BSR Class
BRASS FOUNDER.
BSR Reference
10-00-01
Description
Removing and refixing of bolts, casement fastners or satays, including making good to holts
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
Material Rate
0.00
22.50
Plant Rate
0.00
21.38
BSR Reference
10-00-02
Description
Supplying and fixing polished of 63mm heavy quaLitery brass barrel bolts with brass
Unit
Nos.
screws.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
0.0%
1.00
35.00
35.00
0.0%
6.00
1.80
10.80
45.80
0.00
60.65
59.91
Page 1 of 395
BSR Reference
10-00-03
Description
Supplying fixing and polishing of 75mm heavy quaLitery brass barrel bolts with brass
Unit
Nos.
screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
0.0%
1.00
45.00
45.00
0.0%
6.00
1.80
10.80
Material Rate
55.80
Plant Rate
0.00
70.65
69.91
BSR Reference
10-00-04
Description
Supplying fixing and polishing of 100mm heavy quaLitery brass barrel bolts with brass
Unit
Nos.
screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
0.0%
1.00
55.00
55.00
0.0%
6.00
1.80
10.80
Material Rate
65.80
Plant Rate
0.00
80.65
79.91
BSR Reference
10-00-05
Description
Supplying fixing and polishing of 125mm heavy quaLitery brass barrel bolts with brass
Unit
Nos.
screws.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
0.0%
1.00
66.00
66.00
0.0%
6.00
1.80
10.80
76.80
0.00
91.65
90.91
Page 2 of 395
BSR Reference
10-00-06
Description
Supplying fixing and polishing of 150mm heavy quaLitery brass barrel bolts with brass
Unit
Nos.
screws.
Resource Unit
Wastag
Quantit
Rate Type
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
Nos.
0.0%
1.00
70.00
70.00
0.0%
6.00
1.80
10.80
Material Rate
80.80
Plant Rate
0.00
95.65
94.91
BSR Reference
10-00-07
Description
Supplying and fixing of 200mm brass skeleten bolts with brass screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
75.00
75.00
0.0%
9.00
1.50
13.50
Material Rate
88.50
Plant Rate
0.00
111.00
109.88
BSR Reference
10-00-08
Description
Supplying and fixing of 250mm brass skeleten bolts with brass screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
85.00
85.00
0.0%
9.00
1.50
13.50
Material Rate
Plant Rate
Amount
98.50
0.00
121.00
119.88
Page 3 of 395
BSR Reference
10-00-09
Description
Supplying and fixing of 300mm brass skeleten bolts with brass screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
90.00
90.00
0.0%
9.00
1.50
13.50
Material Rate
103.50
Plant Rate
0.00
126.00
124.88
BSR Reference
10-00-10
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
220.00
220.00
0.0%
12.00
1.50
18.00
Material Rate
238.00
Plant Rate
0.00
260.50
259.38
BSR Reference
10-00-11
Description
Supplying, fixing polished of 50mm heavy quaLitery brass cabin hooks, fixing with brass
Unit
Nos.
screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
25.00
25.00
0.0%
9.00
0.80
7.20
Material Rate
Plant Rate
32.20
0.00
54.70
53.58
Page 4 of 395
BSR Reference
10-00-12
Description
Supplying, fixing polishing of 75mm heavy quaLitery brass cabin hooks, fixing with brass
Unit
Nos.
screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
30.00
30.00
0.0%
9.00
0.80
7.20
Material Rate
37.20
Plant Rate
0.00
59.70
58.58
BSR Reference
10-00-13
Description
Supplying, fixing polishing of 150mm heavy quaLitery brass cabin hooks, fixing with
Unit
Nos.
brass screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
40.00
40.00
0.0%
9.00
0.80
7.20
Material Rate
47.20
Plant Rate
0.00
69.70
68.58
BSR Reference
10-00-14
Description
Supplying, fixing polishing of 200mm heavy quaLitery brass cabin hooks, fixing with
Unit
Nos.
brass screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
50.00
50.00
0.0%
9.00
0.80
7.20
Material Rate
Plant Rate
57.20
0.00
79.70
78.58
Page 5 of 395
BSR Reference
10-00-15
Description
Supplying, fixing polishing of 225mm heavy quaLitery brass cabin hooks, fixing with
Unit
Nos.
brass screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
60.00
60.00
0.0%
9.00
0.80
7.20
Material Rate
67.20
Plant Rate
0.00
89.70
88.58
BSR Reference
10-00-16
Description
Supplying, fixing polishing of 250mm heavy quaLitery brass cabin hooks, fixing with
Unit
Nos.
brass screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
70.00
70.00
0.0%
9.00
0.80
7.20
Material Rate
77.20
Plant Rate
0.00
99.70
98.58
BSR Reference
10-00-17
Description
Supplying, fixing polishing of 300mm heavy quaLitery brass cabin hooks, fixing with
Unit
Nos.
brass screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
80.00
80.00
0.0%
9.00
0.80
7.20
Material Rate
Plant Rate
87.20
0.00
109.70
108.58
Page 6 of 395
BSR Reference
10-00-18
Description
Supplying of Brass heavy quaLitery casement fastners with mortice plate polished, and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
0.0%
32.06
1.00
32.06
Carpenter Nos.
0.0%
0.75
45.00
33.75
0.0%
4.00
1.50
6.00
0.0%
1.00
40.00
40.00
Material Rate
46.00
Plant Rate
0.00
79.75
78.06
BSR Reference
10-00-19
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
4.00
1.50
6.00
0.0%
1.00
40.00
40.00
Material Rate
46.00
Plant Rate
0.00
68.50
67.38
BSR Reference
10-00-20
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
4.00
1.50
6.00
0.0%
1.00
55.00
55.00
Material Rate
Plant Rate
Amount
61.00
0.00
83.50
82.38
Page 7 of 395
BSR Reference
10-00-21
Description
Supplying and fixing of heavy quaLitery brass fanlight catches complete with brass screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
32.06
1.00
32.06
Carpenter Nos.
0.0%
0.75
45.00
33.75
0.0%
4.00
1.50
6.00
0.0%
1.00
35.00
35.00
Material Rate
41.00
Plant Rate
0.00
74.75
73.06
BSR Reference
10-00-22
Description
Supplying , fixing and polishing of heavy quaLitery brass door handles , fixing with brass
Unit
Nos.
screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Nos.
0.0%
0.25
45.00
11.25
0.0%
4.00
4.50
18.00
0.0%
1.00
60.00
60.00
Material Rate
78.00
Plant Rate
0.00
89.25
88.69
BSR Reference
10-00-23
Description
Supplying , fixing and polishing of 150mm brass safety type heavy quaLitery hasf and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
7.00
1.50
10.50
0.0%
1.00
75.00
75.00
Material Rate
Plant Rate
85.50
0.00
108.00
106.88
Page 8 of 395
BSR Reference
10-00-24
Description
Supplying , fixing and polishing of 100mm brass safety type heavy quaLitery hasf and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
7.00
1.50
10.50
0.0%
1.00
45.00
45.00
Material Rate
55.50
Plant Rate
0.00
78.00
76.88
BSR Reference
10-00-25
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
4.00
1.80
7.20
0.0%
1.00
20.00
20.00
Material Rate
27.20
Plant Rate
0.00
49.70
48.57
BSR Reference
10-00-26
Description
Supplying , fixing and polishing of 50mm heavy quaLitery brass butt hinges, fixing with
Unit
Nos.
brass screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
20.66
1.00
20.66
Carpenter Nos.
0.0%
0.25
45.00
11.25
0.0%
0.35
30.00
10.50
0.0%
1.00
20.00
20.00
0.0%
0.50
12.00
6.00
Material Rate
Plant Rate
26.00
0.00
47.75
46.66
Page 9 of 395
BSR Reference
10-00-27
Description
Supplying , fixing and polishing of 75*38*2.03mm (0.066kg) heavy quaLitery brass butt
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
27.07
1.00
27.07
Carpenter Nos.
0.0%
0.38
45.00
17.10
0.0%
0.38
30.00
11.40
0.0%
6.00
1.80
10.80
0.0%
1.00
35.00
35.00
Material Rate
45.80
Plant Rate
0.00
74.30
72.87
BSR Reference
10-00-28
Description
Supplying , fixing and polishing of 87*60*2.67mm (0.144kg) heavy quaLitery brass butt
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
27.07
1.00
27.07
Carpenter Nos.
0.0%
0.38
45.00
17.10
0.0%
0.38
30.00
11.40
0.0%
6.00
1.80
10.80
0.0%
1.00
30.00
30.00
Material Rate
40.80
Plant Rate
0.00
69.30
67.87
BSR Reference
10-00-29
Description
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
27.07
1.00
27.07
Carpenter Nos.
0.0%
0.38
45.00
17.10
0.0%
0.38
30.00
11.40
0.0%
1.00
40.00
40.00
0.0%
8.00
2.50
20.00
Material Rate
Plant Rate
60.00
0.00
88.50
87.07
Page 10 of 395
BSR Reference
10-00-30
Description
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
27.07
1.00
27.07
Carpenter Nos.
0.0%
0.38
45.00
17.10
0.0%
0.38
30.00
11.40
0.0%
1.00
60.00
60.00
0.0%
8.00
2.50
20.00
Material Rate
80.00
Plant Rate
0.00
108.50
107.07
BSR Reference
10-00-31
Description
Supplying, fixing and polishing of heavy quality Brass center pivot hinges(consisting of 2
Unit
Nos.
Resource Unit
Wastag
Quantit
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
1.00
25.00
25.00
0.0%
5.00
1.80
9.00
Material Rate
34.00
Plant Rate
0.00
71.50
69.62
BSR Reference
10-00-32
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
1.00
50.00
50.00
0.0%
8.00
2.50
20.00
Material Rate
Plant Rate
Rate Type
70.00
0.00
107.50
105.63
Page 11 of 395
BSR Reference
10-00-33
Description
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
27.07
1.00
27.07
Carpenter Nos.
0.0%
0.38
45.00
17.10
0.0%
0.38
30.00
11.40
0.0%
1.00
46.00
46.00
0.0%
8.00
2.50
20.00
Material Rate
66.00
Plant Rate
0.00
94.50
93.07
BSR Reference
10-00-34
Description
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
27.07
1.00
27.07
Carpenter Nos.
0.0%
0.38
45.00
17.10
0.0%
0.38
30.00
11.40
0.0%
1.00
56.00
56.00
0.0%
8.00
2.50
20.00
Material Rate
76.00
Plant Rate
0.00
104.50
103.07
BSR Reference
10-00-35
Description
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
27.07
1.00
27.07
Carpenter Nos.
0.0%
0.38
45.00
17.10
0.0%
0.38
30.00
11.40
0.0%
1.00
60.00
60.00
0.0%
10.00
2.50
25.00
Material Rate
Plant Rate
85.00
0.00
113.50
112.07
Page 12 of 395
BSR Reference
10-00-36
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
118.75
1.00
118.75
0.0%
2.00
40.00
80.00
Carpenter Nos.
0.0%
1.00
45.00
45.00
0.0%
20.00
1.00
20.00
Material Rate
0.00
145.00
Plant Rate
0.00
138.75
BSR Reference
10-00-37
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
1.00
200.00
200.00
0.0%
8.00
2.50
20.00
Material Rate
220.00
Plant Rate
0.00
257.50
255.63
BSR Reference
10-00-38
Description
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
8.00
2.50
20.00
Material Rate
Plant Rate
Unit
20.00
0.00
57.50
55.63
Page 13 of 395
BSR Reference
10-00-39
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
95.00
1.00
95.00
0.0%
2.50
40.00
100.00
0.0%
20.00
1.00
20.00
Material Rate
0.00
120.00
Plant Rate
0.00
115.00
BSR Reference
10-00-40
Description
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Nos.
0.0%
0.25
45.00
11.25
0.0%
1.00
35.00
35.00
0.0%
20.00
1.00
20.00
Material Rate
35.00
Plant Rate
0.00
BSR Reference
10-00-41
Description
Resource Unit
66.25
65.69
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter Nos.
0.0%
1.50
45.00
67.50
0.0%
0.50
22.00
11.00
Material Rate
Plant Rate
Unit
11.00
0.00
78.50
75.13
Page 14 of 395
BSR Reference
10-00-42
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
140.13
1.00
140.13
0.0%
2.00
40.00
80.00
Carpenter Nos.
0.0%
1.50
45.00
67.50
0.0%
0.50
22.00
11.00
Material Rate
11.00
Plant Rate
0.00
158.50
151.13
BSR Reference
10-00-43
Description
Supplying of 65mm brass, 4 lever approved quaLitery locks for cupboards and fixing in
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
42.75
1.00
42.75
Carpenter Nos.
0.0%
1.00
45.00
45.00
0.0%
1.00
90.00
90.00
0.0%
0.33
12.00
4.00
Material Rate
94.00
Plant Rate
0.00
BSR Reference
10-00-44
Description
Resource Unit
139.00
136.75
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
80.75
1.00
80.75
0.0%
1.00
40.00
40.00
Carpenter Nos.
0.0%
1.00
45.00
45.00
Material Rate
0.00
85.00
Plant Rate
0.00
80.75
Page 15 of 395
BSR Reference
10-00-45
Description
Supplying fixing and polishing of 150mm brass,2 levered, approved quaLitery rim lock.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter Nos.
0.0%
1.50
45.00
67.50
0.0%
1.00
300.00
300.00
0.0%
0.50
22.00
11.00
Material Rate
311.00
Plant Rate
0.00
378.50
375.13
BSR Reference
10-00-46
Description
Supplying fixing and polishing of 150mm brass,single levered, approved quaLitery rim
Unit
Nos.
lock.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter Nos.
0.0%
1.50
45.00
67.50
0.0%
1.00
250.00
250.00
0.0%
0.50
22.00
11.00
Material Rate
261.00
Plant Rate
0.00
328.50
325.13
BSR Reference
10-00-47
Description
Supplying fixing and polishing of 150mm brass, 4 levered, approved quaLitery rim lock.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter Nos.
0.0%
1.50
45.00
67.50
0.0%
1.25
300.00
375.00
0.0%
0.50
22.00
11.00
Material Rate
Plant Rate
386.00
0.00
453.50
450.13
Page 16 of 395
BSR Reference
10-00-48
Description
Supplying and fixing of 125mm good quaLitery single levered, rim lock.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter Nos.
0.0%
1.50
45.00
67.50
0.0%
1.00
250.00
250.00
0.0%
0.50
22.00
11.00
Material Rate
261.00
Plant Rate
0.00
328.50
325.13
BSR Reference
10-00-49
Description
Supplying and fixing of night latch Yale or Union lock with duplicate keys.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
85.50
1.00
85.50
Carpenter Nos.
0.0%
2.00
45.00
90.00
0.0%
1.00
1,100.00
1,100.00
0.0%
0.50
22.00
11.00
Material Rate
1,111.00
Plant Rate
0.00
1,201.00
1,196.50
BSR Reference
10-00-50
Description
Supplying and fixing of 32mm to 40mm brass rings to doors and windows with brass
Unit
Nos.
screws.
Resource Unit
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Nos.
0.0%
0.25
45.00
11.25
0.0%
1.00
20.00
20.00
0.0%
0.25
12.00
3.00
Material Rate
Plant Rate
Wastag
23.00
0.00
34.25
33.69
Page 17 of 395
BSR Reference
10-00-51
Description
Supplying and fixing of Union mortice lock (imported) for single lever.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
171.00
1.00
171.00
Carpenter Nos.
0.0%
4.00
45.00
180.00
0.0%
1.00
1,100.00
1,100.00
Material Rate
1,100.00
Plant Rate
0.00
1,280.00
1,271.00
BSR Reference
10-00-52
Description
Supplying and fixing of Union mortice (imported) lock for double lever.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
256.50
1.00
256.50
Carpenter Nos.
0.0%
6.00
45.00
270.00
0.0%
1.00
1,800.00
1,800.00
Material Rate
Plant Rate
1,800.00
0.00
2,070.00
2,056.50
Page 18 of 395
BSR Class
BRICKLAYER
BSR Reference
04-00-01
Description
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
0.0%
1,370.85
1.00
1,370.85
Mason M3
0.0%
17.00
45.00
765.00
Unskilled Labour M3
0.0%
22.60
30.00
678.00
Brick : common M3
0.0%
0.53
2,200.00
1,161.60
Cement M3
0.0%
2.27
340.00
771.80
Sand M3
0.0%
0.23
350.00
80.50
0.0%
12.50
1.00
12.50
Material Rate
2,013.90
Plant Rate
0.00
3,469.40
3,397.25
BSR Reference
04-00-02
Description
225mm Brick work in 1:5 cement mortar (above 3 cu.m 1st floor level)
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M3
Quantit
Rate Type
Amount
0.0%
765.23
1.00
765.23
Mason M3
0.0%
8.50
45.00
382.50
Unskilled Labour M3
0.0%
14.10
30.00
423.00
Brick : common M3
0.0%
0.53
2,200.00
1,161.60
Cement M3
0.0%
1.33
340.00
452.20
Sand M3
0.0%
0.23
350.00
80.50
0.0%
12.50
1.00
12.50
1,694.30
0.00
2,512.30
2,472.03
Page 19 of 395
BSR Reference
04-00-03
Description
225mm Brick work in 1:5 cement mortar upto 1st floor level (upto 3 cu.m )
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
0.0%
914.85
1.00
914.85
Mason M3
0.0%
10.60
45.00
477.00
Unskilled Labour M3
0.0%
16.20
30.00
486.00
Brick : common M3
0.0%
0.53
2,200.00
1,161.60
Cement M3
0.0%
1.33
340.00
452.20
Sand M3
0.0%
0.23
350.00
80.50
0.0%
12.50
1.00
12.50
Material Rate
1,694.30
Plant Rate
0.00
2,669.80
2,621.65
BSR Reference
04-00-04
Description
225mm Brick work in 1:5 cement mortar in peirs upto 1st floor level
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M3
Quantit
Rate Type
Amount
0.0%
544.21
1.00
544.21
Mason M3
0.0%
12.73
45.00
572.85
Brick : common M3
0.0%
0.53
2,200.00
1,170.40
Cement M3
0.0%
1.33
340.00
452.20
Sand M3
0.0%
0.23
350.00
80.50
0.0%
12.50
1.00
12.50
1,703.10
0.00
2,288.45
2,259.81
Page 20 of 395
BSR Reference
04-00-05
Description
112mm Brick work in 1:5 cement mortar upto 1st floor level(above 10 sq.m)
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
104.17
1.00
104.17
Mason M2
0.0%
1.29
45.00
58.05
Unskilled Labour M2
0.0%
1.72
30.00
51.60
Brick : common M2
0.0%
0.06
2,200.00
132.00
Cement M2
0.0%
0.14
340.00
47.60
Sand M2
0.0%
0.03
350.00
10.50
0.0%
4.00
1.00
4.00
Material Rate
190.10
Plant Rate
0.00
303.75
298.27
BSR Reference
04-00-06
Description
112mm Brick work in 1:5 cement mortar upto 1st floor level(upto 10 sq.m)
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
72.82
1.00
72.82
Mason M2
0.0%
1.61
45.00
72.45
Unskilled Labour M2
0.0%
0.14
30.00
4.20
Brick : common M2
0.0%
0.06
2,200.00
132.00
Cement M2
0.0%
0.14
340.00
47.60
Sand M2
0.0%
0.03
350.00
10.50
0.0%
4.00
1.00
4.00
190.10
0.00
270.75
266.92
Page 21 of 395
BSR Reference
04-00-07
Description
112mm Brick work in 1:5 cement mortar using available bricks including sorting and
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
0.0%
145.21
1.00
145.21
Mason M2
0.0%
1.61
45.00
72.45
Unskilled Labour M2
0.0%
2.68
30.00
80.40
Cement M2
0.0%
0.14
340.00
47.60
Sand M2
0.0%
0.03
350.00
10.50
0.0%
0.00
1.00
0.00
Material Rate
58.10
Plant Rate
0.00
210.95
203.31
BSR Reference
04-00-08
Description
225mm Brick work in 2:5 lime mortar upto 1st floor level(above 3cu.m)
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M3
Quantit
Rate Type
Amount
0.0%
765.23
1.00
765.23
Mason M3
0.0%
8.50
45.00
382.50
Unskilled Labour M3
0.0%
14.10
30.00
423.00
Boiled lime M3
0.0%
0.07
4.00
0.29
Brick : common M3
0.0%
0.51
2,200.00
1,126.40
Sand M3
0.0%
0.23
350.00
80.50
0.0%
4.00
1.00
4.00
1,207.19
0.00
2,016.69
1,976.41
Page 22 of 395
BSR Reference
04-00-09
Description
225mm Brick work in 2:5 lime mortar upto 1st floor level(upto 3cu.m)
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
914.85
1.00
914.85
Mason M3
0.0%
10.60
45.00
477.00
Unskilled Labour M3
0.0%
16.20
30.00
486.00
Boiled lime M3
0.0%
0.07
4.00
0.29
Brick : common M3
0.0%
0.51
2,200.00
1,126.40
Sand M3
0.0%
0.23
350.00
80.50
0.0%
4.00
1.00
4.00
Material Rate
1,207.19
Plant Rate
0.00
2,174.19
2,126.04
BSR Reference
04-00-10
Description
225mm Brick work in 2:5 lime mortar with bricks available at site including sorting out
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
864.98
1.00
864.98
Mason M3
0.0%
8.50
45.00
382.50
Unskilled Labour M3
0.0%
17.60
30.00
528.00
Boiled lime M3
0.0%
0.09
4.00
0.36
Sand M3
0.0%
0.23
350.00
80.50
0.0%
4.00
1.00
4.00
Material Rate
80.86
Plant Rate
0.00
995.36
949.84
BSR Reference
04-00-11
Description
Extra over item D002 to D005 and D009 to D011 for Brick work from first floor level to
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
119.70
1.00
119.70
Unskilled Labour M3
0.0%
4.20
30.00
126.00
Scafolding M3
0.0%
12.35
1.00
12.35
Material Rate
0.00
138.35
Plant Rate
0.00
132.05
Page 23 of 395
BSR Reference
04-00-12
Description
Extra over item D002 to D005 and D009 to D011 for Brick work above second floor level.
Resource Unit
Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
0.00
1.00
0.00
Unskilled Labour M3
0.0%
0.00
30.00
0.00
Scafolding M3
0.0%
0.00
1.00
0.00
Material Rate
0.00
0.00
Plant Rate
0.00
0.00
BSR Reference
04-00-13
Description
Extra over item D006 to D008 for Brick work from first floor level to second floor level.
Resource Unit
Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
39.90
1.00
39.90
Unskilled Labour M3
0.0%
1.40
30.00
42.00
Scafolding M3
0.0%
12.50
1.00
12.50
Material Rate
0.00
54.50
Plant Rate
0.00
52.40
BSR Reference
04-00-14
Description
Extra over item D006 to D008 for Brick work above second floor level.
Resource Unit
Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
119.70
1.00
119.70
Unskilled Labour M3
0.0%
4.20
30.00
126.00
Scafolding M3
0.0%
12.50
1.00
12.50
Material Rate
0.00
138.50
Plant Rate
0.00
132.20
Page 24 of 395
BSR Reference
04-00-15
Description
Weathered and throated brick coping in 1:5 cement mortar on 112mm thick walls complete
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
114.00
1.00
114.00
Mason M
0.0%
1.60
45.00
72.00
Unskilled Labour M
0.0%
1.60
30.00
48.00
Brick : common M
0.0%
0.01
2,200.00
28.60
Cement M
0.0%
0.17
340.00
57.80
Sand M
0.0%
0.02
350.00
7.35
Material Rate
93.75
Plant Rate
0.00
213.75
207.75
BSR Reference
04-00-16
Description
Weathered and throated brick coping in 1:5 cement mortar on 225mm thick walls complete
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Mason M
0.0%
2.00
45.00
90.00
Unskilled Labour M
0.0%
2.00
30.00
60.00
Brick : common M
0.0%
0.02
2,200.00
48.40
Cement M
0.0%
0.24
340.00
81.60
Sand M
0.0%
0.03
350.00
10.50
140.50
0.00
290.50
283.00
Page 25 of 395
BSR Reference
04-00-17
Description
Weathered and throated brick coping in 1:5 cement mortar on 340mm thick wall complete
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
185.25
1.00
185.25
Mason M
0.0%
2.60
45.00
117.00
Unskilled Labour M
0.0%
2.60
30.00
78.00
Brick : common M
0.0%
0.03
2,200.00
66.00
Cement M
0.0%
0.40
340.00
136.00
Sand M
0.0%
0.06
350.00
21.00
Material Rate
223.00
Plant Rate
0.00
418.00
408.25
BSR Reference
04-00-18
Description
Weathered and throated brick coping in 1:5 cement mortar on 225mm thick walls using
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Mason M
0.0%
2.00
45.00
90.00
Unskilled Labour M
0.0%
2.00
30.00
60.00
Cement M
0.0%
0.24
340.00
81.60
Sand M
0.0%
0.03
350.00
10.50
92.10
0.00
242.10
234.60
Page 26 of 395
BSR Reference
04-00-19
Description
Brick cornices in 1:5 cement mortar complete with 12mm thick 1:3 cement rendering up to
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
370.50
1.00
370.50
Mason M
0.0%
5.20
45.00
234.00
Unskilled Labour M
0.0%
5.20
30.00
156.00
Brick : common M
0.0%
0.10
2,200.00
224.40
Cement M
0.0%
0.09
340.00
30.60
Sand M
0.0%
0.01
350.00
3.15
Material Rate
258.15
Plant Rate
0.00
648.15
628.65
BSR Reference
04-00-20
Description
Inserting of door or window in existing walls including raking opening and making good
Unit
Nos.
to floor and wall (lintel , arch, door & window paid for separately)
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
1,197.00
1.00
1,197.00
Mason Nos.
0.0%
12.00
45.00
540.00
0.0%
24.00
30.00
720.00
0.0%
0.05
4.00
0.20
0.0%
0.19
2,200.00
418.00
Cement Nos.
0.0%
0.52
340.00
176.80
Sand Nos.
0.0%
0.23
350.00
80.50
675.50
0.00
1,935.50
1,872.50
Page 27 of 395
BSR Reference
04-00-21
Description
300mm wide 225mm to 300mm deep brick drains in 1:5 cement mortar complete with 12mm
Unit
thick 1:2 cement rendering and necessary expansion joins (rate to including for excavation)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
254.22
1.00
254.22
Mason M
0.0%
3.28
45.00
147.60
Unskilled Labour M
0.0%
4.00
30.00
120.00
Brick : common M
0.0%
0.06
2,200.00
143.00
Cement M
0.0%
0.33
340.00
112.20
Sand M
0.0%
0.06
350.00
21.00
Material Rate
276.20
Plant Rate
0.00
543.80
530.42
BSR Reference
04-00-22
Description
225mm wide 150mm to 225mm deep brick drains in 1:5 cement mortar complete with 12mm
Unit
thick 1:2 cement rendering and necessary expansion joins (rate to including for excavation)
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
205.49
1.00
205.49
Mason M
0.0%
2.62
45.00
117.90
Unskilled Labour M
0.0%
3.28
30.00
98.40
Brick : common M
0.0%
0.03
2,200.00
72.60
Cement M
0.0%
0.25
340.00
85.00
Sand M
0.0%
0.04
350.00
14.00
171.60
0.00
387.90
377.08
Page 28 of 395
BSR Reference
04-00-23
Description
Scott's pattern drains including apron of overall width 750mm brick masonry in 1:5 cement
Unit
mortar and 12mm thick 1:2 cement rendering and necessary expansion joints (rate to
include for necessary excavation.)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
205.49
1.00
205.49
Mason M
0.0%
2.62
45.00
117.90
Unskilled Labour M
0.0%
3.28
30.00
98.40
Brick : common M
0.0%
0.04
2,200.00
88.00
Cement M
0.0%
0.26
340.00
88.40
Sand M
0.0%
0.04
350.00
14.00
Material Rate
190.40
Plant Rate
0.00
406.70
395.88
BSR Reference
04-00-24
Description
300mm with and 150mm to 225mmhigh masonry or brick work 1:3 cement mortar steps
Unit
complete with 12mm thick 1:2 cement rendering with foundation 150mm below ground.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
93.34
1.00
93.34
Mason M
0.0%
1.31
45.00
58.95
Unskilled Labour M
0.0%
1.31
30.00
39.30
Brick : common M
0.0%
0.04
2,200.00
85.80
Cement M
0.0%
0.20
340.00
68.00
Sand M
0.0%
0.04
350.00
14.00
167.80
0.00
266.05
261.14
Page 29 of 395
BSR Reference
04-00-25
Description
Formation of vent opening up to 300mm height and 150mm with on existing walls and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
71.25
1.00
71.25
Mason Nos.
0.0%
1.00
45.00
45.00
0.0%
1.00
30.00
30.00
0.0%
0.00
4.00
0.01
Sand Nos.
0.0%
0.01
350.00
5.25
0.0%
5.00
1.00
5.00
Material Rate
5.26
85.26
Plant Rate
0.00
81.51
BSR Reference
04-00-26
Description
225mmm brick work in 1:5 cement mortar with brick available at site including sorting and
Unit
M3
clearing bricks
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
904.88
1.00
904.88
Mason M3
0.0%
8.50
45.00
382.50
Unskilled Labour M3
0.0%
19.00
30.00
570.00
Cement M3
0.0%
1.30
340.00
442.00
Sand M3
0.0%
0.25
350.00
87.50
0.0%
12.50
1.00
12.50
529.50
0.00
1,494.50
1,446.87
Page 30 of 395
BSR Reference
04-00-27
Description
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
165.00
1.00
165.00
Mason M2
0.0%
2.20
45.00
99.00
Unskilled Labour M2
0.0%
2.20
30.00
66.00
Cement M2
0.0%
0.08
340.00
26.95
Sand M2
0.0%
0.02
350.00
6.60
Soil M2
0.0%
0.02
212.00
3.99
0.0%
36.00
6.50
234.00
Scafolding M2
0.0%
75.00
1.00
75.00
Material Rate
271.53
Plant Rate
0.00
511.53
511.53
BSR Reference
04-00-28
Description
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
216.00
1.00
216.00
Mason M2
0.0%
2.70
45.00
121.50
Unskilled Labour M2
0.0%
2.70
30.00
81.00
Cement M2
0.0%
0.12
340.00
40.46
Sand M2
0.0%
0.03
350.00
10.08
Soil M2
0.0%
0.03
212.00
6.10
0.0%
30.00
9.00
270.00
Scafolding M2
0.0%
100.00
1.00
100.00
Material Rate
Plant Rate
326.64
0.00
629.14
642.64
Page 31 of 395
BSR Reference
04-00-29
Description
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
235.00
1.00
235.00
Mason M2
0.0%
3.20
45.00
144.00
Unskilled Labour M2
0.0%
3.20
30.00
96.00
Cement M2
0.0%
0.19
340.00
64.67
Sand M2
0.0%
0.05
350.00
15.83
Soil M2
0.0%
0.05
212.00
9.59
0.0%
36.00
12.00
432.00
Scafolding M2
0.0%
125.00
1.00
125.00
Material Rate
Plant Rate
522.09
0.00
887.09
882.09
Page 32 of 395
BSR Class
BSR Reference
08-00-01
Description
40mm to 50mm * 12mm plain chamfered class I timber beading fixed complete with brass
Unit
screws.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
9.26
1.00
9.26
Carpenter M
0.0%
0.13
45.00
5.85
Unskilled Labour M
0.0%
0.13
30.00
3.90
0.0%
1.05
20.00
21.00
0.0%
1.57
2.50
3.93
Material Rate
24.92
Plant Rate
0.00
34.67
34.19
BSR Reference
08-00-02
Description
25mm * 20mm Imported class I timber fillets fixed complete with brass screws.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
9.26
1.00
9.26
Carpenter M
0.0%
0.13
45.00
5.85
Unskilled Labour M
0.0%
0.13
30.00
3.90
0.0%
1.05
24.00
25.20
0.0%
1.57
2.50
3.93
Material Rate
Plant Rate
29.12
0.00
38.87
38.39
Page 33 of 395
BSR Reference
08-00-03
Description
Supply and fixing of beading or filleting in Halmilla timber for glass panes complete with
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.55
1.00
8.55
Carpenter M
0.0%
0.20
45.00
9.00
0.0%
1.10
9.00
9.90
0.0%
3.00
1.00
3.00
Material Rate
9.90
21.90
Plant Rate
0.00
21.45
BSR Reference
08-00-04
Description
Supply and fixing of beading or filleting in Class I local timber for glass panes complete
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.55
1.00
8.55
Carpenter M
0.0%
0.20
45.00
9.00
0.0%
1.10
9.00
9.90
0.0%
3.00
1.00
3.00
Material Rate
9.90
21.90
Plant Rate
0.00
21.45
BSR Reference
08-00-05
Description
Beading or filleting on under side of ceiling removed and refixed with new brass screws
Unit
complete.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
14.25
1.00
14.25
Carpenter M
0.0%
0.20
45.00
9.00
Unskilled Labour M
0.0%
0.20
30.00
6.00
0.0%
1.60
2.50
4.00
Material Rate
4.00
19.00
Plant Rate
0.00
18.25
Page 34 of 395
BSR Reference
08-00-06
Description
Supplying and fixing of 20mm thick Barge valance fascia boards, in imported class I timber
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
47.74
1.00
47.74
Carpenter M2
0.0%
0.67
45.00
30.15
Unskilled Labour M2
0.0%
0.67
30.00
20.10
0.0%
1.10
650.00
715.00
0.0%
8.21
1.00
8.21
0.0%
10.00
1.00
10.00
Material Rate
723.21
Plant Rate
0.00
783.46
780.95
BSR Reference
08-00-07
Description
Supplying and fixing of 20mm thick Barge valance fascia boards, in class I local timber
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter M2
0.0%
0.90
45.00
40.50
Unskilled Labour M2
0.0%
0.90
30.00
27.00
0.0%
1.10
850.00
935.00
0.0%
8.21
1.00
8.21
0.0%
10.00
1.00
10.00
Material Rate
Plant Rate
943.21
0.00
1,020.71
1,017.34
Page 35 of 395
BSR Reference
08-00-08
Description
Supplying and fixing of 20mm thick Barge valance fascia boards, in class II timber complete
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
47.74
1.00
47.74
Carpenter M2
0.0%
0.67
45.00
30.15
Unskilled Labour M2
0.0%
0.67
30.00
20.10
0.0%
8.21
1.00
8.21
0.0%
0.97
300.00
291.00
0.0%
10.00
1.00
10.00
Material Rate
299.21
Plant Rate
0.00
359.46
356.95
BSR Reference
08-00-09
Description
Supplying and fixing of 20mm thick Barge valance fascia boards in class II local timber
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter M2
0.0%
0.90
45.00
40.50
Unskilled Labour M2
0.0%
0.90
30.00
27.00
0.0%
8.21
1.00
8.21
0.0%
0.97
300.00
291.00
0.0%
10.00
1.00
10.00
Material Rate
299.21
Plant Rate
0.00
376.71
373.34
BSR Reference
08-00-10
Description
Fixing and Barge valance fascia boards including cutting and minor repairs
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
49.02
1.00
49.02
Carpenter M2
0.0%
0.86
45.00
38.70
Unskilled Labour M2
0.0%
0.43
30.00
12.90
0.0%
5.17
1.00
5.17
Material Rate
5.17
56.77
Plant Rate
0.00
54.19
Page 36 of 395
BSR Reference
08-00-11
Description
Flat asbestos ceiling fixed to 100mm*50mm*joints and 50mm bearers of class I timber
Unit
M2
including 40mm*12mm cover fillets and 63mm*40mm covers of class I timber .2 coats of
wood preservative to joints & bearers. primer undercoat & 2 coats of emultion pai
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
201.88
1.00
201.88
Carpenter M2
0.0%
2.00
45.00
90.00
Painter M2
0.0%
1.00
40.00
40.00
Unskilled Labour M2
0.0%
2.75
30.00
82.50
0.0%
1.08
200.00
215.60
0.0%
5.30
2.50
13.25
0.0%
1.00
45.00
45.00
Emulsion M2
0.0%
0.04
200.00
8.00
0.0%
0.01
50.00
0.50
0.0%
0.02
250.00
5.00
0.0%
2.10
26.00
54.60
0.0%
0.01
30,000.00
390.00
0.0%
0.03
45.00
1.35
Wood plugs M2
0.0%
1.50
80.00
120.00
Wood Preservative M2
0.0%
0.08
110.00
9.24
0.0%
2.50
1.00
2.50
Material Rate
862.54
Plant Rate
0.00
1,077.54
1,066.91
BSR Reference
08-00-12
Description
Fixing asbestos, plywood canite or colotex ceiling (supplied by Client) including cutting
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
36.91
1.00
36.91
Carpenter M2
0.0%
0.43
45.00
19.35
Unskilled Labour M2
0.0%
0.65
30.00
19.50
0.0%
0.01
50.00
0.30
Scafolding M2
0.0%
1.50
1.00
1.50
Material Rate
0.30
40.65
Plant Rate
0.00
38.71
Page 37 of 395
BSR Reference
08-00-13
Description
Fixing of asbestos, ceiling or partitioning with clout headed nails on existing bearer or
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
36.91
1.00
36.91
Carpenter M2
0.0%
0.43
45.00
19.35
Unskilled Labour M2
0.0%
0.65
30.00
19.50
0.0%
0.75
200.00
150.00
0.0%
0.01
50.00
0.50
Scafolding M2
0.0%
1.50
1.00
1.50
Material Rate
150.50
Plant Rate
0.00
190.85
188.91
BSR Reference
08-00-14
Description
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
0.0%
36.91
1.00
36.91
Carpenter M2
0.0%
0.43
45.00
19.35
Unskilled Labour M2
0.0%
0.65
30.00
19.50
0.0%
0.71
200.00
141.20
Scafolding M2
0.0%
1.50
1.00
1.50
Material Rate
141.20
Plant Rate
0.00
181.55
179.61
BSR Reference
08-00-15
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
15.68
1.00
15.68
Carpenter M
0.0%
0.22
45.00
9.90
Unskilled Labour M
0.0%
0.22
30.00
6.60
Lunumidella 150mm*20mm M
0.0%
0.18
270.00
48.60
Nails M
0.0%
1.50
1.00
1.50
Material Rate
Plant Rate
Amount
48.60
0.00
66.60
65.78
Page 38 of 395
BSR Reference
08-00-16
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter M2
0.0%
0.90
45.00
40.50
Unskilled Labour M2
0.0%
0.90
30.00
27.00
0.0%
0.00
45.00
0.18
Scafolding M2
0.0%
2.00
1.00
2.00
Material Rate
0.18
69.68
Plant Rate
0.00
66.31
BSR Reference
08-00-17
Description
20mm thick Ceiling or partition in Lunumidella, beaded and rebated nailed to under side of
Unit
M2
existing joists, rafters or frames above 10m2 (fillers or beadings beading paid separately)
Resource Unit
Quantit
Rate Type
Amount
0.0%
71.25
1.00
71.25
Carpenter M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.00
30.00
30.00
Lunumidella 150mm*20mm M2
0.0%
1.10
270.00
297.00
0.0%
0.00
45.00
0.18
Scafolding M2
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
Wastag
297.18
0.00
374.18
370.43
Page 39 of 395
BSR Reference
08-00-18
Description
20mm thick Lunumidella ceiling or partition beaded and rebated nailed to under side of
Unit
M2
existing joists, rafters or frames upto 10m2 (fillets and beading paid for separately)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
78.38
1.00
78.38
Carpenter M2
0.0%
1.10
45.00
49.50
Unskilled Labour M2
0.0%
1.10
30.00
33.00
Lunumidella 150mm*20mm M2
0.0%
1.10
270.00
297.00
0.0%
0.00
45.00
0.18
Scafolding M2
0.0%
2.00
1.00
2.00
Material Rate
297.18
Plant Rate
0.00
381.68
377.56
BSR Reference
08-00-19
Description
600mm * 450mm approx. Ceiling openings formed complete with 50mm * 50mm bearers
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
285.00
1.00
285.00
Carpenter Nos.
0.0%
4.00
45.00
180.00
0.0%
4.00
30.00
120.00
0.0%
0.33
270.00
89.10
0.0%
0.00
30,000.00
90.00
Nails Nos.
0.0%
5.00
1.00
5.00
Material Rate
179.10
Plant Rate
0.00
484.10
469.10
BSR Reference
08-00-20
Description
cleaning or upper side of the ceiling and clearing away the debris
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
6.27
1.00
6.27
Unskilled Labour M2
0.0%
0.22
30.00
6.60
Material Rate
0.00
6.60
Plant Rate
0.00
6.27
Page 40 of 395
BSR Reference
08-00-21
Description
Fixing of 63mm * 40 cove mouldings of imported class I timber with brass screws and plugs
Unit
new or renewed.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
20.95
1.00
20.95
Carpenter M
0.0%
0.23
45.00
10.35
Unskilled Labour M
0.0%
0.39
30.00
11.70
0.0%
1.10
45.00
49.50
0.0%
1.18
80.00
94.40
Wood plugs M
0.0%
1.31
80.00
104.96
0.0%
1.00
1.00
1.00
Material Rate
248.86
Plant Rate
0.00
271.91
270.81
BSR Reference
08-00-22
Description
Supplying and fixing of doors and windows ledged, braced and battened with grooved and
Unit
M2
tongued joints 100mm * 75mm frames and 20mm thick sashes in class I local timber
complete with brass furniture.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
456.00
1.00
456.00
Carpenter M2
0.0%
8.00
45.00
360.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
0.0%
40.00
2.50
100.00
0.0%
2.00
40.00
80.00
0.0%
0.70
250.00
175.00
0.0%
4.00
22.00
88.00
0.0%
0.03
30,000.00
900.00
0.0%
1.30
150.00
195.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
1,538.00
0.00
2,168.00
2,144.00
Page 41 of 395
BSR Reference
08-00-23
Description
Supplying and fixing of 20mm ledged, braced and battened sashes and 100mm * 75mm
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
456.00
1.00
456.00
Carpenter M2
0.0%
8.00
45.00
360.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
0.0%
40.00
2.50
100.00
0.0%
2.00
40.00
80.00
0.0%
0.70
250.00
175.00
0.0%
4.00
80.00
320.00
0.0%
0.03
30,000.00
900.00
0.0%
1.30
150.00
195.00
0.0%
90.00
1.00
90.00
0.0%
30.00
1.00
30.00
Material Rate
1,770.00
Plant Rate
0.00
2,370.00
2,346.00
BSR Reference
08-00-24
Description
Supplying and fixing of 20mm thick ledged, braced and battened sash only for doors and
Unit
M2
Resource Unit
Quantit
Rate Type
Amount
0.0%
256.50
1.00
256.50
Carpenter M2
0.0%
4.00
45.00
180.00
Unskilled Labour M2
0.0%
3.00
30.00
90.00
0.0%
0.37
22.00
8.23
0.0%
3.74
8.00
29.92
0.0%
1.30
1,000.00
1,300.00
0.0%
60.00
1.00
60.00
Sand paper M2
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
Wastag
1,338.15
0.00
1,670.65
1,657.15
Page 42 of 395
BSR Reference
08-00-25
Description
Supplying and fixing of 20mm thick ledged, braced and battened sash for door and
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
256.50
1.00
256.50
Carpenter M2
0.0%
4.00
45.00
180.00
Unskilled Labour M2
0.0%
3.00
30.00
90.00
0.0%
45.00
2.50
112.50
0.0%
0.00
22.00
0.00
0.0%
1.30
300.00
390.00
0.0%
50.00
1.00
50.00
Sand paper M2
0.0%
2.50
1.00
2.50
Material Rate
502.50
Plant Rate
0.00
825.00
811.50
BSR Reference
08-00-26
Description
Supplying and fixing of 25mm thick framed and 15mm thick battened sashed and 100mm *
Unit
M2
75mm frames class I local timber complete with brass furniture, for doos and windows.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
598.50
1.00
598.50
Carpenter M2
0.0%
10.00
45.00
450.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
1.33
2.50
3.33
0.0%
2.00
40.00
80.00
0.0%
0.33
22.00
7.26
0.0%
0.03
30,000.00
900.00
0.0%
0.50
1,400.00
700.00
0.0%
0.82
850.00
693.60
0.0%
30.00
1.00
30.00
0.0%
35.00
1.00
35.00
Material Rate
Plant Rate
2,384.18
0.00
3,079.18
3,047.68
Page 43 of 395
BSR Reference
08-00-27
Description
Suppling and fixing of 25mm thick framed and 15mm thick battened sashed and 100mm *
Unit
M2
75mm frames class II local timber complete with brass furniture, for doos and windows.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
598.50
1.00
598.50
Carpenter M2
0.0%
10.00
45.00
450.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
1.33
2.50
3.33
0.0%
2.00
40.00
80.00
0.0%
0.33
22.00
7.26
0.0%
0.03
20,000.00
600.00
0.0%
0.50
1,400.00
700.00
0.0%
0.82
226.00
184.42
0.0%
30.00
1.00
30.00
0.0%
35.00
1.00
35.00
Material Rate
1,575.00
Plant Rate
0.00
2,270.00
2,238.50
BSR Reference
08-00-28
Description
Suppling and fixing of 32mm thick framed and 15mm thick battened sashed and 100mm *
Unit
M2
75mm frames class I local timber complete with brass furniture, for doos and windows.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
598.50
1.00
598.50
Carpenter M2
0.0%
10.00
45.00
450.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
1.33
2.50
3.33
0.0%
2.00
40.00
80.00
0.0%
0.33
22.00
7.26
0.0%
0.82
850.00
693.60
0.0%
0.03
30,000.00
960.00
0.0%
0.50
1,500.00
750.00
0.0%
100.00
1.00
100.00
0.0%
35.00
1.00
35.00
Material Rate
Plant Rate
2,494.19
0.00
3,259.19
3,227.69
Page 44 of 395
BSR Reference
08-00-29
Description
Suppling and fixing of 32mm thick framed and 15mm thick battened sashed and 100mm *
Unit
M2
75mm frames class II local timber complete with brass furniture, for doos and windows.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
598.50
1.00
598.50
Carpenter M2
0.0%
10.00
45.00
450.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
1.33
2.50
3.33
0.0%
2.00
40.00
80.00
0.0%
0.33
22.00
7.26
0.0%
0.82
226.00
184.42
0.0%
0.03
20,000.00
640.00
0.0%
0.50
600.00
300.00
0.0%
100.00
1.00
100.00
0.0%
35.00
1.00
35.00
Material Rate
1,215.00
Plant Rate
0.00
1,980.00
1,948.50
BSR Reference
08-00-30
Description
Suppling and fixing of 25mm thick framed and 15mm thick battened sash class I local timber
Unit
M2
Resource Unit
Quantit
Rate Type
Amount
0.0%
370.50
1.00
370.50
Carpenter M2
0.0%
6.00
45.00
270.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
0.0%
0.33
22.00
7.26
0.0%
1.33
27.00
35.91
0.0%
0.82
850.00
693.60
0.0%
0.50
1,400.00
700.00
0.0%
60.00
1.00
60.00
Sand paper M2
0.0%
2.25
1.00
2.25
Material Rate
Plant Rate
Wastag
1,436.77
0.00
1,889.02
1,869.52
Page 45 of 395
BSR Reference
08-00-31
Description
Suppling and fixing of 25mm thick framed and 15mm thick battened sashed in class II local
Unit
M2
timber for doors and windows. Fixed complete with available furniture.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
370.50
1.00
370.50
Carpenter M2
0.0%
6.00
45.00
270.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
0.0%
0.33
22.00
7.26
0.0%
1.33
27.00
35.91
0.0%
0.82
226.00
184.42
0.0%
0.50
450.00
225.00
0.0%
50.00
1.00
50.00
Sand paper M2
0.0%
2.50
1.00
2.50
Material Rate
452.59
Plant Rate
0.00
895.09
875.59
BSR Reference
08-00-32
Description
Suppling and fixing of 32mm thick framed and 15mm thick battened sashed in class I local
Unit
M2
timber for doors and windows. Fixed complete with available furniture.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
370.50
1.00
370.50
Carpenter M2
0.0%
6.00
45.00
270.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
0.0%
0.33
22.00
7.26
0.0%
1.33
27.00
35.91
0.0%
0.50
1,500.00
750.00
0.0%
0.82
850.00
693.60
0.0%
60.00
1.00
60.00
Sand paper M2
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
1,486.77
0.00
1,939.27
1,919.77
Page 46 of 395
BSR Reference
08-00-33
Description
Suppling and fixing of 32mm thick framed and 15mm thick battened sashed in class II local
Unit
M2
timber for doors and windows. Fixed complete with available furniture.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
370.50
1.00
370.50
Carpenter M2
0.0%
6.00
45.00
270.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
0.0%
0.33
22.00
7.26
0.0%
1.33
27.00
35.91
0.0%
0.82
226.00
184.42
0.0%
0.50
600.00
300.00
0.0%
50.00
1.00
50.00
Sand paper M2
0.0%
2.50
1.00
2.50
Material Rate
527.59
Plant Rate
0.00
970.09
950.59
BSR Reference
08-00-34
Description
Suppling and fixing of 25mm thick sash in import timber for doors and windows. Fixed
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
370.50
1.00
370.50
Carpenter M2
0.0%
6.00
45.00
270.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
0.0%
0.33
22.00
7.26
0.0%
1.33
27.00
35.91
0.0%
0.60
2,200.00
1,320.00
92.0%
0.92
650.00
1,148.16
0.0%
60.00
1.00
60.00
Sand paper M2
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
2,511.33
0.00
2,963.83
2,944.33
Page 47 of 395
BSR Reference
08-00-35
Description
Doors for garage in 32mm frames and 15mm thick battened sashes with 125mm * 100mm
Unit
M2
frames all in class I fixed complete with iron pintels and strap hinges.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
370.50
1.00
370.50
Carpenter M2
0.0%
6.00
45.00
270.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
0.0%
5.00
10.00
50.00
0.0%
0.20
15.00
3.00
0.0%
3.40
2.50
8.50
0.0%
0.20
20.00
4.00
Holdfasts M2
0.0%
1.00
2.50
2.50
0.0%
1.00
160.00
160.00
0.0%
0.64
850.00
544.00
0.0%
0.02
30,000.00
600.00
0.0%
0.60
1,500.00
900.00
0.0%
0.20
46.00
9.20
0.0%
60.00
1.00
60.00
0.0%
30.00
1.00
30.00
Material Rate
Plant Rate
2,281.20
0.00
2,761.20
2,741.70
Page 48 of 395
BSR Reference
08-00-36
Description
Supplying and fixing of glazed and panelled, 32mm thick sash and with 100mm * 75mm
Unit
M2
frames in class I local timber for doors and windows complete with brass furniture.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
684.00
1.00
684.00
Carpenter M2
0.0%
12.00
45.00
540.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
0.40
90.00
36.00
M2
0.0%
0.33
70.00
23.10
0.0%
0.36
192.00
69.12
0.0%
2.00
56.00
112.00
0.0%
9.00
22.00
198.00
0.0%
5.30
10.00
53.00
0.0%
0.25
850.00
212.50
M2
0.0%
1.64
69.00
113.16
0.0%
0.02
30,000.00
600.00
0.0%
0.64
1,500.00
960.00
0.0%
50.00
1.00
50.00
0.0%
35.00
1.00
35.00
Material Rate
Plant Rate
2,376.88
0.00
3,181.88
3,145.88
Page 49 of 395
BSR Reference
08-00-37
Description
Supplying and fixing of glazed or panelled,32mm thick sashes with 100mm * 75mm frames
Unit
M2
in class II local timber complete with brass furniture for door and windows.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
684.00
1.00
684.00
Carpenter M2
0.0%
12.00
45.00
540.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
M2
0.0%
0.33
70.00
23.10
0.0%
0.40
90.00
36.00
0.0%
0.36
192.00
69.12
0.0%
0.33
56.00
18.48
0.0%
9.00
22.00
198.00
0.0%
5.30
10.00
53.00
0.0%
0.25
226.00
56.50
0.0%
1.64
28.00
45.92
0.0%
0.02
20,000.00
400.00
0.0%
0.64
600.00
384.00
0.0%
50.00
1.00
50.00
0.0%
35.00
1.00
35.00
Material Rate
Plant Rate
1,284.12
0.00
2,089.12
2,053.12
Page 50 of 395
BSR Reference
08-00-38
Description
Supplying and fixing of glazed or panelled,32mm thick sashes in class II local timber
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
456.00
1.00
456.00
Carpenter M2
0.0%
8.00
45.00
360.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
M2
0.0%
0.33
70.00
23.10
0.0%
0.40
90.00
36.00
0.0%
0.36
192.00
69.12
0.0%
2.00
56.00
112.00
0.0%
9.00
1.80
16.20
0.0%
0.25
226.00
56.50
0.0%
1.64
28.00
45.92
0.0%
5.30
6.00
31.80
0.0%
0.64
600.00
384.00
0.0%
35.00
1.00
35.00
Sand paper M2
0.0%
30.00
1.00
30.00
Material Rate
Plant Rate
774.64
0.00
1,319.64
1,295.64
Page 51 of 395
BSR Reference
08-00-39
Description
Supplying and fixing of panelled 32mm thick sash and 100mm * 75mm frames in class I
Unit
M2
timber and trellised with GI weld mesh 50mm * 50mm gauge 10 and complete with brass
furniture.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
598.50
1.00
598.50
Carpenter M2
0.0%
10.00
45.00
450.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
16.00
2.50
40.00
0.0%
1.50
40.00
60.00
0.0%
0.70
250.00
175.00
0.0%
4.00
54.00
216.00
0.0%
1.87
10.00
18.70
0.0%
0.29
850.00
246.50
0.0%
0.03
30,000.00
900.00
0.0%
0.52
1,500.00
780.00
0.0%
0.36
100.00
36.00
0.0%
90.00
1.00
90.00
0.0%
30.00
1.00
30.00
Material Rate
Plant Rate
2,472.20
0.00
3,222.20
3,190.70
Page 52 of 395
BSR Reference
08-00-40
Description
Supplying and fixing of 25mm door sash panelled and trellis with 50mm * 50mm gauge 10
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
513.00
1.00
513.00
Carpenter M2
0.0%
8.00
45.00
360.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
0.29
850.00
246.50
0.0%
4.00
1.80
7.20
0.0%
1.87
10.00
18.70
0.0%
2.00
26.00
52.00
0.0%
0.52
1,400.00
728.00
0.0%
0.36
100.00
36.00
0.0%
40.00
1.00
40.00
Sand paper M2
0.0%
2.00
1.00
2.00
Material Rate
1,088.40
Plant Rate
0.00
1,670.40
1,643.40
BSR Reference
08-00-41
Description
Supplying and fixing of 32mm panelled doors sash and with 50mm * 50mm gauge 10 GI
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
513.00
1.00
513.00
Carpenter M2
0.0%
8.00
45.00
360.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
16.00
2.50
40.00
0.0%
4.00
1.80
7.20
0.0%
1.87
10.00
18.70
0.0%
0.29
850.00
246.50
0.0%
2.00
26.00
52.00
0.0%
0.52
1,500.00
780.00
0.0%
0.36
100.00
36.00
0.0%
40.00
1.00
40.00
Sand paper M2
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
1,180.40
0.00
1,762.40
1,735.40
Page 53 of 395
BSR Reference
08-00-42
Description
Supplying and fixing of 32mm panelled door sashes and with 100mm * 75mm frames in
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
598.50
1.00
598.50
Carpenter M2
0.0%
10.00
45.00
450.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
12.30
2.50
30.75
0.0%
1.50
40.00
60.00
0.0%
0.50
250.00
125.00
0.0%
3.00
1.80
5.40
0.0%
0.52
850.00
442.00
0.0%
0.03
30,000.00
900.00
0.0%
0.67
1,500.00
1,005.00
0.0%
100.00
1.00
100.00
0.0%
35.00
1.00
35.00
Material Rate
2,568.15
Plant Rate
0.00
3,333.15
3,301.65
BSR Reference
08-00-43
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
106.88
1.00
106.88
Carpenter Nos.
0.0%
1.50
45.00
67.50
0.0%
1.50
30.00
45.00
Material Rate
0.00
112.50
Plant Rate
0.00
106.88
Page 54 of 395
BSR Reference
08-00-69
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
7.65
1.00
7.65
Carpenter M
0.0%
0.08
45.00
3.46
Unskilled Labour M
0.0%
0.15
30.00
4.59
timber(coconut) rafter M
0.0%
1.10
50.00
55.00
Nails M
0.0%
0.50
1.00
0.50
Material Rate
55.00
Plant Rate
0.00
63.56
63.15
BSR Reference
08-00-70
Description
Supplying and fixing of 50mm * 25mm reepers in class I timber new or renewed with iron
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
3.13
1.00
3.13
Carpenter M
0.0%
0.04
45.00
1.98
Unskilled Labour M
0.0%
0.04
30.00
1.32
0.0%
1.10
35.00
38.50
0.0%
0.00
55.00
0.22
0.0%
0.50
1.00
0.50
38.72
0.00
42.52
42.36
Page 55 of 395
BSR Reference
08-00-71
Description
Supplying and fixing of 50mm * 25mm reepers in class II local timber new or renewed with
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4.70
1.00
4.70
Carpenter M
0.0%
0.07
45.00
2.97
Unskilled Labour M
0.0%
0.07
30.00
1.98
0.0%
0.00
34.50
0.00
0.0%
0.00
55.00
0.00
0.0%
0.50
1.00
0.50
Material Rate
0.00
5.45
Plant Rate
0.00
5.20
BSR Reference
08-00-72
Description
Supplying and fixing of 50mm * 25mm reepers in class II local timber new or renewed with
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3.13
1.00
3.13
Carpenter M
0.0%
0.04
45.00
1.98
Unskilled Labour M
0.0%
0.04
30.00
1.32
0.0%
1.10
34.50
37.95
0.0%
0.00
55.00
0.00
0.0%
0.50
1.00
0.50
Material Rate
Plant Rate
37.95
0.00
41.75
41.59
Page 56 of 395
BSR Reference
08-00-73
Description
Supplying and fixing of 50mm * 12mm reepers in class I timber new or renewed with iron
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3.13
1.00
3.13
Carpenter M
0.0%
0.04
45.00
1.98
Unskilled Labour M
0.0%
0.04
30.00
1.32
0.0%
1.10
20.00
22.00
0.0%
0.00
55.00
0.00
0.0%
0.50
1.00
0.50
Material Rate
22.00
Plant Rate
0.00
25.80
25.64
BSR Reference
08-00-74
Description
Supplying and fixing of 50mm * 12mm reepers in class I timber new or renewed with iron
Unit
Resource Unit
Wastag
Quantit
Rate Type
0.0%
3.13
1.00
3.13
Carpenter M
0.0%
0.04
45.00
1.98
Unskilled Labour M
0.0%
0.04
30.00
1.32
0.0%
1.10
20.00
22.00
0.0%
0.50
1.00
0.50
Material Rate
22.00
Plant Rate
0.00
25.80
25.64
BSR Reference
08-00-80
Description
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M3
Quantit
Rate Type
Amount
0.0%
6,697.50
1.00
6,697.50
Carpenter M3
0.0%
128.00
45.00
5,760.00
Unskilled Labour M3
0.0%
43.00
30.00
1,290.00
0.0%
1.00
30,000.00
30,000.00
Nails M3
0.0%
200.00
1.00
200.00
30,000.00
0.00
37,250.00
36,897.50
Page 57 of 395
BSR Reference
08-00-81
Description
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
6,697.50
1.00
6,697.50
Carpenter M3
0.0%
128.00
45.00
5,760.00
Unskilled Labour M3
0.0%
43.00
30.00
1,290.00
0.0%
1.00
20,000.00
20,000.00
Nails M3
0.0%
200.00
1.00
200.00
Material Rate
20,000.00
Plant Rate
0.00
27,250.00
26,897.50
BSR Reference
08-00-97
Description
Supplying and fixing of Calicut pattern roof on class I timber frame work including ridges,
Unit
M2
hips etc.
Resource Unit
Quantit
Rate Type
Amount
0.0%
117.56
1.00
117.56
Mason M2
0.0%
1.65
45.00
74.25
Unskilled Labour M2
0.0%
1.65
30.00
49.50
Binding wire M2
0.0%
0.06
50.00
3.25
Cement M2
0.0%
0.03
340.00
9.18
0.0%
1.00
20.00
20.00
Sand M2
0.0%
0.00
350.00
1.40
Slaked lime M2
0.0%
0.00
2,850.00
2.85
0.0%
13.45
8.00
107.64
0.0%
0.02
30,000.00
540.00
0.0%
3.61
35.00
126.31
0.0%
0.02
55.00
0.88
Wood Preservative M2
0.0%
0.20
110.00
22.44
Colouring powder M2
0.0%
0.27
1.00
0.27
Material Rate
Plant Rate
Wastag
833.95
0.00
957.97
951.79
Page 58 of 395
BSR Reference
08-00-98
Description
Supplying materials and fixing half round roof on class I sawn timber frame work including
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
127.65
1.00
127.65
Carpenter
0.0%
1.79
45.00
80.55
Unskilled Labour
0.0%
1.79
30.00
53.82
Cement
0.0%
0.03
340.00
9.18
Sand
0.0%
0.00
350.00
1.40
Slaked lime
0.0%
0.00
2,850.00
2.85
0.0%
69.90
5.00
349.50
0.0%
7.22
20.00
144.36
0.0%
0.02
30,000.00
510.00
0.0%
0.02
55.00
1.10
0.0%
0.07
45.00
3.15
Wood Preservative
0.0%
0.25
110.00
26.95
Material Rate
1,048.49
Plant Rate
0.00
1,182.86
1,176.14
BSR Reference
08-00-99
Description
Supplying materials and fixing half round roof on class II sawn timber frame work including
Unit
Resource Unit
Material Rate
Wastag
Quantit
Rate Type
Amount
0.0%
127.82
1.00
127.82
Carpenter
0.0%
1.79
45.00
80.73
Unskilled Labour
0.0%
1.79
30.00
53.82
Cement
0.0%
0.03
340.00
10.20
Sand
0.0%
0.00
350.00
0.00
Slaked lime
0.0%
0.03
2,850.00
85.50
0.0%
69.90
5.00
349.50
0.0%
7.22
20.00
144.40
0.0%
0.02
20,000.00
340.00
0.0%
0.02
55.00
0.88
0.0%
0.06
45.00
2.92
Wood Preservative
0.0%
0.25
110.00
27.50
960.91
1,095.46
Plant Rate
0.00
1,088.73
Page 59 of 395
BSR Reference
08-01-44
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
28.50
1.00
28.50
0.0%
1.00
30.00
30.00
Material Rate
0.00
30.00
Plant Rate
0.00
28.50
BSR Reference
08-01-45
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
188.10
1.00
188.10
Carpenter M
0.0%
4.40
45.00
198.00
0.0%
0.01
30,000.00
390.00
Material Rate
390.00
Plant Rate
0.00
588.00
578.10
BSR Reference
08-01-46
Description
Altering door or window frame by filleting existing rebate using Class I timber and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
627.00
1.00
627.00
Carpenter Nos.
0.0%
12.00
45.00
540.00
0.0%
4.00
30.00
120.00
0.0%
1.00
22.00
22.00
0.0%
1.50
27.00
40.50
0.0%
6.41
26.00
166.66
Material Rate
Plant Rate
229.16
0.00
889.16
856.16
Page 60 of 395
BSR Reference
08-01-47
Description
Renewing of glazing in door windows in Class I timber (Per 2.0m , 32mm * 32mm)
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
146.49
1.00
146.49
Carpenter M
0.0%
2.80
45.00
126.00
Unskilled Labour M
0.0%
0.94
30.00
28.20
0.0%
1.17
69.00
80.73
Material Rate
80.73
Plant Rate
0.00
234.93
227.22
BSR Reference
08-01-48
Description
Supplying and fixing of louvered Door or window sash 25mm to 32mm in Burma Teak with
Unit
M2
available furniture
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
855.00
1.00
855.00
Carpenter M2
0.0%
16.00
45.00
720.00
Unskilled Labour M2
0.0%
6.00
30.00
180.00
0.0%
2.50
22.00
55.00
0.0%
1.33
675.00
897.75
0.0%
0.72
2,200.00
1,584.00
0.0%
100.00
1.00
100.00
Sand paper M2
0.0%
6.15
1.00
6.15
Material Rate
Plant Rate
2,536.75
0.00
3,542.90
3,497.90
Page 61 of 395
BSR Reference
08-01-49
Description
Supplying and fixing 38mm * 38mm * 125mm tapered door stops in Class I timber.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Carpenter Nos.
0.0%
1.00
45.00
45.00
0.0%
0.50
30.00
15.00
0.0%
0.15
69.00
10.35
0.0%
1.25
1.00
1.25
Material Rate
10.35
Plant Rate
0.00
71.60
68.60
BSR Reference
08-01-50
Description
Fixing of door or window sashes in position (sash screws and fittings supplied by
Unit
Nos.
Department)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
213.75
1.00
213.75
Carpenter Nos.
0.0%
3.00
45.00
135.00
0.0%
3.00
30.00
90.00
Material Rate
0.00
225.00
Plant Rate
0.00
213.75
BSR Reference
08-01-51
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Carpenter Nos.
0.0%
2.00
45.00
90.00
0.0%
2.00
30.00
60.00
Material Rate
0.00
150.00
Plant Rate
0.00
142.50
Page 62 of 395
BSR Reference
08-01-52
Description
Supplying and fixing of 25mm thick swing doors (900mm * 450mm each) with 12mm panel
Unit
Pair
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
855.00
1.00
855.00
Carpenter Pair
0.0%
16.00
45.00
720.00
0.0%
6.00
30.00
180.00
0.0%
1.00
2.50
2.50
0.0%
4.00
50.00
200.00
0.0%
3.00
22.00
66.00
0.0%
0.51
1,250.00
637.50
0.0%
0.79
675.00
533.25
0.0%
40.00
1.00
40.00
0.0%
3.00
1.00
3.00
Material Rate
1,439.25
Plant Rate
0.00
2,382.25
2,337.25
BSR Reference
08-01-53
Description
Supplying and fixing of 25mm thick class I timber swing door with 12mm thick plywood
Unit
Pair
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
855.00
1.00
855.00
Carpenter Pair
0.0%
16.00
45.00
720.00
0.0%
6.00
30.00
180.00
0.0%
1.00
2.50
2.50
0.0%
4.00
50.00
200.00
0.0%
0.56
330.00
184.80
0.0%
0.51
1,250.00
637.50
0.0%
20.00
1.00
20.00
0.0%
3.00
1.00
3.00
Material Rate
Plant Rate
1,024.80
0.00
1,947.80
1,902.80
Page 63 of 395
BSR Reference
08-01-54
Description
Supplying and fixing of 20mm * 20mm quadrant filles with spring or nails in ClasI timber
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
14.00
1.00
14.00
0.0%
14.11
1.00
14.11
Carpenter M
0.0%
0.33
45.00
14.85
0.0%
1.10
26.00
28.60
Nails M
0.0%
1.50
1.00
1.50
Material Rate
28.60
Plant Rate
0.00
44.95
58.21
BSR Reference
08-01-55
Description
Supplying and fixing of 25mm * 25mm quadrant filles with spring or nails in ClasI timber
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter M
0.0%
0.33
45.00
14.85
0.0%
1.10
69.00
75.90
Nails M
0.0%
1.50
1.00
1.50
Material Rate
75.90
Plant Rate
0.00
92.25
91.51
BSR Reference
08-01-56
Description
Suppying and fixing of gate sash with available posts at site including fixing post (Gate
Unit
Sash
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
313.50
1.00
313.50
Carpenter Sash
0.0%
2.00
45.00
90.00
0.0%
8.00
30.00
240.00
Material Rate
0.00
330.00
Plant Rate
0.00
313.50
Page 64 of 395
BSR Reference
08-01-57
Description
Supplying and fixing of louver blades with 10mm minimum thickness in class I timber upto
Unit
100mm width.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
56.43
1.00
56.43
Carpenter M
0.0%
1.32
45.00
59.40
0.0%
0.12
675.00
81.00
Nails M
0.0%
4.90
1.00
4.90
Material Rate
81.00
Plant Rate
0.00
145.30
142.33
BSR Reference
08-01-58
Description
Supplying and fixing of 2135mm long, 150mm * 150mm verandah post tapering to 125 mm *
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
285.00
1.00
285.00
Carpenter Nos.
0.0%
6.00
45.00
270.00
0.0%
1.00
30.00
30.00
0.0%
0.05
30,000.00
1,590.00
Material Rate
1,590.00
Plant Rate
0.00
1,890.00
1,875.00
BSR Reference
08-01-59
Description
Supplying and fixing of louvre blades with a 10mm minimum thickness and 150mm to
Unit
Resource Unit
Quantit
Rate Type
Amount
0.0%
70.11
1.00
70.11
Carpenter M
0.0%
1.64
45.00
73.80
0.0%
0.23
675.00
155.25
Nails M
0.0%
4.92
1.00
4.92
Material Rate
Plant Rate
Wastag
155.25
0.00
233.97
230.28
Page 65 of 395
BSR Reference
08-01-60
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
109.44
1.00
109.44
Carpenter M2
0.0%
0.92
45.00
41.40
Unskilled Labour M2
0.0%
2.46
30.00
73.80
Plugs, screws,cement M2
0.0%
1.54
1.00
1.54
Material Rate
0.00
116.74
Plant Rate
0.00
110.98
BSR Reference
08-01-61
Description
Fixing of full panelled or panelled and glazed 28mm thick partition with 100mm * 50mm
Unit
M2
frames and 25mm * 25mm quadrant fillets, complete with brass screws in class I local timber.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1,422.86
1.00
1,422.86
Carpenter M2
0.0%
26.73
45.00
1,202.85
Unskilled Labour M2
0.0%
9.83
30.00
294.90
0.0%
0.43
192.00
82.56
0.0%
0.93
54.00
50.22
0.0%
7.52
69.00
518.88
0.0%
3.38
22.40
75.71
0.0%
0.36
850.00
306.00
0.0%
0.02
30,000.00
600.00
0.0%
0.36
1,000.00
360.00
0.0%
0.04
55.00
2.20
Sand paper M2
0.0%
0.92
1.00
0.92
Material Rate
Plant Rate
1,995.57
0.00
3,494.24
3,419.35
Page 66 of 395
BSR Reference
08-01-62
Description
Timber partition in class I timber frame with 100m * 100mm * 3000mm mainpost 100mm *
Unit
M2
50mm * 2150mm intermediate post 100mm * 50mm laterals 25mm thick timber frame, 12mm
thick plywood & 3mm glass panels, 40mm * 200mm capping complete with timber batte
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
912.00
1.00
912.00
Carpenter M2
0.0%
16.00
45.00
720.00
Unskilled Labour M2
0.0%
8.00
30.00
240.00
0.0%
0.43
192.00
82.56
0.0%
0.36
330.00
118.80
0.0%
0.93
54.00
50.22
0.0%
7.52
69.00
518.88
0.0%
3.38
22.40
75.71
0.0%
0.01
30,000.00
420.00
0.0%
0.36
1,000.00
360.00
0.0%
0.04
55.00
2.20
0.0%
50.00
1.00
50.00
Sand paper M2
0.0%
0.92
1.00
0.92
Material Rate
1,628.37
Plant Rate
0.00
2,639.29
2,591.29
BSR Reference
08-01-63
Description
Supplying and fixing of 100mm long tapered 75mm * 50mm plugs in class I timber on walls
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
22.80
1.00
22.80
Mason Nos.
0.0%
0.40
45.00
18.00
0.0%
0.20
30.00
6.00
0.0%
9.00
1.00
9.00
Material Rate
0.00
33.00
Plant Rate
0.00
31.80
Page 67 of 395
BSR Reference
08-01-64
Description
Supplying of 3 plywood panels and fixing to existing frames (beading paid for separately)
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
77.04
1.00
77.04
Carpenter M2
0.0%
1.80
45.00
81.09
0.0%
1.00
230.00
231.15
Nails M2
0.0%
10.81
1.00
10.81
Material Rate
231.15
Plant Rate
0.00
323.05
319.00
BSR Reference
08-01-65
Description
Supplying and fixing of 2135mm long 125mm * 125mm varandah post tapering to 100mm *
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
242.25
1.00
242.25
Carpenter Nos.
0.0%
5.00
45.00
225.00
0.0%
1.00
30.00
30.00
0.0%
0.04
30,000.00
1,110.00
Material Rate
1,110.00
Plant Rate
0.00
1,365.00
1,352.25
BSR Reference
08-01-67
Description
Supplying & fixing of 2135mm long 150mm*150mm verandah post tapering to 125mm
Unit
Nos.
*125mm onspur stone in class 1 local timber [spur stone paid for saparately]
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
285.00
1.00
285.00
Carpenter Nos.
0.0%
6.00
45.00
270.00
0.0%
1.00
30.00
30.00
0.0%
0.05
30,000.00
1,590.00
1,590.00
0.00
1,890.00
1,875.00
Page 68 of 395
BSR Reference
08-01-68
Description
Fixing of 150mm to 200mm wooden posts of round jungle timber(posta supplied by the
Unit
client)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
37.05
1.00
37.05
Unskilled Labour M
0.0%
1.30
30.00
39.00
Material Rate
0.00
39.00
Plant Rate
0.00
37.05
BSR Reference
08-01-82
Description
Renewing of trellis laths 16mm * 16mm in Class I local timber over 30m
Resource Unit
Unit
Wastag
L.M.
Quantit
Rate Type
0.0%
5.99
1.00
5.99
Carpenter L.M.
0.0%
0.14
45.00
6.30
0.0%
1.10
22.50
24.75
0.0%
0.00
55.00
0.22
Material Rate
24.97
Plant Rate
0.00
31.27
30.96
BSR Reference
08-01-83
Description
Renewing of trellis laths 16mm * 16mm in Class I local timber upto 30m
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
7.48
1.00
7.48
Carpenter M
0.0%
0.17
45.00
7.87
0.0%
1.10
22.50
24.75
0.0%
0.00
55.00
0.22
Material Rate
Plant Rate
Amount
24.97
0.00
32.85
32.45
Page 69 of 395
BSR Reference
08-01-84
Description
Renewing of trellis laths 25mm * 12mm in Class I local timber over 30m
Unit
Resource Unit
Wastag
Quantit
Rate Type
0.0%
7.27
1.00
7.27
Carpenter M
0.0%
0.17
45.00
7.65
0.0%
1.10
29.40
32.34
0.0%
0.00
55.00
0.22
Nails M
0.0%
0.50
1.00
0.50
Material Rate
32.56
Plant Rate
0.00
40.71
40.33
BSR Reference
08-01-86
Description
Renewing of trellis laths 25mm * 12mm in Class I local timber upto 30m
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
9.40
1.00
9.40
Carpenter M
0.0%
0.22
45.00
9.90
0.0%
1.10
29.40
32.34
0.0%
0.00
55.00
0.22
Material Rate
32.56
Plant Rate
0.00
42.46
41.97
BSR Reference
08-01-87
Description
Supplying and fixing of trellis laths 25mm * 25mm in class I local timber.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
7.27
1.00
7.27
Carpenter M
0.0%
0.17
45.00
7.65
0.0%
1.10
20.00
22.00
0.0%
0.01
55.00
0.44
Material Rate
Plant Rate
Amount
22.44
0.00
30.09
29.71
Page 70 of 395
BSR Reference
08-01-88
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
0.0%
7.27
1.00
7.27
Carpenter M2
0.0%
0.17
45.00
7.65
0.0%
1.10
22.00
24.20
0.0%
0.01
55.00
0.44
Material Rate
24.64
Plant Rate
0.00
32.29
31.91
BSR Reference
08-01-89
Description
Supplying and fixing in position 100mm * 75mm door frame in class I local timber.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
424.65
1.00
424.65
Carpenter M
0.0%
5.96
45.00
268.20
Unskilled Labour M
0.0%
5.96
30.00
178.80
Holdfasts M
0.0%
2.65
2.50
6.63
Spure stones M
0.0%
1.33
6.00
7.95
0.0%
0.03
30,000.00
960.00
0.0%
8.30
1.00
8.30
Material Rate
Plant Rate
Amount
974.58
0.00
1,429.88
1,407.53
Page 71 of 395
BSR Reference
08-01-90
Description
Supplying and fixing in position of 100mm * 50mm class I timber door frames.
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
424.65
1.00
424.65
Carpenter M2
0.0%
5.96
45.00
268.20
Unskilled Labour M2
0.0%
5.96
30.00
178.80
Holdfasts M2
0.0%
2.65
2.50
6.63
Spure stones M2
0.0%
1.33
6.00
7.95
0.0%
0.02
30,000.00
570.00
0.0%
8.30
1.00
8.30
Material Rate
584.57
Plant Rate
0.00
1,039.87
1,017.52
BSR Reference
08-01-91
Description
Supplyng and fixing of 32mm thick ordinary sash single (ordinary finish ) plywood door
Unit
M2
hung on 100mm * 75mm frame in Class I timber complete with brass furniture(lock paid
separately)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
228.00
1.00
228.00
Carpenter M2
0.0%
4.00
45.00
180.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
M2
0.0%
0.47
70.00
33.04
0.0%
0.47
90.00
42.30
0.0%
1.42
40.00
56.64
Holdfasts M2
0.0%
2.83
2.50
7.07
0.0%
0.47
600.00
283.20
0.0%
0.48
12.00
5.76
0.0%
0.75
22.00
16.50
0.0%
0.24
8.00
1.89
Spure stones M2
0.0%
0.95
6.00
5.70
0.0%
0.02
30,000.00
660.00
0.0%
8.00
1.00
8.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
1,112.10
0.00
1,410.10
1,398.10
Page 72 of 395
BSR Reference
08-01-92
Description
Supplyng and fixing of 32mm thick ordinary sash single (ordinary finish ) plywood door
Unit
M2
hung on 100mm * 50mm frame in Class I timber complete with brass furniture(lock paid
separately)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
228.00
1.00
228.00
Carpenter M2
0.0%
4.00
45.00
180.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
M2
0.0%
0.47
70.00
33.04
0.0%
0.47
90.00
42.30
0.0%
1.42
40.00
56.64
Holdfasts M2
0.0%
2.83
2.50
7.07
0.0%
0.47
600.00
283.20
0.0%
0.48
12.00
5.76
0.0%
0.75
22.00
16.50
0.0%
0.24
8.00
1.89
Spure stones M2
0.0%
0.94
6.00
5.66
0.0%
0.01
30,000.00
420.00
0.0%
8.00
1.00
8.00
0.0%
40.00
1.00
40.00
Material Rate
872.06
Plant Rate
0.00
1,160.06
1,148.06
BSR Reference
08-01-93
Description
Supplyng and fixing of 32mm thick ordinary sash single (ordinary finish ) plywood door on
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
165.30
1.00
165.30
Carpenter M2
0.0%
2.32
45.00
104.40
Unskilled Labour M2
0.0%
2.32
30.00
69.60
M2
0.0%
0.47
70.00
32.90
0.0%
0.47
90.00
42.48
0.0%
1.42
40.00
56.80
0.0%
0.47
600.00
283.20
0.0%
0.48
12.00
5.76
0.0%
0.75
22.00
16.50
Material Rate
437.64
611.64
Plant Rate
0.00
602.94
Page 73 of 395
BSR Reference
08-01-94
Description
Supplyng and fixing of 32mm thick marine type plywood door (ordinary water proof) on
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
202.14
1.00
202.14
Carpenter M2
0.0%
2.84
45.00
127.66
Unskilled Labour M2
0.0%
2.84
30.00
85.11
0.0%
0.47
55.00
25.85
0.0%
1.42
40.00
56.80
0.0%
0.71
600.00
426.00
0.0%
0.71
20.00
14.20
0.0%
0.71
12.00
8.52
0.0%
0.75
22.00
16.50
Material Rate
547.87
Plant Rate
0.00
760.64
750.01
BSR Reference
08-01-95
Description
Sup & fix of 2100 to 3000mm high, 4mm thick glazed partition with 12mm thick chipboard
Unit
M2
panels on both sides with 100*75mm & 100*100mm uprights at 900mm intervals &
100*75mm as horizontal members in Cl I timber with 50 *12mm timber beading around glas
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
270.75
1.00
270.75
Carpenter M2
0.0%
5.00
45.00
225.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
0.0%
0.40
650.00
260.00
0.0%
0.54
265.00
144.16
0.0%
0.47
22.00
10.34
0.0%
2.22
26.00
57.72
0.0%
0.02
30,000.00
510.00
0.0%
0.14
55.00
7.92
0.0%
1.58
1.00
1.58
0.0%
40.00
1.00
40.00
Material Rate
Plant Rate
990.14
0.00
1,316.72
1,302.47
Page 74 of 395
BSR Reference
08-02-75
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4.70
1.00
4.70
Carpenter M
0.0%
0.07
45.00
2.97
Unskilled Labour M
0.0%
0.07
30.00
1.98
0.0%
0.00
55.00
0.22
0.0%
0.50
1.00
0.50
Material Rate
0.22
5.67
Plant Rate
0.00
5.42
BSR Reference
08-02-76
Description
Sorting out of available timber cut to required sizes and fixed in parttitions and frames.
Resource Unit
Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
10,331.25
1.00
10,331.25
Carpenter M3
0.0%
213.00
45.00
9,585.00
Unskilled Labour M3
0.0%
43.00
30.00
1,290.00
0.0%
213.00
1.00
213.00
Material Rate
0.00
11,088.00
Plant Rate
0.00
10,544.25
BSR Reference
08-02-77
Description
Sorting out of available timber cut to required sizes and fixed in roof and other carpentry
Unit
M3
work.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
6,697.50
1.00
6,697.50
Carpenter M3
0.0%
128.00
45.00
5,760.00
Unskilled Labour M3
0.0%
43.00
30.00
1,290.00
0.0%
213.00
1.00
213.00
Material Rate
0.00
7,263.00
Plant Rate
0.00
6,910.50
Page 75 of 395
BSR Reference
08-02-78
Description
Fixing or renewing parttitions and frames with Class I timber (excluding Milla) including
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
16,302.00
1.00
16,302.00
Carpenter M3
0.0%
286.00
45.00
12,870.00
Unskilled Labour M3
0.0%
143.00
30.00
4,290.00
0.0%
1.00
30,000.00
30,000.00
Nails M3
0.0%
200.00
1.00
200.00
Material Rate
30,000.00
Plant Rate
0.00
47,360.00
46,502.00
BSR Reference
08-02-79
Description
Fixing or renewing parttitions and frames with Class II timber including panels and boards.
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M3
Quantit
Rate Type
Amount
0.0%
16,302.00
1.00
16,302.00
Carpenter M3
0.0%
286.00
45.00
12,870.00
Unskilled Labour M3
0.0%
143.00
30.00
4,290.00
0.0%
1.00
20,000.00
20,000.00
Nails M3
0.0%
200.00
1.00
200.00
20,000.00
0.00
37,360.00
36,502.00
Page 76 of 395
BSR Reference
08-02-96
Description
Supplying and fixing of doors or windows glazed and / or panelled sashes 32mm thick in
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
2,268.60
1.00
2,268.60
0.0%
270.75
1.00
270.75
Carpenter M2
0.0%
5.00
45.00
225.00
Carpenter M2
0.0%
24.40
45.00
1,098.00
Mason M2
0.0%
23.80
45.00
1,071.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
Unskilled Labour M2
0.0%
7.30
30.00
219.00
M2
0.0%
0.90
70.00
63.00
0.0%
0.50
90.00
45.00
0.0%
0.47
200.00
94.60
0.0%
0.41
192.00
78.72
0.0%
0.54
265.00
144.16
0.0%
1.00
56.00
56.00
0.0%
10.00
1.80
18.00
0.0%
0.47
22.00
10.34
0.0%
6.00
10.00
60.00
0.0%
0.28
850.00
238.00
M2
0.0%
1.86
69.00
128.34
0.0%
2.22
26.00
57.72
0.0%
0.02
30,000.00
510.00
0.0%
0.72
1,400.00
1,008.00
0.0%
0.14
55.00
7.92
0.0%
1.58
1.00
1.58
0.0%
40.00
1.00
40.00
Sand paper M2
0.0%
30.00
1.00
30.00
Material Rate
Plant Rate
2,519.80
0.00
5,264.38
5,130.73
Page 77 of 395
BSR Reference
08-02-97
Description
Supplying and fixing 2100mm to 3050mm high, panelled partition with 12mm thick
Unit
M2
chipboard on both sides with 100*50mm & 100*100mm up right fixed at 900mm intervals
& 100mm*50mm as horizontal members in Class I timber
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
228.00
1.00
228.00
Carpenter M2
0.0%
4.00
45.00
180.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
0.0%
0.74
650.00
481.00
0.0%
0.02
30,000.00
480.00
0.0%
2.88
9.00
25.96
0.0%
0.22
55.00
11.83
0.0%
1.50
1.00
1.50
0.0%
40.00
1.00
40.00
Material Rate
998.79
Plant Rate
0.00
1,280.29
1,268.29
BSR Reference
08-02-98
Description
Supplying and fixing 2100mm to 3050mm high, panelled partition with 10mm thick
Unit
M2
chipboard on both sides with 100*50mm & 100*100mm up right fixed at 900mm intervals
& 100mm*50mm as horizontal members in Class I timber
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
228.00
1.00
228.00
Carpenter M2
0.0%
4.00
45.00
180.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
0.0%
0.74
200.00
148.00
0.0%
0.02
30,000.00
480.00
0.0%
2.88
9.00
25.96
0.0%
0.22
55.00
12.10
0.0%
1.50
1.00
1.50
0.0%
40.00
1.00
40.00
Material Rate
Plant Rate
666.07
0.00
947.57
935.57
Page 78 of 395
BSR Reference
08-04-01
Description
Supplying and fixing 20mm thick lunumidella planks in ceiling to frame work consisting of
Unit
M2
100*50mm joists and 50*50mm bearers in Cl I timber. Rate to include for 2 coats of tarnap
to joists and bearers.
Resource Unit
Quantit
Rate Type
Amount
0.0%
142.64
1.00
142.64
0.0%
142.64
1.00
142.64
Carpenter M2
0.0%
1.83
45.00
82.35
Carpenter M2
0.0%
1.83
45.00
82.35
Unskilled Labour M2
0.0%
2.26
30.00
67.80
Unskilled Labour M2
0.0%
2.26
30.00
67.80
Lunumidella 150mm*20mm M2
0.0%
1.30
270.00
351.00
Lunumidella 150mm*20mm M2
0.0%
1.30
270.00
351.00
0.0%
0.01
30,000.00
360.00
0.0%
0.01
30,000.00
360.00
0.0%
0.74
55.00
40.70
0.0%
0.07
55.00
4.07
Wood Preservative M2
0.0%
0.16
110.00
17.60
Wood Preservative M2
0.0%
0.16
110.00
17.60
0.0%
1.08
1.00
1.08
0.0%
1.08
1.00
1.08
Material Rate
Plant Rate
Wastag
1,501.97
0.00
1,804.43
1,789.41
Page 79 of 395
BSR Class
CONCRETOR
BSR Reference
03-00-01
Description
Unit
Resource Unit
Wastag
M3
Quantit
765.08
1.00
765.08
Mason M3
0.0%
2.83
45.00
127.35
Unskilled Labour M3
0.0%
22.60
30.00
678.00
Cement M3
0.0%
4.50
340.00
1,530.00
Metal 40mm M3
0.0%
1.00
700.00
700.00
Sand M3
0.0%
0.56
350.00
196.00
2,426.00
Plant Rate
0.00
3,231.35
3,191.08
BSR Reference
03-00-02
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M3
Quantit
Rate Type
Amount
0.0%
961.88
1.00
961.88
Mason M3
0.0%
3.50
45.00
157.50
Unskilled Labour M3
0.0%
28.50
30.00
855.00
Cement M3
0.0%
4.50
340.00
1,530.00
Metal 40mm M3
0.0%
1.00
700.00
700.00
Sand M3
0.0%
0.56
350.00
196.00
2,426.00
0.00
3,438.50
3,387.88
Page 80 of 395
BSR Reference
03-00-03
Description
Unit
Resource Unit
Wastag
M3
Quantit
765.08
1.00
765.08
Mason M3
0.0%
2.83
45.00
127.35
Unskilled Labour M3
0.0%
22.60
30.00
678.00
Cement M3
0.0%
4.90
340.00
1,666.00
Metal 25mm M3
0.0%
1.00
900.00
900.00
Sand M3
0.0%
0.60
350.00
210.00
2,776.00
Plant Rate
0.00
3,581.35
3,541.08
BSR Reference
03-00-04
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M3
Quantit
Rate Type
Amount
0.0%
961.88
1.00
961.88
Mason M3
0.0%
3.50
45.00
157.50
Unskilled Labour M3
0.0%
28.50
30.00
855.00
Cement M3
0.0%
4.90
340.00
1,666.00
Metal 25mm M3
0.0%
1.00
900.00
900.00
Sand M3
0.0%
0.60
350.00
210.00
2,776.00
0.00
3,788.50
3,737.88
Page 81 of 395
BSR Reference
03-00-05
Description
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
763.80
1.00
763.80
Mason M3
0.0%
2.80
45.00
126.00
Unskilled Labour M3
0.0%
22.60
30.00
678.00
Cement M3
0.0%
6.00
340.00
2,040.00
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
Material Rate
2,360.00
Plant Rate
0.00
3,164.00
3,123.80
BSR Reference
03-00-06
Description
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
954.75
1.00
954.75
Mason M3
0.0%
3.50
45.00
157.50
Unskilled Labour M3
0.0%
28.25
30.00
847.50
Cement M3
0.0%
6.00
340.00
2,040.00
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
Material Rate
2,360.00
Plant Rate
0.00
3,365.00
3,314.75
BSR Reference
03-00-07
Description
Formation of 50mm semicircular channel in cement concrete floors and 12mm thick 1:2
Unit
L.M
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
38.47
1.00
38.47
Mason L.M
0.0%
0.70
45.00
31.50
0.0%
0.30
30.00
9.00
0.0%
3.50
1.00
3.50
Material Rate
0.00
44.00
Plant Rate
0.00
41.97
Page 82 of 395
BSR Reference
03-00-08
Description
Formation of 100mm semicircular channel in cement concrete floors and 12mm thick 1:2
Unit
L.M
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
75.52
1.00
75.52
Mason L.M
0.0%
1.30
45.00
58.50
0.0%
0.70
30.00
21.00
0.0%
0.00
1.00
0.00
Material Rate
0.00
79.50
Plant Rate
0.00
75.52
BSR Reference
03-00-09
Description
1:2:4 cement concrete in 150mm *225mm *375mm corbel stone, reinforced with 4 Nos.
Unit
Nos
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
53.44
1.00
53.44
Mason Nos
0.0%
0.75
45.00
33.75
0.0%
0.75
30.00
22.50
Cement Nos
0.0%
0.08
340.00
27.20
0.0%
0.01
110.00
1.54
Sand Nos
0.0%
0.01
350.00
2.80
0.0%
0.84
35.00
29.40
0.0%
3.00
1.00
3.00
60.94
0.00
120.19
117.38
Page 83 of 395
BSR Reference
03-00-10
Description
1:2:4 cement concrete in 225mm high, 75mm thik,curb including 1:2 cement rendering. Rate
Unit
L.M
to include excavation.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
185.25
1.00
185.25
Mason L.M
0.0%
2.60
45.00
117.00
0.0%
2.60
30.00
78.00
Cement L.M
0.0%
0.14
340.00
47.60
0.0%
0.02
110.00
1.98
Sand L.M
0.0%
0.01
350.00
3.50
0.0%
4.92
1.00
4.92
Material Rate
53.08
Plant Rate
0.00
253.00
243.25
BSR Reference
03-00-11
Description
Unit
L.M
225mm average depth with 75mm thick sides and base inclusive of 12mm, 1:3 cement
rendering with expansion joints as necessary.) rate to include for excavation.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
225.15
1.00
225.15
Mason L.M
0.0%
2.60
45.00
117.00
0.0%
4.00
30.00
120.00
Cement L.M
0.0%
0.42
340.00
142.80
0.0%
0.04
900.00
37.80
Sand L.M
0.0%
0.03
350.00
10.50
Basket L.M
0.0%
3.50
1.00
3.50
191.10
0.00
431.60
419.75
Page 84 of 395
BSR Reference
03-00-12
Description
Unit
L.M
separately)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason L.M
0.0%
1.32
45.00
59.40
0.0%
2.00
30.00
60.00
Cement L.M
0.0%
0.11
340.00
37.40
0.0%
0.02
110.00
1.98
Sand L.M
0.0%
0.01
350.00
3.50
0.0%
0.10
150.00
15.00
0.0%
2.50
1.00
2.50
Material Rate
57.88
Plant Rate
0.00
179.78
173.81
BSR Reference
03-00-13
Description
Unit
L.M
separately)
Resource Unit
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason L.M
0.0%
1.32
45.00
59.40
0.0%
2.00
30.00
60.00
Cement L.M
0.0%
0.22
340.00
74.80
0.0%
0.04
110.00
3.96
Sand L.M
0.0%
0.02
350.00
7.00
0.0%
0.13
150.00
18.90
0.0%
3.50
1.00
3.50
Material Rate
Plant Rate
Wastag
104.66
0.00
227.56
221.59
Page 85 of 395
BSR Reference
03-00-14
Description
Unit
L.M
separately...)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
105.45
1.00
105.45
Mason L.M
0.0%
1.00
45.00
45.00
0.0%
2.20
30.00
66.00
Cement L.M
0.0%
0.33
340.00
112.20
0.0%
0.05
110.00
5.72
Sand L.M
0.0%
0.03
350.00
10.50
0.0%
0.17
150.00
25.05
0.0%
2.50
1.00
2.50
Material Rate
153.47
Plant Rate
0.00
266.97
261.42
BSR Reference
03-00-15
Description
Unit
L.M
Resource Unit
Quantit
Rate Type
Amount
0.0%
149.48
1.00
149.48
Mason L.M
0.0%
1.75
45.00
78.75
0.0%
2.62
30.00
78.60
Cement L.M
0.0%
0.44
340.00
149.60
0.0%
0.07
110.00
7.70
Sand L.M
0.0%
0.04
350.00
14.00
0.0%
0.19
150.00
27.90
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
Wastag
199.20
0.00
359.05
351.18
Page 86 of 395
BSR Reference
03-00-16
Description
Unit
L.M
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
149.48
1.00
149.48
Mason L.M
0.0%
1.75
45.00
78.75
0.0%
2.62
30.00
78.60
Cement L.M
0.0%
0.32
340.00
110.16
0.0%
0.05
110.00
5.50
Sand L.M
0.0%
0.03
350.00
10.50
0.0%
0.16
150.00
23.25
0.0%
5.00
1.00
5.00
Material Rate
149.41
Plant Rate
0.00
311.76
303.89
BSR Reference
03-00-17
Description
Unit
L.M
separately.)
Resource Unit
Quantit
Rate Type
Amount
0.0%
163.88
1.00
163.88
Mason L.M
0.0%
2.00
45.00
90.00
0.0%
2.75
30.00
82.50
Cement L.M
0.0%
0.50
340.00
170.00
0.0%
0.08
110.00
8.80
Sand L.M
0.0%
0.05
350.00
17.50
0.0%
0.20
150.00
30.00
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
Wastag
226.30
0.00
401.30
392.68
Page 87 of 395
BSR Reference
03-00-18
Description
Unit
L.M
separately.)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
235.13
1.00
235.13
Mason L.M
0.0%
3.00
45.00
135.00
0.0%
3.75
30.00
112.50
Cement L.M
0.0%
0.60
340.00
204.00
0.0%
0.10
110.00
11.00
Sand L.M
0.0%
0.06
350.00
21.00
0.0%
0.23
150.00
34.50
0.0%
2.50
1.00
2.50
Material Rate
270.50
Plant Rate
0.00
520.50
508.13
BSR Reference
03-00-19
Description
Unit
Nos
separately.)
Resource Unit
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Mason Nos
0.0%
0.50
45.00
22.50
0.0%
1.00
30.00
30.00
Cement Nos
0.0%
0.15
340.00
51.00
0.0%
0.03
110.00
3.30
Sand Nos
0.0%
0.01
350.00
3.50
0.0%
0.28
150.00
42.00
Material Rate
Plant Rate
Wastag
99.80
0.00
152.30
149.68
Page 88 of 395
BSR Reference
03-00-20
Description
100mm thick flat roof in 1:2:4 (20mm) cement concrete and reinforced with expanded metal,
Unit
M3
12mm thick 1:2 cement rendering with 5% pudlo cement and lime puttying soffit complete.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
302.67
1.00
302.67
Mason M3
0.0%
2.20
45.00
99.00
Unskilled Labour M3
0.0%
7.32
30.00
219.60
Boiled lime M3
0.0%
0.00
4.00
0.01
Cement M3
0.0%
0.75
340.00
255.00
Metal 20mm M3
0.0%
0.10
110.00
11.00
Pudlo Cement M3
0.0%
0.40
80.00
32.00
Sand M3
0.0%
0.08
350.00
28.00
Material Rate
326.01
Plant Rate
0.00
644.61
628.68
BSR Reference
03-00-21
Description
Cost-in-situ 75mm thick slabs over drains in 1:2:4(20mm) reinforced concrete including
Unit
M2
formwork and 12mm 1:2 cement rendering. (Reinforcement paid separately). (per 3.0m
length)
Resource Unit
Quantit
Rate Type
Amount
0.0%
196.65
1.00
196.65
Mason M2
0.0%
2.20
45.00
99.00
Unskilled Labour M2
0.0%
3.60
30.00
108.00
Cement M2
0.0%
0.60
340.00
204.00
Metal 20mm M2
0.0%
0.08
110.00
8.80
Sand M2
0.0%
0.06
350.00
21.00
0.0%
0.55
150.00
82.50
Material Rate
Plant Rate
Wastag
316.30
0.00
523.30
512.95
Page 89 of 395
BSR Reference
03-00-22
Description
1:2:4(20mm) cement concrete in 200mm * 200mm * 150mm spur stones for verandah posts.
Unit
Resource Unit
Wastag
Nos
Quantit
Rate Type
0.0%
39.90
1.00
39.90
Plumber Nos
0.0%
0.60
40.00
24.00
0.0%
0.60
30.00
18.00
Cement Nos
0.0%
0.04
340.00
12.24
0.0%
0.01
900.00
9.00
Sand Nos
0.0%
0.00
350.00
0.00
0.0%
2.00
1.00
2.00
Material Rate
21.24
Plant Rate
0.00
65.24
63.14
BSR Reference
03-00-23
Description
1:2:4(20mm) cement concrete in100mm * 75mm * 50mm spur stones for door posts.
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
Nos
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Mason Nos
0.0%
2.00
45.00
90.00
0.0%
2.00
30.00
60.00
Cement Nos
0.0%
0.03
340.00
10.20
0.0%
0.00
110.00
0.00
Sand Nos
0.0%
0.00
350.00
0.00
0.0%
0.50
1.00
0.50
10.20
0.00
160.70
153.20
Page 90 of 395
BSR Reference
03-00-24
Description
1:2:4(20mm) cement concrete in squatting plates for Latrines as per type plan. (including
Unit
Nos
reinforcement)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
161.50
1.00
161.50
0.0%
0.50
40.00
20.00
Mason Nos
0.0%
2.00
45.00
90.00
0.0%
2.00
30.00
60.00
Cement Nos
0.0%
0.30
340.00
102.00
0.0%
0.04
900.00
36.00
0.0%
2.27
33.00
74.91
Sand Nos
0.0%
0.02
350.00
7.00
0.0%
1.00
1.00
1.00
Material Rate
219.91
Plant Rate
0.00
390.91
382.41
BSR Reference
03-00-25
Description
1:2:4(20mm) cement concrete using concrete mixer and vibrator (-Per formwork paid
Unit
M3
separately)
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
605.48
1.00
605.48
Mason M3
0.0%
2.83
45.00
127.35
Unskilled Labour M3
0.0%
17.00
30.00
510.00
Cement M3
0.0%
5.77
340.00
1,962.82
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
2,282.82
0.00
3,030.17
2,998.30
Page 91 of 395
BSR Reference
03-00-26
Description
1:2:4(20mm) cement concrete in column shifts in ground floor using mixer and vibrator.
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
605.48
1.00
605.48
Mason M3
0.0%
2.83
45.00
127.35
Unskilled Labour M3
0.0%
17.00
30.00
510.00
Cement M3
0.0%
6.48
340.00
2,201.84
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
Material Rate
2,521.84
Plant Rate
0.00
3,269.19
3,237.32
BSR Reference
03-00-27
Description
1:2:4(20mm) cement concrete in column shifts in 1st floor using mixer and vibrator.
Unit
M3
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
763.80
1.00
763.80
Mason M3
0.0%
2.80
45.00
126.00
Unskilled Labour M3
0.0%
22.60
30.00
678.00
Cement M3
0.0%
6.48
340.00
2,201.84
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
2,521.84
0.00
3,435.84
3,395.64
Page 92 of 395
BSR Reference
03-00-28
Description
1:2:4(20mm) cement concrete in column shifts in 2nd floor using mixer and vibrator.
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1,211.25
1.00
1,211.25
Mason M3
0.0%
7.20
45.00
324.00
Unskilled Labour M3
0.0%
31.70
30.00
951.00
Cement M3
0.0%
6.48
340.00
2,203.20
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
Material Rate
2,523.20
Plant Rate
0.00
3,908.20
3,844.45
BSR Reference
03-00-29
Description
1:2:4(20mm) cement concrete in beams in ground floor using mixer and vibrator.
Unit
M3
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
798.43
1.00
798.43
Mason M3
0.0%
3.60
45.00
162.00
Unskilled Labour M3
0.0%
22.61
30.00
678.45
Cement M3
0.0%
6.48
340.00
2,203.20
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
2,523.20
0.00
3,473.65
3,431.63
Page 93 of 395
BSR Reference
03-00-30
Description
1:2:4(20mm) cement concrete in beams in 1st floor using mixer and vibrator. (reinforcement,
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
959.60
1.00
959.60
Mason M3
0.0%
3.60
45.00
162.00
Unskilled Labour M3
0.0%
28.27
30.00
848.10
Cement M3
0.0%
6.48
340.00
2,203.20
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
Material Rate
2,523.20
Plant Rate
0.00
3,643.30
3,592.80
BSR Reference
03-00-31
Description
1:2:4(20mm) cement concrete in beams in 2nd floor using mixer and vibrator. (reinforcement,
Unit
M3
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
1,184.18
1.00
1,184.18
Painter M3
0.0%
3.60
40.00
144.00
Unskilled Labour M3
0.0%
36.75
30.00
1,102.50
Cement M3
0.0%
6.48
340.00
2,201.84
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
2,521.84
0.00
3,878.34
3,816.02
Page 94 of 395
BSR Reference
03-00-32
Description
Form work for floor slab concrete including 100mm * 50mm class II joists and necessary
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
112.57
1.00
112.57
Mason M2
0.0%
0.90
45.00
40.50
Unskilled Labour M2
0.0%
2.60
30.00
78.00
Mould oil M2
0.0%
0.12
10.00
1.20
Props (bamboo) 3 - 4 m M2
0.0%
0.69
80.00
55.20
0.0%
0.00
20,000.00
0.00
0.0%
0.60
150.00
90.00
0.0%
0.10
45.00
4.50
Material Rate
150.90
Plant Rate
0.00
269.40
263.48
BSR Reference
03-00-33
Description
Form work for 225mm * 225mm column shafts including class II timber joists and necessary
Unit
M2
Resource Unit
Quantit
Rate Type
Amount
0.0%
192.38
1.00
192.38
Mason M2
0.0%
2.70
45.00
121.50
Unskilled Labour M2
0.0%
2.70
30.00
81.00
0.0%
0.50
40.00
20.00
Props (bamboo) 3 - 4 m M2
0.0%
1.70
80.00
136.00
0.0%
0.22
300.00
66.00
0.0%
0.00
20,000.00
60.00
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
Wastag
282.00
0.00
486.50
476.38
Page 95 of 395
BSR Reference
03-00-34
Description
Form work for beam sides, soffit including class II timber joists and necessary props (rate to
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
Material Rate
396.06
Plant Rate
0.00
473.06
469.21
BSR Reference
03-00-35
Description
1:2:4(20mm) cement concrete in lintel and beams in ground floor using mixer and vibrator
Unit
M3
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
1,527.60
1.00
1,527.60
Mason M3
0.0%
5.60
45.00
252.00
Unskilled Labour M3
0.0%
45.20
30.00
1,356.00
Cement M3
0.0%
5.77
340.00
1,962.82
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
160.00
1.00
160.00
2,282.82
0.00
4,050.82
3,970.42
Page 96 of 395
BSR Reference
03-00-36
Description
1:2:4(20mm) cement concrete in lintel and beams in ground floor using mixer and vibrator
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1,687.20
1.00
1,687.20
Mason M2
0.0%
5.60
45.00
252.00
Unskilled Labour M2
0.0%
50.80
30.00
1,524.00
Cement M2
0.0%
5.77
340.00
1,962.82
Metal 20mm M2
0.0%
1.00
110.00
110.00
Sand M2
0.0%
0.60
350.00
210.00
0.0%
160.00
1.00
160.00
Material Rate
2,282.82
Plant Rate
0.00
4,218.82
4,130.02
BSR Reference
03-00-37
Description
100mm thick 1:2:4 (120mm) cement concrete in1st floor slab using mixer and vibrator
Unit
M2
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
92.04
1.00
92.04
Mason M2
0.0%
0.43
45.00
19.39
Unskilled Labour M2
0.0%
2.58
30.00
77.49
Cement M2
0.0%
0.58
340.00
196.18
Metal 20mm M2
0.0%
0.10
110.00
11.00
Sand M2
0.0%
0.06
350.00
21.00
0.0%
12.00
1.00
12.00
228.18
0.00
337.07
332.22
Page 97 of 395
BSR Reference
03-00-38
Description
125mm thick 1:2:4 (20mm) cement concrete in 1st floor slab using mixer and vibrator
Unit
M2
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
95.05
1.00
95.05
Mason M2
0.0%
0.43
45.00
19.35
Unskilled Labour M2
0.0%
2.69
30.00
80.70
Cement M2
0.0%
0.72
340.00
245.14
Metal 20mm M2
0.0%
0.10
110.00
11.00
Sand M2
0.0%
0.07
350.00
24.50
0.0%
12.00
1.00
12.00
280.64
0.00
392.69
387.69
Page 98 of 395
BSR Class
DEMOLISHER
BSR Reference
01-00-01
Description
Demolishing brick work in cement mortar bricks stacked and debris removed
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
199.50
1.00
199.50
Unskilled Labour Kg
0.0%
7.00
30.00
210.00
Scafolding Kg
0.0%
10.00
1.00
10.00
Material Rate
0.00
220.00
Plant Rate
0.00
209.50
BSR Reference
01-00-02
Description
Demolition of brick work in lime mortar bricks stacked and debris is cleared
Resource Unit
Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
162.45
1.00
162.45
Unskilled Labour M3
0.0%
5.70
30.00
171.00
Scafolding M3
0.0%
10.00
1.00
10.00
Material Rate
0.00
181.00
Plant Rate
0.00
172.45
BSR Reference
01-00-03
Description
Demolition of cabook masonry in lime mortar, cabook stacked and debris cleared
Resource Unit
Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Unskilled Labour M3
0.0%
5.00
30.00
150.00
Scafolding M3
0.0%
10.00
1.00
10.00
Material Rate
0.00
160.00
Plant Rate
0.00
152.50
Page 99 of 395
BSR Reference
01-00-04
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
5.70
1.00
5.70
Unskilled Labour M2
0.0%
0.20
30.00
6.00
Material Rate
0.00
6.00
Plant Rate
0.00
5.70
BSR Reference
01-00-05
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
39.90
1.00
39.90
Carpenter M2
0.0%
0.20
45.00
9.00
Carpenter M2
0.0%
0.20
45.00
9.00
Unskilled Labour M2
0.0%
0.40
30.00
12.00
Unskilled Labour M2
0.0%
0.40
30.00
12.00
Scafolding M2
0.0%
2.00
1.00
2.00
Material Rate
0.00
44.00
Plant Rate
0.00
41.90
BSR Reference
01-00-06
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
114.00
1.00
114.00
Unskilled Labour M2
0.0%
4.00
30.00
120.00
Material Rate
0.00
120.00
Plant Rate
0.00
114.00
BSR Reference
01-00-07
Description
Demolition and removing of reinforced concrete (100mm) roof and debris cleared away
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
159.60
1.00
159.60
Unskilled Labour M2
0.0%
5.60
30.00
168.00
Material Rate
0.00
168.00
Plant Rate
0.00
159.60
BSR Reference
01-00-08
Description
Removal of iron / asbestos / aluminum corrugated sheets from roofs or wall from a single
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
18.05
1.00
18.05
Black Smith M2
0.0%
0.25
40.00
10.00
Unskilled Labour M2
0.0%
0.30
30.00
9.00
Scafolding M2
0.0%
5.00
1.00
5.00
Material Rate
0.00
24.00
Plant Rate
0.00
23.05
BSR Reference
01-00-09
Description
Removal of corrugated iron / asbestos / aluminum sheets from roofs or walls of two storied
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
20.90
1.00
20.90
Black Smith M2
0.0%
0.25
40.00
10.00
Unskilled Labour M2
0.0%
0.40
30.00
12.00
Scafolding M2
0.0%
5.00
1.00
5.00
Material Rate
0.00
27.00
Plant Rate
0.00
25.90
BSR Reference
01-00-10
Description
Removal of corrugated iron / asbestos / aluminum sheets from roof or walls of 3 storied
Unit
M2
buildings
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Black Smith M2
0.0%
0.25
40.00
10.00
Unskilled Labour M2
0.0%
0.25
30.00
7.50
Scafolding M2
0.0%
7.50
1.00
7.50
Material Rate
0.00
25.00
Plant Rate
0.00
24.13
BSR Reference
01-00-11
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
28.50
1.00
28.50
0.0%
1.00
30.00
30.00
Material Rate
0.00
30.00
Plant Rate
0.00
28.50
BSR Reference
01-00-12
Description
Removal of a door or a window (size over 4 sq.m) from existing wall and stacked.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
42.75
1.00
42.75
0.0%
1.50
30.00
45.00
Material Rate
0.00
45.00
Plant Rate
0.00
42.75
BSR Reference
01-00-13
Description
Removal of a door or a window (size upto 4 sq.m) from wall and stacked.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
Material Rate
0.00
37.50
Plant Rate
0.00
35.63
BSR Reference
01-00-14
Description
Removal of door or a window sash from wall (over 4 sq.m) and stacked.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
53.44
1.00
53.44
Carpenter Nos.
0.0%
0.75
45.00
33.75
0.0%
0.75
30.00
22.50
Material Rate
0.00
56.25
Plant Rate
0.00
53.44
BSR Reference
01-00-15
Description
Removal of old or decayed, 100mm to 150mm dia GI down pipes, from existing buildings
Unit
L.M
and stacked.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.55
1.00
8.55
0.0%
0.30
30.00
9.00
Material Rate
0.00
9.00
Plant Rate
0.00
8.55
BSR Reference
01-00-16
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
25.65
1.00
25.65
Unskilled Labour M
0.0%
0.90
30.00
27.00
Material Rate
0.00
27.00
Plant Rate
0.00
25.65
BSR Reference
01-00-17
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
85.50
1.00
85.50
Carpenter M2
0.0%
1.20
45.00
54.00
Unskilled Labour M2
0.0%
1.20
30.00
36.00
Material Rate
0.00
90.00
Plant Rate
0.00
85.50
BSR Reference
01-00-18
Description
Uprooting of fence, rooting up barbed wire and stacking all material as directed. (length of
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Unskilled Labour M
0.0%
1.25
30.00
37.50
Material Rate
0.00
37.50
Plant Rate
0.00
35.63
BSR Reference
01-00-19
Description
Demolition of brick paved floors and cleaning debris as directed (75mm thick floor)
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
19.95
1.00
19.95
Unskilled Labour M2
0.0%
0.70
30.00
21.00
Material Rate
0.00
21.00
Plant Rate
0.00
19.95
BSR Reference
01-00-20
Description
Removing and stacking of gate sash after demolishing cement concrete blocks or removing
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
28.50
1.00
28.50
0.0%
1.00
30.00
30.00
Material Rate
0.00
30.00
Plant Rate
0.00
28.50
BSR Reference
01-00-21
Description
Removing glass panes in doors, windows and fanlights and stacking as directed.
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
115.43
1.00
115.43
Carpenter M2
0.0%
2.70
45.00
121.50
Material Rate
0.00
121.50
Plant Rate
0.00
115.43
BSR Reference
01-00-22
Description
Removing eaves gutter from roof of single storied buildings and stacking as directed.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
5.70
1.00
5.70
Unskilled Labour M
0.0%
0.20
30.00
6.00
Scafolding M
0.0%
3.00
1.00
3.00
Material Rate
0.00
9.00
Plant Rate
0.00
8.70
BSR Reference
01-00-23
Description
Removing eaves gutter from roof of two storied buildings and stacking as directed.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.55
1.00
8.55
Unskilled Labour M
0.0%
0.30
30.00
9.00
Scafolding M
0.0%
5.00
1.00
5.00
Material Rate
0.00
14.00
Plant Rate
0.00
13.55
BSR Reference
01-00-24
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
9.97
1.00
9.97
Unskilled Labour M
0.0%
0.35
30.00
10.50
Scafolding M
0.0%
7.00
1.00
7.00
Material Rate
0.00
17.50
Plant Rate
0.00
16.97
BSR Reference
01-00-25
Description
Removing partition and stacking at site including making good to walls and floors
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
88.35
1.00
88.35
Carpenter M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
94.00
Plant Rate
0.00
89.35
BSR Reference
01-00-26
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
8.55
1.00
8.55
Unskilled Labour M2
0.0%
0.30
30.00
9.00
Stages M2
0.0%
2.50
1.00
2.50
Material Rate
0.00
11.50
Plant Rate
0.00
11.05
BSR Reference
01-00-27
Description
Chipping of cement rendering on brick walls and floors and clearing away debris
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
28.50
1.00
28.50
Unskilled Labour M2
0.0%
1.00
30.00
30.00
Stages M2
0.0%
2.50
1.00
2.50
Material Rate
0.00
32.50
Plant Rate
0.00
31.00
BSR Reference
01-00-28
Description
Chipping of cement rendering on concrete walls and floors and clearing away debris
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
42.75
1.00
42.75
Unskilled Labour M2
0.0%
1.50
30.00
45.00
Stages M2
0.0%
2.50
1.00
2.50
Material Rate
0.00
47.50
Plant Rate
0.00
45.25
BSR Reference
01-00-29
Description
Removing roof tiles and timber and stacking serviceable material and clearing debris in
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
34.20
1.00
34.20
Carpenter M2
0.0%
0.20
45.00
9.00
Unskilled Labour M2
0.0%
0.90
30.00
27.00
Stages M2
0.0%
2.50
1.00
2.50
Material Rate
0.00
38.50
Plant Rate
0.00
36.70
BSR Reference
01-00-30
Description
Removing roof tiles and timber and stacking serviceable material and clearing debris in 2
Unit
M2
storied buildings
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
48.45
1.00
48.45
Unskilled Labour M2
0.0%
1.70
30.00
51.00
Material Rate
0.00
51.00
Plant Rate
0.00
48.45
BSR Reference
01-00-31
Description
Removing roof tiles and timber and stacking serviceable material and clearing debris in 3
Unit
M2
storied buildings
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Carpenter M2
0.0%
0.20
45.00
9.00
Unskilled Labour M2
0.0%
1.70
30.00
51.00
Scafolding M2
0.0%
3.50
1.00
3.50
Material Rate
0.00
63.50
Plant Rate
0.00
60.50
BSR Reference
01-00-32
Description
Demolition of rubble masonry in cement mortar and stacking rubble and clearing debris as
Unit
M3
directed.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
256.50
1.00
256.50
Unskilled Labour M3
0.0%
9.00
30.00
270.00
Scafolding M3
0.0%
4.00
1.00
4.00
Material Rate
0.00
274.00
Plant Rate
0.00
260.50
BSR Reference
01-00-33
Description
Demolition of rubble masonry in lime mortar and stacking rubble and clearing debris
Resource Unit
Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
171.00
1.00
171.00
Unskilled Labour M3
0.0%
6.00
30.00
180.00
Scafolding M3
0.0%
4.00
1.00
4.00
Material Rate
0.00
184.00
Plant Rate
0.00
175.00
BSR Reference
01-00-34
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Unskilled Labour M2
0.0%
1.75
30.00
52.50
Material Rate
0.00
52.50
Plant Rate
0.00
49.88
BSR Reference
01-00-35
Description
Removing half round calicut tiles from roof of single storied buildings and stacking as
Unit
M2
directed
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
11.40
1.00
11.40
Unskilled Labour M2
0.0%
0.40
30.00
12.00
Stages M2
0.0%
2.70
1.00
2.70
Material Rate
0.00
14.70
Plant Rate
0.00
14.10
BSR Reference
01-00-36
Description
Removing of half round tiles from roof of two storied buildings and stacking as directed
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
17.10
1.00
17.10
Unskilled Labour M2
0.0%
0.60
30.00
18.00
Scafolding M2
0.0%
3.00
1.00
3.00
Material Rate
0.00
21.00
Plant Rate
0.00
20.10
BSR Reference
01-00-37
Description
Removing water proof treatment of bitumen from flat roof and clearing debris as directed.
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
48.45
1.00
48.45
0.0%
25.65
1.00
25.65
Unskilled Labour M2
0.0%
1.70
30.00
51.00
Unskilled Labour M2
0.0%
0.90
30.00
27.00
Scafolding M2
0.0%
3.00
1.00
3.00
Material Rate
0.00
81.00
Plant Rate
0.00
77.10
BSR Reference
01-00-38
Description
Removing asbestos ceiling including timber frame work, stacking serviceable material and
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter M2
0.0%
0.90
45.00
40.50
Unskilled Labour M2
0.0%
0.90
30.00
27.00
Scafolding M2
0.0%
1.50
1.00
1.50
Material Rate
0.00
69.00
Plant Rate
0.00
65.63
BSR Reference
01-00-39
Description
Removing asbestos ceiling including timber frame work, stacking serviceable material and
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
75.52
1.00
75.52
Carpenter M2
0.0%
0.90
45.00
40.50
Unskilled Labour M2
0.0%
1.30
30.00
39.00
Scafolding M2
0.0%
2.50
1.00
2.50
Material Rate
0.00
82.00
Plant Rate
0.00
78.02
BSR Reference
01-00-40
Description
Removing valance / barge boarding materials and clearing away the debris in single storied
Unit
building
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
5.70
1.00
5.70
Unskilled Labour M
0.0%
0.20
30.00
6.00
Scafolding M
0.0%
3.00
1.00
3.00
Material Rate
0.00
9.00
Plant Rate
0.00
8.70
BSR Reference
01-00-41
Description
Removing valance / barge boarding materials and clearing away the debris in two storied
Unit
building
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.55
1.00
8.55
Unskilled Labour M
0.0%
0.30
30.00
9.00
Scafolding M
0.0%
5.00
1.00
5.00
Material Rate
0.00
14.00
Plant Rate
0.00
13.55
BSR Reference
01-00-42
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
38.48
1.00
38.48
Unskilled Labour M2
0.0%
1.35
30.00
40.50
Scafolding M2
0.0%
2.15
1.00
2.15
Material Rate
0.00
42.65
Plant Rate
0.00
40.63
BSR Reference
01-00-43
Description
Cutting down trees girth Not exceeding 600mm, grubbing up roots and fill in excavation
Unit
Nos.
with earth.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
0.0%
2.00
30.00
60.00
Material Rate
0.00
60.00
Plant Rate
0.00
57.00
BSR Reference
01-00-44
Description
Cutting down trees , uprooting and grubbing girth exceeding 600mm, but less than 900mm
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
71.25
1.00
71.25
0.0%
2.50
30.00
75.00
Material Rate
0.00
75.00
Plant Rate
0.00
71.25
BSR Reference
01-00-45
Description
Cutting down trees , uprooting and grubbing girth exceeding 900mm, but less than
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
0.0%
5.00
30.00
150.00
Material Rate
0.00
150.00
Plant Rate
0.00
142.50
BSR Reference
01-00-46
Description
Cutting down trees , uprooting and grubbing girth exceeding 1200mm excavation filled in
Unit
Nos.
Resource Unit
Material Rate
Wastag
Quantit
Rate Type
Amount
0.0%
199.50
1.00
199.50
0.0%
7.00
30.00
210.00
0.00
210.00
Plant Rate
0.00
199.50
BSR Reference
02-00-01
Description
Excavation of drains in any soil except rock requiring blasting and soil deposition within
Unit
M3
site.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
128.25
1.00
128.25
Unskilled Labour M3
0.0%
4.50
30.00
135.00
Material Rate
0.00
135.00
Plant Rate
0.00
128.25
BSR Class
DRAINLAYER
BSR Reference
16-00-01
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
0.13
30.00
3.75
0.0%
1.00
24.00
24.00
Material Rate
Plant Rate
24.00
0.00
27.75
24.00
BSR Reference
16-00-02
Description
600mmx600mm manhole upto 600mm deep, constructed with 225mm brick in 1:3 cement
Unit
Nos.
mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete foundation.
Rate to include forming of channels.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
Mason Nos.
0.0%
8.00
45.00
360.00
0.0%
20.00
30.00
600.00
0.0%
0.26
2,200.00
572.00
Cement Nos.
0.0%
2.04
340.00
693.60
0.0%
0.17
900.00
153.00
Sand Nos.
0.0%
0.28
350.00
99.75
1,518.35
0.00
2,478.35
1,518.35
BSR Reference
16-00-03
Description
1000mmx700mm manhole upto 600mm deep, constructed with 225mm brick in 1:3 cement
Unit
Nos.
mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete foundation.
Rate to include forming of channels.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
Mason Nos.
0.0%
12.00
45.00
540.00
0.0%
32.00
30.00
960.00
0.0%
0.50
2,200.00
1,100.00
Cement Nos.
0.0%
3.30
340.00
1,122.00
0.0%
0.28
900.00
256.50
Sand Nos.
0.0%
0.49
350.00
169.75
2,648.25
0.00
4,148.25
2,648.25
BSR Reference
16-00-04
Description
Unit
Nos.
cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm) concrete
foundation. Rate to include forming of channels.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
Mason Nos.
0.0%
20.00
45.00
900.00
0.0%
56.00
30.00
1,680.00
0.0%
0.88
2,200.00
1,925.00
Cement Nos.
0.0%
4.58
340.00
1,557.20
0.0%
0.25
900.00
225.00
Sand Nos.
0.0%
0.79
350.00
275.10
3,982.30
0.00
6,562.30
3,982.30
BSR Reference
16-00-05
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Mason Nos.
0.0%
2.00
45.00
90.00
0.0%
2.00
30.00
60.00
Cement Nos.
0.0%
0.20
340.00
68.00
0.0%
1.00
1,300.00
1,300.00
0.0%
4.00
23.00
92.00
Material Rate
Plant Rate
1,460.00
0.00
1,610.00
1,460.00
BSR Reference
16-00-06
Description
Unit
Nos.
manhole cover, reinforced with 6mm dia. M.S rods at 75mm centres both ways.
Material Rate
Plant Rate
Resource Unit
Wastag
0.0%
0.50
40.00
20.00
Mason Nos.
0.0%
2.00
45.00
90.00
0.0%
2.00
30.00
60.00
Cement Nos.
0.0%
0.21
340.00
71.40
0.0%
0.03
700.00
19.60
Sand Nos.
0.0%
0.01
350.00
5.25
0.0%
2.50
35.00
87.50
183.75
0.00
Quantit
353.75
183.75
16-00-07
Description
Material Rate
Plant Rate
Unit
Wastag
Amount
BSR Reference
Resource Unit
Rate Type
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
1.00
130.00
130.00
130.00
0.00
150.00
130.00
BSR Reference
16-00-08
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
1.00
25.00
25.00
25.00
0.00
45.00
25.00
BSR Reference
16-00-09
Description
110mm dia. Pvc(type 600) laid in 350x150mm thick 1:3:6(25mm) concrete upto 600mm
Unit
Resource Unit
Quantit
Rate Type
Amount
0.0%
0.03
45.00
1.35
Plumber M
0.0%
0.24
40.00
9.60
Unskilled Labour M
0.0%
3.20
30.00
96.00
Cement M
0.0%
0.42
340.00
142.80
Metal 25mm M
0.0%
0.08
900.00
72.00
0.0%
1.00
330.00
330.00
Sand M
0.0%
0.05
350.00
15.75
0.0%
5.00
1.00
5.00
Material Rate
Plant Rate
Wastag
Mason M
560.55
0.00
672.50
565.55
BSR Reference
16-00-10
Description
110mm dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete upto 600mm to
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
Mason M
0.0%
0.03
45.00
1.35
Plumber M
0.0%
0.24
40.00
9.60
Unskilled Labour M
0.0%
4.24
30.00
127.20
Cement M
0.0%
0.42
340.00
142.80
Metal 25mm M
0.0%
0.08
900.00
72.00
0.0%
1.00
330.00
330.00
Sand M
0.0%
0.05
350.00
15.75
Transport M
0.0%
5.00
1.00
5.00
Material Rate
Plant Rate
560.55
0.00
703.70
565.55
BSR Reference
16-00-11
Description
110mm dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete over 1200mm to
Unit
Resource Unit
Quantit
Rate Type
Amount
0.0%
0.03
45.00
1.35
Plumber M
0.0%
0.24
40.00
9.60
Unskilled Labour M
0.0%
5.60
30.00
168.00
Cement M
0.0%
0.42
340.00
142.80
Metal 25mm M
0.0%
0.08
900.00
72.00
0.0%
1.00
330.00
330.00
Sand M
0.0%
0.05
350.00
15.75
Transport M
0.0%
5.00
1.00
5.00
Material Rate
Plant Rate
Wastag
Mason M
560.55
0.00
744.50
565.55
BSR Reference
16-00-12
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
0.25
30.00
7.50
0.0%
1.00
30.00
30.00
Material Rate
Plant Rate
30.00
0.00
37.50
30.00
BSR Class
EXCAVATOR
BSR Reference
02-00-01
Description
Excavation and leveling site in any material except rock requiring blasting including
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Unskilled Labour M3
0.0%
5.00
30.00
150.00
Material Rate
0.00
150.00
Plant Rate
0.00
142.50
BSR Reference
02-00-02
Description
Excavation and leveling site in any material except rock requiring blasting including
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
85.50
1.00
85.50
Unskilled Labour M3
0.0%
3.00
30.00
90.00
Material Rate
0.00
90.00
Plant Rate
0.00
85.50
BSR Reference
02-00-03
Description
Filling under floors including spreading, watering and compacting in 75mm layers with
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Unskilled Labour M3
0.0%
5.00
30.00
150.00
Material Rate
0.00
150.00
Plant Rate
0.00
142.50
BSR Reference
02-00-04
Description
Filling under floors including spreading, watering and compacting in 75mm layers with
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
159.60
1.00
159.60
Unskilled Labour M3
0.0%
5.60
30.00
168.00
Gravel M3
0.0%
1.10
165.00
181.50
Material Rate
181.50
Plant Rate
0.00
349.50
341.10
BSR Reference
02-00-05
Description
Filling under floors with gravel other approved quality of filling including spreading,
Unit
M3
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
159.60
1.00
159.60
Unskilled Labour M3
0.0%
5.60
30.00
168.00
Gravel M3
0.0%
1.10
165.00
181.50
Transport M3
0.0%
70.00
1.00
70.00
181.50
0.00
419.50
411.10
BSR Class
GLAZIER
BSR Reference
13-00-01
Description
Fixing if glass panes with class1 timber boarding [glass supplied by Client]
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
0.00
1.00
0.00
Glazier M2
0.0%
5.00
25.00
125.00
M2
0.0%
19.65
9.00
176.85
0.0%
16.15
1.00
16.15
Material Rate
301.85
Plant Rate
0.00
318.00
318.00
BSR Reference
13-00-02
Description
Supplying of 3mm thik clear glass panes and fixing class 1 timber beading
Unit
Resource Unit
Plant Rate
Wastag
M2
Quantit
Rate Type
Amount
0.0%
118.75
1.00
118.75
Glazeir M2
0.0%
5.00
25.00
125.00
0.0%
1.10
192.00
211.20
M2
0.0%
19.65
9.00
176.85
Nails M2
0.0%
16.20
1.00
16.20
Material Rate
Amount
388.05
0.00
529.25
523.00
BSR Reference
13-00-03
Description
Supplying of 4mm clear glass panes and fixing with class 1 timber beading .
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
118.75
1.00
118.75
Glazeir M2
0.0%
5.00
25.00
125.00
0.0%
1.10
265.00
291.50
M2
0.0%
19.65
9.00
176.85
Nails M2
0.0%
16.20
1.00
16.20
Material Rate
468.35
Plant Rate
0.00
609.55
603.30
BSR Reference
13-00-04
Description
Supplying of 3mm figured panes & fixing with class 1 timber beading.
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
0.00
1.00
0.00
0.0%
1.10
220.00
242.00
Glazier M2
0.0%
5.00
25.00
125.00
M2
0.0%
19.65
9.00
176.85
Nails M2
0.0%
16.20
1.00
16.20
Material Rate
543.85
Plant Rate
0.00
560.05
560.05
BSR Reference
13-00-05
Description
Supplying og 4mm figured glass panes & fixing with class 1 timber.
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
0.00
1.00
0.00
0.0%
1.10
265.00
291.50
Glazier M2
0.0%
5.00
25.00
125.00
M2
0.0%
19.65
9.00
176.85
Nails M2
0.0%
16.70
1.00
16.70
Plant Rate
Amount
Material Rate
Amount
593.35
0.00
610.05
610.05
BSR Class
HOUSES
BSR Reference
20-00-01
Description
Site clearing
Resource Unit
Unit
Wastag
Item
Quantit
0.0%
1.00
Rate Type
30.00
Material Rate
0.00
Plant Rate
0.00
BSR Reference
20-00-02
Description
Resource Unit
Item Spot Rate Item
Unit
Wastag
0.0%
Quantit
10,000.00
Amount
30.00
30.00
0.00
Item
Rate Type
1.00
Amount
10,000.00
Material Rate
0.00
10,000.00
Plant Rate
0.00
10,000.00
BSR Reference
20-00-03
Description
Resource Unit
Item Spot Rate Item
Unit
Wastag
0.0%
Quantit
2,000.00
Item
Rate Type
1.00
Amount
2,000.00
Material Rate
0.00
2,000.00
Plant Rate
0.00
2,000.00
BSR Reference
20-00-04
Description
Resource Unit
Item Spot Rate Item
Unit
Wastag
0.0%
Quantit
5,000.00
Item
Rate Type
1.00
Amount
5,000.00
Material Rate
0.00
5,000.00
Plant Rate
0.00
5,000.00
BSR Reference
20-00-05
Description
Resource Unit
Item Spot Rate Item
Unit
Wastag
0.0%
Item
Quantit
4,000.00
Rate Type
1.00
Amount
4,000.00
Material Rate
0.00
4,000.00
Plant Rate
0.00
4,000.00
BSR Reference
20-00-06
Description
Resource Unit
Item Spot Rate Item
Unit
Wastag
0.0%
Item
Quantit
5,000.00
Rate Type
1.00
Amount
5,000.00
Material Rate
0.00
5,000.00
Plant Rate
0.00
5,000.00
BSR Reference
20-00-07
Description
Settingout of building
Resource Unit
Item Spot Rate Item
Unit
Wastag
0.0%
Item
Quantit
2,000.00
Rate Type
1.00
Amount
2,000.00
Material Rate
0.00
2,000.00
Plant Rate
0.00
2,000.00
BSR Reference
20-01-10
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
85.50
1.00
85.50
Unskilled Labour M2
0.0%
3.00
30.00
90.00
Material Rate
0.00
90.00
Plant Rate
0.00
85.50
BSR Reference
20-01-11
Description
Excavation for foundation not exceeding 1.5m depth normal soil, deposited within site not
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
85.50
1.00
85.50
0.0%
142.50
1.00
142.50
0.0%
85.50
1.00
85.50
Unskilled Labour M3
0.0%
5.00
30.00
150.00
Material Rate
0.00
150.00
Plant Rate
0.00
313.50
BSR Reference
20-01-12
Description
Excavation for foundation not exceeding 1.5m depth weak soil, deposited within site not
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
85.50
1.00
85.50
0.0%
142.50
1.00
142.50
Unskilled Labour M3
0.0%
5.00
30.00
150.00
Material Rate
0.00
150.00
Plant Rate
0.00
228.00
BSR Reference
20-01-13
Description
Excavation for foundation not exceeding 1.5m depth hard soil, deposited within site not
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
0.0%
85.50
1.00
85.50
Unskilled Labour M3
0.0%
5.00
30.00
150.00
Material Rate
0.00
150.00
Plant Rate
0.00
228.00
BSR Reference
20-01-14
Description
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Unskilled Labour M3
0.0%
5.00
30.00
150.00
Material Rate
0.00
150.00
Plant Rate
0.00
142.50
BSR Reference
20-01-15
Description
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
159.60
1.00
159.60
Unskilled Labour M3
0.0%
5.60
30.00
168.00
Gravel M3
0.0%
1.10
165.00
181.50
Material Rate
181.50
Plant Rate
0.00
349.50
341.10
BSR Reference
20-01-16
Description
Filling under floors using excavated soil, deposited in not more than 150mm layers and
Unit
M3
well compacted
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Unskilled Labour M3
0.0%
5.00
30.00
150.00
Material Rate
0.00
150.00
Plant Rate
0.00
142.50
BSR Reference
20-01-17
Description
Filling under floors using imported soil, deposited in not more than 150mm layers and well
Unit
M3
compacted
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
159.60
1.00
159.60
Unskilled Labour M3
0.0%
5.60
30.00
168.00
Gravel M3
0.0%
1.10
165.00
181.50
Material Rate
181.50
Plant Rate
0.00
349.50
341.10
BSR Reference
20-02-20
Description
Random rubble masonry using 150mm to 225mm rubble and 1:6 cement:sand mortar, up to
Unit
M3
3m3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1,057.35
1.00
1,057.35
Mason M3
0.0%
10.60
45.00
477.00
Unskilled Labour M3
0.0%
21.20
30.00
636.00
Cement M3
0.0%
2.60
340.00
884.00
0.0%
1.00
350.00
350.00
Sand M3
0.0%
0.45
350.00
157.50
Material Rate
1,391.50
Plant Rate
0.00
2,504.50
2,448.85
BSR Reference
20-02-21
Description
Random rubble masonry using 150mm to 225mm rubble and 1:6 cement:sand mortar, more
Unit
M3
than 3m3
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
1,057.35
1.00
1,057.35
Mason M3
0.0%
10.60
45.00
477.00
Unskilled Labour M3
0.0%
21.20
30.00
636.00
Cement M3
0.0%
2.60
340.00
884.00
0.0%
1.00
350.00
350.00
Sand M3
0.0%
0.45
350.00
157.50
1,391.50
0.00
2,504.50
2,448.85
BSR Reference
20-02-22
Description
Random rubble masonry using 150mm to 225mm rubble and 1:8 cement:sand mortar, up to
Unit
M3
3m3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1,057.35
1.00
1,057.35
Mason M3
0.0%
10.60
45.00
477.00
Unskilled Labour M3
0.0%
21.20
30.00
636.00
Cement M3
0.0%
2.60
340.00
884.00
0.0%
1.00
350.00
350.00
Sand M3
0.0%
0.45
350.00
157.50
Material Rate
1,391.50
Plant Rate
0.00
2,504.50
2,448.85
BSR Reference
20-02-23
Description
Random rubble masonry using 150mm to 225mm rubble and 1:8 cement:sand mortar, more
Unit
M3
than 3m3
Resource Unit
Wastag
Quantit
1,057.35
1.00
1,057.35
Mason M3
0.0%
10.60
45.00
477.00
Unskilled Labour M3
0.0%
21.20
30.00
636.00
Cement M3
0.0%
2.60
340.00
884.00
0.0%
1.00
350.00
350.00
Sand M3
0.0%
0.45
350.00
157.50
Plant Rate
1,391.50
0.00
2,504.50
2,448.85
BSR Reference
20-02-24
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M3
Quantit
Rate Type
Amount
Mason M3
0.0%
11.00
45.00
495.00
Unskilled Labour M3
0.0%
17.00
30.00
510.00
Cement M3
0.0%
3.70
340.00
1,258.00
Sand M3
0.0%
1.30
350.00
455.00
1,713.00
0.00
2,718.00
1,713.00
BSR Reference
20-02-25
Description
Cement:Sand (1:10) mix compact foundation, plinth wall using steel a steel mould
Unit
Resource Unit
Material Rate
Wastag
Quantit
13.00
45.00
585.00
Unskilled Labour M3
0.0%
20.00
30.00
600.00
Cement M3
0.0%
3.70
340.00
1,258.00
Sand M3
0.0%
1.30
350.00
455.00
0.00
2,898.00
1,713.00
20-02-26
Description
DPC with 1:3 cement:sand moortar and two coats of DPC tar
Unit
Resource Unit
Plant Rate
Amount
0.0%
BSR Reference
Material Rate
Rate Type
Mason M3
1,713.00
Plant Rate
M3
Wastag
M2
Quantit
Rate Type
Amount
0.0%
104.31
1.00
104.31
Mason M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
2.16
30.00
64.80
Bitumen M2
0.0%
0.70
16.00
11.20
Cement M2
0.0%
0.19
340.00
63.92
Sand M2
0.0%
0.02
350.00
7.70
82.82
0.00
192.62
187.13
BSR Reference
20-03-30
Description
Unit
Resource Unit
Wastag
M2
Quantit
104.17
1.00
104.17
Mason M2
0.0%
1.29
45.00
58.05
Unskilled Labour M2
0.0%
1.72
30.00
51.60
Brick : common M2
0.0%
0.06
2,200.00
132.00
Cement M2
0.0%
0.14
340.00
47.60
Sand M2
0.0%
0.03
350.00
10.50
0.0%
4.00
1.00
4.00
190.10
Plant Rate
0.00
303.75
298.27
BSR Reference
20-03-31
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M2
Quantit
Rate Type
Amount
0.0%
914.85
1.00
914.85
Mason M2
0.0%
10.60
45.00
477.00
Unskilled Labour M2
0.0%
16.20
30.00
486.00
Brick : common M2
0.0%
0.53
2,200.00
1,161.60
Cement M2
0.0%
1.33
340.00
452.20
Sand M2
0.0%
0.23
350.00
80.50
0.0%
12.50
1.00
12.50
1,694.30
0.00
2,669.80
2,621.65
BSR Reference
20-03-32
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
914.85
1.00
914.85
Mason M2
0.0%
10.60
45.00
477.00
Unskilled Labour M2
0.0%
16.20
30.00
486.00
Brick : common M2
0.0%
0.53
2,200.00
1,161.60
Cement M2
0.0%
1.33
340.00
452.20
Sand M2
0.0%
0.23
350.00
80.50
0.0%
12.50
1.00
12.50
Material Rate
Plant Rate
1,694.30
0.00
2,669.80
2,621.65
BSR Reference
20-03-33
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M2
Quantit
Rate Type
0.0%
0.90
45.00
40.50
Unskilled Labour M2
0.0%
1.75
30.00
52.50
Cement M2
0.0%
0.04
340.00
14.62
Sand M2
0.0%
0.01
350.00
3.15
17.77
0.00
110.77
20-03-34
Description
Unit
Resource Unit
Plant Rate
Amount
Mason M2
BSR Reference
Material Rate
Amount
Wastag
17.77
M2
Quantit
Rate Type
Amount
Mason M2
0.0%
1.10
45.00
49.50
Unskilled Labour M2
0.0%
2.20
30.00
66.00
Cement M2
0.0%
0.04
340.00
14.62
Sand M2
0.0%
0.01
350.00
3.15
17.77
0.00
133.27
17.77
BSR Reference
20-03-35
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M2
Quantit
Rate Type
0.0%
1.10
45.00
49.50
Unskilled Labour M2
0.0%
2.20
30.00
66.00
Cement M2
0.0%
0.03
340.00
11.22
Sand M2
0.0%
0.01
350.00
3.15
14.37
0.00
20-03-36
Description
Unit
Resource Unit
Plant Rate
129.87
BSR Reference
Material Rate
Amount
Mason M2
Wastag
14.37
M2
Quantit
Rate Type
Amount
Mason M2
0.0%
1.30
45.00
58.50
Mason M2
0.0%
1.30
45.00
58.50
Unskilled Labour M2
0.0%
2.15
30.00
64.50
Unskilled Labour M2
0.0%
2.15
30.00
64.50
Cement M2
0.0%
0.07
340.00
22.44
Cement M2
0.0%
0.08
340.00
27.54
Sand M2
0.0%
0.02
350.00
6.30
Sand M2
0.0%
0.02
350.00
6.30
62.58
0.00
308.58
62.58
BSR Reference
20-03-37
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
165.00
1.00
165.00
Mason M2
0.0%
2.20
45.00
99.00
Unskilled Labour M2
0.0%
2.20
30.00
66.00
Cement M2
0.0%
0.08
340.00
26.95
Sand M2
0.0%
0.02
350.00
6.60
Soil M2
0.0%
0.02
212.00
3.99
0.0%
36.00
6.50
234.00
Scafolding M2
0.0%
75.00
1.00
75.00
Material Rate
271.53
Plant Rate
0.00
511.53
511.53
BSR Reference
20-03-38
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
216.00
1.00
216.00
Mason M2
0.0%
2.70
45.00
121.50
Unskilled Labour M2
0.0%
2.70
30.00
81.00
Cement M2
0.0%
0.12
340.00
40.46
Sand M2
0.0%
0.03
350.00
10.08
Soil M2
0.0%
0.03
212.00
6.10
0.0%
30.00
9.00
270.00
Scafolding M2
0.0%
100.00
1.00
100.00
Material Rate
Plant Rate
326.64
0.00
629.14
642.64
BSR Reference
20-03-39
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
235.00
1.00
235.00
Mason M2
0.0%
3.20
45.00
144.00
Unskilled Labour M2
0.0%
3.20
30.00
96.00
Cement M2
0.0%
0.19
340.00
64.67
Sand M2
0.0%
0.05
350.00
15.83
Soil M2
0.0%
0.05
212.00
9.59
0.0%
36.00
12.00
432.00
Scafolding M2
0.0%
125.00
1.00
125.00
Material Rate
522.09
Plant Rate
0.00
887.09
882.09
BSR Reference
20-03-40
Description
113X150mm Lintol for 113mm brickwork , 2NNos 10mm Tor steel bars and necessary
Unit
formwork
Resource Unit
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason M
0.0%
1.32
45.00
59.40
Unskilled Labour M
0.0%
2.00
30.00
60.00
Cement M
0.0%
0.11
340.00
37.40
Metal 20mm M
0.0%
0.02
110.00
1.98
Sand M
0.0%
0.01
350.00
3.50
0.0%
0.10
150.00
15.00
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
Wastag
57.88
0.00
179.78
173.81
BSR Reference
20-03-41
Description
225X150mm Lintol for 1225mm brickwork , 2NNos 10mm Tor steel bars and necessary
Unit
formwork
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason M
0.0%
1.32
45.00
59.40
Unskilled Labour M
0.0%
2.00
30.00
60.00
Cement M
0.0%
0.22
340.00
74.80
Metal 20mm M
0.0%
0.04
110.00
3.96
Sand M
0.0%
0.02
350.00
7.00
0.0%
0.13
150.00
18.90
0.0%
3.50
1.00
3.50
Material Rate
104.66
Plant Rate
0.00
227.56
221.59
BSR Reference
20-03-42
Description
225X225mm Lintol for 225mm brickwork , 2Nos 10mm Tor steel bars and necessary
Unit
formwork
Resource Unit
Quantit
Rate Type
Amount
0.0%
105.45
1.00
105.45
Mason M
0.0%
1.00
45.00
45.00
Unskilled Labour M
0.0%
2.20
30.00
66.00
Cement M
0.0%
0.33
340.00
112.20
Metal 20mm M
0.0%
0.05
110.00
5.72
Sand M
0.0%
0.03
350.00
10.50
0.0%
0.17
150.00
25.05
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
Wastag
153.47
0.00
266.97
261.42
BSR Reference
20-03-43
Description
100X150mm Lintol for 1150mm blockwork , 2Nos 10mm Tor steel bars and necessary
Unit
formwork
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason M
0.0%
1.32
45.00
59.40
Unskilled Labour M
0.0%
2.00
30.00
60.00
Cement M
0.0%
0.11
340.00
37.40
Metal 20mm M
0.0%
0.02
110.00
1.98
Sand M
0.0%
0.01
350.00
3.50
0.0%
0.10
150.00
15.00
0.0%
2.50
1.00
2.50
Material Rate
57.88
Plant Rate
0.00
179.78
173.81
BSR Reference
20-03-44
Description
150X150mm Lintol for 1150mm blockwork , 2Nos 10mm Tor steel bars and necessary
Unit
formwork
Resource Unit
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason M
0.0%
1.32
45.00
59.40
Unskilled Labour M
0.0%
2.00
30.00
60.00
Cement M
0.0%
0.22
340.00
74.80
Metal 20mm M
0.0%
0.04
110.00
3.96
Sand M
0.0%
0.02
350.00
7.00
0.0%
0.13
150.00
18.90
0.0%
3.50
1.00
3.50
Material Rate
Plant Rate
Wastag
104.66
0.00
227.56
221.59
BSR Reference
20-03-45
Description
200X150mm Lintol for 200mm blockwork , 2Nos 10mm Tor steel bars and necessary
Unit
formwork
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason
0.0%
1.32
45.00
59.40
Unskilled Labour
0.0%
2.00
30.00
60.00
Cement
0.0%
0.22
340.00
74.80
Metal 20mm
0.0%
0.04
110.00
3.96
Sand
0.0%
0.02
350.00
7.00
0.0%
0.13
150.00
18.90
0.0%
3.50
1.00
3.50
Material Rate
104.66
Plant Rate
0.00
227.56
221.59
BSR Reference
20-03-46
Description
200X225mm Lintol for 200mm blockwork , 2Nos 10mm Tor steel bars and necessary
Unit
formwork
Resource Unit
Quantit
Rate Type
Amount
0.0%
105.45
1.00
105.45
Mason M
0.0%
1.00
45.00
45.00
Unskilled Labour M
0.0%
2.20
30.00
66.00
Cement M
0.0%
0.33
340.00
112.20
Metal 20mm M
0.0%
0.05
110.00
5.72
Sand M
0.0%
0.03
350.00
10.50
0.0%
0.17
150.00
25.05
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
Wastag
153.47
0.00
266.97
261.42
BSR Reference
20-03-47
Description
113X100mm Lintol for 2113mm blockwork (cement:soil) , 2Nos 10mm Tor steel bars and
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason M
0.0%
1.32
45.00
59.40
Unskilled Labour M
0.0%
2.00
30.00
60.00
Cement M
0.0%
0.11
340.00
37.40
Metal 20mm M
0.0%
0.02
110.00
1.98
Sand M
0.0%
0.01
350.00
3.50
0.0%
0.10
150.00
15.00
0.0%
2.50
1.00
2.50
Material Rate
57.88
Plant Rate
0.00
179.78
173.81
BSR Reference
20-03-48
Description
150X100mm Lintol for 150mm blockwork (cement:soil) , 2Nos 10mm Tor steel bars and
Unit
Resource Unit
Quantit
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason M
0.0%
1.32
45.00
59.40
Unskilled Labour M
0.0%
2.00
30.00
60.00
Cement M
0.0%
0.11
340.00
37.40
Metal 20mm M
0.0%
0.02
110.00
1.98
Sand M
0.0%
0.01
350.00
3.50
0.0%
0.10
150.00
15.00
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
Wastag
57.88
0.00
179.78
173.81
BSR Reference
20-03-49
Description
250X100mm Lintol for 250mm blockwork (cement:soil) , 2Nos 10mm Tor steel bars and
Unit
Resource Unit
Wastag
Rate Type
Amount
0.0%
113.43
1.00
113.43
Mason M
0.0%
1.32
45.00
59.40
Unskilled Labour M
0.0%
2.00
30.00
60.00
Cement M
0.0%
0.22
340.00
74.80
Metal 20mm M
0.0%
0.04
110.00
3.96
Sand M
0.0%
0.02
350.00
7.00
0.0%
0.13
150.00
18.90
0.0%
3.50
1.00
3.50
Material Rate
104.66
Plant Rate
0.00
BSR Reference
20-04-50
Description
Material Rate
227.56
221.59
Unit
Resource Unit
Plant Rate
Quantit
Wastag
M3
Quantit
Rate Type
Amount
0.0%
765.08
1.00
765.08
Mason M3
0.0%
2.83
45.00
127.35
Unskilled Labour M3
0.0%
22.60
30.00
678.00
Cement M3
0.0%
4.50
340.00
1,530.00
Metal 40mm M3
0.0%
1.00
700.00
700.00
Sand M3
0.0%
0.56
350.00
196.00
2,426.00
0.00
3,231.35
3,191.08
BSR Reference
20-04-51
Description
Unit
Resource Unit
Wastag
Rate Type
Amount
0.0%
605.48
1.00
605.48
Mason M3
0.0%
2.83
45.00
127.35
Unskilled Labour M3
0.0%
17.00
30.00
510.00
Cement M3
0.0%
5.77
340.00
1,962.82
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
2,282.82
Plant Rate
0.00
BSR Reference
20-04-52
Description
3,030.17
2,998.30
Unit
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
M3
Wastag
M3
Quantit
Rate Type
Amount
0.0%
605.48
1.00
605.48
Mason M3
0.0%
2.83
45.00
127.35
Unskilled Labour M3
0.0%
17.00
30.00
510.00
Cement M3
0.0%
6.48
340.00
2,201.84
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
2,521.84
0.00
3,269.19
3,237.32
BSR Reference
20-04-53
Description
Unit
Resource Unit
Wastag
M3
Quantit
Rate Type
0.0%
798.43
1.00
798.43
Mason M3
0.0%
3.60
45.00
162.00
Unskilled Labour M3
0.0%
22.61
30.00
678.45
Cement M3
0.0%
6.48
340.00
2,203.20
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
Material Rate
2,523.20
Plant Rate
0.00
3,473.65
3,431.63
BSR Reference
20-04-54
Description
1:2:4 (20mm) concrete in beams, more than 225mm width and 400mm depth
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M3
Quantit
Rate Type
Amount
0.0%
798.43
1.00
798.43
Mason M3
0.0%
3.60
45.00
162.00
Unskilled Labour M3
0.0%
22.61
30.00
678.45
Cement M3
0.0%
6.48
340.00
2,203.20
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
2,523.20
0.00
3,473.65
3,431.63
BSR Reference
20-04-55
Description
Unit
Resource Unit
Wastag
Rate Type
Amount
0.0%
959.60
1.00
959.60
0.0%
302.67
1.00
302.67
Mason M3
0.0%
3.60
45.00
162.00
Unskilled Labour M3
0.0%
28.27
30.00
848.10
Cement M3
0.0%
6.48
340.00
2,203.20
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.60
350.00
210.00
0.0%
110.00
1.00
110.00
2,523.20
Plant Rate
0.00
BSR Reference
20-04-56
Description
3,643.30
3,895.47
Unit
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
M3
Wastag
M3
Quantit
Rate Type
Amount
0.0%
959.60
1.00
959.60
Mason M3
0.0%
3.60
45.00
162.00
Unskilled Labour M3
0.0%
28.27
30.00
848.10
Cement M3
0.0%
9.50
340.00
3,230.00
Metal 20mm M3
0.0%
1.00
110.00
110.00
Sand M3
0.0%
0.50
350.00
175.00
0.0%
110.00
1.00
110.00
3,515.00
0.00
4,635.10
4,584.60
BSR Reference
20-05-60
Description
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Mild Steel Kg
0.0%
1.00
33.00
33.00
Wastage Kg
0.0%
2.50
1.00
2.50
Material Rate
33.50
Plant Rate
0.00
BSR Reference
20-05-61
Description
Resource Unit
47.25
46.69
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-62
Description
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-63
Description
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-64
Description
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-65
Description
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-66
Description
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-67
Description
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-68
Description
Resource Unit
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-69
Description
Unit
Resource Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-70
Description
Unit
Resource Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
20-05-80
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M2
Quantit
Rate Type
Amount
0.0%
192.38
1.00
192.38
Mason M2
0.0%
2.70
45.00
121.50
Unskilled Labour M2
0.0%
2.70
30.00
81.00
0.0%
0.00
20,000.00
60.00
60.00
0.00
262.50
252.38
BSR Reference
20-05-81
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
192.38
1.00
192.38
Mason M2
0.0%
2.70
45.00
121.50
Unskilled Labour M2
0.0%
2.70
30.00
81.00
0.0%
0.50
40.00
20.00
Props (bamboo) 3 - 4 m M2
0.0%
1.70
80.00
136.00
0.0%
0.22
300.00
66.00
0.0%
0.00
20,000.00
60.00
0.0%
2.00
1.00
2.00
Material Rate
282.00
Plant Rate
0.00
486.50
476.38
BSR Reference
20-05-82
Description
Unit
Resource Unit
Material Rate
Plant Rate
M2
Wastag
M2
Quantit
Rate Type
Amount
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
0.00
473.06
469.21
BSR Reference
20-05-84
Description
Unit
Resource Unit
Wastag
M2
Quantit
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
Plant Rate
0.00
473.06
469.21
BSR Reference
20-05-85
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M2
Quantit
Rate Type
Amount
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
0.00
473.06
469.21
BSR Reference
20-05-86
Description
Formwork using plywood, 12mm thick in columns including bearers and ties
Unit
Resource Unit
Wastag
M2
Quantit
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
Plant Rate
0.00
473.06
469.21
BSR Reference
20-05-87
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M2
Quantit
Rate Type
Amount
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
0.00
473.06
469.21
BSR Reference
20-05-88
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
Material Rate
396.06
Plant Rate
0.00
473.06
469.21
BSR Reference
20-05-89
Description
Formwork using plywood, 12mm thick in floors including joists and props
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
0.00
473.06
469.21
BSR Reference
20-05-90
Description
Unit
Resource Unit
Wastag
Rate Type
Amount
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
Plant Rate
0.00
BSR Reference
20-05-91
Description
473.06
469.21
Unit
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
M2
Wastag
M2
Quantit
Rate Type
Amount
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
0.00
473.06
469.21
BSR Reference
20-05-92
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
Material Rate
396.06
Plant Rate
0.00
473.06
469.21
BSR Reference
20-05-93
Description
Formwork using steel shetters in bottom of beams including joists and props
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
0.00
473.06
469.21
BSR Reference
20-05-94
Description
Unit
Resource Unit
Wastag
M2
Quantit
73.15
1.00
73.15
Painter M2
0.0%
1.10
40.00
44.00
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
0.01
506.00
5.06
Mould oil M2
0.0%
0.30
10.00
3.00
Props (bamboo) 3 - 4 m M2
0.0%
0.50
80.00
40.00
0.0%
1.10
300.00
330.00
0.0%
0.40
45.00
18.00
396.06
Plant Rate
0.00
473.06
469.21
BSR Reference
20-06-00
Description
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
2.00
1.00
2.00
Unskilled Labour M2
0.0%
0.07
30.00
2.10
0.0%
10.00
12.00
120.00
120.00
0.00
122.10
122.00
BSR Reference
20-06-01
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
63.27
1.00
63.27
Carpenter M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.02
30.00
30.60
0.0%
1.17
220.00
256.74
0.0%
2.15
8.00
17.20
0.0%
0.01
30,000.00
300.00
Wood Preservative M2
0.0%
0.07
110.00
7.70
Material Rate
581.64
Plant Rate
0.00
648.24
644.91
BSR Reference
20-06-02
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
2.00
1.00
2.00
Unskilled Labour M2
0.0%
0.07
30.00
2.10
Material Rate
0.00
2.10
Plant Rate
0.00
2.00
BSR Reference
20-06-03
Description
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
56.29
1.00
56.29
Carpenter M2
0.0%
0.65
45.00
29.25
Unskilled Labour M2
0.0%
1.00
30.00
30.00
0.0%
3.00
8.00
24.00
G.I.sheet 24 B.W.G. M2
0.0%
1.20
320.00
384.00
0.0%
0.01
30,000.00
300.00
Wood Preservative M2
0.0%
0.08
110.00
8.80
716.80
0.00
776.05
773.09
BSR Reference
20-06-04
Description
Roof ridge using clay ridge tiles, and 1:1:6 cement:lime:sand mortar
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
39.19
1.00
39.19
Carpenter M
0.0%
0.55
45.00
24.75
Unskilled Labour M
0.0%
0.55
30.00
16.50
Cement M
0.0%
0.09
340.00
30.60
0.0%
2.50
20.00
50.00
Sand M
0.0%
0.01
350.00
5.25
Slaked lime M
0.0%
0.00
2,850.00
8.55
Colouring powder M
0.0%
3.50
1.00
3.50
Material Rate
94.40
Plant Rate
0.00
BSR Reference
20-06-05
Description
139.15
137.09
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter M
0.0%
0.50
45.00
22.50
Unskilled Labour M
0.0%
0.50
30.00
15.00
0.0%
1.00
210.00
210.00
0.0%
4.00
6.00
24.00
Material Rate
Plant Rate
234.00
0.00
271.50
269.63
BSR Reference
20-06-10
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Carpenter M
0.0%
0.15
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
Amount
16.25
5.00
BSR Reference
20-06-11
Description
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
16.25
5.00
BSR Reference
20-06-12
Description
Timber for roof, 50X150mm imported timber (Kempus or similar) ridge plate
Unit
Amount
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
16.25
5.00
BSR Reference
20-06-13
Description
Timber for roof, 50X175mm imported timber (Kempus or similar) ridge plate
Unit
Amount
Resource Unit
Wastag
Quantit
Rate Type
Carpenter M
0.0%
0.15
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
Amount
16.25
5.00
BSR Reference
20-06-14
Description
Timber for roof, 100X75mm imported timber (Kempus or similar) wall plate
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
16.25
5.00
BSR Reference
20-06-15
Description
Timber for roof, 75X125mm imported timber (Kempus or similar) intermediate beam
Unit
Amount
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
16.25
5.00
BSR Reference
20-06-16
Description
Unit
Amount
Resource Unit
Wastag
Quantit
Rate Type
Carpenter M
0.0%
0.15
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
Amount
16.25
5.00
BSR Reference
20-06-17
Description
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
BSR Reference
20-06-18
Description
Material Rate
Plant Rate
Unit
Amount
16.25
5.00
Resource Unit
Wastag
Carpenter M
0.0%
0.15
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
timber(coconut) rafter M
0.0%
1.10
50.00
55.00
Nails M
0.0%
5.00
1.00
5.00
55.00
0.00
Quantit
Rate Type
Amount
71.25
60.00
BSR Reference
20-06-19
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Carpenter M
0.0%
0.15
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
Amount
16.25
5.00
BSR Reference
20-06-20
Description
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
BSR Reference
20-06-21
Description
Unit
Amount
16.25
5.00
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
BSR Reference
20-06-22
Description
Timber for roof, 50X150mm local timber (Kempus or similar) ridge plat
Unit
Amount
16.25
5.00
Resource Unit
Wastag
Quantit
Rate Type
Carpenter M
0.0%
0.15
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
Amount
16.25
5.00
BSR Reference
20-06-23
Description
Timber for roof, 50X175mm loca timber (Kempus or similar) ridge plate
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
BSR Reference
20-06-24
Description
Timber for roof, 100X75mm local timber (Kempus or similar) wall plate
Unit
Amount
16.25
5.00
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
16.25
5.00
BSR Reference
20-06-25
Description
Timber for roof, 75X125mm local timber (Kempus or similar) intermediate beam
Unit
Amount
Resource Unit
Wastag
Quantit
Rate Type
Carpenter M
0.0%
0.15
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
Amount
16.25
5.00
BSR Reference
20-06-26
Description
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
BSR Reference
20-06-27
Description
Unit
Amount
16.25
5.00
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.15
Rate Type
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
BSR Reference
20-06-28
Description
Unit
Amount
16.25
5.00
Resource Unit
Wastag
Quantit
Rate Type
Carpenter M
0.0%
0.10
45.00
4.50
Unskilled Labour M
0.0%
0.10
30.00
3.00
Nails M
0.0%
5.00
1.00
5.00
Material Rate
0.00
Plant Rate
0.00
Amount
12.50
5.00
BSR Reference
20-06-40
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
Carpenter M2
0.0%
3.00
45.00
135.00
Mason M2
0.0%
0.60
45.00
27.00
Painter M2
0.0%
1.00
40.00
40.00
Unskilled Labour M2
0.0%
4.75
30.00
142.50
0.0%
1.70
45.00
76.50
0.0%
0.10
50.00
5.00
0.0%
25.00
2.50
62.50
M2
0.0%
3.60
9.00
32.40
0.0%
0.03
30,000.00
900.00
Wood plugs M2
0.0%
2.50
80.00
200.00
Wood Preservative M2
0.0%
1.50
110.00
165.00
Nails M2
0.0%
25.00
1.00
25.00
Material Rate
Plant Rate
1,441.40
0.00
1,810.90
1,466.40
BSR Reference
20-06-41
Description
Unit
Resource Unit
Labour Sub-Contract Rate M2
Wastag
M2
Quantit
Rate Type
Amount
0.0%
201.88
1.00
201.88
Carpenter M
0.0%
0.15
45.00
6.75
Carpenter M2
0.0%
2.00
45.00
90.00
Painter M2
0.0%
1.00
40.00
40.00
Unskilled Labour M
0.0%
0.15
30.00
4.50
Unskilled Labour M2
0.0%
2.75
30.00
82.50
0.0%
1.08
200.00
215.60
0.0%
5.30
2.50
13.25
0.0%
1.00
45.00
45.00
Emulsion M2
0.0%
0.04
200.00
8.00
0.0%
0.01
50.00
0.50
0.0%
0.02
250.00
5.00
0.0%
2.10
26.00
54.60
0.0%
0.01
30,000.00
390.00
0.0%
0.03
45.00
1.35
Wood plugs M2
0.0%
1.50
80.00
120.00
Wood Preservative M2
0.0%
0.08
110.00
9.24
0.0%
2.50
1.00
2.50
0.0%
5.00
1.00
5.00
Nails M
Material Rate
Plant Rate
862.54
0.00
1,093.79
1,071.91
BSR Reference
20-06-42
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
71.25
1.00
71.25
Carpenter M
0.0%
0.10
45.00
4.50
Carpenter M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.00
30.00
30.00
Unskilled Labour M
0.0%
0.15
30.00
4.50
Lunumidella 150mm*20mm M2
0.0%
1.10
270.00
297.00
0.0%
0.00
45.00
0.18
0.0%
5.00
1.00
5.00
0.0%
2.00
1.00
2.00
Nails M
Scafolding M2
Material Rate
297.18
Plant Rate
0.00
BSR Reference
20-06-43
Description
388.18
375.43
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
71.25
1.00
71.25
Carpenter M2
0.0%
1.00
45.00
45.00
Carpenter M
0.0%
0.15
45.00
6.75
Unskilled Labour M
0.0%
0.15
30.00
4.50
Unskilled Labour M2
0.0%
1.00
30.00
30.00
0.0%
0.00
45.00
0.18
0.0%
5.00
1.00
5.00
0.0%
2.00
1.00
2.00
Nails M
Scafolding M2
Material Rate
0.18
93.43
Plant Rate
0.00
78.43
BSR Reference
20-06-44
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
71.25
1.00
71.25
Carpenter M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.00
30.00
30.00
0.0%
0.00
45.00
0.18
Scafolding M2
0.0%
2.00
1.00
2.00
Material Rate
0.18
77.18
Plant Rate
0.00
73.43
BSR Reference
20-07-50
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M2
Quantit
Rate Type
Amount
0.0%
64.55
1.00
64.55
Mason M2
0.0%
0.65
45.00
29.25
Unskilled Labour M2
0.0%
1.29
30.00
38.70
Boiled lime M2
0.0%
2.40
4.00
9.60
Cement M2
0.0%
0.09
340.00
29.24
Sand M2
0.0%
0.02
350.00
7.35
46.19
0.00
114.14
110.74
BSR Reference
20-07-51
Description
Wall plaster using 1:1:6 Cement:lime:sand mix, smooth with lime putty
Unit
Resource Unit
Wastag
M2
Quantit
92.63
1.00
92.63
Mason M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.75
30.00
52.50
Boiled lime M2
0.0%
0.03
4.00
0.12
Cement M2
0.0%
0.09
340.00
30.60
Sand M2
0.0%
0.02
350.00
7.35
Plant Rate
38.07
0.00
135.57
130.70
BSR Reference
20-07-52
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M2
Quantit
Rate Type
Amount
Mason M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.25
30.00
37.50
Cement M2
0.0%
0.09
340.00
29.24
Clay M2
0.0%
0.01
120.00
1.44
Sand M2
0.0%
0.02
350.00
8.40
39.08
0.00
121.58
39.08
BSR Reference
20-07-53
Description
Wall plaster using 1:4:8 Cement:soil:sand mix, smooth with lime putty
Unit
Resource Unit
Material Rate
Wastag
Quantit
Rate Type
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.25
30.00
37.50
Boiled lime M2
0.0%
3.00
4.00
12.00
Cement M2
0.0%
0.09
340.00
29.24
Clay M2
0.0%
0.01
120.00
1.44
Sand M2
0.0%
0.02
350.00
8.40
0.00
20-07-54
Description
Wall plaster using 1:3 Cement:sand mix, smooth with cement slurry
Unit
Resource Unit
Wastag
M2
Quantit
Amount
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.25
30.00
37.50
Cement M2
0.0%
0.09
340.00
29.24
Sand M2
0.0%
0.01
350.00
3.15
0.00
114.89
20-07-55
Description
Unit
Resource Unit
Plant Rate
Rate Type
0.0%
BSR Reference
Material Rate
51.08
Mason M2
32.39
Plant Rate
133.58
BSR Reference
Material Rate
Amount
Mason M2
51.08
Plant Rate
M2
Wastag
32.39
M2
Quantit
Rate Type
Amount
0.0%
28.36
1.00
28.36
Mason M2
0.0%
0.33
45.00
14.85
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.02
350.00
5.95
0.0%
92.00
5.00
460.00
533.95
0.00
563.80
562.31
BSR Reference
20-07-56
Description
Unit
Resource Unit
Wastag
M2
Quantit
28.36
1.00
28.36
Mason M2
0.0%
0.33
45.00
14.85
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.02
350.00
5.95
0.0%
92.00
5.00
460.00
533.95
Plant Rate
0.00
563.80
562.31
BSR Reference
20-07-57
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
28.36
1.00
28.36
Mason M2
0.0%
0.33
45.00
14.85
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.02
350.00
5.95
Material Rate
73.95
Plant Rate
0.00
103.80
102.31
BSR Reference
20-07-58
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M2
Quantit
Rate Type
Amount
0.0%
28.36
1.00
28.36
Mason M2
0.0%
0.33
45.00
14.85
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.02
350.00
5.95
73.95
0.00
103.80
102.31
BSR Reference
20-07-70
Description
Unit
Resource Unit
Material Rate
Wastag
Quantit
Rate Type
0.0%
0.50
45.00
22.50
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Brick : common M2
0.0%
0.04
2,200.00
88.00
0.00
125.50
88.00
BSR Reference
20-07-71
Description
Cement rendering using 1:3 cement:sand mix, smooth with neat cement slurry
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
79.80
1.00
79.80
Mason M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
Cement M2
0.0%
0.12
340.00
39.10
Sand M2
0.0%
0.01
350.00
5.25
44.35
Plant Rate
0.00
128.35
124.15
BSR Reference
20-07-72
Description
Cement rendering using 1:4 cement:sand mix, smooth with neat cement slurry
Unit
Resource Unit
Plant Rate
Amount
Material Rate
Material Rate
Amount
Mason M2
88.00
Plant Rate
M2
Wastag
M2
Quantit
Rate Type
Amount
0.0%
79.80
1.00
79.80
Mason M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
Cement M2
0.0%
0.12
340.00
39.10
Sand M2
0.0%
0.02
350.00
5.60
44.70
0.00
128.70
124.50
BSR Reference
20-07-73
Description
Cement rendering using 1:5 cement:sand mix, smooth with neat cement slurry
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
79.80
1.00
79.80
Mason M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
Cement M2
0.0%
0.12
340.00
39.10
Sand M2
0.0%
0.02
350.00
7.00
Material Rate
46.10
Plant Rate
0.00
130.10
125.90
BSR Reference
20-07-74
Description
Cement rendering using 1:3 cement:sand mix, smooth with neat cement slurry, Colour
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
79.80
1.00
79.80
Mason M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
Cement M2
0.0%
0.12
340.00
39.10
0.0%
0.07
200.00
14.60
Sand M2
0.0%
0.01
350.00
5.25
Material Rate
Plant Rate
Amount
58.95
0.00
142.95
138.75
BSR Reference
20-07-75
Description
Cement rendering using 1:4 cement:sand mix, smooth with neat cement slurry, Colour
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
79.80
1.00
79.80
Mason M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
Cement M2
0.0%
0.12
340.00
39.10
0.0%
0.07
200.00
14.60
Sand M2
0.0%
0.02
350.00
5.60
Material Rate
59.30
Plant Rate
0.00
143.30
139.10
BSR Reference
20-07-76
Description
Cement rendering using 1:5 cement:sand mix, smooth with neat cement slurry, Colour
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
79.80
1.00
79.80
Mason M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
Cement M2
0.0%
0.12
340.00
39.10
0.0%
0.07
200.00
14.60
Sand M2
0.0%
0.02
350.00
7.00
Material Rate
Plant Rate
Amount
60.70
0.00
144.70
140.50
BSR Reference
20-07-77
Description
Fixing floor tiles (local) including bedding but excluding concrete base
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
28.36
1.00
28.36
Mason M2
0.0%
0.33
45.00
14.85
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Cement M2
0.0%
0.20
340.00
68.00
0.0%
26.00
25.00
650.00
Sand M2
0.0%
0.02
350.00
5.95
Material Rate
723.95
Plant Rate
0.00
753.80
752.31
BSR Reference
20-07-78
Description
Fixing floor tiles (imported) including bedding but excluding concrete base
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M2
Quantit
Rate Type
Amount
0.0%
28.36
1.00
28.36
Mason M2
0.0%
0.33
45.00
14.85
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.02
350.00
5.95
73.95
0.00
103.80
102.31
BSR Reference
20-07-90
Description
Timber doors, 750X2100mm size 50X100 frame with imported timber, plywood door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
950.00
1.00
950.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
1.00
1,500.00
1,500.00
0.0%
40.00
2.50
100.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
2,820.00
Plant Rate
0.00
2,970.00
3,920.00
BSR Reference
20-08-01
Description
Timber doors, 900X2100mm size 50X100 frame with imported timber, plywood door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
950.00
1.00
950.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
1.00
1,500.00
1,500.00
0.0%
40.00
2.50
100.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
2,820.00
0.00
2,970.00
3,920.00
BSR Reference
20-08-02
Description
Timber doors, 1000X2100mm size 50X100 frame with imported timber, plywood door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
1,010.00
1.00
1,010.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
1.00
1,500.00
1,500.00
0.0%
40.00
2.50
100.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
2,820.00
Plant Rate
0.00
2,970.00
3,980.00
BSR Reference
20-08-03
Description
Timber doors, 750X2100mm size 75X100 frame with imported timber, plywood door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
950.00
1.00
950.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
1.00
1,500.00
1,500.00
0.0%
40.00
2.50
100.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
2,820.00
0.00
2,970.00
3,920.00
BSR Reference
20-08-04
Description
Timber doors, 900X2100mm size 75X100 frame with imported timber, plywood door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
950.00
1.00
950.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
1.00
1,500.00
1,500.00
0.0%
40.00
2.50
100.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
2,820.00
Plant Rate
0.00
2,970.00
3,920.00
BSR Reference
20-08-05
Description
Timber doors, 1000X2100mm size 75X100 frame with imported timber, plywood door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
1,010.00
1.00
1,010.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
1.00
1,500.00
1,500.00
0.0%
40.00
2.50
100.00
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
2,820.00
0.00
2,821.00
3,831.00
BSR Reference
20-08-06
Description
Timber doors, 750X2100mm size 75X100 frame with imported timber, timber pannel door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
2,850.00
1.00
2,850.00
0.0%
3,000.00
1.00
3,000.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
1.60
1,000.00
1,600.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
2,920.00
Plant Rate
0.00
3,070.00
8,920.00
BSR Reference
20-08-07
Description
Timber doors, 900X2100mm size 75X100 frame with imported timber, timber pannel door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3,425.00
1.00
3,425.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
1.90
1,000.00
1,900.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
3,220.00
0.00
3,370.00
6,795.00
BSR Reference
20-08-08
Description
Timber doors, 1000X2100mm size 75X100 frame with imported timber, timber pannel door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3,675.00
1.00
3,675.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.10
1,000.00
2,100.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
3,420.00
Plant Rate
0.00
3,570.00
7,245.00
BSR Reference
20-08-09
Description
Timber doors, 1150X2100mm size 75X100 frame with imported timber, timber pannel door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4,120.00
1.00
4,120.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.50
1,000.00
2,500.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
3,820.00
0.00
3,970.00
8,090.00
BSR Reference
20-08-10
Description
Timber doors, 900X2400mm size 75X100 frame with imported timber, timber pannel door,
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3,750.00
1.00
3,750.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.20
1,000.00
2,200.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
3,520.00
Plant Rate
0.00
3,670.00
7,420.00
BSR Reference
20-08-11
Description
Timber doors, 1000X2400mm size 75X100 frame with imported timber, timber pannel door,
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4,000.00
1.00
4,000.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.40
1,000.00
2,400.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
3,720.00
0.00
3,870.00
7,870.00
BSR Reference
20-08-12
Description
Timber doors, 1150X2400mm size 75X100 frame with imported timber, timber pannel door ,
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4,700.00
1.00
4,700.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
0.80
32.00
0.0%
2.80
1,000.00
2,800.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
4,052.00
Plant Rate
0.00
4,202.00
8,902.00
BSR Reference
20-08-13
Description
Timber doors, 750X2100mm size 75X100 frame with local timber, timber pannel door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
2,850.00
1.00
2,850.00
0.0%
2,850.00
1.00
2,850.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
1.60
1,000.00
1,600.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
2,920.00
0.00
3,070.00
8,770.00
BSR Reference
20-08-14
Description
Timber doors, 900X2100mm size 75X100 frame with local timber, timber pannel door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3,500.00
1.00
3,500.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
1.90
1,000.00
1,900.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
3,220.00
Plant Rate
0.00
3,370.00
6,870.00
BSR Reference
20-08-15
Description
Timber doors, 1000X2100mm size 75X100 frame with local timber, timber pannel door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3,675.00
1.00
3,675.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.10
1,000.00
2,100.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
3,420.00
0.00
3,570.00
7,245.00
BSR Reference
20-08-16
Description
Timber doors, 1150X2100mm size 75X100 frame with local timber, timber pannel door
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4,000.00
1.00
4,000.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.40
1,000.00
2,400.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
3,720.00
Plant Rate
0.00
3,870.00
7,870.00
BSR Reference
20-08-17
Description
Timber doors, 900X2400mm size 75X100 frame with local timber, timber pannel door, slates
Unit
Nos.
on top
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3,800.00
1.00
3,800.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.16
1,000.00
2,160.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
3,480.00
0.00
3,630.00
7,430.00
BSR Reference
20-08-18
Description
Timber doors, 1000X2 400mm size 75X100 frame with local timber, timber pannel
Unit
Nos.
door,slates on top
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4,200.00
1.00
4,200.00
0.0%
4,000.00
1.00
4,000.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.40
1,000.00
2,400.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
3,720.00
Plant Rate
0.00
3,870.00
12,070.00
BSR Reference
20-08-19
Description
Timber doors, 1150X2400mm size 75X100 frame with local timber, timber pannel door,
Unit
Nos.
slates on top
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4,700.00
1.00
4,700.00
0.0%
3.00
40.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
40.00
2.50
100.00
0.0%
2.76
1,000.00
2,760.00
0.0%
100.00
1.00
100.00
0.0%
50.00
1.00
50.00
Material Rate
Plant Rate
4,080.00
0.00
4,230.00
8,930.00
BSR Reference
20-08-20
Description
Timber glazed windows, 1200X1200mm size, 50X100mm frame, imported timber, sahses
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3,135.00
1.00
3,135.00
0.0%
2,268.60
1.00
2,268.60
Nos.
0.0%
2.00
70.00
140.00
0.0%
2.00
90.00
180.00
0.0%
1.44
192.00
276.48
0.0%
4.00
56.00
224.00
0.0%
15.00
1.80
27.00
0.0%
0.40
850.00
340.00
Nos.
0.0%
6.00
69.00
414.00
0.0%
9.00
9.00
81.00
0.0%
0.72
1,400.00
1,008.00
0.0%
30.00
1.00
30.00
Material Rate
2,690.48
Plant Rate
0.00
2,720.48
8,124.08
BSR Reference
20-08-21
Description
Timber glazed windows, 1800X1200mm size, 50X100mm frame, imported timber, sahses
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4,615.00
1.00
4,615.00
0.0%
2,268.60
1.00
2,268.60
Nos.
0.0%
3.00
70.00
210.00
0.0%
3.00
90.00
270.00
0.0%
2.16
192.00
414.72
0.0%
6.00
56.00
336.00
0.0%
25.00
1.80
45.00
0.0%
0.60
850.00
510.00
Nos.
0.0%
9.00
69.00
621.00
0.0%
13.00
9.00
117.00
0.0%
1.08
1,400.00
1,512.00
0.0%
30.00
1.00
30.00
Material Rate
4,035.72
4,065.72
Plant Rate
0.00
10,949.32
BSR Reference
20-08-22
Description
Timber glazed windows, 1200X1500mm size, 50X100mm frame, imported timber, sahses
Unit
Nos.
with 25X100mm rails, 5mm thick glass, 300mm high top opening with slates or similar
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3,965.00
1.00
3,965.00
0.0%
2,268.60
1.00
2,268.60
Nos.
0.0%
2.00
70.00
140.00
0.0%
2.00
90.00
180.00
0.0%
1.80
192.00
345.60
0.0%
4.00
56.00
224.00
0.0%
15.00
1.80
27.00
0.0%
0.50
850.00
425.00
Nos.
0.0%
6.00
69.00
414.00
0.0%
11.00
9.00
99.00
0.0%
1.02
1,400.00
1,428.00
0.0%
30.00
1.00
30.00
Material Rate
3,282.60
Plant Rate
0.00
3,312.60
9,546.20
BSR Reference
20-08-23
Description
Timber glazed windows, 1800X1500mm size, 50X100mm frame, imported timber, sahses
Unit
M2
with 25X100mm rails, 5mm thick glass , 300mm high top opening with slates or similar
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4,970.00
1.00
4,970.00
0.0%
2,268.60
1.00
2,268.60
M2
0.0%
3.00
70.00
210.00
0.0%
3.00
90.00
270.00
0.0%
2.16
192.00
414.72
0.0%
6.00
56.00
336.00
0.0%
25.00
1.80
45.00
0.0%
0.80
850.00
680.00
M2
0.0%
9.00
69.00
621.00
0.0%
13.00
9.00
117.00
0.0%
1.53
1,400.00
2,142.00
Sand paper M2
0.0%
30.00
1.00
30.00
Material Rate
4,835.72
4,865.72
Plant Rate
0.00
12,104.32
BSR Reference
20-08-24
Description
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3,135.00
1.00
3,135.00
0.0%
2,268.60
1.00
2,268.60
M2
0.0%
2.00
70.00
140.00
0.0%
2.00
90.00
180.00
0.0%
1.44
192.00
276.48
0.0%
4.00
56.00
224.00
0.0%
15.00
1.80
27.00
0.0%
9.00
10.00
90.00
0.0%
0.40
850.00
340.00
M2
0.0%
6.00
69.00
414.00
0.0%
0.72
450.00
324.00
Sand paper M2
0.0%
30.00
1.00
30.00
Material Rate
2,015.48
Plant Rate
0.00
2,045.48
7,449.08
BSR Reference
20-08-25
Description
Unit
M2
Mahagony), sahses with 25X100mm rails, 5mm thick glass , 300mm high top opening with
slates or similar
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4,615.00
1.00
4,615.00
0.0%
2,268.60
1.00
2,268.60
M2
0.0%
3.00
70.00
210.00
0.0%
3.00
90.00
270.00
0.0%
2.16
192.00
414.72
0.0%
6.00
56.00
336.00
0.0%
25.00
1.80
45.00
0.0%
13.00
10.00
130.00
0.0%
0.60
850.00
510.00
M2
0.0%
9.00
69.00
621.00
0.0%
1.08
450.00
486.00
Sand paper M2
0.0%
30.00
1.00
30.00
Material Rate
3,022.72
3,052.72
Plant Rate
0.00
9,936.32
BSR Reference
20-08-26
Description
Unit
M2
Mahagony), sahses with 25X100mm rails, 5mm thick glass , 300mm high top opening with
slates or similar
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3,965.00
1.00
3,965.00
0.0%
2,268.60
1.00
2,268.60
M2
0.0%
2.00
70.00
140.00
0.0%
2.00
90.00
180.00
0.0%
1.80
192.00
345.60
0.0%
4.00
56.00
224.00
0.0%
15.00
1.80
27.00
0.0%
11.00
10.00
110.00
0.0%
0.50
850.00
425.00
M2
0.0%
6.00
69.00
414.00
0.0%
1.02
450.00
459.00
Sand paper M2
0.0%
30.00
1.00
30.00
Material Rate
2,324.60
Plant Rate
0.00
2,354.60
8,588.20
BSR Reference
20-09-40
Description
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
532.00
1.00
532.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
1.00
60.00
60.00
0.0%
1.00
400.00
400.00
0.0%
1.00
1,200.00
1,200.00
0.0%
1.00
1,600.00
1,600.00
0.0%
1.00
75.00
75.00
0.0%
7.00
1.00
7.00
Transport Nos.
0.0%
100.00
1.00
100.00
3,335.00
0.00
4,002.00
3,974.00
BSR Reference
20-09-41
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
532.00
1.00
532.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
1.00
60.00
60.00
0.0%
1.00
400.00
400.00
0.0%
1.00
75.00
75.00
0.0%
7.00
1.00
7.00
Transport Nos.
0.0%
100.00
1.00
100.00
Material Rate
535.00
Plant Rate
0.00
1,202.00
1,174.00
BSR Reference
20-09-42
Description
Fixing WC imported (American Standard or Armitage Shank) close couple with systen and
Unit
Nos.
necessary accessories
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
532.00
1.00
532.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
1.00
60.00
60.00
0.0%
1.00
400.00
400.00
0.0%
1.00
75.00
75.00
0.0%
7.00
1.00
7.00
Transport Nos.
0.0%
100.00
1.00
100.00
535.00
0.00
1,202.00
1,174.00
BSR Reference
20-09-43
Description
Fixing WC imported (high standard) close couple with systen and necessary accessories
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
0.0%
532.00
1.00
532.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
1.00
60.00
60.00
0.0%
1.00
400.00
400.00
0.0%
1.00
75.00
75.00
0.0%
7.00
1.00
7.00
Transport Nos.
0.0%
100.00
1.00
100.00
Material Rate
535.00
Plant Rate
0.00
1,202.00
1,174.00
BSR Reference
20-09-44
Description
Fixing wahsh basin Ceylon ceramic with necessary accessories using brackets
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
365.75
1.00
365.75
Plumber Nos.
0.0%
5.50
40.00
220.00
0.0%
5.50
30.00
165.00
0.0%
1.00
1,800.00
1,800.00
0.0%
1.00
55.00
55.00
0.0%
5.00
1.00
5.00
Material Rate
Plant Rate
Amount
1,855.00
0.00
2,245.00
2,225.75
BSR Reference
20-09-45
Description
Fixing wahsh basin Ceylon ceramic Pedestal type with necessary accessories
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
617.50
1.00
617.50
Mason Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
1.00
3,700.00
3,700.00
0.0%
10.00
1.00
10.00
Material Rate
3,700.00
Plant Rate
0.00
4,360.00
4,327.50
BSR Reference
20-09-46
Description
Fixing wahsh basin Imported (American Standard or Armitage Shank) Pedestal type with
Unit
Nos.
necessary accessories
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
617.50
1.00
617.50
Mason Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
10.00
1.00
10.00
Material Rate
0.00
660.00
Plant Rate
0.00
627.50
BSR Reference
20-09-47
Description
Fixing wahsh basin Imported (high standard) Pedestal type with necessary accessories
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
617.50
1.00
617.50
Mason Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
10.00
1.00
10.00
Material Rate
0.00
660.00
Plant Rate
0.00
627.50
BSR Reference
20-09-50
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-51
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-52
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-53
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-54
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-56
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-57
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-59
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-60
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-61
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
25.00
1.00
25.00
Material Rate
0.00
95.00
Plant Rate
0.00
25.00
BSR Reference
20-09-62
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Plumber Nos.
0.0%
1.00
40.00
40.00
Plumber Nos.
0.0%
0.75
40.00
30.00
0.0%
0.75
30.00
22.50
0.0%
1.00
30.00
30.00
0.0%
2.00
3.00
6.00
0.0%
1.00
175.00
175.00
0.0%
25.00
1.00
25.00
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
181.00
0.00
330.50
257.88
BSR Reference
20-09-63
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Plumber Nos.
0.0%
0.75
40.00
30.00
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
0.75
30.00
22.50
0.0%
2.00
3.00
6.00
0.0%
2.00
1.00
2.00
0.0%
25.00
1.00
25.00
Material Rate
6.00
Plant Rate
0.00
BSR Reference
20-09-70
Description
Resource Unit
Unit
Wastag
155.50
82.88
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber M
0.0%
0.10
40.00
4.00
Unskilled Labour M
0.0%
0.10
30.00
3.00
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
0.00
8.00
Plant Rate
0.00
7.65
BSR Reference
20-09-71
Description
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber M
0.0%
0.10
40.00
4.00
Unskilled Labour M
0.0%
0.10
30.00
3.00
0.0%
1.10
16.00
17.60
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
17.60
Plant Rate
0.00
BSR Reference
20-09-72
Description
Resource Unit
25.60
25.25
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber M
0.0%
0.10
40.00
4.00
Unskilled Labour M
0.0%
0.10
30.00
3.00
0.0%
1.10
26.00
28.60
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
28.60
Plant Rate
0.00
BSR Reference
20-09-73
Description
Resource Unit
36.60
36.25
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber M
0.0%
0.13
40.00
5.00
Unskilled Labour M
0.0%
0.13
30.00
3.75
0.0%
1.10
42.00
46.20
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
Unit
46.20
0.00
55.95
55.51
BSR Reference
20-09-74
Description
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber M
0.0%
0.13
40.00
5.00
Unskilled Labour M
0.0%
0.13
30.00
3.75
0.0%
1.10
61.00
67.10
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
67.10
Plant Rate
0.00
BSR Reference
20-09-75
Description
Resource Unit
77.35
76.91
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber M
0.0%
0.20
40.00
8.00
Unskilled Labour M
0.0%
0.20
30.00
6.00
0.0%
1.10
94.00
103.40
Other expenses M
150.0
0.00
1.00
0.00
Material Rate
103.40
Plant Rate
0.00
BSR Reference
20-09-76
Description
Resource Unit
117.40
116.70
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber M
0.0%
0.20
40.00
8.00
Unskilled Labour M
0.0%
0.20
30.00
6.00
0.0%
1.10
230.00
253.00
Other expenses M
150.0
0.00
1.00
0.00
Material Rate
Plant Rate
Unit
253.00
0.00
267.00
266.30
BSR Reference
20-09-81
Description
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber M
0.0%
0.13
40.00
5.00
Unskilled Labour M
0.0%
0.13
30.00
3.75
0.0%
1.10
42.00
46.20
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
46.20
Plant Rate
0.00
BSR Reference
20-09-82
Description
Resource Unit
55.95
55.51
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber M
0.0%
0.13
40.00
5.00
Unskilled Labour M
0.0%
0.13
30.00
3.75
0.0%
1.10
61.00
67.10
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
67.10
Plant Rate
0.00
BSR Reference
20-09-83
Description
Resource Unit
77.35
76.91
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber M
0.0%
0.20
40.00
8.00
Unskilled Labour M
0.0%
0.20
30.00
6.00
0.0%
1.10
94.00
103.40
Other expenses M
150.0
0.00
1.00
0.00
Material Rate
Plant Rate
Unit
103.40
0.00
117.40
116.70
BSR Reference
20-09-84
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber M
0.0%
0.20
40.00
8.00
Unskilled Labour M
0.0%
0.20
30.00
6.00
0.0%
1.10
150.00
165.00
Other expenses M
150.0
0.00
1.00
0.00
Material Rate
165.00
Plant Rate
0.00
BSR Reference
20-09-85
Description
Resource Unit
179.00
178.30
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber M
0.0%
0.20
40.00
8.00
Unskilled Labour M
0.0%
0.20
30.00
6.00
0.0%
1.10
230.00
253.00
Other expenses M
150.0
0.00
1.00
0.00
Material Rate
Plant Rate
253.00
0.00
BSR Reference
20-09-90
Description
Resource Unit
267.00
266.30
Unit
Wastag
Quantit
Rate Type
Amount
Plumber M
0.0%
0.50
40.00
20.00
Unskilled Labour M
0.0%
0.50
30.00
15.00
0.0%
2.00
8.50
17.00
0.0%
4.00
12.00
48.00
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
65.00
0.00
102.00
67.00
BSR Reference
20-09-91
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
Plumber M
0.0%
0.50
40.00
20.00
Unskilled Labour M
0.0%
0.50
30.00
15.00
0.0%
2.00
8.50
17.00
0.0%
4.00
12.00
48.00
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
65.00
0.00
BSR Reference
20-09-92
Description
Unit
Resource Unit
Material Rate
Plant Rate
102.00
Wastag
67.00
Quantit
Rate Type
Amount
Mason M
0.0%
0.03
45.00
1.35
Plumber M
0.0%
0.24
40.00
9.60
Unskilled Labour M
0.0%
5.60
30.00
168.00
Cement M
0.0%
0.42
340.00
142.80
Metal 25mm M
0.0%
0.08
900.00
72.00
Sand M
0.0%
0.05
350.00
15.75
Transport M
0.0%
5.00
1.00
5.00
230.55
0.00
414.50
235.55
BSR Reference
20-09-93
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
Mason M
0.0%
0.03
45.00
1.35
Plumber M
0.0%
0.24
40.00
9.60
Unskilled Labour M
0.0%
5.60
30.00
168.00
Cement M
0.0%
0.42
340.00
142.80
Metal 25mm M
0.0%
0.08
900.00
72.00
0.0%
1.00
330.00
330.00
Sand M
0.0%
0.05
350.00
15.75
Transport M
0.0%
5.00
1.00
5.00
Material Rate
560.55
Plant Rate
0.00
744.50
565.55
BSR Reference
20-09-96
Description
Stainless steel kitchen sink with plumber pillar tap, 1200mm size
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
365.75
1.00
365.75
Plumber Nos.
0.0%
5.50
40.00
220.00
0.0%
5.50
30.00
165.00
0.0%
5.00
1.00
5.00
Material Rate
0.00
390.00
Plant Rate
0.00
370.75
BSR Reference
20-09-97
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
Plumber Nos.
0.0%
0.30
40.00
12.00
0.0%
0.30
30.00
9.00
0.0%
3.00
1.00
3.00
Material Rate
0.00
Plant Rate
0.00
24.00
3.00
BSR Reference
20-10-00
Description
Walls with immulsion paint, one filller coat, one primer coat and two coats of emulsion
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
11.40
1.00
11.40
Painter M2
0.0%
0.30
40.00
12.00
Paint Emultion M2
0.0%
0.08
200.00
16.20
Brushes etc. M2
0.0%
0.15
1.00
0.15
Material Rate
16.20
Plant Rate
0.00
BSR Reference
20-10-01
Description
28.35
27.75
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
9.98
1.00
9.98
Painter M2
0.0%
0.15
40.00
6.00
Unskilled Labour M2
0.0%
0.15
30.00
4.50
Cement M2
0.0%
0.01
340.00
2.38
Brushes etc. M2
0.0%
0.20
1.00
0.20
Material Rate
2.38
13.08
Plant Rate
0.00
12.56
BSR Reference
20-10-02
Description
Unit
Resource Unit
Quantit
Rate Type
Amount
0.0%
10.94
1.00
10.94
Painter M2
0.0%
0.15
40.00
6.00
Unskilled Labour M2
0.0%
0.18
30.00
5.52
Glue M2
0.0%
0.00
95.00
0.00
Slaked lime M2
0.0%
0.30
2,850.00
843.60
Yellow ochre M2
0.0%
0.00
15.00
0.00
0.0%
1.50
1.00
1.50
Material Rate
Plant Rate
Wastag
M2
843.60
0.00
856.62
856.04
BSR Reference
20-10-03
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
9.98
1.00
9.98
Painter M2
0.0%
0.15
40.00
6.00
Unskilled Labour M2
0.0%
0.15
30.00
4.50
Cement M2
0.0%
0.01
340.00
2.38
Brushes etc. M2
0.0%
0.20
1.00
0.20
Material Rate
2.38
13.08
Plant Rate
0.00
12.56
BSR Reference
20-10-04
Description
Tiimber with enamel paint, one coat of aluminum primer and two coats of enamel paint
Unit
Resource Unit
Wastag
M2
Quantit
0.0%
16.34
1.00
16.34
Painter M2
0.0%
0.43
40.00
17.20
Paint Enamel M2
0.0%
0.08
260.00
21.06
Brushes etc. M2
0.0%
0.40
1.00
0.40
21.06
Plant Rate
0.00
38.66
37.80
BSR Reference
20-10-05
Description
Tiimber with vanish, one coat of primer and two coats of vanish
Unit
Resource Unit
Plant Rate
Amount
Material Rate
Material Rate
Rate Type
Wastag
M2
Quantit
Rate Type
Amount
0.0%
23.75
1.00
23.75
Painter M2
0.0%
0.40
40.00
16.00
Unskilled Labour M2
0.0%
0.30
30.00
9.00
Polyrethane varnish M2
0.0%
0.10
250.00
24.25
Brushes etc. M2
0.0%
0.35
1.00
0.35
24.25
0.00
49.60
48.35
BSR Class
IRON MONGER
BSR Reference
09-00-01
Description
Supplying and fixing of 45mm * 6mm bolts and nuts with washers.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
5.34
1.00
5.34
Carpenter Nos.
0.0%
0.13
45.00
5.63
0.0%
1.00
10.00
10.00
0.0%
0.20
1.00
0.20
Material Rate
10.00
Plant Rate
0.00
15.83
15.54
BSR Reference
09-00-02
Description
Supplying and fixing of 65mm * 10mm iron bolts and nuts with washers.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Nos.
0.0%
0.25
45.00
11.25
0.0%
1.00
18.00
18.00
0.0%
0.20
1.00
0.20
Material Rate
18.00
Plant Rate
0.00
29.45
28.89
BSR Reference
09-00-03
Description
Supplying and fixing of 125mm * 10mm iron bolts and nuts with washers.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
0.0%
1.00
25.00
25.00
0.0%
0.50
1.00
0.50
Material Rate
Plant Rate
25.00
0.00
40.35
39.61
BSR Reference
09-00-04
Description
Supplying and fixing of 225mm * 10mm iron bolts and nuts with washers.
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
Nos.
0.0%
1.00
40.00
40.00
0.0%
0.50
1.00
0.50
Material Rate
40.00
Plant Rate
0.00
63.00
61.88
BSR Reference
09-00-05
Description
Supplying and fixing of 65mm * 12mm iron bolts and nuts with washers.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
0.0%
1.00
40.00
40.00
0.0%
0.30
1.00
0.30
Material Rate
40.00
Plant Rate
0.00
55.15
54.41
BSR Reference
09-00-06
Description
Supplying and fixing of 150mm * 10mm iron bolts and nuts with washers.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
14.24
1.00
14.24
Carpenter Nos.
0.0%
0.33
45.00
14.99
0.0%
1.00
45.00
45.00
0.0%
0.50
1.00
0.50
Material Rate
Plant Rate
45.00
0.00
60.49
59.74
BSR Reference
09-00-07
Description
Supplying of 75mm iron heavy quaLitery tower bolts and fixing with iron screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
0.0%
14.24
1.00
14.24
Carpenter Nos.
0.0%
0.33
45.00
14.99
0.0%
1.00
15.00
15.00
0.0%
0.50
5.00
2.50
Material Rate
17.50
Plant Rate
0.00
32.49
31.74
BSR Reference
09-00-08
Description
Supplying of 100mm iron heavy quaLitery tower bolts and fixing with iron screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
0.0%
14.24
1.00
14.24
Carpenter Nos.
0.0%
0.33
45.00
14.99
0.0%
1.00
18.00
18.00
0.0%
0.50
5.00
2.50
20.50
Plant Rate
0.00
35.49
34.74
BSR Reference
09-00-09
Description
Supplying of 125mm iron heavy quaLitery tower bolts and fixing with iron screws.
Resource Unit
Plant Rate
Amount
Material Rate
Material Rate
Amount
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
14.24
1.00
14.24
Carpenter Nos.
0.0%
0.33
45.00
14.99
0.0%
1.00
20.00
20.00
0.0%
0.75
5.00
3.75
23.75
0.00
38.74
37.99
BSR Reference
09-00-10
Description
Supplying of 150mm iron heavy quaLitery tower bolts and fixing with iron screws.
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
14.24
1.00
14.24
Carpenter Nos.
0.0%
0.33
45.00
14.99
0.0%
1.00
25.00
25.00
0.0%
0.75
5.00
3.75
Material Rate
28.75
Plant Rate
0.00
43.74
42.99
BSR Reference
09-00-11
Description
Making 1000mm (approx) iron brackets out of 40mm * 6mm flat iron with fish tail at end
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
102.60
1.00
102.60
Carpenter Nos.
0.0%
2.40
45.00
108.00
0.0%
2.27
38.00
86.26
0.0%
5.00
1.00
5.00
Material Rate
86.26
Plant Rate
0.00
199.26
193.86
BSR Reference
09-00-12
Description
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
142.50
1.00
142.50
Carpenter M2
0.0%
2.00
45.00
90.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
0.0%
1.17
100.00
117.00
Staples M2
0.0%
6.00
1.00
6.00
Material Rate
Plant Rate
117.00
0.00
273.00
265.50
BSR Reference
09-00-13
Description
Sub. of 50*50mm GI weldmesh (gauge 10) & fixing to window frames with 50*12mm Cl I
Unit
M2
timber beading including painting mesh with red lead & 2 coats of enamel apint, beading
with primer and 2 coats of enamel. Rate to including opening for bolts.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
145.92
1.00
145.92
Carpenter M2
0.0%
2.00
45.00
90.00
Painter M2
0.0%
0.09
40.00
3.60
Unskilled Labour M2
0.0%
2.00
30.00
60.00
0.0%
4.92
7.00
34.44
0.0%
4.10
20.00
82.00
0.0%
1.15
100.00
115.00
Paint etc. M2
0.0%
20.00
1.00
20.00
Material Rate
231.44
Plant Rate
0.00
405.04
397.36
BSR Reference
09-00-14
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Nos.
0.0%
0.25
45.00
11.25
0.0%
1.00
6.00
6.00
Material Rate
6.00
17.25
Plant Rate
0.00
16.69
BSR Reference
09-00-15
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Nos.
0.0%
0.25
45.00
11.25
0.0%
1.10
6.00
6.60
Material Rate
6.60
17.85
Plant Rate
0.00
17.29
BSR Reference
09-00-16
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
0.0%
1.00
12.00
12.00
Material Rate
12.00
Plant Rate
0.00
26.85
26.11
BSR Reference
09-00-17
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
14.11
1.00
14.11
Carpenter Nos.
0.0%
0.33
45.00
14.85
0.0%
1.00
20.00
20.00
Material Rate
20.00
Plant Rate
0.00
34.85
34.11
BSR Reference
09-00-18
Description
Making iron gate with 40*40mm angle iron framework including bracing and horizontal
Unit
M2
centre member with 16mm M.S bar at 150mm centres complete with strap hinges hasp and
staples.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
532.00
1.00
532.00
Black Smith M2
0.0%
8.00
40.00
320.00
Unskilled Labour M2
0.0%
8.00
30.00
240.00
0.0%
4.00
150.00
600.00
Mild Steel M2
0.0%
5.00
33.00
165.00
0.0%
12.00
38.00
456.00
Coal etc. M2
0.0%
60.00
1.00
60.00
Welding works M2
0.0%
300.00
1.00
300.00
1,221.00
0.00
2,141.00
2,113.00
BSR Reference
09-00-19
Description
Supplyinf of 20mm * 3mm qutter hook or brackets and fixing in position with iron screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
0.23
38.00
8.66
0.0%
0.17
6.00
1.02
0.0%
5.00
1.00
5.00
Material Rate
9.68
52.18
Plant Rate
0.00
50.31
BSR Reference
09-00-20
Description
Supplyinf of approved heavy quaLitery type 100mm iron hasp and staples and fixing in
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
20.00
20.00
0.0%
0.50
6.00
3.00
Material Rate
23.00
Plant Rate
0.00
45.50
44.38
BSR Reference
09-00-21
Description
Supplying of approved heavy quaLitery safety type, 150mm iron hasp and staples and
Unit
Nos.
Resource Unit
Quantit
Rate Type
Amount
0.0%
21.38
1.00
21.38
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
1.00
40.00
40.00
0.0%
0.50
6.00
3.00
Material Rate
Plant Rate
Wastag
43.00
0.00
65.50
64.38
BSR Reference
09-00-22
Description
Making 300 * 50mm hasp and staple out of 6mm iron plate and fixing in position with 6 *
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
0.0%
570.00
1.00
570.00
Carpenter Nos.
0.0%
8.00
45.00
360.00
0.0%
8.00
30.00
240.00
0.0%
8.00
10.00
80.00
0.0%
1.15
38.00
43.70
Material Rate
123.70
Plant Rate
0.00
723.70
693.70
BSR Reference
09-00-23
Description
Supplying and fixing of approved heavy quaLitery 50mm iron butt hi.nges
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
28.50
1.00
28.50
Carpenter Nos.
0.0%
0.40
45.00
18.00
0.0%
0.40
30.00
12.00
0.0%
1.00
10.00
10.00
0.0%
0.50
6.00
3.00
Material Rate
13.00
Plant Rate
0.00
43.00
41.50
BSR Reference
09-00-24
Description
Supplying and fixing of approved heavy quaLitery 75mm iron butt hi.nges
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
28.50
1.00
28.50
Carpenter Nos.
0.0%
0.40
45.00
18.00
0.0%
0.40
30.00
12.00
0.0%
1.00
20.00
20.00
0.0%
0.50
6.00
3.00
Material Rate
Plant Rate
Amount
23.00
0.00
53.00
51.50
BSR Reference
09-00-25
Description
Supplying and fixing of approved heavy quaLitery 100mm iron butt hi.nges
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
28.50
1.00
28.50
Carpenter Nos.
0.0%
0.40
45.00
18.00
0.0%
0.40
30.00
12.00
0.0%
1.00
35.00
35.00
0.0%
0.50
6.00
3.00
Material Rate
38.00
Plant Rate
0.00
68.00
66.50
BSR Reference
09-00-26
Description
Supplying and fixing of approved heavy quaLitery 125mm iron butt hi.nges
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
1.00
45.00
45.00
0.0%
0.50
6.00
3.00
Material Rate
48.00
Plant Rate
0.00
85.50
83.63
BSR Reference
09-00-27
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
0.50
6.00
3.00
Material Rate
3.00
40.50
Plant Rate
0.00
38.63
BSR Reference
09-00-28
Description
Supplying and fixing of 40 * 60mm, 300mm long iron strap hinge with necessary bolts and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
185.25
1.00
185.25
Carpenter Nos.
0.0%
3.00
45.00
135.00
0.0%
2.00
30.00
60.00
0.0%
4.00
18.00
72.00
0.0%
0.80
38.00
30.40
0.0%
5.00
1.00
5.00
Material Rate
102.40
Plant Rate
0.00
302.40
292.65
BSR Reference
09-00-29
Description
Supplying and fixing of 50 * 6mm, 900mm long iron strap hinge with necessary bolts and
Unit
Nos.
Resource Unit
Quantit
Rate Type
Amount
0.0%
299.25
1.00
299.25
Carpenter Nos.
0.0%
5.00
45.00
225.00
0.0%
3.00
30.00
90.00
0.0%
6.00
40.00
240.00
0.0%
2.50
38.00
95.00
0.0%
10.00
1.00
10.00
Material Rate
Plant Rate
Wastag
335.00
0.00
660.00
644.25
BSR Reference
09-00-30
Description
Supplying of 60*10*1050mm iron double strap hinges, flat iron bend to shape and fixing
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
342.00
1.00
342.00
0.0%
6.00
40.00
240.00
0.0%
4.00
30.00
120.00
Nos.
0.0%
6.00
40.00
240.00
0.0%
2.20
38.00
83.60
Material Rate
323.60
Plant Rate
0.00
683.60
665.60
BSR Reference
09-00-31
Description
Supplying of 65*10*1650mm iron double strap hinges, flat iron bend to shape and fixing
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
0.0%
447.64
1.00
447.64
0.0%
8.00
40.00
320.00
0.0%
5.04
30.00
151.20
0.0%
8.00
45.00
360.00
0.0%
17.27
38.00
656.26
0.0%
10.00
1.00
10.00
Material Rate
1,016.26
Plant Rate
0.00
1,497.46
1,473.90
BSR Reference
09-00-32
Description
Supplying of heavy quaLitery 150mm iron T hinges and fixing with iron screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
1.00
18.00
18.00
0.0%
0.60
8.00
4.80
Material Rate
Plant Rate
Amount
22.80
0.00
60.30
58.43
BSR Reference
09-00-33
Description
Supplying of heavy quaLitery 200mm iron T hinges and fixing with iron screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
1.00
23.00
23.00
0.0%
0.60
8.00
4.80
Material Rate
27.80
Plant Rate
0.00
65.30
63.43
BSR Reference
09-00-34
Description
Supplying of heavy quaLitery 250mm iron T hinges and fixing with iron screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
1.15
23.00
26.45
0.0%
0.60
8.00
4.80
Material Rate
31.25
Plant Rate
0.00
68.75
66.87
BSR Reference
09-00-35
Description
Supplying of heavy quaLitery 300mm iron T hinges and fixing with iron screws.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
53.44
1.00
53.44
Carpenter Nos.
0.0%
0.75
45.00
33.75
0.0%
0.75
30.00
22.50
0.0%
1.00
40.00
40.00
0.0%
0.75
8.00
6.00
Material Rate
Plant Rate
Amount
46.00
0.00
102.25
99.44
BSR Reference
09-00-36
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
46.31
1.00
46.31
Carpenter Nos.
0.0%
0.75
45.00
33.75
0.0%
0.50
30.00
15.00
0.0%
0.41
38.00
15.58
0.0%
0.20
8.00
1.60
Material Rate
17.18
Plant Rate
0.00
65.93
63.49
BSR Reference
09-00-37
Description
Cutting iron rods to correct length inserting in window frames including painting with red
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
27.31
1.00
27.31
Carpenter Nos.
0.0%
0.25
45.00
11.25
Painter Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
5.00
1.00
5.00
Material Rate
0.00
33.75
Plant Rate
0.00
32.31
BSR Reference
09-00-38
Description
Supplying of mild steel rods in reinforcing lintons, beams, columns and laid inposition
Unit
Kg
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Mild Steel Kg
0.0%
1.00
33.00
33.00
Wastage Kg
0.0%
2.50
1.00
2.50
33.50
0.00
47.25
46.69
BSR Reference
09-00-39
Description
Supplying of mild steel rods in reinforcing foundation and laid in position with GI binding
Unit
Kg
wire.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
7.13
1.00
7.13
Carpenter Kg
0.0%
0.10
45.00
4.50
Unskilled Labour Kg
0.0%
0.10
30.00
3.00
Binding wire Kg
0.0%
0.01
50.00
0.50
Mild Steel Kg
0.0%
1.00
33.00
33.00
Wastage Kg
0.0%
2.50
1.00
2.50
Material Rate
33.50
Plant Rate
0.00
43.50
43.12
BSR Reference
09-00-40
Description
Bending and typing of reinforcement and laid in position in beams lintols, floorsetc. with
Unit
Kg
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Carpenter Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
11.75
Plant Rate
0.00
11.19
BSR Reference
09-00-41
Description
Bending and typing of reinforcement and laid in position in foundation with GI binding
Unit
Kg
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
7.13
1.00
7.13
Carpenter Kg
0.0%
0.10
45.00
4.50
Unskilled Labour Kg
0.0%
0.10
30.00
3.00
Binding wire Kg
0.0%
0.01
50.00
0.50
Material Rate
0.50
8.00
Plant Rate
0.00
7.62
BSR Reference
09-00-42
Description
Supplying of 16mm dia. mild steel bars and fixing in window frames at 100mm centres
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
17.81
1.00
17.81
Carpenter M
0.0%
0.25
45.00
11.25
Unskilled Labour M
0.0%
0.25
30.00
7.50
Mild Steel M
0.0%
1.58
33.00
52.11
Material Rate
52.11
Plant Rate
0.00
70.86
69.92
BSR Reference
09-00-43
Description
Supplying of 20mm dia. mild steel bars and fixing in window frames at 100mm centres
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
17.81
1.00
17.81
Carpenter M
0.0%
0.25
45.00
11.25
Unskilled Labour M
0.0%
0.25
30.00
7.50
0.0%
2.47
38.00
93.71
Material Rate
93.71
Plant Rate
0.00
112.46
111.52
BSR Reference
09-00-44
Description
Supplying of pintels for gates and garage doors and fixing in position in cemenconcrete
Unit
Nos.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
231.56
1.00
231.56
Carpenter Nos.
0.0%
3.25
45.00
146.25
0.0%
3.25
30.00
97.50
0.0%
2.28
38.00
86.64
0.0%
5.00
1.00
5.00
86.64
0.00
335.39
323.20
BSR Reference
09-00-45
Description
Supplying and fixing of 100mm * 16mm rag bolts with nuts, washers.
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter Nos.
0.0%
0.50
45.00
22.50
0.0%
0.50
30.00
15.00
0.0%
0.68
33.00
22.51
Material Rate
22.51
Plant Rate
0.00
60.01
58.13
BSR Reference
09-00-46
Description
Supplying and fixing of 24 B.W.G plain G.I sheets to existing frame with wire nails.
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
102.24
1.00
102.24
Carpenter M2
0.0%
1.43
45.00
64.57
Unskilled Labour M2
0.0%
1.43
30.00
43.05
G.I.sheet 24 B.W.G. M2
0.0%
1.00
320.00
320.00
Nails M2
0.0%
20.00
1.00
20.00
Material Rate
320.00
Plant Rate
0.00
447.62
442.24
BSR Reference
09-00-47
Description
Supplying of BS 4449 high yeild steel bars and laid in position as reinforcement in beams,
Unit
Kg
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
10.69
1.00
10.69
Mason Kg
0.0%
0.15
45.00
6.75
Unskilled Labour Kg
0.0%
0.15
30.00
4.50
Binding wire Kg
0.0%
0.01
50.00
0.50
Tor Steel Kg
0.0%
1.00
35.00
35.00
Wastage Kg
0.0%
2.50
1.00
2.50
35.50
0.00
49.25
48.69
BSR Reference
09-00-48
Description
Supplying of BS 4449 high yeild steel bars and laid in position as reinforcement in
Unit
Kg
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
7.13
1.00
7.13
Mason Kg
0.0%
0.10
45.00
4.50
Unskilled Labour Kg
0.0%
0.10
30.00
3.00
Binding wire Kg
0.0%
0.01
50.00
0.50
Tor Steel Kg
0.0%
1.00
35.00
35.00
Wastage Kg
0.0%
2.50
1.00
2.50
35.50
0.00
45.50
45.12
BSR Class
MISCELLANEOUS
BSR Reference
17-00-01
Description
Supplying of Bamboos
Resource Unit
Props (bamboo) 3 - 4 m M
Material Rate
Unit
Wastag
Plant Rate
0.00
BSR Reference
17-00-02
Description
Resource Unit
Quantit
0.0%
28.00
0.35
80.00
Amount
28.00
28.00
28.00
Unit
Wastag
Rate Type
Quantit
Rate Type
Amount
Unskilled Labour M
0.0%
0.13
30.00
3.96
Props (bamboo) 3 - 4 m M
0.0%
0.35
80.00
28.00
Coir, Srting M
0.0%
0.70
1.00
0.70
Material Rate
Plant Rate
28.00
0.00
32.66
28.70
BSR Reference
17-00-03
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
Unskilled Labour M
0.0%
0.18
30.00
5.40
Coir, Srting M
0.0%
0.70
1.00
0.70
Material Rate
0.00
6.10
Plant Rate
0.00
0.70
BSR Reference
17-00-04
Description
Supplying and fixing of light duty galvanized mild steel barbwire (confirming to SLS 31
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.03
Rate Type
45.00
Amount
1.35
Unskilled Labour M
0.0%
0.03
30.00
0.90
Barbed wire M
0.0%
0.09
45.00
4.19
Staples M
0.0%
1.00
1.00
1.00
Material Rate
4.19
7.44
Plant Rate
0.00
5.19
BSR Reference
17-00-05
Description
Supplying and fixing of light duty galvanized mild steel barbwire (confirming to SLS 31
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.05
Rate Type
45.00
Amount
2.25
Unskilled Labour M
0.0%
0.05
30.00
1.50
Barbed wire M
0.0%
0.09
45.00
4.05
0.0%
1.00
1.00
1.00
Material Rate
4.05
8.80
Plant Rate
0.00
5.05
BSR Reference
17-00-06
Description
Supplying and fixing of light duty galvanized mild steel barbwire (confirming to SLS 31
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.04
Rate Type
45.00
Amount
1.80
Unskilled Labour M
0.0%
0.04
30.00
1.20
Barbed wire M
0.0%
0.09
45.00
4.19
Staples M
0.0%
1.00
1.00
1.00
Material Rate
4.19
8.19
Plant Rate
0.00
5.19
BSR Reference
17-00-07
Description
Supplying and fixing of light duty galvanized mild steel barbwire (confirming to SLS 31
Unit
of1988) in short length a concrete or steel post with available hook bolts
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.06
Rate Type
45.00
Amount
2.70
Unskilled Labour M
0.0%
0.06
30.00
1.80
Barbed wire M
0.0%
0.09
45.00
4.19
Material Rate
4.19
8.68
Plant Rate
0.00
4.19
BSR Reference
17-00-08
Description
Fixing of barbed wire with G.I. Staples on existing timber post(Barbed wire supplied by
Unit
Client)
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.03
Rate Type
45.00
Amount
1.35
Unskilled Labour M
0.0%
0.03
30.00
0.90
Staples M
0.0%
1.00
1.00
1.00
Material Rate
0.00
3.25
Plant Rate
0.00
1.00
BSR Reference
17-00-09
Description
Fixing of barbed wire fence with hoog bolts on concrete or steel post(Barbed wire supplied
Unit
by Client)
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.05
Rate Type
45.00
Amount
2.25
Unskilled Labour M
0.0%
0.05
30.00
1.50
0.0%
1.00
1.00
1.00
Material Rate
0.00
4.75
Plant Rate
0.00
1.00
BSR Reference
17-00-10
Description
Unit
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.04
Rate Type
45.00
Amount
1.80
Unskilled Labour M
0.0%
0.04
30.00
1.20
Material Rate
0.00
3.00
Plant Rate
0.00
0.00
BSR Reference
17-00-11
Description
Straining and refixing only the barbed wire on concrete or steel posts with available hook
Unit
bolts
Resource Unit
Wastag
Carpenter M
0.0%
Quantit
0.05
Rate Type
45.00
Amount
2.25
Unskilled Labour M
0.0%
0.05
30.00
1.50
Material Rate
0.00
3.75
Plant Rate
0.00
0.00
BSR Reference
17-00-12
Description
Unit
Nos.
concrete intermediate fence posts reinforced with 4 Nos. 6mm dia. MS rods.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
Mason Nos.
0.0%
2.00
45.00
90.00
0.0%
3.00
30.00
90.00
0.0%
0.23
50.00
11.40
Cement Nos.
0.0%
0.25
340.00
86.70
0.0%
0.03
110.00
3.30
Sand Nos.
0.0%
0.01
350.00
5.25
0.0%
1.80
35.00
63.00
Moulds Nos.
0.0%
12.00
1.00
12.00
169.65
0.00
361.65
181.65
BSR Reference
17-00-13
Description
Unit
Nos.
concrete intermediate fence posts reinforced with 4 Nos. 6mm dia. MS rods.
Material Rate
Plant Rate
Resource Unit
Wastag
0.0%
1.00
40.00
40.00
Mason Nos.
0.0%
1.00
45.00
45.00
0.0%
3.00
30.00
90.00
0.0%
0.34
50.00
17.00
Cement Nos.
0.0%
0.35
340.00
119.00
0.0%
0.04
110.00
3.96
Sand Nos.
0.0%
0.02
350.00
6.30
0.0%
2.27
35.00
79.45
Moulds Nos.
0.0%
12.00
1.00
12.00
225.71
0.00
Quantit
Rate Type
Amount
412.71
237.71
BSR Reference
17-00-14
Description
Construction and fixing of end posts and struts as per drawing. Rate to include excavation
Unit
Nos.
Material Rate
Plant Rate
Resource Unit
Wastag
0.0%
3.25
40.00
130.00
Mason Nos.
0.0%
5.50
45.00
247.50
0.0%
12.00
30.00
360.00
0.0%
0.46
50.00
22.75
Cement Nos.
0.0%
1.79
340.00
608.60
0.0%
0.09
110.00
10.12
0.0%
0.20
700.00
140.00
0.0%
17.00
33.00
561.00
Sand Nos.
0.0%
0.17
350.00
59.50
1,401.97
0.00
Quantit
Rate Type
Amount
2,139.47
1,401.97
BSR Reference
17-00-15
Description
Construction of barbed wire fence 5 strands with 4 points at 75mm centres, including corner
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
Black Smith M
0.0%
1.10
40.00
44.00
Barbed wire M
0.0%
1.40
45.00
63.00
Binding wire M
0.0%
0.11
50.00
5.60
Cement M
0.0%
0.17
340.00
59.50
0.0%
0.55
5.00
2.75
Metal 20mm M
0.0%
0.02
110.00
1.87
Metal 40mm M
0.0%
0.01
700.00
6.30
Mild Steel M
0.0%
3.00
33.00
99.00
Sand M
0.0%
0.01
350.00
4.90
0.0%
0.17
16.00
2.64
Moulds M
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
245.56
0.00
290.56
246.56
BSR Reference
17-00-16
Description
Material Rate
Plant Rate
Unit
Nos.
Resource Unit
Wastag
0.0%
2.00
40.00
80.00
0.0%
2.00
30.00
60.00
0.0%
0.55
33.00
18.15
Nuts Nos.
0.0%
1.50
1.00
1.50
18.15
Quantit
Rate Type
0.00
159.65
BSR Reference
17-00-17
Description
Unit
Resource Unit
Wastag
0.0%
Amount
19.65
P/Block
Quantit
8.00
Rate Type
120.00
Material Rate
0.00
Plant Rate
0.00
Amount
960.00
960.00
0.00
BSR Reference
17-00-18
Description
Unit
Resource Unit
Wastag
0.0%
P/Block
Quantit
24.00
Rate Type
120.00
Material Rate
0.00
Plant Rate
0.00
Amount
2,880.00
2,880.00
0.00
BSR Class
BSR Reference
14-00-01
Description
One coat of cement washing to walls of single storeyed buildings patching and preparing
Unit
M2
surface.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
5.85
1.00
5.85
Painter M2
0.0%
0.09
40.00
3.52
Unskilled Labour M2
0.0%
0.09
30.00
2.64
Cement M2
0.0%
0.00
340.00
1.36
Brushes etc. M2
0.0%
0.20
1.00
0.20
Material Rate
1.36
7.72
Plant Rate
0.00
7.41
BSR Reference
14-00-02
Description
Two coats of cement washing to walls of single storeyed buildings patching & preparing
Unit
M2
surface.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
9.98
1.00
9.98
Painter M2
0.0%
0.15
40.00
6.00
Unskilled Labour M2
0.0%
0.15
30.00
4.50
Cement M2
0.0%
0.01
340.00
2.38
Brushes etc. M2
0.0%
0.20
1.00
0.20
Material Rate
2.38
13.08
Plant Rate
0.00
12.56
BSR Reference
14-00-03
Description
One coat of cement washing to walls of single storeyed buildings patching & preparing
Unit
M3
surface
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
6.92
1.00
6.92
Painter M3
0.0%
0.10
40.00
4.16
Unskilled Labour M3
0.0%
0.10
30.00
3.12
Cement M3
0.0%
0.00
340.00
1.36
Brushes etc. M3
0.0%
3.40
1.00
3.40
Material Rate
1.36
12.04
Plant Rate
0.00
11.68
BSR Reference
14-00-04
Description
Flags average size 1800mm*900mm hung upon buildings as directed & removed when
Unit
Nos.
required [flags supplied by Client . Any poles used are to be paid separately].
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
14.25
1.00
14.25
0.0%
0.50
30.00
15.00
Material Rate
0.00
15.00
Plant Rate
0.00
14.25
BSR Reference
14-00-05
Description
Flags small [burges] upto 100 hungs upon buildings as directed & removed when required
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1.60
1.00
1.60
0.0%
0.06
30.00
1.68
Material Rate
0.00
1.68
Plant Rate
0.00
1.60
BSR Reference
14-00-06
Description
Flags small[Burges] over 100 hung upon building as directed & removed when required
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1.37
1.00
1.37
0.0%
0.05
30.00
1.44
Material Rate
0.00
1.44
Plant Rate
0.00
1.37
BSR Reference
14-00-07
Description
Flag poles [supplied byClient ]planted as directed removed when required and made good.
Unit
Resource Unit
Wastag
post
Quantit
Rate Type
Amount
0.0%
14.25
1.00
14.25
0.0%
0.50
30.00
15.00
Material Rate
0.00
15.00
Plant Rate
0.00
14.25
BSR Reference
14-00-08
Description
Lerrering 25mm to 50mm painted in Sinhala, English or Tamil including painting ground.
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.99
1.00
6.99
Painter Nos.
0.0%
0.18
40.00
7.36
0.0%
0.20
1.00
0.20
Material Rate
0.00
7.56
Plant Rate
0.00
7.19
BSR Reference
14-00-09
Description
Lettering 50mm to 75mm painted in Sinhala, English or Tamil including painting ground
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
7.60
1.00
7.60
Painter Nos.
0.0%
0.20
40.00
8.00
0.0%
0.30
1.00
0.30
Material Rate
0.00
8.30
Plant Rate
0.00
7.90
BSR Reference
14-00-10
Description
Lettering 100mm to 125mm painted in Sinhala, English and Tamil including painting
Unit
Nos.
ground
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
9.50
1.00
9.50
Painter Nos.
0.0%
0.25
40.00
10.00
0.0%
0.50
1.00
0.50
Material Rate
0.00
10.50
Plant Rate
0.00
10.00
BSR Reference
14-00-11
Description
Unit
Resource Unit
Plant Rate
Quantit
Rate Type
Amount
0.0%
16.42
1.00
16.42
Painter M2
0.0%
0.43
40.00
17.28
M2
0.0%
0.07
220.00
15.40
Brushes etc. M2
0.0%
0.55
1.00
0.55
Material Rate
Wastag
M2
15.40
0.00
33.23
32.37
BSR Reference
14-00-12
Description
Painting one coat of enamel paint including washing, cleaning and smoothing down with
Unit
M2
sand paper
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
16.34
1.00
16.34
Painter M2
0.0%
0.43
40.00
17.20
Paint Enamel M2
0.0%
0.08
260.00
21.06
Brushes etc. M2
0.0%
0.40
1.00
0.40
Material Rate
21.06
Plant Rate
0.00
38.66
37.80
BSR Reference
14-00-13
Description
Painting two coats of enamel paint including washing cleaning and smoothing downwith
Unit
M2
sand paper
Resource Unit
Wastag
Quantit
38.00
1.00
38.00
Painter M2
0.0%
1.00
40.00
40.00
Paint Enamel M2
0.0%
0.16
260.00
41.86
Brushes etc. M2
0.0%
0.55
1.00
0.55
41.86
Plant Rate
0.00
82.41
80.41
BSR Reference
14-00-14
Description
Painting new wood work with primer and 2 coats of oil paint
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
49.40
1.00
49.40
Painter M2
0.0%
1.30
40.00
52.00
Paint Oil M2
0.0%
0.16
220.00
35.42
M2
0.0%
0.08
220.00
17.82
Sand paper M2
0.0%
0.55
1.00
0.55
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
53.24
0.00
105.79
103.19
BSR Reference
14-00-15
Description
Painting new wood work with one coat of approved wood primer
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
19.00
1.00
19.00
Painter M2
0.0%
0.50
40.00
20.00
M2
0.0%
0.08
220.00
17.82
Brushes etc. M2
0.0%
0.30
1.00
0.30
Material Rate
17.82
Plant Rate
0.00
38.12
37.12
BSR Reference
14-00-16
Description
Painting steel work, with 1 coat of red lead including removing scale and wire brushing
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
19.00
1.00
19.00
Painter M2
0.0%
0.50
40.00
20.00
0.0%
0.08
250.00
20.25
Brushes etc. M2
0.0%
0.15
1.00
0.15
20.25
Plant Rate
0.00
40.40
39.40
BSR Reference
14-00-17
Description
Painting steel work with 2 coats of red lead including removing scale and wire brushing
Unit
Resource Unit
Plant Rate
Amount
Material Rate
Material Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
38.00
1.00
38.00
Painter M2
0.0%
1.00
40.00
40.00
0.0%
0.16
250.00
40.50
Brushes etc. M2
0.0%
0.20
1.00
0.20
40.50
0.00
80.70
78.70
BSR Reference
14-00-18
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
11.40
1.00
11.40
Painter M2
0.0%
0.30
40.00
12.00
0.0%
0.10
250.00
24.25
Brushes etc. M2
0.0%
0.15
1.00
0.15
Material Rate
24.25
Plant Rate
0.00
36.40
35.80
BSR Reference
14-00-19
Description
Painting walls with one coat of emulsion paint including preparing surface of new work
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
11.40
1.00
11.40
Painter M2
0.0%
0.30
40.00
12.00
Paint Emultion M2
0.0%
0.08
200.00
16.20
Brushes etc. M2
0.0%
0.15
1.00
0.15
16.20
Plant Rate
0.00
28.35
27.75
BSR Reference
14-00-20
Description
Painting walls with two coats of emulsion paint including preparing surface of new work
Unit
Resource Unit
Material Rate
Amount
Material Rate
Plant Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
22.80
1.00
22.80
Painter M2
0.0%
0.60
40.00
24.00
Paint Emultion M2
0.0%
0.15
200.00
30.00
Brushes etc. M2
0.0%
0.30
1.00
0.30
30.00
0.00
54.30
53.10
BSR Reference
14-00-21
Description
Painting walls with one coat of emulsion paint including preparing surface of old work
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
14.29
1.00
14.29
Painter M2
0.0%
0.38
40.00
15.04
Paint Emultion M2
0.0%
0.08
200.00
16.20
Brushes etc. M2
0.0%
0.35
1.00
0.35
Material Rate
16.20
Plant Rate
0.00
31.59
30.84
BSR Reference
14-00-22
Description
Painting walls with two coats of emulsion paint including preparing surface of old work
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
24.70
1.00
24.70
Painter M2
0.0%
0.65
40.00
26.00
Emulsion M2
0.0%
0.15
200.00
30.00
Brushes etc. M2
0.0%
0.50
1.00
0.50
30.00
Plant Rate
0.00
56.50
55.20
BSR Reference
14-00-23
Description
Painting walls with two coats of sNoswcem of equivalent cement paint to new work
Unit
Resource Unit
Plant Rate
Amount
Material Rate
Material Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
38.00
1.00
38.00
Painter M2
0.0%
0.70
40.00
28.00
Unskilled Labour M2
0.0%
0.40
30.00
12.00
Paint Snowcem M2
0.0%
0.34
52.00
17.94
Brushes etc. M2
0.0%
0.25
1.00
0.25
17.94
0.00
58.19
56.19
BSR Reference
14-00-24
Description
Painting old walls with two coats of sNoswcem or equivalent cement paint after scraping
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
46.55
1.00
46.55
Painter M2
0.0%
0.70
40.00
28.00
Unskilled Labour M2
0.0%
0.70
30.00
21.00
Paint Snowcem M2
0.0%
0.34
52.00
17.94
Brushes etc. M2
0.0%
0.25
1.00
0.25
Material Rate
17.94
Plant Rate
0.00
67.19
64.74
BSR Reference
14-00-25
Description
Painting old walls with one coat of sNoswcem or equivalent cement paint after scraping
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
32.30
1.00
32.30
Painter M2
0.0%
0.40
40.00
16.00
Unskilled Labour M2
0.0%
0.60
30.00
18.00
Paint Snowcem M2
0.0%
0.20
52.00
10.24
Brushes etc. M2
0.0%
0.25
1.00
0.25
Material Rate
10.24
Plant Rate
0.00
44.49
42.79
BSR Reference
14-00-26
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
37.05
1.00
37.05
Unskilled Labour M2
0.0%
1.30
30.00
39.00
0.0%
1.10
1.00
1.10
Material Rate
0.00
40.10
Plant Rate
0.00
38.15
BSR Reference
14-00-27
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
0.0%
1.10
1.00
1.10
Material Rate
0.00
61.10
Plant Rate
0.00
58.10
BSR Reference
14-00-28
Description
Painting G.I. pipes 20mm to 40mm diameter with 2 coats of enamel paint
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
7.60
1.00
7.60
Painter M2
0.0%
0.20
40.00
8.00
Paint Enamel M2
0.0%
0.02
260.00
5.72
Material Rate
5.72
13.72
Plant Rate
0.00
13.32
BSR Reference
14-00-29
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M2
Quantit
Rate Type
Amount
0.0%
7.60
1.00
7.60
Painter M2
0.0%
0.20
40.00
8.00
Wood Preservative M2
0.0%
0.12
110.00
13.42
Brushes etc. M2
0.0%
0.15
1.00
0.15
13.42
0.00
21.57
21.17
BSR Reference
14-00-30
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
15.20
1.00
15.20
Painter M2
0.0%
0.40
40.00
16.00
Wood Preservative M2
0.0%
0.22
110.00
23.98
Brushes etc. M2
0.0%
0.25
1.00
0.25
Material Rate
23.98
Plant Rate
0.00
40.23
39.43
BSR Reference
14-00-31
Description
Varnishing with 1 coat of best Copal varnish after washing down and sand papering
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
23.75
1.00
23.75
Painter M2
0.0%
0.40
40.00
16.00
Unskilled Labour M2
0.0%
0.30
30.00
9.00
Polyrethane varnish M2
0.0%
0.10
250.00
24.25
Brushes etc. M2
0.0%
0.35
1.00
0.35
24.25
Plant Rate
0.00
49.60
48.35
BSR Reference
14-00-32
Description
Varnishing with 2 coats of best Copal varnish after washing down and sand papering
Unit
Resource Unit
Plant Rate
Amount
Material Rate
Material Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
38.95
1.00
38.95
Painter M2
0.0%
0.80
40.00
32.00
Unskilled Labour M2
0.0%
0.30
30.00
9.00
Polyrethane varnish M2
0.0%
0.18
250.00
44.50
Brushes etc. M2
0.0%
0.50
1.00
0.50
44.50
0.00
86.00
83.95
BSR Reference
14-00-33
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Unskilled Labour M2
0.0%
1.75
30.00
52.50
Sand paper M2
0.0%
0.35
1.00
0.35
Material Rate
0.00
52.85
Plant Rate
0.00
50.22
BSR Reference
14-00-34
Description
Scraping and removing soot on walls and levelling internally (extra over colour washing)
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
5.70
1.00
5.70
Unskilled Labour M2
0.0%
0.20
30.00
6.00
Material Rate
0.00
6.00
Plant Rate
0.00
5.70
BSR Reference
14-00-35
Description
Scraping of walls to original plaster, sand papering and lime putting cracks and defects,
Unit
M2
preparing surface for new application of distemper sNoswcem paint or similar application
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
3.56
1.00
3.56
Mason M2
0.0%
0.05
45.00
2.25
Unskilled Labour M2
0.0%
0.05
30.00
1.50
Sand paper M2
0.0%
2.15
1.00
2.15
Material Rate
0.00
5.90
Plant Rate
0.00
5.71
BSR Reference
14-00-36
Description
White washing or colour washing wall with 1 coat in single storeyed building including
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
5.99
1.00
5.99
Painter M2
0.0%
0.09
40.00
3.60
Unskilled Labour M2
0.0%
0.09
30.00
2.70
Boiled lime M2
0.0%
0.18
4.00
0.73
Glue M2
0.0%
0.00
95.00
0.10
Yellow ochre M2
0.0%
0.00
15.00
0.02
Brushes etc. M2
0.0%
0.15
1.00
0.15
Material Rate
0.84
7.29
Plant Rate
0.00
6.97
BSR Reference
14-00-37
Description
White washing or colour washing wall with 2 coats in single storeyed building including
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
9.98
1.00
9.98
Painter M2
0.0%
0.15
40.00
6.00
Unskilled Labour M2
0.0%
0.15
30.00
4.50
Boiled lime M2
0.0%
0.30
4.00
1.18
Glue M2
0.0%
0.00
95.00
0.19
Yellow ochre M2
0.0%
0.00
15.00
0.03
Brushes etc. M2
0.0%
0.20
1.00
0.20
Material Rate
1.40
12.10
Plant Rate
0.00
11.58
BSR Reference
14-00-38
Description
White washing or colour washing external walls with one coat in two storeyed buildings
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
6.84
1.00
6.84
Painter M2
0.0%
0.09
40.00
3.60
Unskilled Labour M2
0.0%
0.12
30.00
3.60
Glue M2
0.0%
0.00
95.00
0.10
Slaked lime M2
0.0%
0.18
2,850.00
518.70
Yellow ochre M2
0.0%
0.00
15.00
0.02
Brushes etc. M2
0.0%
1.20
1.00
1.20
Material Rate
518.81
Plant Rate
0.00
527.21
526.85
BSR Reference
14-00-39
Description
White washing or colour washing external walls with one coat in buildings of more than
Unit
M2
two storeys
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
7.45
1.00
7.45
Painter M2
0.0%
0.09
40.00
3.52
Unskilled Labour M2
0.0%
0.14
30.00
4.32
Glue M2
0.0%
0.00
95.00
0.00
Slaked lime M2
0.0%
0.18
2,850.00
513.00
Yellow ochre M2
0.0%
0.00
15.00
0.02
0.0%
2.40
1.00
2.40
Material Rate
Plant Rate
513.02
0.00
523.26
522.86
BSR Reference
14-00-40
Description
White washing or colour washing external walls with 2 coats in 2 storeyed buildings
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
10.94
1.00
10.94
Painter M2
0.0%
0.15
40.00
6.00
Unskilled Labour M2
0.0%
0.18
30.00
5.52
Glue M2
0.0%
0.00
95.00
0.00
Slaked lime M2
0.0%
0.30
2,850.00
843.60
Yellow ochre M2
0.0%
0.00
15.00
0.00
0.0%
1.50
1.00
1.50
Material Rate
843.60
Plant Rate
0.00
856.62
856.04
BSR Reference
14-00-41
Description
White washing or colour washing external wall with 2 coats in buildings with more than 2
Unit
M2
storeys
Resource Unit
Quantit
Rate Type
Amount
0.0%
11.63
1.00
11.63
Painter M2
0.0%
0.15
40.00
6.00
Unskilled Labour M2
0.0%
0.21
30.00
6.24
Glue M2
0.0%
0.00
95.00
0.00
Slaked lime M2
0.0%
0.01
2,850.00
31.46
Yellow ochre M2
0.0%
0.00
15.00
0.03
0.0%
2.50
1.00
2.50
Material Rate
Plant Rate
Wastag
31.49
0.00
46.23
45.62
BSR Reference
14-00-42
Description
Walls internal faces scraped to original plaster patching up cracks and defects lime putting
Unit
M2
sand papering applying plaster of paris and preparing surfaces for application of emulsion
paint or enamel paint
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
40.85
1.00
40.85
Mason M2
0.0%
0.20
45.00
9.00
Painter M2
0.0%
0.10
40.00
4.00
Unskilled Labour M2
0.0%
1.00
30.00
30.00
0.0%
5.00
1.00
5.00
Material Rate
0.00
48.00
Plant Rate
0.00
45.85
BSR Reference
14-00-43
Description
Walls external faces scraped to original plaster patching up cracks and defects and
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
37.05
1.00
37.05
Mason M2
0.0%
0.20
45.00
9.00
Unskilled Labour M2
0.0%
1.00
30.00
30.00
0.0%
9.50
1.00
9.50
Material Rate
0.00
48.50
Plant Rate
0.00
46.55
BSR Reference
14-00-44
Description
Walls external faces scraped to original plaster patching up cracks and defects and
Unit
M2
preparing surface including sand papering for application of sNoswcem or white washing
in two storeyed buildings
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
45.60
1.00
45.60
Mason M2
0.0%
0.20
45.00
9.00
Unskilled Labour M2
0.0%
1.30
30.00
39.00
0.0%
9.50
1.00
9.50
Material Rate
0.00
57.50
Plant Rate
0.00
55.10
BSR Reference
14-00-45
Description
Walls external faces scraped to original plaster patching up cracks and defects and
Unit
M2
preparing surface including sand papering for application of sNoswcem or white washing
in more than two storeyed buildings
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Mason M2
0.0%
0.20
45.00
9.00
Unskilled Labour M2
0.0%
1.70
30.00
51.00
0.0%
9.50
1.00
9.50
Material Rate
0.00
69.50
Plant Rate
0.00
66.50
BSR Reference
14-00-46
Description
Painting walls with 1 coat weathershield paint including preparing surface of new work
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
12.16
1.00
12.16
Painter M2
0.0%
0.32
40.00
12.80
Weathershield M2
0.0%
0.12
260.00
30.42
Brushes etc. M2
0.0%
1.75
1.00
1.75
Material Rate
30.42
Plant Rate
0.00
44.97
44.33
BSR Reference
14-00-47
Description
Painting walls with 2 coats weathershield paint including preparing surface of new work
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
22.80
1.00
22.80
Painter M2
0.0%
0.60
40.00
24.00
Weathershield M2
0.0%
0.22
260.00
57.98
Brushes etc. M2
0.0%
2.00
1.00
2.00
57.98
0.00
83.98
82.78
BSR Reference
14-00-48
Description
Painting walls with 1 coat weathershield paint including preparing surface of old work
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
14.29
1.00
14.29
Painter M2
0.0%
0.38
40.00
15.04
Weathershield M2
0.0%
0.12
260.00
30.42
Brushes etc. M2
0.0%
2.00
1.00
2.00
Material Rate
30.42
Plant Rate
0.00
47.46
46.71
BSR Reference
14-00-49
Description
Painting walls with 2 coats weathershield paint including preparing surface of old work
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
26.60
1.00
26.60
Painter M2
0.0%
0.70
40.00
28.00
Weathershield M2
0.0%
0.22
260.00
57.98
Brushes etc. M2
0.0%
2.15
1.00
2.15
57.98
Plant Rate
0.00
88.13
86.73
BSR Reference
14-00-50
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
9.50
1.00
9.50
Painter M2
0.0%
0.25
40.00
10.00
M2
0.0%
0.08
300.00
24.60
Thinner M2
0.0%
0.01
100.00
0.80
Brushes etc. M2
0.0%
0.00
1.00
0.00
Paint Floor
Plant Rate
Amount
Material Rate
Material Rate
Amount
25.40
0.00
35.40
34.90
BSR Reference
14-00-51
Description
Unit
Resource Unit
Plant Rate
Quantit
Rate Type
Amount
0.0%
19.00
1.00
19.00
Painter M2
0.0%
0.50
40.00
20.00
M2
0.0%
0.16
300.00
49.20
Thinner M2
0.0%
0.02
100.00
1.60
Brushes etc. M2
0.0%
0.35
1.00
0.35
Paint Floor
Material Rate
Wastag
M2
50.80
0.00
71.15
70.15
BSR Class
PAVOR
BSR Reference
06-00-01
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
11.40
1.00
11.40
Mason M
0.0%
0.16
45.00
7.20
Unskilled Labour M
0.0%
0.16
30.00
4.80
0.0%
2.00
1.00
2.00
Material Rate
0.00
14.00
Plant Rate
0.00
13.40
BSR Reference
06-00-02
Description
Expansion joints in concrete floors filled with bitumen and sand(to fill depth of concrete
Unit
and rendering)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
23.51
1.00
23.51
Mason M
0.0%
0.33
45.00
14.85
Unskilled Labour M
0.0%
0.33
30.00
9.90
Bitumen M
0.0%
0.18
16.00
2.88
Sand M
0.0%
0.00
350.00
0.35
Material Rate
3.23
27.98
Plant Rate
0.00
26.74
BSR Reference
06-00-03
Description
75mm thick brick paved floors set in 1:5 cement mortar including 12mm thick 1:3 cement
Unit
M2
rendering
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
171.57
1.00
171.57
Mason M2
0.0%
1.72
45.00
77.40
Unskilled Labour M2
0.0%
3.44
30.00
103.20
Brick : common M2
0.0%
0.04
2,200.00
83.60
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.05
350.00
17.50
Material Rate
169.10
Plant Rate
0.00
349.70
340.67
BSR Reference
06-00-04
Description
75mm thick brick paved floors set in 1:5 cement mortar and 12mm thick 1:3 cement
Unit
M2
rendering with available brick including sorting out and cleaning bricks
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
184.68
1.00
184.68
Mason M2
0.0%
1.72
45.00
77.40
Unskilled Labour M2
0.0%
3.90
30.00
117.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.05
350.00
17.50
85.50
0.00
279.90
270.18
BSR Reference
06-00-05
Description
75mm thick 1:2 1/2:5 (25mm) cement concrete including 12mm thick 1:2 cement rendering
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
141.07
1.00
141.07
Mason M2
0.0%
1.30
45.00
58.50
Unskilled Labour M2
0.0%
3.00
30.00
90.00
Cement M2
0.0%
0.54
340.00
183.60
Metal 25mm M2
0.0%
0.08
900.00
72.00
Sand M2
0.0%
0.05
350.00
17.50
Material Rate
273.10
Plant Rate
0.00
421.60
414.18
BSR Reference
06-00-06
Description
100mm thick 1:2:4 (20mm) cement concrete in upper floors including formwork 12mm thick
Unit
M2
1:3 cement rendering and lime putty rendering to soffit and expansion joints filled with
cement and sand(Reinforcement paid for separately)
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
511.58
1.00
511.58
Mason M2
0.0%
4.40
45.00
198.00
Unskilled Labour M2
0.0%
11.35
30.00
340.50
Boiled lime M2
0.0%
0.00
4.00
0.00
Cement M2
0.0%
0.70
340.00
238.00
Metal 20mm M2
0.0%
0.10
110.00
11.00
Mould oil M2
0.0%
0.12
10.00
1.20
Props (bamboo) 3 - 4 m M2
0.0%
0.69
80.00
55.20
Sand M2
0.0%
0.08
350.00
28.00
0.0%
0.60
300.00
180.00
0.0%
0.00
20,000.00
40.00
0.0%
0.10
55.00
5.50
558.90
0.00
1,097.40
1,070.48
BSR Reference
06-00-07
Description
Supplying spreading watering and completing gravel in floor for 100mm thickness
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
12.26
1.00
12.26
Unskilled Labour M2
0.0%
0.43
30.00
12.90
Gravel M2
0.0%
0.30
165.00
49.50
Material Rate
49.50
Plant Rate
0.00
62.40
61.76
BSR Reference
06-00-08
Description
Supplying and laying of Terrazzo floor tiles including 12mm thick 1:3 cement mortar
Unit
M2
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
361.38
1.00
361.38
Mason M2
0.0%
1.72
45.00
77.40
Terrazo Mason M2
0.0%
9.00
25.00
225.00
Unskilled Labour M2
0.0%
2.60
30.00
78.00
Cement M2
0.0%
0.13
340.00
44.20
Sand M2
0.0%
0.02
350.00
7.00
0.0%
12.00
70.00
840.00
0.0%
5.00
1.00
5.00
891.20
0.00
1,276.60
1,257.58
BSR Reference
06-00-09
Description
Supplying and laying of ceramic floor tiles including 20mm thick 1:3 cement sand bedding
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
28.36
1.00
28.36
Mason M2
0.0%
0.33
45.00
14.85
Unskilled Labour M2
0.0%
0.50
30.00
15.00
0.0%
26.00
25.00
650.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.02
350.00
5.95
Material Rate
723.95
Plant Rate
0.00
753.80
752.31
BSR Reference
06-00-10
Description
Supplying and fixing of Glazed tiles with all specials to walls including raking,
Unit
M2
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
28.36
1.00
28.36
Mason M2
0.0%
0.33
45.00
14.85
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.02
350.00
5.95
0.0%
92.00
5.00
460.00
533.95
0.00
563.80
562.31
BSR Reference
Description
06-00-11
Unit
M2
fixing of Glazed tiles to walls including raking, plastering and bedding in 12mm thick 1:3
cement mortar (Tiles supplied by the Client)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Mason M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
0.50
30.00
15.00
Cement M2
0.0%
0.20
340.00
68.00
Sand M2
0.0%
0.17
350.00
59.50
Material Rate
127.50
Plant Rate
0.00
187.50
184.50
BSR Reference
06-00-12
Description
Supplying and fixing of pressed cement tiles of approved pattern and colour to floors
Unit
M3
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Mason M3
0.0%
0.50
45.00
22.50
Unskilled Labour M3
0.0%
0.50
30.00
15.00
Cement M3
0.0%
0.15
340.00
51.00
Sand M3
0.0%
0.02
350.00
5.95
0.0%
26.00
12.00
312.00
Material Rate
Plant Rate
368.95
0.00
406.45
404.58
BSR Class
PLASTERER.
BSR Reference
11-00-01
Description
Unit
Resource Unit
Wastag
Rate Type
Amount
0.0%
64.55
1.00
64.55
Mason M2
0.0%
0.65
45.00
29.25
Unskilled Labour M2
0.0%
1.29
30.00
38.70
Boiled lime M2
0.0%
2.40
4.00
9.60
Cement M2
0.0%
0.09
340.00
29.24
Sand M2
0.0%
0.02
350.00
7.35
46.19
Plant Rate
0.00
BSR Reference
11-00-02
Description
114.14
110.74
Unit
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
M2
Wastag
M2
Quantit
Rate Type
Amount
0.0%
64.38
1.00
64.38
Mason M2
0.0%
0.65
45.00
29.07
Unskilled Labour M2
0.0%
1.29
30.00
38.70
Boiled lime M2
0.0%
2.40
4.00
9.60
Clay M2
0.0%
0.03
120.00
3.60
13.20
0.00
80.97
77.58
BSR Reference
11-00-03
Description
65mm * 65mm Cove mouliding build in existing walls in 1:2 cement mortar.
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
46.85
1.00
46.85
Mason M
0.0%
0.66
45.00
29.52
Unskilled Labour M
0.0%
0.66
30.00
19.80
Cement M
0.0%
0.04
340.00
12.24
Sand M
0.0%
0.00
350.00
1.05
Material Rate
13.29
Plant Rate
0.00
62.61
60.14
BSR Reference
11-00-04
Description
Plastering of 50mm to 100mm wide cracks in with 1:3 cement plaster after chipping.
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
16.36
1.00
16.36
Mason M
0.0%
0.16
45.00
7.38
Unskilled Labour M
0.0%
0.33
30.00
9.84
Cement M
0.0%
0.01
340.00
3.40
Sand M
0.0%
0.00
350.00
0.70
Material Rate
4.10
21.32
Plant Rate
0.00
20.46
BSR Reference
11-00-05
Description
Cresting with broken glass in 1:4 cement mortar on coping of boundary wall.
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Mason M
0.0%
0.50
45.00
22.50
Unskilled Labour M
0.0%
0.50
30.00
15.00
Cement M
0.0%
0.08
340.00
27.88
Sand M
0.0%
0.01
350.00
3.50
Glass bottling M
0.0%
3.50
1.00
3.50
31.38
0.00
72.38
70.51
BSR Reference
11-00-06
Description
75mm * 12mm Dato moulding in walls in 1:1:4 lime and cement mortar for replacement to
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Mason M
0.0%
0.80
45.00
36.00
Unskilled Labour M
0.0%
0.80
30.00
24.00
Boiled lime M
0.0%
0.02
4.00
0.08
Cement M
0.0%
0.01
340.00
2.72
Sand M
0.0%
0.00
350.00
0.70
Material Rate
3.50
63.50
Plant Rate
0.00
60.50
BSR Reference
11-00-07
Description
150mm * 25mm Dato moulding in walls in 1:1:4 lime and cement mortar only for
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
71.25
1.00
71.25
Mason M
0.0%
1.00
45.00
45.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
Boiled lime M
0.0%
0.90
4.00
3.60
Cement M
0.0%
0.03
340.00
10.20
Sand M
0.0%
0.01
350.00
3.50
17.30
0.00
92.30
88.55
BSR Reference
11-00-08
Description
100mm * 50mm Dato moulding in cement and sand 1:2 built in existing wall.
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
85.50
1.00
85.50
Mason M
0.0%
1.20
45.00
54.00
Unskilled Labour M
0.0%
1.20
30.00
36.00
Cement M
0.0%
0.08
340.00
27.20
Sand M
0.0%
0.01
350.00
2.10
Material Rate
29.30
Plant Rate
0.00
119.30
114.80
BSR Reference
11-00-09
Description
Laying of Flashing or plaster bands over tiles 100mm to 150mm wide on roof in 1:1:4
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
24.94
1.00
24.94
Mason M
0.0%
0.25
45.00
11.25
Unskilled Labour M
0.0%
0.50
30.00
15.00
Boiled lime M
0.0%
0.72
4.00
2.88
Cement M
0.0%
0.03
340.00
8.84
Sand M
0.0%
0.01
350.00
3.50
Material Rate
15.22
Plant Rate
0.00
41.47
40.16
BSR Reference
11-00-10
Description
Letters embossed in plaster 20mm thick 150mm high in cement and sand 1:2 cement floated
Unit
Nos.
and painted.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Mason Nos.
0.0%
0.50
45.00
22.50
Painter Nos.
0.0%
0.13
40.00
5.00
0.0%
0.25
30.00
7.50
0.0%
2.00
1.00
2.00
Material Rate
0.00
37.00
Plant Rate
0.00
35.25
BSR Reference
11-00-11
Description
15mm thick 1:1:5 lime plastering and finished smooth with lime putty.
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
92.63
1.00
92.63
Mason M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
1.75
30.00
52.50
Boiled lime M2
0.0%
0.03
4.00
0.12
Cement M2
0.0%
0.09
340.00
30.60
Sand M2
0.0%
0.02
350.00
7.35
Material Rate
38.07
Plant Rate
0.00
135.57
130.70
BSR Reference
11-01-12
Description
1:2 cement plastering flush in surface cracks including raking out joints.
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
14.14
1.00
14.14
Mason M
0.0%
0.16
45.00
7.38
Unskilled Labour M
0.0%
0.25
30.00
7.50
0.0%
3.25
1.00
3.25
Material Rate
0.00
18.13
Plant Rate
0.00
17.39
BSR Reference
11-01-13
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M2
Quantit
Rate Type
Amount
0.0%
178.13
1.00
178.13
Mason M2
0.0%
2.50
45.00
112.50
Unskilled Labour M2
0.0%
2.50
30.00
75.00
Cement M2
0.0%
0.11
340.00
37.40
Sand M2
0.0%
0.01
350.00
3.15
40.55
0.00
228.05
218.67
BSR Reference
11-01-14
Description
Unit
Resource Unit
Wastag
Quantit
Amount
0.0%
32.35
1.00
32.35
Mason M2
0.0%
0.65
45.00
29.25
Unskilled Labour M2
0.0%
0.16
30.00
4.80
Cement M2
0.0%
0.16
340.00
54.74
Sand M2
0.0%
0.01
350.00
5.25
59.99
Plant Rate
0.00
BSR Reference
11-01-15
Description
94.04
92.34
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
79.80
1.00
79.80
Mason M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
Cement M2
0.0%
0.16
340.00
54.40
Sand M2
0.0%
0.01
350.00
5.25
Material Rate
59.65
Plant Rate
0.00
143.65
139.45
BSR Reference
11-01-16
Description
Unit
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
M2
Wastag
M2
Quantit
Rate Type
Amount
0.0%
64.84
1.00
64.84
Mason M2
0.0%
0.65
45.00
29.25
Unskilled Labour M2
0.0%
1.30
30.00
39.00
Cement M2
0.0%
0.12
340.00
39.10
Sand M2
0.0%
0.01
350.00
5.25
44.35
0.00
112.60
109.19
BSR Reference
11-01-17
Description
Unit
Resource Unit
Wastag
Quantit
Amount
0.0%
79.80
1.00
79.80
Mason M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.60
30.00
48.00
Cement M2
0.0%
0.12
340.00
39.10
Sand M2
0.0%
0.01
350.00
5.25
44.35
Plant Rate
0.00
128.35
124.15
BSR Reference
11-01-18
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
86.28
1.00
86.28
Mason M2
0.0%
0.87
45.00
38.93
Unskilled Labour M2
0.0%
1.73
30.00
51.90
Cement M2
0.0%
0.24
340.00
82.28
Sand M2
0.0%
0.02
350.00
7.00
Material Rate
89.28
Plant Rate
0.00
BSR Reference
11-01-19
Description
180.11
175.56
Unit
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
M2
Wastag
M2
Quantit
Rate Type
Amount
0.0%
104.31
1.00
104.31
Mason M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
2.16
30.00
64.80
Cement M2
0.0%
0.24
340.00
82.28
Sand M2
0.0%
0.02
350.00
7.70
89.98
0.00
199.78
194.29
BSR Reference
11-01-20
Description
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
86.50
1.00
86.50
Mason M2
0.0%
0.87
45.00
39.15
Unskilled Labour M2
0.0%
1.73
30.00
51.90
Cement M2
0.0%
0.19
340.00
63.92
Sand M2
0.0%
0.02
350.00
7.70
Material Rate
71.62
Plant Rate
0.00
BSR Reference
11-01-21
Description
162.67
158.12
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
104.31
1.00
104.31
Mason M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
2.16
30.00
64.80
Cement M2
0.0%
0.19
340.00
63.92
Sand M2
0.0%
0.02
350.00
7.70
Material Rate
71.62
Plant Rate
0.00
181.42
175.93
BSR Reference
11-01-22
Description
Red cement floating coat in rendering , using red cement[coloured & finish smooth].
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
5.70
1.00
5.70
Mason M2
0.0%
0.10
45.00
4.50
Unskilled Labour M2
0.0%
0.05
30.00
1.50
Cement M2
0.0%
0.03
340.00
9.86
0.0%
0.00
200.00
0.60
Material Rate
Plant Rate
Amount
10.46
0.00
16.46
16.16
BSR Reference
11-01-23
Description
Brown or green cement fioating in rendreing with black cement & finish smooth.
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
0.0%
5.70
1.00
5.70
Mason M2
0.0%
0.10
45.00
4.50
Unskilled Labour M2
0.0%
0.05
30.00
1.50
Cement M2
0.0%
0.03
340.00
9.86
0.0%
0.07
200.00
14.00
Material Rate
23.86
Plant Rate
0.00
29.86
29.56
BSR Reference
11-01-24
Description
Black cement floating in rendering with black cement & finish smooth.
Unit
Resource Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
5.70
1.00
5.70
Mason M2
0.0%
0.10
45.00
4.50
Unskilled Labour M2
0.0%
0.05
30.00
1.50
Cement M2
0.0%
0.03
340.00
9.86
0.0%
0.07
200.00
14.60
Material Rate
24.46
Plant Rate
0.00
30.46
30.16
BSR Reference
11-01-25
Description
Unit
Resource Unit
Material Rate
Plant Rate
Amount
Wastag
M2
Quantit
Rate Type
Amount
0.0%
86.50
1.00
86.50
Mason M2
0.0%
0.87
45.00
39.15
Unskilled Labour M2
0.0%
1.73
30.00
51.90
Cement M2
0.0%
0.24
340.00
82.28
Pudlo Cement M2
0.0%
0.55
80.00
43.92
Sand M2
0.0%
0.02
350.00
7.70
133.90
0.00
224.95
220.40
BSR Reference
11-01-26
Description
12mm*150mm skirting in 1:3, projected on flush with wall and including forming groove.
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Mason M
0.0%
0.80
45.00
36.00
Unskilled Labour M
0.0%
0.80
30.00
24.00
Cement M
0.0%
0.03
340.00
11.22
Sand M
0.0%
0.00
350.00
1.05
Material Rate
12.27
Plant Rate
0.00
72.27
69.27
BSR Reference
11-01-27
Description
12mm*150mm skirting in 1:3 cement mortar projected in flush with wall & finished with
Unit
Resource Unit
Quantit
Rate Type
Amount
0.0%
65.55
1.00
65.55
Mason M
0.0%
1.00
45.00
45.00
Unskilled Labour M
0.0%
0.80
30.00
24.00
Cement M
0.0%
0.03
340.00
10.88
0.0%
0.01
200.00
2.60
Sand M
0.0%
0.00
350.00
1.05
Material Rate
Plant Rate
Wastag
14.53
0.00
83.53
80.08
BSR Reference
11-01-28
Description
15mm thick plastering , 1:1:3 cement lime & sand to R.C.beam & slab soffit including
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
124.69
1.00
124.69
Mason M2
0.0%
1.75
45.00
78.75
Unskilled Labour M2
0.0%
1.75
30.00
52.50
Boiled lime M2
0.0%
2.40
4.00
9.60
Cement M2
0.0%
0.09
340.00
30.60
Sand M2
0.0%
0.01
350.00
5.25
Scafolding M2
0.0%
1.75
1.00
1.75
Material Rate
45.45
Plant Rate
0.00
178.45
171.89
BSR Reference
11-01-29
Description
20mm thick 1:2 cement sand D.P. & finished smooth with 2 coats of hot tar blinded with
Unit
M2
coarse sand.C
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
99.75
1.00
99.75
Mason M2
0.0%
1.00
45.00
45.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
Cement M2
0.0%
0.24
340.00
82.28
DPC tar M2
0.0%
0.50
47.00
23.50
Sand M2
0.0%
0.00
350.00
0.70
0.0%
0.60
1.00
0.60
106.48
0.00
212.08
206.83
BSR Reference
11-01-30
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
M2
Quantit
Rate Type
Amount
0.0%
2.15
1.00
2.15
Mason M2
0.0%
0.01
45.00
0.59
Unskilled Labour M2
0.0%
0.06
30.00
1.68
Cement M2
0.0%
0.03
340.00
10.88
10.88
0.00
13.15
13.03
BSR Class
PLUMBER
BSR Reference
15-00-01
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
50.00
50.00
50.00
Plant Rate
0.00
BSR Reference
15-00-02
Description
Resource Unit
85.00
83.25
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
55.00
55.00
Material Rate
55.00
Plant Rate
0.00
BSR Reference
15-00-03
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
90.00
88.25
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Plumber Nos.
0.0%
0.75
40.00
30.00
0.0%
0.75
30.00
22.50
0.0%
1.00
70.00
70.00
70.00
0.00
122.50
119.88
BSR Reference
15-00-04
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
66.50
1.00
66.50
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
1.00
100.00
100.00
Material Rate
Nos.
100.00
Plant Rate
0.00
170.00
166.50
BSR Reference
15-00-05
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
Material Rate
0.00
35.00
Plant Rate
0.00
33.25
BSR Reference
15-00-06
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
71.25
1.00
71.25
Plumber Nos.
0.0%
0.50
40.00
20.00
Tinker Nos.
0.0%
1.00
40.00
40.00
0.0%
0.50
30.00
15.00
0.0%
4.00
1.00
4.00
Material Rate
0.00
79.00
Plant Rate
0.00
75.25
BSR Reference
15-00-07
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Amount
0.0%
42.75
1.00
42.75
Plumber Nos.
0.0%
0.50
40.00
20.00
Tinker Nos.
0.0%
0.25
40.00
10.00
0.0%
0.50
30.00
15.00
0.0%
1.00
90.00
90.00
0.0%
3.00
1.00
3.00
Material Rate
90.00
Plant Rate
0.00
138.00
135.75
BSR Reference
15-00-08
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
42.75
1.00
42.75
Plumber Nos.
0.0%
0.50
40.00
20.00
Tinker Nos.
0.0%
0.25
40.00
10.00
0.0%
0.50
30.00
15.00
0.0%
1.00
160.00
160.00
0.0%
3.00
1.00
3.00
Material Rate
Plant Rate
Rate Type
160.00
0.00
208.00
205.75
BSR Reference
15-00-09
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
59.38
1.00
59.38
Plumber Nos.
0.0%
0.75
40.00
30.00
Tinker Nos.
0.0%
0.25
40.00
10.00
0.0%
0.75
30.00
22.50
0.0%
1.00
200.00
200.00
0.0%
3.00
1.00
3.00
Material Rate
200.00
Plant Rate
0.00
265.50
262.38
BSR Reference
15-00-10
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
42.75
1.00
42.75
Plumber Nos.
0.0%
0.50
40.00
20.00
Tinker Nos.
0.0%
0.25
40.00
10.00
0.0%
0.50
30.00
15.00
0.0%
3.00
1.00
3.00
Material Rate
0.00
48.00
Plant Rate
0.00
45.75
BSR Reference
15-00-11
Description
Fixing of lavatory Basin to wall and connected to existing water service and making good
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
541.50
1.00
541.50
Carpenter Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
6.00
40.00
240.00
0.0%
8.00
30.00
240.00
Plugs Nos.
0.0%
4.00
16.00
64.00
0.0%
4.00
1.00
4.00
Material Rate
64.00
Plant Rate
0.00
638.00
609.50
BSR Reference
15-00-12
Description
Fixing of lavatory Basin on existing brackets (Tap, waste trap and basin supplied by Client)
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
266.00
1.00
266.00
Plumber Nos.
0.0%
4.00
40.00
160.00
0.0%
4.00
30.00
120.00
0.0%
2.00
1.00
2.00
Material Rate
0.00
282.00
Plant Rate
0.00
268.00
BSR Reference
15-00-13
Description
Supplying and fixing of lavatory Basin 560mm x 360mm with one taps, waste plug, with
Unit
Nos.
new brackets (additional tap, trap and outlet pipe paid separately)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
541.50
1.00
541.50
Carpenter Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
6.00
40.00
240.00
0.0%
8.00
30.00
240.00
0.0%
1.00
1,000.00
1,000.00
Plugs Nos.
0.0%
4.00
16.00
64.00
0.0%
1.00
60.00
60.00
0.0%
4.00
1.00
4.00
Material Rate
1,124.00
Plant Rate
0.00
1,698.00
1,669.50
BSR Reference
15-00-14
Description
Supplying and fixing of lavatory Basin 560mm x 360mm with one tap on existing brackets
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
541.50
1.00
541.50
Mason Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
6.00
40.00
240.00
0.0%
8.00
30.00
240.00
0.0%
1.00
1,000.00
1,000.00
Plugs Nos.
0.0%
4.00
16.00
64.00
0.0%
4.00
1.00
4.00
Material Rate
Plant Rate
1,064.00
0.00
1,638.00
1,609.50
BSR Reference
15-00-15
Description
Removing Basin, Urnal or sink including all fittings and walls made good
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
270.75
1.00
270.75
Mason Nos.
0.0%
1.00
45.00
45.00
Plumber Nos.
0.0%
3.00
40.00
120.00
0.0%
4.00
30.00
120.00
0.0%
4.00
1.00
4.00
Material Rate
0.00
289.00
Plant Rate
0.00
274.75
BSR Reference
15-00-16
Description
C.I. enamelled baths removing and re-fixing in new position and making good to walls and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
950.00
1.00
950.00
Mason Nos.
0.0%
4.00
45.00
180.00
Plumber Nos.
0.0%
10.00
40.00
400.00
0.0%
14.00
30.00
420.00
0.0%
10.00
1.00
10.00
Material Rate
0.00
Plant Rate
0.00
1,010.00
960.00
BSR Reference
15-00-17
Description
C.I. enamelled baths any size including trap, tap, outlet pipes etc. fixed complete (Bath and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
674.50
1.00
674.50
Mason Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
10.00
30.00
300.00
0.0%
10.00
1.00
10.00
Material Rate
0.00
720.00
Plant Rate
0.00
684.50
BSR Reference
15-00-18
Description
Fixing of C.I. Bends, elbows, tees, cresses and size upto 50mm (fittings supplied by Client)
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
1.00
1.00
Material Rate
0.00
18.50
Plant Rate
0.00
17.63
BSR Reference
15-00-19
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
30.00
30.00
0.0%
1.00
1.00
1.00
30.00
Plant Rate
0.00
BSR Reference
15-00-20
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
48.50
47.63
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
40.00
40.00
0.0%
1.00
1.00
1.00
40.00
0.00
58.50
57.63
BSR Reference
15-00-21
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
56.00
56.00
0.0%
1.00
1.00
1.00
56.00
Plant Rate
0.00
BSR Reference
15-00-22
Description
Resource Unit
74.50
73.63
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
170.00
170.00
0.0%
1.00
1.00
1.00
Material Rate
170.00
Plant Rate
0.00
BSR Reference
15-00-23
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
188.50
187.63
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
130.00
130.00
0.0%
1.50
1.00
1.50
130.00
0.00
149.00
148.13
BSR Reference
15-00-24
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
170.00
170.00
0.0%
1.50
1.00
1.50
Material Rate
170.00
Plant Rate
0.00
BSR Reference
15-00-25
Description
Resource Unit
189.00
188.13
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
21.95
1.00
21.95
Plumber Nos.
0.0%
0.33
40.00
13.20
0.0%
0.33
30.00
9.90
0.0%
1.00
450.00
450.00
0.0%
2.00
1.00
2.00
Material Rate
450.00
Plant Rate
0.00
475.10
473.95
BSR Reference
15-00-26
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
19.00
1.00
19.00
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
1.00
60.00
60.00
Material Rate
Plant Rate
60.00
0.00
80.00
79.00
BSR Reference
15-01-27
Description
Supplying and fixing of p.v.c. reducing Sockets from 20mm to smaller sizes
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
8.00
Plant Rate
0.00
7.65
BSR Reference
15-01-28
Description
Supplying and fixing of p.v.c. reducing Socket from 25mm to smaller size
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
10.00
10.00
0.0%
1.00
1.00
1.00
Material Rate
10.00
Plant Rate
0.00
18.00
17.65
BSR Reference
15-01-29
Description
Supplying and fixing of p.v.c. reducing Socket from 32mm to smaller size
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
13.00
13.00
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
13.00
0.00
21.00
20.65
BSR Reference
15-01-30
Description
Supplying and fixing of p.v.c. reducing Sockets from 38mm to smaller sizes
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
15.00
15.00
0.0%
1.00
1.00
1.00
Material Rate
15.00
Plant Rate
0.00
23.00
22.65
BSR Reference
15-01-31
Description
Supplying and fixing of p.v.c. reducing Sockets from 50mm to smaller sizes
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
35.00
35.00
0.0%
1.00
1.00
1.00
Material Rate
35.00
Plant Rate
0.00
43.00
42.65
BSR Reference
15-01-32
Description
Supplying and fixing of p.v.c. reducing Tees from 20mm to smaller size
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
7.50
7.50
0.0%
1.00
1.00
1.00
Material Rate
7.50
15.50
Plant Rate
0.00
15.15
BSR Reference
15-01-33
Description
Supplying and fixing of p.v.c. reducing Tees from 25mm to smaller size
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
7.50
7.50
0.0%
1.00
1.00
1.00
Material Rate
7.50
15.50
Plant Rate
0.00
15.15
BSR Reference
15-01-34
Description
Supplying and fixing of p.v.c. reducing Tees from 32mm to smaller sizes
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
13.00
13.00
0.0%
1.50
1.00
1.50
Material Rate
13.00
Plant Rate
0.00
21.50
21.15
BSR Reference
15-01-35
Description
Supplying and fixing of p.v.c. reducing Tees from 40mm to smaller sizes
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
19.00
19.00
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
19.00
0.00
28.00
27.65
BSR Reference
15-01-36
Description
Supplying and fixing of p.v.c. reducing Tees from 50mm to smaller sizes
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
35.00
35.00
0.0%
2.00
1.00
2.00
Material Rate
35.00
Plant Rate
0.00
44.00
43.65
BSR Reference
15-01-37
Description
Supplying and fixing of 560mm x 510mm pedestal type wash basin(L) with two way tapand
Unit
Nos.
waste plug
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
617.50
1.00
617.50
Mason Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
1.00
3,700.00
3,700.00
0.0%
10.00
1.00
10.00
Material Rate
3,700.00
Plant Rate
0.00
4,360.00
4,327.50
BSR Reference
15-01-38
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
5.50
0.55
0.0%
1.00
1.00
1.00
Material Rate
0.55
5.55
Plant Rate
0.00
5.35
BSR Reference
15-01-39
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
7.00
7.00
0.0%
1.00
1.00
1.00
Material Rate
7.00
15.00
Plant Rate
0.00
14.65
BSR Reference
15-01-40
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
9.00
9.00
0.0%
1.00
1.00
1.00
Material Rate
9.00
17.00
Plant Rate
0.00
16.65
BSR Reference
15-01-41
Description
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
26.00
26.00
0.0%
1.00
1.00
1.00
26.00
0.00
34.00
33.65
BSR Reference
15-01-42
Description
Resource Unit
Unit
Wastag
Quantit
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
30.00
30.00
0.0%
1.00
1.00
1.00
30.00
Plant Rate
0.00
38.00
37.65
BSR Reference
15-01-43
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.98
1.00
9.98
Plumber Nos.
0.0%
0.15
40.00
6.00
0.0%
0.15
30.00
4.50
0.0%
1.00
115.00
115.00
0.0%
2.00
1.00
2.00
Material Rate
115.00
Plant Rate
0.00
127.50
126.98
BSR Reference
15-01-44
Description
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
Nos.
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber Nos.
0.0%
0.20
40.00
8.00
0.0%
0.20
30.00
6.00
0.0%
1.00
163.00
163.00
0.0%
2.00
1.00
2.00
163.00
0.00
179.00
178.30
BSR Reference
15-01-45
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
5.50
5.50
0.0%
1.00
1.00
1.00
Material Rate
5.50
13.50
Plant Rate
0.00
13.15
BSR Reference
15-01-46
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
8.00
8.00
0.0%
1.00
1.00
1.00
Material Rate
8.00
16.00
Plant Rate
0.00
15.65
BSR Reference
15-01-47
Description
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
11.00
11.00
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
Unit
11.00
0.00
19.00
18.65
BSR Reference
15-01-48
Description
Resource Unit
Unit
Wastag
Quantit
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
18.00
18.00
0.0%
1.50
1.00
1.50
18.00
Plant Rate
0.00
26.50
26.15
BSR Reference
15-01-49
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
27.00
27.00
0.0%
1.50
1.00
1.50
Material Rate
27.00
Plant Rate
0.00
35.50
35.15
BSR Reference
15-01-50
Description
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
Nos.
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.98
1.00
9.98
Plumber Nos.
0.0%
0.15
40.00
6.00
0.0%
0.15
30.00
4.50
0.0%
1.00
74.00
74.00
0.0%
2.00
1.00
2.00
74.00
0.00
86.50
85.98
BSR Reference
15-01-51
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber Nos.
0.0%
0.20
40.00
8.00
0.0%
0.20
30.00
6.00
0.0%
1.00
96.00
96.00
0.0%
2.00
1.00
2.00
Material Rate
96.00
Plant Rate
0.00
112.00
111.30
BSR Reference
15-01-52
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
3.50
3.50
0.0%
1.00
1.00
1.00
Material Rate
3.50
11.50
Plant Rate
0.00
11.15
BSR Reference
15-01-53
Description
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
10.00
10.00
0.0%
1.00
1.00
1.00
10.00
0.00
18.00
17.65
BSR Reference
15-01-54
Description
Resource Unit
Unit
Wastag
Quantit
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
18.00
18.00
0.0%
1.00
1.00
1.00
18.00
Plant Rate
0.00
26.00
25.65
BSR Reference
15-01-55
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
23.00
23.00
0.0%
1.50
1.00
1.50
Material Rate
23.00
Plant Rate
0.00
31.50
31.15
BSR Reference
15-01-56
Description
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
Nos.
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
42.00
42.00
0.0%
1.50
1.00
1.50
42.00
0.00
50.50
50.15
BSR Reference
15-01-57
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.98
1.00
9.98
Plumber Nos.
0.0%
0.15
40.00
6.00
0.0%
0.15
30.00
4.50
0.0%
1.00
166.50
166.50
0.0%
2.00
1.00
2.00
Material Rate
166.50
Plant Rate
0.00
179.00
178.48
BSR Reference
15-01-58
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber Nos.
0.0%
0.20
40.00
8.00
0.0%
0.20
30.00
6.00
0.0%
1.00
372.00
372.00
0.0%
2.00
1.00
2.00
Material Rate
372.00
Plant Rate
0.00
BSR Reference
15-01-59
Description
Resource Unit
388.00
387.30
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
0.00
0.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
5.00
Plant Rate
0.00
4.80
BSR Reference
15-01-60
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
0.00
0.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
5.00
Plant Rate
0.00
4.80
BSR Reference
15-01-61
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
0.00
0.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
5.00
Plant Rate
0.00
4.80
BSR Reference
15-01-62
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
0.00
0.00
0.0%
1.50
1.00
1.50
Material Rate
0.00
5.50
Plant Rate
0.00
5.30
BSR Reference
15-01-63
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
60.00
60.00
0.0%
1.50
1.00
1.50
Material Rate
60.00
Plant Rate
0.00
BSR Reference
15-01-64
Description
Resource Unit
65.50
65.30
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
60.00
60.00
0.0%
2.00
1.00
2.00
Material Rate
60.00
Plant Rate
0.00
66.00
65.80
BSR Reference
15-01-65
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
4.00
4.00
0.0%
1.00
1.00
1.00
Material Rate
4.00
12.00
Plant Rate
0.00
11.65
BSR Reference
15-01-66
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
6.50
6.50
0.0%
1.00
1.00
1.00
Material Rate
6.50
14.50
Plant Rate
0.00
14.15
BSR Reference
15-01-67
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
9.00
9.00
0.0%
1.00
1.00
1.00
Material Rate
9.00
17.00
Plant Rate
0.00
16.65
BSR Reference
15-01-68
Description
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
14.00
14.00
0.0%
1.50
1.00
1.50
14.00
0.00
22.50
22.15
BSR Reference
15-01-69
Description
Resource Unit
Unit
Wastag
Quantit
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
20.00
20.00
0.0%
1.50
1.00
1.50
20.00
Plant Rate
0.00
28.50
28.15
BSR Reference
15-01-70
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.98
1.00
9.98
Plumber Nos.
0.0%
0.15
40.00
6.00
0.0%
0.15
30.00
4.50
0.0%
1.00
56.00
56.00
0.0%
2.00
1.00
2.00
Material Rate
56.00
Plant Rate
0.00
68.50
67.98
BSR Reference
15-01-71
Description
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
Nos.
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber Nos.
0.0%
0.20
40.00
8.00
0.0%
0.20
30.00
6.00
0.0%
1.00
80.00
80.00
0.0%
2.00
1.00
2.00
80.00
0.00
96.00
95.30
BSR Reference
15-01-72
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
0.0%
3.33
1.00
3.33
Plumber M
0.0%
0.05
40.00
2.00
Unskilled Labour M
0.0%
0.05
30.00
1.50
0.0%
1.00
16.00
16.00
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
16.00
Plant Rate
0.00
20.50
20.33
BSR Reference
15-01-73
Description
Supplying and fixing of 25mm (type 1000) p.v.c. Pipes (fittings paid separately)
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4.46
1.00
4.46
Plumber M
0.0%
0.07
40.00
2.68
Unskilled Labour M
0.0%
0.07
30.00
2.01
0.0%
1.00
26.00
26.00
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
26.00
Plant Rate
0.00
31.69
31.46
BSR Reference
15-01-74
Description
Supplying and fixing of 32mm (type 1000) p.v.c. Pipes (fittings paid separately)
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber M
0.0%
0.10
40.00
4.00
Unskilled Labour M
0.0%
0.10
30.00
3.00
0.0%
1.00
42.00
42.00
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
Amount
42.00
0.00
50.00
49.65
BSR Reference
15-01-75
Description
Supplying and fixing of 40mm (type 1000) p.v.c. Pipes (fittings paid separately)
Resource Unit
Unit
Wastag
Quantit
Rate Type
0.0%
6.65
1.00
6.65
Plumber M
0.0%
0.10
40.00
4.00
Unskilled Labour M
0.0%
0.10
30.00
3.00
0.0%
1.00
61.00
61.00
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
61.00
Plant Rate
0.00
69.50
69.15
BSR Reference
15-01-76
Description
Supplying and fixing of 50mm (type 1000) p.v.c. Pipes (fittings paid separately)
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.84
1.00
8.84
Plumber M
0.0%
0.13
40.00
5.32
Unskilled Labour M
0.0%
0.13
30.00
3.99
0.0%
1.00
94.00
94.00
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
94.00
Plant Rate
0.00
104.81
104.34
BSR Reference
15-01-77
Description
Supplying and fixing of 63mm (type 1000) p.v.c. Pipes (fittings paid separately)
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.84
1.00
8.84
Plumber M
0.0%
0.13
40.00
5.32
Unskilled Labour M
0.0%
0.13
30.00
3.99
0.0%
1.00
150.00
150.00
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
Plant Rate
Amount
150.00
0.00
160.81
160.34
BSR Reference
15-01-78
Description
Supplying and fixing of 75mm (type 1000) p.v.c. Pipes (fittings paid separately)
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.84
1.00
8.84
Plumber M
0.0%
0.13
40.00
5.32
Unskilled Labour M
0.0%
0.13
30.00
3.99
0.0%
1.00
230.00
230.00
Other expenses M
0.0%
2.00
1.00
2.00
Material Rate
230.00
Plant Rate
0.00
241.31
240.84
BSR Reference
15-01-79
Description
Fixing of Closet. pedestal type, available at site with cement concrete after breaking
Unit
Nos.
concrete floor and making good and making connectsion to soil and flush pipe
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
399.00
1.00
399.00
Plumber Nos.
0.0%
6.00
40.00
240.00
0.0%
6.00
30.00
180.00
Cement Nos.
0.0%
0.25
340.00
85.00
0.0%
7.00
1.00
7.00
Material Rate
85.00
Plant Rate
0.00
512.00
491.00
BSR Reference
15-01-80
Description
Fixing of 20mm to 50mm p.v.c. Pipes with specials (pipes and specials supplied by Client)
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
Material Rate
0.00
7.00
Plant Rate
0.00
6.65
BSR Reference
15-01-81
Description
Supplying and fixing of 20mm (type 1000) p.v.c. Pipes including specials and fittings
Resource Unit
Unit
Wastag
Quantit
Rate Type
0.0%
6.65
1.00
6.65
Plumber M
0.0%
0.10
40.00
4.00
Unskilled Labour M
0.0%
0.10
30.00
3.00
0.0%
1.10
16.00
17.60
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
17.60
Plant Rate
0.00
25.60
25.25
BSR Reference
15-01-82
Description
Supplying and fixing of 25mm (type 1000) p.v.c. Pipes including specials and fittings
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber M
0.0%
0.10
40.00
4.00
Unskilled Labour M
0.0%
0.10
30.00
3.00
0.0%
1.10
26.00
28.60
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
28.60
Plant Rate
0.00
36.60
36.25
BSR Reference
15-01-83
Description
Supplying and fixing of 32mm (type 1000) p.v.c. Pipes including specials and fittings
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber M
0.0%
0.13
40.00
5.00
Unskilled Labour M
0.0%
0.13
30.00
3.75
0.0%
1.10
42.00
46.20
Other expenses M
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
Amount
46.20
0.00
55.95
55.51
BSR Reference
15-01-84
Description
Supplying and fixing of 40mm (type 1000) p.v.c. Pipes including specials and fittings
Resource Unit
Unit
Wastag
Quantit
Rate Type
0.0%
8.31
1.00
8.31
Plumber M
0.0%
0.13
40.00
5.00
Unskilled Labour M
0.0%
0.13
30.00
3.75
0.0%
1.10
61.00
67.10
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
67.10
Plant Rate
0.00
77.35
76.91
BSR Reference
15-01-85
Description
Supplying and fixing of 50mm (type 1000) p.v.c. Pipes including specials and fittings
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber M
0.0%
0.20
40.00
8.00
Unskilled Labour M
0.0%
0.20
30.00
6.00
0.0%
1.10
94.00
103.40
Other expenses M
150.0
0.00
1.00
0.00
Material Rate
103.40
Plant Rate
0.00
117.40
116.70
BSR Reference
15-01-86
Description
Supplying and fixing of 63mm (type 1000) p.v.c. Pipes including specials and fittings
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
13.30
1.00
13.30
Plumber M
0.0%
0.20
40.00
8.00
Unskilled Labour M
0.0%
0.20
30.00
6.00
0.0%
1.10
150.00
165.00
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
Plant Rate
Amount
165.00
0.00
180.50
179.80
BSR Reference
15-01-87
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
19.00
1.00
19.00
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
1.00
100.00
100.00
0.0%
0.50
1.00
0.50
Material Rate
100.00
Plant Rate
0.00
BSR Reference
15-01-88
Description
Resource Unit
120.50
119.50
Unit
Wastag
Quantit
Amount
0.0%
38.00
1.00
38.00
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
140.00
140.00
140.00
Plant Rate
0.00
180.00
178.00
BSR Reference
15-02-89
Description
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
Nos.
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
90.00
90.00
90.00
0.00
125.00
123.25
BSR Reference
15-02-90
Description
Resource Unit
Unit
Wastag
Quantit
Amount
0.0%
71.25
1.00
71.25
0.0%
0.50
120.00
60.00
0.0%
0.50
30.00
15.00
0.0%
1.00
120.00
120.00
120.00
Plant Rate
0.00
195.00
191.25
BSR Reference
15-02-91
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Plumber Nos.
0.0%
0.75
40.00
30.00
0.0%
0.75
30.00
22.50
0.0%
1.00
150.00
150.00
Material Rate
150.00
Plant Rate
0.00
202.50
199.88
BSR Reference
15-02-92
Description
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
Nos.
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
66.50
1.00
66.50
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
1.00
200.00
200.00
200.00
0.00
270.00
266.50
BSR Reference
15-02-93
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
66.50
1.00
66.50
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
1.00
240.00
240.00
Material Rate
240.00
Plant Rate
0.00
310.00
306.50
BSR Reference
15-03-00
Description
Removing Closet, squatting type and plugging sewer connections and making good to
Unit
Nos.
floors
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
399.00
1.00
399.00
Plumber Nos.
0.0%
6.00
40.00
240.00
0.0%
6.00
30.00
180.00
Cement Nos.
0.0%
0.50
340.00
170.00
0.0%
5.00
1.00
5.00
Material Rate
170.00
Plant Rate
0.00
595.00
574.00
BSR Reference
15-03-01
Description
Installing Closet, squatting type including breaking floor and fixed in cement concrete
Unit
Nos.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
399.00
1.00
399.00
Plumber Nos.
0.0%
6.00
40.00
240.00
0.0%
6.00
30.00
180.00
Cement Nos.
0.0%
0.34
340.00
115.60
0.0%
10.00
1.00
10.00
115.60
0.00
545.60
524.60
BSR Reference
15-03-02
Description
Installing Closet, squatting type including trap, breaking floor and fixed in cement concrete
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
532.00
1.00
532.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
Cement Nos.
0.0%
0.33
340.00
113.22
0.0%
5.00
1.00
5.00
Material Rate
113.22
Plant Rate
0.00
678.22
650.22
BSR Reference
15-03-03
Description
Installing Closet, squatting type including flushing cistern and pipes complete (Closet and
Unit
Nos.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
869.25
1.00
869.25
Mason Nos.
0.0%
1.00
45.00
45.00
Plumber Nos.
0.0%
12.00
40.00
480.00
0.0%
13.00
30.00
390.00
Cement Nos.
0.0%
0.33
340.00
112.20
Plugs Nos.
0.0%
6.00
16.00
96.00
0.0%
5.00
1.00
5.00
208.20
0.00
1,128.20
1,082.45
BSR Reference
15-03-04
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
22.21
1.00
22.21
Plumber Nos.
0.0%
0.33
40.00
13.36
0.0%
0.33
30.00
10.02
0.0%
1.00
75.00
75.00
0.0%
2.00
1.00
2.00
Material Rate
75.00
Plant Rate
0.00
100.38
99.21
BSR Reference
15-03-05
Description
Supplying & fixing of 12mm cromium plated bib cocks of approved quaLitery.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
22.21
1.00
22.21
Plumber Nos.
0.0%
0.33
40.00
13.36
0.0%
0.33
30.00
10.02
0.0%
1.00
240.00
240.00
0.0%
5.00
1.00
5.00
Material Rate
240.00
Plant Rate
0.00
268.38
267.21
BSR Reference
15-03-06
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
22.21
1.00
22.21
Plumber Nos.
0.0%
0.33
40.00
13.36
0.0%
0.33
30.00
10.02
0.0%
5.00
1.00
5.00
Material Rate
0.00
28.38
Plant Rate
0.00
27.21
BSR Reference
15-03-07
Description
Removing of cocks ,brass bib push or stop cock of size 12mm to 40mm.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
Material Rate
0.00
4.00
Plant Rate
0.00
3.80
BSR Reference
15-03-08
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
3.00
3.00
Material Rate
3.00
38.00
Plant Rate
0.00
36.25
BSR Reference
15-03-94
Description
Supplying and installling of 400 gal capacity Fibre glass tank (with 2 Noss. of 01 Oz.mat.)
Unit
Nos.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
1,216.00
1.00
1,216.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
32.00
30.00
960.00
0.0%
1.00
14,000.00
14,000.00
Scafolding Nos.
0.0%
50.00
1.00
50.00
14,000.00
0.00
15,330.00
15,266.00
BSR Reference
15-03-95
Description
Disconneting, pedestal type closet and plugging sewer connection and making good to all
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
0.0%
266.00
1.00
266.00
Plumber Nos.
0.0%
4.00
40.00
160.00
0.0%
4.00
30.00
120.00
Cement Nos.
0.0%
0.17
340.00
56.78
0.0%
5.00
1.00
5.00
Material Rate
56.78
Plant Rate
0.00
341.78
327.78
BSR Reference
15-03-96
Description
Supplying and fixing pedestal type Closet (seat and cover available)
Resource Unit
Material Rate
Plant Rate
Amount
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
399.00
1.00
399.00
Plumber Nos.
0.0%
6.00
40.00
240.00
0.0%
6.00
30.00
180.00
Cement Nos.
0.0%
0.25
340.00
85.00
0.0%
1.00
1,500.00
1,500.00
0.0%
7.00
1.00
7.00
1,585.00
0.00
2,012.00
1,991.00
BSR Reference
15-03-97
Description
Supplying and fixing of Closet, pedestal type with low level glazed earthenware flushing
Unit
Nos.
cistern, flush pipe, double plastic seat cover 12mm stop cock trap etc.
Resource Unit
Wastag
Quantit
Rate Type
0.0%
532.00
1.00
532.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
1.00
60.00
60.00
0.0%
1.00
400.00
400.00
0.0%
1.00
1,200.00
1,200.00
0.0%
1.00
1,600.00
1,600.00
0.0%
1.00
75.00
75.00
0.0%
7.00
1.00
7.00
Transport Nos.
0.0%
100.00
1.00
100.00
Material Rate
3,335.00
Plant Rate
0.00
4,002.00
3,974.00
BSR Reference
15-03-98
Description
Supplying and fixing of Closet, squatting type with trap excluding cistern
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
532.00
1.00
532.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
Cement Nos.
0.0%
0.33
340.00
113.22
0.0%
1.00
450.00
450.00
0.0%
5.00
1.00
5.00
Material Rate
Plant Rate
Amount
563.22
0.00
1,128.22
1,100.22
BSR Reference
15-03-99
Description
Supplying and fixing of Closet, squatting type with trap with cistern flush pipe including
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
66.50
1.00
66.50
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
Cement Nos.
0.0%
0.33
340.00
113.22
0.0%
1.00
60.00
60.00
0.0%
1.00
400.00
400.00
0.0%
1.00
1,200.00
1,200.00
0.0%
1.00
450.00
450.00
0.0%
1.00
75.00
75.00
0.0%
5.00
1.00
5.00
Material Rate
2,298.22
Plant Rate
0.00
2,373.22
2,369.72
BSR Reference
15-04-00
Description
Making 600mm * 600mm * 150mm sink in 112mm brick masonary in cement 1:5 including
Unit
Nos.
12mm thick 1:2 cement rendering. Rate to include making holes in the wall and supplying
and fixing of 50mm outlet pipes.
Resource Unit
Quantit
Rate Type
Amount
0.0%
427.50
1.00
427.50
Mason Nos.
0.0%
6.00
45.00
270.00
0.0%
6.00
30.00
180.00
0.0%
0.03
2,200.00
70.40
Cement Nos.
0.0%
0.50
340.00
170.00
0.0%
0.31
94.00
29.14
Sand Nos.
0.0%
0.12
350.00
42.00
Material Rate
Plant Rate
Wastag
311.54
0.00
761.54
739.04
BSR Reference
15-04-09
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
66.50
1.00
66.50
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
1.00
3.00
3.00
Material Rate
3.00
73.00
Plant Rate
0.00
69.50
BSR Reference
15-04-10
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
33.00
33.00
0.0%
1.00
1.00
1.00
33.00
Plant Rate
0.00
BSR Reference
15-04-11
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
69.00
67.25
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
42.00
42.00
0.0%
1.00
1.00
1.00
42.00
0.00
78.00
76.25
BSR Reference
15-04-12
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
60.00
60.00
0.0%
1.00
1.00
1.00
60.00
Plant Rate
0.00
BSR Reference
15-04-13
Description
Resource Unit
96.00
94.25
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
90.00
90.00
0.0%
1.00
1.00
1.00
Material Rate
90.00
Plant Rate
0.00
BSR Reference
15-04-14
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos
126.00
124.25
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
90.00
90.00
0.0%
1.00
1.00
1.00
90.00
0.00
126.00
124.25
BSR Reference
15-04-15
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
44.36
1.00
44.36
Plumber Nos.
0.0%
0.67
40.00
26.68
0.0%
0.67
30.00
20.01
0.0%
1.00
150.00
150.00
0.0%
1.00
1.00
1.00
Material Rate
150.00
Plant Rate
0.00
BSR Reference
15-04-16
Description
Resource Unit
197.69
195.36
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
44.36
1.00
44.36
Plumber Nos.
0.0%
0.67
40.00
26.68
0.0%
0.67
30.00
20.01
0.0%
1.00
400.00
400.00
100.0
0.00
1.00
0.00
Material Rate
400.00
Plant Rate
0.00
446.69
444.36
BSR Reference
15-04-17
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
36.00
Plant Rate
0.00
34.25
BSR Reference
15-04-18
Description
Fixing of connector above 38mm & upto 75mm [connector supplied by Client].
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
44.36
1.00
44.36
Plumber Nos.
0.0%
0.67
40.00
26.68
0.0%
0.67
30.00
20.01
0.0%
1.50
1.00
1.50
Material Rate
0.00
48.19
Plant Rate
0.00
45.86
BSR Reference
15-04-19
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
133.00
1.00
133.00
Plumber Nos.
0.0%
2.00
40.00
80.00
0.0%
2.00
30.00
60.00
0.0%
1.00
140.00
140.00
140.00
Plant Rate
0.00
BSR Reference
15-04-20
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
280.00
273.00
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
12.00
12.00
0.0%
1.00
1.00
1.00
12.00
0.00
30.50
29.63
BSR Reference
15-04-21
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
14.00
14.00
0.0%
1.00
1.00
1.00
14.00
Plant Rate
0.00
BSR Reference
15-04-22
Description
Resource Unit
32.50
31.63
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
28.00
28.00
0.0%
1.00
1.00
1.00
Material Rate
28.00
Plant Rate
0.00
BSR Reference
15-04-23
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
46.50
45.63
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
40.00
40.00
0.0%
1.00
1.00
1.00
40.00
0.00
58.50
57.63
BSR Reference
15-04-24
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
55.00
55.00
0.0%
1.00
1.00
1.00
Material Rate
55.00
Plant Rate
0.00
BSR Reference
15-04-25
Description
Resource Unit
73.50
72.63
Unit
Wastag
Nos
Quantit
Rate Type
Amount
0.0%
16.63
1.00
16.63
Plumber Nos
0.0%
0.25
40.00
10.00
0.0%
0.25
30.00
7.50
0.0%
1.00
75.00
75.00
0.0%
1.00
1.00
1.00
Material Rate
75.00
Plant Rate
0.00
93.50
92.63
BSR Reference
15-04-26
Description
Cleaning of cost iron flushing cistern & painting eith one coat Anti-corrosive paint
Unit
Nos.
internally.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
95.00
1.00
95.00
Plumber Nos.
0.0%
2.50
40.00
100.00
0.0%
30.00
1.00
30.00
Material Rate
0.00
130.00
Plant Rate
0.00
125.00
BSR Reference
15-04-27
Description
Supplying & fixing of flushing cistern CI 9 Literres ,excluding flush pipe & brackets but
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
266.00
1.00
266.00
Plumber Nos.
0.0%
4.00
40.00
160.00
0.0%
4.00
30.00
120.00
0.0%
1.00
1,100.00
1,100.00
0.0%
2.00
1.00
2.00
Material Rate
1,100.00
Plant Rate
0.00
1,382.00
1,368.00
BSR Reference
15-04-28
Description
Supplying & fixing of flushing cistern plastic 9 Literers excluding flush pipe & brackets
Unit
Nos.
Resource Unit
Wastag
Quantit
266.00
1.00
266.00
Plumber Nos.
0.0%
4.00
40.00
160.00
0.0%
4.00
30.00
120.00
0.0%
1.00
1,200.00
1,200.00
0.0%
2.00
1.00
2.00
1,200.00
Plant Rate
0.00
1,482.00
1,468.00
BSR Reference
15-04-29
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
308.75
1.00
308.75
Mason Nos.
0.0%
1.00
45.00
45.00
Plumber Nos.
0.0%
4.00
40.00
160.00
0.0%
4.00
30.00
120.00
Plugs Nos.
0.0%
4.00
16.00
64.00
0.0%
1.00
1.00
1.00
64.00
0.00
390.00
373.75
BSR Reference
15-04-30
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
266.00
1.00
266.00
Plumber Nos.
0.0%
4.00
40.00
160.00
0.0%
4.00
30.00
120.00
0.0%
1.00
60.00
60.00
0.0%
1.10
1,200.00
1,320.00
0.0%
1.00
1.00
1.00
Material Rate
1,380.00
Plant Rate
0.00
1,661.00
1,647.00
BSR Reference
15-04-31
Description
Fixing of flushing cistern lever forged out of wrought iron 25mm*5m bent to shape.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
332.50
1.00
332.50
0.0%
4.00
40.00
160.00
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
5.00
30.00
150.00
0.0%
20.00
1.00
20.00
Material Rate
0.00
370.00
Plant Rate
0.00
352.50
BSR Reference
15-04-32
Description
Disconnecting CI flushing cistern & plugging water connection including making good to
Unit
Nos.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
266.00
1.00
266.00
Plumber Nos.
0.0%
4.00
40.00
160.00
0.0%
4.00
30.00
120.00
0.0%
1.00
20.00
20.00
0.0%
20.00
1.00
20.00
20.00
0.00
320.00
306.00
BSR Reference
15-04-33
Description
Removing of flushing & re-fixing in new position including necessary pluges & making
Unit
Nos.
good towalls.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
574.75
1.00
574.75
Mason Nos.
0.0%
1.00
45.00
45.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
8.00
30.00
240.00
0.0%
1.00
20.00
20.00
Plugs Nos.
0.0%
4.00
16.00
64.00
0.0%
2.00
1.00
2.00
Material Rate
84.00
Plant Rate
0.00
691.00
660.75
BSR Reference
15-04-34
Description
Re fixing of flushing pipe of pedestal closets after removing oid putty etc
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
66.50
1.00
66.50
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
1.00
30.00
30.00
0.0%
2.00
1.00
2.00
Material Rate
0.00
72.00
Plant Rate
0.00
68.50
BSR Reference
15-04-35
Description
Fixing GI flush pipe including solders ,joint [flush pipe supplied by Client].
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
133.00
1.00
133.00
Plumber Nos.
0.0%
2.00
40.00
80.00
0.0%
2.00
30.00
60.00
0.0%
2.50
1.00
2.50
Material Rate
0.00
142.50
Plant Rate
0.00
135.50
BSR Reference
15-04-36
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
42.00
42.00
0.0%
2.50
1.00
2.50
Material Rate
42.00
Plant Rate
0.00
79.50
77.75
BSR Reference
15-04-37
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
4.00
4.00
Material Rate
4.00
8.00
Plant Rate
0.00
7.80
BSR Reference
15-04-38
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
4.00
4.00
Material Rate
4.00
8.00
Plant Rate
0.00
7.80
BSR Reference
15-04-39
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
5.00
5.00
Material Rate
5.00
9.00
Plant Rate
0.00
8.80
BSR Reference
15-04-40
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
6.00
6.00
Material Rate
6.00
Plant Rate
0.00
BSR Reference
15-04-41
Description
Resource Unit
Unit
Wastag
10.00
9.80
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
1.00
8.00
8.00
Material Rate
8.00
12.00
Plant Rate
0.00
11.80
BSR Reference
15-04-42
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
3.80
1.00
3.80
Plumber Nos.
0.0%
0.10
40.00
4.00
Material Rate
0.00
4.00
Plant Rate
0.00
3.80
BSR Reference
15-04-43
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
29.00
29.00
29.00
Plant Rate
0.00
BSR Reference
15-04-44
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
36.00
35.65
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
40.00
40.00
40.00
0.00
47.00
46.65
BSR Reference
15-04-45
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
53.00
53.00
53.00
Plant Rate
0.00
BSR Reference
15-04-46
Description
Resource Unit
60.00
59.65
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
63.00
63.00
Material Rate
63.00
Plant Rate
0.00
BSR Reference
15-04-47
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
70.00
69.65
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
78.00
78.00
78.00
0.00
85.00
84.65
BSR Reference
15-04-48
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
146.00
146.00
Material Rate
146.00
Plant Rate
0.00
153.00
152.65
BSR Reference
15-04-49
Description
Fixing of Jam nuts any stze upto 50mm [Jam nuts supplied by Client]
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
Material Rate
0.00
7.00
Plant Rate
0.00
6.65
BSR Reference
15-04-50
Description
Supplying & fixing of bath room type oval shape bevelled mirror 380mm*330mm with rawl
Unit
Nos.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
76.00
1.00
76.00
Plumber Nos.
0.0%
2.00
40.00
80.00
0.0%
1.00
300.00
300.00
0.0%
1.00
400.00
400.00
0.0%
20.00
1.00
20.00
700.00
0.00
800.00
796.00
BSR Reference
15-04-51
Description
Supplying & fixing 320mm*280mm rectrangular bevelled mirror to wall with rawl plugs
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
76.00
1.00
76.00
Plumber Nos.
0.0%
2.00
40.00
80.00
0.0%
1.00
300.00
300.00
0.0%
1.00
400.00
400.00
0.0%
20.00
1.00
20.00
Material Rate
700.00
Plant Rate
0.00
800.00
796.00
BSR Reference
15-04-52
Description
Supplying & fixing of 12mm GI pipe .raye to include trenching backfilling and making
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber M
0.0%
0.50
40.00
20.00
Unskilled Labour M
0.0%
0.50
30.00
15.00
0.0%
0.03
250.00
8.25
Pipe GI 12mm M
0.0%
1.00
40.00
40.00
Other expenses M
0.0%
2.00
1.00
2.00
48.25
0.00
85.25
83.50
BSR Reference
15-04-53
Description
Supplying & fixing of 20mm GI pipe rate toinclude trenching backfilling & making good to
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber M
0.0%
0.50
40.00
20.00
Unskilled Labour M
0.0%
0.50
30.00
15.00
0.0%
0.04
250.00
9.50
Pipe GI 20mm M
0.0%
1.00
50.00
50.00
Other expenses M
0.0%
2.00
1.00
2.00
Material Rate
59.50
Plant Rate
0.00
96.50
94.75
BSR Reference
15-04-54
Description
supplying & fixing of 25mm GI pipe rate to include trechung backfilling & making good to
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
47.50
1.00
47.50
Plumber M
0.0%
0.50
40.00
20.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
0.0%
0.04
250.00
10.50
Pipe GI 25mm M
0.0%
1.00
65.00
65.00
Other expenses M
0.0%
1.50
1.00
1.50
75.50
0.00
127.00
124.50
BSR Reference
15-04-55
Description
Supplying &fixing if 32mm GI pipe rate to include treching & backfilling to walls [fittings
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
47.50
1.00
47.50
Plumber M
0.0%
0.50
40.00
20.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
0.0%
0.33
250.00
82.50
Pipe GI 32mm M
0.0%
1.00
80.00
80.00
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
162.50
Plant Rate
0.00
214.00
211.50
BSR Reference
15-04-56
Description
supplying & fixing of 38mm GI pipes rate to include treching backfilling & making good to
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
47.50
1.00
47.50
Plumber M
0.0%
0.50
40.00
20.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
0.0%
0.03
250.00
8.25
Pipe Gi 38mm M
0.0%
1.00
100.00
100.00
Other expenses M
0.0%
1.50
1.00
1.50
108.25
0.00
159.75
157.25
BSR Reference
15-04-57
Description
Supplying & fixing of 50mm GI pipes rate to include treching backfilling & making good
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Plumber M
0.0%
0.60
40.00
24.00
Unskilled Labour M
0.0%
1.20
30.00
36.00
0.0%
0.03
250.00
8.25
Pipe Gi 50mm M
0.0%
1.00
125.00
125.00
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
133.25
Plant Rate
0.00
194.75
191.75
BSR Reference
15-04-58
Description
Supplying & fixing of 75mm GI pipes rate to include treching backfilling & making good to
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Plumber M
0.0%
0.60
40.00
24.00
Unskilled Labour M
0.0%
1.20
30.00
36.00
0.0%
0.03
250.00
8.25
Pipe GI 75mm M
0.0%
1.00
300.00
300.00
Other expenses M
0.0%
1.50
1.00
1.50
308.25
0.00
369.75
366.75
BSR Reference
15-04-59
Description
Fixing of 12mm to 50mm GI pipes with specials bends,elbows etc [pipes & specials
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Plumber M
0.0%
0.60
40.00
24.00
Unskilled Labour M
0.0%
1.20
30.00
36.00
0.0%
0.03
250.00
8.25
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
8.25
69.75
Plant Rate
0.00
66.75
BSR Reference
15-04-60
Description
Supplying & fixing of 63mm to 75mm GI pipes .rate to including treching & making good to
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Plumber M
0.0%
0.60
40.00
24.00
Unskilled Labour M
0.0%
1.20
30.00
36.00
0.0%
0.03
250.00
7.50
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
7.50
69.00
Plant Rate
0.00
66.00
BSR Reference
15-04-61
Description
Removing of GI pipes any size upto 50mm & trench filled in.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
33.52
1.00
33.52
Plumber M
0.0%
0.13
40.00
5.28
Unskilled Labour M
0.0%
1.00
30.00
30.00
Material Rate
0.00
35.28
Plant Rate
0.00
33.52
BSR Reference
15-04-62
Description
Removing of GI pipes 50mm to 100mm & making good to walls & floors .
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
47.98
1.00
47.98
Plumber M
0.0%
0.85
40.00
34.00
Unskilled Labour M
0.0%
0.55
30.00
16.50
Cement M
0.0%
0.04
340.00
11.90
0.0%
2.25
1.00
2.25
Material Rate
11.90
Plant Rate
0.00
64.65
62.13
BSR Reference
15-04-63
Description
Existing GI pipes upto 50mm takeout ,clraned & relaid rate to include backfilling.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
24.51
1.00
24.51
Plumber M
0.0%
0.27
40.00
10.80
Unskilled Labour M
0.0%
0.50
30.00
15.00
0.0%
0.19
250.00
47.50
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
47.50
Plant Rate
0.00
74.80
73.51
BSR Reference
15-04-64
Description
Existing GI pipes 63mm to 75mm takeout ,cleaned and telaid.rateto include backfilling.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
43.70
1.00
43.70
Plumber M
0.0%
0.40
40.00
16.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
0.0%
0.03
250.00
7.50
Other expenses M
0.0%
1.50
1.00
1.50
Material Rate
7.50
55.00
Plant Rate
0.00
52.70
BSR Reference
15-04-65
Description
Existing GI pipes upto take cleaned and relaid in new position. rate to include backfilling.
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
45.60
1.00
45.60
Plumber M
0.0%
0.30
40.00
12.00
Unskilled Labour M
0.0%
1.20
30.00
36.00
Material Rate
0.00
48.00
Plant Rate
0.00
45.60
BSR Reference
15-04-66
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
28.50
1.00
28.50
Unskilled Labour M
0.0%
1.00
30.00
30.00
Material Rate
0.00
30.00
Plant Rate
0.00
28.50
BSR Reference
15-04-67
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
5.52
1.00
5.52
Plumber Nos.
0.0%
0.08
40.00
3.32
0.0%
0.08
30.00
2.49
Material Rate
0.00
5.81
Plant Rate
0.00
5.52
BSR Reference
15-04-68
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
5.52
1.00
5.52
Plumber Nos.
0.0%
0.08
40.00
3.32
0.0%
0.08
30.00
2.49
0.0%
1.00
20.00
20.00
20.00
Plant Rate
0.00
BSR Reference
15-04-69
Description
Resource Unit
25.81
25.52
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
5.52
1.00
5.52
Plumber Nos.
0.0%
0.08
40.00
3.32
0.0%
0.08
30.00
2.49
0.0%
1.00
12.00
12.00
Material Rate
12.00
Plant Rate
0.00
BSR Reference
15-04-70
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
17.81
17.52
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
5.52
1.00
5.52
Plumber Nos.
0.0%
0.08
40.00
3.32
0.0%
0.08
30.00
2.49
0.0%
1.00
20.00
20.00
20.00
0.00
25.81
25.52
BSR Reference
15-04-71
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
5.52
1.00
5.52
Plumber Nos.
0.0%
0.08
40.00
3.32
0.0%
0.08
30.00
2.49
0.0%
1.00
24.00
24.00
24.00
Plant Rate
0.00
BSR Reference
15-04-72
Description
Resource Unit
29.81
29.52
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
5.52
1.00
5.52
Plumber Nos.
0.0%
0.08
40.00
3.32
0.0%
0.08
30.00
2.49
0.0%
1.00
28.00
28.00
Material Rate
28.00
Plant Rate
0.00
BSR Reference
15-04-73
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
33.81
33.52
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
5.52
1.00
5.52
Plumber Nos.
0.0%
0.08
40.00
3.32
0.0%
0.08
30.00
2.49
0.0%
1.00
33.00
33.00
33.00
0.00
38.81
38.52
BSR Reference
15-04-74
Description
Supplying and fixing of 25mm to 32mm rubber plugs for wash basins and sinks.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.50
1.00
9.50
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
1.00
17.00
17.00
Material Rate
17.00
Plant Rate
0.00
27.00
26.50
BSR Reference
15-04-75
Description
Supplying and fixing of 38mm to 50mm rubber plugs for wash basins and sinks.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.50
1.00
9.50
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
1.00
27.00
27.00
Material Rate
27.00
Plant Rate
0.00
37.00
36.50
BSR Reference
15-04-76
Description
Supplying and fixing of wooden plugs in Class I timber 100mm long, tapered 75mm to
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
22.80
1.00
22.80
Carpenter Nos.
0.0%
0.40
45.00
18.00
0.0%
0.20
30.00
6.00
0.0%
0.07
230.00
16.10
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
16.10
0.00
42.10
40.90
BSR Reference
15-04-77
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
12.69
1.00
12.69
Plumber Nos.
0.0%
0.33
40.00
13.36
0.0%
1.00
100.00
100.00
0.0%
1.00
1.00
1.00
Material Rate
100.00
Plant Rate
0.00
114.36
113.69
BSR Reference
15-04-78
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
12.69
1.00
12.69
Plumber Nos.
0.0%
0.33
40.00
13.36
0.0%
1.00
90.00
90.00
0.0%
1.00
1.00
1.00
Material Rate
90.00
Plant Rate
0.00
104.36
103.69
BSR Reference
15-04-79
Description
Making a platform, with bamboo and planks for lifting or lowering of storage tank to a
Unit
Nos.
Resource Unit
Quantit
Rate Type
Amount
0.0%
456.00
1.00
456.00
0.0%
16.00
30.00
480.00
0.0%
3.50
80.00
280.00
0.0%
0.07
150.00
10.50
0.0%
15.00
1.00
15.00
Material Rate
Plant Rate
Wastag
290.50
0.00
785.50
761.50
BSR Reference
15-04-80
Description
Making a platform, with bamboo and planks for lifting or lowering of storage tanks to a
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
570.00
1.00
570.00
0.0%
20.00
30.00
600.00
0.0%
7.00
80.00
560.00
0.0%
0.07
150.00
10.50
0.0%
20.00
1.00
20.00
Material Rate
570.50
Plant Rate
0.00
1,190.50
1,160.50
BSR Reference
15-04-81
Description
Supplying and fixing of 600mm * 125mm glass shelves with chromium plated brackets to
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
47.50
1.00
47.50
Plumber Nos.
0.0%
1.25
40.00
50.00
0.0%
1.00
250.00
250.00
0.0%
4.00
3.00
12.00
Material Rate
262.00
Plant Rate
0.00
312.00
309.50
BSR Reference
15-04-82
Description
Fixing any size of shower rosw in position (Shower rose supplied by client)
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.50
1.00
9.50
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
11.00
Plant Rate
0.00
10.50
BSR Reference
15-04-83
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.50
1.00
9.50
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
1.00
100.00
100.00
Material Rate
100.00
Plant Rate
0.00
110.00
109.50
BSR Reference
15-04-84
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.50
1.00
9.50
Plumber Nos.
0.0%
0.25
40.00
10.00
0.0%
1.00
60.00
60.00
Material Rate
60.00
Plant Rate
0.00
BSR Reference
15-04-85
Description
Resource Unit
70.00
69.50
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
38.00
1.00
38.00
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
15.00
1.00
15.00
Material Rate
0.00
55.00
Plant Rate
0.00
53.00
BSR Reference
15-04-86
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
4.75
1.00
4.75
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
1.00
12.00
12.00
0.0%
1.00
1.00
1.00
12.00
Plant Rate
0.00
BSR Reference
15-04-87
Description
Resource Unit
18.00
17.75
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4.75
1.00
4.75
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
1.00
15.00
15.00
Material Rate
15.00
Plant Rate
0.00
BSR Reference
15-04-88
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
20.00
19.75
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4.75
1.00
4.75
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
1.00
23.00
23.00
0.0%
1.00
1.00
1.00
23.00
0.00
29.00
28.75
BSR Reference
15-04-89
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
4.75
1.00
4.75
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
1.00
33.00
33.00
0.0%
1.00
1.00
1.00
33.00
Plant Rate
0.00
BSR Reference
15-04-90
Description
Resource Unit
39.00
38.75
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4.75
1.00
4.75
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
1.00
33.00
33.00
0.0%
1.00
1.00
1.00
Material Rate
33.00
Plant Rate
0.00
BSR Reference
15-04-91
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
39.00
38.75
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4.75
1.00
4.75
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
1.00
55.00
55.00
0.0%
1.00
1.00
1.00
55.00
0.00
61.00
60.75
BSR Reference
15-04-92
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4.75
1.00
4.75
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
6.00
Plant Rate
0.00
5.75
BSR Reference
15-04-93
Description
Repairing piller cock and fixing to basin without damaging the basin.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
57.00
1.00
57.00
Plumber Nos.
0.0%
1.50
40.00
60.00
0.0%
2.00
1.00
2.00
Material Rate
0.00
62.00
Plant Rate
0.00
59.00
BSR Reference
15-04-94
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Plumber Nos.
0.0%
0.75
40.00
30.00
0.0%
0.75
30.00
22.50
0.0%
1.00
240.00
240.00
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
240.00
0.00
293.50
290.88
BSR Reference
15-04-95
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Plumber Nos.
0.0%
0.75
40.00
30.00
0.0%
0.75
30.00
22.50
0.0%
1.00
250.00
250.00
0.0%
1.00
1.00
1.00
Material Rate
250.00
Plant Rate
0.00
303.50
300.88
BSR Reference
15-04-96
Description
Fixing of sink in any size with all fitting (Sink and fittings supplied by Client).
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
541.50
1.00
541.50
Mason Nos.
0.0%
2.00
45.00
90.00
Plumber Nos.
0.0%
6.00
40.00
240.00
0.0%
8.00
30.00
240.00
Plugs Nos.
0.0%
4.00
16.00
64.00
0.0%
4.00
1.00
4.00
Material Rate
64.00
Plant Rate
0.00
638.00
609.50
BSR Reference
15-04-97
Description
Supplying and fixing of 610mm * 380mm * 180mm glazed earthenware sink with all fitting
Unit
Nos.
on existing brackets.
Resource Unit
Quantit
Rate Type
Amount
0.0%
365.75
1.00
365.75
Plumber Nos.
0.0%
5.50
40.00
220.00
0.0%
5.50
30.00
165.00
0.0%
1.00
1,800.00
1,800.00
0.0%
5.00
1.00
5.00
Material Rate
Plant Rate
Wastag
1,800.00
0.00
2,190.00
2,170.75
BSR Reference
15-04-98
Description
Supplying and fixing of 610mm * 380mm * 180mm glazed earthenware sink with all
Unit
Nos.
Resource Unit
Wastag
Quantit
Amount
0.0%
365.75
1.00
365.75
Plumber Nos.
0.0%
5.50
40.00
220.00
0.0%
5.50
30.00
165.00
0.0%
1.00
1,800.00
1,800.00
0.0%
1.00
55.00
55.00
0.0%
5.00
1.00
5.00
Material Rate
1,855.00
Plant Rate
0.00
2,245.00
2,225.75
BSR Reference
15-04-99
Description
Unit
Resource Unit
Material Rate
Plant Rate
Rate Type
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
774.25
1.00
774.25
Mason Nos.
0.0%
3.00
45.00
135.00
Plumber Nos.
0.0%
8.00
40.00
320.00
0.0%
12.00
30.00
360.00
Plugs Nos.
0.0%
1.00
16.00
16.00
0.0%
9.00
1.00
9.00
16.00
0.00
840.00
799.25
BSR Reference
15-05-01
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
11.88
1.00
11.88
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
0.13
30.00
3.75
0.0%
1.00
7.00
7.00
0.0%
1.00
1.00
1.00
Material Rate
7.00
20.50
Plant Rate
0.00
19.88
BSR Reference
15-05-02
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
8.00
8.00
0.0%
1.00
1.00
1.00
Material Rate
8.00
17.75
Plant Rate
0.00
17.31
BSR Reference
15-05-03
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
9.00
9.00
0.0%
1.00
1.00
1.00
Material Rate
9.00
18.75
Plant Rate
0.00
18.31
BSR Reference
15-05-04
Description
Resource Unit
Unit
Wastag
Quantit
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
10.00
10.00
0.0%
1.00
1.00
1.00
10.00
Plant Rate
0.00
19.75
19.31
BSR Reference
15-05-05
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
14.00
14.00
0.0%
1.00
1.00
1.00
Material Rate
14.00
Plant Rate
0.00
23.75
23.31
BSR Reference
15-05-06
Description
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
Nos.
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
24.00
24.00
0.0%
1.00
1.00
1.00
24.00
0.00
33.75
33.31
BSR Reference
15-05-07
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
11.11
1.00
11.11
Plumber Nos.
0.0%
0.17
40.00
6.68
0.0%
0.17
30.00
5.01
0.0%
1.00
90.00
90.00
0.0%
1.00
1.00
1.00
Material Rate
90.00
Plant Rate
0.00
102.69
102.11
BSR Reference
15-05-08
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
20.00
20.00
0.0%
1.00
1.00
1.00
Material Rate
20.00
Plant Rate
0.00
29.75
29.31
BSR Reference
15-05-09
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
1.00
30.00
30.00
0.0%
1.00
35.00
35.00
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
35.00
0.00
71.00
69.25
BSR Reference
15-05-10
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
42.00
42.00
0.0%
1.00
1.00
1.00
Material Rate
42.00
Plant Rate
0.00
51.75
51.31
BSR Reference
15-05-11
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
60.00
60.00
0.0%
1.00
1.00
1.00
Material Rate
60.00
Plant Rate
0.00
69.75
69.31
BSR Reference
15-05-12
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
80.00
80.00
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
Amount
80.00
0.00
89.75
89.31
BSR Reference
15-05-13
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
11.11
1.00
11.11
Plumber Nos.
0.0%
0.17
40.00
6.68
0.0%
0.17
30.00
5.01
0.0%
1.00
100.00
100.00
0.0%
1.00
1.00
1.00
Material Rate
100.00
Plant Rate
0.00
112.69
112.11
BSR Reference
15-05-14
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
8.31
1.00
8.31
Plumber Nos.
0.0%
0.13
40.00
5.00
0.0%
0.13
30.00
3.75
0.0%
1.00
1.00
1.00
Material Rate
0.00
9.75
Plant Rate
0.00
9.31
BSR Reference
15-05-15
Description
Suppyling of white porcelain soap tray and fixing to wall by rawl plugs.
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
38.00
1.00
38.00
Plumber Nos.
0.0%
1.00
40.00
40.00
0.0%
2.00
3.00
6.00
0.0%
1.00
210.00
210.00
0.0%
5.00
1.00
5.00
216.00
0.00
261.00
259.00
BSR Reference
15-05-16
Description
Steel work in RSJ's as upport for tanks, Fixing in position up to 6000mm in height and
Unit
Kg
Resource Unit
Wastag
Quantit
2.30
1.00
2.30
Painter Kg
0.0%
0.01
40.00
0.24
Plumber Kg
0.0%
0.02
40.00
0.80
Unskilled Labour Kg
0.0%
0.05
30.00
1.38
Anti-corrosive paint Kg
0.0%
0.01
180.00
1.44
H iron 2"*4" Kg
0.0%
1.10
40.00
44.00
0.0%
0.01
250.00
2.00
Cement etc Kg
0.0%
0.30
1.00
0.30
47.44
Plant Rate
0.00
50.16
50.04
BSR Reference
15-05-17
Description
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
75.00
75.00
0.0%
1.00
1.00
1.00
75.00
0.00
111.00
109.25
BSR Reference
15-05-18
Description
Resource Unit
Unit
Wastag
Quantit
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
90.00
90.00
0.0%
1.00
1.00
1.00
90.00
Plant Rate
0.00
126.00
124.25
BSR Reference
15-05-19
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
90.00
90.00
0.0%
1.00
1.00
1.00
Material Rate
90.00
Plant Rate
0.00
126.00
124.25
BSR Reference
15-05-20
Description
Resource Unit
Plant Rate
Rate Type
Material Rate
Material Rate
Nos.
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
200.00
200.00
0.0%
1.00
1.00
1.00
200.00
0.00
236.00
234.25
BSR Reference
15-05-21
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
250.00
250.00
0.0%
1.00
1.00
1.00
Material Rate
250.00
Plant Rate
0.00
286.00
284.25
BSR Reference
15-05-22
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
41.56
1.00
41.56
Plumber Nos.
0.0%
0.63
40.00
25.00
0.0%
0.63
30.00
18.75
0.0%
1.00
450.00
450.00
0.0%
1.00
1.00
1.00
Material Rate
450.00
Plant Rate
0.00
494.75
492.56
BSR Reference
15-05-23
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Plumber Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
1.00
240.00
240.00
0.0%
1.00
1.00
1.00
Material Rate
Plant Rate
240.00
0.00
276.00
274.25
BSR Reference
15-05-24
Description
Hoist & place in position of 1125-1800 Literre GI tank upto a height of 6000mm & remove
Unit
Nos.
old tank include disconnect & connect all pipes & paint the new
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1,187.50
1.00
1,187.50
Painter Nos.
0.0%
14.00
40.00
560.00
Plumber Nos.
0.0%
4.50
40.00
180.00
0.0%
17.00
30.00
510.00
0.0%
1.40
180.00
252.00
0.0%
0.70
250.00
175.00
0.0%
20.00
1.00
20.00
Material Rate
427.00
Plant Rate
0.00
1,697.00
1,634.50
BSR Reference
15-05-25
Description
Hoisting and planing in position of 110 to 910 Literre GI tank upto a height of 6000mm &
Unit
Nos.
removing the old tank including connecting and disconnecting all pipes and painting the
new tank with red lead & 2 coats of anti corrosive paint.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
703.00
1.00
703.00
Painter Nos.
0.0%
5.00
40.00
200.00
Plumber Nos.
0.0%
4.50
40.00
180.00
0.0%
12.00
30.00
360.00
0.0%
0.45
180.00
81.00
0.0%
0.23
250.00
57.50
0.0%
15.00
1.00
15.00
138.50
0.00
893.50
856.50
BSR Reference
15-05-26
Description
Place in position of 112-910 liter GI tank upto a height of 6000mm & fix erection of steel
Unit
Nos.
support include fixing of all pipes & paint the tank & support with red lead paint & 2 coats
anti corresive paint(Tank pipes, fittings,RSJ's, supplied by the c
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
551.00
1.00
551.00
Painter Nos.
0.0%
5.00
40.00
200.00
Plumber Nos.
0.0%
3.50
40.00
140.00
0.0%
8.00
30.00
240.00
0.0%
0.45
180.00
81.00
0.0%
0.22
250.00
56.25
0.0%
30.00
1.00
30.00
Material Rate
137.25
Plant Rate
0.00
747.25
718.25
BSR Reference
15-05-27
Description
Place in position of 1125-1800 l GI tank at a height of 6000mm & remove and fix of steel
Unit
Nos.
supports removing old tank include disconnect all pipes and paint new tank & support
with red lead paint & 2 coats of anticorrosive paint(Tank, pipes,fittings,R
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
978.50
1.00
978.50
Painter Nos.
0.0%
14.00
40.00
560.00
Plumber Nos.
0.0%
3.50
40.00
140.00
0.0%
11.00
30.00
330.00
0.0%
1.40
180.00
252.00
0.0%
0.70
250.00
175.00
0.0%
40.00
1.00
40.00
427.00
0.00
1,497.00
1,445.50
BSR Reference
15-05-28
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
114.00
1.00
114.00
0.0%
4.00
30.00
120.00
0.0%
10.00
1.00
10.00
Material Rate
0.00
130.00
Plant Rate
0.00
124.00
BSR Reference
15-05-29
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
228.00
1.00
228.00
0.0%
8.00
30.00
240.00
0.0%
12.00
1.00
12.00
Material Rate
0.00
252.00
Plant Rate
0.00
240.00
BSR Reference
15-05-30
Description
Removing of GI Instorage tank good to walls and floor (scaffoding paid separately where
Unit
Nos.
necessary)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
342.00
1.00
342.00
Plumber Nos.
0.0%
3.00
40.00
120.00
0.0%
8.00
30.00
240.00
0.0%
10.00
1.00
10.00
Material Rate
0.00
370.00
Plant Rate
0.00
352.00
BSR Reference
15-05-31
Description
Supplying and installing of 400 litre 16BWG GI tank including painting the tank with
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
475.00
1.00
475.00
Painter Nos.
0.0%
3.00
40.00
120.00
Plumber Nos.
0.0%
3.50
40.00
140.00
0.0%
8.00
30.00
240.00
0.0%
0.55
180.00
99.00
0.0%
1.00
6,000.00
6,000.00
0.0%
0.28
250.00
70.00
0.0%
20.00
1.00
20.00
Material Rate
6,169.00
Plant Rate
0.00
6,689.00
6,664.00
BSR Reference
15-05-32
Description
Supplying and installing of 1125 litre 16BWG GI tank including painting the tank with
Unit
Nos.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
475.00
1.00
475.00
Painter Nos.
0.0%
6.00
40.00
240.00
Plumber Nos.
0.0%
3.50
40.00
140.00
0.0%
4.00
30.00
120.00
0.0%
1.24
180.00
223.20
0.0%
0.62
250.00
155.00
0.0%
1.00
10,000.00
10,000.00
0.0%
25.00
1.00
25.00
10,378.20
0.00
10,903.20
10,878.20
BSR Reference
15-05-33
Description
Supplying and installing of 1800 litre 16BWG GI tank including painting the tank with
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
902.50
1.00
902.50
Painter Nos.
0.0%
12.00
40.00
480.00
Plumber Nos.
0.0%
3.50
40.00
140.00
0.0%
11.00
30.00
330.00
0.0%
1.80
180.00
324.00
0.0%
0.90
250.00
225.00
0.0%
1.00
13,000.00
13,000.00
0.0%
30.00
1.00
30.00
Material Rate
13,549.00
Plant Rate
0.00
14,529.00
14,481.50
BSR Reference
15-05-36
Description
Fixing of PVC bends elbows, tees and other specials upto 75mm (fittings supplied by
Unit
Nos.
Client)
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
1.00
1.00
Material Rate
0.00
8.00
Plant Rate
0.00
7.65
BSR Reference
15-06-37
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
7.50
7.50
0.0%
1.00
1.00
1.00
Material Rate
7.50
15.50
Plant Rate
0.00
15.15
BSR Reference
15-06-38
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
9.50
9.50
0.0%
1.00
1.00
1.00
Material Rate
9.50
17.50
Plant Rate
0.00
17.15
BSR Reference
15-06-39
Description
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
13.50
13.50
0.0%
1.00
1.00
1.00
13.50
0.00
21.50
21.15
BSR Reference
15-06-40
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
27.00
27.00
0.0%
1.00
1.00
1.00
27.00
Plant Rate
0.00
BSR Reference
15-06-41
Description
Resource Unit
35.00
34.65
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
44.00
44.00
0.0%
1.00
1.00
1.00
Material Rate
44.00
Plant Rate
0.00
BSR Reference
15-06-42
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
52.00
51.65
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
254.00
254.00
0.0%
1.25
1.00
1.25
254.00
0.00
262.25
261.90
BSR Reference
15-06-43
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
11.97
1.00
11.97
Plumber Nos.
0.0%
0.18
40.00
7.20
0.0%
0.18
30.00
5.40
0.0%
1.00
434.00
434.00
0.0%
1.25
1.00
1.25
Material Rate
434.00
Plant Rate
0.00
BSR Reference
15-06-44
Description
Resource Unit
447.85
447.22
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
11.31
1.00
11.31
Plumber Nos.
0.0%
0.17
40.00
6.80
0.0%
0.17
30.00
5.10
0.0%
1.00
13.00
13.00
0.0%
1.00
1.00
1.00
Material Rate
13.00
Plant Rate
0.00
BSR Reference
15-06-45
Description
Resource Unit
25.90
25.31
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
9.00
9.00
0.0%
1.00
1.00
1.00
Material Rate
9.00
17.00
Plant Rate
0.00
16.65
BSR Reference
15-06-46
Description
Resource Unit
Unit
Wastag
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
13.00
13.00
0.0%
1.00
1.00
1.00
13.00
Plant Rate
0.00
BSR Reference
15-06-47
Description
Resource Unit
21.00
20.65
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
19.00
19.00
0.0%
1.00
1.00
1.00
Material Rate
19.00
Plant Rate
0.00
BSR Reference
15-06-48
Description
Resource Unit
Plant Rate
Quantit
Material Rate
Material Rate
Nos.
27.00
26.65
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
30.00
30.00
0.0%
1.00
1.00
1.00
30.00
0.00
38.00
37.65
BSR Reference
15-06-49
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
122.00
122.00
0.0%
1.25
1.00
1.25
Material Rate
122.00
Plant Rate
0.00
BSR Reference
15-06-50
Description
Resource Unit
130.25
129.90
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
11.97
1.00
11.97
Plumber Nos.
0.0%
0.18
40.00
7.20
0.0%
0.18
30.00
5.40
0.0%
1.00
211.00
211.00
0.0%
1.25
1.00
1.25
Material Rate
211.00
Plant Rate
0.00
224.85
224.22
BSR Reference
15-06-51
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Plumber Nos.
0.0%
0.10
40.00
4.00
0.0%
0.10
30.00
3.00
0.0%
1.00
7.50
7.50
0.0%
1.00
1.00
1.00
Material Rate
7.50
15.50
Plant Rate
0.00
15.15
BSR Reference
15-06-52
Description
Supplying of 200mm * 400mm half round tooth brush holders and fixing with rawl plugs)
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Plumber Nos.
0.0%
0.75
40.00
30.00
0.0%
0.75
30.00
22.50
0.0%
2.00
3.00
6.00
0.0%
1.00
175.00
175.00
0.0%
2.00
1.00
2.00
Material Rate
Plant Rate
181.00
0.00
235.50
232.88
BSR Class
BSR Reference
05-00-01
Description
Unit
Resource Unit
Wastag
M3
Quantit
844.46
1.00
844.46
Mason M3
0.0%
8.46
45.00
380.70
Unskilled Labour M3
0.0%
16.94
30.00
508.20
Cement M3
0.0%
2.60
340.00
884.00
0.0%
1.00
350.00
350.00
Sand M3
0.0%
0.45
350.00
157.50
1,391.50
Plant Rate
0.00
2,280.40
2,235.95
BSR Reference
05-00-02
Description
Unit
Resource Unit
Plant Rate
Amount
0.0%
Material Rate
Material Rate
Rate Type
Wastag
M3
Quantit
Rate Type
Amount
0.0%
1,057.35
1.00
1,057.35
Mason M3
0.0%
10.60
45.00
477.00
Unskilled Labour M3
0.0%
21.20
30.00
636.00
Cement M3
0.0%
2.60
340.00
884.00
0.0%
1.00
350.00
350.00
Sand M3
0.0%
0.45
350.00
157.50
1,391.50
0.00
2,504.50
2,448.85
BSR Reference
05-00-03
Description
Random rubble masonry in 1:5 cement mortar using rubble available at site including
Unit
M3
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
437.48
1.00
437.48
Mason M3
0.0%
8.50
45.00
382.50
Unskilled Labour M3
0.0%
2.60
30.00
78.00
Cement M3
0.0%
2.60
340.00
884.00
Sand M3
0.0%
0.45
350.00
157.50
1,041.50
0.00
1,502.00
1,478.97
BSR Class
REINFORCEMENT
BSR Reference
18-00-01
Description
Resource Unit
Quantit
Rate Type
Amount
0.0%
20.00
1.00
20.00
Barbender Kg
0.0%
0.50
40.00
20.00
0.0%
1.00
40.00
40.00
40.00
Plant Rate
0.00
BSR Reference
18-00-02
Description
Resource Unit
60.00
60.00
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
20.00
1.00
20.00
Barbender Kg
0.0%
0.50
40.00
20.00
0.0%
1.00
40.00
40.00
Material Rate
40.00
Plant Rate
0.00
BSR Reference
18-00-03
Description
Resource Unit
Plant Rate
Wastag
Kg
Material Rate
Material Rate
Unit
60.00
60.00
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
20.00
1.00
20.00
Barbender Kg
0.0%
0.50
40.00
20.00
0.0%
2.00
40.00
80.00
80.00
0.00
100.00
100.00
BSR Reference
18-00-04
Description
Resource Unit
Quantit
Rate Type
Amount
0.0%
20.00
1.00
20.00
Barbender Kg
0.0%
0.50
40.00
20.00
0.0%
1.00
40.00
40.00
40.00
Plant Rate
0.00
BSR Reference
18-00-05
Description
Resource Unit
60.00
60.00
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
20.00
1.00
20.00
Barbender Kg
0.0%
0.50
40.00
20.00
0.0%
1.00
40.00
40.00
Material Rate
40.00
Plant Rate
0.00
BSR Reference
18-00-06
Description
Resource Unit
Plant Rate
Wastag
Kg
Material Rate
Material Rate
Unit
60.00
60.00
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
20.00
1.00
20.00
Barbender Kg
0.0%
0.50
40.00
20.00
0.0%
1.00
40.00
40.00
40.00
0.00
60.00
60.00
BSR Reference
18-00-07
Description
Resource Unit
Quantit
Rate Type
Amount
0.0%
20.00
1.00
20.00
Barbender Kg
0.0%
0.50
40.00
20.00
0.0%
1.00
40.00
40.00
40.00
Plant Rate
0.00
BSR Reference
18-00-08
Description
Resource Unit
60.00
60.00
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
20.00
1.00
20.00
Barbender Kg
0.0%
0.50
40.00
20.00
0.0%
1.00
40.00
40.00
Material Rate
40.00
Plant Rate
0.00
BSR Reference
18-00-09
Description
Resource Unit
Plant Rate
Wastag
Kg
Material Rate
Material Rate
Unit
60.00
60.00
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
22.00
1.00
22.00
Barbender Kg
0.0%
0.60
40.00
24.00
0.0%
1.00
40.00
40.00
40.00
0.00
64.00
62.00
BSR Reference
18-00-10
Description
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
Kg
Quantit
Rate Type
Amount
0.0%
23.00
1.00
23.00
Barbender Kg
0.0%
0.60
40.00
24.00
0.0%
1.00
40.00
40.00
40.00
0.00
64.00
63.00
BSR Class
ROOFER
BSR Reference
07-00-01
Description
Fixing and corrugated asbestos or aluminum alloy sheets with hooks bolts and nuts to
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
22.23
1.00
22.23
Black Smith M2
0.0%
0.30
40.00
12.00
Unskilled Labour M2
0.0%
0.38
30.00
11.40
0.0%
4.00
6.00
24.00
Limpet washers M2
0.0%
4.00
1.50
6.00
Material Rate
30.00
Plant Rate
0.00
53.40
52.23
BSR Reference
07-00-02
Description
Supplying and fixing of corrugated GI sheets roofing on class I timber purlins complete
Unit
M2
including treating timber with wood and preservatives (ridging measured separately). drive
screws and washers
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
56.29
1.00
56.29
Carpenter M2
0.0%
0.65
45.00
29.25
Unskilled Labour M2
0.0%
1.00
30.00
30.00
0.0%
3.00
8.00
24.00
G.I.sheet 24 B.W.G. M2
0.0%
1.20
320.00
384.00
0.0%
0.01
30,000.00
300.00
Wood Preservative M2
0.0%
0.08
110.00
8.80
716.80
0.00
776.05
773.09
BSR Reference
07-00-03
Description
supplying and fixing of corrugated aluminum sheets on 100mm * 50mm class I timber frame
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
104.88
1.00
104.88
Carpenter M2
0.0%
1.72
45.00
77.40
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
3.00
8.00
24.00
0.0%
1.10
350.00
385.00
0.0%
0.01
30,000.00
300.00
Material Rate
709.00
Plant Rate
0.00
819.40
813.88
BSR Reference
07-00-04
Description
supplying and fixing of corrugated aluminum sheets to roof or wall on existing frame work
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
30.64
1.00
30.64
Carpenter M2
0.0%
0.43
45.00
19.35
Unskilled Labour M2
0.0%
0.43
30.00
12.90
0.0%
3.00
8.00
24.00
0.0%
1.10
350.00
385.00
Material Rate
Plant Rate
409.00
0.00
441.25
439.64
BSR Reference
07-00-05
Description
supplying and fixing of corrugated asbestos sheet roofing on class I timber purlins
Unit
M2
complete including treating timber with wood preservative. drive screws and washers.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
63.27
1.00
63.27
Carpenter M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.02
30.00
30.60
0.0%
1.17
220.00
256.74
0.0%
2.15
8.00
17.20
0.0%
0.01
30,000.00
300.00
Wood Preservative M2
0.0%
0.07
110.00
7.70
Material Rate
581.64
Plant Rate
0.00
648.24
644.91
BSR Reference
07-00-06
Description
supplying and fixing of corrugated asbestos sheet cladding on 100 * 50mm class I timber
Unit
M2
Resource Unit
Quantit
Rate Type
Amount
0.0%
104.88
1.00
104.88
Carpenter M2
0.0%
1.72
45.00
77.40
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
1.10
221.00
243.10
0.0%
2.15
8.00
17.20
0.0%
0.01
30,000.00
300.00
Material Rate
Plant Rate
Wastag
560.30
0.00
670.70
665.18
BSR Reference
07-00-07
Description
supplying and fixing of corrugated asbestos sheets to roof or wall on existing frame work
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
41.33
1.00
41.33
Carpenter M2
0.0%
0.50
45.00
22.50
Unskilled Labour M2
0.0%
0.70
30.00
21.00
0.0%
1.17
221.00
258.57
0.0%
2.00
8.00
16.00
Material Rate
274.57
Plant Rate
0.00
318.07
315.89
BSR Reference
07-00-08
Description
supplying and fixing of 24 BWG corrugated GI. roofing on class I timber purlin complete
Unit
M2
with GI ridging washer hook bolts or clps including treating timber with wood
preservative.
Resource Unit
Quantit
Rate Type
Amount
0.0%
65.83
1.00
65.83
Carpenter M2
0.0%
0.80
45.00
36.00
Unskilled Labour M2
0.0%
1.11
30.00
33.30
0.0%
2.15
8.00
17.20
0.0%
1.20
350.00
420.00
G.I.sheet 24 B.W.G. M2
0.0%
0.06
320.00
18.24
0.0%
0.01
30,000.00
300.00
Wood Preservative M2
0.0%
0.08
110.00
8.80
Material Rate
Plant Rate
Wastag
764.24
0.00
833.54
830.08
BSR Reference
07-00-09
Description
saving and fixing corrugated GI cladding on class I timber frame work fixed complete. Using
Unit
M2
roofing nails
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
104.03
1.00
104.03
Carpenter M2
0.0%
1.70
45.00
76.50
Unskilled Labour M2
0.0%
1.10
30.00
33.00
0.0%
1.20
350.00
420.00
Roofing nails M2
0.0%
0.05
70.00
3.50
0.0%
0.01
30,000.00
300.00
Material Rate
723.50
Plant Rate
0.00
833.00
827.53
BSR Reference
07-00-10
Description
24 BWG corrugated GI sheets fixed to roof wall or fence with necessary cup washes hook
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
30.64
1.00
30.64
Carpenter M2
0.0%
0.43
45.00
19.35
Unskilled Labour M2
0.0%
0.43
30.00
12.90
0.0%
3.00
8.00
24.00
0.0%
1.20
350.00
420.00
Material Rate
444.00
Plant Rate
0.00
476.25
474.64
BSR Reference
07-00-11
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
37.91
1.00
37.91
0.0%
1.33
30.00
39.90
Material Rate
0.00
39.90
Plant Rate
0.00
37.91
BSR Reference
07-00-12
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
9.49
1.00
9.49
0.0%
0.33
30.00
9.99
Material Rate
0.00
9.99
Plant Rate
0.00
9.49
BSR Reference
07-00-13
Description
Rectification of leaks (up to 5 in number) of roof of buildings above one storied building
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
48.45
1.00
48.45
0.0%
1.70
30.00
51.00
Material Rate
0.00
51.00
Plant Rate
0.00
48.45
BSR Reference
07-00-14
Description
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
19.10
1.00
19.10
0.0%
0.67
30.00
20.10
Material Rate
0.00
20.10
Plant Rate
0.00
19.10
BSR Reference
07-00-15
Description
Rectification of leaks in corrugated sheet roofs made good with bitumen washers and GI
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
34.20
1.00
34.20
0.0%
1.20
30.00
36.00
0.0%
1.00
0.50
0.50
0.0%
1.00
5.00
5.00
Material Rate
5.50
41.50
Plant Rate
0.00
39.70
BSR Reference
07-00-16
Description
Rectification of leaks in corrugated sheet roof patched with jute Hussein dipped in asphalt
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
34.20
1.00
34.20
0.0%
1.20
30.00
36.00
0.0%
5.00
1.00
5.00
Material Rate
0.00
41.00
Plant Rate
0.00
39.20
BSR Reference
07-00-17
Description
Fixing of asbestos cement, Aluminum alloy or GI ridging available at site with hook bolts
Unit
or screws
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Black Smith M
0.0%
0.50
40.00
20.00
Unskilled Labour M
0.0%
0.50
30.00
15.00
0.0%
7.00
8.00
56.00
56.00
0.00
91.00
89.25
BSR Reference
07-00-18
Description
Calicut pattern ridging bedded in 1:1:4 cement and lime mortar coloured to match tiles
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
39.19
1.00
39.19
Carpenter M
0.0%
0.55
45.00
24.75
Unskilled Labour M
0.0%
0.55
30.00
16.50
Cement M
0.0%
0.09
340.00
30.60
0.0%
2.50
20.00
50.00
Sand M
0.0%
0.01
350.00
5.25
Slaked lime M
0.0%
0.00
2,850.00
8.55
Colouring powder M
0.0%
3.50
1.00
3.50
Material Rate
94.40
Plant Rate
0.00
139.15
137.09
BSR Reference
07-00-19
Description
Calicut pattern ridging bedded in 1:1:4 cement and lime mortar coloured to match
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
39.19
1.00
39.19
Carpenter M
0.0%
0.55
45.00
24.75
Unskilled Labour M
0.0%
0.55
30.00
16.50
Cement M
0.0%
0.09
340.00
30.60
Sand M
0.0%
0.02
350.00
7.00
Slaked lime M
0.0%
0.00
2,850.00
0.00
Colouring powder M
0.0%
3.50
1.00
3.50
37.60
0.00
82.35
80.29
BSR Reference
07-00-20
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
39.90
1.00
39.90
Black Smith M
0.0%
0.60
40.00
24.00
Unskilled Labour M
0.0%
0.60
30.00
18.00
0.0%
7.00
5.00
35.00
0.0%
0.27
640.00
172.80
Material Rate
207.80
Plant Rate
0.00
249.80
247.70
BSR Reference
07-00-21
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
35.63
1.00
35.63
Carpenter M
0.0%
0.50
45.00
22.50
Unskilled Labour M
0.0%
0.50
30.00
15.00
0.0%
1.00
210.00
210.00
0.0%
4.00
6.00
24.00
Material Rate
Plant Rate
234.00
0.00
271.50
269.63
BSR Reference
07-00-22
Description
Half round tile ridging bedding in 1:1:4 lime cement mortar and coloured to match tiles.
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Carpenter M
0.0%
0.70
45.00
31.50
Unskilled Labour M
0.0%
0.70
30.00
21.00
Cement M
0.0%
0.11
340.00
37.40
Sand M
0.0%
0.02
350.00
7.00
Slaked lime M
0.0%
0.00
2,850.00
11.40
0.0%
4.00
5.00
20.00
Colouring powder M
0.0%
7.00
1.00
7.00
Material Rate
75.80
Plant Rate
0.00
135.30
132.68
BSR Reference
07-00-23
Description
Ridging with half round bedded in 1:1:4 lime cement mortar and coloured to match tiles.
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
49.88
1.00
49.88
Carpenter M
0.0%
0.70
45.00
31.50
Unskilled Labour M
0.0%
0.70
30.00
21.00
Cement M
0.0%
0.11
340.00
37.40
Sand M
0.0%
0.02
350.00
7.00
Slaked lime M
0.0%
0.04
2,850.00
114.00
Colouring powder M
0.0%
7.00
1.00
7.00
158.40
0.00
217.90
215.27
BSR Reference
07-00-24
Description
Ridging with half round or calicut pattern tiles removing and revaying in 1:1:4 lime cement
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
64.13
1.00
64.13
Carpenter M
0.0%
0.90
45.00
40.50
Unskilled Labour M
0.0%
0.90
30.00
27.00
Cement M
0.0%
0.11
340.00
37.40
Sand M
0.0%
0.02
350.00
7.00
Slaked lime M
0.0%
0.00
2,850.00
11.40
Colouring powder M
0.0%
7.00
1.00
7.00
Material Rate
55.80
Plant Rate
0.00
130.30
126.93
BSR Reference
07-00-25
Description
0.6 m * 0.6m * 4mm thick ribbed skvlight glass supplied and fixed to roof including
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
0.0%
142.50
1.00
142.50
Carpenter Nos.
0.0%
2.00
45.00
90.00
0.0%
2.00
30.00
60.00
0.0%
0.37
270.00
99.90
0.0%
16.00
1.00
16.00
Material Rate
99.90
Plant Rate
0.00
265.90
258.40
BSR Reference
07-00-26
Description
Supplying and laving calicut pattern flat tiles (up to 5 tiles) in single storeyed building.
Resource Unit
Material Rate
Plant Rate
Amount
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4.85
1.00
4.85
0.0%
0.17
30.00
5.10
0.0%
1.00
12.00
12.00
12.00
0.00
17.10
16.85
BSR Reference
07-00-27
Description
Supplying and laving calicut pattern flat tiles (above 5 tiles) in single storeyed building.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
2.00
1.00
2.00
0.0%
0.07
30.00
2.10
0.0%
1.00
12.00
12.00
Material Rate
12.00
Plant Rate
0.00
14.10
14.00
BSR Reference
07-00-28
Description
Supplying and laving calicut pattern flat tiles (above 5 tiles) in buildings of more than one
Unit
Nos.
storey.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
9.41
1.00
9.41
0.0%
0.33
30.00
9.90
0.0%
1.00
12.00
12.00
Material Rate
12.00
Plant Rate
0.00
21.90
21.41
BSR Reference
07-00-29
Description
Supplying and laving calicut pattern flat tiles (above 5 up to 25 tiles) in building of more
Unit
Nos.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
3.70
1.00
3.70
0.0%
0.13
30.00
3.90
0.0%
1.00
12.00
12.00
12.00
0.00
15.90
15.70
BSR Reference
07-00-30
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
12.26
1.00
12.26
Unskilled Labour M2
0.0%
0.43
30.00
12.90
0.0%
13.50
8.00
108.00
Material Rate
108.00
Plant Rate
0.00
120.90
120.26
BSR Reference
07-00-31
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
12.26
1.00
12.26
Unskilled Labour M2
0.0%
0.43
30.00
12.90
Material Rate
0.00
12.90
Plant Rate
0.00
12.26
BSR Reference
07-00-32
Description
Laying of glass tiles in small quantities including fixing with GI wire where necessary (
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
14.25
1.00
14.25
0.0%
0.50
30.00
15.00
Material Rate
0.00
15.00
Plant Rate
0.00
14.25
BSR Reference
07-00-33
Description
Supplying and laying of half round tiles up to 50 Nos.. in single storied buildings.
Resource Unit
Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
0.85
1.00
0.85
0.0%
0.03
30.00
0.90
0.0%
1.00
5.00
5.00
Material Rate
5.00
5.90
Plant Rate
0.00
5.85
BSR Reference
07-00-34
Description
Supplying and laying of half round tiles above 50Noss and up to 100Noss in single
Unit
Nos.
storied buildings.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
0.57
1.00
0.57
0.0%
0.02
30.00
0.60
0.0%
1.00
5.00
5.00
Material Rate
5.00
5.60
Plant Rate
0.00
5.57
BSR Reference
07-00-35
Description
Supplying and laying of half round tiles up to 50 Nos.. on buildings of more than one
Unit
Nos.
story
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
2.00
1.00
2.00
0.0%
0.07
30.00
2.10
0.0%
1.00
5.00
5.00
Material Rate
5.00
7.10
Plant Rate
0.00
7.00
BSR Reference
07-00-36
Description
Supplying and laying of half round tiles above 50 and up to 100Noss. on roof of buildings
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
1.43
1.00
1.43
0.0%
0.05
30.00
1.50
0.0%
1.00
5.00
5.00
Material Rate
5.00
6.50
Plant Rate
0.00
6.43
BSR Reference
07-00-37
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
24.51
1.00
24.51
Unskilled Labour M2
0.0%
0.86
30.00
25.80
0.0%
65.00
5.00
325.00
Material Rate
325.00
Plant Rate
0.00
350.80
349.51
BSR Reference
07-00-38
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
24.51
1.00
24.51
Unskilled Labour M2
0.0%
0.86
30.00
25.80
Material Rate
0.00
25.80
Plant Rate
0.00
24.51
BSR Reference
07-00-39
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
18.52
1.00
18.52
Unskilled Labour M2
0.0%
0.65
30.00
19.50
Material Rate
0.00
19.50
Plant Rate
0.00
18.52
BSR Reference
07-00-40
Description
Resource Unit
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
8.26
1.00
8.26
Unskilled Labour M2
0.0%
0.29
30.00
8.70
Material Rate
0.00
8.70
Plant Rate
0.00
8.26
BSR Reference
07-00-41
Description
Shifting and relaying half round tiles over the existing asbestos roof.
Resource Unit
Material Rate
Plant Rate
Unit
Wastag
M2
Quantit
Rate Type
Amount
0.0%
18.52
1.00
18.52
Unskilled Labour M2
0.0%
0.65
30.00
19.50
0.0%
34.50
5.00
172.50
172.50
0.00
192.00
191.02
BSR Reference
07-00-42
Description
Supplying and fixing of calicut pattern titled roof on class I sawn timber frame work
Unit
M2
Resource Unit
Quantit
Rate Type
Amount
0.0%
179.68
1.00
179.68
Carpenter M2
0.0%
2.96
45.00
133.34
Unskilled Labour M2
0.0%
1.86
30.00
55.80
Binding wire M2
0.0%
0.65
50.00
32.50
Cement M2
0.0%
0.03
340.00
10.20
0.0%
0.93
20.00
18.60
Sand M2
0.0%
0.00
350.00
0.00
Slaked lime M2
0.0%
0.03
2,850.00
76.95
0.0%
13.45
8.00
107.64
0.0%
3.61
35.00
126.31
0.0%
0.02
30,000.00
540.00
0.0%
0.02
55.00
0.88
Wood Preservative M2
0.0%
0.20
110.00
22.44
Colouring powder M2
0.0%
0.27
1.00
0.27
Material Rate
Plant Rate
Wastag
935.52
0.00
1,124.93
1,115.47
BSR Reference
07-00-43
Description
Supplying and fixing of calicut pattern titled roof on class II sawn timber frame work
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
179.55
1.00
179.55
Carpenter M2
0.0%
2.96
45.00
133.20
Unskilled Labour M2
0.0%
1.86
30.00
55.80
Binding wire M2
0.0%
0.07
50.00
3.50
Cement M2
0.0%
0.03
340.00
10.20
0.0%
0.93
20.00
18.66
Sand M2
0.0%
0.00
350.00
1.40
Slaked lime M2
0.0%
0.03
2,850.00
76.95
0.0%
13.45
8.00
107.60
0.0%
13.45
34.50
464.20
0.0%
0.02
20,000.00
360.00
0.0%
0.02
55.00
1.10
Wood Preservative M2
0.0%
0.20
110.00
22.44
Colouring powder M2
0.0%
0.27
1.00
0.27
Material Rate
Plant Rate
1,066.05
0.00
1,255.32
1,245.87
BSR Reference
07-00-44
Description
Supplying material and fixing half round titled roof on class I sawn timber frame work
Unit
M2
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
185.25
1.00
185.25
Carpenter M2
0.0%
3.00
45.00
135.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
Cement M2
0.0%
0.03
340.00
9.18
Sand M2
0.0%
0.00
350.00
1.40
Slaked lime M2
0.0%
0.03
2,850.00
85.50
0.0%
64.59
5.00
322.93
0.0%
7.22
20.00
144.36
0.0%
0.02
30,000.00
510.00
0.0%
0.02
55.00
1.10
0.0%
0.07
45.00
3.15
Wood Preservative M2
0.0%
0.25
110.00
26.95
Material Rate
1,104.57
Plant Rate
0.00
1,299.57
1,289.82
BSR Reference
07-00-45
Description
Supplying material and fixing half round titled roof on class II sawn timber frame work
Unit
M2
Resource Unit
Material Rate
Wastag
Quantit
Rate Type
Amount
0.0%
185.25
1.00
185.25
Carpenter M2
0.0%
3.00
45.00
135.00
Unskilled Labour M2
0.0%
2.00
30.00
60.00
Cement M2
0.0%
0.03
340.00
10.20
Sand M2
0.0%
0.00
350.00
1.40
Slaked lime M2
0.0%
0.03
2,850.00
85.50
0.0%
64.59
5.00
322.93
0.0%
7.22
20.00
144.40
0.0%
0.02
20,000.00
400.00
0.0%
0.02
55.00
0.88
0.0%
0.06
45.00
2.92
Wood Preservative M2
0.0%
0.25
110.00
27.50
995.73
1,190.73
Plant Rate
0.00
1,180.98
BSR Class
TINKER
BSR Reference
12-00-01
Description
Supplying and fixing of 100mm dia .,G.I.24 BWG down pipes fixed to walls with holdfast
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
124.69
1.00
124.69
Mason M
0.0%
0.25
45.00
11.25
Tinker M
0.0%
2.25
40.00
90.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
G.I.sheet 24 B.W.G. M
0.0%
0.40
320.00
128.00
0.0%
10.00
1.00
10.00
Material Rate
128.00
Plant Rate
0.00
269.25
262.69
BSR Reference
12-00-02
Description
Supplying and fixing of 150mm rectangle .,G.I.24 BWG down pipes fixed with holdfast or
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
153.19
1.00
153.19
Mason M
0.0%
0.25
45.00
11.25
Tinker M
0.0%
3.00
40.00
120.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
G.I.sheet 24 B.W.G. M
0.0%
0.60
320.00
192.00
0.0%
12.00
1.00
12.00
Material Rate
Plant Rate
192.00
0.00
365.25
357.19
BSR Reference
12-00-03
Description
Supplying and fixing if 100*75mm rectangular G.I.24 BWG doen pipes fixed with holdfast
Unit
in 1:3 cement
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
143.69
1.00
143.69
Mason M
0.0%
0.25
45.00
11.25
Tinker M
0.0%
2.75
40.00
110.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
G.I.sheet 24 B.W.G. M
0.0%
0.45
320.00
144.00
0.0%
10.00
1.00
10.00
Material Rate
144.00
Plant Rate
0.00
305.25
297.69
BSR Reference
12-00-04
Description
Fixing of 100to 150mm circular or rectrangular down pipes fixed with holdfast or plugs in
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
19.04
1.00
19.04
Mason M
0.0%
0.03
45.00
1.30
Tinker M
0.0%
0.29
40.00
11.72
Unskilled Labour M
0.0%
0.23
30.00
7.02
0.0%
10.00
1.00
10.00
Material Rate
0.00
30.05
Plant Rate
0.00
29.04
BSR Reference
12-00-05
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
19.59
1.00
19.59
Mason M
0.0%
0.13
45.00
5.63
Unskilled Labour M
0.0%
0.50
30.00
15.00
Material Rate
0.00
20.63
Plant Rate
0.00
19.59
BSR Reference
12-00-06
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
39.19
1.00
39.19
Mason M
0.0%
0.25
45.00
11.25
Unskilled Labour M
0.0%
1.00
30.00
30.00
Material Rate
0.00
41.25
Plant Rate
0.00
39.19
BSR Reference
12-00-07
Description
Fixing of down pipes loose or new fixed with holdfast or plugs including making good to
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
23.27
1.00
23.27
Tinker M
0.0%
0.35
40.00
14.00
Unskilled Labour M
0.0%
0.35
30.00
10.50
Material Rate
0.00
24.50
Plant Rate
0.00
23.27
BSR Reference
12-00-08
Description
450mm wide G.I.flashing [G.I.24 BWG] fixed with 150mm turned up along and edge tucked
Unit
well into wall in cement lime mortar including removal of old flashing.
Resource Unit
Material Rate
Plant Rate
Wastag
Quantit
Rate Type
Amount
0.0%
84.31
1.00
84.31
Mason M
0.0%
0.25
45.00
11.25
Tinker M
0.0%
1.00
40.00
40.00
Unskilled Labour M
0.0%
1.25
30.00
37.50
G.I.sheet 24 B.W.G. M
0.0%
0.60
320.00
192.00
0.0%
2.50
1.00
2.50
192.00
0.00
283.25
278.81
BSR Reference
12-00-09
Description
Refixing of G.I.flashing including making good walls in cement and lime mortar.
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
67.69
1.00
67.69
Mason M
0.0%
0.25
45.00
11.25
Tinker M
0.0%
0.75
40.00
30.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
0.0%
20.00
1.00
20.00
Material Rate
0.00
91.25
Plant Rate
0.00
87.69
BSR Reference
12-00-10
Description
150mm G.I. Gutters eaves semi circular made with G.I. 24 BWG and fixed with hooks or
Unit
Resource Unit
Quantit
Rate Type
Amount
0.0%
137.75
1.00
137.75
Tinker M
0.0%
2.50
40.00
100.00
Unskilled Labour M
0.0%
1.50
30.00
45.00
0.0%
1.67
10.00
16.67
0.0%
2.50
18.00
45.00
G.I.sheet 24 B.W.G. M
0.0%
0.35
320.00
112.00
0.0%
0.23
38.00
8.74
0.0%
10.00
1.00
10.00
Material Rate
Plant Rate
Wastag
182.41
0.00
337.41
330.16
BSR Reference
12-00-11
Description
150mm G.I. Gutters , eaves semicircular made with G.I, 24 BWG and fixed with hooks or
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
127.22
1.00
127.22
Tinker M
0.0%
2.28
40.00
91.20
Unskilled Labour M
0.0%
1.42
30.00
42.72
0.0%
9.00
1.00
9.00
Material Rate
0.00
142.92
Plant Rate
0.00
136.22
BSR Reference
12-00-12
Description
150mm Gutters , eaves moulded in G.I.24 BWG and fixed complete including brackets .
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
209.00
1.00
209.00
Tinker M
0.0%
4.00
40.00
160.00
Unskilled Labour M
0.0%
2.00
30.00
60.00
G.I.sheet 24 B.W.G. M
0.0%
0.40
320.00
128.00
0.0%
35.00
1.00
35.00
Material Rate
128.00
Plant Rate
0.00
383.00
372.00
BSR Reference
12-00-13
Description
Extra over items M01 to M012 and M026 in two storeyed buildings
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
66.50
1.00
66.50
Tinker M
0.0%
1.00
40.00
40.00
Unskilled Labour M
0.0%
1.00
30.00
30.00
Material Rate
0.00
70.00
Plant Rate
0.00
66.50
BSR Reference
12-00-14
Description
Extra over item M010 to M012 and M026 in three storyed Buildings.
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
106.88
1.00
106.88
Tinker M
0.0%
1.50
40.00
60.00
Unskilled Labour M
0.0%
1.75
30.00
52.50
Props (bamboo) 3 - 4 m M
0.0%
0.95
80.00
76.00
Coir, Srting M
0.0%
0.75
1.00
0.75
Material Rate
76.00
Plant Rate
0.00
189.25
183.62
BSR Reference
12-00-15
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
4.28
1.00
4.28
Unskilled Labour M
0.0%
0.15
30.00
4.50
Material Rate
0.00
4.50
Plant Rate
0.00
4.28
BSR Reference
12-00-16
Description
Resource Unit
Unit
Wastag
Quantit
Rate Type
Amount
0.0%
5.70
1.00
5.70
Unskilled Labour M
0.0%
0.20
30.00
6.00
Material Rate
0.00
6.00
Plant Rate
0.00
5.70
BSR Reference
12-00-17
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
21.20
1.00
21.20
Tinker M
0.0%
0.51
40.00
20.40
Unskilled Labour M
0.0%
0.06
30.00
1.92
Material Rate
0.00
22.32
Plant Rate
0.00
21.20
BSR Reference
12-00-18
Description
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
6.65
1.00
6.65
Tinker M
0.0%
0.10
40.00
4.00
Unskilled Labour M
0.0%
0.10
30.00
3.00
Material Rate
0.00
7.00
Plant Rate
0.00
6.65
BSR Reference
12-00-19
Description
Making openings to existing gutters to receive 100mm to 150mm down pipe attaching
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
133.00
1.00
133.00
Tinker Nos.
0.0%
2.00
40.00
80.00
0.0%
2.00
30.00
60.00
0.0%
0.10
320.00
32.00
0.0%
10.00
1.00
10.00
Material Rate
Plant Rate
32.00
0.00
182.00
175.00
BSR Reference
12-00-20
Description
Making of 250*250*500mm gutter head with G.I. 24 BWG down pipe and fixed complete.
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
323.00
1.00
323.00
Tinker Nos.
0.0%
7.00
40.00
280.00
0.0%
2.00
30.00
60.00
0.0%
0.90
320.00
288.00
0.0%
12.00
1.00
12.00
Material Rate
288.00
Plant Rate
0.00
640.00
623.00
BSR Reference
12-00-21
Description
MAking of 250*250*500mm gutter head made with G.I. sheets 24 BWG down pipes and
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
323.00
1.00
323.00
Tinker Nos.
0.0%
7.00
40.00
280.00
0.0%
2.00
30.00
60.00
0.0%
8.00
1.00
8.00
Material Rate
0.00
348.00
Plant Rate
0.00
331.00
BSR Reference
12-00-22
Description
Making of 225*225*300mm gutter head made with G.I.sheets BWG and fixed complete.
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
190.00
1.00
190.00
Tinker Nos.
0.0%
5.00
40.00
200.00
0.0%
0.50
320.00
160.00
0.0%
5.00
1.00
5.00
160.00
0.00
365.00
355.00
BSR Reference
12-00-23
Description
Making 250*250*300mm gutter head made of 22BWG GI sheets [GI sheets supplied by
Unit
Nos.
Client.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
247.00
1.00
247.00
Tinker Nos.
0.0%
5.00
40.00
200.00
0.0%
2.00
30.00
60.00
0.0%
5.00
1.00
5.00
Material Rate
0.00
265.00
Plant Rate
0.00
252.00
BSR Reference
12-00-24
Description
Supplying of 20mm*3mm gutter hooks brackets and fixing with iron screws.
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
4.87
1.00
4.87
0.0%
0.04
40.00
1.68
Carpenter Nos.
0.0%
0.03
45.00
1.35
0.0%
0.07
30.00
2.10
0.0%
0.23
38.00
8.63
0.0%
0.17
5.00
0.83
0.0%
5.00
1.00
5.00
Material Rate
9.46
19.59
Plant Rate
0.00
19.33
BSR Reference
12-00-25
Description
Unit
Resource Unit
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
33.25
1.00
33.25
Tinker Nos.
0.0%
0.50
40.00
20.00
0.0%
0.50
30.00
15.00
0.0%
2.00
1.00
2.00
Material Rate
0.00
37.00
Plant Rate
0.00
35.25
BSR Reference
12-00-26
Description
GI 900mm overall 22BWG Parapet gutters renewed on existing boards joints soldered and
Unit
Nos.
laid complete.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
93.81
1.00
93.81
Carpenter Nos.
0.0%
0.25
45.00
11.25
Tinker Nos.
0.0%
1.25
40.00
50.00
0.0%
1.25
30.00
37.50
0.0%
0.92
380.00
349.60
0.0%
2.20
1.00
2.20
Material Rate
349.60
Plant Rate
0.00
450.55
445.61
BSR Reference
12-00-27
Description
18 BWG 900mm wide vally gutters renewed on existing boards sheets tarred ,joints
Unit
Nos.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
78.38
1.00
78.38
Carpenter Nos.
0.0%
0.30
45.00
13.50
Tinker Nos.
0.0%
0.60
40.00
24.00
0.0%
1.50
30.00
45.00
Cement Nos.
0.0%
0.03
340.00
9.18
0.0%
0.22
11.00
2.46
0.0%
1.00
540.00
538.92
Sand Nos.
0.0%
0.00
350.00
0.00
0.0%
0.00
2,850.00
0.00
0.0%
2.40
1.00
2.40
Material Rate
Plant Rate
550.56
0.00
635.46
631.34
BSR Reference
12-00-28
Description
18BWG 900mm wide vally gutters renewed on existing boards ,sheets tarred joints
Unit
Nos.
soldered and cement lime filleing complete [G.I. sheets supplied by client].
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
82.19
1.00
82.19
Carpenter Nos.
0.0%
0.30
45.00
13.32
Tinker Nos.
0.0%
0.60
40.00
24.00
0.0%
1.64
30.00
49.20
Cement Nos.
0.0%
0.03
340.00
10.20
0.0%
0.22
11.00
2.46
Sand Nos.
0.0%
0.00
350.00
1.40
0.0%
0.00
2,850.00
2.85
0.0%
2.40
1.00
2.40
Material Rate
16.91
Plant Rate
0.00
105.83
101.51
BSR Reference
12-00-29
Description
Unit
Resource Unit
Material Rate
Plant Rate
Wastag
Nos.
Quantit
Rate Type
Amount
0.0%
199.50
1.00
199.50
Tinker Nos.
0.0%
4.50
40.00
180.00
0.0%
1.00
30.00
30.00
0.0%
0.60
380.00
228.00
0.0%
7.50
1.00
7.50
228.00
0.00
445.50
435.00
BSR Reference
12-00-30
Description
Supplying & fixing of 450mm*300mm*450mm* high hot water tank made with G.I.sheet
Unit
Nos.
22BWG rivetted and soldered [connecting U pipe e& tap paid separately].
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
570.00
1.00
570.00
Tinker Nos.
0.0%
12.00
40.00
480.00
0.0%
4.00
30.00
120.00
0.0%
0.92
380.00
350.74
Rivets[6.3mm*10mm] Nos.
0.0%
30.00
1.00
30.00
0.0%
30.00
1.00
30.00
Material Rate
380.74
Plant Rate
0.00
1,010.74
980.74
BSR Reference
12-00-31
Description
G.I. 900mm overall 22 BWG PArapet gutters renewed including timber 25mm boarding
Unit
Resource Unit
Quantit
Rate Type
Amount
0.0%
186.44
1.00
186.44
Carpenter M
0.0%
1.25
45.00
56.25
Tinker M
0.0%
1.25
40.00
50.00
Unskilled Labour M
0.0%
3.00
30.00
90.00
0.0%
0.92
380.00
349.60
0.0%
0.60
300.00
180.00
0.0%
0.05
55.00
2.75
Wood Preservative M
0.0%
0.20
110.00
22.00
0.0%
2.20
1.00
2.20
Material Rate
Plant Rate
Wastag
554.35
0.00
752.80
742.99
BSR Reference
12-00-32
Description
18 BWG 900mm wide valley gutters renewed including timber 25mm thikc boarding sheet
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
185.25
1.00
185.25
Carpenter M
0.0%
2.00
45.00
90.00
Unskilled Labour M
0.0%
3.50
30.00
105.00
Boiled lime M
0.0%
0.01
4.00
0.04
Cement M
0.0%
0.03
340.00
10.20
Coal tar M
0.0%
0.22
11.00
2.46
0.0%
0.99
540.00
536.22
Sand M
0.0%
0.00
350.00
1.40
0.0%
1.00
300.00
300.00
0.0%
0.07
55.00
3.69
Wood Preservative M
0.0%
0.34
110.00
37.40
0.0%
2.40
1.00
2.40
Material Rate
891.41
Plant Rate
0.00
1,088.81
1,079.06
BSR Reference
12-00-33
Description
Fixing of haif round , 150mm PVC eaves gutters with aluminium brackets 7 brass screws at
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
18.07
1.00
18.07
Plumber M
0.0%
0.27
40.00
10.92
Unskilled Labour M
0.0%
0.27
30.00
8.10
0.0%
2.32
8.50
19.72
0.0%
0.07
75.00
5.10
0.0%
0.14
29.00
3.97
0.0%
0.21
45.00
9.45
0.0%
0.14
39.00
5.34
0.0%
0.14
75.00
10.27
0.0%
0.41
12.00
4.92
See M 399 M
0.0%
0.27
0.00
0.00
Ladder M
0.0%
3.45
1.00
3.45
Material Rate
58.78
81.25
Plant Rate
0.00
80.30
BSR Reference
12-00-34
Description
Fixing of 144mm PVC square eave gutters with PVC brackets and brass screws at 450mm
Unit
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
18.04
1.00
18.04
Plumber M
0.0%
0.27
40.00
10.80
Unskilled Labour M
0.0%
0.27
30.00
8.19
0.0%
0.68
110.00
74.80
0.0%
2.32
13.00
30.16
0.0%
1.00
22.00
22.00
0.0%
0.21
37.00
7.77
0.0%
0.14
85.00
11.64
0.0%
0.41
39.00
15.99
0.0%
0.14
80.00
10.96
0.0%
0.41
12.00
4.92
Ladder M
0.0%
2.10
1.00
2.10
Material Rate
178.24
Plant Rate
0.00
199.33
198.39
BSR Reference
12-00-35
Description
Fixing of 87mm dia PVC down pipes with wooden including all necessary moulded
Unit
fittings.
Resource Unit
Wastag
Quantit
Rate Type
Amount
0.0%
37.48
1.00
37.48
Carpenter M
0.0%
0.27
45.00
12.15
Plumber M
0.0%
0.27
40.00
10.92
Unskilled Labour M
0.0%
0.55
30.00
16.38
0.0%
1.09
60.00
65.58
0.0%
0.55
7.00
3.85
0.0%
0.55
45.00
24.61
0.0%
0.14
30.00
4.11
0.0%
0.20
39.00
7.99
0.0%
0.09
12.00
1.09
Wood plugs M
0.0%
0.55
80.00
44.00
Ladder M
0.0%
5.00
1.00
5.00
Material Rate
151.24
195.69
Plant Rate
0.00
193.72