Status: Draft
Content
Introduction to the Gullfaks field What is MEOR? Selection of pilot area Equipment Implementation of the pilot Results Conclusions
Reservoir Quality
Reservoirs: Brent, Cook, Statfjord & Lunde Very faulted and eroded, with contrasting layers Dip up to 12 o in the western part. Weak formations Porosity (Brent): 30-35 % Permeability (Brent): 10 D 10 mD
Drainage strategy
Aquifer support Water injection Reservoir pressure over bubble point WAG
BACTERIA + OIL + N + P + O2
TY ED C LI U R BI ED E A R AT ME W ER P
IN
TE RE R DU TE FA C N CI E D SI AL O N
Chemical-pump
Principle drawing
P 14-HV119 FE 050A FE 050B
Chemical injection
42-TB21A
Water injectionmanifold
FE 117
SUM
14-HV626
WING
42-PF36
Water injectionmanifold
FE 651
Well A-41
PIT 005
Water injection
05-XV004
05-KB01A
FE 003
Air storage
05-FV003
PIT 015
FIC 003
05-KB01B
Air injection
The injector should, with advantage, be in the oil zone. The distance between injector and producer should not be too long due to
throughput time. To get results in a reasonable time is important.
The injector should be at a lower level than the producer. If not, the process
will not work.
Good reservoir understanding. The producer(s) should be in steady-state conditions as regards to water cut.
10
2 16 0
2 1 6 0
20 6 0
2 2 1 1 4 0 60
34/10 Gullfaks Vann- og Gassflmming i vre NER PCRI52 Topp Ness-1 dybdekart
0 8
2
1972
Pilot area
0
C-17
2188
C-19(F)
2004
2920
C-19
1971
2900
2 1
20 4 0
80
1 2 4 0
I5B 14
1949
2880
0 4 2 0
0 94 1 0 00 2 9 19 1
6 0
C-19
21 2 0 0
2860
12
2 1 0 0
C-10 H6A
2 0
0
1968
C-10
1897
C-23 C-23CT2
1938
2840
C-23A
1883
20 20 2 0 1 9 0 80 0
1 9 8 0
1 19 1 1 9 4 9 00 2 0
2 1 2 0 14 6 0 2 1 2 0 2 1 0 20 0 8 0 20 6 0 20 4 0
20 21 0 0 8 0
60 0
1 9 60
G6
C-25T2 C-25
1857
B-26
B-14A B-14A
1964
86
0
2087
1 9 4 0 1 9 2 1 0 0 8 1 9 0 8 0
GFC
2800 2780 2760 2740 2720 2700
2820
2 0 6 0
PBEG61
21 2 0
4 0 2 0 2 0
B-8
2040
0 6 0 2
B-8
2 00 0
1 9 6 0 1 9 4 0
0 2 1 2
I5A
1860
C-31
C-27
18
1855
B-20
1908
B-11 B-11
1822
1986
40
C-15
1818
0 8 0 2
C-26
1817
2 10 0
0 8 9 1
8 0 0 2
C-3 9 I3B
1 8 40
1817
B-12
H5
19 80
8 1 4 0
GFB
02 0
2130
3
1949
B-27
1898
PBRH54
B-5
1810
1823
C.22 C-22
1800
C.26AT2
C
1 8 6 0
0 2 20
9 0 0 1
1941
B-24
B-36
1886
192 0 0 0 9 1
G5
0 4 0 2
B-17
0 4 19 0 9 8 1
0 198
1 96 0
0 2 2 0 4 0 0 2
2 9 0 1
B-15
8 8 0 1
PBEG52
B-3
2 00 0
1972
C-30
C-11 C-30
1783
C.11
1791 1777
PCRI35
C-28
2680
2660
B-24
2001
0 8 1 9
PBRH53
1841
B-33
8 2 0 1
1838
1793
C.28
2640
B-1
2001
B-30
1792
I2C 4
IXRI25
B-19T2 B-19A B-32 B-19 PBRH31
1799 1793 1795
PCRI37
C-12
1773
8 6 1 0
2620
2 4 00 0 0 9 6 0
B-22(F)
2 00 0
2038
B-36AT2
1993
B-36AT2
B-2
1842
2008
B-19A
1798
PCRI23
2600
B-32
1787
1 8 4 1 8 1 7 8 1 0 0 80 0
1996
1 7 8 0
B-31
0 2 B-23
1800 1790
H3
2580
C-5
1761
19
1 9 20
H4
6 0 8 1 4 8 0 1 1 8 2 0
B-6(F)
1939
B-21
1890
1765
B-10A
2560
C-35
1767
C.35
2540
20 0 0
A-12
1921 1919
1 78 0
B-4 H2
1767
PBRH45
B-34(F)
1766
I2A B-31
1770
2520
A-6A A-33
1880
B-38 B-38
1758
G4
2 0 2 0
1 9 96 80 0
A-31
1 90 0 18 8 0
1896
8 1 6 0 8 40 1
1979 1916
A-34A(F)
1787
2500
I1
1796
A-16
A-34A(F)
1
2480
1922
A-32B
A-16A(F)
1945
A-3H
1785
1 9 60
A-8
1875
18 4 0
GFA
A-32 A-18(F)
2009
A-14 A-14
1833
B-37
0 1 8 0
1772 1755
A-39A(F)
1765
C-32
1857
0 88
U1
2460
4 0 9 1 0 2 9 1
A-1H A-39A
1761
2440
1 82 0
0 6 8 1
A-39A(F)
1760
2420
A-36T3 A-2AH H1
17 8 0
1745
A-36
0 90 1
A-26
1888
2 0 0 0 1 8 9 0
A-20(F)
1991
A-20A
2017
G3
1 9 0 6
2400
A-39A A-39A
1753
A-41B A-41B 60
17
1764
A
1 9 2 0
A-11
1925
A-11 A-19
G2
A-39
1764 1765
0 0 0 2
A-10A
A-7A
1904
8 80 1
2380
A-17
1778 1788
A-17AT2
2360
2340
A-35
1813
A-35 Oljeprodu sent Vanninjekt or Gassinjekt or VAG injektor Syklisk prod./gassinj. Mulig Mulig injeksjon produksjon OU ml
Delvis gassflmmet Delvis vann- og gass-flmmet 2320 Usikker vannflmming Usikker gassflmming Usikker vann- og gassflmming Prospekt
2300
8 0 1 0
8
1936
1 88 0 1 0 8 6
A-24A
0 0 2 0
1983
1 9 0 0 20 9 1
8 20 1
0 0 0 2
4 9 1 0
A-22
1909
0 4 8 1
2280
2260
1 9 8 0
A-15
1965
A-46T2
1904
2240
G1
0 2 0
2 km
2220
2200
198 0 0 2002680 2600 2620 2640 2660 2700 2720 2740 2760 2780 2800 2820 2840 2860 2880 2900 2920 2940 2960 2980 3000 3020 3040
40
11
Status: STOOIP=10,4 M Sm 4,10 M Sm produced from lower Brent (per 1.12.05). Recovery factor of 40% (per 1.12.05), expected recovery factor of 59%. Producers: A-36, A-40 and B-39B Injector: A-41B
12
Increased
pressure drop in the injector A-41B (decreased injectivity) producers A-36 and A-40.
Reduced seawater fraction in the The throughput time for water should be
longer. Tracer injected before start-up of pilot, Jan-05, gave a throughput time of 5 months. (550m between A-41B and A-36)
20000 18000 16000 14000 12000 10000 8000 6000 4000 2000 0
A-36
1 0,9 0,8 0,7 0,6 0,5 0,4 0,3 0,2 0,1 0
Reduced water cut (at least 5% decrease) Reduced H2S in the producer.
13
Pilot implementation
Tracer injected 27.01.05 with a breakthrough time of 5 months. New tracer injected 01.06.06. MEOR injection started 05.12.05. Expected pilot duration of 1 year. Design injection rate A-41B: 6000 Sm/d. Status A-36, 01.12.05 :
Liquid rate / oil rate: ca. 2400 Sm/d / 100 Sm/d Water cut: GOR: 95% 110 - 140 Sm/Sm
14
The injection rate has been constant between 5000 and 6000 Sm/d. 97% regularities on the injector. >90% regularities on the air injection. Nitrat/fosfat solvent: 0,107 l/min (independent of rate) Air: 98 ltr/min (regulated due to rate). Prosper is used to estimate the injectivity of A-41B. Well head pressure used in calculations. The Injectivity index seems to be rather constant and in the same order of magnitude after the MEOR injection as before.
140 120 100 I, Sm3/d/bar 80 60 40 20 0 01.02.2005 05.06.2005 07.10.2005 08.02.2006 12.06.2006 14.10.2006
8000 7000 6000 5000 4000 3000 2000 1000 0 Inj. rate, Sm3/d
The expected reduction in injectivity due to bacterial growth has not been observed.
15
1.2 1 0.8 0.6 0.4 0.2 0 jul. 07
The production has been stable at around 100 Sm/d during the year. The water cut has been stable at around 9597%. The well has rate dependent water cut. High total rate gives lower water cut. The well was restricted by sand and amount of H2S. The seawater fraction has been stable in the lower edge of 1.
A-36
100 90 80 70 60 50 40 30 20 10 0 jul. 98 jul. 99 jul. 00 jul. 01 SO4 SW jul. 02 jul. 03 AMIOR jul. 04 jul. 05 jul. 06
Vannkutt
16
The H2S has stabilised during the period, no reduction, as expected, is observed. In the period from start of planning the pilot to the implementation, the H2S increased rapidly. This increase gave a new uncertainty to the pilot. The bacterial growth had been higher than we first assumed. Problems with continuous production from the well due to high H2S and capacity restrictions on the platform.
H2S
1000 900 800 700 600 500 400 300 200 100 0 24.07.1998 06.12.1999 19.04.2001 01.09.2002 14.01.2004 28.05.2005 10.10.2006 22.02.2008 A-36 Amiorinjeksjon starter A-40
17
The production has been stable at around 200 - 300 Sm/d during the year. Restricted by sand production and closed down in october-06. The water cut has been increasing from 75% to 90% during the period. The well follows an usual trend for lower Brent wells. The seawater fraction has increased from 70 to 80%, following earlier trend. The H2S amount has not been influenced of the pilot. It is at a much lower level than in A36.
H2S
1000 900 800 700 600 500 400 300 200 100 0 24.07.1998 06.12.1999 19.04.2001 01.09.2002 14.01.2004 28.05.2005 10.10.2006 22.02.2008 A-36 Amiorinjeksjon starter A-40
18
Results
No changes in behaviour around the injector A-41B. No reduction in either water cut or seawater fraction in the producers A-36 and A-40.
They behave at the same trend as before MEOR injection.
The tracer injected in June-06 also had a breakthrough time of 5 months. Stabilised H2S in A-36 may be due to MEOR. The temperature in A-36 has decreased with around 10 degrees during the year,
which means that a lot of water has gone trough the reservoir.
The oil rate in the producers has not been influenced by the MEOR process.
19
Conclusions