Larsen & Toubro Limited, Construction.

PB No979,Mount-Poonamallee Road,Manapakkam,Chennai 600089,Tamilnadu,India Work Order - E9452WOD4000005


Job Address : LE130239 - RC - COMPOSITE - UPPAL DEPOT - Hyderabad MEtro Rail Project,,,HYDERABAD,AP,IND01,500081,,, Vendor Address : S0055172 - JAI BHOLE RAILWAY CONTRACTOR - VILLAGE-NAGLA KHUSHA,PLAMN,BAYANA,,BHARATPUR,Rajasthan,INDIA,321401,BIJENDAR SINGH,,09783053212,,MULA.SINGH89@GMAIL.COM Payment Centre : LE130239 - RC - COMPOSITE - UPPAL DEPOT Company PAN No : AAACL0140P WOR Number : E9452WOR4000006 WO Number : E9452WOD4000005 Dt: 13-Jan-2014 Dt: 13-Jan-2014 Vendor PAN No : AAJFJ1945J Created By : PETHE UMESH ANKUSHRAO Authorized By : VALIVETI SRINIVAS , K RAMACHANDRA REDDY Wo Type : Regular Labour With Out Materials Bill Type : Running On : 20-Jan-2014 On : 20-Jan-2014

WO Period From : 11-Dec-2013

To: 12-Mar-2014

WO Status : Active

Amendment No : 0

Dt:

Payment Terms : (1) 100.00% On Execution within 30 Days by Cheque Remarks : Other Terms : Taxes and Duties will be reimbursed against submission of documentary proof Item Details S.No Item-Version-Markup-Stages UOM Values In : INR Quantity 1,000.000 Indian rupee Item Rate 30.00 Item Value 30,000.00

1 302500000000005-1-0-N Numbers Leading of PSC sleepers from supply point including loading, transporting and unloading and stacking in batch of 20 sleepers at locations to facilitate lifting with lead up to 1km. (All works by the contractor)

2 302500000000013-1-0-N Numbers Drilling of holes in the web of 60 Kg / 52 Kg rails (to be justified in isolated cases) a) Drilling of holes on rails b) Chamfering of drilled holes on track. (including Drilling machine, minor tools)

500.000

35.00

17,500.00

3 302500000000018-1-0-N Leading of ballast from stack yards unloading 0.60 cum/m at the track and 1cum/m outside track on both sides with lead up to 500m. (including Loading and Unloading)

Cubic metre

5,000.000

99.00

495,000.00

4 302500000000019-1-0-N Manual track linking if warranted by placing PSC sleepers over the already prepared ballast bed and Placing rails in position, fastenings etc., all inclusive including cutting of rails etc., except welding. (including Labour, tools and plant, transportation of fastenings from stores) & (excluding Supply of rails and sleepers within 250 m lead)

Meter

2,000.000

126.00

252,000.00

Recommended By:
Report Generated at 21-Jan-2014 2:15:11 PM Page 1

For Larsen & Toubro Limited, Construction.


EIP 2014 L&T Construction. All rights reserved

Larsen & Toubro Limited, Construction.


PB No979,Mount-Poonamallee Road,Manapakkam,Chennai 600089,Tamilnadu,India Work Order - E9452WOD4000005
S.No Item-Version-Markup-Stages 5 302500000000035-1-0-N Meter Off- track tamping machine works: Scope of work: Engaging of Labour with sufficient tools for aligning the track and initial packing to make track required level and provision of cant wherever required. (including Minor tools, jacks, crow bar, panja etc)-First packing UOM Quantity 2,000.000 Item Rate 95.00 Item Value 190,000.00

6 302500000000042-1-0-N Meter Off- track tamping machine works: Scope of work: Engaging of Labour with sufficient tools for aligning the track and initial packing to make track required level and provision of cant wherever required. (including Minor tools, jacks, crow bar, panja etc)-second packing

2,000.000

79.00

158,000.00

7 302500000000043-1-0-N Meter Off- track tamping machine works: Scope of work: Engaging of Labour with sufficient tools for aligning the track and initial packing to make track required level and provision of cant wherever required. (including Minor tools, jacks, crow bar, panja etc)-third packing

2,000.000

79.00

158,000.00

8 302500000000078-1-0-N Installation of PSC fan shaped turnouts, derailing switches 60kg/52kg including lead rails as per RDSO layout drawings including proper ballasting,kutcha packing etc.,including rail cutting, drilling if required all inclusive (excluding welding) with a lead up to 250m.(including Engaging Labour, tools and plant) & (excluding procurement of turnouts and sleepers)-1 in 7 turnouts

Numbers

14.000

48,000.00

672,000.00

9 302500000000084-1-0-N Bottom ballast compacting: Levelling of ballast by track dozer and rolling by 8T roller. (including Engaging labour,T&P (tractor dozer and roller), small tools)

Meter

2,000.000

15.00

30,000.00

10 302500000000085-1-0-N Secondary ballasting: Scope of work: Engaging of labours for Shifting of already collected ballast to profile. (including Engaging of Labour, tools to dump ballast in packing zone)

Meter

2,000.000

75.00

150,000.00

11 302500000000086-1-0-N Meter Ballast boxing and profiling: Scope of work: Engaging of labours for Boxing & Sectioning of ballast profile as per profile drawings. (Including Minor tools, crow bar, panja, labours etc.)

2,000.000

40.00

80,000.00

Recommended By:
Report Generated at 21-Jan-2014 2:15:11 PM Page 2

For Larsen & Toubro Limited, Construction.


EIP 2014 L&T Construction. All rights reserved

Larsen & Toubro Limited, Construction.


PB No979,Mount-Poonamallee Road,Manapakkam,Chennai 600089,Tamilnadu,India Work Order - E9452WOD4000005
S.No Item-Version-Markup-Stages Sets UOM Quantity 14.000 Item Rate 17,500.00 Item Value 245,000.00

12 302500000000113-1-0-N Installation of PSC fan shaped turnouts, derailing switches 60kg/52kg including lead rails as per RDSO layout drawings including proper ballasting,kutcha packing etc.,including rail cutting, drilling if required all inclusive (excluding welding) with a lead up to 250m.(including Engaging Labour, tools and plant) & (excluding procurement of turnouts and sleepers)-1 in 7 turnouts first packing

13 302500000000126-1-0-N Installation of PSC fan shaped turnouts, derailing switches 60kg/52kg including lead rails as per RDSO layout drawings including proper ballasting,kutcha packing etc.,including rail cutting, drilling if required all inclusive (excluding welding) with a lead up to 250m.(including Engaging Labour, tools and plant) & (excluding procurement of turnouts and sleepers)-1 in 7 turnouts second packing

Sets

14.000

17,400.00

243,600.00

14 302500000000127-1-0-N Installation of PSC fan shaped turnouts, derailing switches 60kg/52kg including lead rails as per RDSO layout drawings including proper ballasting,kutcha packing etc.,including rail cutting, drilling if required all inclusive (excluding welding) with a lead up to 250m.(including Engaging Labour, tools and plant) & (excluding procurement of turnouts and sleepers)-1 in 7 turnouts third packing

Sets

14.000

17,400.00

243,600.00

15 302500000000146-1-0-N Rail cutting (to be used in isolated cases): Scope of Work: Engaging of Labour for a) Squaring of rails b) Cutting of rails. (including Cutting machine, minor tools)

Numbers

150.000

63.00

9,450.00

16 302500000000183-1-0-N Installation of PSC fan shaped turnouts, derailing switches 60kg/52kg including lead rails as per RDSO layout drawings including proper ballasting,kutcha packing etc.,including rail cutting, drilling if required all inclusive (excluding welding) with a lead up to 250m.(including Engaging Labour, tools and plant) & (excluding procurement of turnouts and sleepers)-Scissors crossovers 1 in 9

Numbers

1.000

190,000.00

190,000.00

Recommended By:
Report Generated at 21-Jan-2014 2:15:11 PM Page 3

For Larsen & Toubro Limited, Construction.


EIP 2014 L&T Construction. All rights reserved

Larsen & Toubro Limited, Construction.


PB No979,Mount-Poonamallee Road,Manapakkam,Chennai 600089,Tamilnadu,India Work Order - E9452WOD4000005
S.No Item-Version-Markup-Stages Sets UOM Quantity 1.000 Item Rate 70,000.00 Item Value 70,000.00

17 302500000000188-1-0-N Installation of PSC fan shaped turnouts, derailing switches 60kg/52kg including lead rails as per RDSO layout drawings including proper ballasting,kutcha packing etc.,including rail cutting, drilling if required all inclusive (excluding welding) with a lead up to 250m.(including Engaging Labour, tools and plant) & (excluding procurement of turnouts and sleepers)-Scissors crossovers 1 in 9 first packing

18 302500000000213-1-0-N Installation of PSC fan shaped turnouts, derailing switches 60kg/52kg including lead rails as per RDSO layout drawings including proper ballasting,kutcha packing etc.,including rail cutting, drilling if required all inclusive (excluding welding) with a lead up to 250m.(including Engaging Labour, tools and plant) & (excluding procurement of turnouts and sleepers)-Scissors crossovers 1 in 9 second packing

Sets

1.000

67,000.00

67,000.00

19 302500000000223-1-0-N Installation of PSC fan shaped turnouts, derailing switches 60kg/52kg including lead rails as per RDSO layout drawings including proper ballasting,kutcha packing etc.,including rail cutting, drilling if required all inclusive (excluding welding) with a lead up to 250m.(including Engaging Labour, tools and plant) & (excluding procurement of turnouts and sleepers)-Scissors crossovers 1 in 9 third packing

Sets

1.000

65,000.00

65,000.00

20 302500000000238-1-0-N Meter Installation of level crossing with UIC 60 IRS-T-12-96, 880 grade rails, with special PSC sleepers of level crossing. All fittings fittings and fasteners, brackets, blocks, check rails, bolts, etc. shall be supplied by L&T. All tools, labour and machinery shall be borne by the agency.

90.000

414.00

37,260.00

Work Done Value : Service Tax Details S.No 1 2 3 Education Cess on Service tax Secondary & Higher Education Cess on Service tax Service tax Rate Tax : Total : Description

3,403,410.00

Value 0.00 0.00 0.00 0.00 3,403,410.00

Recommended By:
Report Generated at 21-Jan-2014 2:15:11 PM Page 4

For Larsen & Toubro Limited, Construction.


EIP 2014 L&T Construction. All rights reserved

Larsen & Toubro Limited, Construction.


PB No979,Mount-Poonamallee Road,Manapakkam,Chennai 600089,Tamilnadu,India Work Order - E9452WOD4000005
Standard Deduction Details S.No 1 2 3 4 Deduction Type INCOME TAX INCOME TAX INCOME TAX RETENTION TDS Surcharge on TDS Cess on (TDS+Surcharge) Retention Description Percentage % 2.00 0.00 0.00 5.00 Effective From Date 01 Apr 2013 01 Apr 2013 01 Apr 2013 11 Dec 2013 Effective To Date 31 Mar 2014 31 Mar 2014 31 Mar 2014 30 Sep 2014

Recommended By:
Report Generated at 21-Jan-2014 2:15:11 PM Page 5

For Larsen & Toubro Limited, Construction.