Вы находитесь на странице: 1из 63

eNodeB LTE V100R006 Field Maintenance

eNodeB V100R006 Field Maintenance

www.huawei.com

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Objectives
Upon completion of this course, you will be able to:
Know the Local maintenance system Grasp the procedure of Power on and Power off eNodeB Grasp replacing of eNodeB components Know the routine maintenance items of eNodeB

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page1

eNodeB LTE V100R006 Field Maintenance

Contents
1. Local Operation and Maintenance Introduction 2. Power on and Power off Procedure of eNodeB 3. Replacing Components of eNodeB 4. Maintenance items for eNodeB

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page2

Operation and Maintenance System Structure


Remote Maintenance M2000 Client

Local Maintenance LMT

eNodeB

M2000 Server

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page3

eNodeB LTE V100R006 Field Maintenance

Locally Connecting to eNodeB (LMPT)

Default Local OM IP address: 192.168.0.49 Setting PC IP same segment, such as: 192.168.0.88

1. LMPT

2.Ethernet Cable

3. PC

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page4

Locally Connecting to eNodeB (UMPT)


The USB port with the USB silkscreen is used for the software upgrade of a base station using a Universal Serial Bus (USB) flash drive. This port also functions as a commissioning Ethernet port An adapter is used for local maintenance connects the USB port on the UMPT to an Ethernet cable during local maintenance

Default Local OM IP address: 192.168.0.49 Setting PC IP same segment, such as: 192.168.0.88
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page5

eNodeB LTE V100R006 Field Maintenance

Locally Logging to eNodeB

Local OM IP address:192.168.0.49 User name: admin Default password: hwbs@com

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page6

WebLMT Panel Overview

Menu bar Status bar Function s Other s

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page7

eNodeB LTE V100R006 Field Maintenance

MML Commands Introduction


MML command structure : Action + Object
Main action: ADD/MOD/RMV/SET/DSP/LST/SWP/BLK/UBL
Black: optional Main objective: BRD/RRU/CELL/SCTPLNK/IPPATH

Example:
DSP BRD BLK BRD UBL BRD
Red: compulsory

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page8

Contents
1. Local Operation and Maintenance Introduction 2. Power on and Power off Procedure of eNodeB 3. Replacing Components of eNodeB 4. Maintenance items for eNodeB

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page9

eNodeB LTE V100R006 Field Maintenance

Prerequisite of Power on BTS3900


The input power cables are correctly and securely connected. The power supply to the BTS3900 meets the specifications listed in Power Supply Requirements of the BTS3900 The Power switches on the DCDU panel are all set to OFF
BTS3900 (Ver.B) has DCDU-01 BTS3900 (Ver.C) has DCDU-11A BTS3900(Ver.C) has DCDU-12A

The external power supply to the BTS3900 is shut down

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page10

Procedure of Power on BTS3900


Step 1 Use a multimeter to measure the resistance between the external power supply and the ground to ensure that there is no short circuit. Step 2 Turn on the external power switch to power on the BTS3900. Step 3 Set the circuit breakers on the EPU or EPS for the corresponding components to ON, and check the power supply status of each component.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page11

eNodeB LTE V100R006 Field Maintenance

Procedure of Power on BTS3900


Step 4 (Optional) Set the circuit breakers for the corresponding components on each DCDU in a BTS3900 cabinet to ON. Skip this step if there is no circuit breaker on the DCDU, such as the DCDU-12A. Step 5 Set the circuit breaker on the UPEU in the BBU to ON. Step 6 Check the power supply to each component according to the indicator state.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page12

Procedure of Power on BTS3900


Step 7 (Optional) If the power supply to a component fails after the cabinet is powered on, handle the fault according to the instructions in the following table.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page13

eNodeB LTE V100R006 Field Maintenance

Procedure of Power on BTS3900

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page14

Procedure of Power on BTS3900

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page15

eNodeB LTE V100R006 Field Maintenance

Powering Off the BTS3900


You can power off the BTS3900 by two methods: normal power-off and emergency power-off
Perform the normal power-off
before an equipment swap or a foreseeable regional blackout

Perform the emergency power-off


when a fire, smoke, or water immersion occurs in the equipment room

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page16

Procedure of Normal Power off BTS3900


Modify the management status to block all the RFUs in the cabinet Set all the circuit breakers on the DCDU to OFF Set all circuit breakers on the EPU, ETP, or EPS subrack to OFF. Shut off the external power supply. Set the power switch for the batteries to OFF if the BTS3900 cabinet is configured with external batteries or PS4890 cabinet which houses batteries

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page17

eNodeB LTE V100R006 Field Maintenance

Procedure of Emergency Power off BTS3900


Shut off the external power supply
Set the power switch for the batteries to OFF if the BTS3900 cabinet is configured with external batteries or PS4890 cabinet which houses batteries

Set all the DC power switches on the DCDU to OFF if time permits Emergency power-off may cause damage to the equipment or boards. Therefore, this type of power-off is not recommended in a normal situation

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page18

Power on Base Station


Prerequisite
Input power cables for the DBS3900 are correctly connected. The power supply to the DBS3900 meets the requirements of the power system. External power supply to the DBS3900 has been shut off. All circuit breakers in the APM30H have been set to OFF. Circuit breakers on the boards in the BBU have been set to OFF. Boards, modules, and cables have been installed in the cabinet

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page19

10

eNodeB LTE V100R006 Field Maintenance

Procedure of power on Base Station


Step 1 Use a multimeter to measure the resistance between the external power supply and the ground to ensure that there is no short circuit. Step 2 Turn on the external power circuit breaker to power on the cabinet. Step 3 Set the circuit breakers for the corresponding components on the DCDU-03B to ON. Step 4 Set the circuit breaker on the UPEU in the BBU to ON, and check the power supply status of each component.
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page20

Procedure of power on Base Station


Step 5 (Optional) If the power supply to a component fails after the cabinet is powered on, handle the fault according to the instructions in the following table. For the detail information, see the remark.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page21

11

eNodeB LTE V100R006 Field Maintenance

Procedure of power on Base Station

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page22

Procedure of power on Base Station

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page23

12

eNodeB LTE V100R006 Field Maintenance

Procedure of Power off Base Station


Step 1 Determine whether to perform a normal power-off or emergency power-off as required.

If... off in scenarios such as a planned equipment swap or foreseeable regional blackout The base station needs to be powered off in emergent scenarios such as a fire, smoke, or water damage occurred in the BBU3900 off.

Then...

The base station needs to be powered Proceed to 2 to perform a normal power-

Proceed to 3 to perform an emergency power off.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page24

Procedure of Power off Base Station


Step 2 Turn off the power switch for the BBU3900, set all circuit breakers on all power units to OFF, and switch off the external power equipment. Step 3 First switch off the external power equipment for the DBS3900. If time permits, then turn off the power switches for the BBU3900 and on all power units.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page25

13

eNodeB LTE V100R006 Field Maintenance

Powering On an RRU
Prerequisite
The RRU hardware is installed and RRU cable connections are secure The input voltage of a DC RRU ranges from -36 V DC to -57 V DC The input voltage of an AC RRU ranges from 100 V AC to 240 V AC

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page26

Procedure of Power on RRU


Step 1 On the power epuipment for the RRU, set the corresponding circuit breaker to ON or insert a corresponding EPC connector and ensure that the indicator on the EPC connector is on to power on the RRU. Step 2 Wait for three to five minutes, and then check the status of the indicators on the RRU Step 3 Take corresponding actions based on the status of the indicators.
If Then... The RRU is operating properly The RRU is faulty End the power-on check task. Set the circuit breaker to OFF, rectify the fault, and go to 1.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page27

14

eNodeB LTE V100R006 Field Maintenance

Procedure of Powering Off an RRU


Power off the RRU in a normal situation
On the power equipment for the RRU, set the corresponding circuit breaker to OFF or remove the corresponding EPC connector and ensure that the indicator on the EPC connector is off.
If RRUs are cascaded, consider the impacts of power-off operations on lower-level RRUs to prevent service interruption

Power off the RRU in an emergency


Shut off the external input power of the power equipment for the RRU. If time permits, set the corresponding circuit breaker on the auxiliary power device for the RRU to OFF
Emergent power-off may lead to damage on the RRU. Therefore, this type of power-off is not recommended in normal cases

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page28

Contents
1. Local Operation and Maintenance Introduction 2. Power on and Power off Procedure of eNodeB 3. Replacing Components of eNodeB 4. Maintenance items for eNodeB

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page29

15

eNodeB LTE V100R006 Field Maintenance

Replacing eNodeB Components


Replacing BBU3900 Components Replacing the RFU Replacing the RRU (For DBS3900) Replacing a DCDU Replacing the Fan Box Replacing the Power Subrack
Query Electronic Label of the Board Replacing the BBU Replacing the LMPT/UMPT Replacing the LBBP Replacing the FAN Unit Replacing the UPEU Replacing the UEIU Replacing the USCU Replacing the UBRI Replacing the UTRP Replacing the UCIU Replacing the Optical Module
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page30

Query Electronic Label of the Board


Before replacing a board, you need to query the electronic label of the board at the remote end to confirm the type of board to be replaced
Run the DSP BRDMFRINFO command on the LMT

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page31

16

eNodeB LTE V100R006 Field Maintenance

Replacing the BBU


As the core component of an eNodeB, the BBU3900 processes baseband signals for the entire eNodeB. It also provides transmission ports between the eNodeB and the MME/S-GW. Replacing the BBU disrupts all the services carried by the eNodeB. Therefore, the BBU should be replaced within 20 minutes

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page32

Procedure of Replacing BBU


Step 1 Instruct the M2000 administrator to perform the following operations for the replacement of the BBU
Back up the service data or transfer the service carried by the BBU to be replaced if required Modify the ESN in the DHCP management interface by referring to the new BBU

Step 2 Power off the BBU according to BBU power off procedure Step 3 Wear an ESD wrist strap or a pair of ESD gloves

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page33

17

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing BBU


Step 4 Record all the cable connections on the panels of the boards in the BBU to be replaced Step 5 Disconnect the power cables, transmission cables, CPRI cables, and alarm cables from the panels of the boards in the BBU Step 6 Loosen the four M6 screws on the BBU, and then remove the BBU

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page34

Procedure of Replacing BBU


Step 7 Remove all the boards in the faulty BBU, install the boards in the corresponding slots of the new BBU, and then install filler panels in the idle slots Step 8 Install the new BBU, tighten the screws on the BBU Step 9 Power on the BBU, for details, see power on BBU procedure Step 10 Check whether the new BBU is functional according to the status of the LEDs on the BBU Step 11 Reapply for a license, and then install the license for the eNodeB
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page35

18

eNodeB LTE V100R006 Field Maintenance

Replacing the LMPT/UMPT


The LMPT/UMPT manages the entire eNodeB system in terms of OM and signaling processing and provides the clock for the BBU3900 LMPT/UMPT board is hot-swappable LMPT and UMPT can not work as active and standby in the same BBU3900 If a standby LMPT/UMPT is not configured, replacing the LMPT /UMPT disrupts all services carried by the LTE. Therefore, the LMPT /UMPT should be replaced within 10 minutes

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page36

PrerequisiteSee Remarks

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page37

19

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing LMPT/UMPT


Step 1 Instruct the M2000 administrator to perform the following operations before replacing the LMPT/UMPT
Back up NE configuration Run the ULD LICENSE command to back up the license in the LTE mode Run the BLK CELL command to block all cells of the base station working in LTE mode

Step 2 Wear an ESD wrist strap or a pair of ESD gloves Step 3 Record all the cable connections on the panel of the board to be replaced

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page38

Procedure of Replacing LMPT/UMPT


Step 3 Record all the cable connections on the panel of the board to be replaced Step 4 Disconnect the cables from LMPT/UMPT Step 5 Remove the two M3 screws on the panel, and then pull out the LMPT/UMPT

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page39

20

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing LMPT/UMPT


Step 6 Install the new board, tighten the screws on the board Step 7 Check the status of the new board by observing the status of indicators Step 8 Perform the following operations according to onsite conditions of the eNodeB as in the notes, then Step 9 Step 9 Take off the ESD wrist strap or ESD gloves, and pack up all tools.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page40

Replacing the LBBP


The LTE Baseband Processing unit (LBBP) in the BBU3900 processes the baseband signals and CPRI signals The LBBP board is hot-swappable

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page41

21

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing LBBP


Step 1 Instruct the M2000 administrator to perform the following operations before replacing the LBBP
On the eNodeB, run the BLK BRD command to block the LBBP

Step 2 Wear an ESD wrist strap or a pair of ESD gloves

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page42

Procedure of Replacing LBBP


Step 3 Record all the CPRI cable connections on the panel of the board to be replaced Step 4 Disconnect the CPRI cable from LBBP Step 5 Loosen the two M3 screws on the panel, raise the ejector levers, and then pull out the LBBP

Step 6 Install the new board, lower the ejector levers, tighten the screws on the board to 0.6 Nm , and then reconnect the cables
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page43

22

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing LBBP


Step 7 Wait for about 15 minutes after the board is started, then check the status of the new board by observing the status of indicators Step 8 Instruct the M2000 administrator to perform,
On the eNodeB, run the UBL BRD command to unblock the LBBP Check whether any new alarms are generated by the base station and handle the alams Synchronize the inventory information manually Ask the onsite engineers to perform dialing tests to check whether the cells can normally provide services

Step 9 Take off the ESD wrist strap or ESD gloves, and pack up all
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

tools

Page44

Replacing the FAN Unit


Replacing the FAN unit may lead to overheating alarms due to interruption of heat dissipation in the BBU. The services, however, should not be affected The FAN unit is hot-swappable Replacing the FAN unit may lead to overheating alarms due to interruption of heat dissipation in the BBU. Therefore, the FAN unit should be replaced within three minutes

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page45

23

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing FAN Unit


Step 1 Wear an ESD wrist strap or a pair of ESD gloves Step 2 Remove the two M3 screws from the panel, and then remove the FAN unit

Step 3 Install the new unit, tighten the screws on the unit Step 4 Check the status of the indicators to determine whether the new module works properly

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page46

Procedure of Replacing FAN Unit


Step 5 Instruct the M2000 administrator to,
Check whether any new alarms are generated by the base station Synchronize the inventory information manually

Step 6 Take off the ESD wrist strap or ESD gloves, and pack up all tools

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page47

24

eNodeB LTE V100R006 Field Maintenance

Replacing the UPEU


The Universal Power and Environment Interface Unit (UPEU) is configured in the BBU and it converts -48 V DC or +24 V DC power into +12 V DC Replacing the UPEU interrupts power supply to the BBU, and accordingly interrupts services carried by the BBU. Therefore, the UPEU must be replaced within 10 minutes

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page48

Procedure of Replacing UPEU


Step 1 Instruct the M2000 administrator to perform the following operations before replacing the UPEU,
Run the BLK CELL command to block all cells of the base station working in LTE mode Replacing the UPEU interrupts all the services carried by the base station if no standby UPEU is configured

Step 2 Power off the BBU Step 3 Put on an ESD wrist strap or ESD gloves Step 4 ecord all the cable connections on the panel of the module to be replaced
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page49

25

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing UPEU


Step 5 Disconnect the power cable, monitoring cable, and alarm cable from the UPEU

Step 6 Loosen the two M3 screws on the panel, and pull out the UPEU

Step 7 Install the new board, tighten the screws on the board to 0.6 Nm, and then reconnect the cables Step 8 Power on the BBU according to the instructions in Powering On the BBU3900
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page50

Procedure of Replacing UPEU


Step 9 Check the status of the new board by observing the status of indicators Step 10 Instruct the M2000 to perform,
Run the UBL CELL command to unblock all the LTE cells Check whether any new alarms are generated by the base station Synchronize the inventory information manually Ask the onsite engineers to perform dialing tests to check whether the cells can normally provide services

Step 11 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page51

26

eNodeB LTE V100R006 Field Maintenance

Replacing the UEIU


The Universal Environment Interface Unit (UEIU) provides channels for transmitting the monitoring signals from external equipment to the BBU The UEIU is hot-swappable Replacing the UEIU may cause the failure to monitor the external equipment. Therefore, the UEIU must be replaced within 5 minutes

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page52

Procedure of Replacing UEIU


Step 1 Wear an ESD wrist strap or a pair of ESD gloves Step 2 Record all cable connections on panel of the board to be replaced Step 3 Disconnect the monitoring cable and alarm cable from the UEIU

Step 4 Loosen the two M3 screws on the panel, and pull out the UEIU

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page53

27

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing UEIU


Step 5 Install the new board, tighten the screws on the board to 0.6 Nm, and then reconnect the cables Step 6 Instruct the M2000 to perform,
Check whether any new alarms are generated by the base station Synchronize the inventory information manually

Step 7 Take off the ESD wrist strap or ESD gloves, and pack up all tools

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page54

Replacing the USCU


The Universal Satellite card and Clock Unit (USCU) in the BBU receives clock signals such as the GPS, RGPS, BITS, and M-1PPS signals. In addition, it transmits or receives 1PPS+TOD clock signals The USCU board is hot-swappable

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page55

28

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing USCU


Step 1 Wear an ESD wrist strap or a pair of ESD gloves Step 2 Record all cable connections on panel of the board to be replaced Step 3 Disconnect the GPS clock signal cable from the USCU

Step 4 Loosen the two M3 screws on the panel, raise the ejector levers, and then pull out the USCU

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page56

Procedure of Replacing USCU


Step 5 Install the new board, lower the ejector levers, tighten the screws on the board to 0.6 Nm and then reconnect the cables Step 6 Check the status of the new board by observing the status of indicators Step 7 Instruct the M2000 administrator to perform,
Check whether any new alarms are generated by the base station Synchronize the inventory information manually

Step 8 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page57

29

eNodeB LTE V100R006 Field Maintenance

Replacing the UTRP


The universal transmission processing unit (UTRP) in the BBU3900 provides ports for transmission The UTRP board is hot-swappable A multi-mode base station implements common transmission using shared ports on the UTRP. Therefore, replacing the UTRP interrupts the services of the peer mode

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page58

Procedure of Replacing UTRP


Step 1 Instruct the M2000 administrator to perform
On the eNodeB, run the BLK CELL command to block all the cells

Step 2 Put on an ESD wrist strap or ESD gloves Step 3 Record all the cable connections on the panel of the board to be replaced Step 4 Disconnect the transmission cable from the UTRP. If a surge protection board is configured, the surge protection transfer cable also needs to be disconnected Step5 Loosen the two M3 screws on the panel, raise the ejector levers, and then pull out the UTRP
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page59

30

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing UTRP


Step 6 Set the DIP switches on the new board according to the settings of the DIP switches on the replaced board. For details about the DIP switch Step 7 Install the new board, lower the ejector levers, tighten the screws on the board to 0.6 Nm and then reconnect the cables Step 8 Check the status of the new board by observing the status of indicators. Step 9 Instruct the M2000 administrator to perform,
On the eNodeB, run the UBL CELL command to unblock all LTE cells Check whether any new alarms are generated by the base station Synchronize the inventory information manually Ask the onsite engineers to perform dialing tests to check whether the cells can normally provide services

Step 10 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page60

Replacing the UBRI


The Universal BaseBand Radio Interface Board (UBRI) provides ports for CPRI cables Replacing the UBRI interrupts all the services carried on the board The UBRI board is hot-swappable

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page61

31

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing UBRI


Step 1 Instruct the M2000 administrator to perform
On the eNodeB, run the BLK CELL command to block all the cells

Step 2 Put on an ESD wrist strap or ESD gloves Step 3 Record all the cable connections on the panel of the board to be replaced Step 4 Disconnect CPRI cables from the board Step5 Loosen the two M3 screws on the panel, raise the ejector levers, and then pull out the UBRI

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page62

Procedure of Replacing UBRI


Step 6 Install the new board, lower the ejector levers, tighten the screws on the board to 0.6 Nm and then reconnect the cables Step 7 Check the status of the new board by observing the status of indicators Step 8 Instruct the M2000 administrator to perform,
On the eNodeB, run the UBL CELL command to unblock all LTE cells Check whether any new alarms are generated by the base station Synchronize the inventory information manually Ask the onsite engineers to perform dialing tests to check whether the cells can normally provide services

Step 9 Take off the ESD wrist strap or ESD gloves, and pack up all
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

tools

Page63

32

eNodeB LTE V100R006 Field Maintenance

Replacing the UCIU


The Universal inter-Connection Infrastructure Unit (UCIU) interconnects BBUs. It forwards control and synchronization information from one BBU to another The UCIU is hot-swappable

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page64

Procedure of Replacing UCIU


Step 1 Put on an ESD wrist strap or ESD gloves Step 2 Record all the cable connections on the panel of the board to be replaced Step 3 Disconnect the interconnection cable between the optical ports on the UCIU Step 4 Loosen the two M3 screws on the panel, raise the ejector levers, and then pull out the UCIU

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page65

33

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing UCIU


Step 5 Install the new board, lower the ejector levers, tighten the screws on the board to 0.6 Nm and then reconnect the cables Step 6 Check the status of the new board by observing the status of indicators Step 7 Instruct the M2000 administrator to perform,
Check whether any new alarms are generated by the base station Synchronize the inventory information manually Ask the onsite engineers to perform dialing tests to check whether the cells can normally provide services

Step 8 Take off the ESD wrist strap or ESD gloves, and pack up all tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page66

Replacing the Optical Module


The optical module is used for the optical transmission between the BBU and other devices Optical modules are hot-swappable Replacing the optical module interrupts the services carried on this port

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page67

34

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing the Optical Module


Step 1 Put on an ESD wrist strap or ESD gloves Step 2 Loosen the screws on the cover plate of the RRU cabling cavity using an M4 Phillips screwdriver, and then open the cover plate. Step 3 Record the connections of the optical module and optical fibers. Step 4 Press the latch on the optical fiber connector, and then remove the connector from the faulty optical module.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page68

Procedure of Replacing the Optical Module


Step 5 Lower the puller on the faulty optical module, and then pull the puller until the optical module is removed from the RRU.

Step 6 Choose the optical module of the same type as the faulty optical module according to the label on the module. Install the new optical module into the RRU. Step 7 Insert the optical fiber connector into the new optical module. Step 8 Check the operating status of the new RRU by observing the status of RRU indicators. Step 9 Reconnect the cables in the cabling cavity.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page69

35

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing the Optical Module


Step 10 Close the cabling cavity of the RRU and use an M4 Phillips screwdriver to tighten the screws on the cover plate for the cabling cavity.

Step 11 Take off the ESD gloves, and pack up all the tools.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page70

Replacing the RFU


The RFU is a radio frequency unit. Replacing an RFU interrupts the services carried on the RFU Replacing an RFU disrupts the services carried on the RFU It takes about 6 to 10 minutes to replace an RFU The handle is used during the RFU replacement. The handle is placed in the slot at the upper right inside the cabinet door

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page71

36

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing RFU


Optional Step 1 If the RFU is functional and is to be replaced as a spare part, check whether the maximum transmit power of the RFU to be replaced is locked if it is functional
If the maximum transmit power of the RFU is locked, set the maximum transmit power to 0 before placing the RFU in the storehouse of spare parts To check whether a maximum transmit power is locked for an RFU,
Run the DSP RRU command to query the maximum output power of the TX channels of the RFU

Set the maximum transmit power for the RFU to 0 to disable the locking for the maximum transmit power
Run the LOC RRUTC command to disable the maximum output power locking for TX channels of the RFU
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page72

Procedure of Replacing RFU


Step 2 Instruct the M2000 administrator to
run the BLK BRD command to block the faulty RFU

Step 3 Verify that TX channels of the RFU are disabled. In this situation, the ACT indicator on the RFU panel blinks at 0.5 Hz Step 4 Wear the ESD wrist strap or ESD gloves Step 5 Turn off the switch for DC power output for the RFU on the direct current distribution unit (DCDU) to power off the RFU

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page73

37

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing RFU


Step 6 Label the power cable for the faulty RFU, and then disconnect the cable Step 7 Label the RF jumper of the faulty RFU, loosen the DIN 7/16 elbow male connector of the RF jumper, and disconnect the RF jumper Step 8 Label the common public radio interface (CPRI) cable for the RFU, and disconnect the CPRI cable

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page74

Procedure of Replacing RFU


Step 9 Loosen the screws at the four corners of the RFU using a Phillips screwdriver, and then pull the RFU using the handle to move it outwards 50 mm to 100 mm
Use one hand to hold the RFU and use the other hand to pull the RFU out of the cabinet.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page75

38

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing RFU


Step 10 Put the faulty RFU into an ESD box, and then place the handle back to the original position Step 11 Place the new RFU on the corresponding guide rails, and then slide it along the rails until it is in position Step 12 Tighten the captive screws at the four corners of the panel of the RFU to secure the RFU on the subrack

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page76

Procedure of Replacing RFU


Step 13 Insert the CPRI cable into the panel of the new RFU according to the labels Step 14 Connect the labeled RF jumper to the new RFU, and tighten the DIN male elbow connector to 25 Nm to 35 Nm using a torque wrench Step 15 Connect the labeled power cable to the new RFU and secure the cable

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page77

39

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing RFU


Step 16 Turn on the switch for DC output power on the DCDU to power on the RFU Step 17 Check the operating status of the RFU by observing indicator status Step 18 Optional: Set the maximum output power locking for TX channels of the RFU
Run the LOC RRUTC command to set the maximum output power of the RFU Run the RST BRD command to reset the RFU Run the DSP TXBRANCH command to check whether the maximum output power of each RFU is set successfully

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page78

Procedure of Replacing RFU


Step 19 Instruct the M2000 administrator to
Run the BLK BRD command to unblock the RFU on the eNodeB

Step 20 Take off the ESD wrist strap or gloves, and then pack up all the tools

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page79

40

eNodeB LTE V100R006 Field Maintenance

Replacing the RRU


A distributed base station consists of RRUs and a BBU Replacing an RRU interrupts all the services carried by the RRU, and alarms are generated It takes about 6 to 10 minutes to replace an RRU, which involves disconnecting the cables, removing screws, removing the faulty RRU, inserting a new RRU, tightening the screws, connecting the cables to the new RRU, and loading the software

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page80

Procedure of Replacing RRU


Optional Step 1 If an RRU to be replaced is not faulty, store it in the spare parts inventory after the maximum output power locking for TX channels is disabled for the RRU
Check the maximum output power locking for TX channels of the target RRU
Run the DSP RRU command to query the maximum output power of the TX channels of the RRU

Set the maximum output power of the TX channels of the RRU to 0 and disable the maximum output power locking
run the LOC RRUTC command to disable the maximum output power locking for TX channels of the RRU
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page81

41

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing RRU


Step 2 Instruct the M2000 administrator to
run the BLK BRD command to block the RRU On the eNodeB

Step 3 Power off the RRU by referring to Powering Off an RRU Step 4 Wear ESD gloves Step 5 Loosen the screws on the cover plate of the RRU cabling cavity using an M4 Phillips screwdriver for common RRU or M5 Phillips screwdriver for 12L blade RRU, and then open the cover plate
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page82

Procedure of Replacing RRU


Step 6 Record all the cable connections on the module to be replaced. Step 7 Disconnect cables from the cabling cavity and bottom panel Step 8 For the 12L blade RRU , If the RRU installed in centralized mode is to be replaced, first use an M6 Phillips screwdriver to loosen the two screws on the metal sheet of the RRU and remove the metal sheet, as shown in following figure. For the common RRU, Loosen the captive screws on the two hoist clamps on the main mounting bracket using an M4 Phillips screwdriver.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page83

42

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing RRU


Removing the metal sheet from an RRU install in centralized mode

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page84

Procedure of Replacing RRU


Step 9
For common RRU, tighten the screws on the attachment plate of the RRU using an M6 Phillips screwdriver. Use the screw only for removing the RRU to loosen the connection between the attachment plate and the main mounting bracket, and then raise the RRU bottom to remove it. For 12L blade RRU, use an inner hexagon torque wrench to loosen the captive screw on the attachment plate, as shown in remark, then raise the RRU bottom to remove it, as shown in remark.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page85

43

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing RRU


Step 10 Tighten the captive screws on the two hoist clamps on the main mounting bracket to 1.4 Nm (12.39 lbfin.) using an M4 torque screwdriver. Install a new RRU and then waterproof the RRU Step 11 Reconnect all required cables, and verify that vacant cable troughs in the cabling cavity are equipped by waterproof blocks Step 12 Close the cover plate of the RRU cabling cavity, and then tighten the protection screw on the cover plate of the RRU cabling cavity using an M4 torque screwdriver Step 13 Power on the RRU by referring to Powering On an RRU Step 14 Check the operating status of the new RRU by observing the status of RRU indicators. For details, see the description of RRU indicators in the RRU Hardware Description
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page86

Procedure of Replacing RRU


Step 15 Optional: Set the maximum output power locking for TX channels of the RRU
Run the LOC RRUTC command to set the maximum output power of the RRU Run the RST BRD command to reset the RRU Run the DSP TXBRANCH command to check whether the maximum output power of each RRU is set successfully

Step 16 Unblock the RRU


run the UBL BRD command to unblock the RRU

Step 17 Take off the ESD gloves, and pack up all the tools
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page87

44

eNodeB LTE V100R006 Field Maintenance

Replacing the DCDU


The DCDU, installed under the BBU3900, supplies DC power for the cabinet.
DCDU-03B for BTS3900A(ver.B) and DBS3900; DCDU-11B for BTS3900A(ver.C) and DBS3900; DCDU-12B for BTS3900A(ver.D) and DBS3900;

Replacing the DCDU disrupts the services carried on the corresponding cabinet. It takes about 20 minutes to replace the DCDU.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page88

Procedure of Replacing DCDU


Step 1 Wear an ESD wrist strap or a pair of ESD gloves Step 2 Modify the administrative state and block all RRUs powered by the DCDU to be replaced. Step 3 (Optional) Before replacing a DCDU-03B or DCDU11B, record the status of circuit breakers SW0 to SW9 on the DCDU, and set all the circuit breakers to OFF. If a DCDU-12B is to be replaced, skip this step.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page89

45

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing DCDU


Step 4 Disconnect the DCDU from power supply provided by the power equipment. Step 5 Record the installation positions (DC output ports) of all connectors on the DCDU, and remove the connectors.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page90

Procedure of Replacing DCDU


Step 6 Use a Phillips screwdriver to remove the protective cover from the DC input wiring terminal block of the DCDU, as shown in the following figure.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page91

46

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing DCDU


Step 7 Record the connection of the DC input power cables, and disconnect the power cables. Step 8 Use a Phillips screwdriver to remove the two screws from each side of the DCDU, and pull the DCDU out of the cabinet along the guide rails gently, as shown in the following figure.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page92

Procedure of Replacing DCDU


Step 9 Place the new DCDU on the installation position, and gently push it into the cabinet along the guide rails. Tighten the two M6 screws on each side of the DCDU to 2 Nm (17.7 lbfin.). Step 10 Remove the protective cover for the DC input wiring terminal block from the new DCDU, reconnect the power cables to the new DCDU according to the recorded installation positions, and then reinstall the protective cover.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page93

47

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing DCDU


Step 11 Reinstall the other cables to the new DCDU according to the recorded installation positions. Step 12 Turn on the switch on the power equipment for the DCDU to power on the DCDU. Step 13 According to the recorded status of the circuit breakers on the DCDU, turn on the circuit breakers that were set to OFF in 3.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page94

Procedure of Replacing DCDU


Step 14 Check the indicators on the RRUs according to the following table to verify that these RRUs are properly powered by
ITEM the DCDU . NORMAL STATUS RUN indicator: blinking (on for 0.125s and off for 0.125s, or on for 1s and off for 1s) Indicators on the BBU ALM indicator: steady off UPEU: The RUN indicator is steady on. FAN: The STATE indicator is blinking green. The normal status of the indicators on the BBU is as follows: RUN indicator: blinking green (on for 1s and off for 1s) ALM indicator: steady off ACT indicator: steady on Indicators on the RRU panel

Step 15 Take off the ESD wrist strap or ESD gloves, and pack up all tools.
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page95

48

eNodeB LTE V100R006 Field Maintenance

Replacing the Fan Box


The fan box works with the air inlet box in the cabinet to form a ventilation loop, and provides forced ventilation Replacing the fan box may result in over-temperature alarms due to interruption of heat dissipation for the cabinet, but services of the base station are not affected It takes about 20 minutes to replace a fan box

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page96

Procedure of Replacing FAN Box


Step 1 Wear an ESD wrist strap or a pair of ESD gloves Step 2 Set the DC power switch labeled FAN on the DCDU01 to OFF. Below figure shows the position of the power switch on the DCDU-01 for the fan box ear an ESD wrist strap or a pair of ESD gloves

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page97

49

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing FAN Box


Step 3 Label the cables on the panel of the fan box and then remove the cables Step 4 Loosen the captive screws on both sides of the adjustable cable trough. Then, raise the cable trough and fix it at the upper mounting hole, as shown in Right figure
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page98

Procedure of Replacing FAN Box


Step 5 Remove the four screws from the fan box. Pull out the fan box by one-third of its length with one hand by using the handle key, hold the fan box with the other hand, and then pull the entire fan box out of the cabinet, as shown in Right Figure . Then, put the faulty fan box into an ESD box

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page99

50

eNodeB LTE V100R006 Field Maintenance

Procedure of Replacing FAN Box


Step 6 Install the new fan box. Then, secure the four screws Step 7 Place the adjustable cable trough to its original position, and then tighten the captive screws on both sides of the adjustable cable trough Step 8 Install the cables to the panel of the fan box based on the labels Step 9 Set the switch on the DCDU-01 for the fan box to ON Step 10 Wear an ESD wrist strap or a pair of ESD gloves

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page100

Replacing an EPS 01 Subrack


Replacing an EPS subrack interrupts the services carried on a base station. Replacing an EPS takes about 30 minutes. The following figure shows the position of the EPS subrack in an APM30H.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page101

51

eNodeB LTE V100R006 Field Maintenance

Replacing an EPS 01 Subrack


Step 1 Put on an ESD wrist strap or a pair of ESD gloves. Step 2 Set the BAT and PSU circuit breaker on the EPS subrack to OFF. Step 3 Switch off external AC power supply to the APM30H. Step 4 Disconnect the ground cable for the EPS subrack from the ground bar on the inner left wall of the cabinet. Step 5 Remove the PMU and all PSUs from the EPS subrack.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page102

Replacing an EPS 01 Subrack


Step 6 Use a Phillips screwdriver to remove the cable tray from the right side of the EPS subrack. Step 7 Label the cables delivered with the EPS subrack on the right side of the EPS subrack, and remove the cables. Step 8 Remove the screws from the AC protective cover on the EPS subrack, and then remove the AC protective cover. Step 9 Label the AC input and output power cables delivered with the EPS subrack on the left side of the EPS subrack, and remove the cables.
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page103

52

eNodeB LTE V100R006 Field Maintenance

Replacing an EPS 01 Subrack


Step 10 bel the DC output power cables delivered with the EPS subrack on the right side of the EPS subrack, and remove the cables. Step 11 Remove the remaining seven screws from both sides of the EPS subrack, and pull the EPS subrack out of the cabinet along the guide rails, as shown in the following figure. Step 12 Push the new EPS subrack into the cabinet along the guide rails, and tighten the seven screws on the EPS subrack to 2 Nm (17.7 lbfin.) and the one hexagonal screw
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

to 3 Nm (26.55 lbfin.).

Page104

Replacing an EPS 01 Subrack


Step 13 (Optional) If the faulty EPS subrack uses 220 V AC three-phase input power, the short-circuiting bars at the AC INPUT terminals on the new EPS subrack must be removed. Step 14 Reinstall the PMU and all PSUs in the corresponding slots in the EPS subrack. Step 15 Connect the new power series 120 connector to the removed cable tray, and reinstall the cable tray onto the right inner side of the cabinet.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page105

53

eNodeB LTE V100R006 Field Maintenance

Replacing an EPS 01 Subrack


Step 16 Reinstall cables on the EPS subrack according to attached labels. Step 17 Install the AC protective cover on the left AC input area of the EPS subrack, and tighten the screw on the cover. Step 18 Restore external AC power supply to the APM30H. Step 19 Set the PSU and PSU circuit breakers on the EPS subrack to ON.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page106

Replacing an EPS 01 Subrack


Step 20 Observe the status of indicators on the PMU and PSUs to determine whether the new EPS subrack is working properly.
When the PMU is working properly, the RUN indicator is blinking green, and the ALM indicator is steady off. When the PSUs are working properly, the power indicators are steady green, and the protection indicators and alarm indicators are steady off.

Step 21 Take off the ESD wrist strap or ESD gloves, and pack up all tools.
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page107

54

eNodeB LTE V100R006 Field Maintenance

Replacing a PMU 01B


The PMU is hotswappable. Replacing a PMU takes about 5 minutes. The position of the PMU varies with the base station type. The right figure shows the positions of the PMU.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page108

Replacing a PMU 01B


Step 1 Put on an ESD wrist strap or a pair of ESD gloves. Step 2 Record the cable connections on the panel of the PMU to be replaced and disconnect the cables from the PMU. Step 3 Use a Phillips screwdriver to remove the two screws from the handle on the panel of the PMU. Step 4 Gently pull the handle to slide the PMU out of the subrack and remove the PMU from the subrack.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page109

55

eNodeB LTE V100R006 Field Maintenance

Replacing a PMU 01B


Step 5 Take out a new PMU, and set the DIP switch on the PMU panel according to the setting of the DIP switch on the faulty PMU. The following figure shows the position of the DIP switch. Step 6 Install the new PMU. Step 7 Check the status of indicators on the new PMU to determine whether the new PMU is working properly. Step 8 Take off the ESD wrist strap or ESD gloves, and pack up all tools.
Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved. Page110

Replacing a PSU (EPW30-48A)


The PSU is hotswappable. Replacing a PSU takes about 3 minutes. The position of the PSU varies with the base station type. The right figure shows the position of the PSU.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page111

56

eNodeB LTE V100R006 Field Maintenance

Replacing a PSU (EPW30-48A)


Step 1 Put on an ESD wrist strap or a pair of ESD gloves.
Step 2 Use a screwdriver to loosen the screws on the ejector lever on the panel of the PSU. Step 3 Gently pull the ejector lever to slide the PSU out of the subrack and remove the PSU from the subrack.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page112

Replacing a PSU (EPW30-48A)


Step 4 Install a new PSU.
Use a screwdriver to loosen the screws on the ejector lever of the PSU, and raise the ejector lever. Slide the PSU along the guide rails into the subrack until it snaps shut, and lower the ejector lever. Slide the PSU along the guide rails into the subrack until it snaps shut, and lower the ejector lever.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page113

57

eNodeB LTE V100R006 Field Maintenance

Replacing a PSU (EPW30-48A)


Step 5 Check the status of indicators on the new PSU to determine whether the new PSU is working properly. When the new PSU is working properly, the power indicator is steady green, and the protection indicator and alarm indicator are steady off. Step 6 Take off the ESD wrist strap or ESD gloves, and pack up all tools.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page114

Contents
1. Local Operation and Maintenance Introduction 2. Power on and Power off Procedure of eNodeB 3. Replacing Components of eNodeB 4. Maintenance items for eNodeB

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page115

58

eNodeB LTE V100R006 Field Maintenance

Equipment Room Maintenance Items


Item Environmental alarms Interval Daily Operation Instruction Check whether power supply alarms, fire alarms, or smoke alarms are reported Record the temperature shown on the thermometer in the equipment room. Reference Standard No power supply alarms, fire alarms, or smoke alarms are reported. The normal temperature ranges from -20 to +55 C.

Temperature in the equipment room Humidity in the equipment room Illumination in the equipment room

Weekly

Weekly

Record the humidity shown The normal humidity on the hygrometer in the ranges from 5% RH equipment room. to 95% RH. Check whether the routine and emergency illumination in equipment room is normal
Page116

Every two months

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Equipment Room Maintenance Items


Item Air conditioner Protective devices Interval Every two months Every two months Operation Instruction Check whether the air conditioner is working normally. Check whether anti-disaster devices, equipment protection devices, and fire protection devices are in good condition. Check whether cabinets, equipment housing, equipment interior, tables, floor, doors, and windows are clean. There is no danger of damage to the equipment by rats or insects. All the items to be checked are clean. Reference Standard

Equipment Room cleanlines s

Every two months

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page117

59

eNodeB LTE V100R006 Field Maintenance

Power Supply and Grounding System Maintenance Items


Item Power cables Interval Monthly Operation Instruction Check the connections of power cables carefully. Measure the voltage of the power supply using a multimeter. Check whether the PGND cable and ground bar are connected properly. Reference Standard The power cables are not aging, and there is no corrosion on the connection points The voltage is within normal range

Voltage

Monthly

PGND cables

Monthly

The connections of the PGND cable are secure. The cable is not aging. The connection points are sound with no corrosion on them.
Page118

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Power Supply and Grounding System Maintenance Items


Item Checking Earth resistance Interval Monthly Operation Instruction Measure the earth resistance using an electric earth resistance tester and keep a record. Check the batteries and rectifiers. Reference Standard The grounding resistance of the cabinet is smaller than 10 ohms.

Batteries

Annually

The battery capacity is within normal range and the batteries are correctly connected. The performance parameters of rectifiers are normal.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page119

60

eNodeB LTE V100R006 Field Maintenance

Main Components Maintenance Items


Item Fans Interval Monthly Operation Instruction Check whether the fans are operational. Reference Standard The fans work properly without exceptional sounds generated by frictions between the blades of the fan and the subrack.

LEDs on the boards

Monthly

Check whether For details about the status of the LEDs on the LEDs, see the hardware boards are normal. description about the corresponding boards. If there is too much dust on the air filter, clean the air filter

Air filter

Quarterl y

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page120

Main Components Maintenance Items


Item Exterior of the cabinet Interval Quarterl y Operation Instruction Check whether there are dents, cracks, holes, or corrosion on the surface of the cabinet and whether the cabinet label is legible. Check whether the lock is normal and the door can be opened and closed easily. Check whether the cabinet is clean. Reference Standard -

Lock and door of the Cabinet Cabinet cleanliness

Quarterl y

Quarterl y

The cabinet surface is clean. The subracks are not dusty.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page121

61

eNodeB LTE V100R006 Field Maintenance

Main Components Maintenance Items


Item ESD wrist strap Interval Quarterl y Operation Instruction Use either of the following methods: Use an ESD wrist strap tester to test the ESD wrist strap. Use a multimeter to test the earth resistance of the ESD wrist strap. Reference Standard If you are using an ESD wrist strap tester, the LED GOOD is on. If you are using a multimeter, the earth resistance is between 0.75 M and 10 M.

Fan box

Annually If there is too much dust on the surface of or inside the fan box, clean the fan box.

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page122

Summary
Maintenance methods of eNodeB Power on and Power off procedure and key points Basic operations of local operation and maintenance Routine maintenance items of equipment and evirement

Copyright 2013 Huawei Technologies Co., Ltd. All rights reserved.

Page123

62

eNodeB LTE V100R006 Field Maintenance

Thank you
www.huawei.com

63

Вам также может понравиться