Port of Fujairah 33 / 11 kV Substation Status of Civil Boughtout items & other Construction materials

As on 15.01.2014 Sl No. Item Description Status of Material/sup plier Approval approved approved Status of Sample Approval Status of Status of Site shop drawing Measurment Approval. Status of Fabrication Status of Delivery

Name of Sub Contractor

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

IDT / Aux Tr roof truss Monorail beam Hand rails Cage ladders CAT Ladder for Basement SS Hand rails for staircase Tr room Precast slab covers Fire trench slab covers Steel Gate Chequerred plates to close openings GI Grating with cover Support for Precast slab in Transf rooms Support for Gratings foR IDT,ET & Reactor Rooms Chequerred plate covers for Manholes, Trenches & Openings Galvanized Edge angles Cross over bridges in bmt & at roof Floor Hatches & Handles IDT / Aux Tr front claustra Cast Alu minium gates Cast Alu minium louvers at roof Aluminium windows

M/s.Al jaber M/s.Al jaber M/s.ASCON M/s.ASCON M/s.ASCON M/s.ASCON M/s.ASCON M/s.ASCON M/s.TARA M/s.ASCON M/s.ASCON M/s.ASCON M/s.ASCON M/s.ASCON M/s.ASCON

approved

approved

M/s.Extraco M/s.Inventure M/s.Inventure M/s.Inventure M/s.Inventure

approved approved approved approved approved

Port of Fujairah 33 / 11 kV Substation Status of Civil Boughtout items & other Construction materials
As on 15.01.2014 Sl No. Item Description Status of Material/sup plier Approval approved approved approved Status of Sample Approval Status of Status of Site shop drawing Measurment Approval. Status of Fabrication Status of Delivery

Name of Sub Contractor

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

Aluminium Door with frame Threshold -Powder coated/ Aluminium Aluminium grooves Steel Doors with frame Iron Mongery Master key & Padlocks GRC Elements GRC Elements fixing accessories Marbles steps (Thread & Risers) Marble Thresholds Marble window sill GRP Gratings & edge angle for basement Plumbing works GRP tanks Hood for Tanks & Pumps Booster pump with CP Transfer pump with CP Sub mersible pumps with controllers Cleaners sink Eye wash & fittings Porcelin sink & fittings Toilet accessories

M/s.Inventure M/s.Inventure M/s.Inventure M/s.Qatar Metal

M/s.ASCON M/s.ASCON M/s.ASCON M/s.ASCON M/s.ASCON M/s.MBBM M/s.Stream line M/s.Extra co M/s.Inventure M/s.Stream line M/s.Stream line M/s.Stream line M/s.Stream line M/s.Stream line M/s.Stream line M/s.Stream line approved submitted approved

Port of Fujairah 33 / 11 kV Substation Status of Civil Boughtout items & other Construction materials
As on 15.01.2014 Sl No. Item Description Status of Material/sup plier Approval approved Status of Sample Approval Status of Status of Site shop drawing Measurment Approval. Status of Fabrication Status of Delivery

Name of Sub Contractor

44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62

Acid alkalin resistant painting Kitchen Cabinet Terrazo/ Ceramic tiles - battery room & Toilet Grout / Adhesive / Mortar Boundary wall Y angle with PVC barbed wire Pre cast boundary wall Interlock tiles, Kerb stone, road gulleys Asphalt Road materials False ceiling Glass blocks Glass block accessories Floor hatch Door labels Project name board GRP lining for OW tank Ductile iron manhole frame & cover Roof water proofing works Aluminium Flashing at roof w/proofing Roof outlet drains with covers

M/s.National paints not applicable M/s.RAK M/s.Fosroc not yet confirmed not yet confirmed M/s.Hussain mohamed abbas not yet confirmed

approved

approved not required

approved

M/s.Kessab M/s.Al shaya building materials M/s.Emirates specialities Refer item 17 M/s.Javed arts M/s.Javed arts

approved

partially approved & balnce to be submitted submitted

approved approved approved approved

approved not required not required not required

M/s.MBBM M/s.Roof tek M/s.Roof tek M/s.MBBM

approved approved approved approved

submitted

approved

Port of Fujairah 33 / 11 kV Substation Status of Civil Boughtout items & other Construction materials
As on 15.01.2014 Sl No. Item Description Status of Material/sup plier Approval Status of Sample Approval Status of Status of Site shop drawing Measurment Approval. Status of Fabrication Status of Delivery

Name of Sub Contractor

Other Materials 1 2 3 4 5 6 7 8 9 10 11 VC Pipes UPVC Pipes Polysterine strips Cavity thermal insulation board Painting Materials Polyurethene screed & paint Epoxy paint Floor marking paint Cobble stone 20 mm Gravel Furniture
not applicable approved approved approved approved approved approved submitted approved approved approved approved

rah 33 / 11 kV Substation items & other Construction materials


As on 15.01.2014 Status of Installation

rah 33 / 11 kV Substation items & other Construction materials


As on 15.01.2014 Status of Installation

rah 33 / 11 kV Substation items & other Construction materials


As on 15.01.2014 Status of Installation

rah 33 / 11 kV Substation items & other Construction materials


As on 15.01.2014 Status of Installation