NEW PROPANE GAS COMPRESSOR PROJECT

LINE DESIGNATION LIST (Existing)


Existing Line Designation Sr.No. Line No. service size class To Location From Existing Reference ID P& Operating pressure Kg/Cm2 g Design Remark Temperature Pressure 0 C Kg/Cm2 g Temperature 0C

14"-RP-10-518-1-B4A-IC

Propane

14"

B4A

Existing 1st stage Compres suction sor drum

10-1000-E-105-A/B/C/D

0.125

-40

18

-45/60

The Datas is taken from control room of ONGC LPG PLANT-1 Uran and same is conformed with operation manual The Datas is taken from control room of ONGC LPG PLANT-1 Uran and same is conformed with operation manual The Datas is taken from control room of ONGC LPG PLANT-1 Uran and same is conformed with operation manual The Datas is taken from control room of ONGC LPG PLANT-1 Uran and same is conformed with operation manual The Datas is taken from control room of ONGC LPG PLANT-1 Uran and same is conformed with operation manual

16"-RP-10-512-1-B4A-IC

Propane

16"

B4A

Existing 2nd stage Compres suction sor drum

10-1000-E-105-A/B/C/D

0.784

-27

18

-45/60

18"-RP-10-507-1-B4A-IC

Propane

18"

B4A

Existing 3rd stage Compres suction sor drum

10-1000-E-105-A/B/C/D

2.835

-7

18

-45/60

14"-RP-10-504-1-B4A

Propane

14"

B4A

Existing 4th stage Compres suction sor drum

10-1000-E-105-A/B/C/D

5.26

18

-45/60

16"-RP-10-501-1-B1A-Is

Propane

16"

B1A

Set of Existing Condens Compressor 10-1000-E-105-A/B/C/D or E-112 K-101

12-13

65

18

150

Existing Vessels data Operating & Mechanical


Sr.no. 1 2 3 4 5 6 Parameter Outside dia in mm Height/Lengthe in mm operating pressure kg/cm2 g Design pressure kg/cm2 g operating Temperature 0C Design Temperature C
0

Vessels V-112 2200 4400 0.125 18 -40 -45 to 80 V-111 2200 5200 0.784 18 -27 -45 to 80 V-110 3000 5600 2.835 18 -7 -20 to 80 V-109 2200

Remark

Data is taken from operation manual and operating pressure & temperature collected from control room. Data is taken from operation manual and operating 9400 pressure & temperature collected from control room. Data is taken from operation manual and operating 5.26 pressure & temperature collected from control room. Data is taken from operation manual and operating 18 pressure & temperature collected from control room. Data is taken from operation manual and operating 8 pressure & temperature collected from control room. Data is taken from operation manual and operating -20 to 80 pressure & temperature collected from control room.

Balance Information required for piping need list


123456891011-

TL to TL dimensions for the vessels V-109, V-110, V-111 & V-112 MOC of the existing vessels V-109, V-110, V-111 & V-112 Nozzle details like thickness, projection size, material, rating of flange Skirt dimensions (height,dia, material, fire proof thk & density,parameters at the bottom end RF pad details at nozzles insulation Details ( thickness & density) material : Rock wool thickness : 75mm top & bottom head details(2:1 tori spherical Allowable Nozzle loads Mill tolerance Latest inspection report for all existing line

TL to TL dimensions for the vessels V-109, V-110, V-111 & V-112

g need list
to be taken on site given in insp report 2005

ers at the bottom end line. thickness : 75mm

SR. no. 1 2 3 4 5 6 7 8 9 10 11 12 14

Piping Need list

TL to TL dimension MOC of the existing suction KODs Nozzle Details(Thk., projection, size, material, rating of the flange Skirt Dimensions Diameter RF pad details at nozzles Insulation details Process Parameters of vessels Top and Bottom head details(2:1 Tori spherical) Allowable Nozzle loads Corrosion Allowance Mill tolerance Latest inspection report for all existing lines (For Stress Analysis

Response Exact Data is not available with Ongc. Refer to Operating Manual the Height of vessels is availableat the page no. 148 on basis of maximum height we can assume the TL to It is C.S. material refer insepection report of ONGC 2005 for the vessels. These details are mentioned in UT reports of the vessels. The size of nozzle is available in the inspection report. Deatil of flange is not availablefrom ONGC. Data is not available from ONGC. Data is available in operation manual. Refer page no. 148 of operation manual. Data is not available from ONGC. Data is not available from ONGC. We can assume for the cryogenic system. Data is available in operation manual and also collected from control room. Data is not available from ONGC. Data is not available from ONGC. Corrosion allowance for the vessels 109 & 112 is 3 mm and this data is collected from vessels name plate . Same we can assume for other two vessels. Data is not available from ONGC Data is not available from ONGC. We hope that this data have no meaning for the stress analysis of new piping system