69

1.00

10.69

Carpenter Nos.

0.0%

0.25

45.00

11.25

Brass door knob Nos.

0.0%

1.00

35.00

35.00

Screws etc Nos.

0.0%

20.00

1.00

20.00

Material Rate

35.00

Plant Rate

0.00

BSR Reference

10-00-41

Description

Fixing and available door locks.

Resource Unit

Unit Rate(Direct Labour)

66.25

Unit Rate (Labour Sub Con)

65.69

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

64.13

1.00

64.13

Carpenter Nos.

0.0%

1.50

45.00

67.50

Screws brass 25mm*gauge 7 Nos.

0.0%

0.50

22.00

11.00

Material Rate
Plant Rate

Unit

11.00
0.00

Unit Rate(Direct Labour)

78.50

Unit Rate (Labour Sub Con)

75.13

Wednesday, March 29, 2006

Page 14 of 395

Southern Province Engineering Services

BSR Reference

10-00-42

Description

Repairing and re-fixing of door locks.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

140.13

1.00

140.13

Black Smith Nos.

0.0%

2.00

40.00

80.00

Carpenter Nos.

0.0%

1.50

45.00

67.50

Screws brass 25mm*gauge 7 Nos.

0.0%

0.50

22.00

11.00

Material Rate

11.00

Plant Rate

0.00

Unit Rate(Direct Labour)

158.50

Unit Rate (Labour Sub Con)

151.13

BSR Reference

10-00-43

Description

Supplying of 65mm brass, 4 lever approved quaLitery locks for cupboards and fixing in

Unit

Nos.

position with brass screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

42.75

1.00

42.75

Carpenter Nos.

0.0%

1.00

45.00

45.00

Lock cupboard four levers brass 63mm Nos.

0.0%

1.00

90.00

90.00

Screws brass 20mm* gauge 6 Nos.

0.0%

0.33

12.00

4.00

Material Rate

94.00

Plant Rate

0.00

BSR Reference

10-00-44

Description

Repairing and re-fixing of cupboard locks.

Resource Unit

Unit Rate(Direct Labour)

139.00

Unit Rate (Labour Sub Con)

136.75

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

80.75

1.00

80.75

Black Smith Nos.

0.0%

1.00

40.00

40.00

Carpenter Nos.

0.0%

1.00

45.00

45.00

Material Rate

0.00

Unit Rate(Direct Labour)

85.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

80.75

Wednesday, March 29, 2006

Page 15 of 395

Southern Province Engineering Services

BSR Reference

10-00-45

Description

Supplying fixing and polishing of 150mm brass,2 levered, approved quaLitery rim lock.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

64.13

1.00

64.13

Carpenter Nos.

0.0%

1.50

45.00

67.50

Lock rim double lever brass 150mm Nos.

0.0%

1.00

300.00

300.00

Screws brass 25mm*gauge 7 Nos.

0.0%

0.50

22.00

11.00

Material Rate

311.00

Plant Rate

0.00

Unit Rate(Direct Labour)

378.50

Unit Rate (Labour Sub Con)

375.13

BSR Reference

10-00-46

Description

Supplying fixing and polishing of 150mm brass,single levered, approved quaLitery rim

Unit

Nos.

lock.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

64.13

1.00

64.13

Carpenter Nos.

0.0%

1.50

45.00

67.50

Lock rim single lever brass 150mm Nos.

0.0%

1.00

250.00

250.00

Screws brass 25mm*gauge 7 Nos.

0.0%

0.50

22.00

11.00

Material Rate

261.00

Plant Rate

0.00

Unit Rate(Direct Labour)

328.50

Unit Rate (Labour Sub Con)

325.13

BSR Reference

10-00-47

Description

Supplying fixing and polishing of 150mm brass, 4 levered, approved quaLitery rim lock.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

64.13

1.00

64.13

Carpenter Nos.

0.0%

1.50

45.00

67.50

Lock rim double lever brass 150mm Nos.

0.0%

1.25

300.00

375.00

Screws brass 25mm*gauge 7 Nos.

0.0%

0.50

22.00

11.00

Material Rate
Plant Rate

386.00
0.00

Unit Rate(Direct Labour)

453.50

Unit Rate (Labour Sub Con)

450.13

Wednesday, March 29, 2006

Page 16 of 395

Southern Province Engineering Services

BSR Reference

10-00-48

Description

Supplying and fixing of 125mm good quaLitery single levered, rim lock.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

64.13

1.00

64.13

Carpenter Nos.

0.0%

1.50

45.00

67.50

Lock rim single lever brass 150mm Nos.

0.0%

1.00

250.00

250.00

Screws brass 25mm*gauge 7 Nos.

0.0%

0.50

22.00

11.00

Material Rate

261.00

Plant Rate

0.00

Unit Rate(Direct Labour)

328.50

Unit Rate (Labour Sub Con)

325.13

BSR Reference

10-00-49

Description

Supplying and fixing of night latch Yale or Union lock with duplicate keys.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

85.50

1.00

85.50

Carpenter Nos.

0.0%

2.00

45.00

90.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws brass 25mm *gauge 7 Nos.

0.0%

0.50

22.00

11.00

Material Rate

1,111.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,201.00

Unit Rate (Labour Sub Con)

1,196.50

BSR Reference

10-00-50

Description

Supplying and fixing of 32mm to 40mm brass rings to doors and windows with brass

Unit

Nos.

screws.

Resource Unit

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

10.69

1.00

10.69

Carpenter Nos.

0.0%

0.25

45.00

11.25

Ring brass 45mm to 38mm Nos.

0.0%

1.00

20.00

20.00

Screws brass 20mm* gauge 6 Nos.

0.0%

0.25

12.00

3.00

Material Rate
Plant Rate

Wastag

23.00
0.00

Unit Rate(Direct Labour)

34.25

Unit Rate (Labour Sub Con)

33.69

Wednesday, March 29, 2006

Page 17 of 395

Southern Province Engineering Services

BSR Reference

10-00-51

Description

Supplying and fixing of Union mortice lock (imported) for single lever.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

171.00

1.00

171.00

Carpenter Nos.

0.0%

4.00

45.00

180.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Material Rate

1,100.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,280.00

Unit Rate (Labour Sub Con)

1,271.00

BSR Reference

10-00-52

Description

Supplying and fixing of Union mortice (imported) lock for double lever.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

256.50

1.00

256.50

Carpenter Nos.

0.0%

6.00

45.00

270.00

Lock mortice union double sash Nos.

0.0%

1.00

1,800.00

1,800.00

Material Rate
Plant Rate

1,800.00
0.00

Unit Rate(Direct Labour)

2,070.00

Unit Rate (Labour Sub Con)

2,056.50

Wednesday, March 29, 2006

Page 18 of 395

Southern Province Engineering Services

BSR Class

BRICKLAYER

BSR Reference

04-00-01

Description

Segmental brick arch in 1:3 cement mortar including centering

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

0.0%

1,370.85

1.00

1,370.85

Mason M3

0.0%

17.00

45.00

765.00

Unskilled Labour M3

0.0%

22.60

30.00

678.00

Brick : common M3

0.0%

0.53

2,200.00

1,161.60

Cement M3

0.0%

2.27

340.00

771.80

Sand M3

0.0%

0.23

350.00

80.50

water and scaffolding M3

0.0%

12.50

1.00

12.50

Material Rate

2,013.90

Plant Rate

0.00

Unit Rate(Direct Labour)

3,469.40

Unit Rate (Labour Sub Con)

3,397.25

BSR Reference

04-00-02

Description

225mm Brick work in 1:5 cement mortar (above 3 cu.m 1st floor level)

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M3

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

765.23

1.00

765.23

Mason M3

0.0%

8.50

45.00

382.50

Unskilled Labour M3

0.0%

14.10

30.00

423.00

Brick : common M3

0.0%

0.53

2,200.00

1,161.60

Cement M3

0.0%

1.33

340.00

452.20

Sand M3

0.0%

0.23

350.00

80.50

water and scaffolding M3

0.0%

12.50

1.00

12.50

1,694.30
0.00

Unit Rate(Direct Labour)

2,512.30

Unit Rate (Labour Sub Con)

2,472.03

Wednesday, March 29, 2006

Page 19 of 395

Southern Province Engineering Services

BSR Reference

04-00-03

Description

225mm Brick work in 1:5 cement mortar upto 1st floor level (upto 3 cu.m )

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

0.0%

914.85

1.00

914.85

Mason M3

0.0%

10.60

45.00

477.00

Unskilled Labour M3

0.0%

16.20

30.00

486.00

Brick : common M3

0.0%

0.53

2,200.00

1,161.60

Cement M3

0.0%

1.33

340.00

452.20

Sand M3

0.0%

0.23

350.00

80.50

water and scaffolding M3

0.0%

12.50

1.00

12.50

Material Rate

1,694.30

Plant Rate

0.00

Unit Rate(Direct Labour)

2,669.80

Unit Rate (Labour Sub Con)

2,621.65

BSR Reference

04-00-04

Description

225mm Brick work in 1:5 cement mortar in peirs upto 1st floor level

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M3

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

544.21

1.00

544.21

Mason M3

0.0%

12.73

45.00

572.85

Brick : common M3

0.0%

0.53

2,200.00

1,170.40

Cement M3

0.0%

1.33

340.00

452.20

Sand M3

0.0%

0.23

350.00

80.50

water and scaffolding M3

0.0%

12.50

1.00

12.50

1,703.10
0.00

Unit Rate(Direct Labour)

2,288.45

Unit Rate (Labour Sub Con)

2,259.81

Wednesday, March 29, 2006

Page 20 of 395

Southern Province Engineering Services

BSR Reference

04-00-05

Description

112mm Brick work in 1:5 cement mortar upto 1st floor level(above 10 sq.m)

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

104.17

1.00

104.17

Mason M2

0.0%

1.29

45.00

58.05

Unskilled Labour M2

0.0%

1.72

30.00

51.60

Brick : common M2

0.0%

0.06

2,200.00

132.00

Cement M2

0.0%

0.14

340.00

47.60

Sand M2

0.0%

0.03

350.00

10.50

water and scaffolding M2

0.0%

4.00

1.00

4.00

Material Rate

190.10

Plant Rate

0.00

Unit Rate(Direct Labour)

303.75

Unit Rate (Labour Sub Con)

298.27

BSR Reference

04-00-06

Description

112mm Brick work in 1:5 cement mortar upto 1st floor level(upto 10 sq.m)

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

72.82

1.00

72.82

Mason M2

0.0%

1.61

45.00

72.45

Unskilled Labour M2

0.0%

0.14

30.00

4.20

Brick : common M2

0.0%

0.06

2,200.00

132.00

Cement M2

0.0%

0.14

340.00

47.60

Sand M2

0.0%

0.03

350.00

10.50

water and scaffolding M2

0.0%

4.00

1.00

4.00

190.10
0.00

Unit Rate(Direct Labour)

270.75

Unit Rate (Labour Sub Con)

266.92

Wednesday, March 29, 2006

Page 21 of 395

Southern Province Engineering Services

BSR Reference

04-00-07

Description

112mm Brick work in 1:5 cement mortar using available bricks including sorting and

Unit

M2

clearing upto 1st floor level

Resource Unit

Wastag

Quantit

Rate Type

0.0%

145.21

1.00

145.21

Mason M2

0.0%

1.61

45.00

72.45

Unskilled Labour M2

0.0%

2.68

30.00

80.40

Cement M2

0.0%

0.14

340.00

47.60

Sand M2

0.0%

0.03

350.00

10.50

water and scaffolding M2

0.0%

0.00

1.00

0.00

Material Rate

58.10

Plant Rate

0.00

Unit Rate(Direct Labour)

210.95

Unit Rate (Labour Sub Con)

203.31

BSR Reference

04-00-08

Description

225mm Brick work in 2:5 lime mortar upto 1st floor level(above 3cu.m)

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

765.23

1.00

765.23

Mason M3

0.0%

8.50

45.00

382.50

Unskilled Labour M3

0.0%

14.10

30.00

423.00

Boiled lime M3

0.0%

0.07

4.00

0.29

Brick : common M3

0.0%

0.51

2,200.00

1,126.40

Sand M3

0.0%

0.23

350.00

80.50

water and scaffolding M3

0.0%

4.00

1.00

4.00

1,207.19
0.00

Unit Rate(Direct Labour)

2,016.69

Unit Rate (Labour Sub Con)

1,976.41

Wednesday, March 29, 2006

Page 22 of 395

Southern Province Engineering Services

BSR Reference

04-00-09

Description

225mm Brick work in 2:5 lime mortar upto 1st floor level(upto 3cu.m)

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

914.85

1.00

914.85

Mason M3

0.0%

10.60

45.00

477.00

Unskilled Labour M3

0.0%

16.20

30.00

486.00

Boiled lime M3

0.0%

0.07

4.00

0.29

Brick : common M3

0.0%

0.51

2,200.00

1,126.40

Sand M3

0.0%

0.23

350.00

80.50

water and scaffolding M3

0.0%

4.00

1.00

4.00

Material Rate

1,207.19

Plant Rate

0.00

Unit Rate(Direct Labour)

2,174.19

Unit Rate (Labour Sub Con)

2,126.04

BSR Reference

04-00-10

Description

225mm Brick work in 2:5 lime mortar with bricks available at site including sorting out

Unit

M3

and cleaning bricks.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

864.98

1.00

864.98

Mason M3

0.0%

8.50

45.00

382.50

Unskilled Labour M3

0.0%

17.60

30.00

528.00

Boiled lime M3

0.0%

0.09

4.00

0.36

Sand M3

0.0%

0.23

350.00

80.50

water and scaffolding M3

0.0%

4.00

1.00

4.00

Material Rate

80.86

Plant Rate

0.00

Unit Rate(Direct Labour)

995.36

Unit Rate (Labour Sub Con)

949.84

BSR Reference

04-00-11

Description

Extra over item D002 to D005 and D009 to D011 for Brick work from first floor level to

Unit

M3

second floor level.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

119.70

1.00

119.70

Unskilled Labour M3

0.0%

4.20

30.00

126.00

Scafolding M3

0.0%

12.35

1.00

12.35

Material Rate

0.00

Unit Rate(Direct Labour)

138.35

Plant Rate

0.00

Unit Rate (Labour Sub Con)

132.05

Wednesday, March 29, 2006

Page 23 of 395

Southern Province Engineering Services

BSR Reference

04-00-12

Description

Extra over item D002 to D005 and D009 to D011 for Brick work above second floor level.

Resource Unit

Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

0.00

1.00

0.00

Unskilled Labour M3

0.0%

0.00

30.00

0.00

Scafolding M3

0.0%

0.00

1.00

0.00

Material Rate

0.00

Unit Rate(Direct Labour)

0.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

0.00

BSR Reference

04-00-13

Description

Extra over item D006 to D008 for Brick work from first floor level to second floor level.

Resource Unit

Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

39.90

1.00

39.90

Unskilled Labour M3

0.0%

1.40

30.00

42.00

Scafolding M3

0.0%

12.50

1.00

12.50

Material Rate

0.00

Unit Rate(Direct Labour)

54.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

52.40

BSR Reference

04-00-14

Description

Extra over item D006 to D008 for Brick work above second floor level.

Resource Unit

Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

119.70

1.00

119.70

Unskilled Labour M3

0.0%

4.20

30.00

126.00

Scafolding M3

0.0%

12.50

1.00

12.50

Material Rate

0.00

Unit Rate(Direct Labour)

138.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

132.20

Wednesday, March 29, 2006

Page 24 of 395

Southern Province Engineering Services

BSR Reference

04-00-15

Description

Weathered and throated brick coping in 1:5 cement mortar on 112mm thick walls complete

Unit

with 12mm thick 1:3 cement rendering

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

114.00

1.00

114.00

Mason M

0.0%

1.60

45.00

72.00

Unskilled Labour M

0.0%

1.60

30.00

48.00

Brick : common M

0.0%

0.01

2,200.00

28.60

Cement M

0.0%

0.17

340.00

57.80

Sand M

0.0%

0.02

350.00

7.35

Material Rate

93.75

Plant Rate

0.00

Unit Rate(Direct Labour)

213.75

Unit Rate (Labour Sub Con)

207.75

BSR Reference

04-00-16

Description

Weathered and throated brick coping in 1:5 cement mortar on 225mm thick walls complete

Unit

with 12mm thick 1:3 cement rendering

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

142.50

1.00

142.50

Mason M

0.0%

2.00

45.00

90.00

Unskilled Labour M

0.0%

2.00

30.00

60.00

Brick : common M

0.0%

0.02

2,200.00

48.40

Cement M

0.0%

0.24

340.00

81.60

Sand M

0.0%

0.03

350.00

10.50

140.50
0.00

Unit Rate(Direct Labour)

290.50

Unit Rate (Labour Sub Con)

283.00

Wednesday, March 29, 2006

Page 25 of 395

Southern Province Engineering Services

BSR Reference

04-00-17

Description

Weathered and throated brick coping in 1:5 cement mortar on 340mm thick wall complete

Unit

with 12mm thick 1:3 cement rendering

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

185.25

1.00

185.25

Mason M

0.0%

2.60

45.00

117.00

Unskilled Labour M

0.0%

2.60

30.00

78.00

Brick : common M

0.0%

0.03

2,200.00

66.00

Cement M

0.0%

0.40

340.00

136.00

Sand M

0.0%

0.06

350.00

21.00

Material Rate

223.00

Plant Rate

0.00

Unit Rate(Direct Labour)

418.00

Unit Rate (Labour Sub Con)

408.25

BSR Reference

04-00-18

Description

Weathered and throated brick coping in 1:5 cement mortar on 225mm thick walls using

Unit

available bricks complete with 12mm thick 1:3 cement rendering

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

142.50

1.00

142.50

Mason M

0.0%

2.00

45.00

90.00

Unskilled Labour M

0.0%

2.00

30.00

60.00

Cement M

0.0%

0.24

340.00

81.60

Sand M

0.0%

0.03

350.00

10.50

92.10
0.00

Unit Rate(Direct Labour)

242.10

Unit Rate (Labour Sub Con)

234.60

Wednesday, March 29, 2006

Page 26 of 395

Southern Province Engineering Services

BSR Reference

04-00-19

Description

Brick cornices in 1:5 cement mortar complete with 12mm thick 1:3 cement rendering up to

Unit

225 mm projection and 225mm depth

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

370.50

1.00

370.50

Mason M

0.0%

5.20

45.00

234.00

Unskilled Labour M

0.0%

5.20

30.00

156.00

Brick : common M

0.0%

0.10

2,200.00

224.40

Cement M

0.0%

0.09

340.00

30.60

Sand M

0.0%

0.01

350.00

3.15

Material Rate

258.15

Plant Rate

0.00

Unit Rate(Direct Labour)

648.15

Unit Rate (Labour Sub Con)

628.65

BSR Reference

04-00-20

Description

Inserting of door or window in existing walls including raking opening and making good

Unit

Nos.

to floor and wall (lintel , arch, door & window paid for separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

1,197.00

1.00

1,197.00

Mason Nos.

0.0%

12.00

45.00

540.00

Unskilled Labour Nos.

0.0%

24.00

30.00

720.00

Boiled lime Nos.

0.0%

0.05

4.00

0.20

Brick : common Nos.

0.0%

0.19

2,200.00

418.00

Cement Nos.

0.0%

0.52

340.00

176.80

Sand Nos.

0.0%

0.23

350.00

80.50

675.50
0.00

Unit Rate(Direct Labour)

1,935.50

Unit Rate (Labour Sub Con)

1,872.50

Wednesday, March 29, 2006

Page 27 of 395

Southern Province Engineering Services

BSR Reference

04-00-21

Description

300mm wide 225mm to 300mm deep brick drains in 1:5 cement mortar complete with 12mm

Unit

thick 1:2 cement rendering and necessary expansion joins (rate to including for excavation)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

254.22

1.00

254.22

Mason M

0.0%

3.28

45.00

147.60

Unskilled Labour M

0.0%

4.00

30.00

120.00

Brick : common M

0.0%

0.06

2,200.00

143.00

Cement M

0.0%

0.33

340.00

112.20

Sand M

0.0%

0.06

350.00

21.00

Material Rate

276.20

Plant Rate

0.00

Unit Rate(Direct Labour)

543.80

Unit Rate (Labour Sub Con)

530.42

BSR Reference

04-00-22

Description

225mm wide 150mm to 225mm deep brick drains in 1:5 cement mortar complete with 12mm

Unit

thick 1:2 cement rendering and necessary expansion joins (rate to including for excavation)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

205.49

1.00

205.49

Mason M

0.0%

2.62

45.00

117.90

Unskilled Labour M

0.0%

3.28

30.00

98.40

Brick : common M

0.0%

0.03

2,200.00

72.60

Cement M

0.0%

0.25

340.00

85.00

Sand M

0.0%

0.04

350.00

14.00

171.60
0.00

Unit Rate(Direct Labour)

387.90

Unit Rate (Labour Sub Con)

377.08

Wednesday, March 29, 2006

Page 28 of 395

Southern Province Engineering Services

BSR Reference

04-00-23

Description

Scott's pattern drains including apron of overall width 750mm brick masonry in 1:5 cement

Unit

mortar and 12mm thick 1:2 cement rendering and necessary expansion joints (rate to
include for necessary excavation.)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

205.49

1.00

205.49

Mason M

0.0%

2.62

45.00

117.90

Unskilled Labour M

0.0%

3.28

30.00

98.40

Brick : common M

0.0%

0.04

2,200.00

88.00

Cement M

0.0%

0.26

340.00

88.40

Sand M

0.0%

0.04

350.00

14.00

Material Rate

190.40

Plant Rate

0.00

Unit Rate(Direct Labour)

406.70

Unit Rate (Labour Sub Con)

395.88

BSR Reference

04-00-24

Description

300mm with and 150mm to 225mmhigh masonry or brick work 1:3 cement mortar steps

Unit

complete with 12mm thick 1:2 cement rendering with foundation 150mm below ground.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

93.34

1.00

93.34

Mason M

0.0%

1.31

45.00

58.95

Unskilled Labour M

0.0%

1.31

30.00

39.30

Brick : common M

0.0%

0.04

2,200.00

85.80

Cement M

0.0%

0.20

340.00

68.00

Sand M

0.0%

0.04

350.00

14.00

167.80
0.00

Unit Rate(Direct Labour)

266.05

Unit Rate (Labour Sub Con)

261.14

Wednesday, March 29, 2006

Page 29 of 395

Southern Province Engineering Services

BSR Reference

04-00-25

Description

Formation of vent opening up to 300mm height and 150mm with on existing walls and

Unit

Nos.

walls made goods.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

71.25

1.00

71.25

Mason Nos.

0.0%

1.00

45.00

45.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Boiled lime Nos.

0.0%

0.00

4.00

0.01

Sand Nos.

0.0%

0.01

350.00

5.25

Cement Sand etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

5.26

Unit Rate(Direct Labour)

85.26

Plant Rate

0.00

Unit Rate (Labour Sub Con)

81.51

BSR Reference

04-00-26

Description

225mmm brick work in 1:5 cement mortar with brick available at site including sorting and

Unit

M3

clearing bricks

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

904.88

1.00

904.88

Mason M3

0.0%

8.50

45.00

382.50

Unskilled Labour M3

0.0%

19.00

30.00

570.00

Cement M3

0.0%

1.30

340.00

442.00

Sand M3

0.0%

0.25

350.00

87.50

water and scaffolding M3

0.0%

12.50

1.00

12.50

529.50
0.00

Unit Rate(Direct Labour)

1,494.50

Unit Rate (Labour Sub Con)

1,446.87

Wednesday, March 29, 2006

Page 30 of 395

Southern Province Engineering Services

BSR Reference

04-00-27

Description

Soil:cement blockwork in 1:1:6 (cement:soil:sand) mortar - 110 mm thick - Blocks

Unit

M2

manufactured using Auram Press 3000

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

165.00

1.00

165.00

Mason M2

0.0%

2.20

45.00

99.00

Unskilled Labour M2

0.0%

2.20

30.00

66.00

Cement M2

0.0%

0.08

340.00

26.95

Sand M2

0.0%

0.02

350.00

6.60

Soil M2

0.0%

0.02

212.00

3.99

Soil:cement blocks 110mm thick - 5% M2

0.0%

36.00

6.50

234.00

Scafolding M2

0.0%

75.00

1.00

75.00

Material Rate

271.53

Plant Rate

0.00

Unit Rate(Direct Labour)

511.53

Unit Rate (Labour Sub Con)

511.53

BSR Reference

04-00-28

Description

Soil:cement blockwork in 1:1:6 (cement:soil:sand) mortar - 150 mm thick - Blocks

Unit

M2

manufactured using Auram Press 3000

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

216.00

1.00

216.00

Mason M2

0.0%

2.70

45.00

121.50

Unskilled Labour M2

0.0%

2.70

30.00

81.00

Cement M2

0.0%

0.12

340.00

40.46

Sand M2

0.0%

0.03

350.00

10.08

Soil M2

0.0%

0.03

212.00

6.10

Soil:cement blocks 1500mm thick - 5% M2

0.0%

30.00

9.00

270.00

Scafolding M2

0.0%

100.00

1.00

100.00

Material Rate
Plant Rate

326.64
0.00

Unit Rate(Direct Labour)

629.14

Unit Rate (Labour Sub Con)

642.64

Wednesday, March 29, 2006

Page 31 of 395

Southern Province Engineering Services

BSR Reference

04-00-29

Description

Soil:cement blockwork in 1:1:6 (cement:soil:sand) mortar - 240 mm thick - Blocks

Unit

M2

manufactured using Auram Press 3000

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

235.00

1.00

235.00

Mason M2

0.0%

3.20

45.00

144.00

Unskilled Labour M2

0.0%

3.20

30.00

96.00

Cement M2

0.0%

0.19

340.00

64.67

Sand M2

0.0%

0.05

350.00

15.83

Soil M2

0.0%

0.05

212.00

9.59

Soil:cement blocks 240mm thick - 5% M2

0.0%

36.00

12.00

432.00

Scafolding M2

0.0%

125.00

1.00

125.00

Material Rate
Plant Rate

522.09
0.00

Unit Rate(Direct Labour)

887.09

Unit Rate (Labour Sub Con)

882.09

Wednesday, March 29, 2006

Page 32 of 395

Southern Province Engineering Services

BSR Class

CARPENTER & JOINER

BSR Reference

08-00-01

Description

40mm to 50mm * 12mm plain chamfered class I timber beading fixed complete with brass

Unit

screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

9.26

1.00

9.26

Carpenter M

0.0%

0.13

45.00

5.85

Unskilled Labour M

0.0%

0.13

30.00

3.90

40mm to 50mmx 12mm class I timber M

0.0%

1.05

20.00

21.00

Brass screws [40mm] gauge 8 M

0.0%

1.57

2.50

3.93

Material Rate

24.92

Plant Rate

0.00

Unit Rate(Direct Labour)

34.67

Unit Rate (Labour Sub Con)

34.19

BSR Reference

08-00-02

Description

25mm * 20mm Imported class I timber fillets fixed complete with brass screws.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

9.26

1.00

9.26

Carpenter M

0.0%

0.13

45.00

5.85

Unskilled Labour M

0.0%

0.13

30.00

3.90

25mmx20mm imported class I timber M

0.0%

1.05

24.00

25.20

Brass screws [40mm] gauge 8 M

0.0%

1.57

2.50

3.93

Material Rate
Plant Rate

29.12
0.00

Unit Rate(Direct Labour)

38.87

Unit Rate (Labour Sub Con)

38.39

Wednesday, March 29, 2006

Page 33 of 395

Southern Province Engineering Services

BSR Reference

08-00-03

Description

Supply and fixing of beading or filleting in Halmilla timber for glass panes complete with

Unit

brass springs or brass panel pins.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.55

1.00

8.55

Carpenter M

0.0%

0.20

45.00

9.00

12mmx12mm imported class I timber M

0.0%

1.10

9.00

9.90

Brass panel pin and putty M

0.0%

3.00

1.00

3.00

Material Rate

9.90

Unit Rate(Direct Labour)

21.90

Plant Rate

0.00

Unit Rate (Labour Sub Con)

21.45

BSR Reference

08-00-04

Description

Supply and fixing of beading or filleting in Class I local timber for glass panes complete

Unit

with brass springs or brass panel pins.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.55

1.00

8.55

Carpenter M

0.0%

0.20

45.00

9.00

12mm x 12mm class 1 timber beading M

0.0%

1.10

9.00

9.90

Brass panel pin and putty M

0.0%

3.00

1.00

3.00

Material Rate

9.90

Unit Rate(Direct Labour)

21.90

Plant Rate

0.00

Unit Rate (Labour Sub Con)

21.45

BSR Reference

08-00-05

Description

Beading or filleting on under side of ceiling removed and refixed with new brass screws

Unit

complete.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

14.25

1.00

14.25

Carpenter M

0.0%

0.20

45.00

9.00

Unskilled Labour M

0.0%

0.20

30.00

6.00

Brass screws [40mm] gauge 8 M

0.0%

1.60

2.50

4.00

Material Rate

4.00

Unit Rate(Direct Labour)

19.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

18.25

Wednesday, March 29, 2006

Page 34 of 395

Southern Province Engineering Services

BSR Reference

08-00-06

Description

Supplying and fixing of 20mm thick Barge valance fascia boards, in imported class I timber

Unit

M2

complete with necessary screws (above 0.03m3)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

47.74

1.00

47.74

Carpenter M2

0.0%

0.67

45.00

30.15

Unskilled Labour M2

0.0%

0.67

30.00

20.10

20mm thick Class A imported timber M2

0.0%

1.10

650.00

715.00

Screws iron 50mm gauge 10 M2

0.0%

8.21

1.00

8.21

Machine planing of timber M2

0.0%

10.00

1.00

10.00

Material Rate

723.21

Plant Rate

0.00

Unit Rate(Direct Labour)

783.46

Unit Rate (Labour Sub Con)

780.95

BSR Reference

08-00-07

Description

Supplying and fixing of 20mm thick Barge valance fascia boards, in class I local timber

Unit

M2

complete with necessary screws (above 0.03m3)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

64.13

1.00

64.13

Carpenter M2

0.0%

0.90

45.00

40.50

Unskilled Labour M2

0.0%

0.90

30.00

27.00

20mm thick planks of class A local M2

0.0%

1.10

850.00

935.00

Screws iron 50mm gauge 10 M2

0.0%

8.21

1.00

8.21

Machine planing of timber M2

0.0%

10.00

1.00

10.00

Material Rate
Plant Rate

943.21
0.00

Unit Rate(Direct Labour)

1,020.71

Unit Rate (Labour Sub Con)

1,017.34

Wednesday, March 29, 2006

Page 35 of 395

Southern Province Engineering Services

BSR Reference

08-00-08

Description

Supplying and fixing of 20mm thick Barge valance fascia boards, in class II timber complete

Unit

M2

with necessary screws (above 0.03m3)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

47.74

1.00

47.74

Carpenter M2

0.0%

0.67

45.00

30.15

Unskilled Labour M2

0.0%

0.67

30.00

20.10

Screws iron 50mm gauge 10 M2

0.0%

8.21

1.00

8.21

Timber planks 25mm class B M2

0.0%

0.97

300.00

291.00

Machine planing of timber M2

0.0%

10.00

1.00

10.00

Material Rate

299.21

Plant Rate

0.00

Unit Rate(Direct Labour)

359.46

Unit Rate (Labour Sub Con)

356.95

BSR Reference

08-00-09

Description

Supplying and fixing of 20mm thick Barge valance fascia boards in class II local timber

Unit

M2

complete with necessary screws (upto 0.03 m3)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

64.13

1.00

64.13

Carpenter M2

0.0%

0.90

45.00

40.50

Unskilled Labour M2

0.0%

0.90

30.00

27.00

Screws iron 50mm gauge 10 M2

0.0%

8.21

1.00

8.21

Timber planks 25mm class B M2

0.0%

0.97

300.00

291.00

Machine planing of timber M2

0.0%

10.00

1.00

10.00

Material Rate

299.21

Plant Rate

0.00

Unit Rate(Direct Labour)

376.71

Unit Rate (Labour Sub Con)

373.34

BSR Reference

08-00-10

Description

Fixing and Barge valance fascia boards including cutting and minor repairs

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

49.02

1.00

49.02

Carpenter M2

0.0%

0.86

45.00

38.70

Unskilled Labour M2

0.0%

0.43

30.00

12.90

Screws iron 50mm gauge 10 M2

0.0%

5.17

1.00

5.17

Material Rate

5.17

Unit Rate(Direct Labour)

56.77

Plant Rate

0.00

Unit Rate (Labour Sub Con)

54.19

Wednesday, March 29, 2006

Page 36 of 395

Southern Province Engineering Services

BSR Reference

08-00-11

Description

Flat asbestos ceiling fixed to 100mm*50mm*joints and 50mm bearers of class I timber

Unit

M2

including 40mm*12mm cover fillets and 63mm*40mm covers of class I timber .2 coats of
wood preservative to joints & bearers. primer undercoat & 2 coats of emultion pai

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

201.88

1.00

201.88

Carpenter M2

0.0%

2.00

45.00

90.00

Painter M2

0.0%

1.00

40.00

40.00

Unskilled Labour M2

0.0%

2.75

30.00

82.50

asbestos plain ceiling sheet M2

0.0%

1.08

200.00

215.60

Brass screws [40mm] gauge 8 M2

0.0%

5.30

2.50

13.25

Cover moulding [63mm*40mm] M2

0.0%

1.00

45.00

45.00

Emulsion M2

0.0%

0.04

200.00

8.00

GI clout nails 20mm M2

0.0%

0.01

50.00

0.50

Paint primer Alkali resisting M2

0.0%

0.02

250.00

5.00

Timber 40mm to 50mm*12mm class 1 M2

0.0%

2.10

26.00

54.60

Timber beams Class A M2

0.0%

0.01

30,000.00

390.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.03

45.00

1.35

Wood plugs M2

0.0%

1.50

80.00

120.00

Wood Preservative M2

0.0%

0.08

110.00

9.24

Cement sand scaffolding and brushes M2

0.0%

2.50

1.00

2.50

Material Rate

862.54

Plant Rate

0.00

Unit Rate(Direct Labour)

1,077.54

Unit Rate (Labour Sub Con)

1,066.91

BSR Reference

08-00-12

Description

Fixing asbestos, plywood canite or colotex ceiling (supplied by Client) including cutting

Unit

M2

on existing bearer rafters or frames (Beading or cover fillets paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

36.91

1.00

36.91

Carpenter M2

0.0%

0.43

45.00

19.35

Unskilled Labour M2

0.0%

0.65

30.00

19.50

GI clout nails 20mm M2

0.0%

0.01

50.00

0.30

Scafolding M2

0.0%

1.50

1.00

1.50

Material Rate

0.30

Unit Rate(Direct Labour)

40.65

Plant Rate

0.00

Unit Rate (Labour Sub Con)

38.71

Wednesday, March 29, 2006

Page 37 of 395

Southern Province Engineering Services

BSR Reference

08-00-13

Description

Fixing of asbestos, ceiling or partitioning with clout headed nails on existing bearer or

Unit

M2

frames (Beading or cover fillets paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

36.91

1.00

36.91

Carpenter M2

0.0%

0.43

45.00

19.35

Unskilled Labour M2

0.0%

0.65

30.00

19.50

asbestos plain ceiling sheet M2

0.0%

0.75

200.00

150.00

GI clout nails 20mm M2

0.0%

0.01

50.00

0.50

Scafolding M2

0.0%

1.50

1.00

1.50

Material Rate

150.50

Plant Rate

0.00

Unit Rate(Direct Labour)

190.85

Unit Rate (Labour Sub Con)

188.91

BSR Reference

08-00-14

Description

Fixing of Canito, treotex or colotex ceiling or partition on existing bearer or frames

Unit

M2

(Beading or cover fillets paid separately)

Resource Unit

Wastag

Quantit

Rate Type

0.0%

36.91

1.00

36.91

Carpenter M2

0.0%

0.43

45.00

19.35

Unskilled Labour M2

0.0%

0.65

30.00

19.50

asbestos plain ceiling sheet M2

0.0%

0.71

200.00

141.20

Scafolding M2

0.0%

1.50

1.00

1.50

Material Rate

141.20

Plant Rate

0.00

Unit Rate(Direct Labour)

181.55

Unit Rate (Labour Sub Con)

179.61

BSR Reference

08-00-15

Description

150mm * 20mm Ceiling boards in Lunumidella, renewed in small quantities.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

15.68

1.00

15.68

Carpenter M

0.0%

0.22

45.00

9.90

Unskilled Labour M

0.0%

0.22

30.00

6.60

Lunumidella 150mm*20mm M

0.0%

0.18

270.00

48.60

Nails M

0.0%

1.50

1.00

1.50

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

48.60
0.00

Unit Rate(Direct Labour)

66.60

Unit Rate (Labour Sub Con)

65.78

Wednesday, March 29, 2006

Page 38 of 395

Southern Province Engineering Services

BSR Reference

08-00-16

Description

Fixing of ceiling in Lunumidella , with wire nails (Boards available at site)

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

64.13

1.00

64.13

Carpenter M2

0.0%

0.90

45.00

40.50

Unskilled Labour M2

0.0%

0.90

30.00

27.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.00

45.00

0.18

Scafolding M2

0.0%

2.00

1.00

2.00

Material Rate

0.18

Unit Rate(Direct Labour)

69.68

Plant Rate

0.00

Unit Rate (Labour Sub Con)

66.31

BSR Reference

08-00-17

Description

20mm thick Ceiling or partition in Lunumidella, beaded and rebated nailed to under side of

Unit

M2

existing joists, rafters or frames above 10m2 (fillers or beadings beading paid separately)

Resource Unit

Quantit

Rate Type

Amount

0.0%

71.25

1.00

71.25

Carpenter M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.00

30.00

30.00

Lunumidella 150mm*20mm M2

0.0%

1.10

270.00

297.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.00

45.00

0.18

Scafolding M2

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

297.18
0.00

Unit Rate(Direct Labour)

374.18

Unit Rate (Labour Sub Con)

370.43

Wednesday, March 29, 2006

Page 39 of 395

Southern Province Engineering Services

BSR Reference

08-00-18

Description

20mm thick Lunumidella ceiling or partition beaded and rebated nailed to under side of

Unit

M2

existing joists, rafters or frames upto 10m2 (fillets and beading paid for separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

78.38

1.00

78.38

Carpenter M2

0.0%

1.10

45.00

49.50

Unskilled Labour M2

0.0%

1.10

30.00

33.00

Lunumidella 150mm*20mm M2

0.0%

1.10

270.00

297.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.00

45.00

0.18

Scafolding M2

0.0%

2.00

1.00

2.00

Material Rate

297.18

Plant Rate

0.00

Unit Rate(Direct Labour)

381.68

Unit Rate (Labour Sub Con)

377.56

BSR Reference

08-00-19

Description

600mm * 450mm approx. Ceiling openings formed complete with 50mm * 50mm bearers

Unit

Nos.

(glass tiles or sheets paid for separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

285.00

1.00

285.00

Carpenter Nos.

0.0%

4.00

45.00

180.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Lunumidella 150mm*20mm Nos.

0.0%

0.33

270.00

89.10

Timber beams Class A Nos.

0.0%

0.00

30,000.00

90.00

Nails Nos.

0.0%

5.00

1.00

5.00

Material Rate

179.10

Plant Rate

0.00

Unit Rate(Direct Labour)

484.10

Unit Rate (Labour Sub Con)

469.10

BSR Reference

08-00-20

Description

cleaning or upper side of the ceiling and clearing away the debris

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

6.27

1.00

6.27

Unskilled Labour M2

0.0%

0.22

30.00

6.60

Material Rate

0.00

Unit Rate(Direct Labour)

6.60

Plant Rate

0.00

Unit Rate (Labour Sub Con)

6.27

Wednesday, March 29, 2006

Page 40 of 395

Southern Province Engineering Services

BSR Reference

08-00-21

Description

Fixing of 63mm * 40 cove mouldings of imported class I timber with brass screws and plugs

Unit

new or renewed.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

20.95

1.00

20.95

Carpenter M

0.0%

0.23

45.00

10.35

Unskilled Labour M

0.0%

0.39

30.00

11.70

Cover moulding [63mm*40mm] M

0.0%

1.10

45.00

49.50

Screws brass 50mm M

0.0%

1.18

80.00

94.40

Wood plugs M

0.0%

1.31

80.00

104.96

Cement Sand etc. M

0.0%

1.00

1.00

1.00

Material Rate

248.86

Plant Rate

0.00

Unit Rate(Direct Labour)

271.91

Unit Rate (Labour Sub Con)

270.81

BSR Reference

08-00-22

Description

Supplying and fixing of doors and windows ledged, braced and battened with grooved and

Unit

M2

tongued joints 100mm * 75mm frames and 20mm thick sashes in class I local timber
complete with brass furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

456.00

1.00

456.00

Carpenter M2

0.0%

8.00

45.00

360.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

Brass screws [40mm] gauge 8 M2

0.0%

40.00

2.50

100.00

Hinge butt brass 100mm 63mm M2

0.0%

2.00

40.00

80.00

Lock rim single lever brass 150mm M2

0.0%

0.70

250.00

175.00

Screws brass 25mm *gauge 7 M2

0.0%

4.00

22.00

88.00

Timber beams Class A M2

0.0%

0.03

30,000.00

900.00

Timber Plank 25mm Class C M2

0.0%

1.30

150.00

195.00

Machine planing of timber M2

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

1,538.00
0.00

Unit Rate(Direct Labour)

2,168.00

Unit Rate (Labour Sub Con)

2,144.00

Wednesday, March 29, 2006

Page 41 of 395

Southern Province Engineering Services

BSR Reference

08-00-23

Description

Supplying and fixing of 20mm ledged, braced and battened sashes and 100mm * 75mm

Unit

M2

frames in class II timber for door and windows.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

456.00

1.00

456.00

Carpenter M2

0.0%

8.00

45.00

360.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

Brass screws [40mm] gauge 8 M2

0.0%

40.00

2.50

100.00

Hinge butt brass 100mm 63mm M2

0.0%

2.00

40.00

80.00

Lock rim single lever brass 150mm M2

0.0%

0.70

250.00

175.00

Screws brass 50mm M2

0.0%

4.00

80.00

320.00

Timber beams Class A M2

0.0%

0.03

30,000.00

900.00

Timber Plank 25mm Class C M2

0.0%

1.30

150.00

195.00

Machine planing of timber M2

0.0%

90.00

1.00

90.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

30.00

1.00

30.00

Material Rate

1,770.00

Plant Rate

0.00

Unit Rate(Direct Labour)

2,370.00

Unit Rate (Labour Sub Con)

2,346.00

BSR Reference

08-00-24

Description

Supplying and fixing of 20mm thick ledged, braced and battened sash only for doors and

Unit

M2

windows in class I timber fixed with available function

Resource Unit

Quantit

Rate Type

Amount

0.0%

256.50

1.00

256.50

Carpenter M2

0.0%

4.00

45.00

180.00

Unskilled Labour M2

0.0%

3.00

30.00

90.00

Screws brass 25mm *gauge 7 M2

0.0%

0.37

22.00

8.23

Screws iron 40mm*gauge 8 M2

0.0%

3.74

8.00

29.92

Timber plank 25mm class A M2

0.0%

1.30

1,000.00

1,300.00

Machine planing of timber M2

0.0%

60.00

1.00

60.00

Sand paper M2

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

1,338.15
0.00

Unit Rate(Direct Labour)

1,670.65

Unit Rate (Labour Sub Con)

1,657.15

Wednesday, March 29, 2006

Page 42 of 395

Southern Province Engineering Services

BSR Reference

08-00-25

Description

Supplying and fixing of 20mm thick ledged, braced and battened sash for door and

Unit

M2

windows in class II timber fixed with available furniture

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

256.50

1.00

256.50

Carpenter M2

0.0%

4.00

45.00

180.00

Unskilled Labour M2

0.0%

3.00

30.00

90.00

Brass screws [40mm] gauge 8 M2

0.0%

45.00

2.50

112.50

Screws brass 25mm *gauge 7 M2

0.0%

0.00

22.00

0.00

Timber planks 25mm class B M2

0.0%

1.30

300.00

390.00

Machine planing of timber M2

0.0%

50.00

1.00

50.00

Sand paper M2

0.0%

2.50

1.00

2.50

Material Rate

502.50

Plant Rate

0.00

Unit Rate(Direct Labour)

825.00

Unit Rate (Labour Sub Con)

811.50

BSR Reference

08-00-26

Description

Supplying and fixing of 25mm thick framed and 15mm thick battened sashed and 100mm *

Unit

M2

75mm frames class I local timber complete with brass furniture, for doos and windows.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

598.50

1.00

598.50

Carpenter M2

0.0%

10.00

45.00

450.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 M2

0.0%

1.33

2.50

3.33

Hinge butt brass 100mm 63mm M2

0.0%

2.00

40.00

80.00

Screws brass 25mm *gauge 7 M2

0.0%

0.33

22.00

7.26

Timber beams Class A M2

0.0%

0.03

30,000.00

900.00

Timber plank 32mm class A M2

0.0%

0.50

1,400.00

700.00

Timber planks 20mm class A M2

0.0%

0.82

850.00

693.60

Machine planing of timber M2

0.0%

30.00

1.00

30.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

35.00

1.00

35.00

Material Rate
Plant Rate

2,384.18
0.00

Unit Rate(Direct Labour)

3,079.18

Unit Rate (Labour Sub Con)

3,047.68

Wednesday, March 29, 2006

Page 43 of 395

Southern Province Engineering Services

BSR Reference

08-00-27

Description

Suppling and fixing of 25mm thick framed and 15mm thick battened sashed and 100mm *

Unit

M2

75mm frames class II local timber complete with brass furniture, for doos and windows.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

598.50

1.00

598.50

Carpenter M2

0.0%

10.00

45.00

450.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 M2

0.0%

1.33

2.50

3.33

Hinge butt brass 100mm 63mm M2

0.0%

2.00

40.00

80.00

Screws brass 25mm*gauge 7 M2

0.0%

0.33

22.00

7.26

Timber beams class B M2

0.0%

0.03

20,000.00

600.00

Timber plank 32mm class A M2

0.0%

0.50

1,400.00

700.00

Timber planks 20mm thick of class II M2

0.0%

0.82

226.00

184.42

Machine planing of timber M2

0.0%

30.00

1.00

30.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

35.00

1.00

35.00

Material Rate

1,575.00

Plant Rate

0.00

Unit Rate(Direct Labour)

2,270.00

Unit Rate (Labour Sub Con)

2,238.50

BSR Reference

08-00-28

Description

Suppling and fixing of 32mm thick framed and 15mm thick battened sashed and 100mm *

Unit

M2

75mm frames class I local timber complete with brass furniture, for doos and windows.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

598.50

1.00

598.50

Carpenter M2

0.0%

10.00

45.00

450.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 M2

0.0%

1.33

2.50

3.33

Hinge butt brass 100mm 63mm M2

0.0%

2.00

40.00

80.00

Screws brass 25mm *gauge 7 M2

0.0%

0.33

22.00

7.26

Timb. Cl.A 20mm thick plank M2

0.0%

0.82

850.00

693.60

Timber beams Class A M2

0.0%

0.03

30,000.00

960.00

Timber plank 38mm class A M2

0.0%

0.50

1,500.00

750.00

Machine planing of timber M2

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

35.00

1.00

35.00

Material Rate
Plant Rate

2,494.19
0.00

Unit Rate(Direct Labour)

3,259.19

Unit Rate (Labour Sub Con)

3,227.69

Wednesday, March 29, 2006

Page 44 of 395

Southern Province Engineering Services

BSR Reference

08-00-29

Description

Suppling and fixing of 32mm thick framed and 15mm thick battened sashed and 100mm *

Unit

M2

75mm frames class II local timber complete with brass furniture, for doos and windows.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

598.50

1.00

598.50

Carpenter M2

0.0%

10.00

45.00

450.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 M2

0.0%

1.33

2.50

3.33

Hinge butt brass 100mm 63mm M2

0.0%

2.00

40.00

80.00

Screws brass 25mm*gauge 7 M2

0.0%

0.33

22.00

7.26

Timb. Cl.II 20mm thick planks M2

0.0%

0.82

226.00

184.42

Timber beams class B M2

0.0%

0.03

20,000.00

640.00

Timber plank 38mm Class B M2

0.0%

0.50

600.00

300.00

Machine planing of timber M2

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

35.00

1.00

35.00

Material Rate

1,215.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,980.00

Unit Rate (Labour Sub Con)

1,948.50

BSR Reference

08-00-30

Description

Suppling and fixing of 25mm thick framed and 15mm thick battened sash class I local timber

Unit

M2

for doors and windows. Fixed complete with available furniture.

Resource Unit

Quantit

Rate Type

Amount

0.0%

370.50

1.00

370.50

Carpenter M2

0.0%

6.00

45.00

270.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

Screws brass 25mm *gauge 7 M2

0.0%

0.33

22.00

7.26

Screws brass 30mm8gauge 7 M2

0.0%

1.33

27.00

35.91

Timb. Cl.A 20mm thick plank M2

0.0%

0.82

850.00

693.60

Timber plank 32mm class A M2

0.0%

0.50

1,400.00

700.00

Machine planing of timber M2

0.0%

60.00

1.00

60.00

Sand paper M2

0.0%

2.25

1.00

2.25

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

1,436.77
0.00

Unit Rate(Direct Labour)

1,889.02

Unit Rate (Labour Sub Con)

1,869.52

Wednesday, March 29, 2006

Page 45 of 395

Southern Province Engineering Services

BSR Reference

08-00-31

Description

Suppling and fixing of 25mm thick framed and 15mm thick battened sashed in class II local

Unit

M2

timber for doors and windows. Fixed complete with available furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

370.50

1.00

370.50

Carpenter M2

0.0%

6.00

45.00

270.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

Screws brass 25mm *gauge 7 M2

0.0%

0.33

22.00

7.26

Screws brass 30mm8gauge 7 M2

0.0%

1.33

27.00

35.91

Timb. Cl.II 20mm thick planks M2

0.0%

0.82

226.00

184.42

Timber plank 32mm class B M2

0.0%

0.50

450.00

225.00

Machine planing of timber M2

0.0%

50.00

1.00

50.00

Sand paper M2

0.0%

2.50

1.00

2.50

Material Rate

452.59

Plant Rate

0.00

Unit Rate(Direct Labour)

895.09

Unit Rate (Labour Sub Con)

875.59

BSR Reference

08-00-32

Description

Suppling and fixing of 32mm thick framed and 15mm thick battened sashed in class I local

Unit

M2

timber for doors and windows. Fixed complete with available furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

370.50

1.00

370.50

Carpenter M2

0.0%

6.00

45.00

270.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

Screws brass 25mm *gauge 7 M2

0.0%

0.33

22.00

7.26

Screws brass 30mm8gauge 7 M2

0.0%

1.33

27.00

35.91

Timber plank class A 38mm M2

0.0%

0.50

1,500.00

750.00

Timber plank class A local timber M2

0.0%

0.82

850.00

693.60

Machine planing of timber M2

0.0%

60.00

1.00

60.00

Sand paper M2

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

1,486.77
0.00

Unit Rate(Direct Labour)

1,939.27

Unit Rate (Labour Sub Con)

1,919.77

Wednesday, March 29, 2006

Page 46 of 395

Southern Province Engineering Services

BSR Reference

08-00-33

Description

Suppling and fixing of 32mm thick framed and 15mm thick battened sashed in class II local

Unit

M2

timber for doors and windows. Fixed complete with available furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

370.50

1.00

370.50

Carpenter M2

0.0%

6.00

45.00

270.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

Screws brass 25mm*gauge 7 M2

0.0%

0.33

22.00

7.26

Screws brass 30mm8gauge 7 M2

0.0%

1.33

27.00

35.91

Timb. Cl.II 20mm thick planks M2

0.0%

0.82

226.00

184.42

Timber plank 38mm Class B M2

0.0%

0.50

600.00

300.00

Machine planing of timber M2

0.0%

50.00

1.00

50.00

Sand paper M2

0.0%

2.50

1.00

2.50

Material Rate

527.59

Plant Rate

0.00

Unit Rate(Direct Labour)

970.09

Unit Rate (Labour Sub Con)

950.59

BSR Reference

08-00-34

Description

Suppling and fixing of 25mm thick sash in import timber for doors and windows. Fixed

Unit

M2

complete with available furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

370.50

1.00

370.50

Carpenter M2

0.0%

6.00

45.00

270.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

Screws brass 25mm *gauge 7 M2

0.0%

0.33

22.00

7.26

Screws brass 30mm8gauge 7 M2

0.0%

1.33

27.00

35.91

Timb. 32mm to 38mm thick [burma M2

0.0%

0.60

2,200.00

1,320.00

Timber impt. 20mm tk. cl. A planks M2

92.0%

0.92

650.00

1,148.16

Machine planing of timber M2

0.0%

60.00

1.00

60.00

Sand paper M2

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

2,511.33
0.00

Unit Rate(Direct Labour)

2,963.83

Unit Rate (Labour Sub Con)

2,944.33

Wednesday, March 29, 2006

Page 47 of 395

Southern Province Engineering Services

BSR Reference

08-00-35

Description

Doors for garage in 32mm frames and 15mm thick battened sashes with 125mm * 100mm

Unit

M2

frames all in class I fixed complete with iron pintels and strap hinges.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

370.50

1.00

370.50

Carpenter M2

0.0%

6.00

45.00

270.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

bolt and nut iron 45*6mm M2

0.0%

5.00

10.00

50.00

bolt tower iron 75mm M2

0.0%

0.20

15.00

3.00

Brass screws [40mm] gauge 8 M2

0.0%

3.40

2.50

8.50

Hasp and staple iron 100mm M2

0.0%

0.20

20.00

4.00

Holdfasts M2

0.0%

1.00

2.50

2.50

Pintels & stay hings 50mm* 6mm*1m M2

0.0%

1.00

160.00

160.00

Timb. Cl.A 20mm thick plank M2

0.0%

0.64

850.00

544.00

Timber beams Class A M2

0.0%

0.02

30,000.00

600.00

Timber plank 38mm class A M2

0.0%

0.60

1,500.00

900.00

Towel bolts, iron 250mm M2

0.0%

0.20

46.00

9.20

Machine planing of timber M2

0.0%

60.00

1.00

60.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

30.00

1.00

30.00

Material Rate
Plant Rate

2,281.20
0.00

Unit Rate(Direct Labour)

2,761.20

Unit Rate (Labour Sub Con)

2,741.70

Wednesday, March 29, 2006

Page 48 of 395

Southern Province Engineering Services

BSR Reference

08-00-36

Description

Supplying and fixing of glazed and panelled, 32mm thick sash and with 100mm * 75mm

Unit

M2

frames in class I local timber for doors and windows complete with brass furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

684.00

1.00

684.00

Carpenter M2

0.0%

12.00

45.00

540.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Balt skeleton brass 300mm M2

0.0%

0.40

90.00

36.00

M2

0.0%

0.33

70.00

23.10

Glass pane clear 3mm M2

0.0%

0.36

192.00

69.12

Hinge parlimentary brass 125mm M2

0.0%

2.00

56.00

112.00

Screws brass 25mm*gauge 7 M2

0.0%

9.00

22.00

198.00

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

5.30

10.00

53.00

Timb. Cl.A 20mm thick plank M2

0.0%

0.25

850.00

212.50

M2

0.0%

1.64

69.00

113.16

Timber beams Class A M2

0.0%

0.02

30,000.00

600.00

Timber plank 38mm class A M2

0.0%

0.64

1,500.00

960.00

Machine planing of timber M2

0.0%

50.00

1.00

50.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

35.00

1.00

35.00

Bolt barrel brass 150mm

Timb.Cl.1 40mm*40mm sash bars

Material Rate
Plant Rate

2,376.88
0.00

Unit Rate(Direct Labour)

3,181.88

Unit Rate (Labour Sub Con)

3,145.88

Wednesday, March 29, 2006

Page 49 of 395

Southern Province Engineering Services

BSR Reference

08-00-37

Description

Supplying and fixing of glazed or panelled,32mm thick sashes with 100mm * 75mm frames

Unit

M2

in class II local timber complete with brass furniture for door and windows.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

684.00

1.00

684.00

Carpenter M2

0.0%

12.00

45.00

540.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

M2

0.0%

0.33

70.00

23.10

Bolt skeleton brass 300mm M2

0.0%

0.40

90.00

36.00

Glass pane clear 3mm M2

0.0%

0.36

192.00

69.12

Hinge parlimentary brass 125mm M2

0.0%

0.33

56.00

18.48

Screws brass 25mm*gauge 7 M2

0.0%

9.00

22.00

198.00

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

5.30

10.00

53.00

Timb. Cl.II 20mm thick planks M2

0.0%

0.25

226.00

56.50

Timb. Cl.II 40mm*40mm sash bars M2

0.0%

1.64

28.00

45.92

Timber beams class B M2

0.0%

0.02

20,000.00

400.00

Timber plank 38mm Class B M2

0.0%

0.64

600.00

384.00

Machine planing of timber M2

0.0%

50.00

1.00

50.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

35.00

1.00

35.00

Bolt barrel brass 150mm

Material Rate
Plant Rate

1,284.12
0.00

Unit Rate(Direct Labour)

2,089.12

Unit Rate (Labour Sub Con)

2,053.12

Wednesday, March 29, 2006

Page 50 of 395

Southern Province Engineering Services

BSR Reference

08-00-38

Description

Supplying and fixing of glazed or panelled,32mm thick sashes in class II local timber

Unit

M2

complete with brass furniture for door and windows.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

456.00

1.00

456.00

Carpenter M2

0.0%

8.00

45.00

360.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

M2

0.0%

0.33

70.00

23.10

Bolt skeleton brass 300mm M2

0.0%

0.40

90.00

36.00

Glass pane clear 3mm M2

0.0%

0.36

192.00

69.12

Hinge parliamentary brass 125mm M2

0.0%

2.00

56.00

112.00

Screws Brass 25mm X gauge8 M2

0.0%

9.00

1.80

16.20

Timb. Cl.II 20mm thick planks M2

0.0%

0.25

226.00

56.50

Timb. Cl.II 40mm*40mm sash bars M2

0.0%

1.64

28.00

45.92

timber fillet 12mmx12mm lical class II M2

0.0%

5.30

6.00

31.80

Timber plank 38mm Class B M2

0.0%

0.64

600.00

384.00

Machine planing of timber M2

0.0%

35.00

1.00

35.00

Sand paper M2

0.0%

30.00

1.00

30.00

Bolt barrel brass 150mm

Material Rate
Plant Rate

774.64
0.00

Unit Rate(Direct Labour)

1,319.64

Unit Rate (Labour Sub Con)

1,295.64

Wednesday, March 29, 2006

Page 51 of 395

Southern Province Engineering Services

BSR Reference

08-00-39

Description

Supplying and fixing of panelled 32mm thick sash and 100mm * 75mm frames in class I

Unit

M2

timber and trellised with GI weld mesh 50mm * 50mm gauge 10 and complete with brass
furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

598.50

1.00

598.50

Carpenter M2

0.0%

10.00

45.00

450.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 M2

0.0%

16.00

2.50

40.00

Hinge butt brass 100mm 63mm M2

0.0%

1.50

40.00

60.00

Lock rim single lever brass 150mm M2

0.0%

0.70

250.00

175.00

Screws brass 50mm x Gauge 10 M2

0.0%

4.00

54.00

216.00

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

1.87

10.00

18.70

Timb. Cl.A 20mm thick plank M2

0.0%

0.29

850.00

246.50

Timber beams Class A M2

0.0%

0.03

30,000.00

900.00

Timber plank 38mm class A M2

0.0%

0.52

1,500.00

780.00

weld mesh[galvanised] 50*50mm M2

0.0%

0.36

100.00

36.00

Machine planing of timber M2

0.0%

90.00

1.00

90.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

30.00

1.00

30.00

Material Rate
Plant Rate

2,472.20
0.00

Unit Rate(Direct Labour)

3,222.20

Unit Rate (Labour Sub Con)

3,190.70

Wednesday, March 29, 2006

Page 52 of 395

Southern Province Engineering Services

BSR Reference

08-00-40

Description

Supplying and fixing of 25mm door sash panelled and trellis with 50mm * 50mm gauge 10

Unit

M2

GI weld mesh in class I timber with available furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

513.00

1.00

513.00

Carpenter M2

0.0%

8.00

45.00

360.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

20mm thick planks of class A local M2

0.0%

0.29

850.00

246.50

Screws Brass 25mm X gauge8 M2

0.0%

4.00

1.80

7.20

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

1.87

10.00

18.70

Timber 40mm to 50mm*12mm class 1 M2

0.0%

2.00

26.00

52.00

Timber plank 32mm class A M2

0.0%

0.52

1,400.00

728.00

weld mesh[galvanised] 50*50mm M2

0.0%

0.36

100.00

36.00

Machine planing of timber M2

0.0%

40.00

1.00

40.00

Sand paper M2

0.0%

2.00

1.00

2.00

Material Rate

1,088.40

Plant Rate

0.00

Unit Rate(Direct Labour)

1,670.40

Unit Rate (Labour Sub Con)

1,643.40

BSR Reference

08-00-41

Description

Supplying and fixing of 32mm panelled doors sash and with 50mm * 50mm gauge 10 GI

Unit

M2

weld mesh in class I timber with available furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

513.00

1.00

513.00

Carpenter M2

0.0%

8.00

45.00

360.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 M2

0.0%

16.00

2.50

40.00

Screws Brass 25mm X gauge8 M2

0.0%

4.00

1.80

7.20

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

1.87

10.00

18.70

Timb. Cl.A 20mm thick plank M2

0.0%

0.29

850.00

246.50

Timber 40mm to 50mm*12mm class 1 M2

0.0%

2.00

26.00

52.00

Timber plank 38mm class A M2

0.0%

0.52

1,500.00

780.00

weld mesh[galvanised] 50*50mm M2

0.0%

0.36

100.00

36.00

Machine planing of timber M2

0.0%

40.00

1.00

40.00

Sand paper M2

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

1,180.40
0.00

Unit Rate(Direct Labour)

1,762.40

Unit Rate (Labour Sub Con)

1,735.40

Wednesday, March 29, 2006

Page 53 of 395

Southern Province Engineering Services

BSR Reference

08-00-42

Description

Supplying and fixing of 32mm panelled door sashes and with 100mm * 75mm frames in

Unit

M2

class I timber fixed complete with brass furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

598.50

1.00

598.50

Carpenter M2

0.0%

10.00

45.00

450.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 M2

0.0%

12.30

2.50

30.75

Hinge butt brass 100mm 63mm M2

0.0%

1.50

40.00

60.00

Lock rim single lever brass 150mm M2

0.0%

0.50

250.00

125.00

Screws Brass 25mm X gauge8 M2

0.0%

3.00

1.80

5.40

Timb. Cl.A 20mm thick plank M2

0.0%

0.52

850.00

442.00

Timber beams Class A M2

0.0%

0.03

30,000.00

900.00

Timber plank 38mm class A M2

0.0%

0.67

1,500.00

1,005.00

Machine planing of timber M2

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand M2

0.0%

35.00

1.00

35.00

Material Rate

2,568.15

Plant Rate

0.00

Unit Rate(Direct Labour)

3,333.15

Unit Rate (Labour Sub Con)

3,301.65

BSR Reference

08-00-43

Description

Removing, easing and refixing of doors or windows

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

106.88

1.00

106.88

Carpenter Nos.

0.0%

1.50

45.00

67.50

Unskilled Labour Nos.

0.0%

1.50

30.00

45.00

Material Rate

0.00

Unit Rate(Direct Labour)

112.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

106.88

Wednesday, March 29, 2006

Page 54 of 395

Southern Province Engineering Services

BSR Reference

08-00-69

Description

Suppling and fixing of coconut rafters

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

7.65

1.00

7.65

Carpenter M

0.0%

0.08

45.00

3.46

Unskilled Labour M

0.0%

0.15

30.00

4.59

timber(coconut) rafter M

0.0%

1.10

50.00

55.00

Nails M

0.0%

0.50

1.00

0.50

Material Rate

55.00

Plant Rate

0.00

Unit Rate(Direct Labour)

63.56

Unit Rate (Labour Sub Con)

63.15

BSR Reference

08-00-70

Description

Supplying and fixing of 50mm * 25mm reepers in class I timber new or renewed with iron

Unit

nails over 30m ( Shifting of tiles paid separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

3.13

1.00

3.13

Carpenter M

0.0%

0.04

45.00

1.98

Unskilled Labour M

0.0%

0.04

30.00

1.32

Timb. Cl.A 50mm*25mm M

0.0%

1.10

35.00

38.50

Wire nail S.W.G 20 to 22 M

0.0%

0.00

55.00

0.22

Wood preservative etc. M

0.0%

0.50

1.00

0.50

38.72
0.00

Unit Rate(Direct Labour)

42.52

Unit Rate (Labour Sub Con)

42.36

Wednesday, March 29, 2006

Page 55 of 395

Southern Province Engineering Services

BSR Reference

08-00-71

Description

Supplying and fixing of 50mm * 25mm reepers in class II local timber new or renewed with

Unit

iron nails upto 30m ( Shifting of tiles paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

4.70

1.00

4.70

Carpenter M

0.0%

0.07

45.00

2.97

Unskilled Labour M

0.0%

0.07

30.00

1.98

Timb. Cl.II local 50mm*25mm M

0.0%

0.00

34.50

0.00

Wire nail S.W.G 20 to 22 M

0.0%

0.00

55.00

0.00

Wood preservative etc. M

0.0%

0.50

1.00

0.50

Material Rate

0.00

Unit Rate(Direct Labour)

5.45

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.20

BSR Reference

08-00-72

Description

Supplying and fixing of 50mm * 25mm reepers in class II local timber new or renewed with

Unit

iron nails over 30m ( Shifting of tiles paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

3.13

1.00

3.13

Carpenter M

0.0%

0.04

45.00

1.98

Unskilled Labour M

0.0%

0.04

30.00

1.32

Timb. Cl.II local 50mm*25mm M

0.0%

1.10

34.50

37.95

Wire nail S.W.G 20 to 22 M

0.0%

0.00

55.00

0.00

Wood preservative etc. M

0.0%

0.50

1.00

0.50

Material Rate
Plant Rate

37.95
0.00

Unit Rate(Direct Labour)

41.75

Unit Rate (Labour Sub Con)

41.59

Wednesday, March 29, 2006

Page 56 of 395

Southern Province Engineering Services

BSR Reference

08-00-73

Description

Supplying and fixing of 50mm * 12mm reepers in class I timber new or renewed with iron

Unit

nails upto 30m.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

3.13

1.00

3.13

Carpenter M

0.0%

0.04

45.00

1.98

Unskilled Labour M

0.0%

0.04

30.00

1.32

Timb. Cl.A 50mm*12mm M

0.0%

1.10

20.00

22.00

Wire nail S.W.G 20 to 22 M

0.0%

0.00

55.00

0.00

Wood preservative etc. M

0.0%

0.50

1.00

0.50

Material Rate

22.00

Plant Rate

0.00

Unit Rate(Direct Labour)

25.80

Unit Rate (Labour Sub Con)

25.64

BSR Reference

08-00-74

Description

Supplying and fixing of 50mm * 12mm reepers in class I timber new or renewed with iron

Unit

nails over 30m.

Resource Unit

Wastag

Quantit

Rate Type

0.0%

3.13

1.00

3.13

Carpenter M

0.0%

0.04

45.00

1.98

Unskilled Labour M

0.0%

0.04

30.00

1.32

Timb. Cl.A 50mm*12mm M

0.0%

1.10

20.00

22.00

Wood preservative etc. M

0.0%

0.50

1.00

0.50

Material Rate

22.00

Plant Rate

0.00

Unit Rate(Direct Labour)

25.80

Unit Rate (Labour Sub Con)

25.64

BSR Reference

08-00-80

Description

Fixing or renewing Class I timber in roof and other carpentry work.

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

6,697.50

1.00

6,697.50

Carpenter M3

0.0%

128.00

45.00

5,760.00

Unskilled Labour M3

0.0%

43.00

30.00

1,290.00

Timber beams Class A M3

0.0%

1.00

30,000.00

30,000.00

Nails M3

0.0%

200.00

1.00

200.00

30,000.00
0.00

Unit Rate(Direct Labour)

37,250.00

Unit Rate (Labour Sub Con)

36,897.50

Wednesday, March 29, 2006

Page 57 of 395

Southern Province Engineering Services

BSR Reference

08-00-81

Description

Fixing or renewing Class II timber in roof and other carpentry work.

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

6,697.50

1.00

6,697.50

Carpenter M3

0.0%

128.00

45.00

5,760.00

Unskilled Labour M3

0.0%

43.00

30.00

1,290.00

Timber beams class B M3

0.0%

1.00

20,000.00

20,000.00

Nails M3

0.0%

200.00

1.00

200.00

Material Rate

20,000.00

Plant Rate

0.00

Unit Rate(Direct Labour)

27,250.00

Unit Rate (Labour Sub Con)

26,897.50

BSR Reference

08-00-97

Description

Supplying and fixing of Calicut pattern roof on class I timber frame work including ridges,

Unit

M2

hips etc.

Resource Unit

Quantit

Rate Type

Amount

0.0%

117.56

1.00

117.56

Mason M2

0.0%

1.65

45.00

74.25

Unskilled Labour M2

0.0%

1.65

30.00

49.50

Binding wire M2

0.0%

0.06

50.00

3.25

Cement M2

0.0%

0.03

340.00

9.18

Ridge tile calicut pattern Gr.I M2

0.0%

1.00

20.00

20.00

Sand M2

0.0%

0.00

350.00

1.40

Slaked lime M2

0.0%

0.00

2,850.00

2.85

Tile calicut pattern Gr .I M2

0.0%

13.45

8.00

107.64

Timber beams Class A M2

0.0%

0.02

30,000.00

540.00

Timber Cl. A 50mm x 25mm M2

0.0%

3.61

35.00

126.31

Wire nail S.W.G 20 to 22 M2

0.0%

0.02

55.00

0.88

Wood Preservative M2

0.0%

0.20

110.00

22.44

Colouring powder M2

0.0%

0.27

1.00

0.27

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

833.95
0.00

Unit Rate(Direct Labour)

957.97

Unit Rate (Labour Sub Con)

951.79

Wednesday, March 29, 2006

Page 58 of 395

Southern Province Engineering Services

BSR Reference

08-00-98

Description

Supplying materials and fixing half round roof on class I sawn timber frame work including

Unit

ridges, hips etc.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate

0.0%

127.65

1.00

127.65

Carpenter

0.0%

1.79

45.00

80.55

Unskilled Labour

0.0%

1.79

30.00

53.82

Cement

0.0%

0.03

340.00

9.18

Sand

0.0%

0.00

350.00

1.40

Slaked lime

0.0%

0.00

2,850.00

2.85

Tile half round Gr.I

0.0%

69.90

5.00

349.50

Timb. Cl.A 50mm*12mm

0.0%

7.22

20.00

144.36

Timber beams Class A

0.0%

0.02

30,000.00

510.00

Wire nail S.W.G 20 to 22

0.0%

0.02

55.00

1.10

Wire nail S.W.G. 4 to 18

0.0%

0.07

45.00

3.15

Wood Preservative

0.0%

0.25

110.00

26.95

Material Rate

1,048.49

Plant Rate

0.00

Unit Rate(Direct Labour)

1,182.86

Unit Rate (Labour Sub Con)

1,176.14

BSR Reference

08-00-99

Description

Supplying materials and fixing half round roof on class II sawn timber frame work including

Unit

ridges, hips etc.

Resource Unit

Material Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate

0.0%

127.82

1.00

127.82

Carpenter

0.0%

1.79

45.00

80.73

Unskilled Labour

0.0%

1.79

30.00

53.82

Cement

0.0%

0.03

340.00

10.20

Sand

0.0%

0.00

350.00

0.00

Slaked lime

0.0%

0.03

2,850.00

85.50

Tile half round Gr.I

0.0%

69.90

5.00

349.50

Timb. Cl.A 50mm*12mm

0.0%

7.22

20.00

144.40

Timber beams class B

0.0%

0.02

20,000.00

340.00

Wire nail S.W.G 20 to 22

0.0%

0.02

55.00

0.88

Wire nail S.W.G. 4 to 18

0.0%

0.06

45.00

2.92

Wood Preservative

0.0%

0.25

110.00

27.50

960.91

Unit Rate(Direct Labour)

1,095.46

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

1,088.73

Page 59 of 395

Southern Province Engineering Services

BSR Reference

08-01-44

Description

Easing of doors and windows

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

28.50

1.00

28.50

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Material Rate

0.00

Unit Rate(Direct Labour)

30.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

28.50

BSR Reference

08-01-45

Description

Renewing in short lengths with Class I timber in Doors and Windows

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

188.10

1.00

188.10

Carpenter M

0.0%

4.40

45.00

198.00

Timber beams Class A M

0.0%

0.01

30,000.00

390.00

Material Rate

390.00

Plant Rate

0.00

Unit Rate(Direct Labour)

588.00

Unit Rate (Labour Sub Con)

578.10

BSR Reference

08-01-46

Description

Altering door or window frame by filleting existing rebate using Class I timber and

Unit

Nos.

rehanging sashes on opposite side.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

627.00

1.00

627.00

Carpenter Nos.

0.0%

12.00

45.00

540.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Screws brass 25mm*gauge 7 Nos.

0.0%

1.00

22.00

22.00

Screws brass 30mm8gauge 7 Nos.

0.0%

1.50

27.00

40.50

Timber fillet 32mm x 12mm ocal class I Nos.

0.0%

6.41

26.00

166.66

Material Rate
Plant Rate

229.16
0.00

Unit Rate(Direct Labour)

889.16

Unit Rate (Labour Sub Con)

856.16

Wednesday, March 29, 2006

Page 60 of 395

Southern Province Engineering Services

BSR Reference

08-01-47

Description

Renewing of glazing in door windows in Class I timber (Per 2.0m , 32mm * 32mm)

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

146.49

1.00

146.49

Carpenter M

0.0%

2.80

45.00

126.00

Unskilled Labour M

0.0%

0.94

30.00

28.20

Timber sash bars 40x40mm class I M

0.0%

1.17

69.00

80.73

Material Rate

80.73

Plant Rate

0.00

Unit Rate(Direct Labour)

234.93

Unit Rate (Labour Sub Con)

227.22

BSR Reference

08-01-48

Description

Supplying and fixing of louvered Door or window sash 25mm to 32mm in Burma Teak with

Unit

M2

available furniture

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

855.00

1.00

855.00

Carpenter M2

0.0%

16.00

45.00

720.00

Unskilled Labour M2

0.0%

6.00

30.00

180.00

Screws brass 25mm*gauge 7 M2

0.0%

2.50

22.00

55.00

Timb. Cl.1 planks 12mm thick M2

0.0%

1.33

675.00

897.75

Timber plank class I imported 32 to M2

0.0%

0.72

2,200.00

1,584.00

Machine planing of timber M2

0.0%

100.00

1.00

100.00

Sand paper M2

0.0%

6.15

1.00

6.15

Material Rate
Plant Rate

2,536.75
0.00

Unit Rate(Direct Labour)

3,542.90

Unit Rate (Labour Sub Con)

3,497.90

Wednesday, March 29, 2006

Page 61 of 395

Southern Province Engineering Services

BSR Reference

08-01-49

Description

Supplying and fixing 38mm * 38mm * 125mm tapered door stops in Class I timber.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

57.00

1.00

57.00

Carpenter Nos.

0.0%

1.00

45.00

45.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Timber Class I 50mm x 50mm Nos.

0.0%

0.15

69.00

10.35

Cement Sand etc. Nos.

0.0%

1.25

1.00

1.25

Material Rate

10.35

Plant Rate

0.00

Unit Rate(Direct Labour)

71.60

Unit Rate (Labour Sub Con)

68.60

BSR Reference

08-01-50

Description

Fixing of door or window sashes in position (sash screws and fittings supplied by

Unit

Nos.

Department)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

213.75

1.00

213.75

Carpenter Nos.

0.0%

3.00

45.00

135.00

Unskilled Labour Nos.

0.0%

3.00

30.00

90.00

Material Rate

0.00

Unit Rate(Direct Labour)

225.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

213.75

BSR Reference

08-01-51

Description

Removing and refixing of door sashes in new position.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

142.50

1.00

142.50

Carpenter Nos.

0.0%

2.00

45.00

90.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

142.50

Wednesday, March 29, 2006

Page 62 of 395

Southern Province Engineering Services

BSR Reference

08-01-52

Description

Supplying and fixing of 25mm thick swing doors (900mm * 450mm each) with 12mm panel

Unit

Pair

or glazed and panelled in class I timber including brass gravity hinges.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Pair

0.0%

855.00

1.00

855.00

Carpenter Pair

0.0%

16.00

45.00

720.00

Unskilled Labour Pair

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 Pair

0.0%

1.00

2.50

2.50

Hinge gavity brass Pair

0.0%

4.00

50.00

200.00

Screws brass 25mm*gauge 7 Pair

0.0%

3.00

22.00

66.00

Timb. Cl.1 28mm thick planks Pair

0.0%

0.51

1,250.00

637.50

Timb. Cl.1 planks 12mm thick Pair

0.0%

0.79

675.00

533.25

Machine planing of timber Pair

0.0%

40.00

1.00

40.00

Sand paper Pair

0.0%

3.00

1.00

3.00

Material Rate

1,439.25

Plant Rate

0.00

Unit Rate(Direct Labour)

2,382.25

Unit Rate (Labour Sub Con)

2,337.25

BSR Reference

08-01-53

Description

Supplying and fixing of 25mm thick class I timber swing door with 12mm thick plywood

Unit

Pair

panels (900mm * 450mm each) complete with gravity hinges.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Pair

0.0%

855.00

1.00

855.00

Carpenter Pair

0.0%

16.00

45.00

720.00

Unskilled Labour Pair

0.0%

6.00

30.00

180.00

Brass screws [40mm] gauge 8 Pair

0.0%

1.00

2.50

2.50

Hinge gavity brass Pair

0.0%

4.00

50.00

200.00

Plywood board ,ordinary 12m Pair

0.0%

0.56

330.00

184.80

Timb. Cl.1 28mm thick planks Pair

0.0%

0.51

1,250.00

637.50

Machine planing of timber Pair

0.0%

20.00

1.00

20.00

Sand paper Pair

0.0%

3.00

1.00

3.00

Material Rate
Plant Rate

1,024.80
0.00

Unit Rate(Direct Labour)

1,947.80

Unit Rate (Labour Sub Con)

1,902.80

Wednesday, March 29, 2006

Page 63 of 395

Southern Province Engineering Services

BSR Reference

08-01-54

Description

Supplying and fixing of 20mm * 20mm quadrant filles with spring or nails in ClasI timber

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

14.00

1.00

14.00

Labour Sub-Contract Rate M

0.0%

14.11

1.00

14.11

Carpenter M

0.0%

0.33

45.00

14.85

Timb. Cl.1 25mm*25mm fillets M

0.0%

1.10

26.00

28.60

Nails M

0.0%

1.50

1.00

1.50

Material Rate

28.60

Plant Rate

0.00

Unit Rate(Direct Labour)

44.95

Unit Rate (Labour Sub Con)

58.21

BSR Reference

08-01-55

Description

Supplying and fixing of 25mm * 25mm quadrant filles with spring or nails in ClasI timber

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

14.11

1.00

14.11

Carpenter M

0.0%

0.33

45.00

14.85

Timb. Cl.1 32mm*32mm M

0.0%

1.10

69.00

75.90

Nails M

0.0%

1.50

1.00

1.50

Material Rate

75.90

Plant Rate

0.00

Unit Rate(Direct Labour)

92.25

Unit Rate (Labour Sub Con)

91.51

BSR Reference

08-01-56

Description

Suppying and fixing of gate sash with available posts at site including fixing post (Gate

Unit

Sash

and posts supplyed by Department)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Sash

0.0%

313.50

1.00

313.50

Carpenter Sash

0.0%

2.00

45.00

90.00

Unskilled Labour Sash

0.0%

8.00

30.00

240.00

Material Rate

0.00

Unit Rate(Direct Labour)

330.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

313.50

Wednesday, March 29, 2006

Page 64 of 395

Southern Province Engineering Services

BSR Reference

08-01-57

Description

Supplying and fixing of louver blades with 10mm minimum thickness in class I timber upto

Unit

100mm width.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

56.43

1.00

56.43

Carpenter M

0.0%

1.32

45.00

59.40

Timb. Cl.1 planks 12mm thick M

0.0%

0.12

675.00

81.00

Nails M

0.0%

4.90

1.00

4.90

Material Rate

81.00

Plant Rate

0.00

Unit Rate(Direct Labour)

145.30

Unit Rate (Labour Sub Con)

142.33

BSR Reference

08-01-58

Description

Supplying and fixing of 2135mm long, 150mm * 150mm verandah post tapering to 125 mm *

Unit

Nos.

125mm on spur in Class I local timber (spur stone paid separately).

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

285.00

1.00

285.00

Carpenter Nos.

0.0%

6.00

45.00

270.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Timber beams Class A Nos.

0.0%

0.05

30,000.00

1,590.00

Material Rate

1,590.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,890.00

Unit Rate (Labour Sub Con)

1,875.00

BSR Reference

08-01-59

Description

Supplying and fixing of louvre blades with a 10mm minimum thickness and 150mm to

Unit

225mm wide in Class I timber.

Resource Unit

Quantit

Rate Type

Amount

0.0%

70.11

1.00

70.11

Carpenter M

0.0%

1.64

45.00

73.80

Timb. Cl.1 planks 12mm thick M

0.0%

0.23

675.00

155.25

Nails M

0.0%

4.92

1.00

4.92

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

155.25
0.00

Unit Rate(Direct Labour)

233.97

Unit Rate (Labour Sub Con)

230.28

Wednesday, March 29, 2006

Page 65 of 395

Southern Province Engineering Services

BSR Reference

08-01-60

Description

Fixing of available partitions including making good to walls and floor

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

109.44

1.00

109.44

Carpenter M2

0.0%

0.92

45.00

41.40

Unskilled Labour M2

0.0%

2.46

30.00

73.80

Plugs, screws,cement M2

0.0%

1.54

1.00

1.54

Material Rate

0.00

Unit Rate(Direct Labour)

116.74

Plant Rate

0.00

Unit Rate (Labour Sub Con)

110.98

BSR Reference

08-01-61

Description

Fixing of full panelled or panelled and glazed 28mm thick partition with 100mm * 50mm

Unit

M2

frames and 25mm * 25mm quadrant fillets, complete with brass screws in class I local timber.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

1,422.86

1.00

1,422.86

Carpenter M2

0.0%

26.73

45.00

1,202.85

Unskilled Labour M2

0.0%

9.83

30.00

294.90

Glass pane clear 3mm M2

0.0%

0.43

192.00

82.56

Screws brass 50mm x Gauge 10 M2

0.0%

0.93

54.00

50.22

Timb. Cl.1 32mm*32mm M2

0.0%

7.52

69.00

518.88

Timb. Cl.1 battens 20mm*20mm M2

0.0%

3.38

22.40

75.71

Timb. Cl.A 20mm thick plank M2

0.0%

0.36

850.00

306.00

Timber beams Class A M2

0.0%

0.02

30,000.00

600.00

Timber plank 25mm class A M2

0.0%

0.36

1,000.00

360.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.04

55.00

2.20

Sand paper M2

0.0%

0.92

1.00

0.92

Material Rate
Plant Rate

1,995.57
0.00

Unit Rate(Direct Labour)

3,494.24

Unit Rate (Labour Sub Con)

3,419.35

Wednesday, March 29, 2006

Page 66 of 395

Southern Province Engineering Services

BSR Reference

08-01-62

Description

Timber partition in class I timber frame with 100m * 100mm * 3000mm mainpost 100mm *

Unit

M2

50mm * 2150mm intermediate post 100mm * 50mm laterals 25mm thick timber frame, 12mm
thick plywood & 3mm glass panels, 40mm * 200mm capping complete with timber batte

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

912.00

1.00

912.00

Carpenter M2

0.0%

16.00

45.00

720.00

Unskilled Labour M2

0.0%

8.00

30.00

240.00

Glass pane clear 3mm M2

0.0%

0.43

192.00

82.56

Plywood board ,ordinary 12m M2

0.0%

0.36

330.00

118.80

Screws brass 50mm x Gauge 10 M2

0.0%

0.93

54.00

50.22

Timb. Cl.1 32mm*32mm M2

0.0%

7.52

69.00

518.88

Timb. Cl.1 battens 20mm*20mm M2

0.0%

3.38

22.40

75.71

Timber beams Class A M2

0.0%

0.01

30,000.00

420.00

Timber plank 25mm class A M2

0.0%

0.36

1,000.00

360.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.04

55.00

2.20

Machine planing of timber M2

0.0%

50.00

1.00

50.00

Sand paper M2

0.0%

0.92

1.00

0.92

Material Rate

1,628.37

Plant Rate

0.00

Unit Rate(Direct Labour)

2,639.29

Unit Rate (Labour Sub Con)

2,591.29

BSR Reference

08-01-63

Description

Supplying and fixing of 100mm long tapered 75mm * 50mm plugs in class I timber on walls

Unit

Nos.

with 1:3 cement mortar.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

22.80

1.00

22.80

Mason Nos.

0.0%

0.40

45.00

18.00

Unskilled Labour Nos.

0.0%

0.20

30.00

6.00

Cement timber etc Nos.

0.0%

9.00

1.00

9.00

Material Rate

0.00

Unit Rate(Direct Labour)

33.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

31.80

Wednesday, March 29, 2006

Page 67 of 395

Southern Province Engineering Services

BSR Reference

08-01-64

Description

Supplying of 3 plywood panels and fixing to existing frames (beading paid for separately)

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

77.04

1.00

77.04

Carpenter M2

0.0%

1.80

45.00

81.09

Plywood board,ordinary M.R. 6mm M2

0.0%

1.00

230.00

231.15

Nails M2

0.0%

10.81

1.00

10.81

Material Rate

231.15

Plant Rate

0.00

Unit Rate(Direct Labour)

323.05

Unit Rate (Labour Sub Con)

319.00

BSR Reference

08-01-65

Description

Supplying and fixing of 2135mm long 125mm * 125mm varandah post tapering to 100mm *

Unit

Nos.

100mm on spur stone in class I timber (Spur stone paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

242.25

1.00

242.25

Carpenter Nos.

0.0%

5.00

45.00

225.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Timber beams Class A Nos.

0.0%

0.04

30,000.00

1,110.00

Material Rate

1,110.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,365.00

Unit Rate (Labour Sub Con)

1,352.25

BSR Reference

08-01-67

Description

Supplying & fixing of 2135mm long 150mm*150mm verandah post tapering to 125mm

Unit

Nos.

*125mm onspur stone in class 1 local timber [spur stone paid for saparately]

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

285.00

1.00

285.00

Carpenter Nos.

0.0%

6.00

45.00

270.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Timber beams Class A Nos.

0.0%

0.05

30,000.00

1,590.00

1,590.00
0.00

Unit Rate(Direct Labour)

1,890.00

Unit Rate (Labour Sub Con)

1,875.00

Wednesday, March 29, 2006

Page 68 of 395

Southern Province Engineering Services

BSR Reference

08-01-68

Description

Fixing of 150mm to 200mm wooden posts of round jungle timber(posta supplied by the

Unit

client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

37.05

1.00

37.05

Unskilled Labour M

0.0%

1.30

30.00

39.00

Material Rate

0.00

Unit Rate(Direct Labour)

39.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

37.05

BSR Reference

08-01-82

Description

Renewing of trellis laths 16mm * 16mm in Class I local timber over 30m

Resource Unit

Unit

Wastag

L.M.

Quantit

Rate Type

0.0%

5.99

1.00

5.99

Carpenter L.M.

0.0%

0.14

45.00

6.30

Timber cl. 1 16mm x16mm L.M.

0.0%

1.10

22.50

24.75

Wire nail S.W.G 20 to 22 L.M.

0.0%

0.00

55.00

0.22

Material Rate

24.97

Plant Rate

0.00

Unit Rate(Direct Labour)

31.27

Unit Rate (Labour Sub Con)

30.96

BSR Reference

08-01-83

Description

Renewing of trellis laths 16mm * 16mm in Class I local timber upto 30m

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

7.48

1.00

7.48

Carpenter M

0.0%

0.17

45.00

7.87

Timber cl. 1 16mm x16mm M

0.0%

1.10

22.50

24.75

Wire nail S.W.G 20 to 22 M

0.0%

0.00

55.00

0.22

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate L.M.

24.97
0.00

Unit Rate(Direct Labour)

32.85

Unit Rate (Labour Sub Con)

32.45

Wednesday, March 29, 2006

Page 69 of 395

Southern Province Engineering Services

BSR Reference

08-01-84

Description

Renewing of trellis laths 25mm * 12mm in Class I local timber over 30m

Unit

Resource Unit

Wastag

Quantit

Rate Type

0.0%

7.27

1.00

7.27

Carpenter M

0.0%

0.17

45.00

7.65

Timber Cl. 1 28mm x 15mm M

0.0%

1.10

29.40

32.34

Wire nail S.W.G 20 to 22 M

0.0%

0.00

55.00

0.22

Nails M

0.0%

0.50

1.00

0.50

Material Rate

32.56

Plant Rate

0.00

Unit Rate(Direct Labour)

40.71

Unit Rate (Labour Sub Con)

40.33

BSR Reference

08-01-86

Description

Renewing of trellis laths 25mm * 12mm in Class I local timber upto 30m

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

9.40

1.00

9.40

Carpenter M

0.0%

0.22

45.00

9.90

Timber Cl. 1 28mm x 15mm M

0.0%

1.10

29.40

32.34

Wire nail S.W.G 20 to 22 M

0.0%

0.00

55.00

0.22

Material Rate

32.56

Plant Rate

0.00

Unit Rate(Direct Labour)

42.46

Unit Rate (Labour Sub Con)

41.97

BSR Reference

08-01-87

Description

Supplying and fixing of trellis laths 25mm * 25mm in class I local timber.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

7.27

1.00

7.27

Carpenter M

0.0%

0.17

45.00

7.65

Timber Cl. A 28mm x 28mm M

0.0%

1.10

20.00

22.00

Wire nail S.W.G 20 to 22 M

0.0%

0.01

55.00

0.44

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M

22.44
0.00

Unit Rate(Direct Labour)

30.09

Unit Rate (Labour Sub Con)

29.71

Wednesday, March 29, 2006

Page 70 of 395

Southern Province Engineering Services

BSR Reference

08-01-88

Description

Renewing of trellis laths 50mm * 12mm in Class I timber

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

0.0%

7.27

1.00

7.27

Carpenter M2

0.0%

0.17

45.00

7.65

Timber cl. A 50mm x 15mm M2

0.0%

1.10

22.00

24.20

Wire nail S.W.G 20 to 22 M2

0.0%

0.01

55.00

0.44

Material Rate

24.64

Plant Rate

0.00

Unit Rate(Direct Labour)

32.29

Unit Rate (Labour Sub Con)

31.91

BSR Reference

08-01-89

Description

Supplying and fixing in position 100mm * 75mm door frame in class I local timber.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

424.65

1.00

424.65

Carpenter M

0.0%

5.96

45.00

268.20

Unskilled Labour M

0.0%

5.96

30.00

178.80

Holdfasts M

0.0%

2.65

2.50

6.63

Spure stones M

0.0%

1.33

6.00

7.95

Timber beams Class A M

0.0%

0.03

30,000.00

960.00

Cement sand & double pin etc M

0.0%

8.30

1.00

8.30

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

974.58
0.00

Unit Rate(Direct Labour)

1,429.88

Unit Rate (Labour Sub Con)

1,407.53

Wednesday, March 29, 2006

Page 71 of 395

Southern Province Engineering Services

BSR Reference

08-01-90

Description

Supplying and fixing in position of 100mm * 50mm class I timber door frames.

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

424.65

1.00

424.65

Carpenter M2

0.0%

5.96

45.00

268.20

Unskilled Labour M2

0.0%

5.96

30.00

178.80

Holdfasts M2

0.0%

2.65

2.50

6.63

Spure stones M2

0.0%

1.33

6.00

7.95

Timber beams Class A M2

0.0%

0.02

30,000.00

570.00

Cement sand & double pin etc M2

0.0%

8.30

1.00

8.30

Material Rate

584.57

Plant Rate

0.00

Unit Rate(Direct Labour)

1,039.87

Unit Rate (Labour Sub Con)

1,017.52

BSR Reference

08-01-91

Description

Supplyng and fixing of 32mm thick ordinary sash single (ordinary finish ) plywood door

Unit

M2

hung on 100mm * 75mm frame in Class I timber complete with brass furniture(lock paid
separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

228.00

1.00

228.00

Carpenter M2

0.0%

4.00

45.00

180.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

M2

0.0%

0.47

70.00

33.04

Bolt skeleton brass 300mm M2

0.0%

0.47

90.00

42.30

Hinge butt brass 100mm 63mm M2

0.0%

1.42

40.00

56.64

Holdfasts M2

0.0%

2.83

2.50

7.07

Plywood door ordinary M.R. 838x20 - M2

0.0%

0.47

600.00

283.20

Screws brass 20mm*gauge 6 M2

0.0%

0.48

12.00

5.76

Screws brass 25mm*gauge 7 M2

0.0%

0.75

22.00

16.50

Screws iron 40mm*gauge 8 M2

0.0%

0.24

8.00

1.89

Spure stones M2

0.0%

0.95

6.00

5.70

Timber beams Class A M2

0.0%

0.02

30,000.00

660.00

Dowels , cement etc. M2

0.0%

8.00

1.00

8.00

Machine planing of timber M2

0.0%

50.00

1.00

50.00

Bolt barrel brass 150mm

Material Rate
Plant Rate

1,112.10
0.00

Unit Rate(Direct Labour)

1,410.10

Unit Rate (Labour Sub Con)

1,398.10

Wednesday, March 29, 2006

Page 72 of 395

Southern Province Engineering Services

BSR Reference

08-01-92

Description

Supplyng and fixing of 32mm thick ordinary sash single (ordinary finish ) plywood door

Unit

M2

hung on 100mm * 50mm frame in Class I timber complete with brass furniture(lock paid
separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

228.00

1.00

228.00

Carpenter M2

0.0%

4.00

45.00

180.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

M2

0.0%

0.47

70.00

33.04

Bolt skeleton brass 300mm M2

0.0%

0.47

90.00

42.30

Hinge butt brass 100mm 63mm M2

0.0%

1.42

40.00

56.64

Holdfasts M2

0.0%

2.83

2.50

7.07

Plywood door ordinary M.R. 838x20 - M2

0.0%

0.47

600.00

283.20

Screws brass 20mm*gauge 6 M2

0.0%

0.48

12.00

5.76

Screws brass 25mm *gauge 7 M2

0.0%

0.75

22.00

16.50

Screws iron 40mm*gauge 8 M2

0.0%

0.24

8.00

1.89

Spure stones M2

0.0%

0.94

6.00

5.66

Timber beams Class A M2

0.0%

0.01

30,000.00

420.00

Dowels , cement etc. M2

0.0%

8.00

1.00

8.00

Machine planing of timber M2

0.0%

40.00

1.00

40.00

Bolt barrel brass 150mm

Material Rate

872.06

Plant Rate

0.00

Unit Rate(Direct Labour)

1,160.06

Unit Rate (Labour Sub Con)

1,148.06

BSR Reference

08-01-93

Description

Supplyng and fixing of 32mm thick ordinary sash single (ordinary finish ) plywood door on

Unit

M2

existing frame(lock paid separately) complete with brass furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

165.30

1.00

165.30

Carpenter M2

0.0%

2.32

45.00

104.40

Unskilled Labour M2

0.0%

2.32

30.00

69.60

M2

0.0%

0.47

70.00

32.90

Bolt skeleton brass 300mm M2

0.0%

0.47

90.00

42.48

Hinge butt brass 100mm 63mm M2

0.0%

1.42

40.00

56.80

Plywood door ordinary M.R. 838x20 - M2

0.0%

0.47

600.00

283.20

Screws brass 20mm*gauge 6 M2

0.0%

0.48

12.00

5.76

Screws brass 25mm*gauge 7 M2

0.0%

0.75

22.00

16.50

Bolt barrel brass 150mm

Material Rate

437.64

Unit Rate(Direct Labour)

611.64

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

602.94

Page 73 of 395

Southern Province Engineering Services

BSR Reference

08-01-94

Description

Supplyng and fixing of 32mm thick marine type plywood door (ordinary water proof) on

Unit

M2

existing frame(lock paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

202.14

1.00

202.14

Carpenter M2

0.0%

2.84

45.00

127.66

Unskilled Labour M2

0.0%

2.84

30.00

85.11

Bolt barrel brass M2

0.0%

0.47

55.00

25.85

Hinge butt brass 100mm 63mm M2

0.0%

1.42

40.00

56.80

Plywood door ordinary M.R. 838x20 - M2

0.0%

0.71

600.00

426.00

Ring brass 45mm to 38mm M2

0.0%

0.71

20.00

14.20

Screws brass 20mm* gauge 6 M2

0.0%

0.71

12.00

8.52

Screws brass 25mm*gauge 7 M2

0.0%

0.75

22.00

16.50

Material Rate

547.87

Plant Rate

0.00

Unit Rate(Direct Labour)

760.64

Unit Rate (Labour Sub Con)

750.01

BSR Reference

08-01-95

Description

Sup & fix of 2100 to 3000mm high, 4mm thick glazed partition with 12mm thick chipboard

Unit

M2

panels on both sides with 100*75mm & 100*100mm uprights at 900mm intervals &
100*75mm as horizontal members in Cl I timber with 50 *12mm timber beading around glas

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

270.75

1.00

270.75

Carpenter M2

0.0%

5.00

45.00

225.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

chip board 12mm thick ( 8ft x 4ft) M2

0.0%

0.40

650.00

260.00

Glass pane clear 4mm M2

0.0%

0.54

265.00

144.16

Screws brass 25mm*gauge 7 M2

0.0%

0.47

22.00

10.34

Timber 40mm to 50mm*12mm class 1 M2

0.0%

2.22

26.00

57.72

Timber beams Class A M2

0.0%

0.02

30,000.00

510.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.14

55.00

7.92

Cement Sand etc. M2

0.0%

1.58

1.00

1.58

Machine planing of timber M2

0.0%

40.00

1.00

40.00

Material Rate
Plant Rate

990.14
0.00

Unit Rate(Direct Labour)

1,316.72

Unit Rate (Labour Sub Con)

1,302.47

Wednesday, March 29, 2006

Page 74 of 395

Southern Province Engineering Services

BSR Reference

08-02-75

Description

Fixing of available reepers with wire nails.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

4.70

1.00

4.70

Carpenter M

0.0%

0.07

45.00

2.97

Unskilled Labour M

0.0%

0.07

30.00

1.98

Wire nail S.W.G 20 to 22 M

0.0%

0.00

55.00

0.22

Wood preservative etc. M

0.0%

0.50

1.00

0.50

Material Rate

0.22

Unit Rate(Direct Labour)

5.67

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.42

BSR Reference

08-02-76

Description

Sorting out of available timber cut to required sizes and fixed in parttitions and frames.

Resource Unit

Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

10,331.25

1.00

10,331.25

Carpenter M3

0.0%

213.00

45.00

9,585.00

Unskilled Labour M3

0.0%

43.00

30.00

1,290.00

Screws and Nails M3

0.0%

213.00

1.00

213.00

Material Rate

0.00

Unit Rate(Direct Labour)

11,088.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

10,544.25

BSR Reference

08-02-77

Description

Sorting out of available timber cut to required sizes and fixed in roof and other carpentry

Unit

M3

work.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

6,697.50

1.00

6,697.50

Carpenter M3

0.0%

128.00

45.00

5,760.00

Unskilled Labour M3

0.0%

43.00

30.00

1,290.00

Nails ,spikes etc. M3

0.0%

213.00

1.00

213.00

Material Rate

0.00

Unit Rate(Direct Labour)

7,263.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

6,910.50

Wednesday, March 29, 2006

Page 75 of 395

Southern Province Engineering Services

BSR Reference

08-02-78

Description

Fixing or renewing parttitions and frames with Class I timber (excluding Milla) including

Unit

M3

panels and boards.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

16,302.00

1.00

16,302.00

Carpenter M3

0.0%

286.00

45.00

12,870.00

Unskilled Labour M3

0.0%

143.00

30.00

4,290.00

Timber beams Class A M3

0.0%

1.00

30,000.00

30,000.00

Nails M3

0.0%

200.00

1.00

200.00

Material Rate

30,000.00

Plant Rate

0.00

Unit Rate(Direct Labour)

47,360.00

Unit Rate (Labour Sub Con)

46,502.00

BSR Reference

08-02-79

Description

Fixing or renewing parttitions and frames with Class II timber including panels and boards.

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

16,302.00

1.00

16,302.00

Carpenter M3

0.0%

286.00

45.00

12,870.00

Unskilled Labour M3

0.0%

143.00

30.00

4,290.00

Timber beams class B M3

0.0%

1.00

20,000.00

20,000.00

Nails M3

0.0%

200.00

1.00

200.00

20,000.00
0.00

Unit Rate(Direct Labour)

37,360.00

Unit Rate (Labour Sub Con)

36,502.00

Wednesday, March 29, 2006

Page 76 of 395

Southern Province Engineering Services

BSR Reference

08-02-96

Description

Supplying and fixing of doors or windows glazed and / or panelled sashes 32mm thick in

Unit

M2

CLass I timber with brass furniture.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

2,268.60

1.00

2,268.60

Labour Sub-Contract Rate M2

0.0%

270.75

1.00

270.75

Carpenter M2

0.0%

5.00

45.00

225.00

Carpenter M2

0.0%

24.40

45.00

1,098.00

Mason M2

0.0%

23.80

45.00

1,071.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

Unskilled Labour M2

0.0%

7.30

30.00

219.00

M2

0.0%

0.90

70.00

63.00

Bolt skeleton brass 300mm M2

0.0%

0.50

90.00

45.00

chip board 10mm M2

0.0%

0.47

200.00

94.60

Glass pane clear 3mm M2

0.0%

0.41

192.00

78.72

Glass pane clear 4mm M2

0.0%

0.54

265.00

144.16

Hinge parliamentary brass 125mm M2

0.0%

1.00

56.00

56.00

Screws Brass 25mm X gauge8 M2

0.0%

10.00

1.80

18.00

Screws brass 25mm*gauge 7 M2

0.0%

0.47

22.00

10.34

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

6.00

10.00

60.00

Timb. Cl.A 20mm thick plank M2

0.0%

0.28

850.00

238.00

M2

0.0%

1.86

69.00

128.34

Timber 40mm to 50mm*12mm class 1 M2

0.0%

2.22

26.00

57.72

Timber beams Class A M2

0.0%

0.02

30,000.00

510.00

Timber plank 32mm class A M2

0.0%

0.72

1,400.00

1,008.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.14

55.00

7.92

Cement Sand etc. M2

0.0%

1.58

1.00

1.58

Machine planing of timber M2

0.0%

40.00

1.00

40.00

Sand paper M2

0.0%

30.00

1.00

30.00

Bolt barrel brass 150mm

Timb.Cl.1 40mm*40mm sash bars

Material Rate
Plant Rate

2,519.80
0.00

Unit Rate(Direct Labour)

5,264.38

Unit Rate (Labour Sub Con)

5,130.73

Wednesday, March 29, 2006

Page 77 of 395

Southern Province Engineering Services

BSR Reference

08-02-97

Description

Supplying and fixing 2100mm to 3050mm high, panelled partition with 12mm thick

Unit

M2

chipboard on both sides with 100*50mm & 100*100mm up right fixed at 900mm intervals
& 100mm*50mm as horizontal members in Class I timber

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

228.00

1.00

228.00

Carpenter M2

0.0%

4.00

45.00

180.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

chip board 12mm thick ( 8ft x 4ft) M2

0.0%

0.74

650.00

481.00

Timber beams Class A M2

0.0%

0.02

30,000.00

480.00

Timber fillet Cl. 1. 50mm x 25mm M2

0.0%

2.88

9.00

25.96

Wire nail S.W.G 20 to 22 M2

0.0%

0.22

55.00

11.83

Cemenr and sand papering M2

0.0%

1.50

1.00

1.50

Machine planing of timber M2

0.0%

40.00

1.00

40.00

Material Rate

998.79

Plant Rate

0.00

Unit Rate(Direct Labour)

1,280.29

Unit Rate (Labour Sub Con)

1,268.29

BSR Reference

08-02-98

Description

Supplying and fixing 2100mm to 3050mm high, panelled partition with 10mm thick

Unit

M2

chipboard on both sides with 100*50mm & 100*100mm up right fixed at 900mm intervals
& 100mm*50mm as horizontal members in Class I timber

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

228.00

1.00

228.00

Carpenter M2

0.0%

4.00

45.00

180.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

chip board 10mm M2

0.0%

0.74

200.00

148.00

Timber beams Class A M2

0.0%

0.02

30,000.00

480.00

Timber fillet Cl. 1. 50mm x 25mm M2

0.0%

2.88

9.00

25.96

Wire nail S.W.G 20 to 22 M2

0.0%

0.22

55.00

12.10

Cement Sand etc. M2

0.0%

1.50

1.00

1.50

Machine planing of timber M2

0.0%

40.00

1.00

40.00

Material Rate
Plant Rate

666.07
0.00

Unit Rate(Direct Labour)

947.57

Unit Rate (Labour Sub Con)

935.57

Wednesday, March 29, 2006

Page 78 of 395

Southern Province Engineering Services

BSR Reference

08-04-01

Description

Supplying and fixing 20mm thick lunumidella planks in ceiling to frame work consisting of

Unit

M2

100*50mm joists and 50*50mm bearers in Cl I timber. Rate to include for 2 coats of tarnap
to joists and bearers.

Resource Unit

Quantit

Rate Type

Amount

0.0%

142.64

1.00

142.64

Labour Sub-Contract Rate M2

0.0%

142.64

1.00

142.64

Carpenter M2

0.0%

1.83

45.00

82.35

Carpenter M2

0.0%

1.83

45.00

82.35

Unskilled Labour M2

0.0%

2.26

30.00

67.80

Unskilled Labour M2

0.0%

2.26

30.00

67.80

Lunumidella 150mm*20mm M2

0.0%

1.30

270.00

351.00

Lunumidella 150mm*20mm M2

0.0%

1.30

270.00

351.00

Timber beams Class A M2

0.0%

0.01

30,000.00

360.00

Timber beams Class A M2

0.0%

0.01

30,000.00

360.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.74

55.00

40.70

Wire nail S.W.G 20 to 22 M2

0.0%

0.07

55.00

4.07

Wood Preservative M2

0.0%

0.16

110.00

17.60

Wood Preservative M2

0.0%

0.16

110.00

17.60

Cement Sand etc. M2

0.0%

1.08

1.00

1.08

Cement Sand etc. M2

0.0%

1.08

1.00

1.08

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

1,501.97
0.00

Unit Rate(Direct Labour)

1,804.43

Unit Rate (Labour Sub Con)

1,789.41

Wednesday, March 29, 2006

Page 79 of 395

Southern Province Engineering Services

BSR Class

CONCRETOR

BSR Reference

03-00-01

Description

1:3:6 (40mm) cement concrete for volumes exceeding 3 cu.m

Unit

Resource Unit

Wastag

M3

Quantit
765.08

1.00

765.08

Mason M3

0.0%

2.83

45.00

127.35

Unskilled Labour M3

0.0%

22.60

30.00

678.00

Cement M3

0.0%

4.50

340.00

1,530.00

Metal 40mm M3

0.0%

1.00

700.00

700.00

Sand M3

0.0%

0.56

350.00

196.00

2,426.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,231.35

Unit Rate (Labour Sub Con)

3,191.08

BSR Reference

03-00-02

Description

1:3:6 (40mm) cement concrete for volumes upto 3 cu.m

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M3

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

961.88

1.00

961.88

Mason M3

0.0%

3.50

45.00

157.50

Unskilled Labour M3

0.0%

28.50

30.00

855.00

Cement M3

0.0%

4.50

340.00

1,530.00

Metal 40mm M3

0.0%

1.00

700.00

700.00

Sand M3

0.0%

0.56

350.00

196.00

2,426.00
0.00

Unit Rate(Direct Labour)

3,438.50

Unit Rate (Labour Sub Con)

3,387.88

Wednesday, March 29, 2006

Page 80 of 395

Southern Province Engineering Services

BSR Reference

03-00-03

Description

1:2 1/2:5 (25mm) cement concrete for volumes exceeding 3 cu.m

Unit

Resource Unit

Wastag

M3

Quantit
765.08

1.00

765.08

Mason M3

0.0%

2.83

45.00

127.35

Unskilled Labour M3

0.0%

22.60

30.00

678.00

Cement M3

0.0%

4.90

340.00

1,666.00

Metal 25mm M3

0.0%

1.00

900.00

900.00

Sand M3

0.0%

0.60

350.00

210.00

2,776.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,581.35

Unit Rate (Labour Sub Con)

3,541.08

BSR Reference

03-00-04

Description

1:2 1/2:5 (25mm) cement concrete for volumes upto 3 cu.m

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M3

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

961.88

1.00

961.88

Mason M3

0.0%

3.50

45.00

157.50

Unskilled Labour M3

0.0%

28.50

30.00

855.00

Cement M3

0.0%

4.90

340.00

1,666.00

Metal 25mm M3

0.0%

1.00

900.00

900.00

Sand M3

0.0%

0.60

350.00

210.00

2,776.00
0.00

Unit Rate(Direct Labour)

3,788.50

Unit Rate (Labour Sub Con)

3,737.88

Wednesday, March 29, 2006

Page 81 of 395

Southern Province Engineering Services

BSR Reference

03-00-05

Description

1:2:4 (20mm) cement concrete for volumes exceeding 3 cu.m

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

763.80

1.00

763.80

Mason M3

0.0%

2.80

45.00

126.00

Unskilled Labour M3

0.0%

22.60

30.00

678.00

Cement M3

0.0%

6.00

340.00

2,040.00

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Material Rate

2,360.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,164.00

Unit Rate (Labour Sub Con)

3,123.80

BSR Reference

03-00-06

Description

1:2:4 (20mm) cement concrete for volumes upto 3 cu.m

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

954.75

1.00

954.75

Mason M3

0.0%

3.50

45.00

157.50

Unskilled Labour M3

0.0%

28.25

30.00

847.50

Cement M3

0.0%

6.00

340.00

2,040.00

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Material Rate

2,360.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,365.00

Unit Rate (Labour Sub Con)

3,314.75

BSR Reference

03-00-07

Description

Formation of 50mm semicircular channel in cement concrete floors and 12mm thick 1:2

Unit

L.M

cement rendering (extra over concrete floors).

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

38.47

1.00

38.47

Mason L.M

0.0%

0.70

45.00

31.50

Unskilled Labour L.M

0.0%

0.30

30.00

9.00

Cement Sand etc. L.M

0.0%

3.50

1.00

3.50

Material Rate

0.00

Unit Rate(Direct Labour)

44.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

41.97

Wednesday, March 29, 2006

Page 82 of 395

Southern Province Engineering Services

BSR Reference

03-00-08

Description

Formation of 100mm semicircular channel in cement concrete floors and 12mm thick 1:2

Unit

L.M

cement rendering (extra over concrete floors).

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

75.52

1.00

75.52

Mason L.M

0.0%

1.30

45.00

58.50

Unskilled Labour L.M

0.0%

0.70

30.00

21.00

Cement Sand etc. L.M

0.0%

0.00

1.00

0.00

Material Rate

0.00

Unit Rate(Direct Labour)

79.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

75.52

BSR Reference

03-00-09

Description

1:2:4 cement concrete in 150mm *225mm *375mm corbel stone, reinforced with 4 Nos.

Unit

Nos

10mm rods. (upto 0.3 cu.m)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos

0.0%

53.44

1.00

53.44

Mason Nos

0.0%

0.75

45.00

33.75

Unskilled Labour Nos

0.0%

0.75

30.00

22.50

Cement Nos

0.0%

0.08

340.00

27.20

Metal 20mm Nos

0.0%

0.01

110.00

1.54

Sand Nos

0.0%

0.01

350.00

2.80

Tor Steel Nos

0.0%

0.84

35.00

29.40

Mould and curing Nos

0.0%

3.00

1.00

3.00

60.94
0.00

Unit Rate(Direct Labour)

120.19

Unit Rate (Labour Sub Con)

117.38

Wednesday, March 29, 2006

Page 83 of 395

Southern Province Engineering Services

BSR Reference

03-00-10

Description

1:2:4 cement concrete in 225mm high, 75mm thik,curb including 1:2 cement rendering. Rate

Unit

L.M

to include excavation.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

185.25

1.00

185.25

Mason L.M

0.0%

2.60

45.00

117.00

Unskilled Labour L.M

0.0%

2.60

30.00

78.00

Cement L.M

0.0%

0.14

340.00

47.60

Metal 20mm L.M

0.0%

0.02

110.00

1.98

Sand L.M

0.0%

0.01

350.00

3.50

Shuttering, excavation curing etc. L.M

0.0%

4.92

1.00

4.92

Material Rate

53.08

Plant Rate

0.00

Unit Rate(Direct Labour)

253.00

Unit Rate (Labour Sub Con)

243.25

BSR Reference

03-00-11

Description

1:3:6:(25mm) Cement concrete in semicircular drains without ramps(225 mm wide and

Unit

L.M

225mm average depth with 75mm thick sides and base inclusive of 12mm, 1:3 cement
rendering with expansion joints as necessary.) rate to include for excavation.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

225.15

1.00

225.15

Mason L.M

0.0%

2.60

45.00

117.00

Unskilled Labour L.M

0.0%

4.00

30.00

120.00

Cement L.M

0.0%

0.42

340.00

142.80

Metal 25mm L.M

0.0%

0.04

900.00

37.80

Sand L.M

0.0%

0.03

350.00

10.50

Basket L.M

0.0%

3.50

1.00

3.50

191.10
0.00

Unit Rate(Direct Labour)

431.60

Unit Rate (Labour Sub Con)

419.75

Wednesday, March 29, 2006

Page 84 of 395

Southern Province Engineering Services

BSR Reference

03-00-12

Description

1:2:4(20mm) Cement concrete in 112mm * 150mm Lintoling formwork. (Reinforcement paid

Unit

L.M

separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

113.43

1.00

113.43

Mason L.M

0.0%

1.32

45.00

59.40

Unskilled Labour L.M

0.0%

2.00

30.00

60.00

Cement L.M

0.0%

0.11

340.00

37.40

Metal 20mm L.M

0.0%

0.02

110.00

1.98

Sand L.M

0.0%

0.01

350.00

3.50

Timber PLank 20mm Class C L.M

0.0%

0.10

150.00

15.00

Timber props and nails L.M

0.0%

2.50

1.00

2.50

Material Rate

57.88

Plant Rate

0.00

Unit Rate(Direct Labour)

179.78

Unit Rate (Labour Sub Con)

173.81

BSR Reference

03-00-13

Description

1:2:4(20mm) Cement concrete in 225mm * 150mm Lintoling formwork. (Reinforcement paid

Unit

L.M

separately)

Resource Unit

Quantit

Rate Type

Amount

0.0%

113.43

1.00

113.43

Mason L.M

0.0%

1.32

45.00

59.40

Unskilled Labour L.M

0.0%

2.00

30.00

60.00

Cement L.M

0.0%

0.22

340.00

74.80

Metal 20mm L.M

0.0%

0.04

110.00

3.96

Sand L.M

0.0%

0.02

350.00

7.00

Timber Plank 25mm Class C L.M

0.0%

0.13

150.00

18.90

Timber props and nails L.M

0.0%

3.50

1.00

3.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate L.M

104.66
0.00

Unit Rate(Direct Labour)

227.56

Unit Rate (Labour Sub Con)

221.59

Wednesday, March 29, 2006

Page 85 of 395

Southern Province Engineering Services

BSR Reference

03-00-14

Description

1:2:4(20mm) Cement concrete in 225mm * 225mm Lintoling formwork. (Reinforcement paid

Unit

L.M

separately...)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

105.45

1.00

105.45

Mason L.M

0.0%

1.00

45.00

45.00

Unskilled Labour L.M

0.0%

2.20

30.00

66.00

Cement L.M

0.0%

0.33

340.00

112.20

Metal 20mm L.M

0.0%

0.05

110.00

5.72

Sand L.M

0.0%

0.03

350.00

10.50

Timber Plank 25mm Class C L.M

0.0%

0.17

150.00

25.05

Timber props and nails L.M

0.0%

2.50

1.00

2.50

Material Rate

153.47

Plant Rate

0.00

Unit Rate(Direct Labour)

266.97

Unit Rate (Labour Sub Con)

261.42

BSR Reference

03-00-15

Description

1:2:4(20mm) cement concrete in 300mm * 225mm Lintol including formwork.

Unit

L.M

(Reinforcement paid separately.)

Resource Unit

Quantit

Rate Type

Amount

0.0%

149.48

1.00

149.48

Mason L.M

0.0%

1.75

45.00

78.75

Unskilled Labour L.M

0.0%

2.62

30.00

78.60

Cement L.M

0.0%

0.44

340.00

149.60

Metal 20mm L.M

0.0%

0.07

110.00

7.70

Sand L.M

0.0%

0.04

350.00

14.00

Timber Plank 25mm Class C L.M

0.0%

0.19

150.00

27.90

Timber props and nails L.M

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate L.M

199.20
0.00

Unit Rate(Direct Labour)

359.05

Unit Rate (Labour Sub Con)

351.18

Wednesday, March 29, 2006

Page 86 of 395

Southern Province Engineering Services

BSR Reference

03-00-16

Description

1:2:4(20mm) cement concrete in 340mm * 150mm Lintol including formwork.

Unit

L.M

(Reinforcement paid separately.)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

149.48

1.00

149.48

Mason L.M

0.0%

1.75

45.00

78.75

Unskilled Labour L.M

0.0%

2.62

30.00

78.60

Cement L.M

0.0%

0.32

340.00

110.16

Metal 20mm L.M

0.0%

0.05

110.00

5.50

Sand L.M

0.0%

0.03

350.00

10.50

Timber Plank 25mm Class C L.M

0.0%

0.16

150.00

23.25

Timber props and nails L.M

0.0%

5.00

1.00

5.00

Material Rate

149.41

Plant Rate

0.00

Unit Rate(Direct Labour)

311.76

Unit Rate (Labour Sub Con)

303.89

BSR Reference

03-00-17

Description

1:2:4(20mm) cement concrete in 340mm * 225mm Lintol formwork. (Reinforcement paid

Unit

L.M

separately.)

Resource Unit

Quantit

Rate Type

Amount

0.0%

163.88

1.00

163.88

Mason L.M

0.0%

2.00

45.00

90.00

Unskilled Labour L.M

0.0%

2.75

30.00

82.50

Cement L.M

0.0%

0.50

340.00

170.00

Metal 20mm L.M

0.0%

0.08

110.00

8.80

Sand L.M

0.0%

0.05

350.00

17.50

Timber Plank 25mm Class C L.M

0.0%

0.20

150.00

30.00

Timber props and nails L.M

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate L.M

226.30
0.00

Unit Rate(Direct Labour)

401.30

Unit Rate (Labour Sub Con)

392.68

Wednesday, March 29, 2006

Page 87 of 395

Southern Province Engineering Services

BSR Reference

03-00-18

Description

1:2:4(20mm) cement concrete in 340mm * 300mm Lintol formwork. (Reinforcement paid

Unit

L.M

separately.)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

235.13

1.00

235.13

Mason L.M

0.0%

3.00

45.00

135.00

Unskilled Labour L.M

0.0%

3.75

30.00

112.50

Cement L.M

0.0%

0.60

340.00

204.00

Metal 20mm L.M

0.0%

0.10

110.00

11.00

Sand L.M

0.0%

0.06

350.00

21.00

Timber Plank 25mm Class C L.M

0.0%

0.23

150.00

34.50

Timber props and nails L.M

0.0%

2.50

1.00

2.50

Material Rate

270.50

Plant Rate

0.00

Unit Rate(Direct Labour)

520.50

Unit Rate (Labour Sub Con)

508.13

BSR Reference

03-00-19

Description

1:2:4(20mm) cement concrete in 340mm * 300mm Lintel formwork. (Reinforcement paid

Unit

Nos

separately.)

Resource Unit

Quantit

Rate Type

Amount

0.0%

49.88

1.00

49.88

Mason Nos

0.0%

0.50

45.00

22.50

Unskilled Labour Nos

0.0%

1.00

30.00

30.00

Cement Nos

0.0%

0.15

340.00

51.00

Metal 20mm Nos

0.0%

0.03

110.00

3.30

Sand Nos

0.0%

0.01

350.00

3.50

Timber Plank 25mm Class C Nos

0.0%

0.28

150.00

42.00

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate Nos

99.80
0.00

Unit Rate(Direct Labour)

152.30

Unit Rate (Labour Sub Con)

149.68

Wednesday, March 29, 2006

Page 88 of 395

Southern Province Engineering Services

BSR Reference

03-00-20

Description

100mm thick flat roof in 1:2:4 (20mm) cement concrete and reinforced with expanded metal,

Unit

M3

12mm thick 1:2 cement rendering with 5% pudlo cement and lime puttying soffit complete.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

302.67

1.00

302.67

Mason M3

0.0%

2.20

45.00

99.00

Unskilled Labour M3

0.0%

7.32

30.00

219.60

Boiled lime M3

0.0%

0.00

4.00

0.01

Cement M3

0.0%

0.75

340.00

255.00

Metal 20mm M3

0.0%

0.10

110.00

11.00

Pudlo Cement M3

0.0%

0.40

80.00

32.00

Sand M3

0.0%

0.08

350.00

28.00

Material Rate

326.01

Plant Rate

0.00

Unit Rate(Direct Labour)

644.61

Unit Rate (Labour Sub Con)

628.68

BSR Reference

03-00-21

Description

Cost-in-situ 75mm thick slabs over drains in 1:2:4(20mm) reinforced concrete including

Unit

M2

formwork and 12mm 1:2 cement rendering. (Reinforcement paid separately). (per 3.0m
length)

Resource Unit

Quantit

Rate Type

Amount

0.0%

196.65

1.00

196.65

Mason M2

0.0%

2.20

45.00

99.00

Unskilled Labour M2

0.0%

3.60

30.00

108.00

Cement M2

0.0%

0.60

340.00

204.00

Metal 20mm M2

0.0%

0.08

110.00

8.80

Sand M2

0.0%

0.06

350.00

21.00

Timber Plank 25mm Class C M2

0.0%

0.55

150.00

82.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

316.30
0.00

Unit Rate(Direct Labour)

523.30

Unit Rate (Labour Sub Con)

512.95

Wednesday, March 29, 2006

Page 89 of 395

Southern Province Engineering Services

BSR Reference

03-00-22

Description

1:2:4(20mm) cement concrete in 200mm * 200mm * 150mm spur stones for verandah posts.

Unit

Resource Unit

Wastag

Nos

Quantit

Rate Type

0.0%

39.90

1.00

39.90

Plumber Nos

0.0%

0.60

40.00

24.00

Unskilled Labour Nos

0.0%

0.60

30.00

18.00

Cement Nos

0.0%

0.04

340.00

12.24

Metal 25mm Nos

0.0%

0.01

900.00

9.00

Sand Nos

0.0%

0.00

350.00

0.00

Mould and curing Nos

0.0%

2.00

1.00

2.00

Material Rate

21.24

Plant Rate

0.00

Unit Rate(Direct Labour)

65.24

Unit Rate (Labour Sub Con)

63.14

BSR Reference

03-00-23

Description

1:2:4(20mm) cement concrete in100mm * 75mm * 50mm spur stones for door posts.

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos

Wastag

Nos

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos

0.0%

142.50

1.00

142.50

Mason Nos

0.0%

2.00

45.00

90.00

Unskilled Labour Nos

0.0%

2.00

30.00

60.00

Cement Nos

0.0%

0.03

340.00

10.20

Metal 20mm Nos

0.0%

0.00

110.00

0.00

Sand Nos

0.0%

0.00

350.00

0.00

Mould and curing Nos

0.0%

0.50

1.00

0.50

10.20
0.00

Unit Rate(Direct Labour)

160.70

Unit Rate (Labour Sub Con)

153.20

Wednesday, March 29, 2006

Page 90 of 395

Southern Province Engineering Services

BSR Reference

03-00-24

Description

1:2:4(20mm) cement concrete in squatting plates for Latrines as per type plan. (including

Unit

Nos

reinforcement)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos

0.0%

161.50

1.00

161.50

Black Smith Nos

0.0%

0.50

40.00

20.00

Mason Nos

0.0%

2.00

45.00

90.00

Unskilled Labour Nos

0.0%

2.00

30.00

60.00

Cement Nos

0.0%

0.30

340.00

102.00

Metal 25mm Nos

0.0%

0.04

900.00

36.00

Mild Steel Nos

0.0%

2.27

33.00

74.91

Sand Nos

0.0%

0.02

350.00

7.00

Mould and curing Nos

0.0%

1.00

1.00

1.00

Material Rate

219.91

Plant Rate

0.00

Unit Rate(Direct Labour)

390.91

Unit Rate (Labour Sub Con)

382.41

BSR Reference

03-00-25

Description

1:2:4(20mm) cement concrete using concrete mixer and vibrator (-Per formwork paid

Unit

M3

separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

605.48

1.00

605.48

Mason M3

0.0%

2.83

45.00

127.35

Unskilled Labour M3

0.0%

17.00

30.00

510.00

Cement M3

0.0%

5.77

340.00

1,962.82

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water, Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

2,282.82
0.00

Unit Rate(Direct Labour)

3,030.17

Unit Rate (Labour Sub Con)

2,998.30

Wednesday, March 29, 2006

Page 91 of 395

Southern Province Engineering Services

BSR Reference

03-00-26

Description

1:2:4(20mm) cement concrete in column shifts in ground floor using mixer and vibrator.

Unit

M3

(reinforcement, formwork and finishes paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

605.48

1.00

605.48

Mason M3

0.0%

2.83

45.00

127.35

Unskilled Labour M3

0.0%

17.00

30.00

510.00

Cement M3

0.0%

6.48

340.00

2,201.84

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water, Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

Material Rate

2,521.84

Plant Rate

0.00

Unit Rate(Direct Labour)

3,269.19

Unit Rate (Labour Sub Con)

3,237.32

BSR Reference

03-00-27

Description

1:2:4(20mm) cement concrete in column shifts in 1st floor using mixer and vibrator.

Unit

M3

(reinforcement, formwork and finishes paid separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

763.80

1.00

763.80

Mason M3

0.0%

2.80

45.00

126.00

Unskilled Labour M3

0.0%

22.60

30.00

678.00

Cement M3

0.0%

6.48

340.00

2,201.84

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

2,521.84
0.00

Unit Rate(Direct Labour)

3,435.84

Unit Rate (Labour Sub Con)

3,395.64

Wednesday, March 29, 2006

Page 92 of 395

Southern Province Engineering Services

BSR Reference

03-00-28

Description

1:2:4(20mm) cement concrete in column shifts in 2nd floor using mixer and vibrator.

Unit

M3

(reinforcement, formwork and finishes paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

1,211.25

1.00

1,211.25

Mason M3

0.0%

7.20

45.00

324.00

Unskilled Labour M3

0.0%

31.70

30.00

951.00

Cement M3

0.0%

6.48

340.00

2,203.20

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water, Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

Material Rate

2,523.20

Plant Rate

0.00

Unit Rate(Direct Labour)

3,908.20

Unit Rate (Labour Sub Con)

3,844.45

BSR Reference

03-00-29

Description

1:2:4(20mm) cement concrete in beams in ground floor using mixer and vibrator.

Unit

M3

(reinforcement, formwork and finishes paid separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

798.43

1.00

798.43

Mason M3

0.0%

3.60

45.00

162.00

Unskilled Labour M3

0.0%

22.61

30.00

678.45

Cement M3

0.0%

6.48

340.00

2,203.20

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

2,523.20
0.00

Unit Rate(Direct Labour)

3,473.65

Unit Rate (Labour Sub Con)

3,431.63

Wednesday, March 29, 2006

Page 93 of 395

Southern Province Engineering Services

BSR Reference

03-00-30

Description

1:2:4(20mm) cement concrete in beams in 1st floor using mixer and vibrator. (reinforcement,

Unit

M3

formwork and finishes paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

959.60

1.00

959.60

Mason M3

0.0%

3.60

45.00

162.00

Unskilled Labour M3

0.0%

28.27

30.00

848.10

Cement M3

0.0%

6.48

340.00

2,203.20

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

Material Rate

2,523.20

Plant Rate

0.00

Unit Rate(Direct Labour)

3,643.30

Unit Rate (Labour Sub Con)

3,592.80

BSR Reference

03-00-31

Description

1:2:4(20mm) cement concrete in beams in 2nd floor using mixer and vibrator. (reinforcement,

Unit

M3

formwork and finishes paid separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

1,184.18

1.00

1,184.18

Painter M3

0.0%

3.60

40.00

144.00

Unskilled Labour M3

0.0%

36.75

30.00

1,102.50

Cement M3

0.0%

6.48

340.00

2,201.84

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

2,521.84
0.00

Unit Rate(Direct Labour)

3,878.34

Unit Rate (Labour Sub Con)

3,816.02

Wednesday, March 29, 2006

Page 94 of 395

Southern Province Engineering Services

BSR Reference

03-00-32

Description

Form work for floor slab concrete including 100mm * 50mm class II joists and necessary

Unit

M2

props (rate to include for removal)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

112.57

1.00

112.57

Mason M2

0.0%

0.90

45.00

40.50

Unskilled Labour M2

0.0%

2.60

30.00

78.00

Mould oil M2

0.0%

0.12

10.00

1.20

Props (bamboo) 3 - 4 m M2

0.0%

0.69

80.00

55.20

Timber beams Class C M2

0.0%

0.00

20,000.00

0.00

Timber Plank 25mm Class C M2

0.0%

0.60

150.00

90.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.10

45.00

4.50

Material Rate

150.90

Plant Rate

0.00

Unit Rate(Direct Labour)

269.40

Unit Rate (Labour Sub Con)

263.48

BSR Reference

03-00-33

Description

Form work for 225mm * 225mm column shafts including class II timber joists and necessary

Unit

M2

props (rate to include for removal)

Resource Unit

Quantit

Rate Type

Amount

0.0%

192.38

1.00

192.38

Mason M2

0.0%

2.70

45.00

121.50

Unskilled Labour M2

0.0%

2.70

30.00

81.00

Bolt and nut iron 225*10mm M2

0.0%

0.50

40.00

20.00

Props (bamboo) 3 - 4 m M2

0.0%

1.70

80.00

136.00

Timb.cl.B planks 25mm M2

0.0%

0.22

300.00

66.00

Timber beams Class C M2

0.0%

0.00

20,000.00

60.00

Screws and Nails M2

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

282.00
0.00

Unit Rate(Direct Labour)

486.50

Unit Rate (Labour Sub Con)

476.38

Wednesday, March 29, 2006

Page 95 of 395

Southern Province Engineering Services

BSR Reference

03-00-34

Description

Form work for beam sides, soffit including class II timber joists and necessary props (rate to

Unit

M2

include for removal)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

Material Rate

396.06

Plant Rate

0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

BSR Reference

03-00-35

Description

1:2:4(20mm) cement concrete in lintel and beams in ground floor using mixer and vibrator

Unit

M3

(Reinforcement and formwork paid separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

1,527.60

1.00

1,527.60

Mason M3

0.0%

5.60

45.00

252.00

Unskilled Labour M3

0.0%

45.20

30.00

1,356.00

Cement M3

0.0%

5.77

340.00

1,962.82

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M3

0.0%

160.00

1.00

160.00

2,282.82
0.00

Unit Rate(Direct Labour)

4,050.82

Unit Rate (Labour Sub Con)

3,970.42

Wednesday, March 29, 2006

Page 96 of 395

Southern Province Engineering Services

BSR Reference

03-00-36

Description

1:2:4(20mm) cement concrete in lintel and beams in ground floor using mixer and vibrator

Unit

M2

(Reinforcement and formwork paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

1,687.20

1.00

1,687.20

Mason M2

0.0%

5.60

45.00

252.00

Unskilled Labour M2

0.0%

50.80

30.00

1,524.00

Cement M2

0.0%

5.77

340.00

1,962.82

Metal 20mm M2

0.0%

1.00

110.00

110.00

Sand M2

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M2

0.0%

160.00

1.00

160.00

Material Rate

2,282.82

Plant Rate

0.00

Unit Rate(Direct Labour)

4,218.82

Unit Rate (Labour Sub Con)

4,130.02

BSR Reference

03-00-37

Description

100mm thick 1:2:4 (120mm) cement concrete in1st floor slab using mixer and vibrator

Unit

M2

(reinforcement and formwork paid separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

92.04

1.00

92.04

Mason M2

0.0%

0.43

45.00

19.39

Unskilled Labour M2

0.0%

2.58

30.00

77.49

Cement M2

0.0%

0.58

340.00

196.18

Metal 20mm M2

0.0%

0.10

110.00

11.00

Sand M2

0.0%

0.06

350.00

21.00

Water,Mixer, Vibrator etc. M2

0.0%

12.00

1.00

12.00

228.18
0.00

Unit Rate(Direct Labour)

337.07

Unit Rate (Labour Sub Con)

332.22

Wednesday, March 29, 2006

Page 97 of 395

Southern Province Engineering Services

BSR Reference

03-00-38

Description

125mm thick 1:2:4 (20mm) cement concrete in 1st floor slab using mixer and vibrator

Unit

M2

(reinforcement and formwork paid separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

95.05

1.00

95.05

Mason M2

0.0%

0.43

45.00

19.35

Unskilled Labour M2

0.0%

2.69

30.00

80.70

Cement M2

0.0%

0.72

340.00

245.14

Metal 20mm M2

0.0%

0.10

110.00

11.00

Sand M2

0.0%

0.07

350.00

24.50

Water,Mixer, Vibrator etc. M2

0.0%

12.00

1.00

12.00

280.64
0.00

Unit Rate(Direct Labour)

392.69

Unit Rate (Labour Sub Con)

387.69

Wednesday, March 29, 2006

Page 98 of 395

Southern Province Engineering Services

BSR Class

DEMOLISHER

BSR Reference

01-00-01

Description

Demolishing brick work in cement mortar bricks stacked and debris removed

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

199.50

1.00

199.50

Unskilled Labour Kg

0.0%

7.00

30.00

210.00

Scafolding Kg

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

220.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

209.50

BSR Reference

01-00-02

Description

Demolition of brick work in lime mortar bricks stacked and debris is cleared

Resource Unit

Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

162.45

1.00

162.45

Unskilled Labour M3

0.0%

5.70

30.00

171.00

Scafolding M3

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

181.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

172.45

BSR Reference

01-00-03

Description

Demolition of cabook masonry in lime mortar, cabook stacked and debris cleared

Resource Unit

Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

142.50

1.00

142.50

Unskilled Labour M3

0.0%

5.00

30.00

150.00

Scafolding M3

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

160.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

152.50

Wednesday, March 29, 2006

Page 99 of 395

Southern Province Engineering Services

BSR Reference

01-00-04

Description

Demolition of cadjan roof or wall, timber stacked and debris clear

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

5.70

1.00

5.70

Unskilled Labour M2

0.0%

0.20

30.00

6.00

Material Rate

0.00

Unit Rate(Direct Labour)

6.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.70

BSR Reference

01-00-05

Description

Demolition of ceiling , materials stacked and debris cleared

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

39.90

1.00

39.90

Carpenter M2

0.0%

0.20

45.00

9.00

Carpenter M2

0.0%

0.20

45.00

9.00

Unskilled Labour M2

0.0%

0.40

30.00

12.00

Unskilled Labour M2

0.0%

0.40

30.00

12.00

Scafolding M2

0.0%

2.00

1.00

2.00

Material Rate

0.00

Unit Rate(Direct Labour)

44.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

41.90

BSR Reference

01-00-06

Description

Demolition of unreinforced concrete (150 mm) and debris cleared away

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

114.00

1.00

114.00

Unskilled Labour M2

0.0%

4.00

30.00

120.00

Material Rate

0.00

Unit Rate(Direct Labour)

120.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

114.00

Wednesday, March 29, 2006

Page 100 of 395

Southern Province Engineering Services

BSR Reference

01-00-07

Description

Demolition and removing of reinforced concrete (100mm) roof and debris cleared away

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

159.60

1.00

159.60

Unskilled Labour M2

0.0%

5.60

30.00

168.00

Material Rate

0.00

Unit Rate(Direct Labour)

168.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

159.60

BSR Reference

01-00-08

Description

Removal of iron / asbestos / aluminum corrugated sheets from roofs or wall from a single

Unit

M2

storey building and stacked

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

18.05

1.00

18.05

Black Smith M2

0.0%

0.25

40.00

10.00

Unskilled Labour M2

0.0%

0.30

30.00

9.00

Scafolding M2

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

24.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

23.05

BSR Reference

01-00-09

Description

Removal of corrugated iron / asbestos / aluminum sheets from roofs or walls of two storied

Unit

M2

buildings and stacked

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

20.90

1.00

20.90

Black Smith M2

0.0%

0.25

40.00

10.00

Unskilled Labour M2

0.0%

0.40

30.00

12.00

Scafolding M2

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

27.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.90

Wednesday, March 29, 2006

Page 101 of 395

Southern Province Engineering Services

BSR Reference

01-00-10

Description

Removal of corrugated iron / asbestos / aluminum sheets from roof or walls of 3 storied

Unit

M2

buildings

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

16.63

1.00

16.63

Black Smith M2

0.0%

0.25

40.00

10.00

Unskilled Labour M2

0.0%

0.25

30.00

7.50

Scafolding M2

0.0%

7.50

1.00

7.50

Material Rate

0.00

Unit Rate(Direct Labour)

25.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

24.13

BSR Reference

01-00-11

Description

Removal of a door or a window (size up to 4 sq.m) existing walls and stacked.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

28.50

1.00

28.50

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Material Rate

0.00

Unit Rate(Direct Labour)

30.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

28.50

BSR Reference

01-00-12

Description

Removal of a door or a window (size over 4 sq.m) from existing wall and stacked.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

42.75

1.00

42.75

Unskilled Labour Nos.

0.0%

1.50

30.00

45.00

Material Rate

0.00

Unit Rate(Direct Labour)

45.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

42.75

Wednesday, March 29, 2006

Page 102 of 395

Southern Province Engineering Services

BSR Reference

01-00-13

Description

Removal of a door or a window (size upto 4 sq.m) from wall and stacked.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Material Rate

0.00

Unit Rate(Direct Labour)

37.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

35.63

BSR Reference

01-00-14

Description

Removal of door or a window sash from wall (over 4 sq.m) and stacked.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

53.44

1.00

53.44

Carpenter Nos.

0.0%

0.75

45.00

33.75

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Material Rate

0.00

Unit Rate(Direct Labour)

56.25

Plant Rate

0.00

Unit Rate (Labour Sub Con)

53.44

BSR Reference

01-00-15

Description

Removal of old or decayed, 100mm to 150mm dia GI down pipes, from existing buildings

Unit

L.M

and stacked.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate L.M

0.0%

8.55

1.00

8.55

Unskilled Labour L.M

0.0%

0.30

30.00

9.00

Material Rate

0.00

Unit Rate(Direct Labour)

9.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

8.55

Wednesday, March 29, 2006

Page 103 of 395

Southern Province Engineering Services

BSR Reference

01-00-16

Description

Demolition of brick drains and clearing debris ased

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

25.65

1.00

25.65

Unskilled Labour M

0.0%

0.90

30.00

27.00

Material Rate

0.00

Unit Rate(Direct Labour)

27.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.65

BSR Reference

01-00-17

Description

Removal of expanded metal from existing frames and stacking as directed.

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

85.50

1.00

85.50

Carpenter M2

0.0%

1.20

45.00

54.00

Unskilled Labour M2

0.0%

1.20

30.00

36.00

Material Rate

0.00

Unit Rate(Direct Labour)

90.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

85.50

BSR Reference

01-00-18

Description

Uprooting of fence, rooting up barbed wire and stacking all material as directed. (length of

Unit

the fencing to be measured)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

35.63

1.00

35.63

Unskilled Labour M

0.0%

1.25

30.00

37.50

Material Rate

0.00

Unit Rate(Direct Labour)

37.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

35.63

Wednesday, March 29, 2006

Page 104 of 395

Southern Province Engineering Services

BSR Reference

01-00-19

Description

Demolition of brick paved floors and cleaning debris as directed (75mm thick floor)

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

19.95

1.00

19.95

Unskilled Labour M2

0.0%

0.70

30.00

21.00

Material Rate

0.00

Unit Rate(Direct Labour)

21.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

19.95

BSR Reference

01-00-20

Description

Removing and stacking of gate sash after demolishing cement concrete blocks or removing

Unit

Nos.

and separating pintles

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

28.50

1.00

28.50

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Material Rate

0.00

Unit Rate(Direct Labour)

30.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

28.50

BSR Reference

01-00-21

Description

Removing glass panes in doors, windows and fanlights and stacking as directed.

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

115.43

1.00

115.43

Carpenter M2

0.0%

2.70

45.00

121.50

Material Rate

0.00

Unit Rate(Direct Labour)

121.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

115.43

Wednesday, March 29, 2006

Page 105 of 395

Southern Province Engineering Services

BSR Reference

01-00-22

Description

Removing eaves gutter from roof of single storied buildings and stacking as directed.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

5.70

1.00

5.70

Unskilled Labour M

0.0%

0.20

30.00

6.00

Scafolding M

0.0%

3.00

1.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

9.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

8.70

BSR Reference

01-00-23

Description

Removing eaves gutter from roof of two storied buildings and stacking as directed.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.55

1.00

8.55

Unskilled Labour M

0.0%

0.30

30.00

9.00

Scafolding M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

14.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

13.55

BSR Reference

01-00-24

Description

Removing eaves gutter from roof of 3 or more storied building as directed.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

9.97

1.00

9.97

Unskilled Labour M

0.0%

0.35

30.00

10.50

Scafolding M

0.0%

7.00

1.00

7.00

Material Rate

0.00

Unit Rate(Direct Labour)

17.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.97

Wednesday, March 29, 2006

Page 106 of 395

Southern Province Engineering Services

BSR Reference

01-00-25

Description

Removing partition and stacking at site including making good to walls and floors

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

88.35

1.00

88.35

Carpenter M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement Sand etc. M2

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

94.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

89.35

BSR Reference

01-00-26

Description

Chipping of lime plaster and clearing debris as directed

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

8.55

1.00

8.55

Unskilled Labour M2

0.0%

0.30

30.00

9.00

Stages M2

0.0%

2.50

1.00

2.50

Material Rate

0.00

Unit Rate(Direct Labour)

11.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.05

BSR Reference

01-00-27

Description

Chipping of cement rendering on brick walls and floors and clearing away debris

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

28.50

1.00

28.50

Unskilled Labour M2

0.0%

1.00

30.00

30.00

Stages M2

0.0%

2.50

1.00

2.50

Material Rate

0.00

Unit Rate(Direct Labour)

32.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

31.00

Wednesday, March 29, 2006

Page 107 of 395

Southern Province Engineering Services

BSR Reference

01-00-28

Description

Chipping of cement rendering on concrete walls and floors and clearing away debris

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

42.75

1.00

42.75

Unskilled Labour M2

0.0%

1.50

30.00

45.00

Stages M2

0.0%

2.50

1.00

2.50

Material Rate

0.00

Unit Rate(Direct Labour)

47.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

45.25

BSR Reference

01-00-29

Description

Removing roof tiles and timber and stacking serviceable material and clearing debris in

Unit

M2

single storied buildings

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

34.20

1.00

34.20

Carpenter M2

0.0%

0.20

45.00

9.00

Unskilled Labour M2

0.0%

0.90

30.00

27.00

Stages M2

0.0%

2.50

1.00

2.50

Material Rate

0.00

Unit Rate(Direct Labour)

38.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

36.70

BSR Reference

01-00-30

Description

Removing roof tiles and timber and stacking serviceable material and clearing debris in 2

Unit

M2

storied buildings

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

48.45

1.00

48.45

Unskilled Labour M2

0.0%

1.70

30.00

51.00

Material Rate

0.00

Unit Rate(Direct Labour)

51.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

48.45

Wednesday, March 29, 2006

Page 108 of 395

Southern Province Engineering Services

BSR Reference

01-00-31

Description

Removing roof tiles and timber and stacking serviceable material and clearing debris in 3

Unit

M2

storied buildings

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

57.00

1.00

57.00

Carpenter M2

0.0%

0.20

45.00

9.00

Unskilled Labour M2

0.0%

1.70

30.00

51.00

Scafolding M2

0.0%

3.50

1.00

3.50

Material Rate

0.00

Unit Rate(Direct Labour)

63.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

60.50

BSR Reference

01-00-32

Description

Demolition of rubble masonry in cement mortar and stacking rubble and clearing debris as

Unit

M3

directed.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

256.50

1.00

256.50

Unskilled Labour M3

0.0%

9.00

30.00

270.00

Scafolding M3

0.0%

4.00

1.00

4.00

Material Rate

0.00

Unit Rate(Direct Labour)

274.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

260.50

BSR Reference

01-00-33

Description

Demolition of rubble masonry in lime mortar and stacking rubble and clearing debris

Resource Unit

Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

171.00

1.00

171.00

Unskilled Labour M3

0.0%

6.00

30.00

180.00

Scafolding M3

0.0%

4.00

1.00

4.00

Material Rate

0.00

Unit Rate(Direct Labour)

184.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

175.00

Wednesday, March 29, 2006

Page 109 of 395

Southern Province Engineering Services

BSR Reference

01-00-34

Description

Demolition of glazed tiles and clearing debris as directed

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

49.88

1.00

49.88

Unskilled Labour M2

0.0%

1.75

30.00

52.50

Material Rate

0.00

Unit Rate(Direct Labour)

52.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

49.88

BSR Reference

01-00-35

Description

Removing half round calicut tiles from roof of single storied buildings and stacking as

Unit

M2

directed

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

11.40

1.00

11.40

Unskilled Labour M2

0.0%

0.40

30.00

12.00

Stages M2

0.0%

2.70

1.00

2.70

Material Rate

0.00

Unit Rate(Direct Labour)

14.70

Plant Rate

0.00

Unit Rate (Labour Sub Con)

14.10

BSR Reference

01-00-36

Description

Removing of half round tiles from roof of two storied buildings and stacking as directed

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

17.10

1.00

17.10

Unskilled Labour M2

0.0%

0.60

30.00

18.00

Scafolding M2

0.0%

3.00

1.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

21.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

20.10

Wednesday, March 29, 2006

Page 110 of 395

Southern Province Engineering Services

BSR Reference

01-00-37

Description

Removing water proof treatment of bitumen from flat roof and clearing debris as directed.

Unit

M2

from roof of two storied buildings and stacking as directed

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

48.45

1.00

48.45

Labour Sub-Contract Rate M2

0.0%

25.65

1.00

25.65

Unskilled Labour M2

0.0%

1.70

30.00

51.00

Unskilled Labour M2

0.0%

0.90

30.00

27.00

Scafolding M2

0.0%

3.00

1.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

81.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

77.10

BSR Reference

01-00-38

Description

Removing asbestos ceiling including timber frame work, stacking serviceable material and

Unit

M2

clearing debris as directed in single storied buildings.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

64.13

1.00

64.13

Carpenter M2

0.0%

0.90

45.00

40.50

Unskilled Labour M2

0.0%

0.90

30.00

27.00

Scafolding M2

0.0%

1.50

1.00

1.50

Material Rate

0.00

Unit Rate(Direct Labour)

69.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

65.63

BSR Reference

01-00-39

Description

Removing asbestos ceiling including timber frame work, stacking serviceable material and

Unit

M2

clearing debris as directed in two storied buildings.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

75.52

1.00

75.52

Carpenter M2

0.0%

0.90

45.00

40.50

Unskilled Labour M2

0.0%

1.30

30.00

39.00

Scafolding M2

0.0%

2.50

1.00

2.50

Material Rate

0.00

Unit Rate(Direct Labour)

82.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

78.02

Wednesday, March 29, 2006

Page 111 of 395

Southern Province Engineering Services

BSR Reference

01-00-40

Description

Removing valance / barge boarding materials and clearing away the debris in single storied

Unit

building

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

5.70

1.00

5.70

Unskilled Labour M

0.0%

0.20

30.00

6.00

Scafolding M

0.0%

3.00

1.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

9.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

8.70

BSR Reference

01-00-41

Description

Removing valance / barge boarding materials and clearing away the debris in two storied

Unit

building

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.55

1.00

8.55

Unskilled Labour M

0.0%

0.30

30.00

9.00

Scafolding M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

14.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

13.55

BSR Reference

01-00-42

Description

Chipping of cement plastering in soffit and clearing debris's directed

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

38.48

1.00

38.48

Unskilled Labour M2

0.0%

1.35

30.00

40.50

Scafolding M2

0.0%

2.15

1.00

2.15

Material Rate

0.00

Unit Rate(Direct Labour)

42.65

Plant Rate

0.00

Unit Rate (Labour Sub Con)

40.63

Wednesday, March 29, 2006

Page 112 of 395

Southern Province Engineering Services

BSR Reference

01-00-43

Description

Cutting down trees girth Not exceeding 600mm, grubbing up roots and fill in excavation

Unit

Nos.

with earth.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

57.00

1.00

57.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Material Rate

0.00

Unit Rate(Direct Labour)

60.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

57.00

BSR Reference

01-00-44

Description

Cutting down trees , uprooting and grubbing girth exceeding 600mm, but less than 900mm

Unit

Nos.

excavation filled in earth logging and stacking.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

71.25

1.00

71.25

Unskilled Labour Nos.

0.0%

2.50

30.00

75.00

Material Rate

0.00

Unit Rate(Direct Labour)

75.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

71.25

BSR Reference

01-00-45

Description

Cutting down trees , uprooting and grubbing girth exceeding 900mm, but less than

Unit

Nos.

1200mm excavation filled in earth logging and stacking.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

142.50

1.00

142.50

Unskilled Labour Nos.

0.0%

5.00

30.00

150.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

142.50

BSR Reference

01-00-46

Description

Cutting down trees , uprooting and grubbing girth exceeding 1200mm excavation filled in

Unit

Nos.

earth rate to include logging and stacking.

Resource Unit

Material Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

199.50

1.00

199.50

Unskilled Labour Nos.

0.0%

7.00

30.00

210.00

0.00

Unit Rate(Direct Labour)

210.00

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

199.50

Page 113 of 395

Southern Province Engineering Services

BSR Reference

02-00-01

Description

Excavation of drains in any soil except rock requiring blasting and soil deposition within

Unit

M3

site.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

128.25

1.00

128.25

Unskilled Labour M3

0.0%

4.50

30.00

135.00

Material Rate

0.00

Unit Rate(Direct Labour)

135.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

128.25

Wednesday, March 29, 2006

Page 114 of 395

Southern Province Engineering Services

BSR Class

DRAINLAYER

BSR Reference

16-00-01

Description

Supplying and fixing of 150mmx150mm C.I. Grating

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

C.I grating 150mm*150mm Nos.

0.0%

1.00

24.00

24.00

Material Rate
Plant Rate

24.00
0.00

Unit Rate(Direct Labour)

27.75

Unit Rate (Labour Sub Con)

24.00

BSR Reference

16-00-02

Description

600mmx600mm manhole upto 600mm deep, constructed with 225mm brick in 1:3 cement

Unit

Nos.

mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete foundation.
Rate to include forming of channels.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Mason Nos.

0.0%

8.00

45.00

360.00

Unskilled Labour Nos.

0.0%

20.00

30.00

600.00

Brick : common Nos.

0.0%

0.26

2,200.00

572.00

Cement Nos.

0.0%

2.04

340.00

693.60

Metal 25mm Nos.

0.0%

0.17

900.00

153.00

Sand Nos.

0.0%

0.28

350.00

99.75

1,518.35
0.00

Unit Rate(Direct Labour)

2,478.35

Unit Rate (Labour Sub Con)

1,518.35

Wednesday, March 29, 2006

Page 115 of 395

Southern Province Engineering Services

BSR Reference

16-00-03

Description

1000mmx700mm manhole upto 600mm deep, constructed with 225mm brick in 1:3 cement

Unit

Nos.

mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete foundation.
Rate to include forming of channels.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Mason Nos.

0.0%

12.00

45.00

540.00

Unskilled Labour Nos.

0.0%

32.00

30.00

960.00

Brick : common Nos.

0.0%

0.50

2,200.00

1,100.00

Cement Nos.

0.0%

3.30

340.00

1,122.00

Metal 25mm Nos.

0.0%

0.28

900.00

256.50

Sand Nos.

0.0%

0.49

350.00

169.75

2,648.25
0.00

Unit Rate(Direct Labour)

4,148.25

Unit Rate (Labour Sub Con)

2,648.25

BSR Reference

16-00-04

Description

1000mmx700mm manhole,1200mm to 1800mm deep, constructed with 225mm brick in 1:3

Unit

Nos.

cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete
foundation. Rate to include forming of channels.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Mason Nos.

0.0%

20.00

45.00

900.00

Unskilled Labour Nos.

0.0%

56.00

30.00

1,680.00

Brick : common Nos.

0.0%

0.88

2,200.00

1,925.00

Cement Nos.

0.0%

4.58

340.00

1,557.20

Metal 25mm Nos.

0.0%

0.25

900.00

225.00

Sand Nos.

0.0%

0.79

350.00

275.10

3,982.30
0.00

Unit Rate(Direct Labour)

6,562.30

Unit Rate (Labour Sub Con)

3,982.30

Wednesday, March 29, 2006

Page 116 of 395

Southern Province Engineering Services

BSR Reference

16-00-05

Description

Supplying and fixing of 550mm x 550mm rectangular C.I.manhole

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Mason Nos.

0.0%

2.00

45.00

90.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Cement Nos.

0.0%

0.20

340.00

68.00

Manhole cover 550mm*550mm Nos.

0.0%

1.00

1,300.00

1,300.00

Rag bolts Nos.

0.0%

4.00

23.00

92.00

Material Rate
Plant Rate

1,460.00
0.00

Unit Rate(Direct Labour)

1,610.00

Unit Rate (Labour Sub Con)

1,460.00

BSR Reference

16-00-06

Description

Constructing and placing in position of 75mm thick 600mmx600mm reinforced concrete

Unit

Nos.

manhole cover, reinforced with 6mm dia. M.S rods at 75mm centres both ways.

Material Rate
Plant Rate

Resource Unit

Wastag

Black Smith Nos.

0.0%

0.50

40.00

20.00

Mason Nos.

0.0%

2.00

45.00

90.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Cement Nos.

0.0%

0.21

340.00

71.40

Metal 40mm Nos.

0.0%

0.03

700.00

19.60

Sand Nos.

0.0%

0.01

350.00

5.25

Tor Steel Nos.

0.0%

2.50

35.00

87.50

183.75
0.00

Quantit

353.75

Unit Rate (Labour Sub Con)

183.75

16-00-07

Description

Supplying and fixing of wire domes 100mm pipes

Material Rate
Plant Rate

Unit

Wastag

Amount

Unit Rate(Direct Labour)

BSR Reference

Resource Unit

Rate Type

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

0.50

40.00

20.00

wire dome 100mm Nos.

0.0%

1.00

130.00

130.00

130.00
0.00

Unit Rate(Direct Labour)

150.00

Unit Rate (Labour Sub Con)

130.00

Wednesday, March 29, 2006

Page 117 of 395

Southern Province Engineering Services

BSR Reference

16-00-08

Description

Supplying and fixing of wire domes 50mm pipes

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

0.50

40.00

20.00

Wire dome 50mm Nos.

0.0%

1.00

25.00

25.00

25.00
0.00

Unit Rate(Direct Labour)

45.00

Unit Rate (Labour Sub Con)

25.00

BSR Reference

16-00-09

Description

110mm dia. Pvc(type 600) laid in 350x150mm thick 1:3:6(25mm) concrete upto 600mm

Unit

depth of trench. Rate to include excavation

Resource Unit

Quantit

Rate Type

Amount

0.0%

0.03

45.00

1.35

Plumber M

0.0%

0.24

40.00

9.60

Unskilled Labour M

0.0%

3.20

30.00

96.00

Cement M

0.0%

0.42

340.00

142.80

Metal 25mm M

0.0%

0.08

900.00

72.00

PVC Pipe 110mm Type 600 M

0.0%

1.00

330.00

330.00

Sand M

0.0%

0.05

350.00

15.75

Erase part etc M

0.0%

5.00

1.00

5.00

Material Rate
Plant Rate

Wastag

Mason M

560.55
0.00

Unit Rate(Direct Labour)

672.50

Unit Rate (Labour Sub Con)

565.55

Wednesday, March 29, 2006

Page 118 of 395

Southern Province Engineering Services

BSR Reference

16-00-10

Description

110mm dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete upto 600mm to

Unit

1200mm depth of trench. Rate to include excavation

Resource Unit

Wastag

Quantit

Rate Type

Amount

Mason M

0.0%

0.03

45.00

1.35

Plumber M

0.0%

0.24

40.00

9.60

Unskilled Labour M

0.0%

4.24

30.00

127.20

Cement M

0.0%

0.42

340.00

142.80

Metal 25mm M

0.0%

0.08

900.00

72.00

PVC Pipe 110mm Type 600 M

0.0%

1.00

330.00

330.00

Sand M

0.0%

0.05

350.00

15.75

Transport M

0.0%

5.00

1.00

5.00

Material Rate
Plant Rate

560.55
0.00

Unit Rate(Direct Labour)

703.70

Unit Rate (Labour Sub Con)

565.55

BSR Reference

16-00-11

Description

110mm dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete over 1200mm to

Unit

1800mm depth of trench. Rate to include excavation

Resource Unit

Quantit

Rate Type

Amount

0.0%

0.03

45.00

1.35

Plumber M

0.0%

0.24

40.00

9.60

Unskilled Labour M

0.0%

5.60

30.00

168.00

Cement M

0.0%

0.42

340.00

142.80

Metal 25mm M

0.0%

0.08

900.00

72.00

PVC Pipe 110mm Type 600 M

0.0%

1.00

330.00

330.00

Sand M

0.0%

0.05

350.00

15.75

Transport M

0.0%

5.00

1.00

5.00

Material Rate
Plant Rate

Wastag

Mason M

560.55
0.00

Unit Rate(Direct Labour)

744.50

Unit Rate (Labour Sub Con)

565.55

Wednesday, March 29, 2006

Page 119 of 395

Southern Province Engineering Services

BSR Reference

16-00-12

Description

Supplying and fixing of 100mm x 100mm aluminium grating

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Aluminium gratting 100mm*100mm Nos.

0.0%

1.00

30.00

30.00

Material Rate
Plant Rate

Wednesday, March 29, 2006

30.00
0.00

Unit Rate(Direct Labour)

37.50

Unit Rate (Labour Sub Con)

30.00

Page 120 of 395

Southern Province Engineering Services

BSR Class

EXCAVATOR

BSR Reference

02-00-01

Description

Excavation and leveling site in any material except rock requiring blasting including

Unit

M3

surplus depositing and leveling at a distance Not exceeding 0.4 km

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

142.50

1.00

142.50

Unskilled Labour M3

0.0%

5.00

30.00

150.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

142.50

BSR Reference

02-00-02

Description

Excavation and leveling site in any material except rock requiring blasting including

Unit

M3

surplus depositing and leveling at a distance Not exceeding 0.4 km

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

85.50

1.00

85.50

Unskilled Labour M3

0.0%

3.00

30.00

90.00

Material Rate

0.00

Unit Rate(Direct Labour)

90.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

85.50

BSR Reference

02-00-03

Description

Filling under floors including spreading, watering and compacting in 75mm layers with

Unit

M3

gravel or other approved material (material available at site).

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

142.50

1.00

142.50

Unskilled Labour M3

0.0%

5.00

30.00

150.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

142.50

Wednesday, March 29, 2006

Page 121 of 395

Southern Province Engineering Services

BSR Reference

02-00-04

Description

Filling under floors including spreading, watering and compacting in 75mm layers with

Unit

M3

gravel or other approved material (1.6 km transport).

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

159.60

1.00

159.60

Unskilled Labour M3

0.0%

5.60

30.00

168.00

Gravel M3

0.0%

1.10

165.00

181.50

Material Rate

181.50

Plant Rate

0.00

Unit Rate(Direct Labour)

349.50

Unit Rate (Labour Sub Con)

341.10

BSR Reference

02-00-05

Description

Filling under floors with gravel other approved quality of filling including spreading,

Unit

M3

watering and compacting in 75mm layers (6 km transport).

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

159.60

1.00

159.60

Unskilled Labour M3

0.0%

5.60

30.00

168.00

Gravel M3

0.0%

1.10

165.00

181.50

Transport M3

0.0%

70.00

1.00

70.00

181.50
0.00

Unit Rate(Direct Labour)

419.50

Unit Rate (Labour Sub Con)

411.10

Wednesday, March 29, 2006

Page 122 of 395

Southern Province Engineering Services

BSR Class

GLAZIER

BSR Reference

13-00-01

Description

Fixing if glass panes with class1 timber boarding [glass supplied by Client]

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

0.00

1.00

0.00

Glazier M2

0.0%

5.00

25.00

125.00

M2

0.0%

19.65

9.00

176.85

Putty, Nails etc. M2

0.0%

16.15

1.00

16.15

Timb. beadings 12mm*12** class 1

Material Rate

301.85

Plant Rate

0.00

Unit Rate(Direct Labour)

318.00

Unit Rate (Labour Sub Con)

318.00

BSR Reference

13-00-02

Description

Supplying of 3mm thik clear glass panes and fixing class 1 timber beading

Unit

Resource Unit

Plant Rate

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

118.75

1.00

118.75

Glazeir M2

0.0%

5.00

25.00

125.00

Glass pane clear 3mm M2

0.0%

1.10

192.00

211.20

M2

0.0%

19.65

9.00

176.85

Nails M2

0.0%

16.20

1.00

16.20

Timb. beadings 12mm*12** class 1

Material Rate

Amount

Labour Sub-Contract Rate M2

388.05
0.00

Unit Rate(Direct Labour)

529.25

Unit Rate (Labour Sub Con)

523.00

Wednesday, March 29, 2006

Page 123 of 395

Southern Province Engineering Services

BSR Reference

13-00-03

Description

Supplying of 4mm clear glass panes and fixing with class 1 timber beading .

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

118.75

1.00

118.75

Glazeir M2

0.0%

5.00

25.00

125.00

Glass pane clear 4mm M2

0.0%

1.10

265.00

291.50

M2

0.0%

19.65

9.00

176.85

Nails M2

0.0%

16.20

1.00

16.20

Timb. beadings 12mm*12** class 1

Material Rate

468.35

Plant Rate

0.00

Unit Rate(Direct Labour)

609.55

Unit Rate (Labour Sub Con)

603.30

BSR Reference

13-00-04

Description

Supplying of 3mm figured panes & fixing with class 1 timber beading.

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

0.00

1.00

0.00

Glass pane figured 3mm M2

0.0%

1.10

220.00

242.00

Glazier M2

0.0%

5.00

25.00

125.00

M2

0.0%

19.65

9.00

176.85

Nails M2

0.0%

16.20

1.00

16.20

Material Rate

543.85

Plant Rate

0.00

Unit Rate(Direct Labour)

560.05

Unit Rate (Labour Sub Con)

560.05

BSR Reference

13-00-05

Description

Supplying og 4mm figured glass panes & fixing with class 1 timber.

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

0.00

1.00

0.00

Glass pane clear 4mm M2

0.0%

1.10

265.00

291.50

Glazier M2

0.0%

5.00

25.00

125.00

M2

0.0%

19.65

9.00

176.85

Nails M2

0.0%

16.70

1.00

16.70

Timb. beadings 12mm*12** class 1

Plant Rate

Amount

Labour Sub-Contract Rate M2

Timb. beadings 12mm*12** class 1

Material Rate

Amount

Labour Sub-Contract Rate M2

593.35
0.00

Unit Rate(Direct Labour)

610.05

Unit Rate (Labour Sub Con)

610.05

Wednesday, March 29, 2006

Page 124 of 395

Southern Province Engineering Services

BSR Class

HOUSES

BSR Reference

20-00-01

Description

Site clearing

Resource Unit

Unit

Wastag

Unskilled Labour Item

Item

Quantit

0.0%

1.00

Rate Type
30.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-00-02

Description

Temporary sheds for construction

Resource Unit
Item Spot Rate Item

Unit

Wastag
0.0%

Quantit
10,000.00

Amount
30.00
30.00
0.00

Item

Rate Type
1.00

Amount
10,000.00

Material Rate

0.00

Unit Rate(Direct Labour)

10,000.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

10,000.00

BSR Reference

20-00-03

Description

Security for site

Resource Unit
Item Spot Rate Item

Unit

Wastag
0.0%

Quantit
2,000.00

Item

Rate Type
1.00

Amount
2,000.00

Material Rate

0.00

Unit Rate(Direct Labour)

2,000.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

2,000.00

BSR Reference

20-00-04

Description

Lighting for site during construction

Resource Unit
Item Spot Rate Item

Unit

Wastag
0.0%

Quantit
5,000.00

Item

Rate Type
1.00

Amount
5,000.00

Material Rate

0.00

Unit Rate(Direct Labour)

5,000.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5,000.00

Wednesday, March 29, 2006

Page 125 of 395

Southern Province Engineering Services

BSR Reference

20-00-05

Description

Supply of temporary services of water etc.

Resource Unit
Item Spot Rate Item

Unit

Wastag
0.0%

Item

Quantit
4,000.00

Rate Type
1.00

Amount
4,000.00

Material Rate

0.00

Unit Rate(Direct Labour)

4,000.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

4,000.00

BSR Reference

20-00-06

Description

Temporary accommodation for workers

Resource Unit
Item Spot Rate Item

Unit

Wastag
0.0%

Item

Quantit
5,000.00

Rate Type
1.00

Amount
5,000.00

Material Rate

0.00

Unit Rate(Direct Labour)

5,000.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5,000.00

BSR Reference

20-00-07

Description

Settingout of building

Resource Unit
Item Spot Rate Item

Unit

Wastag
0.0%

Item

Quantit
2,000.00

Rate Type
1.00

Amount
2,000.00

Material Rate

0.00

Unit Rate(Direct Labour)

2,000.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

2,000.00

BSR Reference

20-01-10

Description

Removal of top soil to a depth of 150mm

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

85.50

1.00

85.50

Unskilled Labour M2

0.0%

3.00

30.00

90.00

Material Rate

0.00

Unit Rate(Direct Labour)

90.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

85.50

Wednesday, March 29, 2006

Page 126 of 395

Southern Province Engineering Services

BSR Reference

20-01-11

Description

Excavation for foundation not exceeding 1.5m depth normal soil, deposited within site not

Unit

M3

more than 30m distance

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

85.50

1.00

85.50

Labour Sub-Contract Rate M3

0.0%

142.50

1.00

142.50

Labour Sub-Contract Rate M3

0.0%

85.50

1.00

85.50

Unskilled Labour M3

0.0%

5.00

30.00

150.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

313.50

BSR Reference

20-01-12

Description

Excavation for foundation not exceeding 1.5m depth weak soil, deposited within site not

Unit

M3

more than 30m distance

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

85.50

1.00

85.50

Labour Sub-Contract Rate M3

0.0%

142.50

1.00

142.50

Unskilled Labour M3

0.0%

5.00

30.00

150.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

228.00

BSR Reference

20-01-13

Description

Excavation for foundation not exceeding 1.5m depth hard soil, deposited within site not

Unit

M3

more than 30m distance

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

142.50

1.00

142.50

Labour Sub-Contract Rate M3

0.0%

85.50

1.00

85.50

Unskilled Labour M3

0.0%

5.00

30.00

150.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

228.00

Wednesday, March 29, 2006

Page 127 of 395

Southern Province Engineering Services

BSR Reference

20-01-14

Description

Filling of foundations using excavted soil

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

142.50

1.00

142.50

Unskilled Labour M3

0.0%

5.00

30.00

150.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

142.50

BSR Reference

20-01-15

Description

Filling of foundations using imported soil

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

159.60

1.00

159.60

Unskilled Labour M3

0.0%

5.60

30.00

168.00

Gravel M3

0.0%

1.10

165.00

181.50

Material Rate

181.50

Plant Rate

0.00

Unit Rate(Direct Labour)

349.50

Unit Rate (Labour Sub Con)

341.10

BSR Reference

20-01-16

Description

Filling under floors using excavated soil, deposited in not more than 150mm layers and

Unit

M3

well compacted

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

142.50

1.00

142.50

Unskilled Labour M3

0.0%

5.00

30.00

150.00

Material Rate

0.00

Unit Rate(Direct Labour)

150.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

142.50

Wednesday, March 29, 2006

Page 128 of 395

Southern Province Engineering Services

BSR Reference

20-01-17

Description

Filling under floors using imported soil, deposited in not more than 150mm layers and well

Unit

M3

compacted

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

159.60

1.00

159.60

Unskilled Labour M3

0.0%

5.60

30.00

168.00

Gravel M3

0.0%

1.10

165.00

181.50

Material Rate

181.50

Plant Rate

0.00

Unit Rate(Direct Labour)

349.50

Unit Rate (Labour Sub Con)

341.10

BSR Reference

20-02-20

Description

Random rubble masonry using 150mm to 225mm rubble and 1:6 cement:sand mortar, up to

Unit

M3

3m3

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

1,057.35

1.00

1,057.35

Mason M3

0.0%

10.60

45.00

477.00

Unskilled Labour M3

0.0%

21.20

30.00

636.00

Cement M3

0.0%

2.60

340.00

884.00

Rubble 150mm to 225mm M3

0.0%

1.00

350.00

350.00

Sand M3

0.0%

0.45

350.00

157.50

Material Rate

1,391.50

Plant Rate

0.00

Unit Rate(Direct Labour)

2,504.50

Unit Rate (Labour Sub Con)

2,448.85

BSR Reference

20-02-21

Description

Random rubble masonry using 150mm to 225mm rubble and 1:6 cement:sand mortar, more

Unit

M3

than 3m3

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

1,057.35

1.00

1,057.35

Mason M3

0.0%

10.60

45.00

477.00

Unskilled Labour M3

0.0%

21.20

30.00

636.00

Cement M3

0.0%

2.60

340.00

884.00

Rubble 150mm to 225mm M3

0.0%

1.00

350.00

350.00

Sand M3

0.0%

0.45

350.00

157.50

1,391.50
0.00

Unit Rate(Direct Labour)

2,504.50

Unit Rate (Labour Sub Con)

2,448.85

Wednesday, March 29, 2006

Page 129 of 395

Southern Province Engineering Services

BSR Reference

20-02-22

Description

Random rubble masonry using 150mm to 225mm rubble and 1:8 cement:sand mortar, up to

Unit

M3

3m3

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

1,057.35

1.00

1,057.35

Mason M3

0.0%

10.60

45.00

477.00

Unskilled Labour M3

0.0%

21.20

30.00

636.00

Cement M3

0.0%

2.60

340.00

884.00

Rubble 150mm to 225mm M3

0.0%

1.00

350.00

350.00

Sand M3

0.0%

0.45

350.00

157.50

Material Rate

1,391.50

Plant Rate

0.00

Unit Rate(Direct Labour)

2,504.50

Unit Rate (Labour Sub Con)

2,448.85

BSR Reference

20-02-23

Description

Random rubble masonry using 150mm to 225mm rubble and 1:8 cement:sand mortar, more

Unit

M3

than 3m3

Resource Unit

Wastag

Quantit
1,057.35

1.00

1,057.35

Mason M3

0.0%

10.60

45.00

477.00

Unskilled Labour M3

0.0%

21.20

30.00

636.00

Cement M3

0.0%

2.60

340.00

884.00

Rubble 150mm to 225mm M3

0.0%

1.00

350.00

350.00

Sand M3

0.0%

0.45

350.00

157.50

Plant Rate

1,391.50
0.00

Unit Rate(Direct Labour)

2,504.50

Unit Rate (Labour Sub Con)

2,448.85

BSR Reference

20-02-24

Description

Cement:Sand (1:10) mix compact foundation - base

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M3

Wastag

M3

Quantit

Rate Type

Amount

Mason M3

0.0%

11.00

45.00

495.00

Unskilled Labour M3

0.0%

17.00

30.00

510.00

Cement M3

0.0%

3.70

340.00

1,258.00

Sand M3

0.0%

1.30

350.00

455.00

1,713.00
0.00

Unit Rate(Direct Labour)

2,718.00

Unit Rate (Labour Sub Con)

1,713.00

Wednesday, March 29, 2006

Page 130 of 395

Southern Province Engineering Services

BSR Reference

20-02-25

Description

Cement:Sand (1:10) mix compact foundation, plinth wall using steel a steel mould

Unit

Resource Unit

Material Rate

Wastag

Quantit
13.00

45.00

585.00

Unskilled Labour M3

0.0%

20.00

30.00

600.00

Cement M3

0.0%

3.70

340.00

1,258.00

Sand M3

0.0%

1.30

350.00

455.00

0.00

Unit Rate(Direct Labour)

2,898.00

Unit Rate (Labour Sub Con)

1,713.00

20-02-26

Description

DPC with 1:3 cement:sand moortar and two coats of DPC tar

Unit

Resource Unit

Plant Rate

Amount

0.0%

BSR Reference

Material Rate

Rate Type

Mason M3

1,713.00

Plant Rate

M3

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

104.31

1.00

104.31

Mason M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

2.16

30.00

64.80

Bitumen M2

0.0%

0.70

16.00

11.20

Cement M2

0.0%

0.19

340.00

63.92

Sand M2

0.0%

0.02

350.00

7.70

82.82
0.00

Unit Rate(Direct Labour)

192.62

Unit Rate (Labour Sub Con)

187.13

Wednesday, March 29, 2006

Page 131 of 395

Southern Province Engineering Services

BSR Reference

20-03-30

Description

Brick work in 1:5 cement:sand mortar, 113mm thick in walls

Unit

Resource Unit

Wastag

M2

Quantit
104.17

1.00

104.17

Mason M2

0.0%

1.29

45.00

58.05

Unskilled Labour M2

0.0%

1.72

30.00

51.60

Brick : common M2

0.0%

0.06

2,200.00

132.00

Cement M2

0.0%

0.14

340.00

47.60

Sand M2

0.0%

0.03

350.00

10.50

water and scaffolding M2

0.0%

4.00

1.00

4.00

190.10

Plant Rate

0.00

Unit Rate(Direct Labour)

303.75

Unit Rate (Labour Sub Con)

298.27

BSR Reference

20-03-31

Description

Brick work in 1:8 cement:sand mortar, 225mm thick in walls

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

914.85

1.00

914.85

Mason M2

0.0%

10.60

45.00

477.00

Unskilled Labour M2

0.0%

16.20

30.00

486.00

Brick : common M2

0.0%

0.53

2,200.00

1,161.60

Cement M2

0.0%

1.33

340.00

452.20

Sand M2

0.0%

0.23

350.00

80.50

water and scaffolding M2

0.0%

12.50

1.00

12.50

1,694.30
0.00

Unit Rate(Direct Labour)

2,669.80

Unit Rate (Labour Sub Con)

2,621.65

Wednesday, March 29, 2006

Page 132 of 395

Southern Province Engineering Services

BSR Reference

20-03-32

Description

Brick work in 1:6 cement:sand mortar, 225mm thick in walls

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

914.85

1.00

914.85

Mason M2

0.0%

10.60

45.00

477.00

Unskilled Labour M2

0.0%

16.20

30.00

486.00

Brick : common M2

0.0%

0.53

2,200.00

1,161.60

Cement M2

0.0%

1.33

340.00

452.20

Sand M2

0.0%

0.23

350.00

80.50

water and scaffolding M2

0.0%

12.50

1.00

12.50

Material Rate
Plant Rate

1,694.30
0.00

Unit Rate(Direct Labour)

2,669.80

Unit Rate (Labour Sub Con)

2,621.65

BSR Reference

20-03-33

Description

Cement:Sand blockwork in 1:5 cement:Sand mortar, 100mm thick

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M2

Quantit

Rate Type

0.0%

0.90

45.00

40.50

Unskilled Labour M2

0.0%

1.75

30.00

52.50

Cement M2

0.0%

0.04

340.00

14.62

Sand M2

0.0%

0.01

350.00

3.15

17.77

Unit Rate(Direct Labour)

0.00

110.77

Unit Rate (Labour Sub Con)

20-03-34

Description

Cement:Sand blockwork in 1:6 cement:Sand mortar, 150mm thick

Unit

Resource Unit

Plant Rate

Amount

Mason M2

BSR Reference

Material Rate

Amount

Labour Sub-Contract Rate M2

Wastag

17.77

M2

Quantit

Rate Type

Amount

Mason M2

0.0%

1.10

45.00

49.50

Unskilled Labour M2

0.0%

2.20

30.00

66.00

Cement M2

0.0%

0.04

340.00

14.62

Sand M2

0.0%

0.01

350.00

3.15

17.77
0.00

Unit Rate(Direct Labour)


Unit Rate (Labour Sub Con)

133.27
17.77

Wednesday, March 29, 2006

Page 133 of 395

Southern Province Engineering Services

BSR Reference

20-03-35

Description

Cement:Sand blockwork in 1:8 cement:Sand mortar, 150mm thick

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M2

Quantit

Rate Type

0.0%

1.10

45.00

49.50

Unskilled Labour M2

0.0%

2.20

30.00

66.00

Cement M2

0.0%

0.03

340.00

11.22

Sand M2

0.0%

0.01

350.00

3.15

14.37

Unit Rate(Direct Labour)

0.00

20-03-36

Description

Cement:Sand blockwork in 1:6 cement:Sand mortar, 200mm thick

Unit

Resource Unit

Plant Rate

129.87

Unit Rate (Labour Sub Con)

BSR Reference

Material Rate

Amount

Mason M2

Wastag

14.37

M2

Quantit

Rate Type

Amount

Mason M2

0.0%

1.30

45.00

58.50

Mason M2

0.0%

1.30

45.00

58.50

Unskilled Labour M2

0.0%

2.15

30.00

64.50

Unskilled Labour M2

0.0%

2.15

30.00

64.50

Cement M2

0.0%

0.07

340.00

22.44

Cement M2

0.0%

0.08

340.00

27.54

Sand M2

0.0%

0.02

350.00

6.30

Sand M2

0.0%

0.02

350.00

6.30

62.58
0.00

Unit Rate(Direct Labour)


Unit Rate (Labour Sub Con)

308.58
62.58

Wednesday, March 29, 2006

Page 134 of 395

Southern Province Engineering Services

BSR Reference

20-03-37

Description

Cement:Soil blockwork in 1:6:6 (cement:sand:soil) mortar, 112mm thick

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

165.00

1.00

165.00

Mason M2

0.0%

2.20

45.00

99.00

Unskilled Labour M2

0.0%

2.20

30.00

66.00

Cement M2

0.0%

0.08

340.00

26.95

Sand M2

0.0%

0.02

350.00

6.60

Soil M2

0.0%

0.02

212.00

3.99

Soil:cement blocks 110mm thick - 5% M2

0.0%

36.00

6.50

234.00

Scafolding M2

0.0%

75.00

1.00

75.00

Material Rate

271.53

Plant Rate

0.00

Unit Rate(Direct Labour)

511.53

Unit Rate (Labour Sub Con)

511.53

BSR Reference

20-03-38

Description

Cement:Soil blockwork in 1:6:6 (cement:sand:soil) mortar, 150mm thick

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

216.00

1.00

216.00

Mason M2

0.0%

2.70

45.00

121.50

Unskilled Labour M2

0.0%

2.70

30.00

81.00

Cement M2

0.0%

0.12

340.00

40.46

Sand M2

0.0%

0.03

350.00

10.08

Soil M2

0.0%

0.03

212.00

6.10

Soil:cement blocks 1500mm thick - 5% M2

0.0%

30.00

9.00

270.00

Scafolding M2

0.0%

100.00

1.00

100.00

Material Rate
Plant Rate

326.64
0.00

Unit Rate(Direct Labour)

629.14

Unit Rate (Labour Sub Con)

642.64

Wednesday, March 29, 2006

Page 135 of 395

Southern Province Engineering Services

BSR Reference

20-03-39

Description

Cement:Soil blockwork in 1:6:6 (cement:sand:soil) mortar, 250mm thick

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

235.00

1.00

235.00

Mason M2

0.0%

3.20

45.00

144.00

Unskilled Labour M2

0.0%

3.20

30.00

96.00

Cement M2

0.0%

0.19

340.00

64.67

Sand M2

0.0%

0.05

350.00

15.83

Soil M2

0.0%

0.05

212.00

9.59

Soil:cement blocks 240mm thick - 5% M2

0.0%

36.00

12.00

432.00

Scafolding M2

0.0%

125.00

1.00

125.00

Material Rate

522.09

Plant Rate

0.00

Unit Rate(Direct Labour)

887.09

Unit Rate (Labour Sub Con)

882.09

BSR Reference

20-03-40

Description

113X150mm Lintol for 113mm brickwork , 2NNos 10mm Tor steel bars and necessary

Unit

formwork

Resource Unit

Quantit

Rate Type

Amount

0.0%

113.43

1.00

113.43

Mason M

0.0%

1.32

45.00

59.40

Unskilled Labour M

0.0%

2.00

30.00

60.00

Cement M

0.0%

0.11

340.00

37.40

Metal 20mm M

0.0%

0.02

110.00

1.98

Sand M

0.0%

0.01

350.00

3.50

Timber PLank 20mm Class C M

0.0%

0.10

150.00

15.00

Timber props and nails M

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

57.88
0.00

Unit Rate(Direct Labour)

179.78

Unit Rate (Labour Sub Con)

173.81

Wednesday, March 29, 2006

Page 136 of 395

Southern Province Engineering Services

BSR Reference

20-03-41

Description

225X150mm Lintol for 1225mm brickwork , 2NNos 10mm Tor steel bars and necessary

Unit

formwork

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

113.43

1.00

113.43

Mason M

0.0%

1.32

45.00

59.40

Unskilled Labour M

0.0%

2.00

30.00

60.00

Cement M

0.0%

0.22

340.00

74.80

Metal 20mm M

0.0%

0.04

110.00

3.96

Sand M

0.0%

0.02

350.00

7.00

Timber Plank 25mm Class C M

0.0%

0.13

150.00

18.90

Timber props and nails M

0.0%

3.50

1.00

3.50

Material Rate

104.66

Plant Rate

0.00

Unit Rate(Direct Labour)

227.56

Unit Rate (Labour Sub Con)

221.59

BSR Reference

20-03-42

Description

225X225mm Lintol for 225mm brickwork , 2Nos 10mm Tor steel bars and necessary

Unit

formwork

Resource Unit

Quantit

Rate Type

Amount

0.0%

105.45

1.00

105.45

Mason M

0.0%

1.00

45.00

45.00

Unskilled Labour M

0.0%

2.20

30.00

66.00

Cement M

0.0%

0.33

340.00

112.20

Metal 20mm M

0.0%

0.05

110.00

5.72

Sand M

0.0%

0.03

350.00

10.50

Timber Plank 25mm Class C M

0.0%

0.17

150.00

25.05

Timber props and nails M

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

153.47
0.00

Unit Rate(Direct Labour)

266.97

Unit Rate (Labour Sub Con)

261.42

Wednesday, March 29, 2006

Page 137 of 395

Southern Province Engineering Services

BSR Reference

20-03-43

Description

100X150mm Lintol for 1150mm blockwork , 2Nos 10mm Tor steel bars and necessary

Unit

formwork

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

113.43

1.00

113.43

Mason M

0.0%

1.32

45.00

59.40

Unskilled Labour M

0.0%

2.00

30.00

60.00

Cement M

0.0%

0.11

340.00

37.40

Metal 20mm M

0.0%

0.02

110.00

1.98

Sand M

0.0%

0.01

350.00

3.50

Timber PLank 20mm Class C M

0.0%

0.10

150.00

15.00

Timber props and nails M

0.0%

2.50

1.00

2.50

Material Rate

57.88

Plant Rate

0.00

Unit Rate(Direct Labour)

179.78

Unit Rate (Labour Sub Con)

173.81

BSR Reference

20-03-44

Description

150X150mm Lintol for 1150mm blockwork , 2Nos 10mm Tor steel bars and necessary

Unit

formwork

Resource Unit

Quantit

Rate Type

Amount

0.0%

113.43

1.00

113.43

Mason M

0.0%

1.32

45.00

59.40

Unskilled Labour M

0.0%

2.00

30.00

60.00

Cement M

0.0%

0.22

340.00

74.80

Metal 20mm M

0.0%

0.04

110.00

3.96

Sand M

0.0%

0.02

350.00

7.00

Timber Plank 25mm Class C M

0.0%

0.13

150.00

18.90

Timber props and nails M

0.0%

3.50

1.00

3.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

104.66
0.00

Unit Rate(Direct Labour)

227.56

Unit Rate (Labour Sub Con)

221.59

Wednesday, March 29, 2006

Page 138 of 395

Southern Province Engineering Services

BSR Reference

20-03-45

Description

200X150mm Lintol for 200mm blockwork , 2Nos 10mm Tor steel bars and necessary

Unit

formwork

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate

0.0%

113.43

1.00

113.43

Mason

0.0%

1.32

45.00

59.40

Unskilled Labour

0.0%

2.00

30.00

60.00

Cement

0.0%

0.22

340.00

74.80

Metal 20mm

0.0%

0.04

110.00

3.96

Sand

0.0%

0.02

350.00

7.00

Timber Plank 25mm Class C

0.0%

0.13

150.00

18.90

Timber props and nails

0.0%

3.50

1.00

3.50

Material Rate

104.66

Plant Rate

0.00

Unit Rate(Direct Labour)

227.56

Unit Rate (Labour Sub Con)

221.59

BSR Reference

20-03-46

Description

200X225mm Lintol for 200mm blockwork , 2Nos 10mm Tor steel bars and necessary

Unit

formwork

Resource Unit

Quantit

Rate Type

Amount

0.0%

105.45

1.00

105.45

Mason M

0.0%

1.00

45.00

45.00

Unskilled Labour M

0.0%

2.20

30.00

66.00

Cement M

0.0%

0.33

340.00

112.20

Metal 20mm M

0.0%

0.05

110.00

5.72

Sand M

0.0%

0.03

350.00

10.50

Timber Plank 25mm Class C M

0.0%

0.17

150.00

25.05

Timber props and nails M

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

153.47
0.00

Unit Rate(Direct Labour)

266.97

Unit Rate (Labour Sub Con)

261.42

Wednesday, March 29, 2006

Page 139 of 395

Southern Province Engineering Services

BSR Reference

20-03-47

Description

113X100mm Lintol for 2113mm blockwork (cement:soil) , 2Nos 10mm Tor steel bars and

Unit

with cement:soil lintol blocks

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

113.43

1.00

113.43

Mason M

0.0%

1.32

45.00

59.40

Unskilled Labour M

0.0%

2.00

30.00

60.00

Cement M

0.0%

0.11

340.00

37.40

Metal 20mm M

0.0%

0.02

110.00

1.98

Sand M

0.0%

0.01

350.00

3.50

Timber PLank 20mm Class C M

0.0%

0.10

150.00

15.00

Timber props and nails M

0.0%

2.50

1.00

2.50

Material Rate

57.88

Plant Rate

0.00

Unit Rate(Direct Labour)

179.78

Unit Rate (Labour Sub Con)

173.81

BSR Reference

20-03-48

Description

150X100mm Lintol for 150mm blockwork (cement:soil) , 2Nos 10mm Tor steel bars and

Unit

with cement:soil lintol blocks

Resource Unit

Quantit

Rate Type

Amount

0.0%

113.43

1.00

113.43

Mason M

0.0%

1.32

45.00

59.40

Unskilled Labour M

0.0%

2.00

30.00

60.00

Cement M

0.0%

0.11

340.00

37.40

Metal 20mm M

0.0%

0.02

110.00

1.98

Sand M

0.0%

0.01

350.00

3.50

Timber PLank 20mm Class C M

0.0%

0.10

150.00

15.00

Timber props and nails M

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

57.88
0.00

Unit Rate(Direct Labour)

179.78

Unit Rate (Labour Sub Con)

173.81

Wednesday, March 29, 2006

Page 140 of 395

Southern Province Engineering Services

BSR Reference

20-03-49

Description

250X100mm Lintol for 250mm blockwork (cement:soil) , 2Nos 10mm Tor steel bars and

Unit

with cement:soil lintol blocks

Resource Unit

Wastag

Rate Type

Amount

0.0%

113.43

1.00

113.43

Mason M

0.0%

1.32

45.00

59.40

Unskilled Labour M

0.0%

2.00

30.00

60.00

Cement M

0.0%

0.22

340.00

74.80

Metal 20mm M

0.0%

0.04

110.00

3.96

Sand M

0.0%

0.02

350.00

7.00

Timber Plank 25mm Class C M

0.0%

0.13

150.00

18.90

Timber props and nails M

0.0%

3.50

1.00

3.50

Material Rate

104.66

Plant Rate

0.00

BSR Reference

20-04-50

Description

1:3:6(25mm) concrete in foundations

Material Rate

Unit Rate(Direct Labour)

227.56

Unit Rate (Labour Sub Con)

221.59

Unit

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate M

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

765.08

1.00

765.08

Mason M3

0.0%

2.83

45.00

127.35

Unskilled Labour M3

0.0%

22.60

30.00

678.00

Cement M3

0.0%

4.50

340.00

1,530.00

Metal 40mm M3

0.0%

1.00

700.00

700.00

Sand M3

0.0%

0.56

350.00

196.00

2,426.00
0.00

Unit Rate(Direct Labour)

3,231.35

Unit Rate (Labour Sub Con)

3,191.08

Wednesday, March 29, 2006

Page 141 of 395

Southern Province Engineering Services

BSR Reference

20-04-51

Description

1:2:4 (20mm) concrete in foundations

Unit

Resource Unit

Wastag

Rate Type

Amount

0.0%

605.48

1.00

605.48

Mason M3

0.0%

2.83

45.00

127.35

Unskilled Labour M3

0.0%

17.00

30.00

510.00

Cement M3

0.0%

5.77

340.00

1,962.82

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water, Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

2,282.82

Plant Rate

0.00

BSR Reference

20-04-52

Description

1:2:4 (20mm) concrete in columns

Unit Rate(Direct Labour)

3,030.17

Unit Rate (Labour Sub Con)

2,998.30

Unit

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate M3

Material Rate

Material Rate

M3

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

605.48

1.00

605.48

Mason M3

0.0%

2.83

45.00

127.35

Unskilled Labour M3

0.0%

17.00

30.00

510.00

Cement M3

0.0%

6.48

340.00

2,201.84

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water, Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

2,521.84
0.00

Unit Rate(Direct Labour)

3,269.19

Unit Rate (Labour Sub Con)

3,237.32

Wednesday, March 29, 2006

Page 142 of 395

Southern Province Engineering Services

BSR Reference

20-04-53

Description

1:2:4 (20mm) concrete in beams, up to 225mm width and 400mm depth

Unit

Resource Unit

Wastag

M3

Quantit

Rate Type

0.0%

798.43

1.00

798.43

Mason M3

0.0%

3.60

45.00

162.00

Unskilled Labour M3

0.0%

22.61

30.00

678.45

Cement M3

0.0%

6.48

340.00

2,203.20

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

Material Rate

2,523.20

Plant Rate

0.00

Unit Rate(Direct Labour)

3,473.65

Unit Rate (Labour Sub Con)

3,431.63

BSR Reference

20-04-54

Description

1:2:4 (20mm) concrete in beams, more than 225mm width and 400mm depth

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M3

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

798.43

1.00

798.43

Mason M3

0.0%

3.60

45.00

162.00

Unskilled Labour M3

0.0%

22.61

30.00

678.45

Cement M3

0.0%

6.48

340.00

2,203.20

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

2,523.20
0.00

Unit Rate(Direct Labour)

3,473.65

Unit Rate (Labour Sub Con)

3,431.63

Wednesday, March 29, 2006

Page 143 of 395

Southern Province Engineering Services

BSR Reference

20-04-55

Description

1:2:4 (20mm) concrete in floors

Unit

Resource Unit

Wastag

Rate Type

Amount

0.0%

959.60

1.00

959.60

Labour Sub-Contract Rate M3

0.0%

302.67

1.00

302.67

Mason M3

0.0%

3.60

45.00

162.00

Unskilled Labour M3

0.0%

28.27

30.00

848.10

Cement M3

0.0%

6.48

340.00

2,203.20

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.60

350.00

210.00

Water,Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

2,523.20

Plant Rate

0.00

BSR Reference

20-04-56

Description

1:1.5:3 (20mm) concrete in water tanks

Unit Rate(Direct Labour)

3,643.30

Unit Rate (Labour Sub Con)

3,895.47

Unit

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate M3

Material Rate

Material Rate

M3

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

959.60

1.00

959.60

Mason M3

0.0%

3.60

45.00

162.00

Unskilled Labour M3

0.0%

28.27

30.00

848.10

Cement M3

0.0%

9.50

340.00

3,230.00

Metal 20mm M3

0.0%

1.00

110.00

110.00

Sand M3

0.0%

0.50

350.00

175.00

Water,Mixer, Vibrator etc. M3

0.0%

110.00

1.00

110.00

3,515.00
0.00

Unit Rate(Direct Labour)

4,635.10

Unit Rate (Labour Sub Con)

4,584.60

Wednesday, March 29, 2006

Page 144 of 395

Southern Province Engineering Services

BSR Reference

20-05-60

Description

Mild steel reinforcement, 5mm diameter

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Mild Steel Kg

0.0%

1.00

33.00

33.00

Wastage Kg

0.0%

2.50

1.00

2.50

Material Rate

33.50

Plant Rate

0.00

BSR Reference

20-05-61

Description

Mild steel reinforcement, 6mm diameter

Resource Unit

Unit Rate(Direct Labour)

47.25

Unit Rate (Labour Sub Con)

46.69

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

BSR Reference

20-05-62

Description

Mild steel reinforcement, 10mm diameter

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

Wednesday, March 29, 2006

Page 145 of 395

Southern Province Engineering Services

BSR Reference

20-05-63

Description

Tor steel reinforcement, 8mm diameter

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

BSR Reference

20-05-64

Description

Tor steel reinforcement, 10mm diameter

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

BSR Reference

20-05-65

Description

Tor steel reinforcement, 12mm diameter

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

Wednesday, March 29, 2006

Page 146 of 395

Southern Province Engineering Services

BSR Reference

20-05-66

Description

Tor steel reinforcement, 16mm diameter

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

BSR Reference

20-05-67

Description

Tor steel reinforcement, 20mm diameter

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

BSR Reference

20-05-68

Description

Tor steel reinforcement, 25mm diameter

Resource Unit

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

Wednesday, March 29, 2006

Page 147 of 395

Southern Province Engineering Services

BSR Reference

20-05-69

Description

Tor steel reinforcement, 32mm diameter

Unit

Resource Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

BSR Reference

20-05-70

Description

Tor steel reinforcement, 38mm diameter

Unit

Resource Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

BSR Reference

20-05-80

Description

Formwork using rubber planks in foundation bases

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

192.38

1.00

192.38

Mason M2

0.0%

2.70

45.00

121.50

Unskilled Labour M2

0.0%

2.70

30.00

81.00

Timber beams Class C M2

0.0%

0.00

20,000.00

60.00

60.00
0.00

Unit Rate(Direct Labour)

262.50

Unit Rate (Labour Sub Con)

252.38

Wednesday, March 29, 2006

Page 148 of 395

Southern Province Engineering Services

BSR Reference

20-05-81

Description

Formwork using rubber planks in columns

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

192.38

1.00

192.38

Mason M2

0.0%

2.70

45.00

121.50

Unskilled Labour M2

0.0%

2.70

30.00

81.00

Bolt and nut iron 225*10mm M2

0.0%

0.50

40.00

20.00

Props (bamboo) 3 - 4 m M2

0.0%

1.70

80.00

136.00

Timb.cl.B planks 25mm M2

0.0%

0.22

300.00

66.00

Timber beams Class C M2

0.0%

0.00

20,000.00

60.00

Screws and Nails M2

0.0%

2.00

1.00

2.00

Material Rate

282.00

Plant Rate

0.00

Unit Rate(Direct Labour)

486.50

Unit Rate (Labour Sub Con)

476.38

BSR Reference

20-05-82

Description

Formwork using rubber planks in sides of beams

Unit

Resource Unit

Material Rate
Plant Rate

M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06
0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

Wednesday, March 29, 2006

Page 149 of 395

Southern Province Engineering Services

BSR Reference

20-05-84

Description

Formwork using rubber planks in floors including props and joists

Unit

Resource Unit

Wastag

M2

Quantit
73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06

Plant Rate

0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

BSR Reference

20-05-85

Description

Formwork using plywood, 12mm thick in foundation bases

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06
0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

Wednesday, March 29, 2006

Page 150 of 395

Southern Province Engineering Services

BSR Reference

20-05-86

Description

Formwork using plywood, 12mm thick in columns including bearers and ties

Unit

Resource Unit

Wastag

M2

Quantit
73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06

Plant Rate

0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

BSR Reference

20-05-87

Description

Formwork using plywood, 12mm thick in sides of beams

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06
0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

Wednesday, March 29, 2006

Page 151 of 395

Southern Province Engineering Services

BSR Reference

20-05-88

Description

Formwork using plywood, 12mm thick in beam bottoms including props

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

Material Rate

396.06

Plant Rate

0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

BSR Reference

20-05-89

Description

Formwork using plywood, 12mm thick in floors including joists and props

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06
0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

Wednesday, March 29, 2006

Page 152 of 395

Southern Province Engineering Services

BSR Reference

20-05-90

Description

Formwork using steel shetters in foundation bases

Unit

Resource Unit

Wastag

Rate Type

Amount

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06

Plant Rate

0.00

BSR Reference

20-05-91

Description

Formwork using steel shetters in columns

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

Unit

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate M2

Material Rate

Material Rate

M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06
0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

Wednesday, March 29, 2006

Page 153 of 395

Southern Province Engineering Services

BSR Reference

20-05-92

Description

Formwork using steel shetters in sides of beams

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

Material Rate

396.06

Plant Rate

0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

BSR Reference

20-05-93

Description

Formwork using steel shetters in bottom of beams including joists and props

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06
0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

Wednesday, March 29, 2006

Page 154 of 395

Southern Province Engineering Services

BSR Reference

20-05-94

Description

Formwork using steel shetters in floors including joists and props

Unit

Resource Unit

Wastag

M2

Quantit
73.15

1.00

73.15

Painter M2

0.0%

1.10

40.00

44.00

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. sheet 18 B.W.G M2

0.0%

0.01

506.00

5.06

Mould oil M2

0.0%

0.30

10.00

3.00

Props (bamboo) 3 - 4 m M2

0.0%

0.50

80.00

40.00

Timb.cl.B planks 25mm M2

0.0%

1.10

300.00

330.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.40

45.00

18.00

396.06

Plant Rate

0.00

Unit Rate(Direct Labour)

473.06

Unit Rate (Labour Sub Con)

469.21

BSR Reference

20-06-00

Description

Roof covering using calicut tiles, without timber strucutre

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M2

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

2.00

1.00

2.00

Unskilled Labour M2

0.0%

0.07

30.00

2.10

Calicut pattern flat tiles M2

0.0%

10.00

12.00

120.00

120.00
0.00

Unit Rate(Direct Labour)

122.10

Unit Rate (Labour Sub Con)

122.00

Wednesday, March 29, 2006

Page 155 of 395

Southern Province Engineering Services

BSR Reference

20-06-01

Description

Roof covering using Asbestos sheets, without timber strucutre

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

63.27

1.00

63.27

Carpenter M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.02

30.00

30.60

Corrugated asbestos sheet M2

0.0%

1.17

220.00

256.74

Drive Screws and washers M2

0.0%

2.15

8.00

17.20

Timber beams Class A M2

0.0%

0.01

30,000.00

300.00

Wood Preservative M2

0.0%

0.07

110.00

7.70

Material Rate

581.64

Plant Rate

0.00

Unit Rate(Direct Labour)

648.24

Unit Rate (Labour Sub Con)

644.91

BSR Reference

20-06-02

Description

Roof covering using micro concrete tiles, without timber strucutre

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

2.00

1.00

2.00

Unskilled Labour M2

0.0%

0.07

30.00

2.10

Material Rate

0.00

Unit Rate(Direct Labour)

2.10

Plant Rate

0.00

Unit Rate (Labour Sub Con)

2.00

BSR Reference

20-06-03

Description

Roof covering using GI sheets, without timber strucutre

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

56.29

1.00

56.29

Carpenter M2

0.0%

0.65

45.00

29.25

Unskilled Labour M2

0.0%

1.00

30.00

30.00

Drive Screws and washers M2

0.0%

3.00

8.00

24.00

G.I.sheet 24 B.W.G. M2

0.0%

1.20

320.00

384.00

Timber beams Class A M2

0.0%

0.01

30,000.00

300.00

Wood Preservative M2

0.0%

0.08

110.00

8.80

716.80
0.00

Unit Rate(Direct Labour)

776.05

Unit Rate (Labour Sub Con)

773.09

Wednesday, March 29, 2006

Page 156 of 395

Southern Province Engineering Services

BSR Reference

20-06-04

Description

Roof ridge using clay ridge tiles, and 1:1:6 cement:lime:sand mortar

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

39.19

1.00

39.19

Carpenter M

0.0%

0.55

45.00

24.75

Unskilled Labour M

0.0%

0.55

30.00

16.50

Cement M

0.0%

0.09

340.00

30.60

Ridge tile calicut pattern Gr.I M

0.0%

2.50

20.00

50.00

Sand M

0.0%

0.01

350.00

5.25

Slaked lime M

0.0%

0.00

2,850.00

8.55

Colouring powder M

0.0%

3.50

1.00

3.50

Material Rate

94.40

Plant Rate

0.00

BSR Reference

20-06-05

Description

Roof ridge using Asbestos ridge units

Unit Rate(Direct Labour)

139.15

Unit Rate (Labour Sub Con)

137.09

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

35.63

1.00

35.63

Carpenter M

0.0%

0.50

45.00

22.50

Unskilled Labour M

0.0%

0.50

30.00

15.00

Close fitting asbestos ridging M

0.0%

1.00

210.00

210.00

G.I hook bolts 8mm*115mm M

0.0%

4.00

6.00

24.00

Material Rate
Plant Rate

234.00
0.00

Unit Rate(Direct Labour)

271.50

Unit Rate (Labour Sub Con)

269.63

BSR Reference

20-06-10

Description

Timber for roof, 50X100mm imported timber (Kempus or similar) rafters

Unit

Resource Unit

Wastag

Quantit

Rate Type

Carpenter M

0.0%

0.15

45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Amount

16.25
5.00

Wednesday, March 29, 2006

Page 157 of 395

Southern Province Engineering Services

BSR Reference

20-06-11

Description

Timber for roof, 50X125mm imported timber (Kempus or similar) rafters

Unit

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.25
5.00

BSR Reference

20-06-12

Description

Timber for roof, 50X150mm imported timber (Kempus or similar) ridge plate

Unit

Amount

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.25
5.00

BSR Reference

20-06-13

Description

Timber for roof, 50X175mm imported timber (Kempus or similar) ridge plate

Unit

Amount

Resource Unit

Wastag

Quantit

Rate Type

Carpenter M

0.0%

0.15

45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Amount

16.25
5.00

Wednesday, March 29, 2006

Page 158 of 395

Southern Province Engineering Services

BSR Reference

20-06-14

Description

Timber for roof, 100X75mm imported timber (Kempus or similar) wall plate

Unit

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.25
5.00

BSR Reference

20-06-15

Description

Timber for roof, 75X125mm imported timber (Kempus or similar) intermediate beam

Unit

Amount

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.25
5.00

BSR Reference

20-06-16

Description

Timber for roof, 100X150mm imported timber (Kempus or similar)main beam

Unit

Amount

Resource Unit

Wastag

Quantit

Rate Type

Carpenter M

0.0%

0.15

45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Amount

16.25
5.00

Wednesday, March 29, 2006

Page 159 of 395

Southern Province Engineering Services

BSR Reference

20-06-17

Description

Timber for roof, 100X200mm imported timber (Kempus or similar)main beam

Unit

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-06-18

Description

Timber for roof, 50X100mm ordinary coconut rafters

Material Rate
Plant Rate

Unit

Amount

16.25
5.00

Resource Unit

Wastag

Carpenter M

0.0%

0.15

45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

timber(coconut) rafter M

0.0%

1.10

50.00

55.00

Nails M

0.0%

5.00

1.00

5.00

55.00
0.00

Quantit

Rate Type

Amount

Unit Rate(Direct Labour)

71.25

Unit Rate (Labour Sub Con)

60.00

BSR Reference

20-06-19

Description

Timber for roof, 50X125mm ordinary coconut beams

Unit

Resource Unit

Wastag

Quantit

Rate Type

Carpenter M

0.0%

0.15

45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Amount

16.25
5.00

Wednesday, March 29, 2006

Page 160 of 395

Southern Province Engineering Services

BSR Reference

20-06-20

Description

Timber for roof, 50X100mm local timber (Kempus or similar) rafters

Unit

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-06-21

Description

Timber for roof, 50X125mm local timber (Kempus or similar) rafters

Unit

Amount

16.25
5.00

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-06-22

Description

Timber for roof, 50X150mm local timber (Kempus or similar) ridge plat

Unit

Amount

16.25
5.00

Resource Unit

Wastag

Quantit

Rate Type

Carpenter M

0.0%

0.15

45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Amount

16.25
5.00

Wednesday, March 29, 2006

Page 161 of 395

Southern Province Engineering Services

BSR Reference

20-06-23

Description

Timber for roof, 50X175mm loca timber (Kempus or similar) ridge plate

Unit

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-06-24

Description

Timber for roof, 100X75mm local timber (Kempus or similar) wall plate

Unit

Amount

16.25
5.00

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.25
5.00

BSR Reference

20-06-25

Description

Timber for roof, 75X125mm local timber (Kempus or similar) intermediate beam

Unit

Amount

Resource Unit

Wastag

Quantit

Rate Type

Carpenter M

0.0%

0.15

45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Amount

16.25
5.00

Wednesday, March 29, 2006

Page 162 of 395

Southern Province Engineering Services

BSR Reference

20-06-26

Description

Timber for roof, 100X150mm local timber (Kempus or similar)main beam

Unit

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-06-27

Description

Timber for roof, 100X200mm local timber (Kempus or similar)main beam

Unit

Amount

16.25
5.00

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.15

Rate Type
45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-06-28

Description

Timber for roof, 50X25mm local timber reepers

Unit

Amount

16.25
5.00

Resource Unit

Wastag

Quantit

Rate Type

Carpenter M

0.0%

0.10

45.00

4.50

Unskilled Labour M

0.0%

0.10

30.00

3.00

Nails M

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Amount

12.50
5.00

Wednesday, March 29, 2006

Page 163 of 395

Southern Province Engineering Services

BSR Reference

20-06-40

Description

Ceiling Structurel - Asbestos flat sheets

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Carpenter M2

0.0%

3.00

45.00

135.00

Mason M2

0.0%

0.60

45.00

27.00

Painter M2

0.0%

1.00

40.00

40.00

Unskilled Labour M2

0.0%

4.75

30.00

142.50

Cover moulding [63mm*40mm] M2

0.0%

1.70

45.00

76.50

GI clout nails 20mm M2

0.0%

0.10

50.00

5.00

Screws Brass 40mm x gauge8 M2

0.0%

25.00

2.50

62.50

M2

0.0%

3.60

9.00

32.40

Timber beams Class A M2

0.0%

0.03

30,000.00

900.00

Wood plugs M2

0.0%

2.50

80.00

200.00

Wood Preservative M2

0.0%

1.50

110.00

165.00

Nails M2

0.0%

25.00

1.00

25.00

Timb. beadings 12mm*12mm class 1

Material Rate
Plant Rate

1,441.40
0.00

Unit Rate(Direct Labour)

1,810.90

Unit Rate (Labour Sub Con)

1,466.40

Wednesday, March 29, 2006

Page 164 of 395

Southern Province Engineering Services

BSR Reference

20-06-41

Description

Ceiling material - Asbestos flat sheets

Unit

Resource Unit
Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

0.0%

201.88

1.00

201.88

Carpenter M

0.0%

0.15

45.00

6.75

Carpenter M2

0.0%

2.00

45.00

90.00

Painter M2

0.0%

1.00

40.00

40.00

Unskilled Labour M

0.0%

0.15

30.00

4.50

Unskilled Labour M2

0.0%

2.75

30.00

82.50

asbestos plain ceiling sheet M2

0.0%

1.08

200.00

215.60

Brass screws [40mm] gauge 8 M2

0.0%

5.30

2.50

13.25

Cover moulding [63mm*40mm] M2

0.0%

1.00

45.00

45.00

Emulsion M2

0.0%

0.04

200.00

8.00

GI clout nails 20mm M2

0.0%

0.01

50.00

0.50

Paint primer Alkali resisting M2

0.0%

0.02

250.00

5.00

Timber 40mm to 50mm*12mm class 1 M2

0.0%

2.10

26.00

54.60

Timber beams Class A M2

0.0%

0.01

30,000.00

390.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.03

45.00

1.35

Wood plugs M2

0.0%

1.50

80.00

120.00

Wood Preservative M2

0.0%

0.08

110.00

9.24

Cement sand scaffolding and brushes M2

0.0%

2.50

1.00

2.50

0.0%

5.00

1.00

5.00

Nails M

Material Rate
Plant Rate

862.54
0.00

Unit Rate(Direct Labour)

1,093.79

Unit Rate (Labour Sub Con)

1,071.91

Wednesday, March 29, 2006

Page 165 of 395

Southern Province Engineering Services

BSR Reference

20-06-42

Description

Ceiling material - Timber 12mm thick Lunumedella

Unit

Resource Unit

Wastag

Labour Sub-Contract Rate M2

M2

Quantit

Rate Type

Amount

0.0%

71.25

1.00

71.25

Carpenter M

0.0%

0.10

45.00

4.50

Carpenter M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.00

30.00

30.00

Unskilled Labour M

0.0%

0.15

30.00

4.50

Lunumidella 150mm*20mm M2

0.0%

1.10

270.00

297.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.00

45.00

0.18

0.0%

5.00

1.00

5.00

0.0%

2.00

1.00

2.00

Nails M
Scafolding M2

Material Rate

297.18

Plant Rate

0.00

BSR Reference

20-06-43

Description

Ceiling material - Gypsum boards

Unit Rate(Direct Labour)

388.18

Unit Rate (Labour Sub Con)

375.43

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

71.25

1.00

71.25

Carpenter M2

0.0%

1.00

45.00

45.00

Carpenter M

0.0%

0.15

45.00

6.75

Unskilled Labour M

0.0%

0.15

30.00

4.50

Unskilled Labour M2

0.0%

1.00

30.00

30.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.00

45.00

0.18

0.0%

5.00

1.00

5.00

0.0%

2.00

1.00

2.00

Nails M
Scafolding M2

Material Rate

0.18

Unit Rate(Direct Labour)

93.43

Plant Rate

0.00

Unit Rate (Labour Sub Con)

78.43

Wednesday, March 29, 2006

Page 166 of 395

Southern Province Engineering Services

BSR Reference

20-06-44

Description

Ceiling material - flat fiber sheets 5mm thick

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

71.25

1.00

71.25

Carpenter M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.00

30.00

30.00

Wire nail S.W.G. 4 to 18 M2

0.0%

0.00

45.00

0.18

Scafolding M2

0.0%

2.00

1.00

2.00

Material Rate

0.18

Unit Rate(Direct Labour)

77.18

Plant Rate

0.00

Unit Rate (Labour Sub Con)

73.43

BSR Reference

20-07-50

Description

Wall plaster using 1:1:6 Cement:lime:sand mix, semi rough

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

64.55

1.00

64.55

Mason M2

0.0%

0.65

45.00

29.25

Unskilled Labour M2

0.0%

1.29

30.00

38.70

Boiled lime M2

0.0%

2.40

4.00

9.60

Cement M2

0.0%

0.09

340.00

29.24

Sand M2

0.0%

0.02

350.00

7.35

46.19
0.00

Unit Rate(Direct Labour)

114.14

Unit Rate (Labour Sub Con)

110.74

Wednesday, March 29, 2006

Page 167 of 395

Southern Province Engineering Services

BSR Reference

20-07-51

Description

Wall plaster using 1:1:6 Cement:lime:sand mix, smooth with lime putty

Unit

Resource Unit

Wastag

M2

Quantit
92.63

1.00

92.63

Mason M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.75

30.00

52.50

Boiled lime M2

0.0%

0.03

4.00

0.12

Cement M2

0.0%

0.09

340.00

30.60

Sand M2

0.0%

0.02

350.00

7.35

Plant Rate

38.07
0.00

Unit Rate(Direct Labour)

135.57

Unit Rate (Labour Sub Con)

130.70

BSR Reference

20-07-52

Description

Wall plaster using 1:4:8 Cement:soil:sand mix, semi rough

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Mason M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.25

30.00

37.50

Cement M2

0.0%

0.09

340.00

29.24

Clay M2

0.0%

0.01

120.00

1.44

Sand M2

0.0%

0.02

350.00

8.40

39.08
0.00

Unit Rate(Direct Labour)


Unit Rate (Labour Sub Con)

121.58
39.08

Wednesday, March 29, 2006

Page 168 of 395

Southern Province Engineering Services

BSR Reference

20-07-53

Description

Wall plaster using 1:4:8 Cement:soil:sand mix, smooth with lime putty

Unit

Resource Unit

Material Rate

Wastag

Quantit

Rate Type

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.25

30.00

37.50

Boiled lime M2

0.0%

3.00

4.00

12.00

Cement M2

0.0%

0.09

340.00

29.24

Clay M2

0.0%

0.01

120.00

1.44

Sand M2

0.0%

0.02

350.00

8.40

Unit Rate(Direct Labour)

0.00

20-07-54

Description

Wall plaster using 1:3 Cement:sand mix, smooth with cement slurry

Unit

Resource Unit

Wastag

M2

Quantit

Amount

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.25

30.00

37.50

Cement M2

0.0%

0.09

340.00

29.24

Sand M2

0.0%

0.01

350.00

3.15

Unit Rate(Direct Labour)

0.00

114.89

Unit Rate (Labour Sub Con)

20-07-55

Description

Ceremic wall tiling using common method, local tiles white

Unit

Resource Unit

Plant Rate

Rate Type

0.0%

BSR Reference

Material Rate

51.08

Mason M2

32.39

Plant Rate

133.58

Unit Rate (Labour Sub Con)

BSR Reference

Material Rate

Amount

Mason M2

51.08

Plant Rate

M2

Wastag

32.39

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

28.36

1.00

28.36

Mason M2

0.0%

0.33

45.00

14.85

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.02

350.00

5.95

Tile glazed 108*108mm M2

0.0%

92.00

5.00

460.00

533.95
0.00

Unit Rate(Direct Labour)

563.80

Unit Rate (Labour Sub Con)

562.31

Wednesday, March 29, 2006

Page 169 of 395

Southern Province Engineering Services

BSR Reference

20-07-56

Description

Ceramic wall tiling using tile adhesive, local tiles, white

Unit

Resource Unit

Wastag

M2

Quantit
28.36

1.00

28.36

Mason M2

0.0%

0.33

45.00

14.85

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.02

350.00

5.95

Tile glazed 108*108mm M2

0.0%

92.00

5.00

460.00

533.95

Plant Rate

0.00

Unit Rate(Direct Labour)

563.80

Unit Rate (Labour Sub Con)

562.31

BSR Reference

20-07-57

Description

Ceremic wall tiling using common method, local tiles colour

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

28.36

1.00

28.36

Mason M2

0.0%

0.33

45.00

14.85

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.02

350.00

5.95

Material Rate

73.95

Plant Rate

0.00

Unit Rate(Direct Labour)

103.80

Unit Rate (Labour Sub Con)

102.31

BSR Reference

20-07-58

Description

Ceramic wall tiling using tile adhesive, local tiles, colour

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

28.36

1.00

28.36

Mason M2

0.0%

0.33

45.00

14.85

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.02

350.00

5.95

73.95
0.00

Unit Rate(Direct Labour)

103.80

Unit Rate (Labour Sub Con)

102.31

Wednesday, March 29, 2006

Page 170 of 395

Southern Province Engineering Services

BSR Reference

20-07-70

Description

Brick paving for cement rendering

Unit

Resource Unit

Material Rate

Wastag

Quantit

Rate Type

0.0%

0.50

45.00

22.50

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Brick : common M2

0.0%

0.04

2,200.00

88.00

Unit Rate(Direct Labour)

0.00

125.50

Unit Rate (Labour Sub Con)

88.00

BSR Reference

20-07-71

Description

Cement rendering using 1:3 cement:sand mix, smooth with neat cement slurry

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

79.80

1.00

79.80

Mason M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement M2

0.0%

0.12

340.00

39.10

Sand M2

0.0%

0.01

350.00

5.25

44.35

Plant Rate

0.00

Unit Rate(Direct Labour)

128.35

Unit Rate (Labour Sub Con)

124.15

BSR Reference

20-07-72

Description

Cement rendering using 1:4 cement:sand mix, smooth with neat cement slurry

Unit

Resource Unit

Plant Rate

Amount

Labour Sub-Contract Rate M2

Material Rate

Material Rate

Amount

Mason M2

88.00

Plant Rate

M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

79.80

1.00

79.80

Mason M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement M2

0.0%

0.12

340.00

39.10

Sand M2

0.0%

0.02

350.00

5.60

44.70
0.00

Unit Rate(Direct Labour)

128.70

Unit Rate (Labour Sub Con)

124.50

Wednesday, March 29, 2006

Page 171 of 395

Southern Province Engineering Services

BSR Reference

20-07-73

Description

Cement rendering using 1:5 cement:sand mix, smooth with neat cement slurry

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

79.80

1.00

79.80

Mason M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement M2

0.0%

0.12

340.00

39.10

Sand M2

0.0%

0.02

350.00

7.00

Material Rate

46.10

Plant Rate

0.00

Unit Rate(Direct Labour)

130.10

Unit Rate (Labour Sub Con)

125.90

BSR Reference

20-07-74

Description

Cement rendering using 1:3 cement:sand mix, smooth with neat cement slurry, Colour

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

79.80

1.00

79.80

Mason M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement M2

0.0%

0.12

340.00

39.10

Colour pigment for cement M2

0.0%

0.07

200.00

14.60

Sand M2

0.0%

0.01

350.00

5.25

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

58.95
0.00

Unit Rate(Direct Labour)

142.95

Unit Rate (Labour Sub Con)

138.75

Wednesday, March 29, 2006

Page 172 of 395

Southern Province Engineering Services

BSR Reference

20-07-75

Description

Cement rendering using 1:4 cement:sand mix, smooth with neat cement slurry, Colour

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

79.80

1.00

79.80

Mason M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement M2

0.0%

0.12

340.00

39.10

Colour pigment for cement M2

0.0%

0.07

200.00

14.60

Sand M2

0.0%

0.02

350.00

5.60

Material Rate

59.30

Plant Rate

0.00

Unit Rate(Direct Labour)

143.30

Unit Rate (Labour Sub Con)

139.10

BSR Reference

20-07-76

Description

Cement rendering using 1:5 cement:sand mix, smooth with neat cement slurry, Colour

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

79.80

1.00

79.80

Mason M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement M2

0.0%

0.12

340.00

39.10

Colour pigment for cement M2

0.0%

0.07

200.00

14.60

Sand M2

0.0%

0.02

350.00

7.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

60.70
0.00

Unit Rate(Direct Labour)

144.70

Unit Rate (Labour Sub Con)

140.50

Wednesday, March 29, 2006

Page 173 of 395

Southern Province Engineering Services

BSR Reference

20-07-77

Description

Fixing floor tiles (local) including bedding but excluding concrete base

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

28.36

1.00

28.36

Mason M2

0.0%

0.33

45.00

14.85

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Cement M2

0.0%

0.20

340.00

68.00

Ceramic floor tile 200*200mm M2

0.0%

26.00

25.00

650.00

Sand M2

0.0%

0.02

350.00

5.95

Material Rate

723.95

Plant Rate

0.00

Unit Rate(Direct Labour)

753.80

Unit Rate (Labour Sub Con)

752.31

BSR Reference

20-07-78

Description

Fixing floor tiles (imported) including bedding but excluding concrete base

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

28.36

1.00

28.36

Mason M2

0.0%

0.33

45.00

14.85

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.02

350.00

5.95

73.95
0.00

Unit Rate(Direct Labour)

103.80

Unit Rate (Labour Sub Con)

102.31

Wednesday, March 29, 2006

Page 174 of 395

Southern Province Engineering Services

BSR Reference

20-07-90

Description

Timber doors, 750X2100mm size 50X100 frame with imported timber, plywood door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

950.00

1.00

950.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Plywood door Nos.

0.0%

1.00

1,500.00

1,500.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

2,820.00

Plant Rate

0.00

Unit Rate(Direct Labour)

2,970.00

Unit Rate (Labour Sub Con)

3,920.00

BSR Reference

20-08-01

Description

Timber doors, 900X2100mm size 50X100 frame with imported timber, plywood door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

950.00

1.00

950.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Plywood door Nos.

0.0%

1.00

1,500.00

1,500.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

2,820.00
0.00

Unit Rate(Direct Labour)

2,970.00

Unit Rate (Labour Sub Con)

3,920.00

Wednesday, March 29, 2006

Page 175 of 395

Southern Province Engineering Services

BSR Reference

20-08-02

Description

Timber doors, 1000X2100mm size 50X100 frame with imported timber, plywood door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

1,010.00

1.00

1,010.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Plywood door Nos.

0.0%

1.00

1,500.00

1,500.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

2,820.00

Plant Rate

0.00

Unit Rate(Direct Labour)

2,970.00

Unit Rate (Labour Sub Con)

3,980.00

BSR Reference

20-08-03

Description

Timber doors, 750X2100mm size 75X100 frame with imported timber, plywood door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

950.00

1.00

950.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Plywood door Nos.

0.0%

1.00

1,500.00

1,500.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

2,820.00
0.00

Unit Rate(Direct Labour)

2,970.00

Unit Rate (Labour Sub Con)

3,920.00

Wednesday, March 29, 2006

Page 176 of 395

Southern Province Engineering Services

BSR Reference

20-08-04

Description

Timber doors, 900X2100mm size 75X100 frame with imported timber, plywood door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

950.00

1.00

950.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Plywood door Nos.

0.0%

1.00

1,500.00

1,500.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

2,820.00

Plant Rate

0.00

Unit Rate(Direct Labour)

2,970.00

Unit Rate (Labour Sub Con)

3,920.00

BSR Reference

20-08-05

Description

Timber doors, 1000X2100mm size 75X100 frame with imported timber, plywood door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

1,010.00

1.00

1,010.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Plywood door Nos.

0.0%

1.00

1,500.00

1,500.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

2,820.00
0.00

Unit Rate(Direct Labour)

2,821.00

Unit Rate (Labour Sub Con)

3,831.00

Wednesday, March 29, 2006

Page 177 of 395

Southern Province Engineering Services

BSR Reference

20-08-06

Description

Timber doors, 750X2100mm size 75X100 frame with imported timber, timber pannel door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

2,850.00

1.00

2,850.00

Item Sub Contract Rate Nos.

0.0%

3,000.00

1.00

3,000.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

1.60

1,000.00

1,600.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

2,920.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,070.00

Unit Rate (Labour Sub Con)

8,920.00

BSR Reference

20-08-07

Description

Timber doors, 900X2100mm size 75X100 frame with imported timber, timber pannel door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

3,425.00

1.00

3,425.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

1.90

1,000.00

1,900.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

3,220.00
0.00

Unit Rate(Direct Labour)

3,370.00

Unit Rate (Labour Sub Con)

6,795.00

Wednesday, March 29, 2006

Page 178 of 395

Southern Province Engineering Services

BSR Reference

20-08-08

Description

Timber doors, 1000X2100mm size 75X100 frame with imported timber, timber pannel door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

3,675.00

1.00

3,675.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.10

1,000.00

2,100.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

3,420.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,570.00

Unit Rate (Labour Sub Con)

7,245.00

BSR Reference

20-08-09

Description

Timber doors, 1150X2100mm size 75X100 frame with imported timber, timber pannel door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

4,120.00

1.00

4,120.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.50

1,000.00

2,500.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

3,820.00
0.00

Unit Rate(Direct Labour)

3,970.00

Unit Rate (Labour Sub Con)

8,090.00

Wednesday, March 29, 2006

Page 179 of 395

Southern Province Engineering Services

BSR Reference

20-08-10

Description

Timber doors, 900X2400mm size 75X100 frame with imported timber, timber pannel door,

Unit

Nos.

with top opening of 300mm high with slates or similar

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

3,750.00

1.00

3,750.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.20

1,000.00

2,200.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

3,520.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,670.00

Unit Rate (Labour Sub Con)

7,420.00

BSR Reference

20-08-11

Description

Timber doors, 1000X2400mm size 75X100 frame with imported timber, timber pannel door,

Unit

Nos.

with top opening of 300mm high with slates or similar

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

4,000.00

1.00

4,000.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.40

1,000.00

2,400.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

3,720.00
0.00

Unit Rate(Direct Labour)

3,870.00

Unit Rate (Labour Sub Con)

7,870.00

Wednesday, March 29, 2006

Page 180 of 395

Southern Province Engineering Services

BSR Reference

20-08-12

Description

Timber doors, 1150X2400mm size 75X100 frame with imported timber, timber pannel door ,

Unit

Nos.

with top opening of 300mm high with slates or similar

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

4,700.00

1.00

4,700.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 12mm Gauge 6mm Nos.

0.0%

40.00

0.80

32.00

Timber plank 25mm class A Nos.

0.0%

2.80

1,000.00

2,800.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

4,052.00

Plant Rate

0.00

Unit Rate(Direct Labour)

4,202.00

Unit Rate (Labour Sub Con)

8,902.00

BSR Reference

20-08-13

Description

Timber doors, 750X2100mm size 75X100 frame with local timber, timber pannel door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

2,850.00

1.00

2,850.00

Item Sub Contract Rate Nos.

0.0%

2,850.00

1.00

2,850.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

1.60

1,000.00

1,600.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

2,920.00
0.00

Unit Rate(Direct Labour)

3,070.00

Unit Rate (Labour Sub Con)

8,770.00

Wednesday, March 29, 2006

Page 181 of 395

Southern Province Engineering Services

BSR Reference

20-08-14

Description

Timber doors, 900X2100mm size 75X100 frame with local timber, timber pannel door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

3,500.00

1.00

3,500.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

1.90

1,000.00

1,900.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

3,220.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,370.00

Unit Rate (Labour Sub Con)

6,870.00

BSR Reference

20-08-15

Description

Timber doors, 1000X2100mm size 75X100 frame with local timber, timber pannel door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

3,675.00

1.00

3,675.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.10

1,000.00

2,100.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

3,420.00
0.00

Unit Rate(Direct Labour)

3,570.00

Unit Rate (Labour Sub Con)

7,245.00

Wednesday, March 29, 2006

Page 182 of 395

Southern Province Engineering Services

BSR Reference

20-08-16

Description

Timber doors, 1150X2100mm size 75X100 frame with local timber, timber pannel door

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

4,000.00

1.00

4,000.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.40

1,000.00

2,400.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

3,720.00

Plant Rate

0.00

Unit Rate(Direct Labour)

3,870.00

Unit Rate (Labour Sub Con)

7,870.00

BSR Reference

20-08-17

Description

Timber doors, 900X2400mm size 75X100 frame with local timber, timber pannel door, slates

Unit

Nos.

on top

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

3,800.00

1.00

3,800.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.16

1,000.00

2,160.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

3,480.00
0.00

Unit Rate(Direct Labour)

3,630.00

Unit Rate (Labour Sub Con)

7,430.00

Wednesday, March 29, 2006

Page 183 of 395

Southern Province Engineering Services

BSR Reference

20-08-18

Description

Timber doors, 1000X2 400mm size 75X100 frame with local timber, timber pannel

Unit

Nos.

door,slates on top

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

4,200.00

1.00

4,200.00

Item Sub Contract Rate Nos.

0.0%

4,000.00

1.00

4,000.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.40

1,000.00

2,400.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate

3,720.00

Plant Rate

Unit Rate(Direct Labour)

0.00

3,870.00

Unit Rate (Labour Sub Con)

12,070.00

BSR Reference

20-08-19

Description

Timber doors, 1150X2400mm size 75X100 frame with local timber, timber pannel door,

Unit

Nos.

slates on top

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

4,700.00

1.00

4,700.00

Hinge butt brass 100mm 63mm Nos.

0.0%

3.00

40.00

120.00

Lock mortice union single sash Nos.

0.0%

1.00

1,100.00

1,100.00

Screws Brass 40mm x gauge8 Nos.

0.0%

40.00

2.50

100.00

Timber plank 25mm class A Nos.

0.0%

2.76

1,000.00

2,760.00

Machine planing of timber Nos.

0.0%

100.00

1.00

100.00

Spure stones rowl plugs, Dowels, sand Nos.

0.0%

50.00

1.00

50.00

Material Rate
Plant Rate

4,080.00
0.00

Unit Rate(Direct Labour)

4,230.00

Unit Rate (Labour Sub Con)

8,930.00

Wednesday, March 29, 2006

Page 184 of 395

Southern Province Engineering Services

BSR Reference

20-08-20

Description

Timber glazed windows, 1200X1200mm size, 50X100mm frame, imported timber, sahses

Unit

Nos.

with 25X100mm rails, 5mm thick glass

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

3,135.00

1.00

3,135.00

Labour Sub-Contract Rate Nos.

0.0%

2,268.60

1.00

2,268.60

Bolt barrel brass 150mm

Nos.

0.0%

2.00

70.00

140.00

Bolt skeleton brass 300mm Nos.

0.0%

2.00

90.00

180.00

Glass pane clear 3mm Nos.

0.0%

1.44

192.00

276.48

Hinge parliamentary brass 125mm Nos.

0.0%

4.00

56.00

224.00

Screws Brass 25mm X gauge8 Nos.

0.0%

15.00

1.80

27.00

Timb. Cl.A 20mm thick plank Nos.

0.0%

0.40

850.00

340.00

Nos.

0.0%

6.00

69.00

414.00

Timb.Cl.1 fillet 12mm*12mmiimported Nos.

0.0%

9.00

9.00

81.00

Timber plank 32mm class A Nos.

0.0%

0.72

1,400.00

1,008.00

Sand paper Nos.

0.0%

30.00

1.00

30.00

Timb.Cl.1 40mm*40mm sash bars

Material Rate

2,690.48

Plant Rate

0.00

Unit Rate(Direct Labour)

2,720.48

Unit Rate (Labour Sub Con)

8,124.08

BSR Reference

20-08-21

Description

Timber glazed windows, 1800X1200mm size, 50X100mm frame, imported timber, sahses

Unit

Nos.

with 25X100mm rails, 5mm thick glass

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

4,615.00

1.00

4,615.00

Labour Sub-Contract Rate Nos.

0.0%

2,268.60

1.00

2,268.60

Bolt barrel brass 150mm

Nos.

0.0%

3.00

70.00

210.00

Bolt skeleton brass 300mm Nos.

0.0%

3.00

90.00

270.00

Glass pane clear 3mm Nos.

0.0%

2.16

192.00

414.72

Hinge parliamentary brass 125mm Nos.

0.0%

6.00

56.00

336.00

Screws Brass 25mm X gauge8 Nos.

0.0%

25.00

1.80

45.00

Timb. Cl.A 20mm thick plank Nos.

0.0%

0.60

850.00

510.00

Nos.

0.0%

9.00

69.00

621.00

Timb.Cl.1 fillet 12mm*12mmiimported Nos.

0.0%

13.00

9.00

117.00

Timber plank 32mm class A Nos.

0.0%

1.08

1,400.00

1,512.00

Sand paper Nos.

0.0%

30.00

1.00

30.00

Timb.Cl.1 40mm*40mm sash bars

Material Rate

4,035.72

Unit Rate(Direct Labour)

4,065.72

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

10,949.32

Page 185 of 395

Southern Province Engineering Services

BSR Reference

20-08-22

Description

Timber glazed windows, 1200X1500mm size, 50X100mm frame, imported timber, sahses

Unit

Nos.

with 25X100mm rails, 5mm thick glass, 300mm high top opening with slates or similar

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate Nos.

0.0%

3,965.00

1.00

3,965.00

Labour Sub-Contract Rate Nos.

0.0%

2,268.60

1.00

2,268.60

Bolt barrel brass 150mm

Nos.

0.0%

2.00

70.00

140.00

Bolt skeleton brass 300mm Nos.

0.0%

2.00

90.00

180.00

Glass pane clear 3mm Nos.

0.0%

1.80

192.00

345.60

Hinge parliamentary brass 125mm Nos.

0.0%

4.00

56.00

224.00

Screws Brass 25mm X gauge8 Nos.

0.0%

15.00

1.80

27.00

Timb. Cl.A 20mm thick plank Nos.

0.0%

0.50

850.00

425.00

Nos.

0.0%

6.00

69.00

414.00

Timb.Cl.1 fillet 12mm*12mmiimported Nos.

0.0%

11.00

9.00

99.00

Timber plank 32mm class A Nos.

0.0%

1.02

1,400.00

1,428.00

Sand paper Nos.

0.0%

30.00

1.00

30.00

Timb.Cl.1 40mm*40mm sash bars

Material Rate

3,282.60

Plant Rate

0.00

Unit Rate(Direct Labour)

3,312.60

Unit Rate (Labour Sub Con)

9,546.20

BSR Reference

20-08-23

Description

Timber glazed windows, 1800X1500mm size, 50X100mm frame, imported timber, sahses

Unit

M2

with 25X100mm rails, 5mm thick glass , 300mm high top opening with slates or similar

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate M2

0.0%

4,970.00

1.00

4,970.00

Labour Sub-Contract Rate M2

0.0%

2,268.60

1.00

2,268.60

Bolt barrel brass 150mm

M2

0.0%

3.00

70.00

210.00

Bolt skeleton brass 300mm M2

0.0%

3.00

90.00

270.00

Glass pane clear 3mm M2

0.0%

2.16

192.00

414.72

Hinge parliamentary brass 125mm M2

0.0%

6.00

56.00

336.00

Screws Brass 25mm X gauge8 M2

0.0%

25.00

1.80

45.00

Timb. Cl.A 20mm thick plank M2

0.0%

0.80

850.00

680.00

M2

0.0%

9.00

69.00

621.00

Timb.Cl.1 fillet 12mm*12mmiimported M2

0.0%

13.00

9.00

117.00

Timber plank 32mm class A M2

0.0%

1.53

1,400.00

2,142.00

Sand paper M2

0.0%

30.00

1.00

30.00

Timb.Cl.1 40mm*40mm sash bars

Material Rate

4,835.72

Unit Rate(Direct Labour)

4,865.72

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

12,104.32

Page 186 of 395

Southern Province Engineering Services

BSR Reference

20-08-24

Description

Timber glazed windows, 1800X1500mm size, 50X100mm frame, local timber(Jak or

Unit

M2

Mahagony), sahses with 25X100mm rails, 5mm thick glass

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate M2

0.0%

3,135.00

1.00

3,135.00

Labour Sub-Contract Rate M2

0.0%

2,268.60

1.00

2,268.60

Bolt barrel brass 150mm

M2

0.0%

2.00

70.00

140.00

Bolt skeleton brass 300mm M2

0.0%

2.00

90.00

180.00

Glass pane clear 3mm M2

0.0%

1.44

192.00

276.48

Hinge parliamentary brass 125mm M2

0.0%

4.00

56.00

224.00

Screws Brass 25mm X gauge8 M2

0.0%

15.00

1.80

27.00

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

9.00

10.00

90.00

Timb. Cl.A 20mm thick plank M2

0.0%

0.40

850.00

340.00

M2

0.0%

6.00

69.00

414.00

Timber plank 32mm class B M2

0.0%

0.72

450.00

324.00

Sand paper M2

0.0%

30.00

1.00

30.00

Timb.Cl.1 40mm*40mm sash bars

Material Rate

2,015.48

Plant Rate

0.00

Unit Rate(Direct Labour)

2,045.48

Unit Rate (Labour Sub Con)

7,449.08

BSR Reference

20-08-25

Description

Timber glazed windows, 1200X1500mm size, 50X100mm frame, local timber(Jak or

Unit

M2

Mahagony), sahses with 25X100mm rails, 5mm thick glass , 300mm high top opening with
slates or similar

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate M2

0.0%

4,615.00

1.00

4,615.00

Labour Sub-Contract Rate M2

0.0%

2,268.60

1.00

2,268.60

Bolt barrel brass 150mm

M2

0.0%

3.00

70.00

210.00

Bolt skeleton brass 300mm M2

0.0%

3.00

90.00

270.00

Glass pane clear 3mm M2

0.0%

2.16

192.00

414.72

Hinge parliamentary brass 125mm M2

0.0%

6.00

56.00

336.00

Screws Brass 25mm X gauge8 M2

0.0%

25.00

1.80

45.00

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

13.00

10.00

130.00

Timb. Cl.A 20mm thick plank M2

0.0%

0.60

850.00

510.00

M2

0.0%

9.00

69.00

621.00

Timber plank 32mm class B M2

0.0%

1.08

450.00

486.00

Sand paper M2

0.0%

30.00

1.00

30.00

Timb.Cl.1 40mm*40mm sash bars

Material Rate

3,022.72

Unit Rate(Direct Labour)

3,052.72

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

9,936.32

Page 187 of 395

Southern Province Engineering Services

BSR Reference

20-08-26

Description

Timber glazed windows, 1800X1500mm size, 50X100mm frame, local timber(Jak or

Unit

M2

Mahagony), sahses with 25X100mm rails, 5mm thick glass , 300mm high top opening with
slates or similar

Resource Unit

Wastag

Quantit

Rate Type

Amount

Item Sub Contract Rate M2

0.0%

3,965.00

1.00

3,965.00

Labour Sub-Contract Rate M2

0.0%

2,268.60

1.00

2,268.60

Bolt barrel brass 150mm

M2

0.0%

2.00

70.00

140.00

Bolt skeleton brass 300mm M2

0.0%

2.00

90.00

180.00

Glass pane clear 3mm M2

0.0%

1.80

192.00

345.60

Hinge parliamentary brass 125mm M2

0.0%

4.00

56.00

224.00

Screws Brass 25mm X gauge8 M2

0.0%

15.00

1.80

27.00

Timb. Cl.1 fillets 12mm*12mm local M2

0.0%

11.00

10.00

110.00

Timb. Cl.A 20mm thick plank M2

0.0%

0.50

850.00

425.00

M2

0.0%

6.00

69.00

414.00

Timber plank 32mm class B M2

0.0%

1.02

450.00

459.00

Sand paper M2

0.0%

30.00

1.00

30.00

Timb.Cl.1 40mm*40mm sash bars

Material Rate

2,324.60

Plant Rate

0.00

Unit Rate(Direct Labour)

2,354.60

Unit Rate (Labour Sub Con)

8,588.20

BSR Reference

20-09-40

Description

Fixing WC Ceylon ceramic with systen and necessary accessories

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

532.00

1.00

532.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cictern bracket Nos.

0.0%

1.00

60.00

60.00

Fitting for cistern Nos.

0.0%

1.00

400.00

400.00

Low leval cictern white Nos.

0.0%

1.00

1,200.00

1,200.00

Low level closet unit Nos.

0.0%

1.00

1,600.00

1,600.00

Stop cock brass 12mm Nos.

0.0%

1.00

75.00

75.00

Sand metal etc. Nos.

0.0%

7.00

1.00

7.00

Transport Nos.

0.0%

100.00

1.00

100.00

3,335.00
0.00

Unit Rate(Direct Labour)

4,002.00

Unit Rate (Labour Sub Con)

3,974.00

Wednesday, March 29, 2006

Page 188 of 395

Southern Province Engineering Services

BSR Reference

20-09-41

Description

Fixing WC Imported(Inidan) with systen and necessary accessories

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

532.00

1.00

532.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cictern bracket Nos.

0.0%

1.00

60.00

60.00

Fitting for cistern Nos.

0.0%

1.00

400.00

400.00

Stop cock brass 12mm Nos.

0.0%

1.00

75.00

75.00

Sand metal etc. Nos.

0.0%

7.00

1.00

7.00

Transport Nos.

0.0%

100.00

1.00

100.00

Material Rate

535.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,202.00

Unit Rate (Labour Sub Con)

1,174.00

BSR Reference

20-09-42

Description

Fixing WC imported (American Standard or Armitage Shank) close couple with systen and

Unit

Nos.

necessary accessories

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

532.00

1.00

532.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cictern bracket Nos.

0.0%

1.00

60.00

60.00

Fitting for cistern Nos.

0.0%

1.00

400.00

400.00

Stop cock brass 12mm Nos.

0.0%

1.00

75.00

75.00

Sand metal etc. Nos.

0.0%

7.00

1.00

7.00

Transport Nos.

0.0%

100.00

1.00

100.00

535.00
0.00

Unit Rate(Direct Labour)

1,202.00

Unit Rate (Labour Sub Con)

1,174.00

Wednesday, March 29, 2006

Page 189 of 395

Southern Province Engineering Services

BSR Reference

20-09-43

Description

Fixing WC imported (high standard) close couple with systen and necessary accessories

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

0.0%

532.00

1.00

532.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cictern bracket Nos.

0.0%

1.00

60.00

60.00

Fitting for cistern Nos.

0.0%

1.00

400.00

400.00

Stop cock brass 12mm Nos.

0.0%

1.00

75.00

75.00

Sand metal etc. Nos.

0.0%

7.00

1.00

7.00

Transport Nos.

0.0%

100.00

1.00

100.00

Material Rate

535.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,202.00

Unit Rate (Labour Sub Con)

1,174.00

BSR Reference

20-09-44

Description

Fixing wahsh basin Ceylon ceramic with necessary accessories using brackets

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

365.75

1.00

365.75

Plumber Nos.

0.0%

5.50

40.00

220.00

Unskilled Labour Nos.

0.0%

5.50

30.00

165.00

Kitchen sink 600*375*175mm Nos.

0.0%

1.00

1,800.00

1,800.00

Wash basin[M] bracket Nos.

0.0%

1.00

55.00

55.00

Cement etc Nos.

0.0%

5.00

1.00

5.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

1,855.00
0.00

Unit Rate(Direct Labour)

2,245.00

Unit Rate (Labour Sub Con)

2,225.75

Wednesday, March 29, 2006

Page 190 of 395

Southern Province Engineering Services

BSR Reference

20-09-45

Description

Fixing wahsh basin Ceylon ceramic Pedestal type with necessary accessories

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

617.50

1.00

617.50

Mason Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Wash basin [L] with pedestal white Nos.

0.0%

1.00

3,700.00

3,700.00

Cement Sand etc. Nos.

0.0%

10.00

1.00

10.00

Material Rate

3,700.00

Plant Rate

0.00

Unit Rate(Direct Labour)

4,360.00

Unit Rate (Labour Sub Con)

4,327.50

BSR Reference

20-09-46

Description

Fixing wahsh basin Imported (American Standard or Armitage Shank) Pedestal type with

Unit

Nos.

necessary accessories

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

617.50

1.00

617.50

Mason Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cement Sand etc. Nos.

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

660.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

627.50

BSR Reference

20-09-47

Description

Fixing wahsh basin Imported (high standard) Pedestal type with necessary accessories

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

617.50

1.00

617.50

Mason Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cement Sand etc. Nos.

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

660.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

627.50

Wednesday, March 29, 2006

Page 191 of 395

Southern Province Engineering Services

BSR Reference

20-09-50

Description

Fixing of good quality hand bidae

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

BSR Reference

20-09-51

Description

Fixing of Stop tap, Plumber or approved equivalent

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

BSR Reference

20-09-52

Description

Fixing of Bib tap, Plumber of approved equivalent

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

Wednesday, March 29, 2006

Page 192 of 395

Southern Province Engineering Services

BSR Reference

20-09-53

Description

Fixing wall tap for shower

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

BSR Reference

20-09-54

Description

Fixing of shower unit

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

BSR Reference

20-09-56

Description

Fixing of mixer tap for shower

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

Wednesday, March 29, 2006

Page 193 of 395

Southern Province Engineering Services

BSR Reference

20-09-57

Description

Fixing of telephone shower

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

BSR Reference

20-09-59

Description

Fixing of shower curtain

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

BSR Reference

20-09-60

Description

Fixing of soap dish

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

Wednesday, March 29, 2006

Page 194 of 395

Southern Province Engineering Services

BSR Reference

20-09-61

Description

Fixing of towel hanger

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

0.00

Unit Rate(Direct Labour)

95.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

25.00

BSR Reference

20-09-62

Description

Fixing of tooth brush holder

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

49.88

1.00

49.88

Plumber Nos.

0.0%

1.00

40.00

40.00

Plumber Nos.

0.0%

0.75

40.00

30.00

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Rawl plugs Nos.

0.0%

2.00

3.00

6.00

Tooth brush holder 200*100mm-white Nos.

0.0%

1.00

175.00

175.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

181.00
0.00

Unit Rate(Direct Labour)

330.50

Unit Rate (Labour Sub Con)

257.88

Wednesday, March 29, 2006

Page 195 of 395

Southern Province Engineering Services

BSR Reference

20-09-63

Description

Fixing of toilet paper roll hanger

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

49.88

1.00

49.88

Plumber Nos.

0.0%

0.75

40.00

30.00

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Rawl plugs Nos.

0.0%

2.00

3.00

6.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Other expenses Nos.

0.0%

25.00

1.00

25.00

Material Rate

6.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-09-70

Description

PVC water pipes 12mm dia, Type 1000

Resource Unit

Unit

Wastag

155.50
82.88

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

6.65

1.00

6.65

Plumber M

0.0%

0.10

40.00

4.00

Unskilled Labour M

0.0%

0.10

30.00

3.00

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

8.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.65

Wednesday, March 29, 2006

Page 196 of 395

Southern Province Engineering Services

BSR Reference

20-09-71

Description

PVC water pipes 20mm dia, Type 1000

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

6.65

1.00

6.65

Plumber M

0.0%

0.10

40.00

4.00

Unskilled Labour M

0.0%

0.10

30.00

3.00

PVC Pipe 20mm type 1000 M

0.0%

1.10

16.00

17.60

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate

17.60

Plant Rate

0.00

BSR Reference

20-09-72

Description

PVC water pipes 25mm dia,

Resource Unit

Unit Rate(Direct Labour)

25.60

Unit Rate (Labour Sub Con)

25.25

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

6.65

1.00

6.65

Plumber M

0.0%

0.10

40.00

4.00

Unskilled Labour M

0.0%

0.10

30.00

3.00

PVC Pipe 25mm type 1000 M

0.0%

1.10

26.00

28.60

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate

28.60

Plant Rate

0.00

BSR Reference

20-09-73

Description

PVC water pipes 32mm dia

Resource Unit

Unit Rate(Direct Labour)

36.60

Unit Rate (Labour Sub Con)

36.25

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.31

1.00

8.31

Plumber M

0.0%

0.13

40.00

5.00

Unskilled Labour M

0.0%

0.13

30.00

3.75

PVC Pipe 32mm type 1000 M

0.0%

1.10

42.00

46.20

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

Unit

46.20
0.00

Unit Rate(Direct Labour)

55.95

Unit Rate (Labour Sub Con)

55.51

Wednesday, March 29, 2006

Page 197 of 395

Southern Province Engineering Services

BSR Reference

20-09-74

Description

PVC water pipes 38mm dia

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.31

1.00

8.31

Plumber M

0.0%

0.13

40.00

5.00

Unskilled Labour M

0.0%

0.13

30.00

3.75

PVC Pipe 40mm type 1000 M

0.0%

1.10

61.00

67.10

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

67.10

Plant Rate

0.00

BSR Reference

20-09-75

Description

PVC water pipes 50mm dia

Resource Unit

Unit Rate(Direct Labour)

77.35

Unit Rate (Labour Sub Con)

76.91

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

13.30

1.00

13.30

Plumber M

0.0%

0.20

40.00

8.00

Unskilled Labour M

0.0%

0.20

30.00

6.00

PVC Pipe 50mm type 1000 M

0.0%

1.10

94.00

103.40

Other expenses M

150.0

0.00

1.00

0.00

Material Rate

103.40

Plant Rate

0.00

BSR Reference

20-09-76

Description

PVC water pipes 75mm dia

Resource Unit

Unit Rate(Direct Labour)

117.40

Unit Rate (Labour Sub Con)

116.70

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

13.30

1.00

13.30

Plumber M

0.0%

0.20

40.00

8.00

Unskilled Labour M

0.0%

0.20

30.00

6.00

PVC Pipe 75mm type 1000 M

0.0%

1.10

230.00

253.00

Other expenses M

150.0

0.00

1.00

0.00

Material Rate
Plant Rate

Unit

253.00
0.00

Unit Rate(Direct Labour)

267.00

Unit Rate (Labour Sub Con)

266.30

Wednesday, March 29, 2006

Page 198 of 395

Southern Province Engineering Services

BSR Reference

20-09-81

Description

PVC waster pipes, 32mm dia

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.31

1.00

8.31

Plumber M

0.0%

0.13

40.00

5.00

Unskilled Labour M

0.0%

0.13

30.00

3.75

PVC Pipe 32mm type 1000 M

0.0%

1.10

42.00

46.20

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate

46.20

Plant Rate

0.00

BSR Reference

20-09-82

Description

PVC waster pipes, 38mm dia

Resource Unit

Unit Rate(Direct Labour)

55.95

Unit Rate (Labour Sub Con)

55.51

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.31

1.00

8.31

Plumber M

0.0%

0.13

40.00

5.00

Unskilled Labour M

0.0%

0.13

30.00

3.75

PVC Pipe 40mm type 1000 M

0.0%

1.10

61.00

67.10

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

67.10

Plant Rate

0.00

BSR Reference

20-09-83

Description

PVC waster pipes, 50mm dia

Resource Unit

Unit Rate(Direct Labour)

77.35

Unit Rate (Labour Sub Con)

76.91

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

13.30

1.00

13.30

Plumber M

0.0%

0.20

40.00

8.00

Unskilled Labour M

0.0%

0.20

30.00

6.00

PVC Pipe 50mm type 1000 M

0.0%

1.10

94.00

103.40

Other expenses M

150.0

0.00

1.00

0.00

Material Rate
Plant Rate

Unit

103.40
0.00

Unit Rate(Direct Labour)

117.40

Unit Rate (Labour Sub Con)

116.70

Wednesday, March 29, 2006

Page 199 of 395

Southern Province Engineering Services

BSR Reference

20-09-84

Description

PVC waster pipes, 63mm dia

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

13.30

1.00

13.30

Plumber M

0.0%

0.20

40.00

8.00

Unskilled Labour M

0.0%

0.20

30.00

6.00

PVC Pipe 63mm type 1000 M

0.0%

1.10

150.00

165.00

Other expenses M

150.0

0.00

1.00

0.00

Material Rate

165.00

Plant Rate

0.00

BSR Reference

20-09-85

Description

PVC waster pipes, 75mm dia

Resource Unit

Unit Rate(Direct Labour)

179.00

Unit Rate (Labour Sub Con)

178.30

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

13.30

1.00

13.30

Plumber M

0.0%

0.20

40.00

8.00

Unskilled Labour M

0.0%

0.20

30.00

6.00

PVC Pipe 75mm type 1000 M

0.0%

1.10

230.00

253.00

Other expenses M

150.0

0.00

1.00

0.00

Material Rate
Plant Rate

253.00
0.00

BSR Reference

20-09-90

Description

UPVC Rain waer gutters retangular type

Resource Unit

Unit Rate(Direct Labour)

267.00

Unit Rate (Labour Sub Con)

266.30

Unit

Wastag

Quantit

Rate Type

Amount

Plumber M

0.0%

0.50

40.00

20.00

Unskilled Labour M

0.0%

0.50

30.00

15.00

Gutter bracket half round [short arm M

0.0%

2.00

8.50

17.00

Screws brass 20mm* gauge 6 M

0.0%

4.00

12.00

48.00

Solvent cement etc M

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

65.00
0.00

Unit Rate(Direct Labour)


Unit Rate (Labour Sub Con)

102.00
67.00

Wednesday, March 29, 2006

Page 200 of 395

Southern Province Engineering Services

BSR Reference

20-09-91

Description

UPVC Rain waer gutters semi circular type

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Plumber M

0.0%

0.50

40.00

20.00

Unskilled Labour M

0.0%

0.50

30.00

15.00

Gutter bracket half round [short arm M

0.0%

2.00

8.50

17.00

Screws brass 20mm* gauge 6 M

0.0%

4.00

12.00

48.00

Solvent cement etc M

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

65.00

Unit Rate(Direct Labour)

0.00

Unit Rate (Labour Sub Con)

BSR Reference

20-09-92

Description

PVC Soil pipes, 83mm diameter

Unit

Resource Unit

Material Rate
Plant Rate

102.00

Wastag

67.00

Quantit

Rate Type

Amount

Mason M

0.0%

0.03

45.00

1.35

Plumber M

0.0%

0.24

40.00

9.60

Unskilled Labour M

0.0%

5.60

30.00

168.00

Cement M

0.0%

0.42

340.00

142.80

Metal 25mm M

0.0%

0.08

900.00

72.00

Sand M

0.0%

0.05

350.00

15.75

Transport M

0.0%

5.00

1.00

5.00

230.55
0.00

Unit Rate(Direct Labour)

414.50

Unit Rate (Labour Sub Con)

235.55

Wednesday, March 29, 2006

Page 201 of 395

Southern Province Engineering Services

BSR Reference

20-09-93

Description

PVC Soil pipes, 100mm diameter

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Mason M

0.0%

0.03

45.00

1.35

Plumber M

0.0%

0.24

40.00

9.60

Unskilled Labour M

0.0%

5.60

30.00

168.00

Cement M

0.0%

0.42

340.00

142.80

Metal 25mm M

0.0%

0.08

900.00

72.00

PVC Pipe 110mm Type 600 M

0.0%

1.00

330.00

330.00

Sand M

0.0%

0.05

350.00

15.75

Transport M

0.0%

5.00

1.00

5.00

Material Rate

560.55

Plant Rate

0.00

Unit Rate(Direct Labour)

744.50

Unit Rate (Labour Sub Con)

565.55

BSR Reference

20-09-96

Description

Stainless steel kitchen sink with plumber pillar tap, 1200mm size

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

365.75

1.00

365.75

Plumber Nos.

0.0%

5.50

40.00

220.00

Unskilled Labour Nos.

0.0%

5.50

30.00

165.00

Cement etc Nos.

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

390.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

370.75

BSR Reference

20-09-97

Description

UPVC Rain water down pipe 87mm size

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Plumber Nos.

0.0%

0.30

40.00

12.00

Unskilled Labour Nos.

0.0%

0.30

30.00

9.00

Solvent cement etc Nos.

0.0%

3.00

1.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

24.00
3.00

Wednesday, March 29, 2006

Page 202 of 395

Southern Province Engineering Services

BSR Reference

20-10-00

Description

Walls with immulsion paint, one filller coat, one primer coat and two coats of emulsion

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

11.40

1.00

11.40

Painter M2

0.0%

0.30

40.00

12.00

Paint Emultion M2

0.0%

0.08

200.00

16.20

Brushes etc. M2

0.0%

0.15

1.00

0.15

Material Rate

16.20

Plant Rate

0.00

BSR Reference

20-10-01

Description

Walls with two coats of cement paint

Unit Rate(Direct Labour)

28.35

Unit Rate (Labour Sub Con)

27.75

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

9.98

1.00

9.98

Painter M2

0.0%

0.15

40.00

6.00

Unskilled Labour M2

0.0%

0.15

30.00

4.50

Cement M2

0.0%

0.01

340.00

2.38

Brushes etc. M2

0.0%

0.20

1.00

0.20

Material Rate

2.38

Unit Rate(Direct Labour)

13.08

Plant Rate

0.00

Unit Rate (Labour Sub Con)

12.56

BSR Reference

20-10-02

Description

Walls with lime wash two coats

Unit

Resource Unit

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

10.94

1.00

10.94

Painter M2

0.0%

0.15

40.00

6.00

Unskilled Labour M2

0.0%

0.18

30.00

5.52

Glue M2

0.0%

0.00

95.00

0.00

Slaked lime M2

0.0%

0.30

2,850.00

843.60

Yellow ochre M2

0.0%

0.00

15.00

0.00

Cement, Sand, Brushes etc. M2

0.0%

1.50

1.00

1.50

Material Rate
Plant Rate

Wastag

M2

843.60
0.00

Unit Rate(Direct Labour)

856.62

Unit Rate (Labour Sub Con)

856.04

Wednesday, March 29, 2006

Page 203 of 395

Southern Province Engineering Services

BSR Reference

20-10-03

Description

Walls with 1:0.25:6 cement:fine soil:water paint - two coats

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

9.98

1.00

9.98

Painter M2

0.0%

0.15

40.00

6.00

Unskilled Labour M2

0.0%

0.15

30.00

4.50

Cement M2

0.0%

0.01

340.00

2.38

Brushes etc. M2

0.0%

0.20

1.00

0.20

Material Rate

2.38

Unit Rate(Direct Labour)

13.08

Plant Rate

0.00

Unit Rate (Labour Sub Con)

12.56

BSR Reference

20-10-04

Description

Tiimber with enamel paint, one coat of aluminum primer and two coats of enamel paint

Unit

Resource Unit

Wastag

M2

Quantit

0.0%

16.34

1.00

16.34

Painter M2

0.0%

0.43

40.00

17.20

Paint Enamel M2

0.0%

0.08

260.00

21.06

Brushes etc. M2

0.0%

0.40

1.00

0.40

21.06

Plant Rate

0.00

Unit Rate(Direct Labour)

38.66

Unit Rate (Labour Sub Con)

37.80

BSR Reference

20-10-05

Description

Tiimber with vanish, one coat of primer and two coats of vanish

Unit

Resource Unit

Plant Rate

Amount

Labour Sub-Contract Rate M2

Material Rate

Material Rate

Rate Type

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

23.75

1.00

23.75

Painter M2

0.0%

0.40

40.00

16.00

Unskilled Labour M2

0.0%

0.30

30.00

9.00

Polyrethane varnish M2

0.0%

0.10

250.00

24.25

Brushes etc. M2

0.0%

0.35

1.00

0.35

24.25
0.00

Unit Rate(Direct Labour)

49.60

Unit Rate (Labour Sub Con)

48.35

Wednesday, March 29, 2006

Page 204 of 395

Southern Province Engineering Services

BSR Class

IRON MONGER

BSR Reference

09-00-01

Description

Supplying and fixing of 45mm * 6mm bolts and nuts with washers.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

5.34

1.00

5.34

Carpenter Nos.

0.0%

0.13

45.00

5.63

bolt and nut iron 45*6mm Nos.

0.0%

1.00

10.00

10.00

Washers etc. Nos.

0.0%

0.20

1.00

0.20

Material Rate

10.00

Plant Rate

0.00

Unit Rate(Direct Labour)

15.83

Unit Rate (Labour Sub Con)

15.54

BSR Reference

09-00-02

Description

Supplying and fixing of 65mm * 10mm iron bolts and nuts with washers.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

10.69

1.00

10.69

Carpenter Nos.

0.0%

0.25

45.00

11.25

Bolt and nut iron 63*10mm Nos.

0.0%

1.00

18.00

18.00

Washers etc. Nos.

0.0%

0.20

1.00

0.20

Material Rate

18.00

Plant Rate

0.00

Unit Rate(Direct Labour)

29.45

Unit Rate (Labour Sub Con)

28.89

BSR Reference

09-00-03

Description

Supplying and fixing of 125mm * 10mm iron bolts and nuts with washers.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

Bolt and nut iron 125mm x 10mm Nos.

0.0%

1.00

25.00

25.00

Washers etc. Nos.

0.0%

0.50

1.00

0.50

Material Rate
Plant Rate

25.00
0.00

Unit Rate(Direct Labour)

40.35

Unit Rate (Labour Sub Con)

39.61

Wednesday, March 29, 2006

Page 205 of 395

Southern Province Engineering Services

BSR Reference

09-00-04

Description

Supplying and fixing of 225mm * 10mm iron bolts and nuts with washers.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Nos.

0.0%

1.00

40.00

40.00

Washers etc. Nos.

0.0%

0.50

1.00

0.50

Bolt and nut iron 225*10mm

Material Rate

40.00

Plant Rate

0.00

Unit Rate(Direct Labour)

63.00

Unit Rate (Labour Sub Con)

61.88

BSR Reference

09-00-05

Description

Supplying and fixing of 65mm * 12mm iron bolts and nuts with washers.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

Bolt and nut iron 125*12mm Nos.

0.0%

1.00

40.00

40.00

Washers etc. Nos.

0.0%

0.30

1.00

0.30

Material Rate

40.00

Plant Rate

0.00

Unit Rate(Direct Labour)

55.15

Unit Rate (Labour Sub Con)

54.41

BSR Reference

09-00-06

Description

Supplying and fixing of 150mm * 10mm iron bolts and nuts with washers.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.24

1.00

14.24

Carpenter Nos.

0.0%

0.33

45.00

14.99

Bolt and nut iron 150mm x 12mm Nos.

0.0%

1.00

45.00

45.00

Washers etc. Nos.

0.0%

0.50

1.00

0.50

Material Rate
Plant Rate

45.00
0.00

Unit Rate(Direct Labour)

60.49

Unit Rate (Labour Sub Con)

59.74

Wednesday, March 29, 2006

Page 206 of 395

Southern Province Engineering Services

BSR Reference

09-00-07

Description

Supplying of 75mm iron heavy quaLitery tower bolts and fixing with iron screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

0.0%

14.24

1.00

14.24

Carpenter Nos.

0.0%

0.33

45.00

14.99

bolt tower iron 75mm Nos.

0.0%

1.00

15.00

15.00

screws iron 16mm*gauge6 Nos.

0.0%

0.50

5.00

2.50

Material Rate

17.50

Plant Rate

0.00

Unit Rate(Direct Labour)

32.49

Unit Rate (Labour Sub Con)

31.74

BSR Reference

09-00-08

Description

Supplying of 100mm iron heavy quaLitery tower bolts and fixing with iron screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

0.0%

14.24

1.00

14.24

Carpenter Nos.

0.0%

0.33

45.00

14.99

bolt tower iron 100mm Nos.

0.0%

1.00

18.00

18.00

screws iron 16mm*gauge6 Nos.

0.0%

0.50

5.00

2.50

20.50

Plant Rate

0.00

Unit Rate(Direct Labour)

35.49

Unit Rate (Labour Sub Con)

34.74

BSR Reference

09-00-09

Description

Supplying of 125mm iron heavy quaLitery tower bolts and fixing with iron screws.

Resource Unit

Plant Rate

Amount

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Amount

Labour Sub-Contract Rate Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.24

1.00

14.24

Carpenter Nos.

0.0%

0.33

45.00

14.99

bolt tower iron 125mm Nos.

0.0%

1.00

20.00

20.00

screws iron 16mm*gauge6 Nos.

0.0%

0.75

5.00

3.75

23.75
0.00

Unit Rate(Direct Labour)

38.74

Unit Rate (Labour Sub Con)

37.99

Wednesday, March 29, 2006

Page 207 of 395

Southern Province Engineering Services

BSR Reference

09-00-10

Description

Supplying of 150mm iron heavy quaLitery tower bolts and fixing with iron screws.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.24

1.00

14.24

Carpenter Nos.

0.0%

0.33

45.00

14.99

bolt tower iron 150mm Nos.

0.0%

1.00

25.00

25.00

screws iron 16mm*gauge6 Nos.

0.0%

0.75

5.00

3.75

Material Rate

28.75

Plant Rate

0.00

Unit Rate(Direct Labour)

43.74

Unit Rate (Labour Sub Con)

42.99

BSR Reference

09-00-11

Description

Making 1000mm (approx) iron brackets out of 40mm * 6mm flat iron with fish tail at end

Unit

Nos.

fixing to walls including making good to walls.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

102.60

1.00

102.60

Carpenter Nos.

0.0%

2.40

45.00

108.00

Mild steel [flat] Nos.

0.0%

2.27

38.00

86.26

Cement Sand etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

86.26

Plant Rate

0.00

Unit Rate(Direct Labour)

199.26

Unit Rate (Labour Sub Con)

193.86

BSR Reference

09-00-12

Description

Supplying of 50mm*50mm GI weldmesh(gauge 10 ) and fixing to existing frame with staples

Unit

M2

(Fillets and beading paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

142.50

1.00

142.50

Carpenter M2

0.0%

2.00

45.00

90.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

weld mesh[galvanised] 50*50mm M2

0.0%

1.17

100.00

117.00

Staples M2

0.0%

6.00

1.00

6.00

Material Rate
Plant Rate

117.00
0.00

Unit Rate(Direct Labour)

273.00

Unit Rate (Labour Sub Con)

265.50

Wednesday, March 29, 2006

Page 208 of 395

Southern Province Engineering Services

BSR Reference

09-00-13

Description

Sub. of 50*50mm GI weldmesh (gauge 10) & fixing to window frames with 50*12mm Cl I

Unit

M2

timber beading including painting mesh with red lead & 2 coats of enamel apint, beading
with primer and 2 coats of enamel. Rate to including opening for bolts.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

145.92

1.00

145.92

Carpenter M2

0.0%

2.00

45.00

90.00

Painter M2

0.0%

0.09

40.00

3.60

Unskilled Labour M2

0.0%

2.00

30.00

60.00

screws iron 30mm*gauge 7 M2

0.0%

4.92

7.00

34.44

Timb. Cl.A 50mm*12mm M2

0.0%

4.10

20.00

82.00

weld mesh[galvanised] 50*50mm M2

0.0%

1.15

100.00

115.00

Paint etc. M2

0.0%

20.00

1.00

20.00

Material Rate

231.44

Plant Rate

0.00

Unit Rate(Direct Labour)

405.04

Unit Rate (Labour Sub Con)

397.36

BSR Reference

09-00-14

Description

Supplying and fixing of 50mm iron cabin hook and eyes.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

10.69

1.00

10.69

Carpenter Nos.

0.0%

0.25

45.00

11.25

cabin hook and eye iron 50mm Nos.

0.0%

1.00

6.00

6.00

Material Rate

6.00

Unit Rate(Direct Labour)

17.25

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.69

BSR Reference

09-00-15

Description

Supplying and fixing of 75mm iron cabin hook and eyes.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

10.69

1.00

10.69

Carpenter Nos.

0.0%

0.25

45.00

11.25

cabin hook and eye iron 50mm Nos.

0.0%

1.10

6.00

6.60

Material Rate

6.60

Unit Rate(Direct Labour)

17.85

Plant Rate

0.00

Unit Rate (Labour Sub Con)

17.29

Wednesday, March 29, 2006

Page 209 of 395

Southern Province Engineering Services

BSR Reference

09-00-16

Description

Supplying and fixing of 150mm iron cabin hook and eyes.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

cabin hook and eye iron 150mm Nos.

0.0%

1.00

12.00

12.00

Material Rate

12.00

Plant Rate

0.00

Unit Rate(Direct Labour)

26.85

Unit Rate (Labour Sub Con)

26.11

BSR Reference

09-00-17

Description

Supplying and fixing of 200mm iron cabin hook and eyes.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.11

1.00

14.11

Carpenter Nos.

0.0%

0.33

45.00

14.85

cabin hook and eye iron 200mm Nos.

0.0%

1.00

20.00

20.00

Material Rate

20.00

Plant Rate

0.00

Unit Rate(Direct Labour)

34.85

Unit Rate (Labour Sub Con)

34.11

BSR Reference

09-00-18

Description

Making iron gate with 40*40mm angle iron framework including bracing and horizontal

Unit

M2

centre member with 16mm M.S bar at 150mm centres complete with strap hinges hasp and
staples.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

532.00

1.00

532.00

Black Smith M2

0.0%

8.00

40.00

320.00

Unskilled Labour M2

0.0%

8.00

30.00

240.00

Angle iron 40x40x6mm M2

0.0%

4.00

150.00

600.00

Mild Steel M2

0.0%

5.00

33.00

165.00

Mild steel [flat] M2

0.0%

12.00

38.00

456.00

Coal etc. M2

0.0%

60.00

1.00

60.00

Welding works M2

0.0%

300.00

1.00

300.00

1,221.00
0.00

Unit Rate(Direct Labour)

2,141.00

Unit Rate (Labour Sub Con)

2,113.00

Wednesday, March 29, 2006

Page 210 of 395

Southern Province Engineering Services

BSR Reference

09-00-19

Description

Supplyinf of 20mm * 3mm qutter hook or brackets and fixing in position with iron screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Mild steel [flat] Nos.

0.0%

0.23

38.00

8.66

screws iron 25mm*gauge 7 Nos.

0.0%

0.17

6.00

1.02

Coal etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

9.68

Unit Rate(Direct Labour)

52.18

Plant Rate

0.00

Unit Rate (Labour Sub Con)

50.31

BSR Reference

09-00-20

Description

Supplyinf of approved heavy quaLitery type 100mm iron hasp and staples and fixing in

Unit

Nos.

position with iron screws.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Hasp and staple iron 100mm Nos.

0.0%

1.00

20.00

20.00

screws iron 25mm*gauge 7 Nos.

0.0%

0.50

6.00

3.00

Material Rate

23.00

Plant Rate

0.00

Unit Rate(Direct Labour)

45.50

Unit Rate (Labour Sub Con)

44.38

BSR Reference

09-00-21

Description

Supplying of approved heavy quaLitery safety type, 150mm iron hasp and staples and

Unit

Nos.

fixing in position with iron screws.

Resource Unit

Quantit

Rate Type

Amount

0.0%

21.38

1.00

21.38

Carpenter Nos.

0.0%

0.50

45.00

22.50

Hasp and staple iron 150mm Nos.

0.0%

1.00

40.00

40.00

screws iron 25mm*gauge 7 Nos.

0.0%

0.50

6.00

3.00

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate Nos.

43.00
0.00

Unit Rate(Direct Labour)

65.50

Unit Rate (Labour Sub Con)

64.38

Wednesday, March 29, 2006

Page 211 of 395

Southern Province Engineering Services

BSR Reference

09-00-22

Description

Making 300 * 50mm hasp and staple out of 6mm iron plate and fixing in position with 6 *

Unit

Nos.

50mm bolts and nuts.

Resource Unit

Wastag

Quantit

Rate Type

0.0%

570.00

1.00

570.00

Carpenter Nos.

0.0%

8.00

45.00

360.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

bolt and nut iron 45*6mm Nos.

0.0%

8.00

10.00

80.00

Mild steel [flat] Nos.

0.0%

1.15

38.00

43.70

Material Rate

123.70

Plant Rate

0.00

Unit Rate(Direct Labour)

723.70

Unit Rate (Labour Sub Con)

693.70

BSR Reference

09-00-23

Description

Supplying and fixing of approved heavy quaLitery 50mm iron butt hi.nges

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

28.50

1.00

28.50

Carpenter Nos.

0.0%

0.40

45.00

18.00

Unskilled Labour Nos.

0.0%

0.40

30.00

12.00

Hinge butt iron 50mm Nos.

0.0%

1.00

10.00

10.00

screws iron 25mm*gauge 7 Nos.

0.0%

0.50

6.00

3.00

Material Rate

13.00

Plant Rate

0.00

Unit Rate(Direct Labour)

43.00

Unit Rate (Labour Sub Con)

41.50

BSR Reference

09-00-24

Description

Supplying and fixing of approved heavy quaLitery 75mm iron butt hi.nges

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

28.50

1.00

28.50

Carpenter Nos.

0.0%

0.40

45.00

18.00

Unskilled Labour Nos.

0.0%

0.40

30.00

12.00

Hing butt iron 75mm Nos.

0.0%

1.00

20.00

20.00

screws iron 25mm*gauge 7 Nos.

0.0%

0.50

6.00

3.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

23.00
0.00

Unit Rate(Direct Labour)

53.00

Unit Rate (Labour Sub Con)

51.50

Wednesday, March 29, 2006

Page 212 of 395

Southern Province Engineering Services

BSR Reference

09-00-25

Description

Supplying and fixing of approved heavy quaLitery 100mm iron butt hi.nges

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

28.50

1.00

28.50

Carpenter Nos.

0.0%

0.40

45.00

18.00

Unskilled Labour Nos.

0.0%

0.40

30.00

12.00

Hinge butt iron 100mm Nos.

0.0%

1.00

35.00

35.00

screws iron 25mm*gauge 7 Nos.

0.0%

0.50

6.00

3.00

Material Rate

38.00

Plant Rate

0.00

Unit Rate(Direct Labour)

68.00

Unit Rate (Labour Sub Con)

66.50

BSR Reference

09-00-26

Description

Supplying and fixing of approved heavy quaLitery 125mm iron butt hi.nges

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Hinge butt iron 125mm Nos.

0.0%

1.00

45.00

45.00

screws iron 25mm*gauge 7 Nos.

0.0%

0.50

6.00

3.00

Material Rate

48.00

Plant Rate

0.00

Unit Rate(Direct Labour)

85.50

Unit Rate (Labour Sub Con)

83.63

BSR Reference

09-00-27

Description

Fixing hinges with iron screws. (hinges supplied by the Client)

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

screws iron 25mm*gauge 7 Nos.

0.0%

0.50

6.00

3.00

Material Rate

3.00

Unit Rate(Direct Labour)

40.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

38.63

Wednesday, March 29, 2006

Page 213 of 395

Southern Province Engineering Services

BSR Reference

09-00-28

Description

Supplying and fixing of 40 * 60mm, 300mm long iron strap hinge with necessary bolts and

Unit

Nos.

nuts excluding pintle.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

185.25

1.00

185.25

Carpenter Nos.

0.0%

3.00

45.00

135.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Bolt and nut iron 63*10mm Nos.

0.0%

4.00

18.00

72.00

Mild steel [flat] Nos.

0.0%

0.80

38.00

30.40

Coal etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

102.40

Plant Rate

0.00

Unit Rate(Direct Labour)

302.40

Unit Rate (Labour Sub Con)

292.65

BSR Reference

09-00-29

Description

Supplying and fixing of 50 * 6mm, 900mm long iron strap hinge with necessary bolts and

Unit

Nos.

nuts excluding pintles.

Resource Unit

Quantit

Rate Type

Amount

0.0%

299.25

1.00

299.25

Carpenter Nos.

0.0%

5.00

45.00

225.00

Unskilled Labour Nos.

0.0%

3.00

30.00

90.00

Bolt and nut iron 125*12mm Nos.

0.0%

6.00

40.00

240.00

Mild steel [flat] Nos.

0.0%

2.50

38.00

95.00

Coal etc. Nos.

0.0%

10.00

1.00

10.00

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate Nos.

335.00
0.00

Unit Rate(Direct Labour)

660.00

Unit Rate (Labour Sub Con)

644.25

Wednesday, March 29, 2006

Page 214 of 395

Southern Province Engineering Services

BSR Reference

09-00-30

Description

Supplying of 60*10*1050mm iron double strap hinges, flat iron bend to shape and fixing

Unit

Nos.

with bolts and nuts.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

342.00

1.00

342.00

Black Smith Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Nos.

0.0%

6.00

40.00

240.00

Mild steel [flat] Nos.

0.0%

2.20

38.00

83.60

Bolt and nut iron 225*10mm

Material Rate

323.60

Plant Rate

0.00

Unit Rate(Direct Labour)

683.60

Unit Rate (Labour Sub Con)

665.60

BSR Reference

09-00-31

Description

Supplying of 65*10*1650mm iron double strap hinges, flat iron bend to shape and fixing

Unit

Nos.

with bolts and nuts.

Resource Unit

Wastag

Quantit

Rate Type

0.0%

447.64

1.00

447.64

Black Smith Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

5.04

30.00

151.20

bolt nut and iron 150*12mm Nos.

0.0%

8.00

45.00

360.00

Mild steel [flat] Nos.

0.0%

17.27

38.00

656.26

Coal etc. Nos.

0.0%

10.00

1.00

10.00

Material Rate

1,016.26

Plant Rate

0.00

Unit Rate(Direct Labour)

1,497.46

Unit Rate (Labour Sub Con)

1,473.90

BSR Reference

09-00-32

Description

Supplying of heavy quaLitery 150mm iron T hinges and fixing with iron screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Hinge T iron 150mm Nos.

0.0%

1.00

18.00

18.00

Screws iron 40mm*gauge 8 Nos.

0.0%

0.60

8.00

4.80

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

22.80
0.00

Unit Rate(Direct Labour)

60.30

Unit Rate (Labour Sub Con)

58.43

Wednesday, March 29, 2006

Page 215 of 395

Southern Province Engineering Services

BSR Reference

09-00-33

Description

Supplying of heavy quaLitery 200mm iron T hinges and fixing with iron screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Hinge T iron 200mm Nos.

0.0%

1.00

23.00

23.00

Screws iron 40mm*gauge 8 Nos.

0.0%

0.60

8.00

4.80

Material Rate

27.80

Plant Rate

0.00

Unit Rate(Direct Labour)

65.30

Unit Rate (Labour Sub Con)

63.43

BSR Reference

09-00-34

Description

Supplying of heavy quaLitery 250mm iron T hinges and fixing with iron screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Hinge T iron 200mm Nos.

0.0%

1.15

23.00

26.45

Screws iron 40mm*gauge 8 Nos.

0.0%

0.60

8.00

4.80

Material Rate

31.25

Plant Rate

0.00

Unit Rate(Direct Labour)

68.75

Unit Rate (Labour Sub Con)

66.87

BSR Reference

09-00-35

Description

Supplying of heavy quaLitery 300mm iron T hinges and fixing with iron screws.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

53.44

1.00

53.44

Carpenter Nos.

0.0%

0.75

45.00

33.75

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Hinge T iron 300mm Nos.

0.0%

1.00

40.00

40.00

Screws iron 40mm*gauge 8 Nos.

0.0%

0.75

8.00

6.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

46.00
0.00

Unit Rate(Direct Labour)


Unit Rate (Labour Sub Con)

102.25
99.44

Wednesday, March 29, 2006

Page 216 of 395

Southern Province Engineering Services

BSR Reference

09-00-36

Description

Supplying of fixing of 3mm * 50mm * 225mm iron hold fasts.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

46.31

1.00

46.31

Carpenter Nos.

0.0%

0.75

45.00

33.75

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Mild steel [flat] Nos.

0.0%

0.41

38.00

15.58

Screws iron 40mm*gauge 8 Nos.

0.0%

0.20

8.00

1.60

Material Rate

17.18

Plant Rate

0.00

Unit Rate(Direct Labour)

65.93

Unit Rate (Labour Sub Con)

63.49

BSR Reference

09-00-37

Description

Cutting iron rods to correct length inserting in window frames including painting with red

Unit

Nos.

lead and 2 coats of anti-corrosive paint. (Rods supplied by Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

27.31

1.00

27.31

Carpenter Nos.

0.0%

0.25

45.00

11.25

Painter Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Paint etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

33.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

32.31

BSR Reference

09-00-38

Description

Supplying of mild steel rods in reinforcing lintons, beams, columns and laid inposition

Unit

Kg

with binding wire.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Mild Steel Kg

0.0%

1.00

33.00

33.00

Wastage Kg

0.0%

2.50

1.00

2.50

33.50
0.00

Unit Rate(Direct Labour)

47.25

Unit Rate (Labour Sub Con)

46.69

Wednesday, March 29, 2006

Page 217 of 395

Southern Province Engineering Services

BSR Reference

09-00-39

Description

Supplying of mild steel rods in reinforcing foundation and laid in position with GI binding

Unit

Kg

wire.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

7.13

1.00

7.13

Carpenter Kg

0.0%

0.10

45.00

4.50

Unskilled Labour Kg

0.0%

0.10

30.00

3.00

Binding wire Kg

0.0%

0.01

50.00

0.50

Mild Steel Kg

0.0%

1.00

33.00

33.00

Wastage Kg

0.0%

2.50

1.00

2.50

Material Rate

33.50

Plant Rate

0.00

Unit Rate(Direct Labour)

43.50

Unit Rate (Labour Sub Con)

43.12

BSR Reference

09-00-40

Description

Bending and typing of reinforcement and laid in position in beams lintols, floorsetc. with

Unit

Kg

GI wire (Steel rods, mild steel or tor steel, supplied by Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Carpenter Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

11.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.19

BSR Reference

09-00-41

Description

Bending and typing of reinforcement and laid in position in foundation with GI binding

Unit

Kg

wire (mild steel rods, or tor steel, supplied by Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

7.13

1.00

7.13

Carpenter Kg

0.0%

0.10

45.00

4.50

Unskilled Labour Kg

0.0%

0.10

30.00

3.00

Binding wire Kg

0.0%

0.01

50.00

0.50

Material Rate

0.50

Unit Rate(Direct Labour)

8.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.62

Wednesday, March 29, 2006

Page 218 of 395

Southern Province Engineering Services

BSR Reference

09-00-42

Description

Supplying of 16mm dia. mild steel bars and fixing in window frames at 100mm centres

Unit

including paindeing with red lead and 2 coats anti-corrosive paint.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

17.81

1.00

17.81

Carpenter M

0.0%

0.25

45.00

11.25

Unskilled Labour M

0.0%

0.25

30.00

7.50

Mild Steel M

0.0%

1.58

33.00

52.11

Material Rate

52.11

Plant Rate

0.00

Unit Rate(Direct Labour)

70.86

Unit Rate (Labour Sub Con)

69.92

BSR Reference

09-00-43

Description

Supplying of 20mm dia. mild steel bars and fixing in window frames at 100mm centres

Unit

including paindeing with red lead and 2 coats anti-corrosive paint.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

17.81

1.00

17.81

Carpenter M

0.0%

0.25

45.00

11.25

Unskilled Labour M

0.0%

0.25

30.00

7.50

Mild steel [flat] M

0.0%

2.47

38.00

93.71

Material Rate

93.71

Plant Rate

0.00

Unit Rate(Direct Labour)

112.46

Unit Rate (Labour Sub Con)

111.52

BSR Reference

09-00-44

Description

Supplying of pintels for gates and garage doors and fixing in position in cemenconcrete

Unit

Nos.

(concrete paid separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

231.56

1.00

231.56

Carpenter Nos.

0.0%

3.25

45.00

146.25

Unskilled Labour Nos.

0.0%

3.25

30.00

97.50

Mild steel [flat] Nos.

0.0%

2.28

38.00

86.64

Coal etc. Nos.

0.0%

5.00

1.00

5.00

86.64
0.00

Unit Rate(Direct Labour)

335.39

Unit Rate (Labour Sub Con)

323.20

Wednesday, March 29, 2006

Page 219 of 395

Southern Province Engineering Services

BSR Reference

09-00-45

Description

Supplying and fixing of 100mm * 16mm rag bolts with nuts, washers.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

35.63

1.00

35.63

Carpenter Nos.

0.0%

0.50

45.00

22.50

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Mild Steel Nos.

0.0%

0.68

33.00

22.51

Material Rate

22.51

Plant Rate

0.00

Unit Rate(Direct Labour)

60.01

Unit Rate (Labour Sub Con)

58.13

BSR Reference

09-00-46

Description

Supplying and fixing of 24 B.W.G plain G.I sheets to existing frame with wire nails.

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

102.24

1.00

102.24

Carpenter M2

0.0%

1.43

45.00

64.57

Unskilled Labour M2

0.0%

1.43

30.00

43.05

G.I.sheet 24 B.W.G. M2

0.0%

1.00

320.00

320.00

Nails M2

0.0%

20.00

1.00

20.00

Material Rate

320.00

Plant Rate

0.00

Unit Rate(Direct Labour)

447.62

Unit Rate (Labour Sub Con)

442.24

BSR Reference

09-00-47

Description

Supplying of BS 4449 high yeild steel bars and laid in position as reinforcement in beams,

Unit

Kg

columns, slabs etc. with binding wire.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

10.69

1.00

10.69

Mason Kg

0.0%

0.15

45.00

6.75

Unskilled Labour Kg

0.0%

0.15

30.00

4.50

Binding wire Kg

0.0%

0.01

50.00

0.50

Tor Steel Kg

0.0%

1.00

35.00

35.00

Wastage Kg

0.0%

2.50

1.00

2.50

35.50
0.00

Unit Rate(Direct Labour)

49.25

Unit Rate (Labour Sub Con)

48.69

Wednesday, March 29, 2006

Page 220 of 395

Southern Province Engineering Services

BSR Reference

09-00-48

Description

Supplying of BS 4449 high yeild steel bars and laid in position as reinforcement in

Unit

Kg

foundation with binding wire.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

7.13

1.00

7.13

Mason Kg

0.0%

0.10

45.00

4.50

Unskilled Labour Kg

0.0%

0.10

30.00

3.00

Binding wire Kg

0.0%

0.01

50.00

0.50

Tor Steel Kg

0.0%

1.00

35.00

35.00

Wastage Kg

0.0%

2.50

1.00

2.50

35.50
0.00

Unit Rate(Direct Labour)

45.50

Unit Rate (Labour Sub Con)

45.12

Wednesday, March 29, 2006

Page 221 of 395

Southern Province Engineering Services

BSR Class

MISCELLANEOUS

BSR Reference

17-00-01

Description

Supplying of Bamboos

Resource Unit
Props (bamboo) 3 - 4 m M

Material Rate

Unit

Wastag

Plant Rate

0.00

BSR Reference

17-00-02

Description

Supplying of bamboos and fixing in position

Resource Unit

Quantit

0.0%

28.00

0.35

80.00

Amount
28.00

Unit Rate(Direct Labour)

28.00

Unit Rate (Labour Sub Con)

28.00

Unit

Wastag

Rate Type

Quantit

Rate Type

Amount

Unskilled Labour M

0.0%

0.13

30.00

3.96

Props (bamboo) 3 - 4 m M

0.0%

0.35

80.00

28.00

Coir, Srting M

0.0%

0.70

1.00

0.70

Material Rate
Plant Rate

28.00
0.00

Unit Rate(Direct Labour)

32.66

Unit Rate (Labour Sub Con)

28.70

BSR Reference

17-00-03

Description

Removing of Bamboos and re-fixing with coir string

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Unskilled Labour M

0.0%

0.18

30.00

5.40

Coir, Srting M

0.0%

0.70

1.00

0.70

Material Rate

0.00

Unit Rate(Direct Labour)

6.10

Plant Rate

0.00

Unit Rate (Labour Sub Con)

0.70

Wednesday, March 29, 2006

Page 222 of 395

Southern Province Engineering Services

BSR Reference

17-00-04

Description

Supplying and fixing of light duty galvanized mild steel barbwire (confirming to SLS 31

Unit

of1988) an existing timber post with GI staples

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.03

Rate Type
45.00

Amount
1.35

Unskilled Labour M

0.0%

0.03

30.00

0.90

Barbed wire M

0.0%

0.09

45.00

4.19

Staples M

0.0%

1.00

1.00

1.00

Material Rate

4.19

Unit Rate(Direct Labour)

7.44

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.19

BSR Reference

17-00-05

Description

Supplying and fixing of light duty galvanized mild steel barbwire (confirming to SLS 31

Unit

of1988) an existing concrete post

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.05

Rate Type
45.00

Amount
2.25

Unskilled Labour M

0.0%

0.05

30.00

1.50

Barbed wire M

0.0%

0.09

45.00

4.05

Hook bolts etc. M

0.0%

1.00

1.00

1.00

Material Rate

4.05

Unit Rate(Direct Labour)

8.80

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.05

BSR Reference

17-00-06

Description

Supplying and fixing of light duty galvanized mild steel barbwire (confirming to SLS 31

Unit

of1988) in short lengths and timber post with GI staples.

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.04

Rate Type
45.00

Amount
1.80

Unskilled Labour M

0.0%

0.04

30.00

1.20

Barbed wire M

0.0%

0.09

45.00

4.19

Staples M

0.0%

1.00

1.00

1.00

Material Rate

4.19

Unit Rate(Direct Labour)

8.19

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.19

Wednesday, March 29, 2006

Page 223 of 395

Southern Province Engineering Services

BSR Reference

17-00-07

Description

Supplying and fixing of light duty galvanized mild steel barbwire (confirming to SLS 31

Unit

of1988) in short length a concrete or steel post with available hook bolts

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.06

Rate Type
45.00

Amount
2.70

Unskilled Labour M

0.0%

0.06

30.00

1.80

Barbed wire M

0.0%

0.09

45.00

4.19

Material Rate

4.19

Unit Rate(Direct Labour)

8.68

Plant Rate

0.00

Unit Rate (Labour Sub Con)

4.19

BSR Reference

17-00-08

Description

Fixing of barbed wire with G.I. Staples on existing timber post(Barbed wire supplied by

Unit

Client)

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.03

Rate Type
45.00

Amount
1.35

Unskilled Labour M

0.0%

0.03

30.00

0.90

Staples M

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

3.25

Plant Rate

0.00

Unit Rate (Labour Sub Con)

1.00

BSR Reference

17-00-09

Description

Fixing of barbed wire fence with hoog bolts on concrete or steel post(Barbed wire supplied

Unit

by Client)

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.05

Rate Type
45.00

Amount
2.25

Unskilled Labour M

0.0%

0.05

30.00

1.50

Hook bolts etc. M

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

4.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

1.00

Wednesday, March 29, 2006

Page 224 of 395

Southern Province Engineering Services

BSR Reference

17-00-10

Description

Straining and refixing of barbed wire on the fence with staples

Unit

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.04

Rate Type
45.00

Amount
1.80

Unskilled Labour M

0.0%

0.04

30.00

1.20

Material Rate

0.00

Unit Rate(Direct Labour)

3.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

0.00

BSR Reference

17-00-11

Description

Straining and refixing only the barbed wire on concrete or steel posts with available hook

Unit

bolts

Resource Unit

Wastag

Carpenter M

0.0%

Quantit
0.05

Rate Type
45.00

Amount
2.25

Unskilled Labour M

0.0%

0.05

30.00

1.50

Material Rate

0.00

Unit Rate(Direct Labour)

3.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

0.00

BSR Reference

17-00-12

Description

Construction and fixing of 100mmx150mm and 1700mm high in 1:1 1/2:3(20mm)cement

Unit

Nos.

concrete intermediate fence posts reinforced with 4 Nos. 6mm dia. MS rods.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Mason Nos.

0.0%

2.00

45.00

90.00

Unskilled Labour Nos.

0.0%

3.00

30.00

90.00

Binding wire Nos.

0.0%

0.23

50.00

11.40

Cement Nos.

0.0%

0.25

340.00

86.70

Metal 20mm Nos.

0.0%

0.03

110.00

3.30

Sand Nos.

0.0%

0.01

350.00

5.25

Tor Steel Nos.

0.0%

1.80

35.00

63.00

Moulds Nos.

0.0%

12.00

1.00

12.00

169.65
0.00

Unit Rate(Direct Labour)

361.65

Unit Rate (Labour Sub Con)

181.65

Wednesday, March 29, 2006

Page 225 of 395

Southern Province Engineering Services

BSR Reference

17-00-13

Description

Construction and fixing of 100mmx150mm and 2285mm high in 1:1 1/2:3(20mm)cement

Unit

Nos.

concrete intermediate fence posts reinforced with 4 Nos. 6mm dia. MS rods.

Material Rate
Plant Rate

Resource Unit

Wastag

Black Smith Nos.

0.0%

1.00

40.00

40.00

Mason Nos.

0.0%

1.00

45.00

45.00

Unskilled Labour Nos.

0.0%

3.00

30.00

90.00

Binding wire Nos.

0.0%

0.34

50.00

17.00

Cement Nos.

0.0%

0.35

340.00

119.00

Metal 20mm Nos.

0.0%

0.04

110.00

3.96

Sand Nos.

0.0%

0.02

350.00

6.30

Tor Steel Nos.

0.0%

2.27

35.00

79.45

Moulds Nos.

0.0%

12.00

1.00

12.00

225.71
0.00

Quantit

Rate Type

Amount

Unit Rate(Direct Labour)

412.71

Unit Rate (Labour Sub Con)

237.71

BSR Reference

17-00-14

Description

Construction and fixing of end posts and struts as per drawing. Rate to include excavation

Unit

Nos.

and base concrete

Material Rate
Plant Rate

Resource Unit

Wastag

Black Smith Nos.

0.0%

3.25

40.00

130.00

Mason Nos.

0.0%

5.50

45.00

247.50

Unskilled Labour Nos.

0.0%

12.00

30.00

360.00

Binding wire Nos.

0.0%

0.46

50.00

22.75

Cement Nos.

0.0%

1.79

340.00

608.60

Metal 20mm Nos.

0.0%

0.09

110.00

10.12

Metal 40mm Nos.

0.0%

0.20

700.00

140.00

Mild Steel Nos.

0.0%

17.00

33.00

561.00

Sand Nos.

0.0%

0.17

350.00

59.50

1,401.97
0.00

Quantit

Rate Type

Amount

Unit Rate(Direct Labour)

2,139.47

Unit Rate (Labour Sub Con)

1,401.97

Wednesday, March 29, 2006

Page 226 of 395

Southern Province Engineering Services

BSR Reference

17-00-15

Description

Construction of barbed wire fence 5 strands with 4 points at 75mm centres, including corner

Unit

posts, struts, intermediate post binding concrete as per drawing.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Black Smith M

0.0%

1.10

40.00

44.00

Barbed wire M

0.0%

1.40

45.00

63.00

Binding wire M

0.0%

0.11

50.00

5.60

Cement M

0.0%

0.17

340.00

59.50

G.I bolts & nuts M

0.0%

0.55

5.00

2.75

Metal 20mm M

0.0%

0.02

110.00

1.87

Metal 40mm M

0.0%

0.01

700.00

6.30

Mild Steel M

0.0%

3.00

33.00

99.00

Sand M

0.0%

0.01

350.00

4.90

Starting bolts 16mm dia M

0.0%

0.17

16.00

2.64

Moulds M

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

245.56
0.00

Unit Rate(Direct Labour)

290.56

Unit Rate (Labour Sub Con)

246.56

BSR Reference

17-00-16

Description

Supplying and fixing of 12mm dia. 450mm long straining bolts.

Material Rate
Plant Rate

Unit

Nos.

Resource Unit

Wastag

Black Smith Nos.

0.0%

2.00

40.00

80.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

M/S rods 1/2" Nos.

0.0%

0.55

33.00

18.15

Nuts Nos.

0.0%

1.50

1.00

1.50

18.15

Quantit

Rate Type

Unit Rate(Direct Labour)

0.00

159.65

Unit Rate (Labour Sub Con)

BSR Reference

17-00-17

Description

Cleaning of lavotory or sewage block (without clearing rods)

Unit

Resource Unit

Wastag

Sanitary labourer P/Block

0.0%

Amount

19.65

P/Block

Quantit
8.00

Rate Type
120.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Amount
960.00
960.00
0.00

Wednesday, March 29, 2006

Page 227 of 395

Southern Province Engineering Services

BSR Reference

17-00-18

Description

Cleaning of lavotory or sewage block (with contractor and cleaning rods)

Unit

Resource Unit

Wastag

Sanitary labourer P/Block

0.0%

P/Block

Quantit
24.00

Rate Type
120.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

Wednesday, March 29, 2006

Amount
2,880.00
2,880.00
0.00

Page 228 of 395

Southern Province Engineering Services

BSR Class

PAINTER & DECORATOR

BSR Reference

14-00-01

Description

One coat of cement washing to walls of single storeyed buildings patching and preparing

Unit

M2

surface.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

5.85

1.00

5.85

Painter M2

0.0%

0.09

40.00

3.52

Unskilled Labour M2

0.0%

0.09

30.00

2.64

Cement M2

0.0%

0.00

340.00

1.36

Brushes etc. M2

0.0%

0.20

1.00

0.20

Material Rate

1.36

Unit Rate(Direct Labour)

7.72

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.41

BSR Reference

14-00-02

Description

Two coats of cement washing to walls of single storeyed buildings patching & preparing

Unit

M2

surface.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

9.98

1.00

9.98

Painter M2

0.0%

0.15

40.00

6.00

Unskilled Labour M2

0.0%

0.15

30.00

4.50

Cement M2

0.0%

0.01

340.00

2.38

Brushes etc. M2

0.0%

0.20

1.00

0.20

Material Rate

2.38

Unit Rate(Direct Labour)

13.08

Plant Rate

0.00

Unit Rate (Labour Sub Con)

12.56

Wednesday, March 29, 2006

Page 229 of 395

Southern Province Engineering Services

BSR Reference

14-00-03

Description

One coat of cement washing to walls of single storeyed buildings patching & preparing

Unit

M3

surface

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

6.92

1.00

6.92

Painter M3

0.0%

0.10

40.00

4.16

Unskilled Labour M3

0.0%

0.10

30.00

3.12

Cement M3

0.0%

0.00

340.00

1.36

Brushes etc. M3

0.0%

3.40

1.00

3.40

Material Rate

1.36

Unit Rate(Direct Labour)

12.04

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.68

BSR Reference

14-00-04

Description

Flags average size 1800mm*900mm hung upon buildings as directed & removed when

Unit

Nos.

required [flags supplied by Client . Any poles used are to be paid separately].

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.25

1.00

14.25

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Material Rate

0.00

Unit Rate(Direct Labour)

15.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

14.25

BSR Reference

14-00-05

Description

Flags small [burges] upto 100 hungs upon buildings as directed & removed when required

Unit

Nos.

[flags supplied by Client. Any used are to be paid separately].

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

1.60

1.00

1.60

Unskilled Labour Nos.

0.0%

0.06

30.00

1.68

Material Rate

0.00

Unit Rate(Direct Labour)

1.68

Plant Rate

0.00

Unit Rate (Labour Sub Con)

1.60

Wednesday, March 29, 2006

Page 230 of 395

Southern Province Engineering Services

BSR Reference

14-00-06

Description

Flags small[Burges] over 100 hung upon building as directed & removed when required

Unit

Nos.

[flags supplied by Client,Any poles used to be paid separately].

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

1.37

1.00

1.37

Unskilled Labour Nos.

0.0%

0.05

30.00

1.44

Material Rate

0.00

Unit Rate(Direct Labour)

1.44

Plant Rate

0.00

Unit Rate (Labour Sub Con)

1.37

BSR Reference

14-00-07

Description

Flag poles [supplied byClient ]planted as directed removed when required and made good.

Unit

Resource Unit

Wastag

post

Quantit

Rate Type

Amount

Labour Sub-Contract Rate post

0.0%

14.25

1.00

14.25

Unskilled Labour post

0.0%

0.50

30.00

15.00

Material Rate

0.00

Unit Rate(Direct Labour)

15.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

14.25

BSR Reference

14-00-08

Description

Lerrering 25mm to 50mm painted in Sinhala, English or Tamil including painting ground.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.99

1.00

6.99

Painter Nos.

0.0%

0.18

40.00

7.36

Brushes paint etc. Nos.

0.0%

0.20

1.00

0.20

Material Rate

0.00

Unit Rate(Direct Labour)

7.56

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.19

Wednesday, March 29, 2006

Page 231 of 395

Southern Province Engineering Services

BSR Reference

14-00-09

Description

Lettering 50mm to 75mm painted in Sinhala, English or Tamil including painting ground

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

7.60

1.00

7.60

Painter Nos.

0.0%

0.20

40.00

8.00

Brushes paint etc. Nos.

0.0%

0.30

1.00

0.30

Material Rate

0.00

Unit Rate(Direct Labour)

8.30

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.90

BSR Reference

14-00-10

Description

Lettering 100mm to 125mm painted in Sinhala, English and Tamil including painting

Unit

Nos.

ground

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.50

1.00

9.50

Painter Nos.

0.0%

0.25

40.00

10.00

Brushes paint etc. Nos.

0.0%

0.50

1.00

0.50

Material Rate

0.00

Unit Rate(Direct Labour)

10.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

10.00

BSR Reference

14-00-11

Description

Painting the metal surface with one coat of aluminium paint

Unit

Resource Unit

Plant Rate

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

16.42

1.00

16.42

Painter M2

0.0%

0.43

40.00

17.28

M2

0.0%

0.07

220.00

15.40

Brushes etc. M2

0.0%

0.55

1.00

0.55

Paint primer Aluminium

Material Rate

Wastag

M2

15.40
0.00

Unit Rate(Direct Labour)

33.23

Unit Rate (Labour Sub Con)

32.37

Wednesday, March 29, 2006

Page 232 of 395

Southern Province Engineering Services

BSR Reference

14-00-12

Description

Painting one coat of enamel paint including washing, cleaning and smoothing down with

Unit

M2

sand paper

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

16.34

1.00

16.34

Painter M2

0.0%

0.43

40.00

17.20

Paint Enamel M2

0.0%

0.08

260.00

21.06

Brushes etc. M2

0.0%

0.40

1.00

0.40

Material Rate

21.06

Plant Rate

0.00

Unit Rate(Direct Labour)

38.66

Unit Rate (Labour Sub Con)

37.80

BSR Reference

14-00-13

Description

Painting two coats of enamel paint including washing cleaning and smoothing downwith

Unit

M2

sand paper

Resource Unit

Wastag

Quantit
38.00

1.00

38.00

Painter M2

0.0%

1.00

40.00

40.00

Paint Enamel M2

0.0%

0.16

260.00

41.86

Brushes etc. M2

0.0%

0.55

1.00

0.55

41.86

Plant Rate

0.00

Unit Rate(Direct Labour)

82.41

Unit Rate (Labour Sub Con)

80.41

BSR Reference

14-00-14

Description

Painting new wood work with primer and 2 coats of oil paint

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

49.40

1.00

49.40

Painter M2

0.0%

1.30

40.00

52.00

Paint Oil M2

0.0%

0.16

220.00

35.42

M2

0.0%

0.08

220.00

17.82

Sand paper M2

0.0%

0.55

1.00

0.55

Paint primer Alumimium for wood

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M2

53.24
0.00

Unit Rate(Direct Labour)

105.79

Unit Rate (Labour Sub Con)

103.19

Wednesday, March 29, 2006

Page 233 of 395

Southern Province Engineering Services

BSR Reference

14-00-15

Description

Painting new wood work with one coat of approved wood primer

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

19.00

1.00

19.00

Painter M2

0.0%

0.50

40.00

20.00

M2

0.0%

0.08

220.00

17.82

Brushes etc. M2

0.0%

0.30

1.00

0.30

Paint primer Alumimium for wood

Material Rate

17.82

Plant Rate

0.00

Unit Rate(Direct Labour)

38.12

Unit Rate (Labour Sub Con)

37.12

BSR Reference

14-00-16

Description

Painting steel work, with 1 coat of red lead including removing scale and wire brushing

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

19.00

1.00

19.00

Painter M2

0.0%

0.50

40.00

20.00

Paint Read lead M2

0.0%

0.08

250.00

20.25

Brushes etc. M2

0.0%

0.15

1.00

0.15

20.25

Plant Rate

0.00

Unit Rate(Direct Labour)

40.40

Unit Rate (Labour Sub Con)

39.40

BSR Reference

14-00-17

Description

Painting steel work with 2 coats of red lead including removing scale and wire brushing

Unit

Resource Unit

Plant Rate

Amount

Labour Sub-Contract Rate M2

Material Rate

Material Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

38.00

1.00

38.00

Painter M2

0.0%

1.00

40.00

40.00

Paint Read lead M2

0.0%

0.16

250.00

40.50

Brushes etc. M2

0.0%

0.20

1.00

0.20

40.50
0.00

Unit Rate(Direct Labour)

80.70

Unit Rate (Labour Sub Con)

78.70

Wednesday, March 29, 2006

Page 234 of 395

Southern Province Engineering Services

BSR Reference

14-00-18

Description

Painting walls with Alkali resisting primer where necessary

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

11.40

1.00

11.40

Painter M2

0.0%

0.30

40.00

12.00

Paint primer Alkali resisting M2

0.0%

0.10

250.00

24.25

Brushes etc. M2

0.0%

0.15

1.00

0.15

Material Rate

24.25

Plant Rate

0.00

Unit Rate(Direct Labour)

36.40

Unit Rate (Labour Sub Con)

35.80

BSR Reference

14-00-19

Description

Painting walls with one coat of emulsion paint including preparing surface of new work

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

11.40

1.00

11.40

Painter M2

0.0%

0.30

40.00

12.00

Paint Emultion M2

0.0%

0.08

200.00

16.20

Brushes etc. M2

0.0%

0.15

1.00

0.15

16.20

Plant Rate

0.00

Unit Rate(Direct Labour)

28.35

Unit Rate (Labour Sub Con)

27.75

BSR Reference

14-00-20

Description

Painting walls with two coats of emulsion paint including preparing surface of new work

Unit

Resource Unit

Material Rate

Amount

Labour Sub-Contract Rate M2

Material Rate

Plant Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

22.80

1.00

22.80

Painter M2

0.0%

0.60

40.00

24.00

Paint Emultion M2

0.0%

0.15

200.00

30.00

Brushes etc. M2

0.0%

0.30

1.00

0.30

30.00
0.00

Unit Rate(Direct Labour)

54.30

Unit Rate (Labour Sub Con)

53.10

Wednesday, March 29, 2006

Page 235 of 395

Southern Province Engineering Services

BSR Reference

14-00-21

Description

Painting walls with one coat of emulsion paint including preparing surface of old work

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

14.29

1.00

14.29

Painter M2

0.0%

0.38

40.00

15.04

Paint Emultion M2

0.0%

0.08

200.00

16.20

Brushes etc. M2

0.0%

0.35

1.00

0.35

Material Rate

16.20

Plant Rate

0.00

Unit Rate(Direct Labour)

31.59

Unit Rate (Labour Sub Con)

30.84

BSR Reference

14-00-22

Description

Painting walls with two coats of emulsion paint including preparing surface of old work

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

24.70

1.00

24.70

Painter M2

0.0%

0.65

40.00

26.00

Emulsion M2

0.0%

0.15

200.00

30.00

Brushes etc. M2

0.0%

0.50

1.00

0.50

30.00

Plant Rate

0.00

Unit Rate(Direct Labour)

56.50

Unit Rate (Labour Sub Con)

55.20

BSR Reference

14-00-23

Description

Painting walls with two coats of sNoswcem of equivalent cement paint to new work

Unit

Resource Unit

Plant Rate

Amount

Labour Sub-Contract Rate M2

Material Rate

Material Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

38.00

1.00

38.00

Painter M2

0.0%

0.70

40.00

28.00

Unskilled Labour M2

0.0%

0.40

30.00

12.00

Paint Snowcem M2

0.0%

0.34

52.00

17.94

Brushes etc. M2

0.0%

0.25

1.00

0.25

17.94
0.00

Unit Rate(Direct Labour)

58.19

Unit Rate (Labour Sub Con)

56.19

Wednesday, March 29, 2006

Page 236 of 395

Southern Province Engineering Services

BSR Reference

14-00-24

Description

Painting old walls with two coats of sNoswcem or equivalent cement paint after scraping

Unit

M2

existing colourwash, sand papering and wiping down

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

46.55

1.00

46.55

Painter M2

0.0%

0.70

40.00

28.00

Unskilled Labour M2

0.0%

0.70

30.00

21.00

Paint Snowcem M2

0.0%

0.34

52.00

17.94

Brushes etc. M2

0.0%

0.25

1.00

0.25

Material Rate

17.94

Plant Rate

0.00

Unit Rate(Direct Labour)

67.19

Unit Rate (Labour Sub Con)

64.74

BSR Reference

14-00-25

Description

Painting old walls with one coat of sNoswcem or equivalent cement paint after scraping

Unit

M2

existing colour wash, sand papering and wiping

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

32.30

1.00

32.30

Painter M2

0.0%

0.40

40.00

16.00

Unskilled Labour M2

0.0%

0.60

30.00

18.00

Paint Snowcem M2

0.0%

0.20

52.00

10.24

Brushes etc. M2

0.0%

0.25

1.00

0.25

Material Rate

10.24

Plant Rate

0.00

Unit Rate(Direct Labour)

44.49

Unit Rate (Labour Sub Con)

42.79

BSR Reference

14-00-26

Description

Removing Paint entirely with blow lamp to bare timber

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

37.05

1.00

37.05

Unskilled Labour M2

0.0%

1.30

30.00

39.00

Blow lamp oil etc. M2

0.0%

1.10

1.00

1.10

Material Rate

0.00

Unit Rate(Direct Labour)

40.10

Plant Rate

0.00

Unit Rate (Labour Sub Con)

38.15

Wednesday, March 29, 2006

Page 237 of 395

Southern Province Engineering Services

BSR Reference

14-00-27

Description

Removing Paint on panelled and moulded surfaces

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

57.00

1.00

57.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

Blow lamp oil etc. M2

0.0%

1.10

1.00

1.10

Material Rate

0.00

Unit Rate(Direct Labour)

61.10

Plant Rate

0.00

Unit Rate (Labour Sub Con)

58.10

BSR Reference

14-00-28

Description

Painting G.I. pipes 20mm to 40mm diameter with 2 coats of enamel paint

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

7.60

1.00

7.60

Painter M2

0.0%

0.20

40.00

8.00

Paint Enamel M2

0.0%

0.02

260.00

5.72

Material Rate

5.72

Unit Rate(Direct Labour)

13.72

Plant Rate

0.00

Unit Rate (Labour Sub Con)

13.32

BSR Reference

14-00-29

Description

Applying of 1 coat Tarnap or other wood preservative to old wood work

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

7.60

1.00

7.60

Painter M2

0.0%

0.20

40.00

8.00

Wood Preservative M2

0.0%

0.12

110.00

13.42

Brushes etc. M2

0.0%

0.15

1.00

0.15

13.42
0.00

Unit Rate(Direct Labour)

21.57

Unit Rate (Labour Sub Con)

21.17

Wednesday, March 29, 2006

Page 238 of 395

Southern Province Engineering Services

BSR Reference

14-00-30

Description

Applying of 2 coats Tarnap or other wood preservative to new wood work

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

15.20

1.00

15.20

Painter M2

0.0%

0.40

40.00

16.00

Wood Preservative M2

0.0%

0.22

110.00

23.98

Brushes etc. M2

0.0%

0.25

1.00

0.25

Material Rate

23.98

Plant Rate

0.00

Unit Rate(Direct Labour)

40.23

Unit Rate (Labour Sub Con)

39.43

BSR Reference

14-00-31

Description

Varnishing with 1 coat of best Copal varnish after washing down and sand papering

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

23.75

1.00

23.75

Painter M2

0.0%

0.40

40.00

16.00

Unskilled Labour M2

0.0%

0.30

30.00

9.00

Polyrethane varnish M2

0.0%

0.10

250.00

24.25

Brushes etc. M2

0.0%

0.35

1.00

0.35

24.25

Plant Rate

0.00

Unit Rate(Direct Labour)

49.60

Unit Rate (Labour Sub Con)

48.35

BSR Reference

14-00-32

Description

Varnishing with 2 coats of best Copal varnish after washing down and sand papering

Unit

Resource Unit

Plant Rate

Amount

Labour Sub-Contract Rate M2

Material Rate

Material Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

38.95

1.00

38.95

Painter M2

0.0%

0.80

40.00

32.00

Unskilled Labour M2

0.0%

0.30

30.00

9.00

Polyrethane varnish M2

0.0%

0.18

250.00

44.50

Brushes etc. M2

0.0%

0.50

1.00

0.50

44.50
0.00

Unit Rate(Direct Labour)

86.00

Unit Rate (Labour Sub Con)

83.95

Wednesday, March 29, 2006

Page 239 of 395

Southern Province Engineering Services

BSR Reference

14-00-33

Description

Removing existing varnishing to bare timber and preparing surface

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

49.88

1.00

49.88

Unskilled Labour M2

0.0%

1.75

30.00

52.50

Sand paper M2

0.0%

0.35

1.00

0.35

Material Rate

0.00

Unit Rate(Direct Labour)

52.85

Plant Rate

0.00

Unit Rate (Labour Sub Con)

50.22

BSR Reference

14-00-34

Description

Scraping and removing soot on walls and levelling internally (extra over colour washing)

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

5.70

1.00

5.70

Unskilled Labour M2

0.0%

0.20

30.00

6.00

Material Rate

0.00

Unit Rate(Direct Labour)

6.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.70

BSR Reference

14-00-35

Description

Scraping of walls to original plaster, sand papering and lime putting cracks and defects,

Unit

M2

preparing surface for new application of distemper sNoswcem paint or similar application

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

3.56

1.00

3.56

Mason M2

0.0%

0.05

45.00

2.25

Unskilled Labour M2

0.0%

0.05

30.00

1.50

Sand paper M2

0.0%

2.15

1.00

2.15

Material Rate

0.00

Unit Rate(Direct Labour)

5.90

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.71

Wednesday, March 29, 2006

Page 240 of 395

Southern Province Engineering Services

BSR Reference

14-00-36

Description

White washing or colour washing wall with 1 coat in single storeyed building including

Unit

M2

patching and preparing surface

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

5.99

1.00

5.99

Painter M2

0.0%

0.09

40.00

3.60

Unskilled Labour M2

0.0%

0.09

30.00

2.70

Boiled lime M2

0.0%

0.18

4.00

0.73

Glue M2

0.0%

0.00

95.00

0.10

Yellow ochre M2

0.0%

0.00

15.00

0.02

Brushes etc. M2

0.0%

0.15

1.00

0.15

Material Rate

0.84

Unit Rate(Direct Labour)

7.29

Plant Rate

0.00

Unit Rate (Labour Sub Con)

6.97

BSR Reference

14-00-37

Description

White washing or colour washing wall with 2 coats in single storeyed building including

Unit

M2

patching and preparing surface

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

9.98

1.00

9.98

Painter M2

0.0%

0.15

40.00

6.00

Unskilled Labour M2

0.0%

0.15

30.00

4.50

Boiled lime M2

0.0%

0.30

4.00

1.18

Glue M2

0.0%

0.00

95.00

0.19

Yellow ochre M2

0.0%

0.00

15.00

0.03

Brushes etc. M2

0.0%

0.20

1.00

0.20

Material Rate

1.40

Unit Rate(Direct Labour)

12.10

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.58

Wednesday, March 29, 2006

Page 241 of 395

Southern Province Engineering Services

BSR Reference

14-00-38

Description

White washing or colour washing external walls with one coat in two storeyed buildings

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

6.84

1.00

6.84

Painter M2

0.0%

0.09

40.00

3.60

Unskilled Labour M2

0.0%

0.12

30.00

3.60

Glue M2

0.0%

0.00

95.00

0.10

Slaked lime M2

0.0%

0.18

2,850.00

518.70

Yellow ochre M2

0.0%

0.00

15.00

0.02

Brushes etc. M2

0.0%

1.20

1.00

1.20

Material Rate

518.81

Plant Rate

0.00

Unit Rate(Direct Labour)

527.21

Unit Rate (Labour Sub Con)

526.85

BSR Reference

14-00-39

Description

White washing or colour washing external walls with one coat in buildings of more than

Unit

M2

two storeys

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

7.45

1.00

7.45

Painter M2

0.0%

0.09

40.00

3.52

Unskilled Labour M2

0.0%

0.14

30.00

4.32

Glue M2

0.0%

0.00

95.00

0.00

Slaked lime M2

0.0%

0.18

2,850.00

513.00

Yellow ochre M2

0.0%

0.00

15.00

0.02

Cement sand scaffolding and brushes M2

0.0%

2.40

1.00

2.40

Material Rate
Plant Rate

513.02
0.00

Unit Rate(Direct Labour)

523.26

Unit Rate (Labour Sub Con)

522.86

Wednesday, March 29, 2006

Page 242 of 395

Southern Province Engineering Services

BSR Reference

14-00-40

Description

White washing or colour washing external walls with 2 coats in 2 storeyed buildings

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

10.94

1.00

10.94

Painter M2

0.0%

0.15

40.00

6.00

Unskilled Labour M2

0.0%

0.18

30.00

5.52

Glue M2

0.0%

0.00

95.00

0.00

Slaked lime M2

0.0%

0.30

2,850.00

843.60

Yellow ochre M2

0.0%

0.00

15.00

0.00

Cement, Sand, Brushes etc. M2

0.0%

1.50

1.00

1.50

Material Rate

843.60

Plant Rate

0.00

Unit Rate(Direct Labour)

856.62

Unit Rate (Labour Sub Con)

856.04

BSR Reference

14-00-41

Description

White washing or colour washing external wall with 2 coats in buildings with more than 2

Unit

M2

storeys

Resource Unit

Quantit

Rate Type

Amount

0.0%

11.63

1.00

11.63

Painter M2

0.0%

0.15

40.00

6.00

Unskilled Labour M2

0.0%

0.21

30.00

6.24

Glue M2

0.0%

0.00

95.00

0.00

Slaked lime M2

0.0%

0.01

2,850.00

31.46

Yellow ochre M2

0.0%

0.00

15.00

0.03

Cement, Sand, Brushes etc. M2

0.0%

2.50

1.00

2.50

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

31.49
0.00

Unit Rate(Direct Labour)

46.23

Unit Rate (Labour Sub Con)

45.62

Wednesday, March 29, 2006

Page 243 of 395

Southern Province Engineering Services

BSR Reference

14-00-42

Description

Walls internal faces scraped to original plaster patching up cracks and defects lime putting

Unit

M2

sand papering applying plaster of paris and preparing surfaces for application of emulsion
paint or enamel paint

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

40.85

1.00

40.85

Mason M2

0.0%

0.20

45.00

9.00

Painter M2

0.0%

0.10

40.00

4.00

Unskilled Labour M2

0.0%

1.00

30.00

30.00

Cemenr and sand papering M2

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

48.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

45.85

BSR Reference

14-00-43

Description

Walls external faces scraped to original plaster patching up cracks and defects and

Unit

M2

preparing surface including sand papering for application of sNoswcem/white washing in


single storyed buildings

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

37.05

1.00

37.05

Mason M2

0.0%

0.20

45.00

9.00

Unskilled Labour M2

0.0%

1.00

30.00

30.00

cement sand and scaffolding M2

0.0%

9.50

1.00

9.50

Material Rate

0.00

Unit Rate(Direct Labour)

48.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

46.55

BSR Reference

14-00-44

Description

Walls external faces scraped to original plaster patching up cracks and defects and

Unit

M2

preparing surface including sand papering for application of sNoswcem or white washing
in two storeyed buildings

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

45.60

1.00

45.60

Mason M2

0.0%

0.20

45.00

9.00

Unskilled Labour M2

0.0%

1.30

30.00

39.00

cement sand and scaffolding M2

0.0%

9.50

1.00

9.50

Material Rate

0.00

Unit Rate(Direct Labour)

57.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

55.10

Wednesday, March 29, 2006

Page 244 of 395

Southern Province Engineering Services

BSR Reference

14-00-45

Description

Walls external faces scraped to original plaster patching up cracks and defects and

Unit

M2

preparing surface including sand papering for application of sNoswcem or white washing
in more than two storeyed buildings

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

57.00

1.00

57.00

Mason M2

0.0%

0.20

45.00

9.00

Unskilled Labour M2

0.0%

1.70

30.00

51.00

cement, sand and lime putty M2

0.0%

9.50

1.00

9.50

Material Rate

0.00

Unit Rate(Direct Labour)

69.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

66.50

BSR Reference

14-00-46

Description

Painting walls with 1 coat weathershield paint including preparing surface of new work

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

12.16

1.00

12.16

Painter M2

0.0%

0.32

40.00

12.80

Weathershield M2

0.0%

0.12

260.00

30.42

Brushes etc. M2

0.0%

1.75

1.00

1.75

Material Rate

30.42

Plant Rate

0.00

Unit Rate(Direct Labour)

44.97

Unit Rate (Labour Sub Con)

44.33

BSR Reference

14-00-47

Description

Painting walls with 2 coats weathershield paint including preparing surface of new work

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

22.80

1.00

22.80

Painter M2

0.0%

0.60

40.00

24.00

Weathershield M2

0.0%

0.22

260.00

57.98

Brushes etc. M2

0.0%

2.00

1.00

2.00

57.98
0.00

Unit Rate(Direct Labour)

83.98

Unit Rate (Labour Sub Con)

82.78

Wednesday, March 29, 2006

Page 245 of 395

Southern Province Engineering Services

BSR Reference

14-00-48

Description

Painting walls with 1 coat weathershield paint including preparing surface of old work

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

14.29

1.00

14.29

Painter M2

0.0%

0.38

40.00

15.04

Weathershield M2

0.0%

0.12

260.00

30.42

Brushes etc. M2

0.0%

2.00

1.00

2.00

Material Rate

30.42

Plant Rate

0.00

Unit Rate(Direct Labour)

47.46

Unit Rate (Labour Sub Con)

46.71

BSR Reference

14-00-49

Description

Painting walls with 2 coats weathershield paint including preparing surface of old work

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

26.60

1.00

26.60

Painter M2

0.0%

0.70

40.00

28.00

Weathershield M2

0.0%

0.22

260.00

57.98

Brushes etc. M2

0.0%

2.15

1.00

2.15

57.98

Plant Rate

0.00

Unit Rate(Direct Labour)

88.13

Unit Rate (Labour Sub Con)

86.73

BSR Reference

14-00-50

Description

Painting floors with 1 coat floor paint including preparing surface

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

9.50

1.00

9.50

Painter M2

0.0%

0.25

40.00

10.00

M2

0.0%

0.08

300.00

24.60

Thinner M2

0.0%

0.01

100.00

0.80

Brushes etc. M2

0.0%

0.00

1.00

0.00

Paint Floor

Plant Rate

Amount

Labour Sub-Contract Rate M2

Material Rate

Material Rate

Amount

Labour Sub-Contract Rate M2

25.40
0.00

Unit Rate(Direct Labour)

35.40

Unit Rate (Labour Sub Con)

34.90

Wednesday, March 29, 2006

Page 246 of 395

Southern Province Engineering Services

BSR Reference

14-00-51

Description

Painting floors with 2 coats floor paint including preparing surface

Unit

Resource Unit

Plant Rate

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

19.00

1.00

19.00

Painter M2

0.0%

0.50

40.00

20.00

M2

0.0%

0.16

300.00

49.20

Thinner M2

0.0%

0.02

100.00

1.60

Brushes etc. M2

0.0%

0.35

1.00

0.35

Paint Floor

Material Rate

Wastag

M2

50.80
0.00

Unit Rate(Direct Labour)

71.15

Unit Rate (Labour Sub Con)

70.15

Wednesday, March 29, 2006

Page 247 of 395

Southern Province Engineering Services

BSR Class

PAVOR

BSR Reference

06-00-01

Description

Expansion joints in brick floors filled with bitumen and sand

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

11.40

1.00

11.40

Mason M

0.0%

0.16

45.00

7.20

Unskilled Labour M

0.0%

0.16

30.00

4.80

Sand and Bitumen M

0.0%

2.00

1.00

2.00

Material Rate

0.00

Unit Rate(Direct Labour)

14.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

13.40

BSR Reference

06-00-02

Description

Expansion joints in concrete floors filled with bitumen and sand(to fill depth of concrete

Unit

and rendering)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

23.51

1.00

23.51

Mason M

0.0%

0.33

45.00

14.85

Unskilled Labour M

0.0%

0.33

30.00

9.90

Bitumen M

0.0%

0.18

16.00

2.88

Sand M

0.0%

0.00

350.00

0.35

Material Rate

3.23

Unit Rate(Direct Labour)

27.98

Plant Rate

0.00

Unit Rate (Labour Sub Con)

26.74

Wednesday, March 29, 2006

Page 248 of 395

Southern Province Engineering Services

BSR Reference

06-00-03

Description

75mm thick brick paved floors set in 1:5 cement mortar including 12mm thick 1:3 cement

Unit

M2

rendering

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

171.57

1.00

171.57

Mason M2

0.0%

1.72

45.00

77.40

Unskilled Labour M2

0.0%

3.44

30.00

103.20

Brick : common M2

0.0%

0.04

2,200.00

83.60

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.05

350.00

17.50

Material Rate

169.10

Plant Rate

0.00

Unit Rate(Direct Labour)

349.70

Unit Rate (Labour Sub Con)

340.67

BSR Reference

06-00-04

Description

75mm thick brick paved floors set in 1:5 cement mortar and 12mm thick 1:3 cement

Unit

M2

rendering with available brick including sorting out and cleaning bricks

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

184.68

1.00

184.68

Mason M2

0.0%

1.72

45.00

77.40

Unskilled Labour M2

0.0%

3.90

30.00

117.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.05

350.00

17.50

85.50
0.00

Unit Rate(Direct Labour)

279.90

Unit Rate (Labour Sub Con)

270.18

Wednesday, March 29, 2006

Page 249 of 395

Southern Province Engineering Services

BSR Reference

06-00-05

Description

75mm thick 1:2 1/2:5 (25mm) cement concrete including 12mm thick 1:2 cement rendering

Unit

M2

with expansion joints filled with cement and sand

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

141.07

1.00

141.07

Mason M2

0.0%

1.30

45.00

58.50

Unskilled Labour M2

0.0%

3.00

30.00

90.00

Cement M2

0.0%

0.54

340.00

183.60

Metal 25mm M2

0.0%

0.08

900.00

72.00

Sand M2

0.0%

0.05

350.00

17.50

Material Rate

273.10

Plant Rate

0.00

Unit Rate(Direct Labour)

421.60

Unit Rate (Labour Sub Con)

414.18

BSR Reference

06-00-06

Description

100mm thick 1:2:4 (20mm) cement concrete in upper floors including formwork 12mm thick

Unit

M2

1:3 cement rendering and lime putty rendering to soffit and expansion joints filled with
cement and sand(Reinforcement paid for separately)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

511.58

1.00

511.58

Mason M2

0.0%

4.40

45.00

198.00

Unskilled Labour M2

0.0%

11.35

30.00

340.50

Boiled lime M2

0.0%

0.00

4.00

0.00

Cement M2

0.0%

0.70

340.00

238.00

Metal 20mm M2

0.0%

0.10

110.00

11.00

Mould oil M2

0.0%

0.12

10.00

1.20

Props (bamboo) 3 - 4 m M2

0.0%

0.69

80.00

55.20

Sand M2

0.0%

0.08

350.00

28.00

Timb.cl.B planks 25mm M2

0.0%

0.60

300.00

180.00

Timber beams class B M2

0.0%

0.00

20,000.00

40.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.10

55.00

5.50

558.90
0.00

Unit Rate(Direct Labour)

1,097.40

Unit Rate (Labour Sub Con)

1,070.48

Wednesday, March 29, 2006

Page 250 of 395

Southern Province Engineering Services

BSR Reference

06-00-07

Description

Supplying spreading watering and completing gravel in floor for 100mm thickness

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

12.26

1.00

12.26

Unskilled Labour M2

0.0%

0.43

30.00

12.90

Gravel M2

0.0%

0.30

165.00

49.50

Material Rate

49.50

Plant Rate

0.00

Unit Rate(Direct Labour)

62.40

Unit Rate (Labour Sub Con)

61.76

BSR Reference

06-00-08

Description

Supplying and laying of Terrazzo floor tiles including 12mm thick 1:3 cement mortar

Unit

M2

leveling screed etc.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

361.38

1.00

361.38

Mason M2

0.0%

1.72

45.00

77.40

Terrazo Mason M2

0.0%

9.00

25.00

225.00

Unskilled Labour M2

0.0%

2.60

30.00

78.00

Cement M2

0.0%

0.13

340.00

44.20

Sand M2

0.0%

0.02

350.00

7.00

Tile Terrazo 300*300mm M2

0.0%

12.00

70.00

840.00

Steel pin coloured cement M2

0.0%

5.00

1.00

5.00

891.20
0.00

Unit Rate(Direct Labour)

1,276.60

Unit Rate (Labour Sub Con)

1,257.58

Wednesday, March 29, 2006

Page 251 of 395

Southern Province Engineering Services

BSR Reference

06-00-09

Description

Supplying and laying of ceramic floor tiles including 20mm thick 1:3 cement sand bedding

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

28.36

1.00

28.36

Mason M2

0.0%

0.33

45.00

14.85

Unskilled Labour M2

0.0%

0.50

30.00

15.00

200 x 200mm ceramic floor tile M2

0.0%

26.00

25.00

650.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.02

350.00

5.95

Material Rate

723.95

Plant Rate

0.00

Unit Rate(Direct Labour)

753.80

Unit Rate (Labour Sub Con)

752.31

BSR Reference

06-00-10

Description

Supplying and fixing of Glazed tiles with all specials to walls including raking,

Unit

M2

plastering and bedding in 12mm thick 1:3 cement mortar

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

28.36

1.00

28.36

Mason M2

0.0%

0.33

45.00

14.85

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.02

350.00

5.95

Tile glazed 108*108mm M2

0.0%

92.00

5.00

460.00

533.95
0.00

Unit Rate(Direct Labour)

563.80

Unit Rate (Labour Sub Con)

562.31

Wednesday, March 29, 2006

Page 252 of 395

Southern Province Engineering Services

BSR Reference
Description

06-00-11

Unit

M2

fixing of Glazed tiles to walls including raking, plastering and bedding in 12mm thick 1:3
cement mortar (Tiles supplied by the Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

57.00

1.00

57.00

Mason M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

0.50

30.00

15.00

Cement M2

0.0%

0.20

340.00

68.00

Sand M2

0.0%

0.17

350.00

59.50

Material Rate

127.50

Plant Rate

0.00

Unit Rate(Direct Labour)

187.50

Unit Rate (Labour Sub Con)

184.50

BSR Reference

06-00-12

Description

Supplying and fixing of pressed cement tiles of approved pattern and colour to floors

Unit

M3

including 20mm thick 1:3 cement sand bedding

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

35.63

1.00

35.63

Mason M3

0.0%

0.50

45.00

22.50

Unskilled Labour M3

0.0%

0.50

30.00

15.00

Cement M3

0.0%

0.15

340.00

51.00

Sand M3

0.0%

0.02

350.00

5.95

Tile cement pressed 200*200mm M3

0.0%

26.00

12.00

312.00

Material Rate
Plant Rate

368.95
0.00

Unit Rate(Direct Labour)

406.45

Unit Rate (Labour Sub Con)

404.58

Wednesday, March 29, 2006

Page 253 of 395

Southern Province Engineering Services

BSR Class

PLASTERER.

BSR Reference

11-00-01

Description

15mm thick 1:1:5 cement lime plastering.

Unit

Resource Unit

Wastag

Rate Type

Amount

0.0%

64.55

1.00

64.55

Mason M2

0.0%

0.65

45.00

29.25

Unskilled Labour M2

0.0%

1.29

30.00

38.70

Boiled lime M2

0.0%

2.40

4.00

9.60

Cement M2

0.0%

0.09

340.00

29.24

Sand M2

0.0%

0.02

350.00

7.35

46.19

Plant Rate

0.00

BSR Reference

11-00-02

Description

Clay Plastering and lime puttying smooth.

Unit Rate(Direct Labour)

114.14

Unit Rate (Labour Sub Con)

110.74

Unit

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate M2

Material Rate

Material Rate

M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

64.38

1.00

64.38

Mason M2

0.0%

0.65

45.00

29.07

Unskilled Labour M2

0.0%

1.29

30.00

38.70

Boiled lime M2

0.0%

2.40

4.00

9.60

Clay M2

0.0%

0.03

120.00

3.60

13.20
0.00

Unit Rate(Direct Labour)

80.97

Unit Rate (Labour Sub Con)

77.58

Wednesday, March 29, 2006

Page 254 of 395

Southern Province Engineering Services

BSR Reference

11-00-03

Description

65mm * 65mm Cove mouliding build in existing walls in 1:2 cement mortar.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

46.85

1.00

46.85

Mason M

0.0%

0.66

45.00

29.52

Unskilled Labour M

0.0%

0.66

30.00

19.80

Cement M

0.0%

0.04

340.00

12.24

Sand M

0.0%

0.00

350.00

1.05

Material Rate

13.29

Plant Rate

0.00

Unit Rate(Direct Labour)

62.61

Unit Rate (Labour Sub Con)

60.14

BSR Reference

11-00-04

Description

Plastering of 50mm to 100mm wide cracks in with 1:3 cement plaster after chipping.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

16.36

1.00

16.36

Mason M

0.0%

0.16

45.00

7.38

Unskilled Labour M

0.0%

0.33

30.00

9.84

Cement M

0.0%

0.01

340.00

3.40

Sand M

0.0%

0.00

350.00

0.70

Material Rate

4.10

Unit Rate(Direct Labour)

21.32

Plant Rate

0.00

Unit Rate (Labour Sub Con)

20.46

BSR Reference

11-00-05

Description

Cresting with broken glass in 1:4 cement mortar on coping of boundary wall.

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

35.63

1.00

35.63

Mason M

0.0%

0.50

45.00

22.50

Unskilled Labour M

0.0%

0.50

30.00

15.00

Cement M

0.0%

0.08

340.00

27.88

Sand M

0.0%

0.01

350.00

3.50

Glass bottling M

0.0%

3.50

1.00

3.50

31.38
0.00

Unit Rate(Direct Labour)

72.38

Unit Rate (Labour Sub Con)

70.51

Wednesday, March 29, 2006

Page 255 of 395

Southern Province Engineering Services

BSR Reference

11-00-06

Description

75mm * 12mm Dato moulding in walls in 1:1:4 lime and cement mortar for replacement to

Unit

match existing, or to be etxra over rate for plastering.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

57.00

1.00

57.00

Mason M

0.0%

0.80

45.00

36.00

Unskilled Labour M

0.0%

0.80

30.00

24.00

Boiled lime M

0.0%

0.02

4.00

0.08

Cement M

0.0%

0.01

340.00

2.72

Sand M

0.0%

0.00

350.00

0.70

Material Rate

3.50

Unit Rate(Direct Labour)

63.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

60.50

BSR Reference

11-00-07

Description

150mm * 25mm Dato moulding in walls in 1:1:4 lime and cement mortar only for

Unit

replacement to match existing, or to be etxra over rate for plastering.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

71.25

1.00

71.25

Mason M

0.0%

1.00

45.00

45.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

Boiled lime M

0.0%

0.90

4.00

3.60

Cement M

0.0%

0.03

340.00

10.20

Sand M

0.0%

0.01

350.00

3.50

17.30
0.00

Unit Rate(Direct Labour)

92.30

Unit Rate (Labour Sub Con)

88.55

Wednesday, March 29, 2006

Page 256 of 395

Southern Province Engineering Services

BSR Reference

11-00-08

Description

100mm * 50mm Dato moulding in cement and sand 1:2 built in existing wall.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

85.50

1.00

85.50

Mason M

0.0%

1.20

45.00

54.00

Unskilled Labour M

0.0%

1.20

30.00

36.00

Cement M

0.0%

0.08

340.00

27.20

Sand M

0.0%

0.01

350.00

2.10

Material Rate

29.30

Plant Rate

0.00

Unit Rate(Direct Labour)

119.30

Unit Rate (Labour Sub Con)

114.80

BSR Reference

11-00-09

Description

Laying of Flashing or plaster bands over tiles 100mm to 150mm wide on roof in 1:1:4

Unit

cement and lime mortar.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

24.94

1.00

24.94

Mason M

0.0%

0.25

45.00

11.25

Unskilled Labour M

0.0%

0.50

30.00

15.00

Boiled lime M

0.0%

0.72

4.00

2.88

Cement M

0.0%

0.03

340.00

8.84

Sand M

0.0%

0.01

350.00

3.50

Material Rate

15.22

Plant Rate

0.00

Unit Rate(Direct Labour)

41.47

Unit Rate (Labour Sub Con)

40.16

BSR Reference

11-00-10

Description

Letters embossed in plaster 20mm thick 150mm high in cement and sand 1:2 cement floated

Unit

Nos.

and painted.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Mason Nos.

0.0%

0.50

45.00

22.50

Painter Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Cement paint etc Nos.

0.0%

2.00

1.00

2.00

Material Rate

0.00

Unit Rate(Direct Labour)

37.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

35.25

Wednesday, March 29, 2006

Page 257 of 395

Southern Province Engineering Services

BSR Reference

11-00-11

Description

15mm thick 1:1:5 lime plastering and finished smooth with lime putty.

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

92.63

1.00

92.63

Mason M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

1.75

30.00

52.50

Boiled lime M2

0.0%

0.03

4.00

0.12

Cement M2

0.0%

0.09

340.00

30.60

Sand M2

0.0%

0.02

350.00

7.35

Material Rate

38.07

Plant Rate

0.00

Unit Rate(Direct Labour)

135.57

Unit Rate (Labour Sub Con)

130.70

BSR Reference

11-01-12

Description

1:2 cement plastering flush in surface cracks including raking out joints.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

14.14

1.00

14.14

Mason M

0.0%

0.16

45.00

7.38

Unskilled Labour M

0.0%

0.25

30.00

7.50

Cement Sand etc. M

0.0%

3.25

1.00

3.25

Material Rate

0.00

Unit Rate(Direct Labour)

18.13

Plant Rate

0.00

Unit Rate (Labour Sub Con)

17.39

BSR Reference

11-01-13

Description

1:2 cement plastering projected in brick masonary etc.

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

178.13

1.00

178.13

Mason M2

0.0%

2.50

45.00

112.50

Unskilled Labour M2

0.0%

2.50

30.00

75.00

Cement M2

0.0%

0.11

340.00

37.40

Sand M2

0.0%

0.01

350.00

3.15

40.55
0.00

Unit Rate(Direct Labour)

228.05

Unit Rate (Labour Sub Con)

218.67

Wednesday, March 29, 2006

Page 258 of 395

Southern Province Engineering Services

BSR Reference

11-01-14

Description

12mm thick 1:2 cement rendering, above 10m2

Unit

Resource Unit

Wastag

Quantit

Amount

0.0%

32.35

1.00

32.35

Mason M2

0.0%

0.65

45.00

29.25

Unskilled Labour M2

0.0%

0.16

30.00

4.80

Cement M2

0.0%

0.16

340.00

54.74

Sand M2

0.0%

0.01

350.00

5.25

59.99

Plant Rate

0.00

BSR Reference

11-01-15

Description

12mm thick 1:2 cement rendering, upto 10m2

Unit Rate(Direct Labour)

94.04

Unit Rate (Labour Sub Con)

92.34

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

79.80

1.00

79.80

Mason M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement M2

0.0%

0.16

340.00

54.40

Sand M2

0.0%

0.01

350.00

5.25

Material Rate

59.65

Plant Rate

0.00

Unit Rate(Direct Labour)

143.65

Unit Rate (Labour Sub Con)

139.45

BSR Reference

11-01-16

Description

12mm thick 1:3 cement rendering, above 10m2

Unit

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate M2

Material Rate

Material Rate

M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

64.84

1.00

64.84

Mason M2

0.0%

0.65

45.00

29.25

Unskilled Labour M2

0.0%

1.30

30.00

39.00

Cement M2

0.0%

0.12

340.00

39.10

Sand M2

0.0%

0.01

350.00

5.25

44.35
0.00

Unit Rate(Direct Labour)

112.60

Unit Rate (Labour Sub Con)

109.19

Wednesday, March 29, 2006

Page 259 of 395

Southern Province Engineering Services

BSR Reference

11-01-17

Description

12mm thick 1:3 cement rendering, upto 10m2

Unit

Resource Unit

Wastag

Quantit

Amount

0.0%

79.80

1.00

79.80

Mason M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.60

30.00

48.00

Cement M2

0.0%

0.12

340.00

39.10

Sand M2

0.0%

0.01

350.00

5.25

44.35

Plant Rate

0.00

Unit Rate(Direct Labour)

128.35

Unit Rate (Labour Sub Con)

124.15

BSR Reference

11-01-18

Description

20mm thick 1:2 cement rendering, above 10m2

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

86.28

1.00

86.28

Mason M2

0.0%

0.87

45.00

38.93

Unskilled Labour M2

0.0%

1.73

30.00

51.90

Cement M2

0.0%

0.24

340.00

82.28

Sand M2

0.0%

0.02

350.00

7.00

Material Rate

89.28

Plant Rate

0.00

BSR Reference

11-01-19

Description

20mm thick 1:2 cement rendering, upto 10m2.

Unit Rate(Direct Labour)

180.11

Unit Rate (Labour Sub Con)

175.56

Unit

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate M2

Material Rate

Material Rate

M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

104.31

1.00

104.31

Mason M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

2.16

30.00

64.80

Cement M2

0.0%

0.24

340.00

82.28

Sand M2

0.0%

0.02

350.00

7.70

89.98
0.00

Unit Rate(Direct Labour)

199.78

Unit Rate (Labour Sub Con)

194.29

Wednesday, March 29, 2006

Page 260 of 395

Southern Province Engineering Services

BSR Reference

11-01-20

Description

20mm thick cement rendering, above 10m2.

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

86.50

1.00

86.50

Mason M2

0.0%

0.87

45.00

39.15

Unskilled Labour M2

0.0%

1.73

30.00

51.90

Cement M2

0.0%

0.19

340.00

63.92

Sand M2

0.0%

0.02

350.00

7.70

Material Rate

71.62

Plant Rate

0.00

BSR Reference

11-01-21

Description

20mm thick 1:3 cement reducing, upto 10m2.

Unit Rate(Direct Labour)

162.67

Unit Rate (Labour Sub Con)

158.12

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

104.31

1.00

104.31

Mason M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

2.16

30.00

64.80

Cement M2

0.0%

0.19

340.00

63.92

Sand M2

0.0%

0.02

350.00

7.70

Material Rate

71.62

Plant Rate

0.00

Unit Rate(Direct Labour)

181.42

Unit Rate (Labour Sub Con)

175.93

BSR Reference

11-01-22

Description

Red cement floating coat in rendering , using red cement[coloured & finish smooth].

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

5.70

1.00

5.70

Mason M2

0.0%

0.10

45.00

4.50

Unskilled Labour M2

0.0%

0.05

30.00

1.50

Cement M2

0.0%

0.03

340.00

9.86

Colour pigment for cement M2

0.0%

0.00

200.00

0.60

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

10.46
0.00

Unit Rate(Direct Labour)

16.46

Unit Rate (Labour Sub Con)

16.16

Wednesday, March 29, 2006

Page 261 of 395

Southern Province Engineering Services

BSR Reference

11-01-23

Description

Brown or green cement fioating in rendreing with black cement & finish smooth.

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

0.0%

5.70

1.00

5.70

Mason M2

0.0%

0.10

45.00

4.50

Unskilled Labour M2

0.0%

0.05

30.00

1.50

Cement M2

0.0%

0.03

340.00

9.86

Colour pigment for cement M2

0.0%

0.07

200.00

14.00

Material Rate

23.86

Plant Rate

0.00

Unit Rate(Direct Labour)

29.86

Unit Rate (Labour Sub Con)

29.56

BSR Reference

11-01-24

Description

Black cement floating in rendering with black cement & finish smooth.

Unit

Resource Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

5.70

1.00

5.70

Mason M2

0.0%

0.10

45.00

4.50

Unskilled Labour M2

0.0%

0.05

30.00

1.50

Cement M2

0.0%

0.03

340.00

9.86

Colour pigment for cement M2

0.0%

0.07

200.00

14.60

Material Rate

24.46

Plant Rate

0.00

Unit Rate(Direct Labour)

30.46

Unit Rate (Labour Sub Con)

30.16

BSR Reference

11-01-25

Description

20mm thick 1:2 cement rendering with 5% pudio cement.

Unit

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M2

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

86.50

1.00

86.50

Mason M2

0.0%

0.87

45.00

39.15

Unskilled Labour M2

0.0%

1.73

30.00

51.90

Cement M2

0.0%

0.24

340.00

82.28

Pudlo Cement M2

0.0%

0.55

80.00

43.92

Sand M2

0.0%

0.02

350.00

7.70

133.90
0.00

Unit Rate(Direct Labour)

224.95

Unit Rate (Labour Sub Con)

220.40

Wednesday, March 29, 2006

Page 262 of 395

Southern Province Engineering Services

BSR Reference

11-01-26

Description

12mm*150mm skirting in 1:3, projected on flush with wall and including forming groove.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

57.00

1.00

57.00

Mason M

0.0%

0.80

45.00

36.00

Unskilled Labour M

0.0%

0.80

30.00

24.00

Cement M

0.0%

0.03

340.00

11.22

Sand M

0.0%

0.00

350.00

1.05

Material Rate

12.27

Plant Rate

0.00

Unit Rate(Direct Labour)

72.27

Unit Rate (Labour Sub Con)

69.27

BSR Reference

11-01-27

Description

12mm*150mm skirting in 1:3 cement mortar projected in flush with wall & finished with

Unit

red cement floating including forming groove.

Resource Unit

Quantit

Rate Type

Amount

0.0%

65.55

1.00

65.55

Mason M

0.0%

1.00

45.00

45.00

Unskilled Labour M

0.0%

0.80

30.00

24.00

Cement M

0.0%

0.03

340.00

10.88

Colour pigment for cement M

0.0%

0.01

200.00

2.60

Sand M

0.0%

0.00

350.00

1.05

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

14.53
0.00

Unit Rate(Direct Labour)

83.53

Unit Rate (Labour Sub Con)

80.08

Wednesday, March 29, 2006

Page 263 of 395

Southern Province Engineering Services

BSR Reference

11-01-28

Description

15mm thick plastering , 1:1:3 cement lime & sand to R.C.beam & slab soffit including

Unit

M2

floating with lime putty.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

124.69

1.00

124.69

Mason M2

0.0%

1.75

45.00

78.75

Unskilled Labour M2

0.0%

1.75

30.00

52.50

Boiled lime M2

0.0%

2.40

4.00

9.60

Cement M2

0.0%

0.09

340.00

30.60

Sand M2

0.0%

0.01

350.00

5.25

Scafolding M2

0.0%

1.75

1.00

1.75

Material Rate

45.45

Plant Rate

0.00

Unit Rate(Direct Labour)

178.45

Unit Rate (Labour Sub Con)

171.89

BSR Reference

11-01-29

Description

20mm thick 1:2 cement sand D.P. & finished smooth with 2 coats of hot tar blinded with

Unit

M2

coarse sand.C

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

99.75

1.00

99.75

Mason M2

0.0%

1.00

45.00

45.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

Cement M2

0.0%

0.24

340.00

82.28

DPC tar M2

0.0%

0.50

47.00

23.50

Sand M2

0.0%

0.00

350.00

0.70

Fire wood and water etc. M2

0.0%

0.60

1.00

0.60

106.48
0.00

Unit Rate(Direct Labour)

212.08

Unit Rate (Labour Sub Con)

206.83

Wednesday, March 29, 2006

Page 264 of 395

Southern Province Engineering Services

BSR Reference

11-01-30

Description

Cement floating coat in rendering using Nosrmal & finished smooth.

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

2.15

1.00

2.15

Mason M2

0.0%

0.01

45.00

0.59

Unskilled Labour M2

0.0%

0.06

30.00

1.68

Cement M2

0.0%

0.03

340.00

10.88

10.88
0.00

Unit Rate(Direct Labour)

13.15

Unit Rate (Labour Sub Con)

13.03

Wednesday, March 29, 2006

Page 265 of 395

Southern Province Engineering Services

BSR Class

PLUMBER

BSR Reference

15-00-01

Description

Supplying and fixing of 12mm Ball float valve

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Ball valve 12mm Nos.

0.0%

1.00

50.00

50.00

50.00

Plant Rate

0.00

BSR Reference

15-00-02

Description

Supplying and fixing of 20mm Ball valve

Resource Unit

Unit Rate(Direct Labour)

85.00

Unit Rate (Labour Sub Con)

83.25

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Ball valve 20mm Nos.

0.0%

1.00

55.00

55.00

Material Rate

55.00

Plant Rate

0.00

BSR Reference

15-00-03

Description

Supplying and fixing of 25mm Ball valve

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

90.00

Unit Rate (Labour Sub Con)

88.25

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

49.88

1.00

49.88

Plumber Nos.

0.0%

0.75

40.00

30.00

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Ball valve ,25mm Nos.

0.0%

1.00

70.00

70.00

70.00
0.00

Unit Rate(Direct Labour)

122.50

Unit Rate (Labour Sub Con)

119.88

Wednesday, March 29, 2006

Page 266 of 395

Southern Province Engineering Services

BSR Reference

15-00-04

Description

Supplying and fixing of 32mm Ball valve

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

66.50

1.00

66.50

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

0.0%

1.00

100.00

100.00

Ball valve, 32mm

Material Rate

Nos.

100.00

Plant Rate

0.00

Unit Rate(Direct Labour)

170.00

Unit Rate (Labour Sub Con)

166.50

BSR Reference

15-00-05

Description

Fixing of 12mm to 25mm Ball valve (Valve supplied by Client)

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Material Rate

0.00

Unit Rate(Direct Labour)

35.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

33.25

BSR Reference

15-00-06

Description

Removing, repairing, testing and fixing of Ball valve

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

71.25

1.00

71.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Tinker Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Leads etc. Nos.

0.0%

4.00

1.00

4.00

Material Rate

0.00

Unit Rate(Direct Labour)

79.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

75.25

Wednesday, March 29, 2006

Page 267 of 395

Southern Province Engineering Services

BSR Reference

15-00-07

Description

Supplying and fixing of Ball only plastic, for 12mm valve

Unit

Resource Unit

Wastag

Nos.

Quantit

Amount

0.0%

42.75

1.00

42.75

Plumber Nos.

0.0%

0.50

40.00

20.00

Tinker Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Ball only [plastic] 1/2" valve Nos.

0.0%

1.00

90.00

90.00

Leads etc. Nos.

0.0%

3.00

1.00

3.00

Material Rate

90.00

Plant Rate

0.00

Unit Rate(Direct Labour)

138.00

Unit Rate (Labour Sub Con)

135.75

BSR Reference

15-00-08

Description

Supplying and fixing of Ball only plastic for 20mm valve

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

42.75

1.00

42.75

Plumber Nos.

0.0%

0.50

40.00

20.00

Tinker Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Ball only [plastic] 3/4" valve Nos.

0.0%

1.00

160.00

160.00

Leads etc. Nos.

0.0%

3.00

1.00

3.00

Material Rate
Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

160.00
0.00

Unit Rate(Direct Labour)

208.00

Unit Rate (Labour Sub Con)

205.75

Wednesday, March 29, 2006

Page 268 of 395

Southern Province Engineering Services

BSR Reference

15-00-09

Description

Supplying and fixing of Ball only plastic, for 25mm valve

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

59.38

1.00

59.38

Plumber Nos.

0.0%

0.75

40.00

30.00

Tinker Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Ball only [plastic] 1" valve Nos.

0.0%

1.00

200.00

200.00

Leads etc. Nos.

0.0%

3.00

1.00

3.00

Material Rate

200.00

Plant Rate

0.00

Unit Rate(Direct Labour)

265.50

Unit Rate (Labour Sub Con)

262.38

BSR Reference

15-00-10

Description

Ball soldered and fixed to lever operating valve

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

42.75

1.00

42.75

Plumber Nos.

0.0%

0.50

40.00

20.00

Tinker Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Leads etc. Nos.

0.0%

3.00

1.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

48.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

45.75

Wednesday, March 29, 2006

Page 269 of 395

Southern Province Engineering Services

BSR Reference

15-00-11

Description

Fixing of lavatory Basin to wall and connected to existing water service and making good

Unit

Nos.

(Basin brackets and fittings supplied by Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

541.50

1.00

541.50

Carpenter Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Plugs Nos.

0.0%

4.00

16.00

64.00

Screws, cement, red lead etc. Nos.

0.0%

4.00

1.00

4.00

Material Rate

64.00

Plant Rate

0.00

Unit Rate(Direct Labour)

638.00

Unit Rate (Labour Sub Con)

609.50

BSR Reference

15-00-12

Description

Fixing of lavatory Basin on existing brackets (Tap, waste trap and basin supplied by Client)

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

266.00

1.00

266.00

Plumber Nos.

0.0%

4.00

40.00

160.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Red lead etc. Nos.

0.0%

2.00

1.00

2.00

Material Rate

0.00

Unit Rate(Direct Labour)

282.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

268.00

Wednesday, March 29, 2006

Page 270 of 395

Southern Province Engineering Services

BSR Reference

15-00-13

Description

Supplying and fixing of lavatory Basin 560mm x 360mm with one taps, waste plug, with

Unit

Nos.

new brackets (additional tap, trap and outlet pipe paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

541.50

1.00

541.50

Carpenter Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Basin 360*560 with tap waste plug Nos.

0.0%

1.00

1,000.00

1,000.00

Plugs Nos.

0.0%

4.00

16.00

64.00

wash basin [L] bracket Nos.

0.0%

1.00

60.00

60.00

Screws, cement, red lead etc. Nos.

0.0%

4.00

1.00

4.00

Material Rate

1,124.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,698.00

Unit Rate (Labour Sub Con)

1,669.50

BSR Reference

15-00-14

Description

Supplying and fixing of lavatory Basin 560mm x 360mm with one tap on existing brackets

Unit

Nos.

complete (additional tap, trap and outlet pipe paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

541.50

1.00

541.50

Mason Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Basin 360*560 with tap waste plug Nos.

0.0%

1.00

1,000.00

1,000.00

Plugs Nos.

0.0%

4.00

16.00

64.00

Screws, cement, red lead etc. Nos.

0.0%

4.00

1.00

4.00

Material Rate
Plant Rate

1,064.00
0.00

Unit Rate(Direct Labour)

1,638.00

Unit Rate (Labour Sub Con)

1,609.50

Wednesday, March 29, 2006

Page 271 of 395

Southern Province Engineering Services

BSR Reference

15-00-15

Description

Removing Basin, Urnal or sink including all fittings and walls made good

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

270.75

1.00

270.75

Mason Nos.

0.0%

1.00

45.00

45.00

Plumber Nos.

0.0%

3.00

40.00

120.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Cement lime etc. Nos.

0.0%

4.00

1.00

4.00

Material Rate

0.00

Unit Rate(Direct Labour)

289.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

274.75

BSR Reference

15-00-16

Description

C.I. enamelled baths removing and re-fixing in new position and making good to walls and

Unit

Nos.

floors (extra pipes required paid separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

950.00

1.00

950.00

Mason Nos.

0.0%

4.00

45.00

180.00

Plumber Nos.

0.0%

10.00

40.00

400.00

Unskilled Labour Nos.

0.0%

14.00

30.00

420.00

Cement, Sand and Lead Nos.

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

1,010.00
960.00

BSR Reference

15-00-17

Description

C.I. enamelled baths any size including trap, tap, outlet pipes etc. fixed complete (Bath and

Unit

Nos.

fittings supplied by Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

674.50

1.00

674.50

Mason Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

10.00

30.00

300.00

Screws, cement, red lead etc. Nos.

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

720.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

684.50

Wednesday, March 29, 2006

Page 272 of 395

Southern Province Engineering Services

BSR Reference

15-00-18

Description

Fixing of C.I. Bends, elbows, tees, cresses and size upto 50mm (fittings supplied by Client)

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

18.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

17.63

BSR Reference

15-00-19

Description

Supplying and fixing of 12mm G.I. Bends

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Bend G.I,12mm Nos.

0.0%

1.00

30.00

30.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

30.00

Plant Rate

0.00

BSR Reference

15-00-20

Description

Supplying and fixing of 20mm G.I. Bends

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

48.50

Unit Rate (Labour Sub Con)

47.63

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Bend G.I 20mm Nos.

0.0%

1.00

40.00

40.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

40.00
0.00

Unit Rate(Direct Labour)

58.50

Unit Rate (Labour Sub Con)

57.63

Wednesday, March 29, 2006

Page 273 of 395

Southern Province Engineering Services

BSR Reference

15-00-21

Description

Supplying and fixing of 25mm G.I. Bends

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Bend G.I. 25mm Nos.

0.0%

1.00

56.00

56.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

56.00

Plant Rate

0.00

BSR Reference

15-00-22

Description

Supplying and fixing of 32mm G.I. Bends

Resource Unit

Unit Rate(Direct Labour)

74.50

Unit Rate (Labour Sub Con)

73.63

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Bend G,I 50mm Nos.

0.0%

1.00

170.00

170.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

170.00

Plant Rate

0.00

BSR Reference

15-00-23

Description

Supplying and fixing of 38mm G.I. Bends

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

188.50

Unit Rate (Labour Sub Con)

187.63

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Bend G.I. 38mm Nos.

0.0%

1.00

130.00

130.00

Red lead etc. Nos.

0.0%

1.50

1.00

1.50

130.00
0.00

Unit Rate(Direct Labour)

149.00

Unit Rate (Labour Sub Con)

148.13

Wednesday, March 29, 2006

Page 274 of 395

Southern Province Engineering Services

BSR Reference

15-00-24

Description

Supplying and fixing of 50mm G.I. Bends

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Bend G,I 50mm Nos.

0.0%

1.00

170.00

170.00

Red lead etc. Nos.

0.0%

1.50

1.00

1.50

Material Rate

170.00

Plant Rate

0.00

BSR Reference

15-00-25

Description

Supplying and fixing of 75mm G.I. Bends

Resource Unit

Unit Rate(Direct Labour)

189.00

Unit Rate (Labour Sub Con)

188.13

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

21.95

1.00

21.95

Plumber Nos.

0.0%

0.33

40.00

13.20

Unskilled Labour Nos.

0.0%

0.33

30.00

9.90

Bend G.I. 75mm Nos.

0.0%

1.00

450.00

450.00

Red lead etc. Nos.

0.0%

2.00

1.00

2.00

Material Rate

450.00

Plant Rate

0.00

Unit Rate(Direct Labour)

475.10

Unit Rate (Labour Sub Con)

473.95

BSR Reference

15-00-26

Description

Supplying and fixing of Chain, chromium plated for flushing cistern

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

19.00

1.00

19.00

Plumber Nos.

0.0%

0.50

40.00

20.00

Chromium plated chain for flushing Nos.

0.0%

1.00

60.00

60.00

Material Rate
Plant Rate

60.00
0.00

Unit Rate(Direct Labour)

80.00

Unit Rate (Labour Sub Con)

79.00

Wednesday, March 29, 2006

Page 275 of 395

Southern Province Engineering Services

BSR Reference

15-01-27

Description

Supplying and fixing of p.v.c. reducing Sockets from 20mm to smaller sizes

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

8.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.65

BSR Reference

15-01-28

Description

Supplying and fixing of p.v.c. reducing Socket from 25mm to smaller size

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. tee 25mm to smaller size Nos.

0.0%

1.00

10.00

10.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

10.00

Plant Rate

0.00

Unit Rate(Direct Labour)

18.00

Unit Rate (Labour Sub Con)

17.65

BSR Reference

15-01-29

Description

Supplying and fixing of p.v.c. reducing Socket from 32mm to smaller size

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. socket 32mm to smaller size Nos.

0.0%

1.00

13.00

13.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

13.00
0.00

Unit Rate(Direct Labour)

21.00

Unit Rate (Labour Sub Con)

20.65

Wednesday, March 29, 2006

Page 276 of 395

Southern Province Engineering Services

BSR Reference

15-01-30

Description

Supplying and fixing of p.v.c. reducing Sockets from 38mm to smaller sizes

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. sokt. 40mm to smaller size Nos.

0.0%

1.00

15.00

15.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

15.00

Plant Rate

0.00

Unit Rate(Direct Labour)

23.00

Unit Rate (Labour Sub Con)

22.65

BSR Reference

15-01-31

Description

Supplying and fixing of p.v.c. reducing Sockets from 50mm to smaller sizes

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. tee 50mm to smaller size Nos.

0.0%

1.00

35.00

35.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

35.00

Plant Rate

0.00

Unit Rate(Direct Labour)

43.00

Unit Rate (Labour Sub Con)

42.65

BSR Reference

15-01-32

Description

Supplying and fixing of p.v.c. reducing Tees from 20mm to smaller size

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. sockt 25mm to smaller size Nos.

0.0%

1.00

7.50

7.50

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

7.50

Unit Rate(Direct Labour)

15.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

15.15

Wednesday, March 29, 2006

Page 277 of 395

Southern Province Engineering Services

BSR Reference

15-01-33

Description

Supplying and fixing of p.v.c. reducing Tees from 25mm to smaller size

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. sockt 25mm to smaller size Nos.

0.0%

1.00

7.50

7.50

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

7.50

Unit Rate(Direct Labour)

15.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

15.15

BSR Reference

15-01-34

Description

Supplying and fixing of p.v.c. reducing Tees from 32mm to smaller sizes

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. socket 32mm to smaller size Nos.

0.0%

1.00

13.00

13.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

Material Rate

13.00

Plant Rate

0.00

Unit Rate(Direct Labour)

21.50

Unit Rate (Labour Sub Con)

21.15

BSR Reference

15-01-35

Description

Supplying and fixing of p.v.c. reducing Tees from 40mm to smaller sizes

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Reducing tee 40mm to smaller size Nos.

0.0%

1.00

19.00

19.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

19.00
0.00

Unit Rate(Direct Labour)

28.00

Unit Rate (Labour Sub Con)

27.65

Wednesday, March 29, 2006

Page 278 of 395

Southern Province Engineering Services

BSR Reference

15-01-36

Description

Supplying and fixing of p.v.c. reducing Tees from 50mm to smaller sizes

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. tee 50mm to smaller size Nos.

0.0%

1.00

35.00

35.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate

35.00

Plant Rate

0.00

Unit Rate(Direct Labour)

44.00

Unit Rate (Labour Sub Con)

43.65

BSR Reference

15-01-37

Description

Supplying and fixing of 560mm x 510mm pedestal type wash basin(L) with two way tapand

Unit

Nos.

waste plug

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

617.50

1.00

617.50

Mason Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Wash basin [L] with pedestal white Nos.

0.0%

1.00

3,700.00

3,700.00

Cement Sand etc. Nos.

0.0%

10.00

1.00

10.00

Material Rate

3,700.00

Plant Rate

0.00

Unit Rate(Direct Labour)

4,360.00

Unit Rate (Labour Sub Con)

4,327.50

BSR Reference

15-01-38

Description

Supplying and fixing of 20mm p.v.c. Valve socket

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

PVC Valve socket 20mm Nos.

0.0%

0.10

5.50

0.55

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.55

Unit Rate(Direct Labour)

5.55

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.35

Wednesday, March 29, 2006

Page 279 of 395

Southern Province Engineering Services

BSR Reference

15-01-39

Description

Supplying and fixing of 25mm p.v.c. Valve socket

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Valve socket 25mm Nos.

0.0%

1.00

7.00

7.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

7.00

Unit Rate(Direct Labour)

15.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

14.65

BSR Reference

15-01-40

Description

Supplying and fixing of 32mm p.v.c. Valve socket

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Valve socket 32mm Nos.

0.0%

1.00

9.00

9.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

9.00

Unit Rate(Direct Labour)

17.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.65

BSR Reference

15-01-41

Description

Supplying and fixing of 40mm p.v.c. Valve socket

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Valve socket 40mm Nos.

0.0%

1.00

26.00

26.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

26.00
0.00

Unit Rate(Direct Labour)

34.00

Unit Rate (Labour Sub Con)

33.65

Wednesday, March 29, 2006

Page 280 of 395

Southern Province Engineering Services

BSR Reference

15-01-42

Description

Supplying and fixing of 50mm p.v.c. Valve socket

Resource Unit

Unit

Wastag

Quantit

Amount

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Valve socket 50mm Nos.

0.0%

1.00

30.00

30.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

30.00

Plant Rate

0.00

Unit Rate(Direct Labour)

38.00

Unit Rate (Labour Sub Con)

37.65

BSR Reference

15-01-43

Description

Supplying and fixing of 75mm p.v.c. Valve socket

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.98

1.00

9.98

Plumber Nos.

0.0%

0.15

40.00

6.00

Unskilled Labour Nos.

0.0%

0.15

30.00

4.50

PVC Valve socket 75mm Nos.

0.0%

1.00

115.00

115.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate

115.00

Plant Rate

0.00

Unit Rate(Direct Labour)

127.50

Unit Rate (Labour Sub Con)

126.98

BSR Reference

15-01-44

Description

Supplying and fixing of 90mm p.v.c. Valve socket

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

13.30

1.00

13.30

Plumber Nos.

0.0%

0.20

40.00

8.00

Unskilled Labour Nos.

0.0%

0.20

30.00

6.00

PVC Valve socket 90mm Nos.

0.0%

1.00

163.00

163.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

163.00
0.00

Unit Rate(Direct Labour)

179.00

Unit Rate (Labour Sub Con)

178.30

Wednesday, March 29, 2006

Page 281 of 395

Southern Province Engineering Services

BSR Reference

15-01-45

Description

Supplying and fixing of 20mm p.v.c. Faucet socket

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Faucet socket 20mm Nos.

0.0%

1.00

5.50

5.50

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

5.50

Unit Rate(Direct Labour)

13.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

13.15

BSR Reference

15-01-46

Description

Supplying and fixing of 25mm p.v.c. Faucet socket

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC faucet socket 25mm Nos.

0.0%

1.00

8.00

8.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

8.00

Unit Rate(Direct Labour)

16.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

15.65

BSR Reference

15-01-47

Description

Supplying and fixing of 32mm p.v.c. Faucet socket

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Faucket socket 32mm Nos.

0.0%

1.00

11.00

11.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

Unit

11.00
0.00

Unit Rate(Direct Labour)

19.00

Unit Rate (Labour Sub Con)

18.65

Wednesday, March 29, 2006

Page 282 of 395

Southern Province Engineering Services

BSR Reference

15-01-48

Description

Supplying and fixing of 40mm p.v.c. Faucet socket

Resource Unit

Unit

Wastag

Quantit

Amount

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Faucet socket 40mm Nos.

0.0%

1.00

18.00

18.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

18.00

Plant Rate

0.00

Unit Rate(Direct Labour)

26.50

Unit Rate (Labour Sub Con)

26.15

BSR Reference

15-01-49

Description

Supplying and fixing of 50mm p.v.c. Faucet socket

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Faucet socket 50mm Nos.

0.0%

1.00

27.00

27.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

Material Rate

27.00

Plant Rate

0.00

Unit Rate(Direct Labour)

35.50

Unit Rate (Labour Sub Con)

35.15

BSR Reference

15-01-50

Description

Supplying and fixing of 75mm p.v.c. Faucet socket

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.98

1.00

9.98

Plumber Nos.

0.0%

0.15

40.00

6.00

Unskilled Labour Nos.

0.0%

0.15

30.00

4.50

PVC faucet socket 75mm Nos.

0.0%

1.00

74.00

74.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

74.00
0.00

Unit Rate(Direct Labour)

86.50

Unit Rate (Labour Sub Con)

85.98

Wednesday, March 29, 2006

Page 283 of 395

Southern Province Engineering Services

BSR Reference

15-01-51

Description

Supplying and fixing of 90mm p.v.c. Faucet socket

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

13.30

1.00

13.30

Plumber Nos.

0.0%

0.20

40.00

8.00

Unskilled Labour Nos.

0.0%

0.20

30.00

6.00

PVC Faucet socket 90mm Nos.

0.0%

1.00

96.00

96.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate

96.00

Plant Rate

0.00

Unit Rate(Direct Labour)

112.00

Unit Rate (Labour Sub Con)

111.30

BSR Reference

15-01-52

Description

Supplying and fixing of 20mm p.v.c. equal Tee

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Equal tee 20mm Nos.

0.0%

1.00

3.50

3.50

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

3.50

Unit Rate(Direct Labour)

11.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.15

BSR Reference

15-01-53

Description

Supplying and fixing of 25mm p.v.c. Equal Tee

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Equal tee 25mm Nos.

0.0%

1.00

10.00

10.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

10.00
0.00

Unit Rate(Direct Labour)

18.00

Unit Rate (Labour Sub Con)

17.65

Wednesday, March 29, 2006

Page 284 of 395

Southern Province Engineering Services

BSR Reference

15-01-54

Description

Supplying and fixing of 32mm p.v.c. Equal Tee

Resource Unit

Unit

Wastag

Quantit

Amount

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Equal tee 32mm Nos.

0.0%

1.00

18.00

18.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

18.00

Plant Rate

0.00

Unit Rate(Direct Labour)

26.00

Unit Rate (Labour Sub Con)

25.65

BSR Reference

15-01-55

Description

Supplying and fixing of 40mm p.v.c. Equal Tee

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Equal tee 40mm Nos.

0.0%

1.00

23.00

23.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

Material Rate

23.00

Plant Rate

0.00

Unit Rate(Direct Labour)

31.50

Unit Rate (Labour Sub Con)

31.15

BSR Reference

15-01-56

Description

Supplying and fixing of 50mm p.v.c. Equal Tee

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Equal tee 50mm Nos.

0.0%

1.00

42.00

42.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

42.00
0.00

Unit Rate(Direct Labour)

50.50

Unit Rate (Labour Sub Con)

50.15

Wednesday, March 29, 2006

Page 285 of 395

Southern Province Engineering Services

BSR Reference

15-01-57

Description

Supplying and fixing of 75mm p.v.c. Equal Tee

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.98

1.00

9.98

Plumber Nos.

0.0%

0.15

40.00

6.00

Unskilled Labour Nos.

0.0%

0.15

30.00

4.50

PVC Equal tee 75mm Nos.

0.0%

1.00

166.50

166.50

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate

166.50

Plant Rate

0.00

Unit Rate(Direct Labour)

179.00

Unit Rate (Labour Sub Con)

178.48

BSR Reference

15-01-58

Description

Supplying and fixing of 90mm p.v.c. Equal Tee

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

13.30

1.00

13.30

Plumber Nos.

0.0%

0.20

40.00

8.00

Unskilled Labour Nos.

0.0%

0.20

30.00

6.00

PVC Equal tee 90mm Nos.

0.0%

1.00

372.00

372.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate

372.00

Plant Rate

0.00

BSR Reference

15-01-59

Description

Supplying and fixing of 20mm p.v.c. Plugs

Resource Unit

Unit Rate(Direct Labour)

388.00

Unit Rate (Labour Sub Con)

387.30

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Plug PVC 20mm (see M350) Nos.

0.0%

1.00

0.00

0.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

5.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

4.80

Wednesday, March 29, 2006

Page 286 of 395

Southern Province Engineering Services

BSR Reference

15-01-60

Description

Supplying and fixing of 25mm p.v.c. Plugs

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Plugs pvc 25mm [see M351] Nos.

0.0%

1.00

0.00

0.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

5.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

4.80

BSR Reference

15-01-61

Description

Supplying and fixing of 32mm p.v.c. Plugs

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Plugs pvc 32mm Nos.

0.0%

1.00

0.00

0.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

5.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

4.80

BSR Reference

15-01-62

Description

Supplying and fixing of 40mm p.v.c. Plugs

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Pluga pvc 40mm Nos.

0.0%

1.00

0.00

0.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

Material Rate

0.00

Unit Rate(Direct Labour)

5.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.30

Wednesday, March 29, 2006

Page 287 of 395

Southern Province Engineering Services

BSR Reference

15-01-63

Description

Supplying and fixing of 50mm p.v.c. Plugs

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Plugs pvc 50mm Nos.

0.0%

1.00

60.00

60.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

Material Rate

60.00

Plant Rate

0.00

BSR Reference

15-01-64

Description

Supplying and fixing of 75mm p.v.c. Plugs

Resource Unit

Unit Rate(Direct Labour)

65.50

Unit Rate (Labour Sub Con)

65.30

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Plugs pvc 75mm Nos.

0.0%

1.00

60.00

60.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate

60.00

Plant Rate

0.00

Unit Rate(Direct Labour)

66.00

Unit Rate (Labour Sub Con)

65.80

BSR Reference

15-01-65

Description

Supplying and fixing of 20mm p.v.c. Sockets plain

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Socket 20mm Nos.

0.0%

1.00

4.00

4.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

4.00

Unit Rate(Direct Labour)

12.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.65

Wednesday, March 29, 2006

Page 288 of 395

Southern Province Engineering Services

BSR Reference

15-01-66

Description

Supplying and fixing of 25mm p.v.c. Sockets plain

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Socket 25mm Nos.

0.0%

1.00

6.50

6.50

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

6.50

Unit Rate(Direct Labour)

14.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

14.15

BSR Reference

15-01-67

Description

Supplying and fixing of 32mm p.v.c. Sockets plain

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Socket 32mm Nos.

0.0%

1.00

9.00

9.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

9.00

Unit Rate(Direct Labour)

17.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.65

BSR Reference

15-01-68

Description

Supplying and fixing of 40mm p.v.c. Sockets plain

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Socket 40mm Nos.

0.0%

1.00

14.00

14.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

14.00
0.00

Unit Rate(Direct Labour)

22.50

Unit Rate (Labour Sub Con)

22.15

Wednesday, March 29, 2006

Page 289 of 395

Southern Province Engineering Services

BSR Reference

15-01-69

Description

Supplying and fixing of 50mm p.v.c. Sockets plain

Resource Unit

Unit

Wastag

Quantit

Amount

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Socket 50mm Nos.

0.0%

1.00

20.00

20.00

Other expenses Nos.

0.0%

1.50

1.00

1.50

20.00

Plant Rate

0.00

Unit Rate(Direct Labour)

28.50

Unit Rate (Labour Sub Con)

28.15

BSR Reference

15-01-70

Description

Supplying and fixing of 75mm p.v.c. Sockets plain

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.98

1.00

9.98

Plumber Nos.

0.0%

0.15

40.00

6.00

Unskilled Labour Nos.

0.0%

0.15

30.00

4.50

PVC Socket 75mm Nos.

0.0%

1.00

56.00

56.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate

56.00

Plant Rate

0.00

Unit Rate(Direct Labour)

68.50

Unit Rate (Labour Sub Con)

67.98

BSR Reference

15-01-71

Description

Supplying and fixing of 90mm p.v.c. Sockets plain

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

13.30

1.00

13.30

Plumber Nos.

0.0%

0.20

40.00

8.00

Unskilled Labour Nos.

0.0%

0.20

30.00

6.00

PVC Socket 90mm Nos.

0.0%

1.00

80.00

80.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

80.00
0.00

Unit Rate(Direct Labour)

96.00

Unit Rate (Labour Sub Con)

95.30

Wednesday, March 29, 2006

Page 290 of 395

Southern Province Engineering Services

BSR Reference

15-01-72

Description

Supplying and fixing of 20mm p.v.c. Pipes (fittings paid separately)

Resource Unit

Unit

Wastag

Quantit

Rate Type

0.0%

3.33

1.00

3.33

Plumber M

0.0%

0.05

40.00

2.00

Unskilled Labour M

0.0%

0.05

30.00

1.50

PVC Pipe 20mm type 1000 M

0.0%

1.00

16.00

16.00

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate

16.00

Plant Rate

0.00

Unit Rate(Direct Labour)

20.50

Unit Rate (Labour Sub Con)

20.33

BSR Reference

15-01-73

Description

Supplying and fixing of 25mm (type 1000) p.v.c. Pipes (fittings paid separately)

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

4.46

1.00

4.46

Plumber M

0.0%

0.07

40.00

2.68

Unskilled Labour M

0.0%

0.07

30.00

2.01

PVC Pipe 25mm type 1000 M

0.0%

1.00

26.00

26.00

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate

26.00

Plant Rate

0.00

Unit Rate(Direct Labour)

31.69

Unit Rate (Labour Sub Con)

31.46

BSR Reference

15-01-74

Description

Supplying and fixing of 32mm (type 1000) p.v.c. Pipes (fittings paid separately)

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

6.65

1.00

6.65

Plumber M

0.0%

0.10

40.00

4.00

Unskilled Labour M

0.0%

0.10

30.00

3.00

PVC Pipe 32mm type 1000 M

0.0%

1.00

42.00

42.00

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M

42.00
0.00

Unit Rate(Direct Labour)

50.00

Unit Rate (Labour Sub Con)

49.65

Wednesday, March 29, 2006

Page 291 of 395

Southern Province Engineering Services

BSR Reference

15-01-75

Description

Supplying and fixing of 40mm (type 1000) p.v.c. Pipes (fittings paid separately)

Resource Unit

Unit

Wastag

Quantit

Rate Type

0.0%

6.65

1.00

6.65

Plumber M

0.0%

0.10

40.00

4.00

Unskilled Labour M

0.0%

0.10

30.00

3.00

PVC Pipe 40mm type 1000 M

0.0%

1.00

61.00

61.00

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

61.00

Plant Rate

0.00

Unit Rate(Direct Labour)

69.50

Unit Rate (Labour Sub Con)

69.15

BSR Reference

15-01-76

Description

Supplying and fixing of 50mm (type 1000) p.v.c. Pipes (fittings paid separately)

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.84

1.00

8.84

Plumber M

0.0%

0.13

40.00

5.32

Unskilled Labour M

0.0%

0.13

30.00

3.99

PVC Pipe 50mm type 1000 M

0.0%

1.00

94.00

94.00

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

94.00

Plant Rate

0.00

Unit Rate(Direct Labour)

104.81

Unit Rate (Labour Sub Con)

104.34

BSR Reference

15-01-77

Description

Supplying and fixing of 63mm (type 1000) p.v.c. Pipes (fittings paid separately)

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.84

1.00

8.84

Plumber M

0.0%

0.13

40.00

5.32

Unskilled Labour M

0.0%

0.13

30.00

3.99

PVC Pipe 63mm type 1000 M

0.0%

1.00

150.00

150.00

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M

150.00
0.00

Unit Rate(Direct Labour)

160.81

Unit Rate (Labour Sub Con)

160.34

Wednesday, March 29, 2006

Page 292 of 395

Southern Province Engineering Services

BSR Reference

15-01-78

Description

Supplying and fixing of 75mm (type 1000) p.v.c. Pipes (fittings paid separately)

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.84

1.00

8.84

Plumber M

0.0%

0.13

40.00

5.32

Unskilled Labour M

0.0%

0.13

30.00

3.99

PVC Pipe 75mm type 1000 M

0.0%

1.00

230.00

230.00

Other expenses M

0.0%

2.00

1.00

2.00

Material Rate

230.00

Plant Rate

0.00

Unit Rate(Direct Labour)

241.31

Unit Rate (Labour Sub Con)

240.84

BSR Reference

15-01-79

Description

Fixing of Closet. pedestal type, available at site with cement concrete after breaking

Unit

Nos.

concrete floor and making good and making connectsion to soil and flush pipe

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

399.00

1.00

399.00

Plumber Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

6.00

30.00

180.00

Cement Nos.

0.0%

0.25

340.00

85.00

Metal ,sand, red lead, hemp etc. Nos.

0.0%

7.00

1.00

7.00

Material Rate

85.00

Plant Rate

0.00

Unit Rate(Direct Labour)

512.00

Unit Rate (Labour Sub Con)

491.00

BSR Reference

15-01-80

Description

Fixing of 20mm to 50mm p.v.c. Pipes with specials (pipes and specials supplied by Client)

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

7.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

6.65

Wednesday, March 29, 2006

Page 293 of 395

Southern Province Engineering Services

BSR Reference

15-01-81

Description

Supplying and fixing of 20mm (type 1000) p.v.c. Pipes including specials and fittings

Resource Unit

Unit

Wastag

Quantit

Rate Type

0.0%

6.65

1.00

6.65

Plumber M

0.0%

0.10

40.00

4.00

Unskilled Labour M

0.0%

0.10

30.00

3.00

PVC Pipe 20mm type 1000 M

0.0%

1.10

16.00

17.60

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate

17.60

Plant Rate

0.00

Unit Rate(Direct Labour)

25.60

Unit Rate (Labour Sub Con)

25.25

BSR Reference

15-01-82

Description

Supplying and fixing of 25mm (type 1000) p.v.c. Pipes including specials and fittings

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

6.65

1.00

6.65

Plumber M

0.0%

0.10

40.00

4.00

Unskilled Labour M

0.0%

0.10

30.00

3.00

PVC Pipe 25mm type 1000 M

0.0%

1.10

26.00

28.60

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate

28.60

Plant Rate

0.00

Unit Rate(Direct Labour)

36.60

Unit Rate (Labour Sub Con)

36.25

BSR Reference

15-01-83

Description

Supplying and fixing of 32mm (type 1000) p.v.c. Pipes including specials and fittings

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

8.31

1.00

8.31

Plumber M

0.0%

0.13

40.00

5.00

Unskilled Labour M

0.0%

0.13

30.00

3.75

PVC Pipe 32mm type 1000 M

0.0%

1.10

42.00

46.20

Other expenses M

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M

46.20
0.00

Unit Rate(Direct Labour)

55.95

Unit Rate (Labour Sub Con)

55.51

Wednesday, March 29, 2006

Page 294 of 395

Southern Province Engineering Services

BSR Reference

15-01-84

Description

Supplying and fixing of 40mm (type 1000) p.v.c. Pipes including specials and fittings

Resource Unit

Unit

Wastag

Quantit

Rate Type

0.0%

8.31

1.00

8.31

Plumber M

0.0%

0.13

40.00

5.00

Unskilled Labour M

0.0%

0.13

30.00

3.75

PVC Pipe 40mm type 1000 M

0.0%

1.10

61.00

67.10

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

67.10

Plant Rate

0.00

Unit Rate(Direct Labour)

77.35

Unit Rate (Labour Sub Con)

76.91

BSR Reference

15-01-85

Description

Supplying and fixing of 50mm (type 1000) p.v.c. Pipes including specials and fittings

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

13.30

1.00

13.30

Plumber M

0.0%

0.20

40.00

8.00

Unskilled Labour M

0.0%

0.20

30.00

6.00

PVC Pipe 50mm type 1000 M

0.0%

1.10

94.00

103.40

Other expenses M

150.0

0.00

1.00

0.00

Material Rate

103.40

Plant Rate

0.00

Unit Rate(Direct Labour)

117.40

Unit Rate (Labour Sub Con)

116.70

BSR Reference

15-01-86

Description

Supplying and fixing of 63mm (type 1000) p.v.c. Pipes including specials and fittings

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

13.30

1.00

13.30

Plumber M

0.0%

0.20

40.00

8.00

Unskilled Labour M

0.0%

0.20

30.00

6.00

PVC Pipe 63mm type 1000 M

0.0%

1.10

150.00

165.00

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate M

165.00
0.00

Unit Rate(Direct Labour)

180.50

Unit Rate (Labour Sub Con)

179.80

Wednesday, March 29, 2006

Page 295 of 395

Southern Province Engineering Services

BSR Reference

15-01-87

Description

Supplying and fixing of 150mm x 12mm p.v.c. rose with specials

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

19.00

1.00

19.00

Plumber Nos.

0.0%

0.50

40.00

20.00

Shower rose copper 150mm*12mm Nos.

0.0%

1.00

100.00

100.00

Other expenses Nos.

0.0%

0.50

1.00

0.50

Material Rate

100.00

Plant Rate

0.00

BSR Reference

15-01-88

Description

Supplying and fixing of plastic seat cover

Resource Unit

Unit Rate(Direct Labour)

120.50

Unit Rate (Labour Sub Con)

119.50

Unit

Wastag

Quantit

Amount

0.0%

38.00

1.00

38.00

Plumber Nos.

0.0%

1.00

40.00

40.00

Seat cover plastic Nos.

0.0%

1.00

140.00

140.00

140.00

Plant Rate

0.00

Unit Rate(Direct Labour)

180.00

Unit Rate (Labour Sub Con)

178.00

BSR Reference

15-02-89

Description

Supplying and fixing of 12mm brass Gate valve

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Gate valve brass 12mm Nos.

0.0%

1.00

90.00

90.00

90.00
0.00

Unit Rate(Direct Labour)

125.00

Unit Rate (Labour Sub Con)

123.25

Wednesday, March 29, 2006

Page 296 of 395

Southern Province Engineering Services

BSR Reference

15-02-90

Description

Supplying and fixing of 20mm brass Gate valve

Resource Unit

Unit

Wastag

Quantit

Amount

0.0%

71.25

1.00

71.25

Sanitary labourer Nos.

0.0%

0.50

120.00

60.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Gate valve brass 20mm Nos.

0.0%

1.00

120.00

120.00

120.00

Plant Rate

0.00

Unit Rate(Direct Labour)

195.00

Unit Rate (Labour Sub Con)

191.25

BSR Reference

15-02-91

Description

Supplying and fixing of 25mm brass Gate valve

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

49.88

1.00

49.88

Plumber Nos.

0.0%

0.75

40.00

30.00

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Gate valve brass 25mm Nos.

0.0%

1.00

150.00

150.00

Material Rate

150.00

Plant Rate

0.00

Unit Rate(Direct Labour)

202.50

Unit Rate (Labour Sub Con)

199.88

BSR Reference

15-02-92

Description

Supplying and fixing of 32mm brass Gate valve

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

66.50

1.00

66.50

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Gate valve brass 32mm Nos.

0.0%

1.00

200.00

200.00

200.00
0.00

Unit Rate(Direct Labour)

270.00

Unit Rate (Labour Sub Con)

266.50

Wednesday, March 29, 2006

Page 297 of 395

Southern Province Engineering Services

BSR Reference

15-02-93

Description

Supplying and fixing of 38mm brass Gate valve

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

66.50

1.00

66.50

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Gate valve brass 38mm Nos.

0.0%

1.00

240.00

240.00

Material Rate

240.00

Plant Rate

0.00

Unit Rate(Direct Labour)

310.00

Unit Rate (Labour Sub Con)

306.50

BSR Reference

15-03-00

Description

Removing Closet, squatting type and plugging sewer connections and making good to

Unit

Nos.

floors

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

399.00

1.00

399.00

Plumber Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

6.00

30.00

180.00

Cement Nos.

0.0%

0.50

340.00

170.00

Sand metal etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

170.00

Plant Rate

0.00

Unit Rate(Direct Labour)

595.00

Unit Rate (Labour Sub Con)

574.00

BSR Reference

15-03-01

Description

Installing Closet, squatting type including breaking floor and fixed in cement concrete

Unit

Nos.

(Closet supplied by Client)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

399.00

1.00

399.00

Plumber Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

6.00

30.00

180.00

Cement Nos.

0.0%

0.34

340.00

115.60

Sand metal etc. Nos.

0.0%

10.00

1.00

10.00

115.60
0.00

Unit Rate(Direct Labour)

545.60

Unit Rate (Labour Sub Con)

524.60

Wednesday, March 29, 2006

Page 298 of 395

Southern Province Engineering Services

BSR Reference

15-03-02

Description

Installing Closet, squatting type including trap, breaking floor and fixed in cement concrete

Unit

Nos.

(Closet and trap supplied by Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

532.00

1.00

532.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cement Nos.

0.0%

0.33

340.00

113.22

Metal etc Nos.

0.0%

5.00

1.00

5.00

Material Rate

113.22

Plant Rate

0.00

Unit Rate(Direct Labour)

678.22

Unit Rate (Labour Sub Con)

650.22

BSR Reference

15-03-03

Description

Installing Closet, squatting type including flushing cistern and pipes complete (Closet and

Unit

Nos.

all fittings supplied)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

869.25

1.00

869.25

Mason Nos.

0.0%

1.00

45.00

45.00

Plumber Nos.

0.0%

12.00

40.00

480.00

Unskilled Labour Nos.

0.0%

13.00

30.00

390.00

Cement Nos.

0.0%

0.33

340.00

112.20

Plugs Nos.

0.0%

6.00

16.00

96.00

Metal etc Nos.

0.0%

5.00

1.00

5.00

208.20
0.00

Unit Rate(Direct Labour)

1,128.20

Unit Rate (Labour Sub Con)

1,082.45

Wednesday, March 29, 2006

Page 299 of 395

Southern Province Engineering Services

BSR Reference

15-03-04

Description

Supplying &fixing of 12mm brass bib cocks of approved quaLitery.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

22.21

1.00

22.21

Plumber Nos.

0.0%

0.33

40.00

13.36

Unskilled Labour Nos.

0.0%

0.33

30.00

10.02

Stop cock brass 12mm Nos.

0.0%

1.00

75.00

75.00

Red lead etc. Nos.

0.0%

2.00

1.00

2.00

Material Rate

75.00

Plant Rate

Unit Rate(Direct Labour)

0.00

100.38

Unit Rate (Labour Sub Con)

99.21

BSR Reference

15-03-05

Description

Supplying & fixing of 12mm cromium plated bib cocks of approved quaLitery.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

22.21

1.00

22.21

Plumber Nos.

0.0%

0.33

40.00

13.36

Unskilled Labour Nos.

0.0%

0.33

30.00

10.02

Pillar cock chromium plated 12mm Nos.

0.0%

1.00

240.00

240.00

Other expenses Nos.

0.0%

5.00

1.00

5.00

Material Rate

240.00

Plant Rate

0.00

Unit Rate(Direct Labour)

268.38

Unit Rate (Labour Sub Con)

267.21

BSR Reference

15-03-06

Description

Fixing of cocks brass any size or push [cock supplied by Client].

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

22.21

1.00

22.21

Plumber Nos.

0.0%

0.33

40.00

13.36

Unskilled Labour Nos.

0.0%

0.33

30.00

10.02

Other expenses Nos.

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

28.38

Plant Rate

0.00

Unit Rate (Labour Sub Con)

27.21

Wednesday, March 29, 2006

Page 300 of 395

Southern Province Engineering Services

BSR Reference

15-03-07

Description

Removing of cocks ,brass bib push or stop cock of size 12mm to 40mm.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Material Rate

0.00

Unit Rate(Direct Labour)

4.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

3.80

BSR Reference

15-03-08

Description

Repairing of cocks bib or stop by fixing leather washes.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Leather washer Nos.

0.0%

1.00

3.00

3.00

Material Rate

3.00

Unit Rate(Direct Labour)

38.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

36.25

BSR Reference

15-03-94

Description

Supplying and installling of 400 gal capacity Fibre glass tank (with 2 Noss. of 01 Oz.mat.)

Unit

Nos.

including scaffolding & transport

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

1,216.00

1.00

1,216.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

32.00

30.00

960.00

Tank fibre glass 400 gal. Nos.

0.0%

1.00

14,000.00

14,000.00

Scafolding Nos.

0.0%

50.00

1.00

50.00

14,000.00
0.00

Unit Rate(Direct Labour)

15,330.00

Unit Rate (Labour Sub Con)

15,266.00

Wednesday, March 29, 2006

Page 301 of 395

Southern Province Engineering Services

BSR Reference

15-03-95

Description

Disconneting, pedestal type closet and plugging sewer connection and making good to all

Unit

Nos.

affected walls and floors

Resource Unit

Wastag

Quantit

Rate Type

0.0%

266.00

1.00

266.00

Plumber Nos.

0.0%

4.00

40.00

160.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Cement Nos.

0.0%

0.17

340.00

56.78

Sand metal etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

56.78

Plant Rate

0.00

Unit Rate(Direct Labour)

341.78

Unit Rate (Labour Sub Con)

327.78

BSR Reference

15-03-96

Description

Supplying and fixing pedestal type Closet (seat and cover available)

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

399.00

1.00

399.00

Plumber Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

6.00

30.00

180.00

Cement Nos.

0.0%

0.25

340.00

85.00

Closet pedastal typs Nos.

0.0%

1.00

1,500.00

1,500.00

Sand etc Nos.

0.0%

7.00

1.00

7.00

1,585.00
0.00

Unit Rate(Direct Labour)

2,012.00

Unit Rate (Labour Sub Con)

1,991.00

Wednesday, March 29, 2006

Page 302 of 395

Southern Province Engineering Services

BSR Reference

15-03-97

Description

Supplying and fixing of Closet, pedestal type with low level glazed earthenware flushing

Unit

Nos.

cistern, flush pipe, double plastic seat cover 12mm stop cock trap etc.

Resource Unit

Wastag

Quantit

Rate Type

0.0%

532.00

1.00

532.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cictern bracket Nos.

0.0%

1.00

60.00

60.00

Fitting for cistern Nos.

0.0%

1.00

400.00

400.00

Low leval cictern white Nos.

0.0%

1.00

1,200.00

1,200.00

Low level closet unit Nos.

0.0%

1.00

1,600.00

1,600.00

Stop cock brass 12mm Nos.

0.0%

1.00

75.00

75.00

Sand metal etc. Nos.

0.0%

7.00

1.00

7.00

Transport Nos.

0.0%

100.00

1.00

100.00

Material Rate

3,335.00

Plant Rate

0.00

Unit Rate(Direct Labour)

4,002.00

Unit Rate (Labour Sub Con)

3,974.00

BSR Reference

15-03-98

Description

Supplying and fixing of Closet, squatting type with trap excluding cistern

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

532.00

1.00

532.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cement Nos.

0.0%

0.33

340.00

113.22

Squatting pan [m] with P tap Nos.

0.0%

1.00

450.00

450.00

Metal etc Nos.

0.0%

5.00

1.00

5.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

563.22
0.00

Unit Rate(Direct Labour)

1,128.22

Unit Rate (Labour Sub Con)

1,100.22

Wednesday, March 29, 2006

Page 303 of 395

Southern Province Engineering Services

BSR Reference

15-03-99

Description

Supplying and fixing of Closet, squatting type with trap with cistern flush pipe including

Unit

Nos.

12mm stop cock and specials

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

66.50

1.00

66.50

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Cement Nos.

0.0%

0.33

340.00

113.22

Cictern bracket Nos.

0.0%

1.00

60.00

60.00

Fitting for cistern Nos.

0.0%

1.00

400.00

400.00

Low leval cictern white Nos.

0.0%

1.00

1,200.00

1,200.00

Squatting pan [m] with P tap Nos.

0.0%

1.00

450.00

450.00

Stop cock brass 12mm Nos.

0.0%

1.00

75.00

75.00

Metal etc Nos.

0.0%

5.00

1.00

5.00

Material Rate

2,298.22

Plant Rate

0.00

Unit Rate(Direct Labour)

2,373.22

Unit Rate (Labour Sub Con)

2,369.72

BSR Reference

15-04-00

Description

Making 600mm * 600mm * 150mm sink in 112mm brick masonary in cement 1:5 including

Unit

Nos.

12mm thick 1:2 cement rendering. Rate to include making holes in the wall and supplying
and fixing of 50mm outlet pipes.

Resource Unit

Quantit

Rate Type

Amount

0.0%

427.50

1.00

427.50

Mason Nos.

0.0%

6.00

45.00

270.00

Unskilled Labour Nos.

0.0%

6.00

30.00

180.00

Brick : common Nos.

0.0%

0.03

2,200.00

70.40

Cement Nos.

0.0%

0.50

340.00

170.00

PVC Pipe 50mm type 1000 Nos.

0.0%

0.31

94.00

29.14

Sand Nos.

0.0%

0.12

350.00

42.00

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate Nos.

311.54
0.00

Unit Rate(Direct Labour)

761.54

Unit Rate (Labour Sub Con)

739.04

Wednesday, March 29, 2006

Page 304 of 395

Southern Province Engineering Services

BSR Reference

15-04-09

Description

Repairing & fixing of 12mm GI connector .

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

66.50

1.00

66.50

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Leather washer Nos.

0.0%

1.00

3.00

3.00

Material Rate

3.00

Unit Rate(Direct Labour)

73.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

69.50

BSR Reference

15-04-10

Description

supplying & fixing of 12mm GI connectore .

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Connector GI 12mm Nos.

0.0%

1.00

33.00

33.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

33.00

Plant Rate

0.00

BSR Reference

15-04-11

Description

Supplying & fixing of 20mm GI connectpr .

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

69.00

Unit Rate (Labour Sub Con)

67.25

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Connector GI 20mm Nos.

0.0%

1.00

42.00

42.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

42.00
0.00

Unit Rate(Direct Labour)

78.00

Unit Rate (Labour Sub Con)

76.25

Wednesday, March 29, 2006

Page 305 of 395

Southern Province Engineering Services

BSR Reference

15-04-12

Description

Supplying & fixing of 25mm GI connector.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

33.25

1.00

33.25

Plumber Nos

0.0%

0.50

40.00

20.00

Unskilled Labour Nos

0.0%

0.50

30.00

15.00

Connector GI 25mm Nos

0.0%

1.00

60.00

60.00

Red lead etc. Nos

0.0%

1.00

1.00

1.00

60.00

Plant Rate

0.00

BSR Reference

15-04-13

Description

Supplying & fixing of 32mm GI connector .

Resource Unit

Unit Rate(Direct Labour)

96.00

Unit Rate (Labour Sub Con)

94.25

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Connector GI 32mm Nos.

0.0%

1.00

90.00

90.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

90.00

Plant Rate

0.00

BSR Reference

15-04-14

Description

Supplying and fixing of 38mm GI connector.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos

Material Rate

Material Rate

Nos

Unit Rate(Direct Labour)

126.00

Unit Rate (Labour Sub Con)

124.25

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Connector GI 38mm Nos.

0.0%

1.00

90.00

90.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

90.00
0.00

Unit Rate(Direct Labour)

126.00

Unit Rate (Labour Sub Con)

124.25

Wednesday, March 29, 2006

Page 306 of 395

Southern Province Engineering Services

BSR Reference

15-04-15

Description

Supplying & fixing of 50mm GI connector

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

44.36

1.00

44.36

Plumber Nos.

0.0%

0.67

40.00

26.68

Unskilled Labour Nos.

0.0%

0.67

30.00

20.01

Connectir GI 50mm Nos.

0.0%

1.00

150.00

150.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

150.00

Plant Rate

0.00

BSR Reference

15-04-16

Description

supplying & fixing of 75mm GI connector.

Resource Unit

Unit Rate(Direct Labour)

197.69

Unit Rate (Labour Sub Con)

195.36

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

44.36

1.00

44.36

Plumber Nos.

0.0%

0.67

40.00

26.68

Unskilled Labour Nos.

0.0%

0.67

30.00

20.01

Connector GI 75mm Nos.

0.0%

1.00

400.00

400.00

Red lead etc. Nos.

100.0

0.00

1.00

0.00

Material Rate

400.00

Plant Rate

0.00

Unit Rate(Direct Labour)

446.69

Unit Rate (Labour Sub Con)

444.36

BSR Reference

15-04-17

Description

Fixing of connector any size upto 38mm [connector supplied by Client]

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

36.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

34.25

Wednesday, March 29, 2006

Page 307 of 395

Southern Province Engineering Services

BSR Reference

15-04-18

Description

Fixing of connector above 38mm & upto 75mm [connector supplied by Client].

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

44.36

1.00

44.36

Plumber Nos.

0.0%

0.67

40.00

26.68

Unskilled Labour Nos.

0.0%

0.67

30.00

20.01

Red lead etc. Nos.

0.0%

1.50

1.00

1.50

Material Rate

0.00

Unit Rate(Direct Labour)

48.19

Plant Rate

0.00

Unit Rate (Labour Sub Con)

45.86

BSR Reference

15-04-19

Description

Supplying & fixing of plastic cover for commode.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

133.00

1.00

133.00

Plumber Nos.

0.0%

2.00

40.00

80.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Seat cover plastic Nos.

0.0%

1.00

140.00

140.00

140.00

Plant Rate

0.00

BSR Reference

15-04-20

Description

Supplying & fixing of 12mm GI Elbows

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

280.00

Unit Rate (Labour Sub Con)

273.00

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Elbow GI 12mm Nos.

0.0%

1.00

12.00

12.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

12.00
0.00

Unit Rate(Direct Labour)

30.50

Unit Rate (Labour Sub Con)

29.63

Wednesday, March 29, 2006

Page 308 of 395

Southern Province Engineering Services

BSR Reference

15-04-21

Description

Supplying & fixing of 20mm GI Elbows.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Elbow GI 20mm Nos.

0.0%

1.00

14.00

14.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

14.00

Plant Rate

0.00

BSR Reference

15-04-22

Description

Supplying & fixing of 25mm GI Elbows.

Resource Unit

Unit Rate(Direct Labour)

32.50

Unit Rate (Labour Sub Con)

31.63

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Elbow GI 25mm Nos.

0.0%

1.00

28.00

28.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

28.00

Plant Rate

0.00

BSR Reference

15-04-23

Description

Supplying & fixing of 32mm GI Elbows.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

46.50

Unit Rate (Labour Sub Con)

45.63

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Elbow GI 32mm Nos.

0.0%

1.00

40.00

40.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

40.00
0.00

Unit Rate(Direct Labour)

58.50

Unit Rate (Labour Sub Con)

57.63

Wednesday, March 29, 2006

Page 309 of 395

Southern Province Engineering Services

BSR Reference

15-04-24

Description

Supplying & fixing of 38mm GI Elbows.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

16.63

1.00

16.63

Plumber Nos.

0.0%

0.25

40.00

10.00

Unskilled Labour Nos.

0.0%

0.25

30.00

7.50

Elbow GI 38mm Nos.

0.0%

1.00

55.00

55.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

55.00

Plant Rate

0.00

BSR Reference

15-04-25

Description

supplying & fixing of 50mm GI Elbow.

Resource Unit

Unit Rate(Direct Labour)

73.50

Unit Rate (Labour Sub Con)

72.63

Unit

Wastag

Nos

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos

0.0%

16.63

1.00

16.63

Plumber Nos

0.0%

0.25

40.00

10.00

Unskilled Labour Nos

0.0%

0.25

30.00

7.50

Elbow GI 50mm Nos

0.0%

1.00

75.00

75.00

Red lead etc. Nos

0.0%

1.00

1.00

1.00

Material Rate

75.00

Plant Rate

0.00

Unit Rate(Direct Labour)

93.50

Unit Rate (Labour Sub Con)

92.63

BSR Reference

15-04-26

Description

Cleaning of cost iron flushing cistern & painting eith one coat Anti-corrosive paint

Unit

Nos.

internally.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

95.00

1.00

95.00

Plumber Nos.

0.0%

2.50

40.00

100.00

Paint and brush Nos.

0.0%

30.00

1.00

30.00

Material Rate

0.00

Unit Rate(Direct Labour)

130.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

125.00

Wednesday, March 29, 2006

Page 310 of 395

Southern Province Engineering Services

BSR Reference

15-04-27

Description

Supplying & fixing of flushing cistern CI 9 Literres ,excluding flush pipe & brackets but

Unit

Nos.

including ball valve.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

266.00

1.00

266.00

Plumber Nos.

0.0%

4.00

40.00

160.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Cistern high level CI Nos.

0.0%

1.00

1,100.00

1,100.00

Red lead etc. Nos.

0.0%

2.00

1.00

2.00

Material Rate

1,100.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,382.00

Unit Rate (Labour Sub Con)

1,368.00

BSR Reference

15-04-28

Description

Supplying & fixing of flushing cistern plastic 9 Literers excluding flush pipe & brackets

Unit

Nos.

but ball valvs.

Resource Unit

Wastag

Quantit
266.00

1.00

266.00

Plumber Nos.

0.0%

4.00

40.00

160.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Cistern high level plastic Nos.

0.0%

1.00

1,200.00

1,200.00

Red lead etc. Nos.

0.0%

2.00

1.00

2.00

1,200.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,482.00

Unit Rate (Labour Sub Con)

1,468.00

BSR Reference

15-04-29

Description

Fixing of flushing cistern [cistern brackets suplied ]

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate Nos.

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

308.75

1.00

308.75

Mason Nos.

0.0%

1.00

45.00

45.00

Plumber Nos.

0.0%

4.00

40.00

160.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Plugs Nos.

0.0%

4.00

16.00

64.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

64.00
0.00

Unit Rate(Direct Labour)

390.00

Unit Rate (Labour Sub Con)

373.75

Wednesday, March 29, 2006

Page 311 of 395

Southern Province Engineering Services

BSR Reference

15-04-30

Description

Supplying & fixing of low level porcelain flushing cistern .

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

266.00

1.00

266.00

Plumber Nos.

0.0%

4.00

40.00

160.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Cictern bracket Nos.

0.0%

1.00

60.00

60.00

Low leval cictern white Nos.

0.0%

1.10

1,200.00

1,320.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

1,380.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,661.00

Unit Rate (Labour Sub Con)

1,647.00

BSR Reference

15-04-31

Description

Fixing of flushing cistern lever forged out of wrought iron 25mm*5m bent to shape.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

332.50

1.00

332.50

Black Smith Nos.

0.0%

4.00

40.00

160.00

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

5.00

30.00

150.00

Steel etc. Nos.

0.0%

20.00

1.00

20.00

Material Rate

0.00

Unit Rate(Direct Labour)

370.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

352.50

BSR Reference

15-04-32

Description

Disconnecting CI flushing cistern & plugging water connection including making good to

Unit

Nos.

all damage walls ,floors etc

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

266.00

1.00

266.00

Plumber Nos.

0.0%

4.00

40.00

160.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Plug GI 12mm Nos.

0.0%

1.00

20.00

20.00

Red lead etc. Nos.

0.0%

20.00

1.00

20.00

20.00
0.00

Unit Rate(Direct Labour)

320.00

Unit Rate (Labour Sub Con)

306.00

Wednesday, March 29, 2006

Page 312 of 395

Southern Province Engineering Services

BSR Reference

15-04-33

Description

Removing of flushing & re-fixing in new position including necessary pluges & making

Unit

Nos.

good towalls.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

574.75

1.00

574.75

Mason Nos.

0.0%

1.00

45.00

45.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Plug GI 12mm Nos.

0.0%

1.00

20.00

20.00

Plugs Nos.

0.0%

4.00

16.00

64.00

Red lead etc. Nos.

0.0%

2.00

1.00

2.00

Material Rate

84.00

Plant Rate

0.00

Unit Rate(Direct Labour)

691.00

Unit Rate (Labour Sub Con)

660.75

BSR Reference

15-04-34

Description

Re fixing of flushing pipe of pedestal closets after removing oid putty etc

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

66.50

1.00

66.50

Plumber Nos.

0.0%

1.00

40.00

40.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Putty etc Nos.

0.0%

2.00

1.00

2.00

Material Rate

0.00

Unit Rate(Direct Labour)

72.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

68.50

BSR Reference

15-04-35

Description

Fixing GI flush pipe including solders ,joint [flush pipe supplied by Client].

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

133.00

1.00

133.00

Plumber Nos.

0.0%

2.00

40.00

80.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Lead, cement etc. Nos.

0.0%

2.50

1.00

2.50

Material Rate

0.00

Unit Rate(Direct Labour)

142.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

135.50

Wednesday, March 29, 2006

Page 313 of 395

Southern Province Engineering Services

BSR Reference

15-04-36

Description

Supplying & fixing 32mm PVC flush pipe PVC.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

PVC Pipe 32mm type 1000 Nos.

0.0%

1.00

42.00

42.00

Other expenses Nos.

0.0%

2.50

1.00

2.50

Material Rate

42.00

Plant Rate

0.00

Unit Rate(Direct Labour)

79.50

Unit Rate (Labour Sub Con)

77.75

BSR Reference

15-04-37

Description

Supplying & fixing of hooks for GI 12mm pipes .

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Hooks for 12mm GI pipes Nos.

0.0%

1.00

4.00

4.00

Material Rate

4.00

Unit Rate(Direct Labour)

8.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.80

BSR Reference

15-04-38

Description

Supplying & fixing of hooks for GI 20mm pipes

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Hooks for 20mm GI pipes Nos.

0.0%

1.00

4.00

4.00

Material Rate

4.00

Unit Rate(Direct Labour)

8.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.80

Wednesday, March 29, 2006

Page 314 of 395

Southern Province Engineering Services

BSR Reference

15-04-39

Description

Supplying & fixing of hooks for GI 25mm pipes

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Hooks for 25mm GI pipes Nos.

0.0%

1.00

5.00

5.00

Material Rate

5.00

Unit Rate(Direct Labour)

9.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

8.80

BSR Reference

15-04-40

Description

Supplying & fixing of hooks for GI pipes.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Hooks for 32mm pipes Nos.

0.0%

1.00

6.00

6.00

Material Rate

6.00

Unit Rate(Direct Labour)

Plant Rate

0.00

Unit Rate (Labour Sub Con)

BSR Reference

15-04-41

Description

Supplying &fixing of hooks for GI 38mm pipes.

Resource Unit

Unit

Wastag

10.00
9.80

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Hooks for 38mm Gi pipes Nos.

0.0%

1.00

8.00

8.00

Material Rate

8.00

Unit Rate(Direct Labour)

12.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

11.80

Wednesday, March 29, 2006

Page 315 of 395

Southern Province Engineering Services

BSR Reference

15-04-42

Description

Fixing of hooks for GI pipes [hooks available]

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.80

1.00

3.80

Plumber Nos.

0.0%

0.10

40.00

4.00

Material Rate

0.00

Unit Rate(Direct Labour)

4.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

3.80

BSR Reference

15-04-43

Description

Supplying & fixing of 12mm GI Jam nuts.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

GI joint nut 12mm Nos.

0.0%

1.00

29.00

29.00

29.00

Plant Rate

0.00

BSR Reference

15-04-44

Description

Supplying & fixing pf 20mm GI Jam nuts.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

36.00

Unit Rate (Labour Sub Con)

35.65

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

GI joint nut 20mm Nos.

0.0%

1.00

40.00

40.00

40.00
0.00

Unit Rate(Direct Labour)

47.00

Unit Rate (Labour Sub Con)

46.65

Wednesday, March 29, 2006

Page 316 of 395

Southern Province Engineering Services

BSR Reference

15-04-45

Description

Supplying & fixing 25mm GI Jam nuts.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

GI joint nut 25mm Nos.

0.0%

1.00

53.00

53.00

53.00

Plant Rate

0.00

BSR Reference

15-04-46

Description

Supplying & fixing of 32mm GI Jam nuts

Resource Unit

Unit Rate(Direct Labour)

60.00

Unit Rate (Labour Sub Con)

59.65

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

GI joint nut 32mm Nos.

0.0%

1.00

63.00

63.00

Material Rate

63.00

Plant Rate

0.00

BSR Reference

15-04-47

Description

Supplying & fixing of 38mm GI Jam nuts.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

70.00

Unit Rate (Labour Sub Con)

69.65

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

GI joint nut 38mm Nos.

0.0%

1.00

78.00

78.00

78.00
0.00

Unit Rate(Direct Labour)

85.00

Unit Rate (Labour Sub Con)

84.65

Wednesday, March 29, 2006

Page 317 of 395

Southern Province Engineering Services

BSR Reference

15-04-48

Description

Supplying & fixing of 50mm GUI Jam nuts

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

GI joint nut 50mm Nos.

0.0%

1.00

146.00

146.00

Material Rate

146.00

Plant Rate

0.00

Unit Rate(Direct Labour)

153.00

Unit Rate (Labour Sub Con)

152.65

BSR Reference

15-04-49

Description

Fixing of Jam nuts any stze upto 50mm [Jam nuts supplied by Client]

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

7.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

6.65

BSR Reference

15-04-50

Description

Supplying & fixing of bath room type oval shape bevelled mirror 380mm*330mm with rawl

Unit

Nos.

plygs and chromium plated fittings,

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

76.00

1.00

76.00

Plumber Nos.

0.0%

2.00

40.00

80.00

Mirror frame oval-white Nos.

0.0%

1.00

300.00

300.00

Mirror only oval Nos.

0.0%

1.00

400.00

400.00

Plugs screws etc Nos.

0.0%

20.00

1.00

20.00

700.00
0.00

Unit Rate(Direct Labour)

800.00

Unit Rate (Labour Sub Con)

796.00

Wednesday, March 29, 2006

Page 318 of 395

Southern Province Engineering Services

BSR Reference

15-04-51

Description

Supplying & fixing 320mm*280mm rectrangular bevelled mirror to wall with rawl plugs

Unit

Nos.

and chromium plated fittings.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

76.00

1.00

76.00

Plumber Nos.

0.0%

2.00

40.00

80.00

Mirror frame oval-white Nos.

0.0%

1.00

300.00

300.00

Mirror only oval Nos.

0.0%

1.00

400.00

400.00

Plugs screws etc Nos.

0.0%

20.00

1.00

20.00

Material Rate

700.00

Plant Rate

0.00

Unit Rate(Direct Labour)

800.00

Unit Rate (Labour Sub Con)

796.00

BSR Reference

15-04-52

Description

Supplying & fixing of 12mm GI pipe .raye to include trenching backfilling and making

Unit

good to wall [fittings & pipe hooks paid separately]

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

33.25

1.00

33.25

Plumber M

0.0%

0.50

40.00

20.00

Unskilled Labour M

0.0%

0.50

30.00

15.00

Paint Read lead M

0.0%

0.03

250.00

8.25

Pipe GI 12mm M

0.0%

1.00

40.00

40.00

Other expenses M

0.0%

2.00

1.00

2.00

48.25
0.00

Unit Rate(Direct Labour)

85.25

Unit Rate (Labour Sub Con)

83.50

Wednesday, March 29, 2006

Page 319 of 395

Southern Province Engineering Services

BSR Reference

15-04-53

Description

Supplying & fixing of 20mm GI pipe rate toinclude trenching backfilling & making good to

Unit

walls [fitting & pipe hooks paid saparately.]

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

33.25

1.00

33.25

Plumber M

0.0%

0.50

40.00

20.00

Unskilled Labour M

0.0%

0.50

30.00

15.00

Paint Read lead M

0.0%

0.04

250.00

9.50

Pipe GI 20mm M

0.0%

1.00

50.00

50.00

Other expenses M

0.0%

2.00

1.00

2.00

Material Rate

59.50

Plant Rate

0.00

Unit Rate(Direct Labour)

96.50

Unit Rate (Labour Sub Con)

94.75

BSR Reference

15-04-54

Description

supplying & fixing of 25mm GI pipe rate to include trechung backfilling & making good to

Unit

walls [fittings & pipe hooks paid saparately]

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

47.50

1.00

47.50

Plumber M

0.0%

0.50

40.00

20.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

Paint Read lead M

0.0%

0.04

250.00

10.50

Pipe GI 25mm M

0.0%

1.00

65.00

65.00

Other expenses M

0.0%

1.50

1.00

1.50

75.50
0.00

Unit Rate(Direct Labour)

127.00

Unit Rate (Labour Sub Con)

124.50

Wednesday, March 29, 2006

Page 320 of 395

Southern Province Engineering Services

BSR Reference

15-04-55

Description

Supplying &fixing if 32mm GI pipe rate to include treching & backfilling to walls [fittings

Unit

& pipe hooks paid saparately]

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

47.50

1.00

47.50

Plumber M

0.0%

0.50

40.00

20.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

Paint Read lead M

0.0%

0.33

250.00

82.50

Pipe GI 32mm M

0.0%

1.00

80.00

80.00

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

162.50

Plant Rate

0.00

Unit Rate(Direct Labour)

214.00

Unit Rate (Labour Sub Con)

211.50

BSR Reference

15-04-56

Description

supplying & fixing of 38mm GI pipes rate to include treching backfilling & making good to

Unit

walls [fittings & pipe hooks paid saparately]

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

47.50

1.00

47.50

Plumber M

0.0%

0.50

40.00

20.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

Paint Read lead M

0.0%

0.03

250.00

8.25

Pipe Gi 38mm M

0.0%

1.00

100.00

100.00

Other expenses M

0.0%

1.50

1.00

1.50

108.25
0.00

Unit Rate(Direct Labour)

159.75

Unit Rate (Labour Sub Con)

157.25

Wednesday, March 29, 2006

Page 321 of 395

Southern Province Engineering Services

BSR Reference

15-04-57

Description

Supplying & fixing of 50mm GI pipes rate to include treching backfilling & making good

Unit

towalls [fittings & pipe hooks paid saparately]

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

57.00

1.00

57.00

Plumber M

0.0%

0.60

40.00

24.00

Unskilled Labour M

0.0%

1.20

30.00

36.00

Paint Read lead M

0.0%

0.03

250.00

8.25

Pipe Gi 50mm M

0.0%

1.00

125.00

125.00

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

133.25

Plant Rate

0.00

Unit Rate(Direct Labour)

194.75

Unit Rate (Labour Sub Con)

191.75

BSR Reference

15-04-58

Description

Supplying & fixing of 75mm GI pipes rate to include treching backfilling & making good to

Unit

walls [fittings & pipe hook paid saparately]

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

57.00

1.00

57.00

Plumber M

0.0%

0.60

40.00

24.00

Unskilled Labour M

0.0%

1.20

30.00

36.00

Paint Read lead M

0.0%

0.03

250.00

8.25

Pipe GI 75mm M

0.0%

1.00

300.00

300.00

Other expenses M

0.0%

1.50

1.00

1.50

308.25
0.00

Unit Rate(Direct Labour)

369.75

Unit Rate (Labour Sub Con)

366.75

Wednesday, March 29, 2006

Page 322 of 395

Southern Province Engineering Services

BSR Reference

15-04-59

Description

Fixing of 12mm to 50mm GI pipes with specials bends,elbows etc [pipes & specials

Unit

supplied by Client] rate to include treching & making good to walls

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

57.00

1.00

57.00

Plumber M

0.0%

0.60

40.00

24.00

Unskilled Labour M

0.0%

1.20

30.00

36.00

Paint Read lead M

0.0%

0.03

250.00

8.25

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

8.25

Unit Rate(Direct Labour)

69.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

66.75

BSR Reference

15-04-60

Description

Supplying & fixing of 63mm to 75mm GI pipes .rate to including treching & making good to

Unit

walls [fittings & pipe hooks paid saparately]

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

57.00

1.00

57.00

Plumber M

0.0%

0.60

40.00

24.00

Unskilled Labour M

0.0%

1.20

30.00

36.00

Paint Read lead M

0.0%

0.03

250.00

7.50

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

7.50

Unit Rate(Direct Labour)

69.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

66.00

BSR Reference

15-04-61

Description

Removing of GI pipes any size upto 50mm & trench filled in.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

33.52

1.00

33.52

Plumber M

0.0%

0.13

40.00

5.28

Unskilled Labour M

0.0%

1.00

30.00

30.00

Material Rate

0.00

Unit Rate(Direct Labour)

35.28

Plant Rate

0.00

Unit Rate (Labour Sub Con)

33.52

Wednesday, March 29, 2006

Page 323 of 395

Southern Province Engineering Services

BSR Reference

15-04-62

Description

Removing of GI pipes 50mm to 100mm & making good to walls & floors .

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

47.98

1.00

47.98

Plumber M

0.0%

0.85

40.00

34.00

Unskilled Labour M

0.0%

0.55

30.00

16.50

Cement M

0.0%

0.04

340.00

11.90

Brick sand etc. M

0.0%

2.25

1.00

2.25

Material Rate

11.90

Plant Rate

0.00

Unit Rate(Direct Labour)

64.65

Unit Rate (Labour Sub Con)

62.13

BSR Reference

15-04-63

Description

Existing GI pipes upto 50mm takeout ,clraned & relaid rate to include backfilling.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

24.51

1.00

24.51

Plumber M

0.0%

0.27

40.00

10.80

Unskilled Labour M

0.0%

0.50

30.00

15.00

Paint Read lead M

0.0%

0.19

250.00

47.50

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

47.50

Plant Rate

0.00

Unit Rate(Direct Labour)

74.80

Unit Rate (Labour Sub Con)

73.51

BSR Reference

15-04-64

Description

Existing GI pipes 63mm to 75mm takeout ,cleaned and telaid.rateto include backfilling.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

43.70

1.00

43.70

Plumber M

0.0%

0.40

40.00

16.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

Paint Read lead M

0.0%

0.03

250.00

7.50

Other expenses M

0.0%

1.50

1.00

1.50

Material Rate

7.50

Unit Rate(Direct Labour)

55.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

52.70

Wednesday, March 29, 2006

Page 324 of 395

Southern Province Engineering Services

BSR Reference

15-04-65

Description

Existing GI pipes upto take cleaned and relaid in new position. rate to include backfilling.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

45.60

1.00

45.60

Plumber M

0.0%

0.30

40.00

12.00

Unskilled Labour M

0.0%

1.20

30.00

36.00

Material Rate

0.00

Unit Rate(Direct Labour)

48.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

45.60

BSR Reference

15-04-66

Description

Cleaning of pipe outlets,upto 2400mm length.[Excluding removing & replacing]

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

28.50

1.00

28.50

Unskilled Labour M

0.0%

1.00

30.00

30.00

Material Rate

0.00

Unit Rate(Direct Labour)

30.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

28.50

BSR Reference

15-04-67

Description

G.plugs of any size fixed in position (Plugs supplied by Client)

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

5.52

1.00

5.52

Plumber Nos.

0.0%

0.08

40.00

3.32

Unskilled Labour Nos.

0.0%

0.08

30.00

2.49

Material Rate

0.00

Unit Rate(Direct Labour)

5.81

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.52

Wednesday, March 29, 2006

Page 325 of 395

Southern Province Engineering Services

BSR Reference

15-04-68

Description

Supplying and fixing of 12mm GI plugs.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

5.52

1.00

5.52

Plumber Nos.

0.0%

0.08

40.00

3.32

Unskilled Labour Nos.

0.0%

0.08

30.00

2.49

Plug GI 12mm Nos.

0.0%

1.00

20.00

20.00

20.00

Plant Rate

0.00

BSR Reference

15-04-69

Description

Supplying and fixing of 20mm GI plugs.

Resource Unit

Unit Rate(Direct Labour)

25.81

Unit Rate (Labour Sub Con)

25.52

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

5.52

1.00

5.52

Plumber Nos.

0.0%

0.08

40.00

3.32

Unskilled Labour Nos.

0.0%

0.08

30.00

2.49

Plugs Gi 20mm Nos.

0.0%

1.00

12.00

12.00

Material Rate

12.00

Plant Rate

0.00

BSR Reference

15-04-70

Description

Supplying and fixing of 25mm GI plugs.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

17.81

Unit Rate (Labour Sub Con)

17.52

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

5.52

1.00

5.52

Plumber Nos.

0.0%

0.08

40.00

3.32

Unskilled Labour Nos.

0.0%

0.08

30.00

2.49

Plugs GI 25mm Nos.

0.0%

1.00

20.00

20.00

20.00
0.00

Unit Rate(Direct Labour)

25.81

Unit Rate (Labour Sub Con)

25.52

Wednesday, March 29, 2006

Page 326 of 395

Southern Province Engineering Services

BSR Reference

15-04-71

Description

Supplying and fixing of 32mm GI plugs.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

5.52

1.00

5.52

Plumber Nos.

0.0%

0.08

40.00

3.32

Unskilled Labour Nos.

0.0%

0.08

30.00

2.49

Plugs Gi 32mm Nos.

0.0%

1.00

24.00

24.00

24.00

Plant Rate

0.00

BSR Reference

15-04-72

Description

Supplying and fixing of 38mm GI plugs.

Resource Unit

Unit Rate(Direct Labour)

29.81

Unit Rate (Labour Sub Con)

29.52

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

5.52

1.00

5.52

Plumber Nos.

0.0%

0.08

40.00

3.32

Unskilled Labour Nos.

0.0%

0.08

30.00

2.49

Plug GI 38mm Nos.

0.0%

1.00

28.00

28.00

Material Rate

28.00

Plant Rate

0.00

BSR Reference

15-04-73

Description

Supplying and fixing of 50mm GI plugs.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

33.81

Unit Rate (Labour Sub Con)

33.52

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

5.52

1.00

5.52

Plumber Nos.

0.0%

0.08

40.00

3.32

Unskilled Labour Nos.

0.0%

0.08

30.00

2.49

Plug GI 50mm Nos.

0.0%

1.00

33.00

33.00

33.00
0.00

Unit Rate(Direct Labour)

38.81

Unit Rate (Labour Sub Con)

38.52

Wednesday, March 29, 2006

Page 327 of 395

Southern Province Engineering Services

BSR Reference

15-04-74

Description

Supplying and fixing of 25mm to 32mm rubber plugs for wash basins and sinks.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.50

1.00

9.50

Plumber Nos.

0.0%

0.25

40.00

10.00

Rubber plug 25mm to 32mm Nos.

0.0%

1.00

17.00

17.00

Material Rate

17.00

Plant Rate

0.00

Unit Rate(Direct Labour)

27.00

Unit Rate (Labour Sub Con)

26.50

BSR Reference

15-04-75

Description

Supplying and fixing of 38mm to 50mm rubber plugs for wash basins and sinks.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.50

1.00

9.50

Plumber Nos.

0.0%

0.25

40.00

10.00

Rubber plug 32mmto 50mm Nos.

0.0%

1.00

27.00

27.00

Material Rate

27.00

Plant Rate

0.00

Unit Rate(Direct Labour)

37.00

Unit Rate (Labour Sub Con)

36.50

BSR Reference

15-04-76

Description

Supplying and fixing of wooden plugs in Class I timber 100mm long, tapered 75mm to

Unit

Nos.

50mm square square section bedded in 1:2 cement mortar.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

22.80

1.00

22.80

Carpenter Nos.

0.0%

0.40

45.00

18.00

Unskilled Labour Nos.

0.0%

0.20

30.00

6.00

Timb. Cl. 1 100mm*100mm beams Nos.

0.0%

0.07

230.00

16.10

Cement etc Nos.

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

16.10
0.00

Unit Rate(Direct Labour)

42.10

Unit Rate (Labour Sub Con)

40.90

Wednesday, March 29, 2006

Page 328 of 395

Southern Province Engineering Services

BSR Reference

15-04-77

Description

Supplying and fixing of 12mm heavy quaLitery brass push tape.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

12.69

1.00

12.69

Plumber Nos.

0.0%

0.33

40.00

13.36

Brass push tap plumber heavy quality Nos.

0.0%

1.00

100.00

100.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

100.00

Plant Rate

0.00

Unit Rate(Direct Labour)

114.36

Unit Rate (Labour Sub Con)

113.69

BSR Reference

15-04-78

Description

Supplying and fixing of 12mm light pattern brass push tape.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

12.69

1.00

12.69

Plumber Nos.

0.0%

0.33

40.00

13.36

Brass push tap plumber light quality Nos.

0.0%

1.00

90.00

90.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

90.00

Plant Rate

0.00

Unit Rate(Direct Labour)

104.36

Unit Rate (Labour Sub Con)

103.69

BSR Reference

15-04-79

Description

Making a platform, with bamboo and planks for lifting or lowering of storage tank to a

Unit

Nos.

height 4575mm to 9145mm and removing same.

Resource Unit

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

456.00

1.00

456.00

Unskilled Labour Nos.

0.0%

16.00

30.00

480.00

Props (bamboo) 3 - 4 m Nos.

0.0%

3.50

80.00

280.00

Timber Plank 25mm Class C Nos.

0.0%

0.07

150.00

10.50

Other expenses Nos.

0.0%

15.00

1.00

15.00

Material Rate
Plant Rate

Wastag

290.50
0.00

Unit Rate(Direct Labour)

785.50

Unit Rate (Labour Sub Con)

761.50

Wednesday, March 29, 2006

Page 329 of 395

Southern Province Engineering Services

BSR Reference

15-04-80

Description

Making a platform, with bamboo and planks for lifting or lowering of storage tanks to a

Unit

Nos.

height 9145mm to 15240mm and removing same.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

570.00

1.00

570.00

Unskilled Labour Nos.

0.0%

20.00

30.00

600.00

Props (bamboo) 3 - 4 m Nos.

0.0%

7.00

80.00

560.00

Timber Plank 25mm Class C Nos.

0.0%

0.07

150.00

10.50

Other expenses Nos.

0.0%

20.00

1.00

20.00

Material Rate

570.50

Plant Rate

0.00

Unit Rate(Direct Labour)

1,190.50

Unit Rate (Labour Sub Con)

1,160.50

BSR Reference

15-04-81

Description

Supplying and fixing of 600mm * 125mm glass shelves with chromium plated brackets to

Unit

Nos.

wall with rawl plugs.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

47.50

1.00

47.50

Plumber Nos.

0.0%

1.25

40.00

50.00

Glass shelf 600mm*125mm With chr. Nos.

0.0%

1.00

250.00

250.00

Rawl plugs Nos.

0.0%

4.00

3.00

12.00

Material Rate

262.00

Plant Rate

0.00

Unit Rate(Direct Labour)

312.00

Unit Rate (Labour Sub Con)

309.50

BSR Reference

15-04-82

Description

Fixing any size of shower rosw in position (Shower rose supplied by client)

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.50

1.00

9.50

Plumber Nos.

0.0%

0.25

40.00

10.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

11.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

10.50

Wednesday, March 29, 2006

Page 330 of 395

Southern Province Engineering Services

BSR Reference

15-04-83

Description

Supplying and fixing of 150mm copper shower rose.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.50

1.00

9.50

Plumber Nos.

0.0%

0.25

40.00

10.00

Shower rose copper 150mm*12mm Nos.

0.0%

1.00

100.00

100.00

Material Rate

100.00

Plant Rate

0.00

Unit Rate(Direct Labour)

110.00

Unit Rate (Labour Sub Con)

109.50

BSR Reference

15-04-84

Description

Supplying and fixing of 150mm PVC shower rose.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.50

1.00

9.50

Plumber Nos.

0.0%

0.25

40.00

10.00

Shower rose pvc 150mm*12mm Nos.

0.0%

1.00

60.00

60.00

Material Rate

60.00

Plant Rate

0.00

BSR Reference

15-04-85

Description

Swower rose solidered and re-fixed.

Resource Unit

Unit Rate(Direct Labour)

70.00

Unit Rate (Labour Sub Con)

69.50

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

38.00

1.00

38.00

Plumber Nos.

0.0%

1.00

40.00

40.00

Red lead etc. Nos.

0.0%

15.00

1.00

15.00

Material Rate

0.00

Unit Rate(Direct Labour)

55.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

53.00

Wednesday, March 29, 2006

Page 331 of 395

Southern Province Engineering Services

BSR Reference

15-04-86

Description

Supplying and fixing of 12mm G.I nipples.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

4.75

1.00

4.75

Plumber Nos.

0.0%

0.13

40.00

5.00

Nipple GI 12mm Nos.

0.0%

1.00

12.00

12.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

12.00

Plant Rate

0.00

BSR Reference

15-04-87

Description

Supplying and fixing of 20mm G.I nipples.

Resource Unit

Unit Rate(Direct Labour)

18.00

Unit Rate (Labour Sub Con)

17.75

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

4.75

1.00

4.75

Plumber Nos.

0.0%

0.13

40.00

5.00

Nipple GI 20mm Nos.

0.0%

1.00

15.00

15.00

Material Rate

15.00

Plant Rate

0.00

BSR Reference

15-04-88

Description

Supplying and fixing of 25mm G.I nipples.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

20.00

Unit Rate (Labour Sub Con)

19.75

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

4.75

1.00

4.75

Plumber Nos.

0.0%

0.13

40.00

5.00

Nipple Gi 25mm Nos.

0.0%

1.00

23.00

23.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

23.00
0.00

Unit Rate(Direct Labour)

29.00

Unit Rate (Labour Sub Con)

28.75

Wednesday, March 29, 2006

Page 332 of 395

Southern Province Engineering Services

BSR Reference

15-04-89

Description

Supplying and fixing of 32mm G.I nipples.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

4.75

1.00

4.75

Plumber Nos.

0.0%

0.13

40.00

5.00

Nipple GI 32mm Nos.

0.0%

1.00

33.00

33.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

33.00

Plant Rate

0.00

BSR Reference

15-04-90

Description

Supplying and fixing of 38mm G.I nipples.

Resource Unit

Unit Rate(Direct Labour)

39.00

Unit Rate (Labour Sub Con)

38.75

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

4.75

1.00

4.75

Plumber Nos.

0.0%

0.13

40.00

5.00

Nipple GI 32mm Nos.

0.0%

1.00

33.00

33.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

33.00

Plant Rate

0.00

BSR Reference

15-04-91

Description

Supplying and fixing of 50mm G.I nipples.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

39.00

Unit Rate (Labour Sub Con)

38.75

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

4.75

1.00

4.75

Plumber Nos.

0.0%

0.13

40.00

5.00

Nipple GI 50mm Nos.

0.0%

1.00

55.00

55.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

55.00
0.00

Unit Rate(Direct Labour)

61.00

Unit Rate (Labour Sub Con)

60.75

Wednesday, March 29, 2006

Page 333 of 395

Southern Province Engineering Services

BSR Reference

15-04-92

Description

Fixing in position of G.I nipples upto 50mm (Nipples supplied).

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

4.75

1.00

4.75

Plumber Nos.

0.0%

0.13

40.00

5.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

6.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.75

BSR Reference

15-04-93

Description

Repairing piller cock and fixing to basin without damaging the basin.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

57.00

1.00

57.00

Plumber Nos.

0.0%

1.50

40.00

60.00

Washers etc. Nos.

0.0%

2.00

1.00

2.00

Material Rate

0.00

Unit Rate(Direct Labour)

62.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

59.00

BSR Reference

15-04-94

Description

Supplying and fixing 12mm chromium plated piller cockes to basin.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

49.88

1.00

49.88

Plumber Nos.

0.0%

0.75

40.00

30.00

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Pillar cock chromium plated 12mm Nos.

0.0%

1.00

240.00

240.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

240.00
0.00

Unit Rate(Direct Labour)

293.50

Unit Rate (Labour Sub Con)

290.88

Wednesday, March 29, 2006

Page 334 of 395

Southern Province Engineering Services

BSR Reference

15-04-95

Description

Supplying and fixing 20mm chromium plated piller cockes to basin.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

49.88

1.00

49.88

Plumber Nos.

0.0%

0.75

40.00

30.00

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Piller cock chrom. plated 20mm Nos.

0.0%

1.00

250.00

250.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

250.00

Plant Rate

0.00

Unit Rate(Direct Labour)

303.50

Unit Rate (Labour Sub Con)

300.88

BSR Reference

15-04-96

Description

Fixing of sink in any size with all fitting (Sink and fittings supplied by Client).

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

541.50

1.00

541.50

Mason Nos.

0.0%

2.00

45.00

90.00

Plumber Nos.

0.0%

6.00

40.00

240.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Plugs Nos.

0.0%

4.00

16.00

64.00

Cement etc Nos.

0.0%

4.00

1.00

4.00

Material Rate

64.00

Plant Rate

0.00

Unit Rate(Direct Labour)

638.00

Unit Rate (Labour Sub Con)

609.50

BSR Reference

15-04-97

Description

Supplying and fixing of 610mm * 380mm * 180mm glazed earthenware sink with all fitting

Unit

Nos.

on existing brackets.

Resource Unit

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

365.75

1.00

365.75

Plumber Nos.

0.0%

5.50

40.00

220.00

Unskilled Labour Nos.

0.0%

5.50

30.00

165.00

Kitchen sink 600*375*175mm Nos.

0.0%

1.00

1,800.00

1,800.00

Cement etc Nos.

0.0%

5.00

1.00

5.00

Material Rate
Plant Rate

Wastag

1,800.00
0.00

Unit Rate(Direct Labour)

2,190.00

Unit Rate (Labour Sub Con)

2,170.75

Wednesday, March 29, 2006

Page 335 of 395

Southern Province Engineering Services

BSR Reference

15-04-98

Description

Supplying and fixing of 610mm * 380mm * 180mm glazed earthenware sink with all

Unit

Nos.

fittings. Rate to include for provision of brackets.

Resource Unit

Wastag

Quantit

Amount

0.0%

365.75

1.00

365.75

Plumber Nos.

0.0%

5.50

40.00

220.00

Unskilled Labour Nos.

0.0%

5.50

30.00

165.00

Kitchen sink 600*375*175mm Nos.

0.0%

1.00

1,800.00

1,800.00

Wash basin[M] bracket Nos.

0.0%

1.00

55.00

55.00

Cement etc Nos.

0.0%

5.00

1.00

5.00

Material Rate

1,855.00

Plant Rate

0.00

Unit Rate(Direct Labour)

2,245.00

Unit Rate (Labour Sub Con)

2,225.75

BSR Reference

15-04-99

Description

Removing sink on basin refixing in new position.

Unit

Resource Unit

Material Rate
Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

774.25

1.00

774.25

Mason Nos.

0.0%

3.00

45.00

135.00

Plumber Nos.

0.0%

8.00

40.00

320.00

Unskilled Labour Nos.

0.0%

12.00

30.00

360.00

Plugs Nos.

0.0%

1.00

16.00

16.00

Cement, Red lead etc Nos.

0.0%

9.00

1.00

9.00

16.00
0.00

Unit Rate(Direct Labour)

840.00

Unit Rate (Labour Sub Con)

799.25

Wednesday, March 29, 2006

Page 336 of 395

Southern Province Engineering Services

BSR Reference

15-05-01

Description

Supplying and fixing of 12mm plain G.I sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

11.88

1.00

11.88

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Socket GI 12mm Nos.

0.0%

1.00

7.00

7.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

7.00

Unit Rate(Direct Labour)

20.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

19.88

BSR Reference

15-05-02

Description

Supplying and fixing of 20mm plain G.I sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Socket GI20mm Nos.

0.0%

1.00

8.00

8.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

8.00

Unit Rate(Direct Labour)

17.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

17.31

BSR Reference

15-05-03

Description

Supplying and fixing of 25mm plain G.I sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Socket GI 25mm Nos.

0.0%

1.00

9.00

9.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

9.00

Unit Rate(Direct Labour)

18.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

18.31

Wednesday, March 29, 2006

Page 337 of 395

Southern Province Engineering Services

BSR Reference

15-05-04

Description

Supplying and fixing of 32mm plain G.I sockets.

Resource Unit

Unit

Wastag

Quantit

Amount

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

SOcket GI 32mm Nos.

0.0%

1.00

10.00

10.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

10.00

Plant Rate

0.00

Unit Rate(Direct Labour)

19.75

Unit Rate (Labour Sub Con)

19.31

BSR Reference

15-05-05

Description

Supplying and fixing of 38mm plain G.I sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Socket GI 38mm Nos.

0.0%

1.00

14.00

14.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

14.00

Plant Rate

0.00

Unit Rate(Direct Labour)

23.75

Unit Rate (Labour Sub Con)

23.31

BSR Reference

15-05-06

Description

Supplying and fixing of 50mm plain G.I sockets.

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Socket GI 50mm Nos.

0.0%

1.00

24.00

24.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

24.00
0.00

Unit Rate(Direct Labour)

33.75

Unit Rate (Labour Sub Con)

33.31

Wednesday, March 29, 2006

Page 338 of 395

Southern Province Engineering Services

BSR Reference

15-05-07

Description

Supplying and fixing of 75mm plain G.I sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

11.11

1.00

11.11

Plumber Nos.

0.0%

0.17

40.00

6.68

Unskilled Labour Nos.

0.0%

0.17

30.00

5.01

Socket GI 75mm Nos.

0.0%

1.00

90.00

90.00

Red lead etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

90.00

Plant Rate

0.00

Unit Rate(Direct Labour)

102.69

Unit Rate (Labour Sub Con)

102.11

BSR Reference

15-05-08

Description

Supplying and fixing of 20mm to smaller size G.I reducing sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Reducing socket GI 20mm to smaller Nos.

0.0%

1.00

20.00

20.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

20.00

Plant Rate

0.00

Unit Rate(Direct Labour)

29.75

Unit Rate (Labour Sub Con)

29.31

BSR Reference

15-05-09

Description

Supplying and fixing of 25mm to smaller size G.I reducing sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

Reducing socket GI 25mm to smaller Nos.

0.0%

1.00

35.00

35.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

35.00
0.00

Unit Rate(Direct Labour)

71.00

Unit Rate (Labour Sub Con)

69.25

Wednesday, March 29, 2006

Page 339 of 395

Southern Province Engineering Services

BSR Reference

15-05-10

Description

Supplying and fixing of 32mm to smaller size G.I reducing sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Reducing socket GI 32mm Nos.

0.0%

1.00

42.00

42.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

42.00

Plant Rate

0.00

Unit Rate(Direct Labour)

51.75

Unit Rate (Labour Sub Con)

51.31

BSR Reference

15-05-11

Description

Supplying and fixing of 38mm to smaller size G.I reducing sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Reducing socket GI 38mm Nos.

0.0%

1.00

60.00

60.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

60.00

Plant Rate

0.00

Unit Rate(Direct Labour)

69.75

Unit Rate (Labour Sub Con)

69.31

BSR Reference

15-05-12

Description

Supplying and fixing of 50mm to smaller size G.I reducing sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Reducing socket GI 50mm Nos.

0.0%

1.00

80.00

80.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

80.00
0.00

Unit Rate(Direct Labour)

89.75

Unit Rate (Labour Sub Con)

89.31

Wednesday, March 29, 2006

Page 340 of 395

Southern Province Engineering Services

BSR Reference

15-05-13

Description

Supplying and fixing of 75mm to 50mm G.I reducing sockets.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

11.11

1.00

11.11

Plumber Nos.

0.0%

0.17

40.00

6.68

Unskilled Labour Nos.

0.0%

0.17

30.00

5.01

Reducing socket GI 75mm Nos.

0.0%

1.00

100.00

100.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

100.00

Plant Rate

0.00

Unit Rate(Direct Labour)

112.69

Unit Rate (Labour Sub Con)

112.11

BSR Reference

15-05-14

Description

Fixing in position of G.I socket in any size(socket supplied by client)

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

8.31

1.00

8.31

Plumber Nos.

0.0%

0.13

40.00

5.00

Unskilled Labour Nos.

0.0%

0.13

30.00

3.75

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

9.75

Plant Rate

0.00

Unit Rate (Labour Sub Con)

9.31

BSR Reference

15-05-15

Description

Suppyling of white porcelain soap tray and fixing to wall by rawl plugs.

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

38.00

1.00

38.00

Plumber Nos.

0.0%

1.00

40.00

40.00

Rawl plugs Nos.

0.0%

2.00

3.00

6.00

Soap holder white Nos.

0.0%

1.00

210.00

210.00

Screws and Nails Nos.

0.0%

5.00

1.00

5.00

216.00
0.00

Unit Rate(Direct Labour)

261.00

Unit Rate (Labour Sub Con)

259.00

Wednesday, March 29, 2006

Page 341 of 395

Southern Province Engineering Services

BSR Reference

15-05-16

Description

Steel work in RSJ's as upport for tanks, Fixing in position up to 6000mm in height and

Unit

Kg

painted 2 coarts red lead and 2 coats anti corrosive paint.

Resource Unit

Wastag

Quantit
2.30

1.00

2.30

Painter Kg

0.0%

0.01

40.00

0.24

Plumber Kg

0.0%

0.02

40.00

0.80

Unskilled Labour Kg

0.0%

0.05

30.00

1.38

Anti-corrosive paint Kg

0.0%

0.01

180.00

1.44

H iron 2"*4" Kg

0.0%

1.10

40.00

44.00

Paint Read lead Kg

0.0%

0.01

250.00

2.00

Cement etc Kg

0.0%

0.30

1.00

0.30

47.44

Plant Rate

0.00

Unit Rate(Direct Labour)

50.16

Unit Rate (Labour Sub Con)

50.04

BSR Reference

15-05-17

Description

Supplying and fixing of 12mm brass stop cocks.

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate Kg

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Stop cock brass 12mm Nos.

0.0%

1.00

75.00

75.00

Leads etc. Nos.

0.0%

1.00

1.00

1.00

75.00
0.00

Unit Rate(Direct Labour)

111.00

Unit Rate (Labour Sub Con)

109.25

Wednesday, March 29, 2006

Page 342 of 395

Southern Province Engineering Services

BSR Reference

15-05-18

Description

Supplying and fixing of 20mm brass stop cocks.

Resource Unit

Unit

Wastag

Quantit

Amount

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Stop cock brass 20mm Nos.

0.0%

1.00

90.00

90.00

Leads etc. Nos.

0.0%

1.00

1.00

1.00

90.00

Plant Rate

0.00

Unit Rate(Direct Labour)

126.00

Unit Rate (Labour Sub Con)

124.25

BSR Reference

15-05-19

Description

Supplying and fixing of 25mm brass stop cocks.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Stop cock brass 20mm Nos.

0.0%

1.00

90.00

90.00

Leads etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

90.00

Plant Rate

0.00

Unit Rate(Direct Labour)

126.00

Unit Rate (Labour Sub Con)

124.25

BSR Reference

15-05-20

Description

Supplying and fixing of 32mm brass stop cocks.

Resource Unit

Plant Rate

Rate Type

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Stop cock brass 32mm Nos.

0.0%

1.00

200.00

200.00

Leads etc. Nos.

0.0%

1.00

1.00

1.00

200.00
0.00

Unit Rate(Direct Labour)

236.00

Unit Rate (Labour Sub Con)

234.25

Wednesday, March 29, 2006

Page 343 of 395

Southern Province Engineering Services

BSR Reference

15-05-21

Description

Supplying and fixing of 38mm brass stop cocks.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Stop cock brass38mm Nos.

0.0%

1.00

250.00

250.00

Leads etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

250.00

Plant Rate

0.00

Unit Rate(Direct Labour)

286.00

Unit Rate (Labour Sub Con)

284.25

BSR Reference

15-05-22

Description

Supplying and fixing of 50mm brass stop cocks.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

41.56

1.00

41.56

Plumber Nos.

0.0%

0.63

40.00

25.00

Unskilled Labour Nos.

0.0%

0.63

30.00

18.75

Stop cock brass 50mm Nos.

0.0%

1.00

450.00

450.00

Leads etc. Nos.

0.0%

1.00

1.00

1.00

Material Rate

450.00

Plant Rate

0.00

Unit Rate(Direct Labour)

494.75

Unit Rate (Labour Sub Con)

492.56

BSR Reference

15-05-23

Description

Supplying and fixing of 12mm chromium plated stop cocks.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Plumber Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Stop cook chromium plated 12mm Nos.

0.0%

1.00

240.00

240.00

Other expenses Nos.

0.0%

1.00

1.00

1.00

Material Rate
Plant Rate

240.00
0.00

Unit Rate(Direct Labour)

276.00

Unit Rate (Labour Sub Con)

274.25

Wednesday, March 29, 2006

Page 344 of 395

Southern Province Engineering Services

BSR Reference

15-05-24

Description

Hoist & place in position of 1125-1800 Literre GI tank upto a height of 6000mm & remove

Unit

Nos.

old tank include disconnect & connect all pipes & paint the new

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

1,187.50

1.00

1,187.50

Painter Nos.

0.0%

14.00

40.00

560.00

Plumber Nos.

0.0%

4.50

40.00

180.00

Unskilled Labour Nos.

0.0%

17.00

30.00

510.00

Anti-corrosive paint Nos.

0.0%

1.40

180.00

252.00

Paint Read lead Nos.

0.0%

0.70

250.00

175.00

Brushes etc. Nos.

0.0%

20.00

1.00

20.00

Material Rate

427.00

Plant Rate

0.00

Unit Rate(Direct Labour)

1,697.00

Unit Rate (Labour Sub Con)

1,634.50

BSR Reference

15-05-25

Description

Hoisting and planing in position of 110 to 910 Literre GI tank upto a height of 6000mm &

Unit

Nos.

removing the old tank including connecting and disconnecting all pipes and painting the
new tank with red lead & 2 coats of anti corrosive paint.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

703.00

1.00

703.00

Painter Nos.

0.0%

5.00

40.00

200.00

Plumber Nos.

0.0%

4.50

40.00

180.00

Unskilled Labour Nos.

0.0%

12.00

30.00

360.00

Anti-corrosive paint Nos.

0.0%

0.45

180.00

81.00

Paint Read lead Nos.

0.0%

0.23

250.00

57.50

Brushes etc. Nos.

0.0%

15.00

1.00

15.00

138.50
0.00

Unit Rate(Direct Labour)

893.50

Unit Rate (Labour Sub Con)

856.50

Wednesday, March 29, 2006

Page 345 of 395

Southern Province Engineering Services

BSR Reference

15-05-26

Description

Place in position of 112-910 liter GI tank upto a height of 6000mm & fix erection of steel

Unit

Nos.

support include fixing of all pipes & paint the tank & support with red lead paint & 2 coats
anti corresive paint(Tank pipes, fittings,RSJ's, supplied by the c

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

551.00

1.00

551.00

Painter Nos.

0.0%

5.00

40.00

200.00

Plumber Nos.

0.0%

3.50

40.00

140.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Anti-corrosive paint Nos.

0.0%

0.45

180.00

81.00

Paint Read lead Nos.

0.0%

0.22

250.00

56.25

Brushes etc. Nos.

0.0%

30.00

1.00

30.00

Material Rate

137.25

Plant Rate

0.00

Unit Rate(Direct Labour)

747.25

Unit Rate (Labour Sub Con)

718.25

BSR Reference

15-05-27

Description

Place in position of 1125-1800 l GI tank at a height of 6000mm & remove and fix of steel

Unit

Nos.

supports removing old tank include disconnect all pipes and paint new tank & support
with red lead paint & 2 coats of anticorrosive paint(Tank, pipes,fittings,R

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

978.50

1.00

978.50

Painter Nos.

0.0%

14.00

40.00

560.00

Plumber Nos.

0.0%

3.50

40.00

140.00

Unskilled Labour Nos.

0.0%

11.00

30.00

330.00

Anti-corrosive paint Nos.

0.0%

1.40

180.00

252.00

Paint Read lead Nos.

0.0%

0.70

250.00

175.00

Brushes etc. Nos.

0.0%

40.00

1.00

40.00

427.00
0.00

Unit Rate(Direct Labour)

1,497.00

Unit Rate (Labour Sub Con)

1,445.50

Wednesday, March 29, 2006

Page 346 of 395

Southern Province Engineering Services

BSR Reference

15-05-28

Description

Cleaning of tanks upto the storeage capacity of 1800 litres

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

114.00

1.00

114.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Brushes etc. Nos.

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

130.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

124.00

BSR Reference

15-05-29

Description

Cleaning of tanks upto the storeage capacity over 1800 litres

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

228.00

1.00

228.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Brushes etc. Nos.

0.0%

12.00

1.00

12.00

Material Rate

0.00

Unit Rate(Direct Labour)

252.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

240.00

BSR Reference

15-05-30

Description

Removing of GI Instorage tank good to walls and floor (scaffoding paid separately where

Unit

Nos.

necessary)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

342.00

1.00

342.00

Plumber Nos.

0.0%

3.00

40.00

120.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Cement etc Nos.

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

370.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

352.00

Wednesday, March 29, 2006

Page 347 of 395

Southern Province Engineering Services

BSR Reference

15-05-31

Description

Supplying and installing of 400 litre 16BWG GI tank including painting the tank with

Unit

Nos.

one coats of anticorrosive paint.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

475.00

1.00

475.00

Painter Nos.

0.0%

3.00

40.00

120.00

Plumber Nos.

0.0%

3.50

40.00

140.00

Unskilled Labour Nos.

0.0%

8.00

30.00

240.00

Anti-corrosive paint Nos.

0.0%

0.55

180.00

99.00

G.I.Tank 400 L 16 BWG Nos.

0.0%

1.00

6,000.00

6,000.00

Paint Read lead Nos.

0.0%

0.28

250.00

70.00

Brushes, washes etc Nos.

0.0%

20.00

1.00

20.00

Material Rate

6,169.00

Plant Rate

0.00

Unit Rate(Direct Labour)

6,689.00

Unit Rate (Labour Sub Con)

6,664.00

BSR Reference

15-05-32

Description

Supplying and installing of 1125 litre 16BWG GI tank including painting the tank with

Unit

Nos.

2 coats of anticorrosive paint.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

475.00

1.00

475.00

Painter Nos.

0.0%

6.00

40.00

240.00

Plumber Nos.

0.0%

3.50

40.00

140.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

Anti-corrosive paint Nos.

0.0%

1.24

180.00

223.20

Paint Read lead Nos.

0.0%

0.62

250.00

155.00

Tank 16BWG G.I, 1125 L Nos.

0.0%

1.00

10,000.00

10,000.00

Brushes, washes etc Nos.

0.0%

25.00

1.00

25.00

10,378.20
0.00

Unit Rate(Direct Labour)

10,903.20

Unit Rate (Labour Sub Con)

10,878.20

Wednesday, March 29, 2006

Page 348 of 395

Southern Province Engineering Services

BSR Reference

15-05-33

Description

Supplying and installing of 1800 litre 16BWG GI tank including painting the tank with

Unit

Nos.

one coat primer and 2 coats of anticorrosive paint.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

902.50

1.00

902.50

Painter Nos.

0.0%

12.00

40.00

480.00

Plumber Nos.

0.0%

3.50

40.00

140.00

Unskilled Labour Nos.

0.0%

11.00

30.00

330.00

Anti-corrosive paint Nos.

0.0%

1.80

180.00

324.00

Paint Read lead Nos.

0.0%

0.90

250.00

225.00

Tank 16 BWG G.I. , 1800 L Nos.

0.0%

1.00

13,000.00

13,000.00

Brushes, washes etc Nos.

0.0%

30.00

1.00

30.00

Material Rate

13,549.00

Plant Rate

0.00

Unit Rate(Direct Labour)

14,529.00

Unit Rate (Labour Sub Con)

14,481.50

BSR Reference

15-05-36

Description

Fixing of PVC bends elbows, tees and other specials upto 75mm (fittings supplied by

Unit

Nos.

Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

Material Rate

0.00

Unit Rate(Direct Labour)

8.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.65

Wednesday, March 29, 2006

Page 349 of 395

Southern Province Engineering Services

BSR Reference

15-06-37

Description

Supplying and fixing of 20mm PVC bends.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Bend PVC 20mm Nos.

0.0%

1.00

7.50

7.50

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

Material Rate

7.50

Unit Rate(Direct Labour)

15.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

15.15

BSR Reference

15-06-38

Description

Supplying and fixing of 25mm PVC bends.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Bend PVC 25mm Nos.

0.0%

1.00

9.50

9.50

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

Material Rate

9.50

Unit Rate(Direct Labour)

17.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

17.15

BSR Reference

15-06-39

Description

Supplying and fixing of 32mm PVC bends.

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Bend PVC 32mm Nos.

0.0%

1.00

13.50

13.50

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

13.50
0.00

Unit Rate(Direct Labour)

21.50

Unit Rate (Labour Sub Con)

21.15

Wednesday, March 29, 2006

Page 350 of 395

Southern Province Engineering Services

BSR Reference

15-06-40

Description

Supplying and fixing of 40mm PVC bends.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Bend PVc 40mm Nos.

0.0%

1.00

27.00

27.00

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

27.00

Plant Rate

0.00

BSR Reference

15-06-41

Description

Supplying and fixing of 50mm PVC bends.

Resource Unit

Unit Rate(Direct Labour)

35.00

Unit Rate (Labour Sub Con)

34.65

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Bend PVC 50mm Nos.

0.0%

1.00

44.00

44.00

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

Material Rate

44.00

Plant Rate

0.00

BSR Reference

15-06-42

Description

Supplying and fixing of 75mm PVC bends.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

52.00

Unit Rate (Labour Sub Con)

51.65

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

Bend PVc 75mm Nos.

0.0%

1.00

254.00

254.00

Solvent cement etc Nos.

0.0%

1.25

1.00

1.25

254.00
0.00

Unit Rate(Direct Labour)

262.25

Unit Rate (Labour Sub Con)

261.90

Wednesday, March 29, 2006

Page 351 of 395

Southern Province Engineering Services

BSR Reference

15-06-43

Description

Supplying and fixing of 90mm PVC bends.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

11.97

1.00

11.97

Plumber Nos.

0.0%

0.18

40.00

7.20

Unskilled Labour Nos.

0.0%

0.18

30.00

5.40

Bend PVC 90mm Nos.

0.0%

1.00

434.00

434.00

Solvent cement etc Nos.

0.0%

1.25

1.00

1.25

Material Rate

434.00

Plant Rate

0.00

BSR Reference

15-06-44

Description

Supplying and fixing of 20mm PVC elbows.

Resource Unit

Unit Rate(Direct Labour)

447.85

Unit Rate (Labour Sub Con)

447.22

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

11.31

1.00

11.31

Plumber Nos.

0.0%

0.17

40.00

6.80

Unskilled Labour Nos.

0.0%

0.17

30.00

5.10

PVC Elbow 32mm Nos.

0.0%

1.00

13.00

13.00

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

Material Rate

13.00

Plant Rate

0.00

BSR Reference

15-06-45

Description

Supplying and fixing of 25mm PVC elbows.

Resource Unit

Unit Rate(Direct Labour)

25.90

Unit Rate (Labour Sub Con)

25.31

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Elbow 25mm Nos.

0.0%

1.00

9.00

9.00

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

Material Rate

9.00

Unit Rate(Direct Labour)

17.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

16.65

Wednesday, March 29, 2006

Page 352 of 395

Southern Province Engineering Services

BSR Reference

15-06-46

Description

Supplying and fixing of 32mm PVC elbows.

Resource Unit

Unit

Wastag

Rate Type

Amount

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Elbow 32mm Nos.

0.0%

1.00

13.00

13.00

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

13.00

Plant Rate

0.00

BSR Reference

15-06-47

Description

Supplying and fixing of 40mm PVC elbows.

Resource Unit

Unit Rate(Direct Labour)

21.00

Unit Rate (Labour Sub Con)

20.65

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Elbow 40mm Nos.

0.0%

1.00

19.00

19.00

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

Material Rate

19.00

Plant Rate

0.00

BSR Reference

15-06-48

Description

Supplying and fixing of 50mm PVC elbows.

Resource Unit

Plant Rate

Quantit

Labour Sub-Contract Rate Nos.

Material Rate

Material Rate

Nos.

Unit Rate(Direct Labour)

27.00

Unit Rate (Labour Sub Con)

26.65

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Elbow 50mm Nos.

0.0%

1.00

30.00

30.00

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

30.00
0.00

Unit Rate(Direct Labour)

38.00

Unit Rate (Labour Sub Con)

37.65

Wednesday, March 29, 2006

Page 353 of 395

Southern Province Engineering Services

BSR Reference

15-06-49

Description

Supplying and fixing of 75mm PVC elbows.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Elbow 75mm Nos.

0.0%

1.00

122.00

122.00

Solvent cement etc Nos.

0.0%

1.25

1.00

1.25

Material Rate

122.00

Plant Rate

0.00

BSR Reference

15-06-50

Description

Supplying and fixing of 90mm PVC elbows.

Resource Unit

Unit Rate(Direct Labour)

130.25

Unit Rate (Labour Sub Con)

129.90

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

11.97

1.00

11.97

Plumber Nos.

0.0%

0.18

40.00

7.20

Unskilled Labour Nos.

0.0%

0.18

30.00

5.40

PVC Elbow 90mm Nos.

0.0%

1.00

211.00

211.00

Solvent cement etc Nos.

0.0%

1.25

1.00

1.25

Material Rate

211.00

Plant Rate

0.00

Unit Rate(Direct Labour)

224.85

Unit Rate (Labour Sub Con)

224.22

BSR Reference

15-06-51

Description

Supplying and fixing of PVC reducing sockets 20mm to smaller sizes.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

6.65

1.00

6.65

Plumber Nos.

0.0%

0.10

40.00

4.00

Unskilled Labour Nos.

0.0%

0.10

30.00

3.00

PVC Redu. sockt 25mm to smaller size Nos.

0.0%

1.00

7.50

7.50

Solvent cement etc Nos.

0.0%

1.00

1.00

1.00

Material Rate

7.50

Unit Rate(Direct Labour)

15.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

15.15

Wednesday, March 29, 2006

Page 354 of 395

Southern Province Engineering Services

BSR Reference

15-06-52

Description

Supplying of 200mm * 400mm half round tooth brush holders and fixing with rawl plugs)

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

49.88

1.00

49.88

Plumber Nos.

0.0%

0.75

40.00

30.00

Unskilled Labour Nos.

0.0%

0.75

30.00

22.50

Rawl plugs Nos.

0.0%

2.00

3.00

6.00

Tooth brush holder 200*100mm-white Nos.

0.0%

1.00

175.00

175.00

Other expenses Nos.

0.0%

2.00

1.00

2.00

Material Rate
Plant Rate

181.00
0.00

Unit Rate(Direct Labour)

235.50

Unit Rate (Labour Sub Con)

232.88

Wednesday, March 29, 2006

Page 355 of 395

Southern Province Engineering Services

BSR Class

RANDOM RUBBLE MASONRY

BSR Reference

05-00-01

Description

Random rubble masonry in 1:5 cement mortar (above 3 cu.m)

Unit

Resource Unit

Wastag

M3

Quantit
844.46

1.00

844.46

Mason M3

0.0%

8.46

45.00

380.70

Unskilled Labour M3

0.0%

16.94

30.00

508.20

Cement M3

0.0%

2.60

340.00

884.00

Rubble 150mm to 225mm M3

0.0%

1.00

350.00

350.00

Sand M3

0.0%

0.45

350.00

157.50

1,391.50

Plant Rate

0.00

Unit Rate(Direct Labour)

2,280.40

Unit Rate (Labour Sub Con)

2,235.95

BSR Reference

05-00-02

Description

Random rubble masonry in 1:5 cement mortar (upto 3 cu.m)

Unit

Resource Unit

Plant Rate

Amount

0.0%

Material Rate

Material Rate

Rate Type

Labour Sub-Contract Rate M3

Wastag

M3

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

1,057.35

1.00

1,057.35

Mason M3

0.0%

10.60

45.00

477.00

Unskilled Labour M3

0.0%

21.20

30.00

636.00

Cement M3

0.0%

2.60

340.00

884.00

Rubble 150mm to 225mm M3

0.0%

1.00

350.00

350.00

Sand M3

0.0%

0.45

350.00

157.50

1,391.50
0.00

Unit Rate(Direct Labour)

2,504.50

Unit Rate (Labour Sub Con)

2,448.85

Wednesday, March 29, 2006

Page 356 of 395

Southern Province Engineering Services

BSR Reference

05-00-03

Description

Random rubble masonry in 1:5 cement mortar using rubble available at site including

Unit

M3

sorting out and clearing rubble.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M3

0.0%

437.48

1.00

437.48

Mason M3

0.0%

8.50

45.00

382.50

Unskilled Labour M3

0.0%

2.60

30.00

78.00

Cement M3

0.0%

2.60

340.00

884.00

Sand M3

0.0%

0.45

350.00

157.50

1,041.50
0.00

Unit Rate(Direct Labour)

1,502.00

Unit Rate (Labour Sub Con)

1,478.97

Wednesday, March 29, 2006

Page 357 of 395

Southern Province Engineering Services

BSR Class

REINFORCEMENT

BSR Reference

18-00-01

Description

Mild steel reinforcement 6mm

Resource Unit

Quantit

Rate Type

Amount

0.0%

20.00

1.00

20.00

Barbender Kg

0.0%

0.50

40.00

20.00

Mild Steel 6mm Kg

0.0%

1.00

40.00

40.00

40.00

Plant Rate

0.00

BSR Reference

18-00-02

Description

Mild steel reinforcement 10mm

Resource Unit

Unit Rate(Direct Labour)

60.00

Unit Rate (Labour Sub Con)

60.00

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

20.00

1.00

20.00

Barbender Kg

0.0%

0.50

40.00

20.00

Mild Steel 10mm Kg

0.0%

1.00

40.00

40.00

Material Rate

40.00

Plant Rate

0.00

BSR Reference

18-00-03

Description

Tor steel reinforcement 8mm

Resource Unit

Plant Rate

Wastag

Kg

Labour Sub-Contract Rate Kg

Material Rate

Material Rate

Unit

Unit Rate(Direct Labour)

60.00

Unit Rate (Labour Sub Con)

60.00

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

20.00

1.00

20.00

Barbender Kg

0.0%

0.50

40.00

20.00

Tor Steel 8mm Kg

0.0%

2.00

40.00

80.00

80.00
0.00

Unit Rate(Direct Labour)

100.00

Unit Rate (Labour Sub Con)

100.00

Wednesday, March 29, 2006

Page 358 of 395

Southern Province Engineering Services

BSR Reference

18-00-04

Description

Tor steel reinforcement 10mm

Resource Unit

Quantit

Rate Type

Amount

0.0%

20.00

1.00

20.00

Barbender Kg

0.0%

0.50

40.00

20.00

Tor Steel 10mm Kg

0.0%

1.00

40.00

40.00

40.00

Plant Rate

0.00

BSR Reference

18-00-05

Description

Tor steel reinforcement 12mm

Resource Unit

Unit Rate(Direct Labour)

60.00

Unit Rate (Labour Sub Con)

60.00

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

20.00

1.00

20.00

Barbender Kg

0.0%

0.50

40.00

20.00

Tor Steel 12mm Kg

0.0%

1.00

40.00

40.00

Material Rate

40.00

Plant Rate

0.00

BSR Reference

18-00-06

Description

Tor steel reinforcement 16mm

Resource Unit

Plant Rate

Wastag

Kg

Labour Sub-Contract Rate Kg

Material Rate

Material Rate

Unit

Unit Rate(Direct Labour)

60.00

Unit Rate (Labour Sub Con)

60.00

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

20.00

1.00

20.00

Barbender Kg

0.0%

0.50

40.00

20.00

Tor Steel 16mm Kg

0.0%

1.00

40.00

40.00

40.00
0.00

Unit Rate(Direct Labour)

60.00

Unit Rate (Labour Sub Con)

60.00

Wednesday, March 29, 2006

Page 359 of 395

Southern Province Engineering Services

BSR Reference

18-00-07

Description

Tor steel reinforcement 20mm

Resource Unit

Quantit

Rate Type

Amount

0.0%

20.00

1.00

20.00

Barbender Kg

0.0%

0.50

40.00

20.00

Tor Steel 20mm Kg

0.0%

1.00

40.00

40.00

40.00

Plant Rate

0.00

BSR Reference

18-00-08

Description

Tor steel reinforcement 25mm

Resource Unit

Unit Rate(Direct Labour)

60.00

Unit Rate (Labour Sub Con)

60.00

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

20.00

1.00

20.00

Barbender Kg

0.0%

0.50

40.00

20.00

Tor Steel 25mm Kg

0.0%

1.00

40.00

40.00

Material Rate

40.00

Plant Rate

0.00

BSR Reference

18-00-09

Description

Tor steel reinforcement 32mm

Resource Unit

Plant Rate

Wastag

Kg

Labour Sub-Contract Rate Kg

Material Rate

Material Rate

Unit

Unit Rate(Direct Labour)

60.00

Unit Rate (Labour Sub Con)

60.00

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

22.00

1.00

22.00

Barbender Kg

0.0%

0.60

40.00

24.00

Tor Steel 32mm Kg

0.0%

1.00

40.00

40.00

40.00
0.00

Unit Rate(Direct Labour)

64.00

Unit Rate (Labour Sub Con)

62.00

Wednesday, March 29, 2006

Page 360 of 395

Southern Province Engineering Services

BSR Reference

18-00-10

Description

Tor steel reinforcement 38mm

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

Kg

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Kg

0.0%

23.00

1.00

23.00

Barbender Kg

0.0%

0.60

40.00

24.00

Tor Steel 38mm Kg

0.0%

1.00

40.00

40.00

40.00
0.00

Unit Rate(Direct Labour)

64.00

Unit Rate (Labour Sub Con)

63.00

Wednesday, March 29, 2006

Page 361 of 395

Southern Province Engineering Services

BSR Class

ROOFER

BSR Reference

07-00-01

Description

Fixing and corrugated asbestos or aluminum alloy sheets with hooks bolts and nuts to

Unit

M2

roofing or walling (sheets available at site)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

22.23

1.00

22.23

Black Smith M2

0.0%

0.30

40.00

12.00

Unskilled Labour M2

0.0%

0.38

30.00

11.40

G.I Hook bolts 8mm*155mm M2

0.0%

4.00

6.00

24.00

Limpet washers M2

0.0%

4.00

1.50

6.00

Material Rate

30.00

Plant Rate

0.00

Unit Rate(Direct Labour)

53.40

Unit Rate (Labour Sub Con)

52.23

BSR Reference

07-00-02

Description

Supplying and fixing of corrugated GI sheets roofing on class I timber purlins complete

Unit

M2

including treating timber with wood and preservatives (ridging measured separately). drive
screws and washers

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

56.29

1.00

56.29

Carpenter M2

0.0%

0.65

45.00

29.25

Unskilled Labour M2

0.0%

1.00

30.00

30.00

Drive Screws and washers M2

0.0%

3.00

8.00

24.00

G.I.sheet 24 B.W.G. M2

0.0%

1.20

320.00

384.00

Timber beams Class A M2

0.0%

0.01

30,000.00

300.00

Wood Preservative M2

0.0%

0.08

110.00

8.80

716.80
0.00

Unit Rate(Direct Labour)

776.05

Unit Rate (Labour Sub Con)

773.09

Wednesday, March 29, 2006

Page 362 of 395

Southern Province Engineering Services

BSR Reference

07-00-03

Description

supplying and fixing of corrugated aluminum sheets on 100mm * 50mm class I timber frame

Unit

M2

work for cladding

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

104.88

1.00

104.88

Carpenter M2

0.0%

1.72

45.00

77.40

Unskilled Labour M2

0.0%

1.10

30.00

33.00

Drive Screws and washers M2

0.0%

3.00

8.00

24.00

G.I. sheet corrugated 26BWG M2

0.0%

1.10

350.00

385.00

Timber beams Class A M2

0.0%

0.01

30,000.00

300.00

Material Rate

709.00

Plant Rate

0.00

Unit Rate(Direct Labour)

819.40

Unit Rate (Labour Sub Con)

813.88

BSR Reference

07-00-04

Description

supplying and fixing of corrugated aluminum sheets to roof or wall on existing frame work

Unit

M2

with hooks, bolts or drive screws etc

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

30.64

1.00

30.64

Carpenter M2

0.0%

0.43

45.00

19.35

Unskilled Labour M2

0.0%

0.43

30.00

12.90

Drive Screws and washers M2

0.0%

3.00

8.00

24.00

G.I. sheet corrugated 26BWG M2

0.0%

1.10

350.00

385.00

Material Rate
Plant Rate

409.00
0.00

Unit Rate(Direct Labour)

441.25

Unit Rate (Labour Sub Con)

439.64

Wednesday, March 29, 2006

Page 363 of 395

Southern Province Engineering Services

BSR Reference

07-00-05

Description

supplying and fixing of corrugated asbestos sheet roofing on class I timber purlins

Unit

M2

complete including treating timber with wood preservative. drive screws and washers.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

63.27

1.00

63.27

Carpenter M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.02

30.00

30.60

Corrugated asbestos sheet M2

0.0%

1.17

220.00

256.74

Drive Screws and washers M2

0.0%

2.15

8.00

17.20

Timber beams Class A M2

0.0%

0.01

30,000.00

300.00

Wood Preservative M2

0.0%

0.07

110.00

7.70

Material Rate

581.64

Plant Rate

0.00

Unit Rate(Direct Labour)

648.24

Unit Rate (Labour Sub Con)

644.91

BSR Reference

07-00-06

Description

supplying and fixing of corrugated asbestos sheet cladding on 100 * 50mm class I timber

Unit

M2

frame work completed.

Resource Unit

Quantit

Rate Type

Amount

0.0%

104.88

1.00

104.88

Carpenter M2

0.0%

1.72

45.00

77.40

Unskilled Labour M2

0.0%

1.10

30.00

33.00

Asbestos sheets Corrugated M2

0.0%

1.10

221.00

243.10

Drive Screws and washers M2

0.0%

2.15

8.00

17.20

Timber beams Class A M2

0.0%

0.01

30,000.00

300.00

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

560.30
0.00

Unit Rate(Direct Labour)

670.70

Unit Rate (Labour Sub Con)

665.18

Wednesday, March 29, 2006

Page 364 of 395

Southern Province Engineering Services

BSR Reference

07-00-07

Description

supplying and fixing of corrugated asbestos sheets to roof or wall on existing frame work

Unit

M2

with necessary coach screws and limped washers or hook bolts.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

41.33

1.00

41.33

Carpenter M2

0.0%

0.50

45.00

22.50

Unskilled Labour M2

0.0%

0.70

30.00

21.00

Asbestos sheets Corrugated M2

0.0%

1.17

221.00

258.57

Drive Screws and washers M2

0.0%

2.00

8.00

16.00

Material Rate

274.57

Plant Rate

0.00

Unit Rate(Direct Labour)

318.07

Unit Rate (Labour Sub Con)

315.89

BSR Reference

07-00-08

Description

supplying and fixing of 24 BWG corrugated GI. roofing on class I timber purlin complete

Unit

M2

with GI ridging washer hook bolts or clps including treating timber with wood
preservative.

Resource Unit

Quantit

Rate Type

Amount

0.0%

65.83

1.00

65.83

Carpenter M2

0.0%

0.80

45.00

36.00

Unskilled Labour M2

0.0%

1.11

30.00

33.30

Drive Screws and washers M2

0.0%

2.15

8.00

17.20

G.I. Sheet corrugated 24 BWG M2

0.0%

1.20

350.00

420.00

G.I.sheet 24 B.W.G. M2

0.0%

0.06

320.00

18.24

Timber beams Class A M2

0.0%

0.01

30,000.00

300.00

Wood Preservative M2

0.0%

0.08

110.00

8.80

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

764.24
0.00

Unit Rate(Direct Labour)

833.54

Unit Rate (Labour Sub Con)

830.08

Wednesday, March 29, 2006

Page 365 of 395

Southern Province Engineering Services

BSR Reference

07-00-09

Description

saving and fixing corrugated GI cladding on class I timber frame work fixed complete. Using

Unit

M2

roofing nails

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

104.03

1.00

104.03

Carpenter M2

0.0%

1.70

45.00

76.50

Unskilled Labour M2

0.0%

1.10

30.00

33.00

G.I. Sheet corrugated 24 BWG M2

0.0%

1.20

350.00

420.00

Roofing nails M2

0.0%

0.05

70.00

3.50

Timber beams Class A M2

0.0%

0.01

30,000.00

300.00

Material Rate

723.50

Plant Rate

0.00

Unit Rate(Direct Labour)

833.00

Unit Rate (Labour Sub Con)

827.53

BSR Reference

07-00-10

Description

24 BWG corrugated GI sheets fixed to roof wall or fence with necessary cup washes hook

Unit

M2

bolts or screws ( timber framing paid for separately)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

30.64

1.00

30.64

Carpenter M2

0.0%

0.43

45.00

19.35

Unskilled Labour M2

0.0%

0.43

30.00

12.90

Drive Screws and washers M2

0.0%

3.00

8.00

24.00

G.I. Sheet corrugated 24 BWG M2

0.0%

1.20

350.00

420.00

Material Rate

444.00

Plant Rate

0.00

Unit Rate(Direct Labour)

476.25

Unit Rate (Labour Sub Con)

474.64

BSR Reference

07-00-11

Description

Rectification of leaks (up to 5 number) in roofs of single storied building

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

37.91

1.00

37.91

Unskilled Labour Nos.

0.0%

1.33

30.00

39.90

Material Rate

0.00

Unit Rate(Direct Labour)

39.90

Plant Rate

0.00

Unit Rate (Labour Sub Con)

37.91

Wednesday, March 29, 2006

Page 366 of 395

Southern Province Engineering Services

BSR Reference

07-00-12

Description

Rectification of leaks (above 5 number) in roofs of single storied building

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.49

1.00

9.49

Unskilled Labour Nos.

0.0%

0.33

30.00

9.99

Material Rate

0.00

Unit Rate(Direct Labour)

9.99

Plant Rate

0.00

Unit Rate (Labour Sub Con)

9.49

BSR Reference

07-00-13

Description

Rectification of leaks (up to 5 in number) of roof of buildings above one storied building

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

48.45

1.00

48.45

Unskilled Labour Nos.

0.0%

1.70

30.00

51.00

Material Rate

0.00

Unit Rate(Direct Labour)

51.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

48.45

BSR Reference

07-00-14

Description

Rectification of leaks (above 5 in number) in roofs of buildings above one storied

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

19.10

1.00

19.10

Unskilled Labour Nos.

0.0%

0.67

30.00

20.10

Material Rate

0.00

Unit Rate(Direct Labour)

20.10

Plant Rate

0.00

Unit Rate (Labour Sub Con)

19.10

Wednesday, March 29, 2006

Page 367 of 395

Southern Province Engineering Services

BSR Reference

07-00-15

Description

Rectification of leaks in corrugated sheet roofs made good with bitumen washers and GI

Unit

Nos.

bolts and nuts

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

34.20

1.00

34.20

Unskilled Labour Nos.

0.0%

1.20

30.00

36.00

Bitumen washes Nos.

0.0%

1.00

0.50

0.50

G.I bolts & nuts Nos.

0.0%

1.00

5.00

5.00

Material Rate

5.50

Unit Rate(Direct Labour)

41.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

39.70

BSR Reference

07-00-16

Description

Rectification of leaks in corrugated sheet roof patched with jute Hussein dipped in asphalt

Unit

Nos.

and laid over with a cement and sand layer

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

34.20

1.00

34.20

Unskilled Labour Nos.

0.0%

1.20

30.00

36.00

Jute hessain, Bitumen and cement Nos.

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

41.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

39.20

BSR Reference

07-00-17

Description

Fixing of asbestos cement, Aluminum alloy or GI ridging available at site with hook bolts

Unit

or screws

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

33.25

1.00

33.25

Black Smith M

0.0%

0.50

40.00

20.00

Unskilled Labour M

0.0%

0.50

30.00

15.00

Drive Screws and washers M

0.0%

7.00

8.00

56.00

56.00
0.00

Unit Rate(Direct Labour)

91.00

Unit Rate (Labour Sub Con)

89.25

Wednesday, March 29, 2006

Page 368 of 395

Southern Province Engineering Services

BSR Reference

07-00-18

Description

Calicut pattern ridging bedded in 1:1:4 cement and lime mortar coloured to match tiles

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

39.19

1.00

39.19

Carpenter M

0.0%

0.55

45.00

24.75

Unskilled Labour M

0.0%

0.55

30.00

16.50

Cement M

0.0%

0.09

340.00

30.60

Ridge tile calicut pattern Gr.I M

0.0%

2.50

20.00

50.00

Sand M

0.0%

0.01

350.00

5.25

Slaked lime M

0.0%

0.00

2,850.00

8.55

Colouring powder M

0.0%

3.50

1.00

3.50

Material Rate

94.40

Plant Rate

0.00

Unit Rate(Direct Labour)

139.15

Unit Rate (Labour Sub Con)

137.09

BSR Reference

07-00-19

Description

Calicut pattern ridging bedded in 1:1:4 cement and lime mortar coloured to match

Unit

tiles(Tiles available at site)

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

39.19

1.00

39.19

Carpenter M

0.0%

0.55

45.00

24.75

Unskilled Labour M

0.0%

0.55

30.00

16.50

Cement M

0.0%

0.09

340.00

30.60

Sand M

0.0%

0.02

350.00

7.00

Slaked lime M

0.0%

0.00

2,850.00

0.00

Colouring powder M

0.0%

3.50

1.00

3.50

37.60
0.00

Unit Rate(Direct Labour)

82.35

Unit Rate (Labour Sub Con)

80.29

Wednesday, March 29, 2006

Page 369 of 395

Southern Province Engineering Services

BSR Reference

07-00-20

Description

24 BWG GI ridging 450 mm wide overall fixed complete.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

39.90

1.00

39.90

Black Smith M

0.0%

0.60

40.00

24.00

Unskilled Labour M

0.0%

0.60

30.00

18.00

G.I bolts & nuts M

0.0%

7.00

5.00

35.00

G.I. ridging 2m*1m- 24 BWG M

0.0%

0.27

640.00

172.80

Material Rate

207.80

Plant Rate

0.00

Unit Rate(Direct Labour)

249.80

Unit Rate (Labour Sub Con)

247.70

BSR Reference

07-00-21

Description

Asbestos ridging complete with screws or hooks.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

35.63

1.00

35.63

Carpenter M

0.0%

0.50

45.00

22.50

Unskilled Labour M

0.0%

0.50

30.00

15.00

Close fitting asbestos ridging M

0.0%

1.00

210.00

210.00

G.I hook bolts 8mm*115mm M

0.0%

4.00

6.00

24.00

Material Rate
Plant Rate

234.00
0.00

Unit Rate(Direct Labour)

271.50

Unit Rate (Labour Sub Con)

269.63

Wednesday, March 29, 2006

Page 370 of 395

Southern Province Engineering Services

BSR Reference

07-00-22

Description

Half round tile ridging bedding in 1:1:4 lime cement mortar and coloured to match tiles.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

49.88

1.00

49.88

Carpenter M

0.0%

0.70

45.00

31.50

Unskilled Labour M

0.0%

0.70

30.00

21.00

Cement M

0.0%

0.11

340.00

37.40

Sand M

0.0%

0.02

350.00

7.00

Slaked lime M

0.0%

0.00

2,850.00

11.40

Tile half round Gr.I M

0.0%

4.00

5.00

20.00

Colouring powder M

0.0%

7.00

1.00

7.00

Material Rate

75.80

Plant Rate

0.00

Unit Rate(Direct Labour)

135.30

Unit Rate (Labour Sub Con)

132.68

BSR Reference

07-00-23

Description

Ridging with half round bedded in 1:1:4 lime cement mortar and coloured to match tiles.

Unit

Tiles available at site

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

49.88

1.00

49.88

Carpenter M

0.0%

0.70

45.00

31.50

Unskilled Labour M

0.0%

0.70

30.00

21.00

Cement M

0.0%

0.11

340.00

37.40

Sand M

0.0%

0.02

350.00

7.00

Slaked lime M

0.0%

0.04

2,850.00

114.00

Colouring powder M

0.0%

7.00

1.00

7.00

158.40
0.00

Unit Rate(Direct Labour)

217.90

Unit Rate (Labour Sub Con)

215.27

Wednesday, March 29, 2006

Page 371 of 395

Southern Province Engineering Services

BSR Reference

07-00-24

Description

Ridging with half round or calicut pattern tiles removing and revaying in 1:1:4 lime cement

Unit

mortar and coloured to match tiles.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

64.13

1.00

64.13

Carpenter M

0.0%

0.90

45.00

40.50

Unskilled Labour M

0.0%

0.90

30.00

27.00

Cement M

0.0%

0.11

340.00

37.40

Sand M

0.0%

0.02

350.00

7.00

Slaked lime M

0.0%

0.00

2,850.00

11.40

Colouring powder M

0.0%

7.00

1.00

7.00

Material Rate

55.80

Plant Rate

0.00

Unit Rate(Direct Labour)

130.30

Unit Rate (Labour Sub Con)

126.93

BSR Reference

07-00-25

Description

0.6 m * 0.6m * 4mm thick ribbed skvlight glass supplied and fixed to roof including

Unit

Nos.

necessary lime cement filleting

Resource Unit

Wastag

Quantit

Rate Type

0.0%

142.50

1.00

142.50

Carpenter Nos.

0.0%

2.00

45.00

90.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Glass pane figured 4mm Nos.

0.0%

0.37

270.00

99.90

Lime sand etc Nos.

0.0%

16.00

1.00

16.00

Material Rate

99.90

Plant Rate

0.00

Unit Rate(Direct Labour)

265.90

Unit Rate (Labour Sub Con)

258.40

BSR Reference

07-00-26

Description

Supplying and laving calicut pattern flat tiles (up to 5 tiles) in single storeyed building.

Resource Unit

Material Rate
Plant Rate

Amount

Labour Sub-Contract Rate Nos.

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

4.85

1.00

4.85

Unskilled Labour Nos.

0.0%

0.17

30.00

5.10

Calicut pattern flat tiles Nos.

0.0%

1.00

12.00

12.00

12.00
0.00

Unit Rate(Direct Labour)

17.10

Unit Rate (Labour Sub Con)

16.85

Wednesday, March 29, 2006

Page 372 of 395

Southern Province Engineering Services

BSR Reference

07-00-27

Description

Supplying and laving calicut pattern flat tiles (above 5 tiles) in single storeyed building.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

2.00

1.00

2.00

Unskilled Labour Nos.

0.0%

0.07

30.00

2.10

Calicut pattern flat tiles Nos.

0.0%

1.00

12.00

12.00

Material Rate

12.00

Plant Rate

0.00

Unit Rate(Direct Labour)

14.10

Unit Rate (Labour Sub Con)

14.00

BSR Reference

07-00-28

Description

Supplying and laving calicut pattern flat tiles (above 5 tiles) in buildings of more than one

Unit

Nos.

storey.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

9.41

1.00

9.41

Unskilled Labour Nos.

0.0%

0.33

30.00

9.90

Calicut pattern flat tiles Nos.

0.0%

1.00

12.00

12.00

Material Rate

12.00

Plant Rate

0.00

Unit Rate(Direct Labour)

21.90

Unit Rate (Labour Sub Con)

21.41

BSR Reference

07-00-29

Description

Supplying and laving calicut pattern flat tiles (above 5 up to 25 tiles) in building of more

Unit

Nos.

than one storey.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

3.70

1.00

3.70

Unskilled Labour Nos.

0.0%

0.13

30.00

3.90

Calicut pattern flat tiles Nos.

0.0%

1.00

12.00

12.00

12.00
0.00

Unit Rate(Direct Labour)

15.90

Unit Rate (Labour Sub Con)

15.70

Wednesday, March 29, 2006

Page 373 of 395

Southern Province Engineering Services

BSR Reference

07-00-30

Description

Supplying and laving calicut pattern tiles in any building

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

12.26

1.00

12.26

Unskilled Labour M2

0.0%

0.43

30.00

12.90

Tile calicut pattern Gr .I M2

0.0%

13.50

8.00

108.00

Material Rate

108.00

Plant Rate

0.00

Unit Rate(Direct Labour)

120.90

Unit Rate (Labour Sub Con)

120.26

BSR Reference

07-00-31

Description

Laving of calicut pattern tiles in any building ( Tiles available at site)

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

12.26

1.00

12.26

Unskilled Labour M2

0.0%

0.43

30.00

12.90

Material Rate

0.00

Unit Rate(Direct Labour)

12.90

Plant Rate

0.00

Unit Rate (Labour Sub Con)

12.26

BSR Reference

07-00-32

Description

Laying of glass tiles in small quantities including fixing with GI wire where necessary (

Unit

Nos.

Tiles supplied by the Client)

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

14.25

1.00

14.25

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Material Rate

0.00

Unit Rate(Direct Labour)

15.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

14.25

Wednesday, March 29, 2006

Page 374 of 395

Southern Province Engineering Services

BSR Reference

07-00-33

Description

Supplying and laying of half round tiles up to 50 Nos.. in single storied buildings.

Resource Unit

Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

0.85

1.00

0.85

Unskilled Labour Nos.

0.0%

0.03

30.00

0.90

Tile half round Gr.I Nos.

0.0%

1.00

5.00

5.00

Material Rate

5.00

Unit Rate(Direct Labour)

5.90

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.85

BSR Reference

07-00-34

Description

Supplying and laying of half round tiles above 50Noss and up to 100Noss in single

Unit

Nos.

storied buildings.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

0.57

1.00

0.57

Unskilled Labour Nos.

0.0%

0.02

30.00

0.60

Tile half round Gr.I Nos.

0.0%

1.00

5.00

5.00

Material Rate

5.00

Unit Rate(Direct Labour)

5.60

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.57

BSR Reference

07-00-35

Description

Supplying and laying of half round tiles up to 50 Nos.. on buildings of more than one

Unit

Nos.

story

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

2.00

1.00

2.00

Unskilled Labour Nos.

0.0%

0.07

30.00

2.10

Tile half round Gr.I Nos.

0.0%

1.00

5.00

5.00

Material Rate

5.00

Unit Rate(Direct Labour)

7.10

Plant Rate

0.00

Unit Rate (Labour Sub Con)

7.00

Wednesday, March 29, 2006

Page 375 of 395

Southern Province Engineering Services

BSR Reference

07-00-36

Description

Supplying and laying of half round tiles above 50 and up to 100Noss. on roof of buildings

Unit

Nos.

of more than one story

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

1.43

1.00

1.43

Unskilled Labour Nos.

0.0%

0.05

30.00

1.50

Tile half round Gr.I Nos.

0.0%

1.00

5.00

5.00

Material Rate

5.00

Unit Rate(Direct Labour)

6.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

6.43

BSR Reference

07-00-37

Description

Supplying and laying of half round tiles in any building

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

24.51

1.00

24.51

Unskilled Labour M2

0.0%

0.86

30.00

25.80

Tile half round Gr.I M2

0.0%

65.00

5.00

325.00

Material Rate

325.00

Plant Rate

0.00

Unit Rate(Direct Labour)

350.80

Unit Rate (Labour Sub Con)

349.51

BSR Reference

07-00-38

Description

Laying of half round tiles in any building (Tiles available at site)

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

24.51

1.00

24.51

Unskilled Labour M2

0.0%

0.86

30.00

25.80

Material Rate

0.00

Unit Rate(Direct Labour)

25.80

Plant Rate

0.00

Unit Rate (Labour Sub Con)

24.51

Wednesday, March 29, 2006

Page 376 of 395

Southern Province Engineering Services

BSR Reference

07-00-39

Description

Shifting and relaying half round tiles

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

18.52

1.00

18.52

Unskilled Labour M2

0.0%

0.65

30.00

19.50

Material Rate

0.00

Unit Rate(Direct Labour)

19.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

18.52

BSR Reference

07-00-40

Description

Shifting and relaying calicut pattern tiles

Resource Unit

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

8.26

1.00

8.26

Unskilled Labour M2

0.0%

0.29

30.00

8.70

Material Rate

0.00

Unit Rate(Direct Labour)

8.70

Plant Rate

0.00

Unit Rate (Labour Sub Con)

8.26

BSR Reference

07-00-41

Description

Shifting and relaying half round tiles over the existing asbestos roof.

Resource Unit

Material Rate
Plant Rate

Unit

Wastag

M2

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

18.52

1.00

18.52

Unskilled Labour M2

0.0%

0.65

30.00

19.50

Tile half round Gr.I M2

0.0%

34.50

5.00

172.50

172.50
0.00

Unit Rate(Direct Labour)

192.00

Unit Rate (Labour Sub Con)

191.02

Wednesday, March 29, 2006

Page 377 of 395

Southern Province Engineering Services

BSR Reference

07-00-42

Description

Supplying and fixing of calicut pattern titled roof on class I sawn timber frame work

Unit

M2

including ridges, hips etc.

Resource Unit

Quantit

Rate Type

Amount

0.0%

179.68

1.00

179.68

Carpenter M2

0.0%

2.96

45.00

133.34

Unskilled Labour M2

0.0%

1.86

30.00

55.80

Binding wire M2

0.0%

0.65

50.00

32.50

Cement M2

0.0%

0.03

340.00

10.20

Ridge tile calicut pattern Gr.I M2

0.0%

0.93

20.00

18.60

Sand M2

0.0%

0.00

350.00

0.00

Slaked lime M2

0.0%

0.03

2,850.00

76.95

Tile calicut pattern Gr .I M2

0.0%

13.45

8.00

107.64

Timb. Cl.A 50mm*25mm M2

0.0%

3.61

35.00

126.31

Timber beams Class A M2

0.0%

0.02

30,000.00

540.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.02

55.00

0.88

Wood Preservative M2

0.0%

0.20

110.00

22.44

Colouring powder M2

0.0%

0.27

1.00

0.27

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M2

935.52
0.00

Unit Rate(Direct Labour)

1,124.93

Unit Rate (Labour Sub Con)

1,115.47

Wednesday, March 29, 2006

Page 378 of 395

Southern Province Engineering Services

BSR Reference

07-00-43

Description

Supplying and fixing of calicut pattern titled roof on class II sawn timber frame work

Unit

M2

including ridges, hips etc.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

179.55

1.00

179.55

Carpenter M2

0.0%

2.96

45.00

133.20

Unskilled Labour M2

0.0%

1.86

30.00

55.80

Binding wire M2

0.0%

0.07

50.00

3.50

Cement M2

0.0%

0.03

340.00

10.20

Ridge tile calicut pattern Gr.I M2

0.0%

0.93

20.00

18.66

Sand M2

0.0%

0.00

350.00

1.40

Slaked lime M2

0.0%

0.03

2,850.00

76.95

Tile calicut pattern Gr .I M2

0.0%

13.45

8.00

107.60

Timb. Cl.II local 50mm*25mm M2

0.0%

13.45

34.50

464.20

Timber beams class B M2

0.0%

0.02

20,000.00

360.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.02

55.00

1.10

Wood Preservative M2

0.0%

0.20

110.00

22.44

Colouring powder M2

0.0%

0.27

1.00

0.27

Material Rate
Plant Rate

1,066.05
0.00

Unit Rate(Direct Labour)

1,255.32

Unit Rate (Labour Sub Con)

1,245.87

Wednesday, March 29, 2006

Page 379 of 395

Southern Province Engineering Services

BSR Reference

07-00-44

Description

Supplying material and fixing half round titled roof on class I sawn timber frame work

Unit

M2

including ridges, hips etc.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

185.25

1.00

185.25

Carpenter M2

0.0%

3.00

45.00

135.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

Cement M2

0.0%

0.03

340.00

9.18

Sand M2

0.0%

0.00

350.00

1.40

Slaked lime M2

0.0%

0.03

2,850.00

85.50

Tile half round Gr.I M2

0.0%

64.59

5.00

322.93

Timb. Cl.A 50mm*12mm M2

0.0%

7.22

20.00

144.36

Timber beams Class A M2

0.0%

0.02

30,000.00

510.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.02

55.00

1.10

Wire nail S.W.G. 4 to 18 M2

0.0%

0.07

45.00

3.15

Wood Preservative M2

0.0%

0.25

110.00

26.95

Material Rate

1,104.57

Plant Rate

0.00

Unit Rate(Direct Labour)

1,299.57

Unit Rate (Labour Sub Con)

1,289.82

BSR Reference

07-00-45

Description

Supplying material and fixing half round titled roof on class II sawn timber frame work

Unit

M2

including ridges, hips etc.

Resource Unit

Material Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M2

0.0%

185.25

1.00

185.25

Carpenter M2

0.0%

3.00

45.00

135.00

Unskilled Labour M2

0.0%

2.00

30.00

60.00

Cement M2

0.0%

0.03

340.00

10.20

Sand M2

0.0%

0.00

350.00

1.40

Slaked lime M2

0.0%

0.03

2,850.00

85.50

Tile half round Gr.I M2

0.0%

64.59

5.00

322.93

Timb. Cl.A 50mm*12mm M2

0.0%

7.22

20.00

144.40

Timber beams class B M2

0.0%

0.02

20,000.00

400.00

Wire nail S.W.G 20 to 22 M2

0.0%

0.02

55.00

0.88

Wire nail S.W.G. 4 to 18 M2

0.0%

0.06

45.00

2.92

Wood Preservative M2

0.0%

0.25

110.00

27.50

995.73

Unit Rate(Direct Labour)

1,190.73

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

1,180.98

Page 380 of 395

Southern Province Engineering Services

BSR Class

TINKER

BSR Reference

12-00-01

Description

Supplying and fixing of 100mm dia .,G.I.24 BWG down pipes fixed to walls with holdfast

Unit

or plugs in 1:3 cement.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

124.69

1.00

124.69

Mason M

0.0%

0.25

45.00

11.25

Tinker M

0.0%

2.25

40.00

90.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

G.I.sheet 24 B.W.G. M

0.0%

0.40

320.00

128.00

Plugs, Brackets, Screws, Solder and M

0.0%

10.00

1.00

10.00

Material Rate

128.00

Plant Rate

0.00

Unit Rate(Direct Labour)

269.25

Unit Rate (Labour Sub Con)

262.69

BSR Reference

12-00-02

Description

Supplying and fixing of 150mm rectangle .,G.I.24 BWG down pipes fixed with holdfast or

Unit

plugs in 1:3 cement

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

153.19

1.00

153.19

Mason M

0.0%

0.25

45.00

11.25

Tinker M

0.0%

3.00

40.00

120.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

G.I.sheet 24 B.W.G. M

0.0%

0.60

320.00

192.00

Plugs, Brackets, Screws, Solder and M

0.0%

12.00

1.00

12.00

Material Rate
Plant Rate

192.00
0.00

Unit Rate(Direct Labour)

365.25

Unit Rate (Labour Sub Con)

357.19

Wednesday, March 29, 2006

Page 381 of 395

Southern Province Engineering Services

BSR Reference

12-00-03

Description

Supplying and fixing if 100*75mm rectangular G.I.24 BWG doen pipes fixed with holdfast

Unit

in 1:3 cement

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

143.69

1.00

143.69

Mason M

0.0%

0.25

45.00

11.25

Tinker M

0.0%

2.75

40.00

110.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

G.I.sheet 24 B.W.G. M

0.0%

0.45

320.00

144.00

Plugs, Brackets, Screws, Solder and M

0.0%

10.00

1.00

10.00

Material Rate

144.00

Plant Rate

0.00

Unit Rate(Direct Labour)

305.25

Unit Rate (Labour Sub Con)

297.69

BSR Reference

12-00-04

Description

Fixing of 100to 150mm circular or rectrangular down pipes fixed with holdfast or plugs in

Unit

1:3 cement mortar[G.I. sheets supplied dy client.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

19.04

1.00

19.04

Mason M

0.0%

0.03

45.00

1.30

Tinker M

0.0%

0.29

40.00

11.72

Unskilled Labour M

0.0%

0.23

30.00

7.02

Plugs, Iron screws etc. M

0.0%

10.00

1.00

10.00

Material Rate

0.00

Unit Rate(Direct Labour)

30.05

Plant Rate

0.00

Unit Rate (Labour Sub Con)

29.04

BSR Reference

12-00-05

Description

Extra over item M001 to M004 in two storeyed buildings.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

19.59

1.00

19.59

Mason M

0.0%

0.13

45.00

5.63

Unskilled Labour M

0.0%

0.50

30.00

15.00

Material Rate

0.00

Unit Rate(Direct Labour)

20.63

Plant Rate

0.00

Unit Rate (Labour Sub Con)

19.59

Wednesday, March 29, 2006

Page 382 of 395

Southern Province Engineering Services

BSR Reference

12-00-06

Description

Extra over item M001 to M004 in buildings of three or more storeyed.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

39.19

1.00

39.19

Mason M

0.0%

0.25

45.00

11.25

Unskilled Labour M

0.0%

1.00

30.00

30.00

Material Rate

0.00

Unit Rate(Direct Labour)

41.25

Plant Rate

0.00

Unit Rate (Labour Sub Con)

39.19

BSR Reference

12-00-07

Description

Fixing of down pipes loose or new fixed with holdfast or plugs including making good to

Unit

walls[down pipes supplied by client, plugs or holdfast paid for separately].

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

23.27

1.00

23.27

Tinker M

0.0%

0.35

40.00

14.00

Unskilled Labour M

0.0%

0.35

30.00

10.50

Material Rate

0.00

Unit Rate(Direct Labour)

24.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

23.27

BSR Reference

12-00-08

Description

450mm wide G.I.flashing [G.I.24 BWG] fixed with 150mm turned up along and edge tucked

Unit

well into wall in cement lime mortar including removal of old flashing.

Resource Unit

Material Rate
Plant Rate

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

84.31

1.00

84.31

Mason M

0.0%

0.25

45.00

11.25

Tinker M

0.0%

1.00

40.00

40.00

Unskilled Labour M

0.0%

1.25

30.00

37.50

G.I.sheet 24 B.W.G. M

0.0%

0.60

320.00

192.00

Cement, Sand and Lead M

0.0%

2.50

1.00

2.50

192.00
0.00

Unit Rate(Direct Labour)

283.25

Unit Rate (Labour Sub Con)

278.81

Wednesday, March 29, 2006

Page 383 of 395

Southern Province Engineering Services

BSR Reference

12-00-09

Description

Refixing of G.I.flashing including making good walls in cement and lime mortar.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

67.69

1.00

67.69

Mason M

0.0%

0.25

45.00

11.25

Tinker M

0.0%

0.75

40.00

30.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

Cement, Sand and Lead M

0.0%

20.00

1.00

20.00

Material Rate

0.00

Unit Rate(Direct Labour)

91.25

Plant Rate

0.00

Unit Rate (Labour Sub Con)

87.69

BSR Reference

12-00-10

Description

150mm G.I. Gutters eaves semi circular made with G.I. 24 BWG and fixed with hooks or

Unit

brackets and bolts and joints solded complete.

Resource Unit

Quantit

Rate Type

Amount

0.0%

137.75

1.00

137.75

Tinker M

0.0%

2.50

40.00

100.00

Unskilled Labour M

0.0%

1.50

30.00

45.00

bolt and nut iron 45*6mm M

0.0%

1.67

10.00

16.67

bolt and nut iron 63*10mm M

0.0%

2.50

18.00

45.00

G.I.sheet 24 B.W.G. M

0.0%

0.35

320.00

112.00

Mild steel [flat] M

0.0%

0.23

38.00

8.74

Making btackets, Lead etc M

0.0%

10.00

1.00

10.00

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

182.41
0.00

Unit Rate(Direct Labour)

337.41

Unit Rate (Labour Sub Con)

330.16

Wednesday, March 29, 2006

Page 384 of 395

Southern Province Engineering Services

BSR Reference

12-00-11

Description

150mm G.I. Gutters , eaves semicircular made with G.I, 24 BWG and fixed with hooks or

Unit

brackets and joints solded complete [G.I. sheets by client].

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

127.22

1.00

127.22

Tinker M

0.0%

2.28

40.00

91.20

Unskilled Labour M

0.0%

1.42

30.00

42.72

Gutters, Hooks, Lead etc. M

0.0%

9.00

1.00

9.00

Material Rate

0.00

Unit Rate(Direct Labour)

142.92

Plant Rate

0.00

Unit Rate (Labour Sub Con)

136.22

BSR Reference

12-00-12

Description

150mm Gutters , eaves moulded in G.I.24 BWG and fixed complete including brackets .

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

209.00

1.00

209.00

Tinker M

0.0%

4.00

40.00

160.00

Unskilled Labour M

0.0%

2.00

30.00

60.00

G.I.sheet 24 B.W.G. M

0.0%

0.40

320.00

128.00

Gutters, Hooks, Lead etc. M

0.0%

35.00

1.00

35.00

Material Rate

128.00

Plant Rate

0.00

Unit Rate(Direct Labour)

383.00

Unit Rate (Labour Sub Con)

372.00

BSR Reference

12-00-13

Description

Extra over items M01 to M012 and M026 in two storeyed buildings

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

66.50

1.00

66.50

Tinker M

0.0%

1.00

40.00

40.00

Unskilled Labour M

0.0%

1.00

30.00

30.00

Material Rate

0.00

Unit Rate(Direct Labour)

70.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

66.50

Wednesday, March 29, 2006

Page 385 of 395

Southern Province Engineering Services

BSR Reference

12-00-14

Description

Extra over item M010 to M012 and M026 in three storyed Buildings.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

106.88

1.00

106.88

Tinker M

0.0%

1.50

40.00

60.00

Unskilled Labour M

0.0%

1.75

30.00

52.50

Props (bamboo) 3 - 4 m M

0.0%

0.95

80.00

76.00

Coir, Srting M

0.0%

0.75

1.00

0.75

Material Rate

76.00

Plant Rate

0.00

Unit Rate(Direct Labour)

189.25

Unit Rate (Labour Sub Con)

183.62

BSR Reference

12-00-15

Description

Cleaning of Gutters ,eaves and down pipes in single storeyed buildings

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

4.28

1.00

4.28

Unskilled Labour M

0.0%

0.15

30.00

4.50

Material Rate

0.00

Unit Rate(Direct Labour)

4.50

Plant Rate

0.00

Unit Rate (Labour Sub Con)

4.28

BSR Reference

12-00-16

Description

Cleaning of Gutters eaves and down pipes ia two storeyed buildings.

Resource Unit

Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

5.70

1.00

5.70

Unskilled Labour M

0.0%

0.20

30.00

6.00

Material Rate

0.00

Unit Rate(Direct Labour)

6.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

5.70

Wednesday, March 29, 2006

Page 386 of 395

Southern Province Engineering Services

BSR Reference

12-00-17

Description

Re-garding Gutters eaves in single storeyed buildings.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

21.20

1.00

21.20

Tinker M

0.0%

0.51

40.00

20.40

Unskilled Labour M

0.0%

0.06

30.00

1.92

Material Rate

0.00

Unit Rate(Direct Labour)

22.32

Plant Rate

0.00

Unit Rate (Labour Sub Con)

21.20

BSR Reference

12-00-18

Description

Re-garding Gutters eaves in two storeyed buildings.

Unit

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

6.65

1.00

6.65

Tinker M

0.0%

0.10

40.00

4.00

Unskilled Labour M

0.0%

0.10

30.00

3.00

Material Rate

0.00

Unit Rate(Direct Labour)

7.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

6.65

BSR Reference

12-00-19

Description

Making openings to existing gutters to receive 100mm to 150mm down pipe attaching

Unit

Nos.

spigot piece joints soldered including making good.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

133.00

1.00

133.00

Tinker Nos.

0.0%

2.00

40.00

80.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

G.I.sheet 24 B.W.G. Nos.

0.0%

0.10

320.00

32.00

Plugs, Brackets, Screws, Solder and Nos.

0.0%

10.00

1.00

10.00

Material Rate
Plant Rate

32.00
0.00

Unit Rate(Direct Labour)

182.00

Unit Rate (Labour Sub Con)

175.00

Wednesday, March 29, 2006

Page 387 of 395

Southern Province Engineering Services

BSR Reference

12-00-20

Description

Making of 250*250*500mm gutter head with G.I. 24 BWG down pipe and fixed complete.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

323.00

1.00

323.00

Tinker Nos.

0.0%

7.00

40.00

280.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

G.I.sheet 24 B.W.G. Nos.

0.0%

0.90

320.00

288.00

Plugs, screws,cement Nos.

0.0%

12.00

1.00

12.00

Material Rate

288.00

Plant Rate

0.00

Unit Rate(Direct Labour)

640.00

Unit Rate (Labour Sub Con)

623.00

BSR Reference

12-00-21

Description

MAking of 250*250*500mm gutter head made with G.I. sheets 24 BWG down pipes and

Unit

Nos.

fixed complete [Sheets supplied by client]

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

323.00

1.00

323.00

Tinker Nos.

0.0%

7.00

40.00

280.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Lead, Soldering, Fluid etc. Nos.

0.0%

8.00

1.00

8.00

Material Rate

0.00

Unit Rate(Direct Labour)

348.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

331.00

BSR Reference

12-00-22

Description

Making of 225*225*300mm gutter head made with G.I.sheets BWG and fixed complete.

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

190.00

1.00

190.00

Tinker Nos.

0.0%

5.00

40.00

200.00

G.I.sheet 24 B.W.G. Nos.

0.0%

0.50

320.00

160.00

Leads etc. Nos.

0.0%

5.00

1.00

5.00

160.00
0.00

Unit Rate(Direct Labour)

365.00

Unit Rate (Labour Sub Con)

355.00

Wednesday, March 29, 2006

Page 388 of 395

Southern Province Engineering Services

BSR Reference

12-00-23

Description

Making 250*250*300mm gutter head made of 22BWG GI sheets [GI sheets supplied by

Unit

Nos.

Client.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

247.00

1.00

247.00

Tinker Nos.

0.0%

5.00

40.00

200.00

Unskilled Labour Nos.

0.0%

2.00

30.00

60.00

Leads etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

0.00

Unit Rate(Direct Labour)

265.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

252.00

BSR Reference

12-00-24

Description

Supplying of 20mm*3mm gutter hooks brackets and fixing with iron screws.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

4.87

1.00

4.87

Black Smith Nos.

0.0%

0.04

40.00

1.68

Carpenter Nos.

0.0%

0.03

45.00

1.35

Unskilled Labour Nos.

0.0%

0.07

30.00

2.10

Mild steel [flat] Nos.

0.0%

0.23

38.00

8.63

screws iron 16mm*gauge6 Nos.

0.0%

0.17

5.00

0.83

Coal etc. Nos.

0.0%

5.00

1.00

5.00

Material Rate

9.46

Unit Rate(Direct Labour)

19.59

Plant Rate

0.00

Unit Rate (Labour Sub Con)

19.33

BSR Reference

12-00-25

Description

Gutters ,leaks replaced or joints soldered.

Unit

Resource Unit

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

33.25

1.00

33.25

Tinker Nos.

0.0%

0.50

40.00

20.00

Unskilled Labour Nos.

0.0%

0.50

30.00

15.00

Leads etc. Nos.

0.0%

2.00

1.00

2.00

Material Rate

0.00

Unit Rate(Direct Labour)

37.00

Plant Rate

0.00

Unit Rate (Labour Sub Con)

35.25

Wednesday, March 29, 2006

Page 389 of 395

Southern Province Engineering Services

BSR Reference

12-00-26

Description

GI 900mm overall 22BWG Parapet gutters renewed on existing boards joints soldered and

Unit

Nos.

laid complete.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

93.81

1.00

93.81

Carpenter Nos.

0.0%

0.25

45.00

11.25

Tinker Nos.

0.0%

1.25

40.00

50.00

Unskilled Labour Nos.

0.0%

1.25

30.00

37.50

G.I.sheet 22 BWG [plain] Nos.

0.0%

0.92

380.00

349.60

Lead, Soldering, Fluid etc. Nos.

0.0%

2.20

1.00

2.20

Material Rate

349.60

Plant Rate

0.00

Unit Rate(Direct Labour)

450.55

Unit Rate (Labour Sub Con)

445.61

BSR Reference

12-00-27

Description

18 BWG 900mm wide vally gutters renewed on existing boards sheets tarred ,joints

Unit

Nos.

soldered and cement lime filleing complete.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

78.38

1.00

78.38

Carpenter Nos.

0.0%

0.30

45.00

13.50

Tinker Nos.

0.0%

0.60

40.00

24.00

Unskilled Labour Nos.

0.0%

1.50

30.00

45.00

Cement Nos.

0.0%

0.03

340.00

9.18

Coal tar Nos.

0.0%

0.22

11.00

2.46

G.I.Sheet 18BWG ( plain) Nos.

0.0%

1.00

540.00

538.92

Sand Nos.

0.0%

0.00

350.00

0.00

Slaked lime Nos.

0.0%

0.00

2,850.00

0.00

Nails, Soldering, Materials etc. Nos.

0.0%

2.40

1.00

2.40

Material Rate
Plant Rate

550.56
0.00

Unit Rate(Direct Labour)

635.46

Unit Rate (Labour Sub Con)

631.34

Wednesday, March 29, 2006

Page 390 of 395

Southern Province Engineering Services

BSR Reference

12-00-28

Description

18BWG 900mm wide vally gutters renewed on existing boards ,sheets tarred joints

Unit

Nos.

soldered and cement lime filleing complete [G.I. sheets supplied by client].

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

82.19

1.00

82.19

Carpenter Nos.

0.0%

0.30

45.00

13.32

Tinker Nos.

0.0%

0.60

40.00

24.00

Unskilled Labour Nos.

0.0%

1.64

30.00

49.20

Cement Nos.

0.0%

0.03

340.00

10.20

Coal tar Nos.

0.0%

0.22

11.00

2.46

Sand Nos.

0.0%

0.00

350.00

1.40

Slaked lime Nos.

0.0%

0.00

2,850.00

2.85

Nails, Soldering, Materials etc. Nos.

0.0%

2.40

1.00

2.40

Material Rate

16.91

Plant Rate

0.00

Unit Rate(Direct Labour)

105.83

Unit Rate (Labour Sub Con)

101.51

BSR Reference

12-00-29

Description

Swan neck approx 1000mm long 100mm dia 22BWG renewed.

Unit

Resource Unit

Material Rate
Plant Rate

Wastag

Nos.

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

199.50

1.00

199.50

Tinker Nos.

0.0%

4.50

40.00

180.00

Unskilled Labour Nos.

0.0%

1.00

30.00

30.00

G.I.sheet 22 BWG [plain] Nos.

0.0%

0.60

380.00

228.00

Leads etc. Nos.

0.0%

7.50

1.00

7.50

228.00
0.00

Unit Rate(Direct Labour)

445.50

Unit Rate (Labour Sub Con)

435.00

Wednesday, March 29, 2006

Page 391 of 395

Southern Province Engineering Services

BSR Reference

12-00-30

Description

Supplying & fixing of 450mm*300mm*450mm* high hot water tank made with G.I.sheet

Unit

Nos.

22BWG rivetted and soldered [connecting U pipe e& tap paid separately].

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate Nos.

0.0%

570.00

1.00

570.00

Tinker Nos.

0.0%

12.00

40.00

480.00

Unskilled Labour Nos.

0.0%

4.00

30.00

120.00

G.I.sheet 22 BWG [plain] Nos.

0.0%

0.92

380.00

350.74

Rivets[6.3mm*10mm] Nos.

0.0%

30.00

1.00

30.00

Lead, Soldering, Fluid etc. Nos.

0.0%

30.00

1.00

30.00

Material Rate

380.74

Plant Rate

Unit Rate(Direct Labour)

0.00

1,010.74

Unit Rate (Labour Sub Con)

980.74

BSR Reference

12-00-31

Description

G.I. 900mm overall 22 BWG PArapet gutters renewed including timber 25mm boarding

Unit

joints soldered & laid complete.

Resource Unit

Quantit

Rate Type

Amount

0.0%

186.44

1.00

186.44

Carpenter M

0.0%

1.25

45.00

56.25

Tinker M

0.0%

1.25

40.00

50.00

Unskilled Labour M

0.0%

3.00

30.00

90.00

G.I.sheet 22 BWG [plain] M

0.0%

0.92

380.00

349.60

Timber planks 25mm class B M

0.0%

0.60

300.00

180.00

Wire nail S.W.G 20 to 22 M

0.0%

0.05

55.00

2.75

Wood Preservative M

0.0%

0.20

110.00

22.00

Lead, Soldering, Fluid etc. M

0.0%

2.20

1.00

2.20

Material Rate
Plant Rate

Wastag

Labour Sub-Contract Rate M

554.35
0.00

Unit Rate(Direct Labour)

752.80

Unit Rate (Labour Sub Con)

742.99

Wednesday, March 29, 2006

Page 392 of 395

Southern Province Engineering Services

BSR Reference

12-00-32

Description

18 BWG 900mm wide valley gutters renewed including timber 25mm thikc boarding sheet

Unit

tarred joints soldered & cement filetting complete.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

185.25

1.00

185.25

Carpenter M

0.0%

2.00

45.00

90.00

Unskilled Labour M

0.0%

3.50

30.00

105.00

Boiled lime M

0.0%

0.01

4.00

0.04

Cement M

0.0%

0.03

340.00

10.20

Coal tar M

0.0%

0.22

11.00

2.46

G.I.Sheet 18BWG ( plain) M

0.0%

0.99

540.00

536.22

Sand M

0.0%

0.00

350.00

1.40

Timb.cl.B planks 25mm M

0.0%

1.00

300.00

300.00

Wire nail S.W.G 20 to 22 M

0.0%

0.07

55.00

3.69

Wood Preservative M

0.0%

0.34

110.00

37.40

Nails, Soldering, Materials etc. M

0.0%

2.40

1.00

2.40

Material Rate

891.41

Plant Rate

0.00

Unit Rate(Direct Labour)

1,088.81

Unit Rate (Labour Sub Con)

1,079.06

BSR Reference

12-00-33

Description

Fixing of haif round , 150mm PVC eaves gutters with aluminium brackets 7 brass screws at

Unit

450mm intervals including necessary moulded fittings.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

18.07

1.00

18.07

Plumber M

0.0%

0.27

40.00

10.92

Unskilled Labour M

0.0%

0.27

30.00

8.10

Gutter bracket half round [short arm M

0.0%

2.32

8.50

19.72

Mitre joint half round pvc 150mm M

0.0%

0.07

75.00

5.10

PVC Gutter end cap half round 159mm. M

0.0%

0.14

29.00

3.97

PVC Gutter jioner half round 150mm M

0.0%

0.21

45.00

9.45

PVC Slovent cement M

0.0%

0.14

39.00

5.34

Running head pvc 150mm M

0.0%

0.14

75.00

10.27

Screws brass 20mm* gauge 6 M

0.0%

0.41

12.00

4.92

See M 399 M

0.0%

0.27

0.00

0.00

Ladder M

0.0%

3.45

1.00

3.45

Material Rate

58.78

Unit Rate(Direct Labour)

81.25

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

80.30

Page 393 of 395

Southern Province Engineering Services

BSR Reference

12-00-34

Description

Fixing of 144mm PVC square eave gutters with PVC brackets and brass screws at 450mm

Unit

intervals including all necessary moulded fittings.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

18.04

1.00

18.04

Plumber M

0.0%

0.27

40.00

10.80

Unskilled Labour M

0.0%

0.27

30.00

8.19

Mitre joint square pvc 144mm M

0.0%

0.68

110.00

74.80

PVC Gutter bracket square 144mm M

0.0%

2.32

13.00

30.16

PVC Gutter end cap square 144mm M

0.0%

1.00

22.00

22.00

PVC Gutter joint square 144mm M

0.0%

0.21

37.00

7.77

PVC Gutter square 144mm M

0.0%

0.14

85.00

11.64

PVC Slovent cement M

0.0%

0.41

39.00

15.99

Running head square pvc 144mm M

0.0%

0.14

80.00

10.96

Screws brass 20mm* gauge 6 M

0.0%

0.41

12.00

4.92

Ladder M

0.0%

2.10

1.00

2.10

Material Rate

178.24

Plant Rate

0.00

Unit Rate(Direct Labour)

199.33

Unit Rate (Labour Sub Con)

198.39

BSR Reference

12-00-35

Description

Fixing of 87mm dia PVC down pipes with wooden including all necessary moulded

Unit

fittings.

Resource Unit

Wastag

Quantit

Rate Type

Amount

Labour Sub-Contract Rate M

0.0%

37.48

1.00

37.48

Carpenter M

0.0%

0.27

45.00

12.15

Plumber M

0.0%

0.27

40.00

10.92

Unskilled Labour M

0.0%

0.55

30.00

16.38

PVC Down pipe 89mm M

0.0%

1.09

60.00

65.58

PVC Down pipe clip 89mm M

0.0%

0.55

7.00

3.85

PVC Down pipe elbow 89mm M

0.0%

0.55

45.00

24.61

PVC Down pipe joiner 89mm M

0.0%

0.14

30.00

4.11

PVC Slovent cement M

0.0%

0.20

39.00

7.99

Screws brass 20mm* gauge 6 M

0.0%

0.09

12.00

1.09

Wood plugs M

0.0%

0.55

80.00

44.00

Ladder M

0.0%

5.00

1.00

5.00

Material Rate

151.24

Unit Rate(Direct Labour)

195.69

Plant Rate

Wednesday, March 29, 2006

0.00

Unit Rate (Labour Sub Con)

193.72

Page 394 of 395

Southern Province Engineering Services

Wednesday, March 29, 2006

Page 395 of 395