Академический Документы
Профессиональный Документы
Культура Документы
www.huawei.com
Objectives
Upon completion of this course, you will be able to:
Know the Local maintenance system Grasp the procedure of Power on and Power off eNodeB Grasp replacing of eNodeB components Know the routine maintenance items of eNodeB
Page1
Contents
1. Local Operation and Maintenance Introduction 2. Power on and Power off Procedure of eNodeB 3. Replacing Components of eNodeB 4. Maintenance items for eNodeB
Page2
eNodeB
M2000 Server
Page3
Default Local OM IP address: 192.168.0.49 Setting PC IP same segment, such as: 192.168.0.88
1. LMPT
2.Ethernet Cable
3. PC
Page4
Default Local OM IP address: 192.168.0.49 Setting PC IP same segment, such as: 192.168.0.88
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page5
Page6
Page7
Example:
DSP BRD BLK BRD UBL BRD
Red: compulsory
Page8
Contents
1. Local Operation and Maintenance Introduction 2. Power on and Power off Procedure of eNodeB 3. Replacing Components of eNodeB 4. Maintenance items for eNodeB
Page9
Page10
Page11
Page12
Page13
Page14
Page15
Page16
Page17
Set all the DC power switches on the DCDU to OFF if time permits Emergency power-off may cause damage to the equipment or boards. Therefore, this type of power-off is not recommended in a normal situation
Page18
Page19
10
Page21
11
Page22
Page23
12
If... off in scenarios such as a planned equipment swap or foreseeable regional blackout The base station needs to be powered off in emergent scenarios such as a fire, smoke, or water damage occurred in the BBU3900 off.
Then...
Page24
Page25
13
Powering On an RRU
Prerequisite
The RRU hardware is installed and RRU cable connections are secure The input voltage of a DC RRU ranges from -36 V DC to -57 V DC The input voltage of an AC RRU ranges from 100 V AC to 240 V AC
Page26
Page27
14
Page28
Contents
1. Local Operation and Maintenance Introduction 2. Power on and Power off Procedure of eNodeB 3. Replacing Components of eNodeB 4. Maintenance items for eNodeB
Page29
15
Page31
16
Page32
Step 2 Power off the BBU according to BBU power off procedure Step 3 Wear an ESD wrist strap or a pair of ESD gloves
Page33
17
Page34
18
Page36
PrerequisiteSee Remarks
Page37
19
Step 2 Wear an ESD wrist strap or a pair of ESD gloves Step 3 Record all the cable connections on the panel of the board to be replaced
Page38
Page39
20
Page40
Page41
21
Page42
Step 6 Install the new board, lower the ejector levers, tighten the screws on the board to 0.6 Nm , and then reconnect the cables
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page43
22
Step 9 Take off the ESD wrist strap or ESD gloves, and pack up all
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.
tools
Page44
Page45
23
Step 3 Install the new unit, tighten the screws on the unit Step 4 Check the status of the indicators to determine whether the new module works properly
Page46
Step 6 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Page47
24
Page48
Step 2 Power off the BBU Step 3 Put on an ESD wrist strap or ESD gloves Step 4 ecord all the cable connections on the panel of the module to be replaced
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page49
25
Step 6 Loosen the two M3 screws on the panel, and pull out the UPEU
Step 7 Install the new board, tighten the screws on the board to 0.6 Nm, and then reconnect the cables Step 8 Power on the BBU according to the instructions in Powering On the BBU3900
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page50
Step 11 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page51
26
Page52
Step 4 Loosen the two M3 screws on the panel, and pull out the UEIU
Page53
27
Step 7 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Page54
Page55
28
Step 4 Loosen the two M3 screws on the panel, raise the ejector levers, and then pull out the USCU
Page56
Step 8 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page57
29
Page58
Step 2 Put on an ESD wrist strap or ESD gloves Step 3 Record all the cable connections on the panel of the board to be replaced Step 4 Disconnect the transmission cable from the UTRP. If a surge protection board is configured, the surge protection transfer cable also needs to be disconnected Step5 Loosen the two M3 screws on the panel, raise the ejector levers, and then pull out the UTRP
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page59
30
Step 10 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page60
Page61
31
Step 2 Put on an ESD wrist strap or ESD gloves Step 3 Record all the cable connections on the panel of the board to be replaced Step 4 Disconnect CPRI cables from the board Step5 Loosen the two M3 screws on the panel, raise the ejector levers, and then pull out the UBRI
Page62
Step 9 Take off the ESD wrist strap or ESD gloves, and pack up all
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.
tools
Page63
32
Page64
Page65
33
Step 8 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page66
Page67
34
Page68
Step 6 Choose the optical module of the same type as the faulty optical module according to the label on the module. Install the new optical module into the RRU. Step 7 Insert the optical fiber connector into the new optical module. Step 8 Check the operating status of the new RRU by observing the status of RRU indicators. Step 9 Reconnect the cables in the cabling cavity.
Page69
35
Step 11 Take off the ESD gloves, and pack up all the tools.
Page70
Page71
36
Set the maximum transmit power for the RFU to 0 to disable the locking for the maximum transmit power
Run the LOC RRUTC command to disable the maximum output power locking for TX channels of the RFU
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page72
Step 3 Verify that TX channels of the RFU are disabled. In this situation, the ACT indicator on the RFU panel blinks at 0.5 Hz Step 4 Wear the ESD wrist strap or ESD gloves Step 5 Turn off the switch for DC power output for the RFU on the direct current distribution unit (DCDU) to power off the RFU
Page73
37
Page74
Page75
38
Page76
Page77
39
Page78
Step 20 Take off the ESD wrist strap or gloves, and then pack up all the tools
Page79
40
Page80
Set the maximum output power of the TX channels of the RRU to 0 and disable the maximum output power locking
run the LOC RRUTC command to disable the maximum output power locking for TX channels of the RRU
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page81
41
Step 3 Power off the RRU by referring to Powering Off an RRU Step 4 Wear ESD gloves Step 5 Loosen the screws on the cover plate of the RRU cabling cavity using an M4 Phillips screwdriver for common RRU or M5 Phillips screwdriver for 12L blade RRU, and then open the cover plate
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page82
Page83
42
Page84
Page85
43
Step 17 Take off the ESD gloves, and pack up all the tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page87
44
Replacing the DCDU disrupts the services carried on the corresponding cabinet. It takes about 20 minutes to replace the DCDU.
Page88
Page89
45
Page90
Page91
46
Page92
Page93
47
Page94
Step 15 Take off the ESD wrist strap or ESD gloves, and pack up all tools.
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page95
48
Page96
Page97
49
Page99
50
Page100
Page101
51
Page102
52
to 3 Nm (26.55 lbfin.).
Page104
Page105
53
Page106
Step 21 Take off the ESD wrist strap or ESD gloves, and pack up all tools.
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page107
54
Page108
Page109
55
Page111
56
Page112
Page113
57
Page114
Contents
1. Local Operation and Maintenance Introduction 2. Power on and Power off Procedure of eNodeB 3. Replacing Components of eNodeB 4. Maintenance items for eNodeB
Page115
58
Temperature in the equipment room Humidity in the equipment room Illumination in the equipment room
Weekly
Weekly
Record the humidity shown The normal humidity on the hygrometer in the ranges from 5% RH equipment room. to 95% RH. Check whether the routine and emergency illumination in equipment room is normal
Page116
Page117
59
Voltage
Monthly
PGND cables
Monthly
The connections of the PGND cable are secure. The cable is not aging. The connection points are sound with no corrosion on them.
Page118
Batteries
Annually
The battery capacity is within normal range and the batteries are correctly connected. The performance parameters of rectifiers are normal.
Page119
60
Monthly
Check whether For details about the status of the LEDs on the LEDs, see the hardware boards are normal. description about the corresponding boards. If there is too much dust on the air filter, clean the air filter
Air filter
Quarterl y
Page120
Quarterl y
Quarterl y
Page121
61
Fan box
Annually If there is too much dust on the surface of or inside the fan box, clean the fan box.
Page122
Summary
Maintenance methods of eNodeB Power on and Power off procedure and key points Basic operations of local operation and maintenance Routine maintenance items of equipment and evirement
Page123
62
Thank you
www.huawei.com
63