Академический Документы
Профессиональный Документы
Культура Документы
100 90 80 70 60 50 40 30 20 10 0 0.001
saC
0.01
10
100
wopt=10,6%
2050
1800 1600 1400 Axial stress [kPa] 1200 1000 800 600 400 200 0 0 2000 4000 6000 8000 10000 12000 14000 time [s]
3.5 3 2.5 penetration [mm] 2 1.5 1 0.5 0 0 2000 4000 6000 8000 time [s] 10000 12000 14000
Figure 8a. Results from cyclic CBR test in function of stress and penetration of plunger for not stabilized clay.
450 400 350 Axial stress [kPa] 300 250 200 150 100 50 0 0 0.5 1 1.5 penetration d [mm] 2 2.5 3
Figure 8b. Results from cyclic CBR test in function of stress and penetration of plunger for 1 hour stabilized clay.
1800 1600 1400 Axial stress [kPa] 1200 1000 800 600 400 200 0 0 0.5 1 1.5 2 2.5 3 3.5 penetration d [mm]
Figure 8c. Results from cyclic CBR test in function of stress and penetration of plunger for 14 days stabilized clay.
2000 1800 1600 Axial stress [kPa] 1400 1200 1000 800 600 400 200 0 0 0.5 1 1.5 2 2.5 3 3.5 penetration d [mm]
Figure 8d. Results from cyclic CBR test in function of stress and penetration of plunger for 30 days stabilized clay.
900 800 R = 0.946 700 Resilient modulus MR [MPa] 600 500 400 300 200 100 0 1 10 logarithm of cycles [-] R = 0.9623 R = 0.9374 Log. (Resilient modulus after 30 days carring for lime stabilized clay) Log. (Resilient modulus after 14 days carring for lime stabilized clay) Linear (Resilient modulus for non stabilized clay) Log. (Resilient modulus after 1 hour carring for lime stabilized clay)
R = 0.9625
Figure 9. Resilient modulus MR change for clay stabilized with lime during following cycles.
Sample details non stabilized 145,26 stabilized after 1 hour 531,42 14 days 671,72 30 days 830,09
70
60 52
58
50
40
30 24 20 18 CBR value = 2,9805ln(t) + 6,211 R = 0,9992 6 0 0 80 160 240 320 400 480 560 640 720 time [s] Standard CBR value calculate from static CBR test CBR value estimated from AASHTO equation 26
10
Figure 10. CBR values from static CBR test and obtain form MR value from cyclic CBR test.