Content
Market description
Shipyards an overview
Market Overview
Brazilian Shipyards order book has 367 orders for Shipbuilding and Offshore construction. The maritime market is experiencing a new booming. After the 70s, this industry is again on the spot attracting a lot of investments. 9 new shipyards under implementation in different regions of the country. Brazil is currently the 4th biggest drilling unit builder and the 2nd in production platform construction. 28 new drilling units hired by Sete Brasil on behalf of Petrobras. Potential Norwegian Expert Contracts: more than USD 7bn.
Source: SINAVAL, ABENAV.
62,000 workers directly employed. In 2017 the estimate is to reach 100,000 workers. 20 offshore oil platforms under construction
33 offshore deepwater drilling rigs
Source: Sinaval
Orderbook
Production Platforms: 14 will be built in Brazil and 6 will have the hulls converted in international shipyards
Type
Production platforms Drilling rigs
Quantity
20 28
Container ships
Bulk carriers Offshore support vessels (OSVs)
7
6 70
Products ship
Tankers Bunkers
29
26 11
Gas tankers
River barges River pushers
15
111 26
Harbor tugs
Total
18
367
Shipyards in Brazil
Shipyards in Brazil
The shipping industry is concentrated in the extension from Rio de Janeiro to Rio Grande do Sul states.
Source: Sinaval
Total
Source: SINAVAL and shipyards
392
7900
Source: Petrobras
Source: Petrobras
Source: Petrobras
Source: Petrobras
Atlntico Sul
Mau Mau STX Promar
3 Aframax DP
12 products 4 Panamax 8 gas tankers 2 1 3 2 2 1 3 3 3 3
TBD
Total:
Source: Sinaval
3 bunkers
49 ships 3 3 8 8 8 5 2
1
5
2
6
15
Local content requirements increasing progressively for units under construction at the same shipyard.
Assets: drillship and semi-subs, 6th generation drilling units, operating in water depths of 3.000 meters, and Dynamic Position (DP-3).
Setebrasil has partnered with reputable operators who will have minority ownership of their respective units.
16
Additional Equipment/Content
Additional Equipment/Content
GIEK/Eksportkreditt will play a very important role in the transaction. DNB and Banco Santander are financial advisors for Sete. Setebrasil is emphasizing the importance of contracts of Norwegian interest and production to be structured in a way to maximizes the financing for Sete from GIEK/Eksportkreditt Workshops to present Norwegian suppliers to the shipyards that won the contracts will be conducted in the beginning of March (week 10 to be confirmed)
22
Events 2013
Happenings 2013
SETE Brazil workshop March 4. 8. (TBC)
(FINEP O&G industry matchmaking March 14. 15.)
OSV Conference Brazil May 23. 24. Navalshore (with NME) August 13. 15.
OTC Brazil October 29. 31.
Keep in mind
SETE project:
Singaporean owned yards (Brasfels, Jurong) contracts are
generally handled from Singapore Norwegian content requirements from GIEK/Eksportkreditt vs. Local content requirements
Local content:
New ANP proposal expected soon Hearing round closes February 14. No major changes expected
4200
2503 2022
Source: Petrobras
Source: Petrobras
2022
Construction of the Hull; P-67 Replicant 2 (LC 70%) - Lula Central; Construction of the Hull; P-68 Replicant 3 (LC 70%) - Lula South; Construction of the Hull; P-69 Replicant 4 (LC 70%) - Lula North; Construction of the Casco; P-70 Replicant 5 (LC 70%) - Lula Extreme South; Construction of the Hull; P-71 Replicant 6 (LC 70%) - Iara Horst; Construction of the Hull; P-72 Replicant 7 (LC 70%) - Iara NW; Construction of the Hull; P-73 Replicant 8 (LC 70%) - Carcar; Construction of the Hull;
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Source: Petrobras
Source: Petrobras
2503 2022
Curumim
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Source: Petrobras
Source: Petrobras
Brasfels Shipyard
Workforce peak: 7500 workers (Aug/12); 6 semi-submersible drilling rigs: Urca (LC 55%) Franco East Frade (LC 55%) Jpiter Bracuhy (LC 60%) Carcar Cidade So Paulo Cidade Paraty P-61 2022
Portogalo 4200
Portogalo (LC 60%) Iara Surround Mangaratiba (LC 65%) Florim Botinas (LC 55%) Florim
P-61 (LC 65%) Papa-Terra Construction of the hull and integration P-66 (LC 67%) Lula High Construction of 6 modules and integration P-69 (LC 67%) Lula North Construction of 6 modules and integration Cidade So Paulo (LC 65%) Sapinho Pilot Construction of 4 modules and integration Cidade Paraty (LC 65%) Lula NE Pilot Construction of 5 modules and integration Cidade Mangaratiba (LC 65%) Iracema South Construction of 4 modules and integration
Source: Petrobras
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Source: Petrobras
UTC Engenharia
Workforce peak: 3000 workers (Aug/12); P-55 P-55 (LC 65%) Roncador Mod. 3 modules construction: M-07 Booster Compression and Gas Dehydration M-08 Amines Unit 2503 2022 P-58 P-62
4200
P-58 (LC 63%) Whales Park modules construction: M-01 Gas Dehydration M-03 CO2 and H2S Removal M-05/06/07 Oil Processing M-10 Water Injection M-10A SRU Sulfate Removal P-62 (LC 63%) Roncador Mod. 4 modules construction: M-01 Gas Dehydration and Torch System M-03 CO2 and H2S Removal M-05/06/07 Oil Processing M-10 Water Injection M-10A SRU Sulfate Removal
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Source: Petrobras
Source: Petrobras
Brasa Shipyard
Workforce peak: 1900 workers (Mar/13); Ilhabela Cidade de Ilhabela (LC 65%) Sapinho North Construction of 10 modules and integration of the FPSO 2022 2503
4200
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Source: Petrobras
Source: Petrobras
Mau Shipyard
Workforce peak: 3300 workers (Jul/14); Celso Furtado (LC 74%) Product Vessels 48ktpb Srgio Buarque de Holanda (LC 73%) Product Vessel 48ktpb 2022 Rmulo Almeida (65%) Product Vessel 48ktpb Jos Alencar (LC 65%) Product Vessel 48ktpb 4 Vessels Panamax (LC 65%) 65 a 80ktpb
2011 2012
1 Panamax 2 Products CF JA
3 Products
4200
3 Products
2017 2018 2019 2020
Source: Petrobras
Source: Petrobras
Paraty
2503 2022
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Cidade Ilhabela (LC 65%) Sapinho Norte Construction of 4 modules: TS005 Injection of chemical products TS077 Flare vases TS078 CO2 Removal TS079 H2S Removal Cidade Mangaratiba (LC 65%) Iracema Sul Construction of 5 modules: Module of water and utilities injection Module of gas treatment Module of electrical equipment Module of high and low separation Module of flare vases
Source: Petrobras
4200
Ipanema 2 Aframax 2 Aframax Leme Leblon
2503
2 Suezmax, Grumari Arpoador Copacabana
2015 2016 2017
Ipanema (LC 60%) Jpiter Leblon (LC 65%) Franco Leste Leme (LC 65%) Franco Leste Marambaia (LC 65%) Entorno de Iara
P-55 (LC 65%) Roncador Mod. 3 Hull construction P-62 (LC 63%) Roncador Mod. 4 Conversion, construction of 3 modules and integration Joo Cndido (LC 70%) Suezmax 158ktpb Zumbi dos Palmares (LC 65%) Suezmax 158ktpb 8 Suezmax ships (LC 65%) 158ktpb
JC 1 Suezmax
2012 2013 2014
1 Suezmax 3 Aframax
2019 2020
2011
2018
4200
Pituba
P-59 P-60
Boipeba
2503
Interlagos Itapema
2022
Ondina
6 drillships: Ondina (LC 55%) Iara Horst Pituba (LC 55%) Iara NW Boipeba (LC 60%) Exploration Interlagos (LC 60%) Exploration Itapema (LC 65%) Iara NW Comandatuba (LC 65%) Exploration
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Source: Petrobras
Source: Petrobras
4200
Itanas Siri
Sahy
2016 2017 2018 2019 2020
Itaoca (LC 60%) Iara NW Itanas (LC 60%) Exploration Siri (LC 65%) Exploration Sahy (LC 65%) Exploration
P-68 Replicant #3 (LC 67%) Lula South Construction of 6 modules and integration P-71 Replicant #6 (LC 67%) Iara Horst Construction of 6 modules and integration
2011
Source: Petrobras
Source: Petrobras
OSX Shipyard
Workforce peak: 12000workers (Jul/16); P-67 Replicant #2 (LC 67%) Lula Central Construction of 6 modules and integration P-70 Replicant #5 (LC 67%) Lula Extreme South Construction of 6 modules and integration
P-67 2503 2022 P-70
4200
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
Source: Petrobras
Source: Petrobras