CHAPTER-12
SNO.
1. SINGLE LINE DIAGRAM
2. MAINTENANCE PROCEDURE
Line 2
71
(73 )
( 74)
Line - 1
72
132 KV SWITCHYARD
Single Line Diagram
LA for line
Wave trap
Coupling cap.
Line PT
3NO nos. 1PH VT
132KV/ 3 / 110/3 / 110/3
Isolator with ES
MOCB
132 KV
MOCB
ISOLATOR
CT
ISOLATOR
Tie - ISOLATOR
132 KV, 1250A,5000MVA, 3PH,50Hz BUS
ISOLATOR
100/1A, CL: PS differential prot.
100/1A, CL: PS res. E/F prot.
100/1A, CL: 5P20O/C prot
ISOLATOR
Core1
Core 2
Core 3
MOCB
132 KV
Transformer
132/11KV,
12.5/16 MVA
ONAN/ONAF
MOCB
for yard equipments prot.LA
SB E/F
RES E/F
50/1A
100/1A
NGR
15.8, 400A , 10 Sec
CT
SB E/F
200/1A
NGR
RES E/F
1250/1A
VT 11KV/3 / 110V/3
1250/1A, CL: 1.0metering
1 250/1A, CL: 5P20O/C prot
1250/1A, CL: PSres. E/F prot.
1250/1A, CL: PSdifferential prot.
Core1
Core 2
Core 3
Core 4
MOCB 11KV
MOCB
MOCB
It is always considered a good and safe practice to keep pad-locked the isolated
electrical installation at isolation points, where this facility is feasible & have
been provided, till the maintenance job is in progress.
Safety tags must issued for maintenance of electrical installation, these shall be
legibly filled with name of person issuing, date & time, purpose of isolation,
name of person doing the maintenance job. The stub must be retained by the
person on maintenance job, after completion of the job and checking healthiness
of the electrical installation after maintenance, safety stub must be return back for
energisation of electrical equipment.