Вы находитесь на странице: 1из 26

Mariner & Bressay

2011-02-23 Thomas Bernt, Facilities Project Director - Mariner Hege Blom, Procurement Manager
1Classification: Internal 2011-02-22

Mariner and Bressay Fields

Mariner: Statoil (65 (65,11%), 11%) Eni (28 (28,89%), 89%) Nautical Petroleum (6%) Bressay: Statoil (81,6%) (81 6%) and Shell (18 (18,4%) 4%)
2Classification: Internal 2011-02-22

Operations in Aberdeen, UK

H Heavy Oil API G Grade d f from 12 12.1 1t to 14 14.2 2

3-

Classification: Internal

2011-02-22

M i Mariner Overview O i

Concept Reserves Pre-sanction (DG2) Sanction (DG3) Production start

PDQ + FSU 370 mmbbls March 2010 2H 2012 Q1 2017

4-

Classification: Internal

2011-02-22

Well layout

Maureen Main 16 Producers 6 Water Injectors Heimdal 44 Dual MLTs 3 Single Producers 32 Water Injectors

5-

Classification: Internal

2011-02-22

Concept short listing

Twin-rig setup

PDQ

Bridge-linked cylindrical FSO

FSU

Shuttle

Diluent
ESP
6Classification: Internal 2011-02-22

Selected development p concept p

7-

Classification: Internal

2011-02-22

PDQ Platform
60 well slots 2 drilling rigs Living Quarter for 190 people Gas system for import of fuel gas Process Capacities: Reservoir liquid 300 kbl/sd Reservoir oil 60 kbbl/sd Res. Gas 0.34 MSm3/sd Diluent

8-

Classification: Internal

2011-02-22

30,000 , tonnes topside p weight g

Mariner PDQ Double Rig


Overall Dimensions Main Frame Dimensions Utility Module Process/Wellhead Module Jacket Interface 133m x 36m 110m x 28m 52.5m x 28m 67.5m x 28m 88m x 28m

Topsides Dry Weight

30000Te

9-

Classification: Internal

2011-02-22

Drilling g facilities Twin rig g

10 - Classification: Internal

2011-02-22

Steel jacket
8 legs Spacing p g at mud line: 62m x 88m Spacing at topside: 28m x 95m, cantilevered 7m to west Five p pile cluster ( (96) ) in each of the four corners Operation Jacket Weight: Launch weight: Pile weight 20 x 96: 17 918t 19 797t 6 800 t

11 - Classification: Internal

2011-02-22

Topside units offshore installation


1715Te DES

Topside installation by heavy lifts


4201Te DSM

Flare 203Te

2937Te Living Quarters

8713Te Utility y Module

8882Te + 735Te Process/Wellhead Module

12 - Classification: Internal

2011-02-22

Floating g Storage g Unit (FSU) ( )

Storage capacity: 1 mm bbls (75%crude//25% dil ent) diluent) Export diluent to the PDQ at a rate of up to 20 000 bbls/day) Receive diluted crude oil from the PDQ at a rate of up to 80 000 bbls/day Export the diluted crude oil to North Sea Shuttle Tanker via a Stern Discharge System (SDS)

13 - Classification: Internal

2011-02-22

Bridge connection
Telescopic p bridge g on PDQ to compensate for the FSU movement relative to PDQ A cantilevered truss work bridge on the FSU (45 m)

14 - Classification: Internal

2011-02-22

Development p schedule
Mariner Development Project
Overall Master Schedule
2011 Q1 DG2 Key Milestones Q2 Q3 Q4 Q1 2012 Q2 Q3 Q4 DG3 Q1 2013 Q2 Q3 Q4 Q1 2014 Q2 Q3 Q4 Q1 2015 Q2 Q3 Q4 Q1 2016 Q2 Q3 Q4 2017 Q1 DG4

Study Phase

Definition (FEEDs)
ITT / TEA / CA

PDQ

PDQ - Jacket Construction

Fam.
ITT / TEA / CA

Eng. Pro. & Fabrication

po t & Production oduct o Pieline e e Import

Eng./ g Pro./ Fab.

Offshore Installation & HU


ITT / TEA / CA

Ins. & HU / Comm

FSU Construction

Eng. Pro. & Fabrication

HU /Com

Drilling & Completion

Pre-Drilling

15 - Classification: Internal

2011-02-22

Objectives j and challenges g


Realise the optimal value potential from the field Execute the project according to HSE requirements, scope, cost estimate, schedule and quality Main challenges for the FEED Phase: Ensure high quality in the FEED by maturing of scope up to EPC Contract award Global Gl b l competition titi Main challenges for the Execution Phase: Secure safe working conditions at all site locations Secure timely and quality deliverables Ensure high quality in planning and executing of the offshore installation and completion work Installation in 2016
16 - Classification: Internal 2011-02-22

Mariner Field Development


2011-02-23

Procurement
17 - Classification: Internal 2011-02-22

Procurement philosophy
All procurement will be according to the European Economic Act (EEA) Qualification through FPAL Global competition Final contract split/strategy will be settled through the FEED phase (2011) Most likely major contracts huge global companies Optimal split based on market opportunities, interface handling, risk sharing, and company organisational strategy Final procurement strategy to be approved by Statoil management and the partners

18 - Classification: Internal

2011-02-22

M i Mariner FEED P Program 2011


Topside FEED study (contract award end March) Jacket FEED study (contract award June) FSU FEED study (contract award June) Pipelines FEED study (contract award May) Heavy Lift; Parallel studies (contract award 2Q/3Q2011)

19 - Classification: Internal

2011-02-22

Typical Topside & Jacket Contract Strategy


Platform Jacket Project Management Concept Screening studies Concept studies FEED contracts Interface Detail Engineering Procurement Construction Supervision Construction Offshore installation Offshore Tie-in & Hook-up MC & Commissioning RFO / Start Up Operation Statoil Launching lift Launching, installation and piling Hook-up Heavy lift EPC EPC EPC EPC EPC FEED Process/Wellhead Module Utility Module Statoil Studies Study by Aker Solutions Main FEED Lead interface coordinator + common system engineering responsibility LQ Drilling Module (DES/DSM)

20 - Classification: Internal

2011-02-22

Tentative schedule major contracts


Process & WH, drilling and utility modules; Invitation to Tender: Contract award: LQ module; Invitation to Tender: Contract award: Jacked; Invitation to Tender: Contract award: 2Q2012 4Q2012 3Q2012 1Q2013 2Q2012 4Q2012

21 - Classification: Internal

2011-02-22

Market communication
A supplier conference was arranged in London summer 09 to inform about the projects Statoil, Statoil UK is presently evaluating to join the Supply Chain Code of Practice Statoil to be represented on OE2011 (and Share Fair 2011) Ongoing communication with potential FEED contractors Dialogue meetings with potential major EPC (FC) contractors in 2011 Communication strategy gy to be established within 1Q2011 Q International UK - regional/local companies UK seminars are foreseen from 2011 ( (arranged g by y Statoil or applicable pp networks) Generally major Statoil projects establish a project specific web site, incl procurement issues e issues, e.g. g strategies strategies, plans plans, contact persons persons, awarded contracts etc etc.

22 - Classification: Internal

2011-02-22

H How t to prepare ?
Qualified/register in FPAL As a supplier: What is my core business, contribution, level who is my partner ? To be qualified with respect to: HSE References Financial situation Capacity Necessary approvals from UK authorities if applicable

23 - Classification: Internal

2011-02-22

Use of Statoil corporate Frame Agreements F iliti Facilities


Frame Agreements to be used when considered favourable to the project Typical areas; Heavy Lift Pipelines & Marine operation Rotating equipment Cranes Automation Valves Further definition in the specific contract strategies

24 - Classification: Internal

2011-02-22

Synergies Sy e g es be between ee o other e p projects ojec s


The p project j will strive for synergies y g and/or standardisation between Mariner and Bressay. The actual synergies are dependent on the final concept and the phasing of the Bressay project compared to the Mariner project. Mariner FEED studies might include option for similar work for Bressay Standardisation across the topside modules is assumed. Common Blanket Orders for Mariner and Bressay for vital type of materials might be established in close cooperation with UK Operation. This concept will be further matured during the FEED phase Synergies related to Operations and D&W across UKCS and NCS will be evaluated in detail during the coming phase and subsequent years

25 - Classification: Internal

2011-02-22

Thank you y
Presentation title Presenters name Presenters title E-mail address, tel: +00 00 00 00 www.statoil.com

26 - Classification: Internal

2011-02-22

Вам также может понравиться