Second Party: The company Desert Roofing & Flooring L.L.C., P.O. Box 186, Dubai, U.A.E.

, as hereinafter referred to as Subcontractor.

0.1

Preamble (N/A)

2.0 2.1

Definition The complete Scope of Works to be executed by the Subcontractor and as described in this Sub-Contract and under the relevant clauses of this Sub-Contract shall hereinafter be referred to as the Works. Wherever in the Sub-Contract Documents stated under Clause 4.0, the words Client and/or Owner and/or Employer and/or Consultant and /or Engineer etc. are used it shall be construed as Main Contractor and wherever Supplier etc. are used it shall be construed as Subcontractor, except where the context otherwise requires.

2.2

3.0 3.1

Preconditions for Contract The Client and/or Owner and/or Employer and/or Consultant and /or Engineer must approve the Subcontractor and the material to be supplied. The Main Contractor undertakes to apply for approval of the Subcontractor and its material after all necessary approval information has been submitted by the Subcontractor. In the event of cancellation of this Sub-Contract due to whatsoever reasons and if the Main Contractor receives the relevant reimbursement from the Client and/or General Contractor the Main Contractor will reimburse the Subcontractor direct proven costs for technical services that have been performed between the date of this Sub-Contract and the date of the cancellation, in the same manner as the Main Contractor will be reimbursed by the Client and/or General Contractor. If the Subcontractor however is responsible for the rejection then it has to bear all costs occurred and occurring. In the event that the approved Subcontractor is not able to supply the material demanded within the time given it by written notice and/or telefax then the Main Contractor reserves the right to delete the supply of the material or to supply the material itself or to ask third parties to do so or to cancel this SubContract in total, if necessary. All costs arising shall be borne by the SubconSub-Structure Waterproofing

3.2

3.3

3.4

Sub-Contract N JS045/003

tractor.

4.0 4.1

Sub-Contract Documents All documents forming this Sub-Contract as a whole are below: a) b) c) d) e) f) g) The Sub-Contract Agreement (Page 1 to 6) The General Conditions of Contract (Main Contractor) The Drawings The Specification Frayland Quality Control Programme Frayland Health & Safety Programme The Schedule of Price

In case of ambiguity, discrepancies, contradictions or dispute, the order in which the documents are listed above shall determine the precedence. 4.2 The Subcontractor shall perform the Works in strict accordance with the data indicated in the Sub-Contract Documents. In case of data discrepancies, conflicts, or contradictions between the Drawings, Specifications etc., the Subcontractor shall immediately inform the Main Contractor and upon approval from Main Contractor, shall execute the Works under consideration of those data which result in the highest efficiency for the Client.

5.0 5.1

Scope of Works The Subcontractor shall perform the Works in accordance with the SubContract Documents as laid down under the clauses of this Sub-Contract. Production of shop drawings to detail waterproofing on both vertical and horizontal areas with details at junctions and penetrations. A detailed specific method statement to be submitted by the Subcontractor. The Subcontractor shall furnish all the equipment, materials and temporary works, and shall complete all fabrications, installations and maintenance of the permanent materials herein specified in accordance with the clauses of this Sub-Contract. The Subcontractor shall furnish and maintain all personnel required to execute the said Works. The Subcontractor shall be responsible for all transportation of personnel, equipment, temporary works and materials to the site. The Subcontractor shall strictly adhere to Frayland Quality Control and Safety Procedure. Any violation shall be under Subcontractors own cost, risk and time.

5.2

5.3

5.4 5.5 5.6

Sub-Contract N JS045/003 Page N 1 of 6

Sub-Structure Waterproofing

6.0 6.1

Sub-Contract Price The Subcontractor agrees that all drawings, specifications and documents stated in this Sub-Contract were received by it and/or made available to it and were such that it enabled the Subcontractor to determine the prices herein and to execute all its contractual obligations. The Subcontractor declares that it is familiar with the working conditions and the local conditions and that these have been allowed for in its price. For the completed and accepted Works described under the Clauses and Conditions of this Sub-Contract, a Provisional Sub-Contract Price of

6.2 6.3

AED. 469,600.00
(In Words: Dirhams Four Hundred Sixty Nine Thousand Six Hundred only) is agreed. The Schedule of Price is as given below: Item No A. Description Supply & apply one full, coat of Indever Primer, torch-on 4mm thick Index Helastoplan 180 gsm (Two Layers), heavy duty reinforced with thermoplastic elastroplastomeric synthetic SBS rubber waterproofing. i) Horizontal Area ii) B. Vertical Area Qty Rate Amount

5,600 m2 1,600 m2 1,600 m2

61.00 61.00 19.00

341,600.00 97,600.00 30,400.00 469,600.00

Supply & fix 3.2 mm thick INDEBOARD protection board to vertical area TOTAL CONTRACT PRICE

6.5

Final value to be estimated on a re-measured quantity multiplied on the agreed unit rate. The re-measurement will be carried out as per the standards set out in POMI (Principle of Measurement International) The agreed Unit Price(s) of this Sub-Contract is/are valid for the duration of the construction (until such time the building is handed over to the Client by the Main Contractor and the period of Guarantee and Maintenance (clause 7 & 11) and there shall be no provisions whatsoever for adjustment to the price(s) by reason of cost escalation (cost experience, productivity variation, or other) during the performance of the Works. The agreed Unit Price(s) of this Sub-Contract include all necessary plant, labour, equipment, needed for the construction of a complete, functional and usable facility and the period of Guarantee and Maintenance. All costs of transportation, insurance, flight tickets, freight charges, custom duties, etc. and all other related costs are also included in the price(s) herein applicable to the Subcontractors scope of the Works.

6.6

Sub-Contract N JS045/003 Page N 2 of 6

Sub-Structure Waterproofing

0.1 7.1

Warranty The Subcontractor warrants that the material is manufactured in accordance with the Approved Specifications and the requirements, and that it is liable for all necessary repair works to faulty workmanship.

7.2

The Main Contractor reserves the right to cancel this Sub-Contract should the Subcontractor fail to meet the specified quality or delivery requirements of the Main Contractor. d by the Main Contractor. 10.2 Surface preparation of the fillets and slab has to be carried out by the Main Contractor. 10.3 Cement, sand, angle, fillets at corner, groove and surface preparation if required, to be done by Main Contractor, to details provided by Subcontractor. 10.4 Permission for access to the site including gate passes, if required, to be arranged by the Main Contractor. 10.5 Scaffolding, if required, has to be provided by the Main contractor. 10.6 Crane for lifting of materials on site shall be provided by the Main contractor.

11.0 Project Time Schedule The tentative project time schedule for the Sub-Structure Waterproofing is as given below: 01 December 2011 to 15 January 2012 The above period is subject to change as per the site condition. The anticipated handing over of the Building to the Client is 23 December, 2012.

Sub-Contract N JS045/003 Page N 3 of 6

Sub-Structure Waterproofing