Config: Assign Calibration inspection type-14 to respective PM Order type. Master Data: 1.

You first create Maintenance Plan (IP41). Considering you've already an Equip ments (IE01), General Taks List for equipment (IA05) created/available in system in PM module. 2. Then you schedule Maintenance Plan using IP10. 3. After Scheduling, system generates a Maintenance Order automatically in backg round. 4. Then you release Maintenace Order (IW32). Once PM order releaseed, an inspect ion lot is generated (Based on Configuration done). 5. Then process the Insp Lot (UD)n depending on which a status will be updated f or an equipment. 6. Subsequently, process the Maintenace Order & close it. ================================= A. Calibration inspection-In House Scope: Calibration plan, schedule calibration plan, calibration inspection, comp lete calibration order 1. Create Calibration order-T code:IW31/IW32 Pre-requisite: a. Create equipment as Finished goods b. Create sampling procedure c. Create master inspection characteristics d. Create general/equipment task list as per the requirement 2. Execution of maintenance plan u2013 dead line monitoring of the Maintenance P lan-T code:IP30 3. Perform Calibration inspection-T code:QA32 4. Close / Change Calibration order-T code:IW32 B. Calibration Inspection-External 1.Create Calibration order-T code:IW31/IW32 Pre-requisite: a. Create equipment as Finished goods b. Create sampling procedure c. Create master inspection characteristics d. Create general/equipment task list as per the requirement 2. 3. 4. 5. 6. Release PR-Tcode:ME54n Generate PO based on PR- T code:ME21n PO release:ME29n Service Entry Sheet:Tcode ML81n Invoice verification: Tode MIRO

================== Please follow the following prcoess flow(assuming test equipment(IE01) and maste r data created) IA05- Create General Task list(Enter inspection point :300,operation,inspection charactertics to the operation,usage) IP01-Create maintenance plan( Use maintenace startegy of plant,enter equipment, select general task list for plan the equipment,enter call horizon,planning cycl e schduling period) IP10-Schedule the plan Schedule the plan for the quantity with frequency defined in the plan.Which schdule the according to the schdule date.Schedule date gener ates pm order for the plan on due date.

IW33-Display order. QE51-Calibration result recording for equipment- Gives status for result i.e ok or not ok. QA11-Lot usage decision IW41-Confirmation for the order. You can create a maintenance strategy(IP11) for the calibration of equipment mea n to say in what frequency calibaration is carried out either monthly,weekly or yearly. Assign this strategy to the task list.after that follow the process steps as exp lained. Once scheduling is carried out in IP10,according to the strategy maintained in t ask list,system will generate maintenance calls.for example if calibration is ca rried out monthly and scheduling is done for the period of 12 months,system will generate 12 maintenance calls.once first call is finished do deadline monitorin g(iw38),system will automatically created maintenance order for the second call. Calibration flow almost follows the preventive maintenance cycle except inspecti on point is assigned in task list. ======== Config: Assign Calibration inspection type-14 to respective PM Order type. Master Data: 1. You first create Maintenance Plan (IP41). Considering you've already an Equip ments (IE01), General Taks List for equipment (IA05) created/available in system in PM module. 2. Then you schedule Maintenance Plan using IP10. 3. After Scheduling, system generates a Maintenance Order automatically in backg round. 4. Then you release Maintenace Order (IW32). Once PM order releaseed, an inspect ion lot is generated (Based on Configuration done). 5. Then process the Insp Lot (UD)n depending on which a status will be updated f or an equipment. 6. Subsequently, process the Maintenace Order & close it.

Вам также может понравиться