Herman Posada
NASA Dryden Flight Research
Center
July 2009
Western States Fire Mission Modifications
11
Payload Areas
3
8/5/09
2007 Western States Fire Mission Objectives
Mission
4
8/5/09
Operations Concept
FL430
FL410
Class A
RVSM
FL230 FL290
18,000
Restricted
s e A i rcraft Restricted
airspace Cha d airspace
require 5
8/5/09
Certificate of Authorization (COA) Boundary Request
3 Operational Zones
States covered
California, Nevada,
Oregon, Washington,
Utah, Montana,
Wyoming, Idaho
ZONE C
6
8/5/09
Range Safety Protection Zones
KEEP-OUT ZONES
Can be changed or
updated before or
during flight with
concurrence of a DFRC
Range Safety Officer
(RSO)
NOMINAL
AIRCRAFT
UNHEALTHY
AIRCRAFT
7
8/5/09
Routes A, B, C
ZONE C
8
8/5/09
Primary Emergency Landing Sites
Minimum Range
on Battery
Power
Aircraft has
single generator
Landing
agreements
negotiated with
each site
9
8/5/09
Secondary Emergency Landing Sites
Selected in unpopulated
areas. Abandoned runways,
dry lakebeds, flat ground,
ditch areas
Primary purpose is to
protect public
11
8/5/09
Mac Gillivray
Near Adelaida, CA
(Abandoned landing strip)
Heading SOUTHWEST
12
8/5/09
Chart Case Professional
CHART CASE
13
8/5/09
Chart Case Professional
CHART CASE WITH XM WEATHER
14
8/5/09
COA Application Provisions
15
8/5/09
COA: Special Provisions
16
8/5/09
COA: Special Provisions (con’t)
17
8/5/09
COA: Special Provisions (con’t)
18
8/5/09
Approved COA Area
19
8/5/09
Domke Lake
GW Big Bend
Colby
22
8/5/09
WSFM #3 - September 7-8, 2007
23
8/5/09
California Emergency Wildfire Response
• Oct 20-21: High winds (>50 MPH) drive wildfires in 4 southern California
counties
• Oct 22nd: Ikhana team began preparation for a possible fire mission
• Two impediments to launching a mission
– Failed hard drive in the wildfire sensor
– Ikhana wings being modified for fiber-optic wing sensor demonstration
• Tiger team assembled to assess airworthiness
Paint removed
along 2 strips
Patched with
flexible rubber
tape
24
8/5/09
California Emergency Wildfire Response
Santiago
Rice
Ammo Poomacha
Witch
Harris
26
8/5/09
WSFM #5 - Ammo Fire, Oct 24th
27
8/5/09
WSFM #6 - Oct. 25th
28
8/5/09
WSFM #7 - Oct. 26th
SANTIAGO FIRE
Hot spots in yellow
Santiago Fire –
3D with Hot Detects
29
8/5/09
WSFM #8 - Ammo Burn Area, Oct. 28th
AMMO FIRE
Sensor optimized
for Burn Area
Emergency
Response (BAER)
imagery
30
8/5/09
WSFM #8 - Santiago Fire, Oct. 28th
SANTIAGO FIRE
Housing
31
8/5/09
WSFM #4-#8 Southern California Results
32
8/5/09
2007 WSFM Challenges
• Weather
– Wind
– Clouds
– Icing
– Thunderstorms
• Long missions
33
8/5/09
Credit where Credit is Due
• USAF
• Gray Butte for Command/Control frequency flexibility
• Nellis Range for GPS Testing flexibility
• General Atomics
34
8/5/09
NASA Global Hawk: A New Tool
for Earth Science Research
35
Global Hawk Block Approach
• USAF
• Gray Butte for Command/Control frequency flexibility
• Nellis Range for GPS Testing flexibility
• General Atomics
39
8/5/09
Global Hawk Specs
• USAF
• Gray Butte for Command/Control frequency flexibility
• Nellis Range for GPS Testing flexibility
• General Atomics
42
8/5/09
Global Hawk ship 006 NASA 872
• USAF
• Gray Butte for Command/Control frequency flexibility
• Nellis Range for GPS Testing flexibility
• General Atomics
43
8/5/09
Dryden Global Hawk
• USAF
• Gray Butte for Command/Control frequency flexibility
• Nellis Range for GPS Testing flexibility
• General Atomics
44
8/5/09
Dryden Global Hawk
• USAF
• Gray Butte for Command/Control frequency flexibility
• Nellis Range for GPS Testing flexibility
• General Atomics
45
8/5/09
GHOC (Global Hawk Ops Center)
Pilot
Operations
Pilot Displays
Payload
Control
Photos Courtesy NASA Dryden
Global Hawk Operations Center (GHOC)
Support
Equipment
Room
(SER)
55
8/5/09
GHOC
• USAF
• Gray Butte for Command/Control frequency flexibility
• Nellis Range for GPS Testing flexibility
• General Atomics
56
8/5/09
Roll out ceremony
• USAF
• Gray Butte for Command/Control frequency flexibility
• Nellis Range for GPS Testing flexibility
• General Atomics
57
8/5/09
15 Jan 09: NASA/NGC Roll-out Ceremony