DESIGN OF SLRB PIPE CULVERT @ KM 23.

905 ON - D-12 DISTRIBUTORY OF LINK CANAL-- KOIL SAGAR LIFT IRRIGATION SCHEME STAGE - II HYDRAULIC PARTICULARS OF CANAL HYDRAULIC PARTICULARS Discharge required Discharge designed Bed width Full supply depth Free board Side slopes Bed fall Value of n Canal bed level ( CBL) Full supply level ( FSL) Top bund level (TBL) Height of drop Velocity of flow Ground level Top width of Banks L/R Road Level Existing Dia of proposed pipe Thickness of pipe Proposed Road width Length of the pipe proposed Sill level of pipe Available depth of cushion NP3 d 1 0.115 4.25 5 365.096 1.182 OK Depth of Flow in pipe D/d Area of flow d/2 D-d/2 Cos Q Q 2Q sector Area Triangle Area non flow area Flow Area Velocity through pipe 0.5 0.05 0.1 84.2230999 168.4462 0.368 0.025 0.343 0.443 1.3724605 > OK 1.23 0.3075 0.41 0.15 0.15 m D 0.55 m 0.55 U/S 0.57 0.608 1.80 0.55 0.45 1.5:1/1.5:1 I in 2500 0.025 365.096 365.646 366.096 --0.421 367.393 5/1.5 367.393 m m m m m Units cumec cumec M M M D/S 0.57 0.608 1.80 0.55 0.45 1.5:1/1.5:1 I in 2500 0.025 365.096 365.646 366.096 0 0.421 5/1.5 OK Revise RL Units cumec cumec M M M

m/s

M m/s

sqm sqm sqm sqm m/s 0.842 twice the velocity

Trench width Outer dia pipe d1 d1/4 d1/3 Min Free working space on each side

0.3075 m
365.4035

365.096 0.3075 m 364.7885 Design of Head wall Height of live load surcharge 2.297 m IRC Class A Loading single Lane 14.3 8.5 5.1 3.8 3 2.2 1.7 1.4 1.53

Vide IRC Bridge equalivalent height of surchrge for single lane bridge 4.7139 m

Length of abutment for SLRB Bridges L'=Length of retaining wall Say Actual surchrage

4.5 m 9.891 9.9

0.2 1 2 3 4 6 8 10 & above m

4.7139 *(L/L')*(1+sinQ)/(1-SinQ)*1/3*(1600/2100) 1.77096473 m

Page 1

Design of Head Wall TOP WIDTH : WALL TOP LEVEL : FOUNDATION TOP LEVEL : FOUNDATION BOTTOM LEVEL : EARTH SIDE WIDTH : CONCRETE OFFSET : Height of wall : Thickness of the foundation : WEIGHT OF CONCRETE/Masonry : WEIGHT OF SOIL : Horizantal Earth Coefficient : VERTICAL EARTH COEEFICENT : bottom width : Total width of bottom foundation 0.375 367.693 365.096 364.789 1.350 0.150 2.597 0.308 2.400 2.100 0.134 0.039 1.725 2.025 0.38 1.73 2.025 TAKING MOMENTS AT (A): Force W1 W2 W3 PV PH Particulars 2.400 2.400 2.100 Magnitude Lever (T) Arm(M) 2.337 1.538 3.721 0.900 3.256 0.450 1.084 0 10.399 3.766 0.919 Moment (T-M) 3.594 3.349 1.465 0.000 3.460 11.868 367.693 367.393

W1

W3

W4 EARTH SIDE

W2

W5

A + 365.096 + 364.789 B 1.35 0.150

0.375 2.597 0.500 1.350 0.500 1.350 0.0385 2.100 TOTAL VERTICAL FORCE 0.1337 2.100

2.297 2.297 13.412 13.412 TOTAL

Base Width = Lever arm = Eccentricity = Eccentricity Limit = Stress on Concrete : Direct stress = Bending stress = STRESSES ON CONCRETE max.stress = Min. stress TAKING MOMENTS ABOUT (B): Force W1 W2 W3 W4 W5 Pv Ph

1.725 m M/V= Total Moment / Vertical force = Lever arm-Base width/2 = 0.279 m b / 6 = 0.288 total vertical force/base width = (6 x vertical force x eccentricity) / b2 = 6.028

1.141 m

5.845

Direct stress + Bending stress = Direct stress - Bending stress = Particulars

11.87 0.18

t/m2 t/m2 Magnitude Lever (T) Arm(M) 2.337 1.613 3.721 1.050 3.256 0.525 0.724 0.075 1.494 1.013 1.294 0.000 12.827 4.495 1.042 Moment (T-M) 3.769 3.907 1.709 0.054 1.513 0.000 4.683 15.635

As calculated above As calculated above As calculated above 0.150 2.297 2.025 0.308 0.0385 2.100 TOTAL VERTICAL FORCE 0.1337 2.100 TOTAL MOMENTS

2.100 2.400 16.008 16.008

Base Width = Lever arm = Eccentricity = Eccentricity Limit = Stress on Concrete : Direct stress = Bending stress = STRESSES ON SOIL max.stress = Min. stress

2.025 m M/V= Total Moment / Vertical force = Lever arm-Base width/2= 0.206 m b / 6 = 0.338 total vertical force/base width = (6 x vertical force x eccentricity) / b2 = 6.334

1.219 m

3.875

Direct stress + Bending stress = Direct stress - Bending stress =

10.21 2.46

t/m2 t/m2

Page 2

DESIGN OF1.20 M VERTICAL DROP AT Km 6.040 on - D-5 DISTRIBUTORY OF LINK CANAL KOIL SAGAR LIFT IRRIGATION SCHEME STAGE - II
HYDRAULIC PARTICULARS OF CANAL HYDRAULIC PARTICULARS Discharge required Discharge designed Bed width Full supply depth Free board Side slopes Bed fall Canal bed level ( CBL) Full supply level ( FSL) Top bund level (TBL) Height of drop Velocity of flow Ground level Hydraulic calculations Height of drop Throat width Crest Level : ( as per cl.8.2.3, eq-3,manual on canal falls) Q = Cd BTD3/2 X ( D/LT)1/6 Cd = coefficient of discharge D = [(Q x LT 1/6)/(Cd x B)]3/5 LT = (Assumed) D= = 0.994 * = = 1.84 = = HL = BT = 1.200 1.9 m m i.e. equal to bed width U/S 0.939 0.994 1.90 0.70 0.45 1.5:1/1.5:1 I in 2500 384.697 385.397 385.847 --0.482 D/S 0.549 0.65 1.60 0.60 0.45 1.5:1/1.5:1 I in 2500 383.497 384.097 384.547 1.2 0.482

Units cumec cumec M M M

Units cumec cumec M M M

m/s

M m/s

0.70 m
0.454

0.7 = = = = =

^(1/6)/(1.84*

1.9 0.454 U/S FSL+Va2/2g

))^(3/5))

0.454

Depth of water (including velocity head) U/S TEL Va = U/S velocity Va 2/2g U/S TEL (as per cl.8.2.4, manual on canal falls)

0.482 m/sec 0.482 ^2/(2*9.81) 0.012 + 385.397 385.409 U/S TEL - D 385.409 -

0.012

crest level

0.454

384.955
The height of crest above U/S CBL

384.697 0.258

384.955

Page 3

hL = height of crest hL should be< 0.4of FSD i.e = 0.4 x 0.7 0.258 <

0.28
0.28

Hence safe Cistern Level and Length


(as per cl.8.5.1.1, manual on canal falls)

Depth of Cistern

Provide

= = = =

1/4 ( HL x D)2/3 1.2 1/4(

x 0.167

0.454 )^2/3

0.170 m

Minimum depth of cistern shall be 0.15m below D/S bed level Hence reduced level of cistern = = (as per cl.8.5.1.1, manual on canal falls) Length of cistern = = = Provide = The cistern is to be joined to the D/S bed level at a slope of 1:1 Scour depth calculation
(a) Discharge per unit length (q)

383.497 383.327 5(HL x D)1/2 1.2 5(

0.17

x 3.689 m 3.700 m

0.454 )^1/2 3.6894363

(b) Scour depth R = 1.346 x (q2/f)1/3

= = where f = silt factor = 1 = = = = =

Designed discharge 0.523

1.346x

( 1.5 x

Maximum scour depth


(d) depth of cut off below u/s CBL

2 (1/3) 0.523 /1)^ 0.874 m 0.874 1.3 m

U/S F.S.L - 1.5 x scour depth 385.397 384.086 385.397 384.097 382.786 -

E. U/S scour level


(F)Depth of cut off below d/s CBL

= = = = = = = =

1.311 384.697 0.61 m 1.3

384.086
1.311 383.497 0.71 m 0.70 m

366.314

provide

(g) D/S scour level

383.497

0.70 382.797

(as per cl.9.3., manual on canal falls) Depth of curtain wall at the D/S end of cistern

= = Actually provided depth =

D/S FSD/2 0.6 \

2m 0.300 m

0.70
1/2

m 384.955 383.327

Length of Crest
Actually provided

0.55 x (R.L of crest - R.L of cistern) = =

0.55 x

0.70 m 0.70 m

Page 4

Crest wall Thickness at base


Provided
Floor length of upstream approach

0.5 x (R.L of crest - R.L of cistern) = = = = = = = 1.5 x(U/S TBL - U/S CBL) 1.5 x

0.5 x

384.955

383.327

0.814 0.814

m 384.697

Provided Floor length from Exit Gradient consideration (As per clause 9.5.1 of canal falls manual) Safe exit gradient

385.847 1.725 m 1.725 m

1 in 4

Max static head H = Difference between crest level and D/S bed level = 384.955 = The D/S curtain wall depth, d = Total length of impervious floor b Provide = = = = = = = = = Exit gradient = =

383.497 1.458 0.70 m 0.70 6.425 m 6.425 m 0.70 9.179 9.179 5.116
2

0.15
b/d 6.425 \ (1+(1+ ) )/2 (1+ (1+
2 1/2

1.725

3.70

0.15

)^(1/2))/2

H/D x 1( x 1/2) 0.241 0.241 <

Allowed GE 1 in 4 UPLIFT PRESSURES


At U/S cut off wall = = = = =

0.25

Hence safe

b/d (Floor length / D/S cut off) 6.425 \ 9.179 5.116

0.70

= = = = = = (

(1/)cos-1 ((-2)/) (1/180)cos^-1(( 5.116 0.609 cos^-1 -2 )\ 0.609 52.502 x 100 29.17 5.116 2)/ 5.116 5.116

(-2)/ cos-1((-2)/)

E C

= = = =

1/180 x 52.502 29.168 % 100 70.832 %

Page 5

Floor thickness
At D/S face of crest Wall
Length from D/S cut off to the face of crest wall

= =
percentage pressure at toe of the crest

6.425

0.15

1.725

0.700

3.850
=
E+(C-E) x length from D/S cut off / floor length

29.17

70.83 = = = =

29.17 54.134 % crest level - D/S CBL 384.955 -

3.850

6.425

Floor thickness at D/S face of crest wall pressure acting

Percentage of pressure @ D/S toe x head acting /100

383.497

1.458

Floor thickness taking 100% up lift = 54.13

x = =

1.458 x 1 /

(1.4 x 100) Density of concrete - density of water = 0.565 2.4 - 1 1.4

0.564

provide At the Middle of the floor


Length of D/S cut off to the middle of floor percentage pressure at the middle of floor

0.564
= =

3.850 \2

0.025

1.950
29.17 41.813 % 41.813 x 0.435 m 0.436 m x 1.950 1.458 x \ 6.425
1/(100x1.4)

=
Thickness of the floor

29.17

70.83 = = = Provide =

Page 6

DESIGN OF1.20 M VERTICAL DROP AT Km 6.040 on - D-5 DISTRIBUTORY OF LINK CANAL KOIL SAGAR LIFT IRRIGATION SCHEME STAGE - II

Design of drop wall


TOP WIDTH : WALL TOP LEVEL : FOUNDATION TOP LEVEL :
FOUNDATION BOTTOM LEVEL :

0.700 384.955 383.252 382.952 0.200 0.150 1.703 0.300 2.400 2.100 0.1337 0.0385 0.900 1.200 + 384.955 STRESS ON CONCRETE(t/m2) MAX. STRESS MIN. STRESS BASE WIDTH 7.760 0.820 0.900

EARTH SIDE WIDTH : CONCRETE OFFSET : Height of wall :


Thickness of the foundation :
WEIGHT OF CONCRETE/Masonry :

STRESS ON SOIL(t/m2)

WEIGHT OF SOIL :
Horizantal Earth Coefficient : VERTICAL EARTH COEEFICENT :

MAX.STRESS MIN. STRESS BASE WIDTH

7.160 1.760 1.200

bottom width : Total width of bottom foundation :

W1

W3

W4 EARTH SIDE

1.703

W2

0.300

W5

A + 383.252 + 382.952 B 0.150

0.150

0.70

0.20 0.90 1.200

TAKING MOMENTS AT (A): Force W1 W2 W3 PV PH 0.700 0.500 0.500 0.0385 0.1337 Particulars 1.703 0.200 0.200 2.100 2.100 2.400 2.400 2.100 Magnitude Lever (T) Arm(M) 1.703 1.703 2.901 2.901 TOTAL 2.861 0.409 0.358 0.235 3.862 0.814 0.681 0.555 2.207 0.550 0.133 0.067 0 Moment (T-M) 1.574 0.054 0.024 0.000

TOTAL VERTICAL FORCE

Base Width = 0.900 m Lever arm = M / V = Total Moment / Vertical force = Eccentricity = Lever arm-Base width/2 = 0.121 m Eccentricity Limit = b / 6 = 0.150 Stress on Concrete : Direct stress = total vertical force/base width = 4.291 (6 x vertical force x eccentricity) / b2 = Bending stress = STRESSES ON CONCRETE max.stress = Direct stress + Bending stress = 7.764 0.818

0.571 m

3.473

t/m2 t/m2 Magnitude Lever (T) Arm(M) 2.861 0.409 0.358 0.536 0.864 0.324 5.353 1.127 0.981 1.105 3.860 0.700 0.283 0.217 0.075 0.600 0.000 Moment (T-M) 2.003 0.116 0.077 0.040 0.518 0.000

Min. stress Direct stress - Bending stress = TAKING MOMENTS ABOUT (B): Force W1 W2 W3 W4 W5 Pv Ph Particulars As calculated above As calculated above As calculated above 0.150 1.703 1.200 0.300 0.0385 2.100 0.1337 2.100

2.100 2.400 4.012 4.012

TOTAL VERTICAL FORCE TOTAL MOMENTS Base Width = 1.200 m Lever arm = M / V = Total Moment / Vertical force = Eccentricity = Lever arm-Base width/2= 0.121 m Eccentricity Limit = b / 6 = 0.200 Stress on Concrete : Direct stress = total vertical force/base width = 4.460 (6 x vertical force x eccentricity) / b2 = Bending stress = STRESSES ON SOIL max.stress = Min. stress Direct stress + Bending stress = Direct stress - Bending stress = 7.16 1.76

0.721 m

0.167 2.703

t/m2 t/m2

DESIGN OF1.20 M VERTICAL DROP AT Km 6.040 on - D-5 DISTRIBUTORY OF LINK CANAL KOIL SAGAR LIFT IRRIGATION SCHEME STAGE - II

U/S WING & RETURN WALL


TOP WIDTH : WALL TOP LEVEL : FOUNDATION TOP LEVEL :
FOUNDATION BOTTOM LEVEL :

0.450 367.693 365.096 364.796 1.100 0.150 2.597 0.300 2.400 2.100 0.1337 0.0385 1.550 1.850 + 367.693 STRESS ON CONCRETE(t/m2) MAX. STRESS MIN. STRESS BASE WIDTH 12.490 0.440 1.550

EARTH SIDE WIDTH : CONCRETE OFFSET : Height of wall :


Thickness of the foundation :
WEIGHT OF CONCRETE/Masonry :

STRESS ON SOIL(t/m2)

WEIGHT OF SOIL :
Horizantal Earth Coefficient : VERTICAL EARTH COEEFICENT :

MAX.STRESS MIN. STRESS BASE WIDTH

9.100 3.800 1.850

bottom width : Total width of bottom foundation :

W1 2.597

W3

W4 EARTH SIDE

W2

0.300

W5

A + 365.096 + 364.796 B 0.150

0.150

0.45

1.10 1.55 1.850

TAKING MOMENTS AT (A): Force W1 W2 W3 PV PH 0.450 0.500 0.500 0.0385 0.1337 Particulars 2.597 1.100 1.100 2.100 2.100 2.400 2.400 2.100 Magnitude Lever (T) Arm(M) 2.597 2.597 9.772 9.772 TOTAL 2.805 3.428 3.000 0.790 10.022 2.744 1.039 2.850 10.180 1.325 0.733 0.367 0 Moment (T-M) 3.716 2.514 1.100 0.000

TOTAL VERTICAL FORCE

Base Width = 1.550 m Lever arm = M / V = Total Moment / Vertical force = Eccentricity = Lever arm-Base width/2 = 0.241 m Eccentricity Limit = b / 6 = 0.258 Stress on Concrete : Direct stress = total vertical force/base width = 6.466 (6 x vertical force x eccentricity) / b2 = Bending stress = STRESSES ON CONCRETE max.stress = Direct stress + Bending stress = 12.492 0.440

1.016 m

6.026

t/m2 t/m2 Magnitude Lever (T) Arm(M) 2.805 3.428 3.000 0.818 1.332 0.545 11.928 1.894 1.339 2.535 12.544 1.475 0.883 0.517 0.075 0.925 0.000 Moment (T-M) 4.137 3.028 1.550 0.061 1.232 0.000

Min. stress Direct stress - Bending stress = TAKING MOMENTS ABOUT (B): Force W1 W2 W3 W4 W5 Pv Ph Particulars As calculated above As calculated above As calculated above 0.150 2.597 1.850 0.300 0.0385 2.100 0.1337 2.100

2.100 2.400 6.744 6.744

TOTAL VERTICAL FORCE TOTAL MOMENTS Base Width = 1.850 m Lever arm = M / V = Total Moment / Vertical force = Eccentricity = Lever arm-Base width/2= 0.127 m Eccentricity Limit = b / 6 = 0.308 Stress on Concrete : Direct stress = total vertical force/base width = 6.447 (6 x vertical force x eccentricity) / b2 = Bending stress = STRESSES ON SOIL max.stress = Min. stress Direct stress + Bending stress = Direct stress - Bending stress = 9.10 3.80

1.052 m

0.167 2.648

t/m2 t/m2

DESIGN OF1.20 M VERTICAL DROP AT Km 6.040 on - D-5 DISTRIBUTORY OF LINK CANAL KOIL SAGAR LIFT IRRIGATION SCHEME STAGE - II

D/S WING & RETURN WALL


TOP WIDTH : WALL TOP LEVEL : FOUNDATION TOP LEVEL :
FOUNDATION BOTTOM LEVEL :

0.450 384.547 383.252 382.952 0.700 0.150 1.295 0.300 2.400 2.100 0.1337 0.0385 1.150 1.450 + 384.547 STRESS ON CONCRETE(t/m2) MAX. STRESS MIN. STRESS BASE WIDTH 4.070 2.140 1.150

EARTH SIDE WIDTH : CONCRETE OFFSET : Height of wall :


Thickness of the foundation :
WEIGHT OF CONCRETE/Masonry :

STRESS ON SOIL(t/m2)

WEIGHT OF SOIL :
Horizantal Earth Coefficient : VERTICAL EARTH COEEFICENT :

MAX.STRESS MIN. STRESS BASE WIDTH

4.130 2.900 1.450

Bottom width : Total width of bottom foundation :

W1 1.295

W3

W4 EARTH SIDE

W2

0.300

W5

A + 383.252 + 382.952 B 0.150

0.150

0.45

0.70 1.15 1.450

TAKING MOMENTS AT (A): Force W1 W2 W3 PV PH 0.450 0.500 0.500 0.0385 0.134 Particulars 1.295 0.700 0.700 2.100 2.100 2.400 2.400 2.100 Magnitude Lever (T) Arm(M) 1.295 1.295 1.677 1.677 TOTAL 1.399 1.088 0.952 0.136 3.574 0.471 0.518 0.244 2.267 0.925 0.467 0.233 0 Moment (T-M) 1.294 0.508 0.222 0.000

TOTAL VERTICAL FORCE

Base Width = 1.150 m Lever arm = M / V = Total Moment / Vertical force = Eccentricity = Lever arm-Base width/2 = 0.059 m Eccentricity Limit = b / 6 = 0.192 Stress on Concrete : Direct stress = total vertical force/base width = 3.108 (6 x vertical force x eccentricity) / b2 = Bending stress = STRESSES ON CONCRETE max.stress = Direct stress + Bending stress = 4.071 2.144

0.634 m

0.964

t/m2 t/m2 Magnitude Lever (T) Arm(M) 1.399 1.088 0.952 0.408 1.044 0.206 5.096 0.714 0.818 0.584 3.911 1.075 0.617 0.383 0.075 0.725 0.000 Moment (T-M) 1.503 0.671 0.365 0.031 0.757 0.000

Min. stress Direct stress - Bending stress = TAKING MOMENTS ABOUT (B): Force W1 W2 W3 W4 W5 Pv Ph Particulars As calculated above As calculated above As calculated above 0.150 1.295 1.450 0.300 0.0385 2.100 0.1337 2.100

2.100 2.400 2.544 2.544

TOTAL VERTICAL FORCE TOTAL MOMENTS Base Width = 1.450 m Lever arm = M / V = Total Moment / Vertical force = Eccentricity = Lever arm-Base width/2= 0.042 m Eccentricity Limit = b / 6 = 0.242 Stress on Concrete : Direct stress = total vertical force/base width = 3.514 (6 x vertical force x eccentricity) / b2 = Bending stress = STRESSES ON SOIL max.stress = Min. stress Direct stress + Bending stress = Direct stress - Bending stress = 4.13 2.90

0.767 m

0.618

t/m2 t/m2

Subject : Ref :

OFFICE NOTE Design of 1.20M Vertical Drop @ KM 6.04 On D - 5 Distributory Linkt canal Koilsagar project Stage - II approval accorded regarding
1. IVRCL letter No M/S IVRCL/Koil sagar/stage-II/link canal/2010-11/ 2. Dy.EE JLIP Sub - divn (3) letter No DEE/SD3/MBNR/ Dt : Dt:

It is submitted that design calculation of 1.50m vertical drop @ Km 2.20 on D-64 distributory of left canal are checked and found the following observations.

H.P'S
H.P'S are verified with approved alignment and found correct & some corrections are made in discharge required, discharge designed, bed width, full supply depth,free board, side slopes, canal bed level in U/S & D/S, velocity of flow, height of drop etc

2
S.NO

DESIGN CALCULATIONS
DESCRIPTION As per agency's calculations As per Department calculations Remarks

1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

2
Crest level cistern level cistern length in mts Scour depth U/S Scour depth D/S
length of the crest against the assumed length 0.74 in mts

3
384.955 383.327 3.7 366.314 382.797 0.70 0.81 1.725 0.243 0.565 0.31 ----7.75 0.83 --6.66 1.81 --6.52 0.41 --5.39 1.43 --12.66 0.08

4
384.955 383.327 3.7 366.314 382.797 0.70 0.81 1.725 0.241 0.565 0.436 ----7.760 0.820 --7.160 1.760 --12.490 0.440 --9.100 3.800 --#REF! #REF!

not shown in drawing

assumed is accepted

Thickness of crest wall at base in mts


floor length of the U/S approach in mts

Exit gradient
Floor thickness at the D/S face of the crest in mts Floor thickness at middle of the floor

permitted in between 0.20 to 0.25

due to error in calculation

Stability calculation drop wall stress on concrete i) max stress in t/sqmt ii) min stress in t/sqmt Drop wall stress on soil i) max stress in t/sqmt ii) min stress in t/sqmt
U/S wing & return wall stress on concrete

-----

---

---

i) max stress in t/sqmt ii) min stress in t/sqmt


U/S wing & return wall stress on soil

---

i) max stress in t/sqmt ii) min stress in t/sqmt


D/S wing wall (max section) stress on concrete

---

i) max stress in t/sqmt ii) min stress in t/sqmt

1 2 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

Crest level cistern level


D/S wing wall (max section) stress on soil

384.955 383.327 --9.78 2.36 --5.78 0.71 --4.84 1.61 --0.15 0.15 0.15
M-10 using 40mm metal M-10 using 40mm metal M-10 using 40mm metal max size graded metal

384.955 383.327 --#REF! #REF! --4.070 2.140 --4.130 2.900 --0.300 0.300 #REF! 0.300 M-15 M-15 M-15

---

i) max stress in t/sqmt ii) min stress in t/sqmt


D/S wing & return wall stress on concrete

---

i) max stress in t/sqmt ii) min stress in t/sqmt


D/S wing & return wall stress on soil

---

i) max stress in t/sqmt ii) min stress in t/sqmt thickness of the foundation U/S wing wall in mts Drop wall in mts D/S wing wall (max section) inmts D/S wing wall in mts grade of concrete for foundation grade of concrete for apron grade of concrete for abutment, wings, returns & drop wall

---

0.15

on approval the designs and drawings will be corrected as per the calculations noted in the column no(4) of the above.

submitted for perusal and approval please.

Executive Engineer JLIP Division No.1 Mahabubnagar.

D/d 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9

0 0 0.0409 0.1118 0.1982 0.2934 0.393 0.492 0.587 0.674 0.745

0.01 0.0013 0.047 0.1199 0.2074

0.02

0.03

0.04

0.05

0.06

0.07

0.08

0.09