PCC
Grid BT AC Transmission Line 110 kV
~ =
~ =
~ =
80 MW
Rolling clouds lead to sudden voltage drop and rise Peak shaving and injection of reactive power required
Requires EES
DSO / TSO desires / requires conventional power plant properties LV fault ride through capability Fault current capability
Can be improved by EES
Participation in primary control (provision of positive and negative Requires EES active power) Provision of positive or negative reactive power Strong Demand for a Short Term Electrical Energy Storage System
Can be improved by EES
PCC
Grid BT AC Transmission Line 110 kV
~ =
~ =
~ =
DSO
SC.500
Grid 10 30 kV
~ =
SC.Ctrl SC.Log
~
BMS Battery Container
=
SC.500 TKS-SC 1000
Grid
PCC
Connection to 110 kV or other voltage possible (add. Transformer req.)
PV.500
~ = PV Power Plant
PV.Ctrl PV.Log
~ =
PV.500 TKS-C 1000
TKS-SC.1000
Inverter Cabinet
Battery Technology
Battery Storage Aided Grid Connection of PV Power Plants
Battery Technology
10
DSO
SC.500
Grid 10 30 kV
~ =
SC.Ctrl SC.Log
~
BMS Battery Container
=
SC.500 TKS-SC 1000
Grid
PCC
Connection to 110 kV or other voltage possible (add. Transformer req.)
PV.500
~ = PV Power Plant
PV.Ctrl PV.Log
~ =
PV.500 TKS-C 1000
11
SC. Control
SC. Log
Ethernet
BMS