Scope of Work
The selected ADT for each bundle will be expected to complete the following tasks
as part of the Phase One conceptual design enhancement phase:
• Embrace the project goals and project theme, Whilamut Passage, and the
directions that resulted from the design workshops, DEP work sessions, and
project work package requirements and timelines.
• Identify ideas and proposals of merit that may emerge beyond the scope of
the WRB project.
• Define elements that are within the full jurisdiction, ownership and
maintenance of ODOT and those requiring stakeholder involvement or
consent and/or intergovernmental agreements (IGA) defining future
ownership and maintenance responsibilities.
(The following are Contingency Tasks to be executed only upon written approval
from OBEC after completion and acceptance of Phase One conceptual designs)
ADT s selected for completing Phase Two final design and/or art production for a
given bundle will be expected to complete the following tasks as part of the Phase
Two:
• Work collaboratively with the WRB design and construction team to integrate
the above design enhancement elements into the final constructed project.