Name: Mengheng LIM ID: 12020303

Software Design Assignment 3


1. Explain Different Team programming approach in detail. Democratic Team Approach: the main idea for this approach is egoless programming, which mean that each of individual programmers share the tasks and working individually with equal right. There is no one who is the leader or controls other members, and there is no different between higher experiences programmers and beginner programmers. Moreover, each programmer likes to convince other member to find the faults in his/her code, which make the quality of the code much better. Furthermore, everyone must be taking a part of the responsible for the project whether the result is good or bad. On the other hand, the money and the awards that they get for that project are divided equally among all of the members. Chief Programmers Team Approach: the main idea for this approach is hierarchy process which means there must me someone to control, manage and responsible for the project given. Moreover, each programmer is divided for separate task that related to their specialize skills, which they have been trained before. The chief programmer is both a successful manager and a highly programming skilled that can do the architectural design for the programmers and can solve any critical or complex sections of the code. There is also a backup programmer that is also having similar personality to chief programmer but he/she is the most important when the chief is ill or busy or are no more available for this project. Another member is programming secretary, which has highly programming skill and responsible for maintaining the project production library, the documentation of the project. Mixed team approach: is the team programming approach which make use of the strengths of both democratic and chief programmer teams, and it is useful for team that has more than 20 members. The chief programmers are no longer exist but there are two separate leaders in responsible for the task, team leader works with the technical related task such as programming. Team manager works with the non-

technical related to managerial role in a team such as team meeting, any issues relate to the team or personal. 2. Write different methods to calculate the size of the project. Explain all in detail. Lines of code: LOC (Line of Code), KDSI (Thousand Distribution Source Instruction), KLOC (Thousand Line of Code). There is not specific way to count line of code because it differ from project to project as style of coding is not always the same. For example, there are Executable lines of code, Data definitions, Comments and JCL statements. However, all of these line can be changed or deleted during the implementation or testing. As the result, we can only calculate it after the project is completed. FFP: is the method using the data processing products and the main structural elements of this method is Files (Fi), Flows (Fl) and Processes (Pr). The formula for this method is o Size: S = Fi +Fl +Pr o Cost: C = b ! S ; b is the efficiency or productivity constant which might be different from company to company Function Points: its metric is based on the number of input (Inp), output (Out), inquiries (Inq), master files (Maf), and interfaces (Inf). o FP = 4 ! Inp + 5 ! Out + 4 ! Inq + 10 ! Maf + 7 ! Inf Then we find the Compute the technical complexity factor (TCF) which each of the 14 factors value from 0 to 5. And add those 14 numbers to get the total degree of influence (DI), then use the formula: o TCF = 0.65 + 0.01 ! DI

COCOMO: First step the length of products in KDSI is estimated then we can estimate the Nominal effort using this formula: o Nominal effort = 3.2 * (KDSI)1.05 person-months

Вам также может понравиться