Вы находитесь на странице: 1из 3

Companies Registration Section

Local Manufacturer Pre qualification Guidelines

Telephone: +971 2 694 3261, Facsimile: +971 2 694 3294 | PO Box 6120, Abu Dhabi, United Arab Emirates | www.adwea.ae

LIST OF DOCUMENTS TO BE SUBMIT PRIOR TO SITE SURVEY FOR MANUFACTURER

Covering letter with Companys brief profile, indicating company services can provide to ADWEA (Attach Company Brochure, if available).The Companys will only be considered for registration with ADWEA for services which match with the activities mentioned in Company Licenses. Copies of the following company licenses:

1. Department of Economic Development or equivalent licenses issued from Abu Dhabi 2. Chamber of Commerce License 3. Industrial License Planning and Economy License and Chamber of Commerce License. INCLUDING Planning Department Classification, if available,

List of Major Orders for each product in Last Five Years as per Attachment

Whole copy of the Quality System Manual and copy of certificates held, if any.

Safety Manual and Lost Time Injury Records. Organization chart indicating Positions/Names of key personnel.

List of manpower by discipline specifying permanent staff, along with copy of Ministry of Labour Certificate, issued by UAE Government, Employee Training Policy and/or on the Job Certification. List of major equipment location-wise, including office equipment viz. computer hardware/software and specifying the manufacturer/make, year of purchase and quantity available.

Layout of your facilities (offices/workshop/warehouse/showrooms) and its necessary to include the LOCATION MAP of your facilities. Financial turnover in last 3 years with audited Annual Reports for the last Year.

BUSINESS PLANNING & PREFORMANCE DEPARTMENT COMPANY REGISTRATION SECTION


L I S T
COMPANY NAME

O F

M A J O R

O R D E R S

F O R

L A S T

F I V E

Y E A R S
REGISTRATION CODE PRODUCT GROUP CODE

PRODUCT GROUP (PG) DESCRIPTION


SR. NO. (1)

PROJECT TITLE (2)

CLIENT NAME/END USER (3)

SCOPE OF WORK/SPECIFICATIONS (4)

YEAR OF SUPPLY (5)

TOTAL ORDER VALUE Dhs (6)

ROLE IN SUPPLY (7)

Notes:
I. II.
III. IV.

Please identify Product Group Code from project Equipment List, for items manufactured by you Use a SEPARATE SHEET for each PRODUCT NUMBER to list MAJOR ORDERS including ongoing and completed jobs for last five years giving the TOTAL value in UAE Dhs in Column No. 6 and component of the total value which belongs this Product Number in Column No. 7. Column No. 7 Please use the following codes to identify SCOPE of your order (use more than one code if necessary): S = Supply, M = Manufacturing, F = Fabrication, W = Machining/Maintenance, I = Installation, E = Engineering/ Design. Column No. 4 Please specify the dimensions, weight and wall thickness for pressure Vessels, Columns, Columns, Separators.

Вам также может понравиться