mit, Pro!idin" e#pansion joint at e!er$ 1%0 meters is not ad!isab&e' (orma&&$ )or pipe rac* desi"n +e "o )or pieces o) 60 meters' i) it is not possib&e to ma*e pieces t,en $ou ,a!e to "o )or s&idin" support at e!er$ 60 meters' (o p&ace in +or&d ,a!e same temperature t,rou",out $ear' So, p&ease c,ec* temperature !ariation in t,at area and considered ma#imum temp and minimum temp in basic &oad cases and in &oad combinations' -ariation in temperature in addition to )riction and anc,or )orces +i&& create major trans!erse and &on"itudina& )orces' +,ic, +i&& become "o!ernin" criteria )or )oundation desi"n' For !ertica& bracin" in trans!erse direction, I +ou&d pro!ide at e!er$ "rid &ocation' For &on"itudina& direction, I +ou&d pro!ide at +,ere t,e anc,or )orces are &ocated' i) no anc,or )orces are pro!ided, t,en I +ou&d "o )or one braced ba$ at e!er$ 60 meters in &on"itudina& direction' .e"ards /etan 0arot Structura& En"ineer
Back to to ra!"ee"a
Posted: Mon Feb 15, 2010 5:51 pm bracin" &ocation in pipe rac* Post subject: -ertica&

SEFI .e"u&ars

3ear
Joined: 02 Feb 2001 Posts: 3% 2ocation: 0an"a&ore

mit,

1' 4,e spacin" bet+een t,e E#pansion Joints depend upon t,e temperature di))erentia& and 5t,e e#pansion6 )or +,ic, t,e joint is desi"ned )or' 2' For steam &ines, t,at +e come across "enera&&$, 70 to 50 metres is "i!en as t,e spacin"' 8,at are $our &ines carr$in"9 P&ease &ea!e t,e desi"n o) e#pansion Joints to t,e pipin" En"ineers' 4,e$ can a&so pro!ide t,e )orces on t,e anc,or :s&idin" supports etc' 3' 4,e &on"itudina& )orce +i&& be ma#imum +,ere t,e )i#ed anc,ors are &ocated' Idea&&$ t,e bracin"s s,ou&d be &ocated at t,ese points' 0est 8is,es,

-' .amac,andran'

Subject: ;SEFI< -ertica& bracin" &ocation in pipe rac* From: )orum=se)india'or" 5)orum=se)india'or"6 3ate: Sun, 17 Feb 2010 1%:3%:06 >0530 4o: "enera&=se)india'or" 5"enera&=se)india'or"6 I am desi"nin" a stee& pipe rac* s$stem +,ic, e#tends t,rou",out a proposed re)iner$ ' I am pro!idin" e#pansion joint e!er$ 1%0 metres ' ?an I ,a!e t,e !ertica& bracin" at t,e ba$ just +it, t,e co&umn t,at ,as t,e e#pansion joint 9 4,e pipe rac* is a t+o tier pipe rac* ' 2on"itudina& )orces are )rom pipe )riction &oad @ pipe anc,or &oads ' 8it, re"ards MI4 3A44 Posted !ia Emai&

Dear Manoj,We preferebly keep vertical bracing either one in middle bay or one set at end for end bay.Bracings in single middle bay normally a economical option but sometimes it is not possible to provide in middle bay from machinery and men movement point of view.RegardsRajesh panchal
B#$$ %ELD

I want to highlight some relevant points regarding butt welding in line with the queries as follows : There are many kinds of butt welding which depend on the thickness of the element to be joined. Normally we use Single v !ouble " Single bevel !ouble bevel. #. The query is actually a splicing problem and normally splicing should be located withing 1/3rd of the beam length from supports. $. If welding is being done at erected position reduction in butt weld strength shall be considered by a factor of %.& and if at shop factor is #. 'ef : IS &#( ). If welding is being done from one side of the plate and there is no back strip then again a strength reduction factor

of *+& shall be applied. 'ef : IS &#( ,. -or full strength to develop if welding is being done from one side backstrip shall be placed in other side beforehand and welding shall be done in shop. .r shop welding shall be done from both sides after gouging the weld from the other side of root run. *. It is better to use splicing plate of of lower capacity /*%01 after doing butt welding. 2s because from sl. $ 3 ) we get cumulative factor of /%.& 4 *+& 5 %.*1. (. Top flange splice 6eb Splice 3 7ottom plate splice location shall be staggered at a distance of *%%mm /minm1 6ith regards 7ijay