PROJECT: GIFT CITY, TOWER QC2

TITLE : ELECTRICAL LOAD ESTIMATION -ANNEXURE (As given by M/s IL&FS)

S.No

Building

Basement

1
B
1

Total load for whole basement

Ground floor

Ground Floor Area

Total load for whole GF

1st floor

Gym

Common Area (Lighting + Power)

D
1

Total load for whole FF

Cafeteria - 2

E
1

2nd floor

AHU-01

AHU-02

Carpet
Area in
sq.m

Total Area Carpet Area


in sq.ft
in sq.ft
Lighting

Power

UPS

AHU/
Lighting
Vent

0.00

0.00

0.00

2,232.00

2,232.00

0.00

0.00

0.00

23,964.78

23,964.78

0.00

0.00

0.00

27.5

5.00

27.50

0.00

0.00

0.00

0.00

374

4,026

0.00

0.00

0.00

0.00

6.5

0.00

0.00

0.00

0.00

0.0

1.1

0.0

0.0

0.0

0.0

0.0

G
1

2
3

G
1
H
1

198.25

Total load for whole FF


Office - 01

10,471.50

27 & 28 Floors - 02 Nos.

795.00

Office - 02

198.25

Total load for whole FF


Lighting + Power Load

Terrace/Roof floor

Machine room

Passenger Lifts - 12 Nos.

Machine Room Lighting

0.00

0.0

0.70

0.0

0.0

0.0

0.0

7.5

0.0

0.0

0.0

7.5

0.0

0.0

0.0

5.3

5.25

0.0

84.5

10.8

37.8

0.0

5.6

54.20

0.0

8.2

5.7

0.0

0.7

0.0

6.40

0.0

0.0

0.0

0.0

0.0

7.5

8.0

0.0

0.0

0.0

0.0

0.0

7.5

5.3

5.25

0.0

8.0

0.0

0.0

0.0

34.10

126.00

1.10

0.00

31.00

0.00

0.00

0.00

192.20

27.28

75.60

0.72

4.0

20.5

0.0

0.0

5.5

0.0

0.0

0.0

30.0

3.2

12.3

0.0

3.9

19.35

0.0

30.0

3.2

12.3

0.0

3.9

19.35

0.0

0.0

0.0

0.0

6.5

20.5
0.0

0.0
1.1

0.0
0.0

5.5
0.0

0.0
0.0

0.0
0.0

0.0

45.0
45.0

7.6

4.4
5.2

20.4
20.4

0.0

0.00

0.0

0.00

0.00

28.65

3.9

4,026

4.0

20.5

0.0

0.0

5.5

0.0

0.0

0.0

30.0

3.2

12.3

0.0

3.9

19.35

6,900

6.0

38.5

0.0

0.0

5.5

0.0

0.0

0.0

50.0

4.8

23.1

0.0

3.9

31.75

2,134

112,714.28

0.00

0.00

0.00

0.00

132.00

9.5

8,557.31
2,133.95

6.5

9.5
6.5

3,576.50

0.00

38,497.12

0.00

0.00

0.00

0.00

51.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.00

15.00

6.5

0.0

558.00

27.0

27.0

1.1

6.60

25.0

0.0

0.00

0.0

0.0

99.00

11.0

0.0
0.0

0.00

0.0

0.0
0.0

0.00

0.0

0.0
0.0

0.00

0.0

45.0
7.6

334.80

72.5

7.6

16.2

7.6

5.2

0.0

11.0

0.0

0.0

0.0

122.5

108.00 102.20

100.00

44.00

0.00

0.00

0.00

405.20

0.00

0.00

0.00

0.00

0.00

15.00

528

528

0.00

0.00

0.00

0.00

1.1

0.0

0.00

0.0

0.00

0.0

0.00

0.0

0.00

0.0

0.00

0.0

105.60

50.0

1.1

5.2

20.4

795.60

25.0

0.0

4.4

15.00

7.6

7.6

0.0
0.7

4.29

0.00

0.00

0.00

5.92

0.00

5.5

277.20

28.65

0.00

0.0

0.00

0.0

125.30

396.00

0.0

12.87

0.00

3.9

0.0

0.7

21.70

54.20

0.00

34.0

367.20 1,177.20

5.6

19.80

5.5

0.00 2,836.80

4.4

0.0

53.50

0.0

1.1

37.8

0.0

0.00

63.0

0.0

10.8

0.0

0.00

13.5

7.1

84.5

0.0

0.00

5.90

35.10

63.0

7.70

14.95

1,962.00

8,557.31

795.00

Common Area (Lighting + Power)

Total load for whole T/R Floor

0.00

32.65

3.9

0.00

47.34

459.00

5,726

641

Common Area (Lighting + Power)

0.00

10.00

0.0

Office - 03

0.00

0.00

3.9

0.0
0.7

0.00

0.00

83.08

0.0

0.00

0.0

14.35

14.35

0.00

0.0

0.00

5.2

8.7

0.00

0.00

0.00

5.5

0.00

7.6

2.4

1.63

0.00

4.0

0.00

23.0

14.40

11.00

0.0

47.34

16.97

0.00

0.0

0.00

68.21

1.08

34.0

532

34.33

58.50

5.5

374

0.00

12.50

5,726

Office - 02

0.00

0.0

Office - 01

0.00

26.4

532

0.00

2.4

Office - 04

0.00

52.5

0.0

389,486.70

17.88

0.0

0.0

0.0

0.00

3.00

0.0

0.0

0.0

36,184.50

13.46

0.0

5.5

0.0

Typical Floors - 03 Offices - 06 Nos.

49.32

5.5

5.5

Total load for whole TF

34.33

0.0

0.0

0.0

0.0

5,726
2,133.95

0.0

44.0

0.0

0.0

3.0

34.0

198.25

0.0

1.63

5.5

Common Area (Lighting + Power)

0.0

14.40

4,026

17.9

16.97

0
0

3.0

68.21

374
532

13.5

0.00

Office - 02
Office - 03

49.3

0.00

2
3

0.8

0.00

0.0

Typical Floors - 04 Offices - 18 Nos.

0.7

20.50

0.0

Total MD (KW)

0.8

0.00

0.0

Lift
(DF)

0.7

2.50

14.5

PHE
(DF)

0.9

24.00

0.00

Server
Room
cooling

0.65

21.21

0.00

AHU/Vent
(DF)

0.6

0.00

0.00

UPS
Server
(DF)

0.8

0.00

20.50

0.00

UPS
(DF)

0.00

0.00

0.00

Power
(DF)

0.00

2.50

0.00

Lighting
(DF)

16.82

24.00

0.00

Total CL
(KW)

LIFT

0.00

21.21

0.00

PHE

0.00

13.5

Total load for whole SF


Office - 01

5.0

AHU/
Vent

0.00

Cafeteria - 1

Common Area (Lighting + Power)

UPS

16.8

3.0

0.00

Power

Tenant
Server
UPS load
provision

Tenant
Server
Room AC
load
provision

0.00

F&B Area

2
3

Total Area in
sq.m

Maximum Demand using the following Diversity Factor

Connected Load (CL) (in KW)

Lighting + Power Load

Area-W/sq.ft

3.9

0.00

0.0

0.0

69.30

1,834.47

28.65

0.00

0.00

0.00

5.92

513.99

7.7

31.50

0.0

5.92

16.2

32.5

40.80

64.80

66.43

0.00

30.80

0.00

0.00

0.00

202.83

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12.00

422.4

422.40

12.00

5.2

0.00

0.7

0.00

0.72

7.7

0.00

0.00

64.00

0.00

0.00

0.00

12.00
0.00

5.92
0.00

Area-W/sq.ft
S.No

Building

Total Area in
sq.m

Carpet
Area in
sq.m

Total Area Carpet Area


in sq.ft
in sq.ft
Lighting

Power

UPS

AHU/
Lighting
Vent

Power

High side Services- Electrical load

1
2
3
4
5

Heat exchanger & Chilled water pumps - 04 Nos.


Pressurization Unit
Fresh Air Handling Units
Car Park Jet Fans
AHUs

Extract Fans

43.2

Central Emergency Backup System

32.0

8
9

10

11
12

13
14

15

UPS

Tenant
Server
UPS load
provision

180.0
3.5

Water Pumps

AHU/
Vent

Tenant
Server
Room AC
load
provision

PHE

LIFT

25.5
3.5

RO plant(Provision)

Lift pressurisation fans


Service (Fire) Lift

748

AHU/Vent
(DF)

Server
Room
cooling

PHE
(DF)

99.9

Lift
(DF)

0.00

0.0

99.90
3.50
109.90
12.00
17.85

109.9
17.9

Total MD (KW)

3.5

3.50

43.20
49.00
32.00

0.0

0.00

210.0

210.0

180.00

11.0

11.0

11.00

3,625

70.6

70.60

88.0
84.0
162

100

788

Estimated load for Tower QC2


Total Connected Load

5,950

Total Maximum Demand

3,955

Total MD @0.9 Vertical diversity factor, 0.9 pf

3,955

Total installed transformer capacity required @ 80% loading

VA/Sq.ft

UPS
Server
(DF)

32.0

84

UPS
(DF)

49.0

88.0

Spare Feeders

Power
(DF)

43.2

70.6

Staircase pressurisation fans

Lighting
(DF)

3.5

49.0

Fire fighting pumps

Total CL
(KW)

180.0
3.5
157.0
12.0
25.5

157.0

12.0

Makeup Pumps (High Pressure) for Chilled Water System

Grand Total Load

Maximum Demand using the following Diversity Factor

Connected Load (CL) (in KW)

4,943.66

528

5,950

599

1,705

105

649

70.4

70.40

493

3,955