Table of Contents
1. INTRODUCTION ................................................................................... 4 2. PS INTERFACES OVERVIEW ....................................................................... 5
2.1. NETWORK ARCHITECTURE............................................................................................5 2.2. TRX PLANNING OVERVIEW ...........................................................................................6 2.3. EXTRA ABIS TIMESLOTS PLANNING ..................................................................................7
2.3.1. Extra Abis Nibbles ............................................................................ 7 2.3.2. Bonus Abis Nibbles ........................................................................... 7 2.3.3. Basic Abis Nibbles ............................................................................ 7
2.4. ATERMUX PS .......................................................................................................8
3. MAIN (E) GPRS PARAMETERS ..................................................................... 9 4. ABIS/ATER OVER SATELLITE SITES/BSC ...........................................................10 5. NETWORK ARCHITECTURE IN NKTT ...............................................................11 6. CONCLUSION ....................................................................................12
Edition 1.0
Page 8/14/2011 2 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
Table of Figures
Figure 1:Network Architecture ........................................................................................5 Figure 2: TRX Timeslots .................................................................................................6 Figure 3: Abis Timeslots.................................................................................................7 Figure 4: ATERMUX .......................................................................................................8 Figure 5: VSAT Parameters Values .................................................................................. 10
Edition 1.0
Page 8/14/2011 3 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
1. INTRODUCTION
The Aim of this document is to provide an overview on the PS network as well as a brief explanation on the main interfaces This document also includes the main (E) GPRS parameters that control the PS resources management and the features activations. The set of parameters that need to be fine tuned for ABIS/ATER over satellite Sites/BSCs will be highlighted with the recommended values. The Architecture in Nouakchott city will also be explained in this report.
Edition 1.0
Page 8/14/2011 4 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
2. PS INTERFACES OVERVIEW
The aim of this section of the document is to present a quick overview on the PS main interfaces with some details and specifications.
Edition 1.0
Page 8/14/2011 5 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
TCH channel can handle PDCH to carry PS traffic. However, some parameters need be set to specific values. The BCCH timeslot and the Static SDCCH cant carry PS traffic. The parameters are mentioned in the Main GPRS Parameters section of this document.
Edition 1.0
Page 8/14/2011 6 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
The Abis Timeslots Types are stated below with an explanation for each:
Edition 1.0
Page 8/14/2011 7 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
2.4. ATERMUX PS
Figure 4: ATERMUX
The Atermux interface is a set of 2 Mbit/s PCM links, i.e. a PCM is made of 32 timeslots of 64 Kbit/s carrying either only PS traffic or a mix of PS traffic and CS traffic. The CS timeslots are made up of: Speech timeslots composed of 4 speech nibbles at 16 Kbit/s. A speech nibble carried the voice for a transaction or data in circuit mode. A speech nibble is also called CIC. Four 16 Kbit/s nibbles from 64 Kbit/s timeslot of the PCM link. Speech signaling N7. Other specific O&M timeslots not related to speech (X25, Qmux, Alarm octet). The timeslots devoted to the transport of PS data composed of 4 PS nibbles at 16 Kbit/s. A PS nibble on the ATERMUX is called GIC. The content of the GIC is called GCH. Four of 16 Kbit/s nibbles from a 64 Kbit/s timeslot of the PCM link. The PS LapD link at 64 Kbit/s supports the signaling channel. There is one LapD link per ATERMUX PCM. The signaling channel shares the traffic over LapD links. The content of a GPRS signaling channel is called GSL.
Edition 1.0
Page 8/14/2011 8 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
Edition 1.0
Page 8/14/2011 9 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
Edition 1.0
Page 8/14/2011 10 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
It is covered by 4 LACs which are stated below: 131 132 133 134
It has to be mentioned that any site that is under the BSCs BMX_Nouakchott1 to BMX_Nouakchott6 but not under the LACs from 131 to 134 is not considered in Nouakchott city Each BSC is connected to 2 ATERMUX dedicated only for PS. An audit will be performed on the ATERMUX after the (E) GPRS is on air as a double check for the resources and capacity. Each BSC is dimensioned by 1 GPU which exists in the MFS. Also an audit on the GPUs will be performed after the MFS is on air in order to double check the capacity and utilizations.
Edition 1.0
Page 8/14/2011 11 of 12
All rights reserved. Passing on and copying of this document, use and communication of its contents not permitted without written authorization.
6. CONCLUSION
This document gave an overview for the most important interfaces as well as for the Network architecture. This document showed the main (E) GPRS parameters that manage the PS comportment for a network. It has to be mentioned that a template for the values of the main parameters mentioned in this report will be submitted in an excel sheet