Вы находитесь на странице: 1из 4

LAKIREDDY BALI REDDY COLLEGE OF ENGINEERING (AUTONOMOUS)

L.B.REDDY NAGAR, MYLAVARAM 521 230

School of Management Studies


Academic Year: 201 3 14
SUBJECT: INDUSTRIAL ENGINEERING & MANAGEMENT
CSE
:4th YEAR II SEM
SEC-A
SNO
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.

NO.
HOUR
S
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01

DATE
16-12-2013
17-12-2013

PLANNED TOPICS
UNIT I Management Introduction
Definition, Nature

17-12-2013

Importance of management

18-12-2013

Functions

19-12-2013
19-12-2013
20-12-2013
20-12-2013
23-12-2013
24-12-2013
24-12-2013
26-12-2013
26-12-2013
27-12-2013

STAFF: U.RAMBABU
CREDITs: 04

Taylors scientific management theory


Fayals principles of management
Tutorials
Contribution of Elton mayo
MASLOW theory
Herzberg, douglas, MC Gregor, basic concepts of Orgn.
tutorials
Basic concept of organization :Authority Responsibility
Delegation of Authority and span of control
Departmentation and Decentralization

27-12-2013

tutorials

30-12-2013

Orgn.structure Line and staff organization

31-12-2013
31-12-2013
02-01-2014
02-01-2014
03-01-2014
03-01-2014
06-01-2014
07-01-2014
07-01-2014
08-01-2014

Line and staff organization


Functional organization
Committee Matrix organization
Tutorials
UNIT II Operations Management
Plant location Factors influencing location
Principles and types of plant layouts
Methods of production : job batch and mass production
Work study
Basic procedure involved in method study

REMARKS

27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.

01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01

08-01-2014
09-01-2014
16-01-2014
16-01-2014
17-01-2014
17-01-2014
20-01-2014
21-01-2014

Work measure ment


tutorial
UNIT III quality and materials management
Statistical quality control Meaning
Variables and attributes
X chart R Chart C Chart PC hart
X chart R Chart C Chart PC hart
Acceptance sampling Sampling plans

21-01-2014

Demings contribution to quality

22-01-2014

Materials management : objectives

23-01-2014

Need for inventory control

23-01-2014
24-01-2014
24-01-2014
27-01-2014
28-01-2014
29-01-2014
30-01-2014

Tutorials
Purchase procedure
Store records
EOQ
problens
ABC analysis
Stock levels

30-01-2014

Stock level problems

31-01-2014

UNIT IV Human Resource management Concepts of


HRM

01

31-01-2014

Basic functions of HR manager

01

03-02-2014

Man power planning

01

01
01
01
01
01
01
01
01
01

04-02-2014
04-02-2014
05-02-2014
10-02-2014
11-02-2014
11-02-2014
12-02-2014

Selection
Recruitment
Training and development Placement
Wage and salary admn
Promotion
Transfers Separation performance. Appraisal
Job evaluation and merit ranking

13-02-2014

Tutorials

13-02-2014

UNIT V project management Early techniques in project


management

58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.

01
01
01
01
01
01
01
01
01
01
01
01
01
01
01
01

14-02-2014
14-02-2014
17-02-2014
18-02-2014
18-02-2014
19-02-2014
20-02-2014
20-02-2014
21-02-2014
21-02-2014
24-02-2014
25-02-2014
25-02-2014
26-02-2014
28-02-2014
28-02-2014

SIGNATURE OF FACULTY

Network analysis Programme evaluation and review


technique (PERT)
Critical path method
Identifying critical path
Problems
problems
problems
problems
Probability of completing project within time
problems
Project cost analysis project crashing
Problems
Problems
Problems
Problems
REVISION
REVISION

HOD

Вам также может понравиться