IB THERMAL POWER STATION AT/PO : BANHARPALLI DIST: JHARSUGUDA 768 234 (ORISSA) TELE: 06645-222224 FAX: 06645-222249
Bid Document for
Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Bid Document Number: ITPS/CC-22/2008/68 Date of Issue: 03.09.2008
Confidential Page 2 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
TABLE OF CONTENTS
Bid Data Sheet ...................................................................................................................................................... 4 Disclaimer .............................................................................................................................................................. 5 Section 1: Project Introduction ........................................................................................................ 6 1.1 About OPGC ................................................................................................................................................. 7 1.2 Future Business Plan ................................................................................................................................... 8 1.3 ERP Project Background Note .................................................................................................................. 8 Section 2: Scope Of Work ................................................................................................................. 9 2.1 Supply of Hardware and Non-SAP Software .............................................................................................. 10 2.2 Design, installation & commissioning of Infrastructure ............................................................................... 10 2.3 Implementation of the SAP applications ..................................................................................................... 10 2.4 Implementation of Non-SAP applications ................................................................................................... 10 2.5 Project Management in different phases, Change Management and Training. ......................................... 11 2.6 Post Implementation support services for running the SAP Application, Non-SAP applications and Infrastructure Facility Management services....................................................................................................... 11 Section 3: Bidding Procedure ........................................................................................................ 12 3.1 Formal Invitation to Bid ............................................................................................................................... 13 3.2 Bidding Procedure ...................................................................................................................................... 15 3.3 Structure of Bid Document ......................................................................................................................... 19 3.4 Submission Of Bid ...................................................................................................................................... 19 3.5 Instruction to Bidder .................................................................................................................................... 21 Section 4: Evaluation of Bids ......................................................................................................... 26 4.1 Opening Of Bids ......................................................................................................................................... 27 4.2 Evaluation & Comparison of Bids ............................................................................................................... 27 4.3 Signing Of Agreement ................................................................................................................................ 28
Appendix-A: Bidding Reference .......................................................................................................... 30 Appendix-A1: Current IT Infrastructure details .................................................................................. 31 Appendix-A2: Business Processes Requirement-Overview ............................................................ 35
Appendix-B: Bid Support Documents ................................................................................................ 48 Appendix-B1: Letter of Undertaking by the Bidder ........................................................................... 49 Appendix-B2: Form for Price Bid ........................................................................................................ 51 Appendix-B4: Proforma for Bank Guarantee for Bid Security (Earnest Money Deposit) .............. 57 Appendix-B5: Consortium MOU .......................................................................................................... 59 Appendix-B6: Profile of Implementation Partner ............................................................................... 61 Appendix-B7: Profile of Hardware Partner ......................................................................................... 67
Appendix-C: Contract Document ........................................................................................................ 68 1 Definitions & Interpretations ................................................................................................................... 70 2 Scope of Agreement............................................................................................................................... 72 3 Obligation of Vendor ............................................................................................................................... 72 4 Obligation of Owner ................................................................................................................................ 76 5 Implementation Plan ............................................................................................................................... 78 6 Scope Change ........................................................................................................................................ 80
Confidential Page 3 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
7 Product Upgrades .................................................................................................................................. 80 8 Assignment and Subcontracting ............................................................................................................ 80 9 Tests ....................................................................................................................................................... 80 10 Performance Guarantee / Warranty ....................................................................................................... 84 11 Waiver .................................................................................................................................................... 86 12 Price and Payment ................................................................................................................................. 86 13 Liquidated Damages .............................................................................................................................. 90 14 Insurance ................................................................................................................................................ 91 15 Indemnity ................................................................................................................................................ 92 16 Patent Infringement ................................................................................................................................ 92 17 Settlement of Disputes ........................................................................................................................... 92 18 Term and Termination ............................................................................................................................ 93 19 Force Majeure ........................................................................................................................................ 94 20 Ownership .............................................................................................................................................. 95 21 Limitation of Liability ............................................................................................................................... 95 22 Time of the Essence ............................................................................................................................... 95 23 Confidential Information ......................................................................................................................... 95 24 Miscellaneous ......................................................................................................................................... 96 Annexure-1: Detailed Scope of Work .................................................................................................. 98 T Ta ab bl le e- -0 01 1: : Techno-Functional Requirement Specifications ............................................................................... 119 Table-02: Broad Specifications for Hardware and Devices .............................................................................. 126 Table-03: Broad Specifications for Data Center ............................................................................................... 157 Table-4: Broad Specifications for Network Layout ............................................................................................ 172 Table-05 Broad Specifications for Video Conferencing Equipment & Software ............................................... 175 Table-06: Broad Specifications for IP Telephony Equipments & Software ....................................................... 178 Table-07: Broad Specifications for Email Solution ............................................................................................ 186 Table-08: Broad Specifications Antivirus/ Anti-Spam ....................................................................................... 200 Table-09: Broad Specifications EMS/ NMS ...................................................................................................... 204 Table-10: Broad Specifications of Building Management System .................................................................... 221 Annexure-2: Deliverables & Performance Parameters .................................................................... 227 Annexure-3: Preliminary Implementation Plan ................................................................................ 240 Annexure-4: Price Schedule .............................................................................................................. 241 Annexure-5: Payment Milestone ....................................................................................................... 245 Annexure-6: Proforma for Performance Bank Guarantee (PBG) ................................................... 250 Annexure-7: Owner Safety Rules ...................................................................................................... 253
Confidential Page 4 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Bi d Dat a Sheet Bid Document No- ITPS/CC-22/2008/68, Date 03.09.2008
Date of Issue Bid Document 03 rd Sep 2008 Address for Communication Contract Cell, Orissa Power Generation Company Limited IB Thermal Power Station AT/PO : Banharpalli, Dist: J harsuguda Orissa -768234 Tele: 06645-222224 Fax : 06645 222249 contractcell@opgc.co.in Bid Document Bid Document shall be available on the website (http://www.opgc.co.in) for download from 03 rd Sept 2008 to 15 th Sep 2008 Pre-Bid Clarification The queries on the Bid Document if any shall only be received on 16 th & 17 Th of Sep 2008. All queries should be addressed to contractcell@opgc.co.in. The Bidders shall be invited for a pre-bid meeting at OPGC Head Office Fortune Towers, Chandrasekharpur, Bhubaneswar on 22 nd & 23 rd of Sep 2008 in which all the received queries shall be discussed and confirmed to all the bidders. Last Date, Time and Place for submission of Bids By 10:00 Hrs on 14 th Oct 2008at Contract Cell, OPGC IB Thermal Power Station, Banharpali, District: J harsuguda, Orissa EMD to be submitted as part of bid Amount: Rs 6,00,000 (Rupees SIX LAKHS ONLY) Mode : DD/ Bank Guarantee Bank : In case of DD, one of the authorized banks as per Bid Invitation details. In case of BG any schedule Bank (except co-operative Banks). Period of Bid validity 180 days from the last date of submission of Bids or any extension thereof. Date & Time of Opening of Techno- Commercial Bid 15.00 Hrs of 14 th Oct 2008 Demonstration and Bidder Interactions Exact dates of visit to OPGC Head Office, Bhubaneswar will be communicated individually to each Techno Commercially qualified Bidders. Date and Time of Opening Price bids To be intimated to the Techno commercially Qualified Bidders. Negotiation Only qualified bidder will be invited for this activity. Agreement Signing Will be intimated.
Confidential Page 5 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Di scl ai mer The purpose of this document is to give the bidders information to help them understand the scope of the IT Solution required for OPGC. In addition, OPGC encourages bidders to provide alternate innovative and proven approaches to the Solution that will minimize cost, time and risk and will maximize the potential success of the project. The information on existing IT infrastructure and business processes of OPGC as detailed under Appendix A, are indicative only and the Bidder shall be fully responsible for carrying out due diligence and queries at his level to satisfy his requirement with respect to participating in the bid. OPGC reserves the right to provide additional information at its sole discretion.
The information contained in this document is confidential in nature. The bidders shall not share this information with any other party not connected with responding to this Bid document.
OPGC makes no representation or warranty and shall incur no liability under any law, statute, rules or regulations on any claim, the potential bidder may make in case of failure to understand the requirement and respond to the Bid document. OPGC may, in its absolute discretion, but without being under any obligation to do so, update, amend or supplement the information in this Bid Document.
Contract Cell, Orissa Power Generation Company Limited IB Thermal Power Station AT/PO : Banharpalli, Dist: Jharsuguda Orissa -768234 Tele: 06645-222224 Fax : 06645-222249 e-mail: contractcell@opgc.co.in
Confidential Page 6 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Section 1: Project Introduction
Confidential Page 7 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
1. 1 About OPGC Orissa Power Generation Corporation Limited (OPGC) was incorporated on November 14, 1984. OPGC started as a wholly owned Government Company of the State of Orissa with the main objective of establishing, operating & maintaining large Thermal power generating stations. In the pursuit of its objective, OPGC established IB Thermal Power Station (ITPS) having two units of 210 MW each in the Ib valley area of J harsuguda District in the State of Orissa. The plant went into commercial operation from 1996. The entire generation from these units are committed to Gridco the state owned Trading Company on the basis of a long- term power purchase agreement. As a part of the reforms process in the energy sector, the State Govt. divested 49% of the equity in favour of a Private investor i.e. AES Corporation of USA in early 1999 through International Competitive Bidding (ICB) process. OPGC with its present Ownership structure is unique of its kind in the country and has excellent track record of plant performance and earnings. The Company has earned many state as well as national level awards and recognitions. Today OPGC has firmly established its credentials as a successful power generating company both technically & commercially by providing safe, clean & reliable power. ITPS has a good Town Ship with all modern amenities. The township along with the plant is surrounded and well protected with a boundary wall of 12 KM length. The township comprises of quarters for 672 Employees. It contains Training Hostel, Erector's Hostel (Guest House), English Medium DAV school, Oriya Medium High School, Officers Club, Community Center, Shopping Complex, Hospital, Banks, Post Office, Bust stand, temple & Helipad.
OPGC's stated vision, mission and core values are: a) To be one of the best and reliable power utilities of India b) To make every work place a safe work place c) To keep the environment clean d) To be socially responsible for employees and society
Strength of OPGC a) This is a Pithead Thermal Power plant with coal field located nearby & a Merry-Go-Round (MGR) system for Coal transportation. b) There is adequate water availability from the nearby Hirakud Reservoir with an Intake Channel connected to Reservoir. c) Long term PPA with the State Power Transmission utility i.e. GRIDCO for 100% off-take. d) Payment security mechanism comprising Escrow Account and revolving Letter of Credit with Gridco. e) Infrastructure like land and common facilities are already available for further expansion. f) A Dedicated workforce of Young Engineers & support staff. g) Long term Fuel Linkage Agreement with Mahanadi Coalfield Limited (MCL) for supply of coal.
Confidential Page 8 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
1. 2 Fut ur e Busi ness Pl an OPGC is in the process of further capacity addition of another 1200 MW at the same location. Requisite land is already in physical possession. Water linkage & required infrastructure are in place. The Capital Investment for the expansion project will be Rs. 5700 crores (approx.). OPGC has been allotted two Coal Blocks namely Manoharpur and Dip Side of Manoharpur, having indicated reserves of 531 million tones, from the Ministry of Coal, GOI through Govt. Dispensation Route and is in the process of entering into mining development activities for its own captive use..The initial capital Investment for mining activities is estimated to be Rs. 800 crores. OPGC is also planning to enter into Power Trading business in near future and may also extend its business to multi- locations in India.
1. 3 ERP Pr oj ect Backgr ound Not e It is envisaged that OPGC's business transformation will result in new business processes through extensive process change as it seeks improved efficiency, expansion into new markets and partnerships. OPGC's IT strategy has been developed based on aligning OPGC to become an efficient organization, both for its existing operations and keeping in view future growth. OPGC is seeking to replace the current in-house developed systems in the corporate centre and Plant with a centralised, ERP solution. The key reason for seeking a centralised, ERP Solution is that the existing in-house applications are disparate, lack seamless integration and have become very complex to extend to new business processes. Therefore, it is desired to establish integrated business applications architecture based on SAP ERP backbone that will support OPGC's IT strategy and will in turn move its larger objectives of attaining higher efficiency and growth. OPGC, accordingly, intends to seek proposals from prospective bidders and shortlist the most eligible bidder to become the Implementation Partner OPGCs goal and objective for ERP implementation is to enhance performance through a) Improving Operational Efficiency b) Driving Revenue Growth c) Increasing Compliance
Confidential Page 9 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Section 2: Scope Of Work
Confidential Page 10 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
2. 1 Suppl y of Har dwar e and Non-SAP Sof t war e 2.1.1 Supply of Hardware Data Center Equipments 2.1.2 Supply of Hardware Servers, Storage, Backup Devices, Racks & Other Hardware (PCs/Printers) etc. 2.1.3 Supply of Hardware Networking Equipments 2.1.4 Supply of Hardware Video conferencing Equipments 2.1.5 Supply of Hardware IP Telephony Equipments 2.1.6 Supply of Non-SAP Software Messaging & Collaboration System. 2.1.7 Supply of Non-SAP Software Anti Virus / Anti Spam /Content Filtering 2.1.8 Supply of Non-SAP Software EMS/NMS and Service Desk tools. 2.1.9 Supply of Non-SAP Software Building Management System(BMS) 2.1.10 Supply of Non-SAP Software Video conferencing system 2.1.11 Supply of Non-SAP Software IP Telephony System 2.1.12 Supply of Non-SAP Software Other Software 2. 2 Desi gn, I nst al l at i on & commi ssi oni ng of I nf r as t r uct ur e 2.2.1 Design, installation & commissioning of Data Centre including civil constructions work (OPGC will provide bare floor space along with provision of power supply). 2.2.2 Installation & commissioning of Hardware. 2.2.3 Installation & commissioning of Networking Components. 2.2.4 Installation & commissioning of Video Conferencing System 2.2.5 Installation & commissioning of IP Telephony System 2. 3 I mpl ement at i on of t he SAP appl i cat i ons 2.3.1 Conducting Business Process Study. 2.3.2 Mapping of Business processes as per Business Blueprinting. 2.3.3 Conceptualizing, Developing, Configuring and Testing the Solution. 2.3.4 SAP Application installation on development, quality and production instances. 2.3.5 Data migration to SAP system. 2.3.6 Go-live and Stabilization Support. 2. 4 I mpl ement at i on of Non-SAP appl i cat i ons 2.4.1 Active Directory implementation with Single Sign On (SSO). 2.4.2 Messaging and Collaboration solution with Black Berry integration. 2.4.3 Anti-Virus, Anti-Spam solution & Content Filtering. 2.4.4 Enterprise Management System (EMS) / Network Management System (NMS) & Service Desk 2.4.5 Building Management System (BMS) for Data Center. 2.4.6 Video Conferencing Application 2.4.7 IP Telephony Application 2.4.8 Implementation Stabilization Support.
Confidential Page 11 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
2. 5 Pr oj ec t Management i n di f f er ent phases, Change Management and Tr ai ni ng. The work covering all the above elements put together will be completed by the Bidder on a Turnkey basis. 2. 6 Post I mpl ement at i on suppor t ser vi ces f or r unni ng t he SAP Appl i c at i on, Non- SAP appl i cat i ons and I nf r ast r uct ur e Faci l i t y Management ser vi ces. 2.6.1 SAP Application Support 2.6.2 Non-SAP Application Support 2.6.3 Infrastructure Facility Management Support 2.6.4 Hardware & Network Equipment maintenance
Confidential Page 12 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Section 3: Bidding Procedure
Confidential Page 13 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
3. 1 For mal I nvi t at i on t o Bi d
NOTICE INVITING TENDER
1. Bids in two Parts (Techno-Commercial & Price Bid) are invited from financially sound & authorised SAP Implementation Partners having PF Code, IT PAN & VAT/Sales Tax Registration Certificates, Service Tax Registration Certificate, Professional Tax Registration Certificate, on behalf of the OPGC Ltd. for the work of Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post- Implementation support with Facility Management at OPGC. 2. OPGC reserves the right to directly invite any organisation to bid for the project and evaluate them on a competitive basis along with other bidders. 3. The Bid & Rates shall be in the prescribed form provided in the Bid Document. 4. The Contract Period is for 12 (Twelve) Months for the Project Implementation from the date of Signing of Agreement and 48 (Forty Eight) Months for providing Post Implementation Support with Facility Management from the date of Final Acceptance of the Project. The Project shall be implemented within 6 (Six) Months form the date of sign of Agreement and subsequent 6 (Six) Months shall be for Post Go-live Stabilization Support. 5. The queries on the Bid Document if any shall only be received on 16 th & 17 Th of Sep 2008. The Bidders will be invited for a pre-bid meeting at OPGC Head Office Fortune Towers, Chandrashekarpur, Bhubaneswar on 22 nd & 23 rd of Sep 2008 in which all the clarifications of the received queries will be discussed and be confirmed. The queries should be addressed to contractcell@opgc.co.in. 6. Bidders should familiarise themselves with the site conditions before submitting the Bids. 7. Any Bidder for the works shall not be the witness in the Bid of any other Bidder, for the same works. Failure to observe this condition shall render the Bid of the Bidder tendering as well as of those witnessing the Bid, liable for rejection. 8. Bids will be received up to 10.00Hrs of 14 th of Oct 2008 and Techno-Commercial Bid shall be opened at 15.00 Hrs of 14 th of Oct 2008 in presence of the Bidders or their duly authorized representatives. 9. The Bid shall be accompanied by Earnest Money (EMD) of Rs. 6,00,000.00(Rupees Six Lacs only). The Earnest Money offered shall be in shape of Demand Draft drawn in favour of Orissa Power Generation Corporation Ltd. and payable at State Bank of India (Code-9510) / Andhra Bank (Code-0662) / Central Bank of India (Code-Belpah) or Bank Guarantee issued by a scheduled Bank( excluding Co-operative Banks) in the enclosed proforma (Appendix-B4) in the bid document. The EMD submitted in the form of BG should be valid for 6(Six) months from the date of opening of the Techno Commercial Bid. Any Bid not accompanied with Earnest Money in accordance with aforesaid provisions shall be rejected by the Owner as non-responsive Bid. No interest will be payable by the Owner on the said amount covered under Earnest Money / other security deposits. The Earnest Money of all unsuccessful Bidders will be returned within thirty (30) days after the award of the Agreement. 10. The Bid shall be accompanied with letter of undertaking on non- judicial stamp paper of appropriate value in the prescribed proforma (Appendix-B1) in the Bid document. 11. In consideration of the Owner opening and considering the Bid for purpose of award of Agreement, Bidder shall keep his Bid valid for a period of 180 days(One Hundred Eighty) from the last date for submission of Bids or any extension thereof. During this period the Bidder agrees not to vary, alter or revoke his offer either in whole or in part. If the Bidder however, fails to keep his offer valid for 180(One Hundred Eighty) days or varies its terms and conditions during the said period then the Owner shall be entitled to forfeit the Earnest Money amount without any notice or proof of damages etc.
Confidential Page 14 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
12. On finalization of Bid, the successful Bidder will submit a security deposit @10% of the Contract value towards the head of Project in the form of Performance Bank Guarantee (PBG) at Annexure-6 of Appendix-C: Contract Document, on signing of the Agreement. The EMD of all the Bidders shall be returned on award of the contract. 13. A Bidder shall submit the offer which satisfies each and every condition laid down in this notice and other Bid documents, failing which the Bid will be liable to be rejected. 14. The Orissa Power Generation Corporation Ltd. do not bind them to accept the lowest or any Bid or to give any reasons for their decision. The Orissa Power Generation Corporation Ltd. reserves the right of accepting the whole or any part of the Bid or split the total scope of work among eligible Bidders and Bidder (s) shall be bound to perform the same at his/their quoted rates.
For and on behalf of Orissa Power Generation Corporation Ltd.
SignatureSd/-
Senior Manager (PSM), Contract Cell, ITPS.
Confidential Page 15 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
3. 2 Bi ddi ng Pr ocedur e The Bidder shall bear all costs associated with understanding the scope of work, bid preparation and bid submission. OPGC will in no case be responsible or liable for these costs, regardless of the conduct or outcome of the bidding process. 3.2.1 Qualification to bid The bidding process will be open to any Authorised SAP Implementation Partner, who shall be able to supply, design, install and commission all of the components as described in the Broad Scope of work at Section- 2 and Detail Scope of Work at Annexure-1 of Appendix-C and be able to provide Post implementation support services with Facility management, either on their own or by forming a consortium
The only exclusion is SAP Product and related software licenses which will be procured from SAP directly.
The bidders must also meet the following mandatory qualification criteria with respect to the above.
Mandatory Qualification Criteria for Bidding
SN Parameter Description Supporting Documents Bidder Response Reference 1 Implementation capabilities in Power Generation The Bidder should have done end-to-end SAP implementation in at least 2 Power Generation Companies. Documentary evidence in form of Purchase Order or Completion Certificate or any other document from customer
2 Global SAP Implementation Experience
The Bidder should be Authorised SAP Implementation Partner and must have done 10 SAP Implementations as the Lead vendor.
Out of these 10 implementations, there has to be a minimum of 5 end-to-end implementations containing at least Five of the following modules and all the five implementation should have a user base of 500 or more.
1. Finance & Controlling / Costing 2. Material Management 3. Asset Management 4. Project systems 5. EH&S 6. HR and Payroll 7. Maintenance Management 8. Quality Management 9. Employee Self Service 10. Business Intelligence. Documentary evidence in form of Purchase Order or Completion Certificate or any other supporting document from customer
As per Appendix- B6: Profile of Implement ation Partner Number of customer acquisition
Stage of Implementation
Scope of Implementation
Testimonial
Confidential Page 16 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
SN Parameter Description Supporting Documents Bidder Response Reference 3 Indian SAP Implementation Experience
The Bidder should have done at least 3 successful end-to-end SAP implementations as a Lead Vendor of which at least one implementation in an Indian PSU. All the implementations should have been done for at least five of the following modules, with a user base of 500 or more.
1. Finance & Controlling / Costing 2. Material Management 3. Asset Management 4. Project systems 5. EH&S 6. HR and India Payroll 7. Maintenance Management 8. Quality Management 9. Employee Self Service 10. Business Intelligence Documentary evidence in form of Purchase Order or Completion Certificate or any other supporting document from customer
As per Appendix- B6: Profile of Implement ation Partner Number of customer acquisition
Stage of Implementation
Scope of Implementation
Testimonial Note: The Indian and global experiences are mutually exclusive and all the customers should have unique names. 3 SAP Experience in Power industries Experience in computerising all or most of associated business functions typical of a thermal power plant such as Plant Maintenance, Materials, Plant Performance, Efficiency measurements, Mining & Coal handling and Environment Health and Safety etc. Valid documentary evidence in form of Major processes covered. As per Appendix- B6: Profile of Implement ation Partner Scope of Implementation
Customer feedback
Presentation 4 Systems Integration Capability The Implementation Partner should have executed and completed at least One turnkey projects, in India, involving ERP implementation, Hardware & Networking installation and integration, Data Center set-up and / or facilities management. The turnkey project value in one or more projects should not be less than INR 10 crores in last three years. Documentary evidence in form of Purchase Order or Completion Certificate stating the value or any other Customer Testimonials As per Appendix- B6: Profile of Implement ation Partner Customer acquisition
Stage of implementation
6 Implementation Team The Implementation Partner has to provide the details of the Senior Project Team Members who must fulfil all the requirements of the Role mentioned in the RFP Brief Resume As per Appendix- B6: Profile of Implement ation Partner Qualitative 7 Financial Stability, Manpower & Quality a) The companys turnover from IT Application Implementation and Systems Integration services for the last three financial years (2005, 06 and 07) should be at least INR 500 crores for each of the three years and should have a positive net worth in each of the last three years.
b) The Implementation Partner should have its Delivery Centre / R& D / CoE in India with overall employee strength of not less than 5000 employees on its payroll as on 31 st
March 2008. The Implementation Audited Financial Statements for the each of three years.
Self certificate from companys authorised signatory
As per Appendix- B6: Profile of Implement ation Partner Financials
Manpower
SAP Focus
Accreditations
Confidential Page 17 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
SN Parameter Description Supporting Documents Bidder Response Reference Partner shall have a trained Delivery staff strength of at least 500 personnel on its payroll, of the offered SAP product, as on 31st March 2008.
c) The Implementation Partner should have a CMMI Level V Certification
Copy / details of certificate 8 Alliance with Vendors / Vendor Accreditation The Implementation Partner (IP) needs to be an authorized partner of SAP.
The Implementation Partner should have the Partner Certification from the offered SAP product and other Hardware & Software vendors respectively.
Valid documentary evidence.
Please provide the Vendor Accreditation Certificate As per Appendix- B6: Profile of Implement ation Partner Partnership certificate
Vendor accreditation certificate
Note: The Bidder has to provide responses to the above failing which it will not be considered for Technical Scoring. Please use additional sheets wherever required.
Hardware and Network Manufacturer Partner Capability SN Parameter Description Supporting Documents Bidder Response Reference 1 Implementation in large organisations
The Hardware platform suggested should have been successfully implemented in at least five organizations, in SAP environment with a user base of 500 or more Documentary evidence in form of Customer Testimonials As per Appendix- B7: Profile of Implement ation Partner Customer Testimonials 2 Hardware configuration The hardware platform configuration should be RISC / EPIC. Details of Hardware configuration. Scope of H/W installation 3 Guarantee Support Guarantee support for the provided hardware for minimum 5 years after completion of warranty with regard to service and spares and must be willing to undertake Annual Maintenance Contract (AMC) for all the supplied equipment in the Bid for minimum 5 years after completion of warranty with manpower stationed at OPGC. Submit self certificate to this effect from the companys authorized signatory. Self authenticated certificate 4 Authorized Partner Must be an OEM or authorized partner of the OEM for minimum 6 months. Please submit certificate from the OEM to this effect. Partnership certificate 5 Hardware Supply and installation Experience The Hardware partner should have executed a single order of minimum value of Rs. 5 crores for supply and installation of Hardware in India during the last 2 years. submit the order copy
Copy of order 6 Local presence
The Hardware manufacturer must have offices in India and the hardware manufacturer should have support centre for the quoted hardware in India. Details of offices and activities performed to be submitted Offices Manpower Brief Financials 7 Support services
The Hardware manufacturer must be capable of providing 24 X 7 support services on technical issues, upgrades, bug fixes etc related to hardware. Self certificate From companys Authorized Signatory Customer testimonials
Confidential Page 18 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Note: The Bidder has to provide responses to the above failing which it will not be considered for Technical Scoring. Please use additional sheets wherever required.
Note: The following are expressly barred from bidding for this project either individually or as a member of any consortium a) Any business unit of PricewaterhouseCoopers Private Limited (PwC) even if not involved in current engagement being executed. b) Any subsidiary or affiliate of PwC 3.2.2 Consortium Guidelines In case, the Bidder bids by forming consortium then the following guidelines shall be followed.
The consortium should consist of Authorised SAP Implementation Partner, Hardware manufacturer and Network component manufacturer, Non SAP Software license provider & Service providers. The Implementation Partner must be an Authorised SAP Implementation Partner and should be the leader of consortium, responsible for providing the total solution to OPGC. While this is acceptable to OPGC in principle, it expects certain requirements to be fulfilled by each of the consortium member. These include the following preconditions
Sl. no Preconditions 1 The Implementation Partner should be the Lead Partner of the consortium. 2 The response to the Bid has to be submitted only by the Implementation Partner & will be designated as the Bidder for the purpose of this Bid. 3 The response to the Bid must contain a written declaration by the competent authority of all the consortium members that : a) They have collectively agreed to respond to the Bid. b) They have nominated the named entity (name of Implementation Partner) as the leader of the consortium and his nomination shall be evidenced by submitting a letter of authorization signed by legally authorized signatories of all the members of the consortium. c) The consortium leader is authorized to receive instruction / communications from OPGC, authorized to incur liabilities and shall deliver all the provisions of the contract on behalf of consortium members. d) All members of the Consortium shall be responsible and liable jointly and severally for the execution of the Scope of Work under Agreement in accordance with the terms and conditions of the Agreement. However, the Leader of the Consortium shall be solely responsible for the integration, interface, coordination and completeness of the entire Scope of Work including establishment of Performance Guarantees under the Agreement. A format in which such a declaration may be submitted is given in Appendix-B5: Consortium MOU. 4 The Implementation Partner cannot submit different bids by forming consortium with different Hardware Manufacturer and Network Hardware & Network Service Provider. 5 It will be Implementation partners responsibility to certify the work completed by the other consortium members. 6 Payments shall only be released to the Implementation Partner against his Invoices as per the Price schedule. 7 The bidder should provide a declaration from all the consortium members that they have full property right or requisite right to use all intellectual property / tool they propose to supply or use in course of this project. 8 The Implementation Partner must provide in writing the mechanism for decision making and dispute resolution among the Consortium members. 9 The offer shall include all the information required for a Bid as described in Bid Document including the eligible criteria, for each Consortium member.
Confidential Page 19 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
10 The offer shall be signed only by the Implementation Partner. 12 The offer submitted by one bidder shall not be permitted to be transferred to another bidder. 3. 3 St r uct ur e of Bi d Document The Bid Document is structured into four Sections and three Appendices. Section-1 to Section-4 describes the Project Introduction, Broad Scope of Work, Bidding Procedure and Evaluation of bids. Appendix-A provides indicative details of the existing IT infrastructure & Facilities in OPGC, a brief overview of the business processes. Appendix-B outlines the supporting documents/inputs which are to be submitted as a part of the bid. Appendix-C outlines the Agreement along with supporting Annexures. 3. 4 Submi s si on Of Bi d 3.4.1 Complete Bid Both the Techno-commercial & Price Bid in shape of soft copy (PDF Format), in password protected / encrypted CDs or DVDs, shall be submitted in separate and sealed covers, super scribed as Techno-commercial and price Bid. The passwords / decryption key need to be typed and put into a separate envelope. All these envelopes shall be put in to a third envelope. All the envelopes must be sealed & superscripted with Name of the Work, NIT No., and due date of opening. The full name, postal address, telegraphic address and Telex / telephone / fax / E- Mail of the Bidder shall be written on the bottom left corner of the envelope. Completed Bid shall be submitted within due date and during office hours only. The bids can be sent by speed post /registered post or submitted in person so as to reach the accepting authority before the date & time fixed for submission of the bid. Bids sent by any other mode(s) will be rejected. The Bidder will be required to return the original Bid Document (in soft copy) as a part of the response to the Bid. It shall be expressly agreed therein by the Bidder that he has read and understood the complete Bid Document and shall comply with the same. All pages of the original Bid Document, Techno-Commercial Bid and Price Bid must be signed (scanned signature) by the person or persons of the Implementation Partner, duly authorized to sign such a Bid. Any changes, erasing, alterations, additions or overwriting made in the Bid will be valid only if the person or persons signing the bid have authenticated the same with their signature. Deviation, if any, from the Bid specifications and other parts of the Bid Document, shall be listed out separately and clearly by the Bidder as per the format of Exclusion /Deviation Statement attached as Appendix-B3. If deviations are not clearly listed as such, they will not be considered by OPGC later. 3.4.2 Bid Submission Format The Bidders are requested to submit the proposals written only in English language. Each proposal shall have three parts containing the following:
Part - A: Certificate of Acceptance of Important Conditions and EMD a) Covering letter. b) Crossed Demand Draft / BG for requisite amount drawn in favour of Orissa Power Generation Corporation Ltd. in the manner prescribed in NIT enclosed herewith towards the Earnest Money. c) Letter of undertaking in judicial stamp paper of worth Rs. 10.00 in the format enclosed at Appendix-B1. d) Consortium MOU, as per Appendix - B5 e) Documents in support of authentication of the person who signed the Bid. Only proprietor, partner, directors or permanent employee with due power of attorney is recognized for such signature.
Confidential Page 20 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Part - B: Techno-Commercial Proposal a) Statement of work. b) Project Charter. c) Details of work of similar nature and magnitude executed by the Bidder during last three years d) Details of present commitments of the Bidder. e) Scanned copy of valid VAT/Sales Tax Registration Certificate and IT PAN. f) Scanned copy of Provident Fund Registration No. and Service Tax Registration No. of appropriate category issued by competent authority. g) Scanned copy of the Registration of Firm / Company. h) Present & permanent Address for correspondence along with Telephone No./Fax No./E-mail address etc. i) Any other technical information, Bidder wishes to furnish. j) Resumes of personnel who will be working on the Project. k) Formal proposal and response to Functional and Technical requirements. l) The Bidder shall submit a detailed Service Level Agreement (SLA) covering severity levels, expected service windows, expected service levels, performance measurement matrix, escalation matrix etc. for the post implementation support along with the bid document. m) Exclusion /Deviation Statement in the proforma at Appendix-B3. n) Unpriced Schedule of BPS and Bill of Quantity, being proposed by Bidder. Techno-Commercial Proposal shall not contain any price. o) Scanned copy of supporting documents for Important Conditions as specified in clause 3.2.1: Qualification to bid p) Profile of Implementation Partner and Hardware Partner as per Appendix- B6 and B7. Part - C: Price Proposal Price bid shall include - 1. Original price bid / schedule of quantity duly filled in, signed & stamped on each page as token of unconditional acceptance. The Bidder shall take utmost care in filling the Bid documents corresponding to instruction to Bidder and relevant information elsewhere in Bid document. Price Bid shall be completed in all respects with all their attachments / enclosures, if any.
Confidential Page 21 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
The submission of various documents constituting the bid shall be submitted in the manner as detailed below. Part of Proposal Submission Type Part A Hard Copy ONLY. All documents need to be submitted in original. Part B & C Soft Copy in CD / DVD - For security purpose all CDs and DVDs will be password protected or encrypted. - All passwords or decryption information must be provided in a sealed envelop and shall be opened in front of the bidders as per the bid sheet schedule. - All signatures needed for this part can be digital or scanned in nature. - This authorization in favour of person/persons signing the bid must be duly supported by a stamped Power-of-Attorney from the Implementation Partner (backed up by board of directors resolution) which must be submitted in HARD COPY along with the Bid. In addition, the authorization letter of all the members of the Consortium indicating their mandate to the leader of the Consortium for submitting the Bid must also be submitted along with the bid. 3.4.3 Sealing the Bid All the envelopes containing the Bid documents must be put in a tamper proof packet and sealed preferably with lacquer. Appropriate care should be taken to protect the DVDs from damage. 3.4.4 Rejection of Bid The Bid Document must be submitted in the form of printed document or soft copy as specifically mentioned in 3.4.2 above. Bids submitted by fax or email will not be treated as valid and rejected outright.
Once the deviations as submitted along with the original Bid documents are sorted out at mutually agreed terms and conditions with all the participating Bidders, no further deviations are acceptable and any bids submitted with any deviations shall be liable for rejection. Bids not containing all the parts will be rejected. 3. 5 I nst r uct i on t o Bi dder 3.5.1 Bidder to obtain their own Information a) Bidder shall for all purposes and whatsoever reason may be, deemed to have independently obtained all necessary information for the purpose of preparing his Bid. The correctness of the details given in the Bid Document is for guideline/ information only, to help the Bidder to prepare his Bid. b) Bidder shall be deemed to have examined the Bid documents and to have obtained his own information in all matters whatsoever that might influence carrying out the implementation of the Project at the scheduled rates and satisfied himself to the sufficiency of his Bid. Any error in description or quantity or omission there from shall not vitiate the Agreement or release the Implementation Partner from executing the work comprised in the Agreement according to the scope of work and specifications at scheduled rates. He is deemed to know the scope, nature and magnitude of implementing the Project.
Confidential Page 22 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
c) Bidder shall be deemed to have visited the sites, offices and surrounding areas, to have satisfied itself to the nature of all existing Business processes and also as to the nature and the conditions of available facilities and communications and possible interruptions there to the access and egress from site and to have made enquiries, examined satisfied himself of the sites in respect to requirements for implementing Project and to have made local independent enquiries on all matters affecting the Agreement. He is deemed to have acquainted himself his liability for payment of Government Taxes, Customs and Duties and other charges. d) Any neglect or failure on part of the Bidder in obtaining necessary and reliable information on issues stated in the above clause or any other matters affecting the Agreement shall not relieve him from any risks or liabilities or the entire responsibility for implementing the SAP Solution at the scheduled rates and time in strict accordance with the contract documents. e) Any change in site conditions or technological requirement shall be binding on the Implementation Partner and no extra claim on this account shall be entertained. f) The oral agreement or inference from conversation with any officer or employee of the Owner either before, during or after the execution of the Agreement shall not in any way affect or modify the terms and obligations herein contained. 3.5.2 Addenda / Corrigenda / Amendments issued to this Tender a) OPGC reserves the right to issue any addenda or corrigenda to the Bid document without assigning any reason thereto. In response to such addenda / corrigenda, the Bidders shall submit their Bid in a fresh schedule. However, if the Bidder has already submitted his Bid prior to issue of such addenda / corrigenda, they shall resubmit a fresh offer marked on the envelope as Amended Offer. The original offer submitted by such party shall be destroyed in presence of the Bidder on the date of opening. b) At any time prior to the deadline of submission of Bids, OPGC may, for any reason, whether at its own initiatives or in response to a clarification by a prospective bidder, modify the bid document through Amendment(s) c) The Amendment(s) will be notified to all prospective bidders through the website and such Amendment(s) will be binding on them. d) OPGC may extend the deadline for the submission of bids, in order to allow the prospective bidders a reasonable time in which to take the amendment(s) into account in preparing their Bids.
3.5.3 Extension of Bid Opening Date OPGC may, at its sole discretion, decide to extend this Bid Opening Date and / or date for submission of Bids. In such a case, all rights and obligations of OPGC and that of Bidders previously subject to the Bid Opening Date will thereafter be subject to the new Bid Opening Date. 3.5.4 Bids Received Late Any bid received by OPGC after the expiry of the specified date and time for submission of bids will be rejected outright and returned to the Bidder. The Bidders must take all responsibility of submitting the Bids within the prescribed date of submission of Bids. OPGC will not accept as valid reason or be responsible for any postal delay or non-receipt / non-delivery of the Bids. 3.5.5 Modification and Withdrawal of Bids 3.5.5.1 Modification Request by Bidder The Bidder will not be allowed to modify its Bid after its submission, 3.5.5.2 Withdrawal of Bid by Bidder No bid shall be withdrawn during the period between the Bid Opening Date and the expiration of the bid validity
Confidential Page 23 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
period as specified in Notice Inviting Tender. Withdrawal of a bid during this interval period may result in the forfeiture of the Bidders Bid Security (EMD). 3.5.6 Acceptance of Important Conditions Bidders may note that no deviations whatsoever to certain important conditions as per the RFP is permitted by the Owner and therefore, the Bidders are advised that while developing their proposals and prices, these conditions may appropriately be taken into consideration especially with respect to their effect, wherever applicable, on the cash flow projections during the execution of the Agreement. Bidders are required to furnish certificates to support the requirements furnished under clause 3.2.1 and Appendix- B6 and B7. Any Bid not accompanied by such certificate shall be rejected by the Owner and shall not be opened. 3.5.7 Bid Validity Period All bids, not rejected for any other reason, will remain valid for a period of 180 (One Hundred Eighty) days from the last date for submission of Bids or any extension thereof. Each Proposal shall indicate that it is a firm and irrevocable offer. Non-adherence to this requirement may form ground for declaring the proposal as non- responsive. In case of the bidder revoking or withdrawing / cancelling his Bid, varying any term in regard thereof during the validity period of the Tender without the written consent of OPGC, the Bid submitted shall be liable for rejection and will entail forfeiture of the Earnest Money paid along with the Bid. On completion of the validity period 180 (One Hundred Eight) days, unless the bidder withdraws its bid in writing, it will be deemed to be valid until such time that the bidder formally (in writing) withdraws its bid. 3.5.7.1 Extension of Period of Bid Validity In exceptional circumstances, OPGC may request all the Bidders consent to an extension of the period of validity of their respective bid. The request and the response thereto will be made in writing. Extension of validity period by the Bidder must be unconditional. The bid EMD provided in the form of BG will also have to be accordingly extended. A Bidder will not be permitted to modify his bid. 3.5.8 EMD Bids not accompanied by the requisite EMD, or bids accompanied by EMD of inadequate value shall not be entertained and in such a case bids shall be returned to the Bidders without being opened. The EMD may be forfeited, a) If the Bidder withdraws its bid during the period of bid validity. b) In the case of a successful Bidder, if the Bidder fails within the specified time limit to furnish the acceptance of Letter of Award and / or fails to submit Performance Guarantee of requisite amount. c) If, during evaluation of bids, OPGC ascertains that there is discrepancy in the bid price due to arithmetical error, and on communicating such error to the Bidder, the Bidder does not accept the proposed correction of errors. 3.5.9 Price Basis, Taxes and Duties Complete details of Commercial Bid are to be provided in specified schedules in Bid Proposal Sheets (BPS). All prices are to exclude central and local taxes and duties which shall be indicated separately. All items and services are to be quoted in Indian Rupees. No adjustment of the contract price shall be made on account of variation of costs of labour and materials or any other cost component affecting the total cost in fulfilling the obligations under the Agreement. The prices once offered must remain firm and shall not be subject to escalation due to fluctuation in foreign currency or for any reason; however Taxes, Duties, Levies etc prevailing during the contract period as per payment milestones shall be paid. All the Bidders are requested to familiarise themselves with the laws, rules and regulations prevailing in India and consider the same while developing and submitting their Proposal.
The Bidder has to consider all taxes, duties, levies, cess etc., applicable for executing this Contract and accordingly, shall indicate the excise duties, customs duties and all other taxes, levies, cess etc. considered on
Confidential Page 24 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
supplies and services either imported or locally sourced included in his offer. Non inclusion or omission either declared or not declared on the part of the Bidder shall be construed as inclusive of such duties or taxes in his quoted price as may be applicable as of 7 (seven) days prior to the Date of opening of Techno-Commercial bids. 3.5.10 Rates To Be In Figures & Words The Bidder shall quote both in figures and in words for the rates and amount Bided by him in the Schedule of quantities / Price schedule forming part of the Bid document, in such a way that interpolation is not possible. The amount of each item shall be worked out and entered and requisite total given for all items. The Bided amount for the work shall be entered in the Bid and duly signed by the Bidder. If any ambiguities are observed in the rates & amount given in words & figures the following procedure shall be followed: When there is difference between the rates in figures and words, rate which corresponds to the amount worked out by the Bidder, shall be taken as correct. When the rate quoted by the Bidder in figures and words tally but the amount is incorrect, the rate quoted by the Bidder shall be taken as correct but not the amount. When it is not possible to ascertain the correct rate by either of above methods, the rate quoted in words shall be taken as correct. 3.5.11 Abnormal Rates The Bidder is expected to quote the rate for each item after careful analysis of cost involved for the satisfactory performance and completion of item work considering all specifications and conditions of Agreement. This will avoid loss of profit or gain in case of curtailment or change in specification for any other item. In case the rates quoted by the Bidder for any item are unusually high or unusually low it will be sufficient cause for the rejection of the Bid unless the Owner is convinced about the reasonableness of the analysis for rate furnished by the Bidder (on demand) after scrutiny. 3.5.12 Corrections & Erases No erases or over writings are permissible. All corrections and alterations in the entries of Bid papers shall be signed by the Bidder with date. 3.5.13 Details & Signature Of Bidder The Bid shall contain the name, residence and place of business of person or persons making the Bid and shall be signed by the Bidder with his usual signature. Partnership firms shall furnish the full names of the partners in the Bid. It should be signed in the partnerships name by all the partners or by duly authorized representative followed by the name and designation of the person signing. Bid by a Corporation shall be signed by an authorized representative and a power of attorney / authorization on its behalf shall accompany the Bid. A copy of constitution of the firm with names of all partners shall be furnished. In case of cooperative society, the authorized representative of the society will sign the Bid. Similar principle shall be followed in case of any Trust and Hindu Undivided Family business. The signature should be attested, at least by one witness. 3.5.14 False or Misleading Claims OPGC may in its absolute discretion exclude or reject any proposal that in the reasonable opinion only of OPGC contains any false or misleading claims or statements. OPGC has no liability to any person for excluding or rejecting any such proposal. 3.5.15 Fraud and Corruption Bidders are expected to observe the highest standard of ethics during the procurement stage and execution of this Agreement. In pursuit of this policy, OPGC defines, for the purposes of this provision, the terms set forth below as follows: corrupt practice means the offering, giving, receiving, or soliciting of anything of value to influence the action in the procurement process or in Contract execution; and
Confidential Page 25 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
"fraudulent practice means a misrepresentation of facts in order to influence a procurement process or the execution of a Contract to the detriment of OPGC and includes collusive practices among Bidders (prior to or after bid submission) designed to establish bid prices at artificial, non-competitive levels and to deprive OPGC of the benefits of competition; 3.5.16 Contacting The Owner From the time of bid opening to the time of Contract award, if any Bidder wishes to contact the Owner on any matter related to the bid, he shall do so in e-mail.
All Technical queries, if any, shall be referred to the Head of IT, OPGC by the Bidder. All Commercial queries, if any, shall be referred to Contract Cell, OPGC by the Bidder. 3.5.17 Conflict of Interest Bidders must state in their submission any circumstances, arrangements, understandings or relationships that constitute, or may reasonably be considered to constitute, an actual or potential conflict of interest with the Bidders (or their consortium partners) obligations under this RFP (including but not limited to these conditions of proposal) or under any contract which may be negotiated or executed between the Bidder and OPGC. Bidders and their employees, agents, advisers and any other person associated with the Bidder must not place themselves in a position which may, or does, give rise to a conflict of interest (or a potential conflict of interest) between the interests of OPGC or any other interests during the bidding process. 3.5.18 Ownership of Responses Without affecting any intellectual property rights, which may exist in a response to this RFP document, all responses submitted will become the property of OPGC. Without limiting this section, OPGC reserves the right to copy and reproduce responses for the purposes of evaluation, clarification, negotiation and/or contract execution and anything else related to these purposes. In addition, OPGC will retain (soft and hard) copies of all responses, evaluation, negotiation or such other materials as are required for the discharge of its legal obligations and in order to efficiently and effectively manage any contract entered into with a Bidder. 3.5.19 Owners Right to Accept Any Bid and to Reject any or all Bids OPGC reserves the right to accept or reject any bid or to annul the bidding process and reject all bids at any time prior to Contract award, without assigning any reasons thereof and OPGC shall not entertain any claim whatsoever on this account. 3.5.20 Clarification on Bids During the bid evaluation, OPGC may, at its discretion, ask the Bidder for clarifications on its Proposal. 3.5.21 Language English shall be the binding and controlling language for all matters relating to the meaning or interpretation of this Contract. 3.5.22 Caution to Bidder The person who submit the Bid or participate in the opening of the Bid must abide by the safety rule of OPGC right from the plant gate. Some of the checkpoints are, the vehicle must have valid insurance & tax paid road permit, valid driving license of the driver / Owner as the case may be. Persons with full shoes shall be allowed to enter the plant & our plant gate shall provide other items such as hardhat, safety glass & visitor pass. Not more than 2(two) persons for one Bid shall be allowed to participate in Bid opening.
Confidential Page 26 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Section 4: Evaluation of Bids
Confidential Page 27 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
4. 1 Openi ng Of Bi ds The Techno-Commercial bid shall be opened at a predetermined time, venue & date in presence of the Bidder(s) or their authorized representative(s) who may like to be present. Partner, Director or permanent employee of the firm duly authorized only can be the authorized representative. Price bid shall be opened at a future date under intimation to all technically qualified Bidders and in presence of them or their authorized representatives who shall participate. 4.1.1 Preliminary Examination of Proposals OPGC will examine the Proposals to determine whether they are complete, whether required EMD have been furnished, whether the documents have been properly signed, and whether the Proposals are generally in order. If a Proposal is not substantially responsive, it shall be liable for rejection by OPGC. OPGCs determination of Proposals responsiveness will be based on the contents of the Proposal itself and any written clarifications, if sought for by OPGC and submitted by the Bidder. 4. 2 Eval uat i on & Compar i son of Bi ds 4.2.1 Basis for Technical Evaluation OPGC will carry out a detailed evaluation of the bids previously determined to be substantially responsive, in order to ascertain whether the technical aspects are in accordance with the requirements set forth in the Bid Document. OPGC will examine and compare the technical aspects of the bids on the basis of the information supplied by the bidders, taking into account the following factors: a) Technical and Functional requirements b) Bidders project approach c) Capability of the Implementation Partner i. Organization Strength and Business Focus ii. Experience as a System Integrator iii. Experience in providing IT support & Facility Management Services. 4.2.2 Basis for Price Evaluation: 4.2.2.1 OPGC will examine the Price Proposals to determine whether any arithmetical errors have been made, whether the documents have been signed, and whether the Proposals are generally in order. Arithmetical errors will be rectified on the following basis. a) If there is a discrepancy between the unit price and the total price, which is obtained by multiplying the unit price and quantity, or between subtotals and the total price, the unit or subtotal price shall prevail, and the total price shall be corrected. b) If there is a discrepancy between words and figures, the amount in words will prevail. If a Bidder does not accept the correction of errors, its Proposal will be rejected and its bid security may be forfeited. 4.2.2.2 The evaluation shall be based on the evaluated cost of completing the contract in compliance with all commercial, contractual and technical obligations under this Bid including taxes, duties & levies etc. The rates of taxes, duties and levies as applicable on seven (7) days prior to the date of Techno-commercial bid opening shall be considered for the purpose of evaluation. 4.2.3 Techno Commercial evaluation: The Techno Commercial Evaluation of bids shall be done in two stages as detailed below.
Confidential Page 28 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
4.2.3.1 Stage I: Response to Mandatory Requirements The evaluation committee, appointed by OPGC as a whole, evaluates the proposals on the basis of their responsiveness to the Mandatory Requirement criteria (3.2.1 Qualification to bid). Proposal shall be rejected at this stage if it does not respond to mandatory requirements criteria. Only those bidders, who meet all the mandatory requirements, shall be considered for stage II evaluation. 4.2.3.2 Stage II: Response to Techno-Functional Qualification Criteria The Techno-functional requirements are broadly categorized in two sections (A) Capability of Implementation Partner (as in Appendix-B6 & B7) (B) Technical-functional requirement specifications (as in Table-01 of Annexure-1 in Appendix-C, Techno-functional Requirement Specifications). There would be certain cut-off marks or criteria for each of the above sections. A proposal shall be rejected at this stage if it fails to meet the minimum qualifying marks or cut-off points. The evaluation committee, appointed by the OPGC as a whole, evaluates the proposals on the basis of the response of the bidder to criterion set forth by OPGC.
OPGC shall notify the bidders that have secured the minimum qualifying mark, indicating the date and time set for opening the Financial Proposals. 4.2.4 Award Criteria OPGC will award the contract to the successful bidder whose bid has been determined to be substantially responsive and to be economically advantageous, which will be established by weighing Tehno-Commercial quality against price on a 70:30 basis. The selected Bidder for OPGC shall be the bidder with the highest cumulative points. 4.2.5 Negotiation The selected bidder will be notified in writing by OPGC inviting him for further Negotiations. Negotiations will be held only at OPGCs corporate office. 4. 3 Si gni ng Of Agr eement On finalization of negotiation, to the mutual satisfaction of both the parties, OPGC shall invite the selected bidder through Letter of Acceptance (LOA) for the signing of the Agreement. The selected bidder shall execute the Agreement within a period of Fourteen (14) days of receiving LOA from OPGC. The Agreement is to be signed in English language in two originals, one each for OPGC and the Bidder Within 14 days of signing of the Agreement, the Bidder shall submit 6 photocopies of the entire contract document duly bound to OPGC. The Bidder shall submit the following documents for signing of the formal Agreement: a) Copy of detailed LOA duly signed on all pages as a token of acknowledgement of receipt. b) Security Deposit as in the form of Bank Guarantee as per proforma Bank Guarantee for security deposit in the contract document. c) Non-J udicial Stamp Paper of value Rs.100/- purchased in Orissa, India for the signing of Agreement. d) Permanent Account Number of all consortium partners allotted by Income Tax Department. e) Self-attested Photostat copy of Notarized Power of Attorney by the Competent Authority or Board of Directors resolution authorizing the individual(s), to sign the Agreement.
Confidential Page 29 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
f) Self-attested Photostat copy of the Registration under Orissa State VAT, Service Tax, as applicable. 4.3.1 Failure to Sign Agreement / Commence The Work Failure to sign the agreement and / or commence the Work within the date to be agreed upon after issue of LOA, the LOA will be terminated and the Bidder will be liable to be debarred from participation in the Owners Tenders for a period of two (2) years, besides forfeiture of EMD.
Confidential Page 30 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-A: Bidding Reference
Confidential Page 31 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-A1: Current IT Infrastructure details A. Current IT Organization set-up In line with OPGCs IT strategy, the efforts are to ensure that the IT imperatives of the organization are in line with the business objectives. The IT department is headed by the Director (Operations). A steering committee under chairmanship of Managing Director has already been constituted to monitor and ensure successful implementation of SAP in the organization. This committee comprises of Director Finance, Director Operations, Senior GM Head Finance/ P&A, DGM Projects and Support Services. Manager(El)-Head IT, who will be responsible for all IT related technical support for SAP implementation, is also a member of this Steering Committee. B. Brief Description of existing Applications 1. Ramco e-Application 3.1 Enterprise Asset Management Systems. The modules are Maintenance, Inventory, Purchase and HRIS. Operating System - WIN NT 4.0 & Database - MS SQL 7.0. 2. Locally developed Finance & Payroll package. Operating System - Win-2000 & Database - Oracle 8.0. 3. Locally developed Automatic Attendance Recording Software. Operating System WIN 2000 & Database - Oracle 8.0. 4. Locally developed Generation MIS software. Operating System Win2000 & Database MS SQL 2000. 5. Knowledge Sharing A Document Server is deployed to share common documents for knowledge sharing. Operating System Win2003 6. The Intranet Mailing Facility is extended to the users through the use of Microsoft Exchange Server 5.5 for 30 users & Red Hat Linux Send Mail for rest of the users at ITPS. 7. Client Operating System Windows Vista, Windows XP, Windows 98 8. Other client software MS Office 2000/2003/2007, MS Project 2000/2003/2007 C. Existing IT Infrastructure at OPGC Plant (Ib Thermal Power Station) The bidder shall indicate in their proposal if the hardware, devices out of the following list can be used with adequate details. 1. Hardware & Network a) No of PCs - For details of No PC & Laptops please refer Appendix-A2: Business Processes Requirement-Overview- Expected Number of Users b) Local Area Network Layer-3 Fiber Optic Backbone Fast Ethernet Networking. c) No of Backbone Switch -1, No of Workgroup Switches 6, No of Ethernet Switches 8 (All the switches are D-Link/ Cabletron make) d) Total No of Servers 6 (Intel Xeon, PIV & PIII Compaq, IBM & HCL make) e) Backup Solution. Daily Backups are taken in Tape & stored in a Data Safe. No standard Backup solution. f) Remote connectivity to LAN Broad Band DIAS system. Please refer the Network Diagram in figure-5
Confidential Page 32 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
g) Existing Fiber Optic cable length 2.8 Km shall be used in the proposed solution. h) Existing internal network (access layer) within Service Building, Control room shall be used in the proposed solution. i) Attendance Punching System 8 No of Keltron make Integrated Data Capture Units.
Figure 05: Network layout across plant (existing)
Confidential Page 33 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
MS Exchange Mail Server Ramco e-Application server Attendance &MIS Server Document Server Internet &Mail Gateway Proxy Server &Mail (Sendmail) Server Broad Band Direct Internet Access System Internet Router(CISCO 2600) VSAT Terminal Controll Room Time Office for Central Store 3rd Floor 2 nd Floor 4 th Floor Switch To Remote Locations Ramco Backup Server VSAT Antenna at Roof Top Testing Terminal UTP Link Fiber Link Telephone Line Fiber Converter Fiber Converter Coaxial Cable (A) (B) (C) (D) (E) (F) Reliance Antena &ODU Reliance IDU Reliance Router Reliance Connectivity(1 MBPS Internet &512Kbps MPLS VPN connectivity to HO ) under implementation
Figure 06: Network layout within Server Room (existing)
2. Internet Connecti vity a) Through 64 Kbps VSAT Connectivity. Recently installed 1Mbps Direct Internet Access from Reliance. b) Connectivity to Corporate Office. Recently installed 512Kbps MPLS VPN connectivity to connect ITPS with Corporate Office.
Confidential Page 34 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
D. Existing IT Infrastructure at Head Office (HO) 1. Hardware a) For details of No PC & Laptops please refer Appendix A2: Business Processes Requirement- Overview- Expected Number of Users b) Local Area Network Cat-5 Ethernet Networking. c) No of Ethernet Switches 2. (D-Link) d) Total No of Servers 1 (Intel PIII Compaq make used as Internet Proxy Server) e) Fortuna make employee ID proximity reader for attendance recording. 2. Software a) Client Operating System Windows Vista, Windows XP, Windows 98 b) Other client software MS Office 2000, MS Project 2003 3. Internet Connecti vity a) 1 Mbps BSNL Broadband Connectivity. E. OPGC Web Site Official website www.opgc.co.in was hosted by M/S Alloy Soft Solutions, Bhubaneswar. It has all information regarding the location, Monthly/Yearly performance, achievements, Tender notices, financial information etc. The Website is actively used for Tender (Work/Purchase) publication.
Confidential Page 35 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-A2: Business Processes Requirement-Overview A. Business process overview OPGC is engaged in the business of generating power from coal. It was incorporated as a fully owned subsidiary of Govt. of Orissa in 1984, registered under the Companies Act 1956 and went into commercial operation with 2x210 MW generation units (Units 1&2) in 1996. 49% of OPGC was divested in 1999 in favour AES Corporation, USA, with a mandated to take over the day-to-day management of the company. OPGC has been in operation since commissioning and has been improving on its performance consistently. OPGC has been a profit making company and has been consistently paying dividends to its share holders. 1. Business locations OPGC has two primary business locations. The head office is at Bhubaneshwar, the capital city of the State of Orissa. Bhubaneshwar is connected to most of the major cities in India through roads, railway and air. The plant is located at Ib Valley, in J harsuguda District, which is over 400 kms from Bhubaneshwar. J harsuguda is well connected to Bhubaneshwar through roads and railways. As part of the expansion plans of OPGC, it has acquired captive coal mines located at a distance of @ 55 kms from the plant site. In the process of developing and operating the mines, OPGC shall also be creating office and other infrastructure set up close to the mine location, which is expected in a span of next two to three years. OPGC also has seven mini-micro hydel projects spread out at various locations, with a total generation capacity of 5.4 MW. In the instant case, OPGC is not considering extending the IT solutions to these areas. 2. Functional areas of the company Head office The head office has @ 150 employees. The primary functions managed at the head office comprise of HR, Finance, projects and corporate affairs. HR at head office mostly looks at managing the payroll of the employees at head office and other employee related information. At organization level, it maintains the employee data base, looks at transfers, issues policy guidelines and manages new initiatives for employee development. FINANCE function deals with cash bank, investment of surplus funds, insurance, accounts receivable, managing head office expenses, audits, taxation, treasury and preparation of financial statements and budgets. PROJ ECTS looks after business development initiatives and co-ordinates all aspects of the expansion projects, mostly looking at permits and clearances and appointment and management of consultants. CORPORATE AFFAIRS looks after the corporate communication, managing media and brand imaging of OPGC through advertisements, sponsorships and events. This functionality is also responsible for handling reporting to various Govt. departments and responding to the queries of State and Central Govt. bodies. Ib Thermal Power Station (ITPS), Banharpalli, Jharsuguda The plant site has @ 400 employees. The functional departments operational within ITPS comprise of, Coal transportation: OPGC has a coal requirement of slightly over eight (8) tons per day. It gets coal from Lakhanpur mines of Mahanadi Coal Fields Ltd.(MCL), a subsidiary of Coal India Ltd. (CIL). The coal supply is effected through a long term coal linkage agreement. The coal mine is 11 km from the plant and is connected
Confidential Page 36 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
through railway Merry-go-Round system (MGR) from a railway siding at Ubuda. Both the Railway siding and the rail network, along with the diesel engines and wagons are owned, operated and maintained by OPGC. Coal from the mines is transported upto railway siding by MCL tippers, from where they are transported through OPGC MGR. Coal Handling Plant (CHP): Coal transported through the MGR are unloaded on to a track hopper from where they are transferred through belt conveyors to the Transfer House. From the transfer house the coal is either transferred to the crusher house or stacking yard based on whether coal needs to be fed directly to the plant or stored. Water Treatment Plant (WTP): Water for the plant is drawn from the Hirakud Reservoir, through an intake channel. Water is then processed in the WTP to make it usable in the boiler and other areas within the plant. Operations and Efficiency: The plant operations looks after control and monitoring of the power block through the Control Room which is situated in the generator building. Their primary function is to monitor key operating parameters through a Distributed Control System. Efficiency department assists Operations in collating key operational parameters, analyzing, providing corrective inputs, monitoring equipment performance to optimize overall plant performance and generating MIS. Maintenance & Maintenance Planning: The maintenance function is segregated into different departments based on core area of work. These departments are Mechanical, Electrical, Control & Instrumentation and Civil. These departments handle preventive, predictive and break down maintenance of various plant and equipment falling within their purview. Maintenance planning department plans and schedules all maintenance activities within the plant which are inclusive of preventive, predictive and break down maintenance. This is done through a process of receiving work requests and issue of work orders to respective maintenance functions. Apart from the above all annual shut down or major overhauling schedules are planned by this department. Ash Management: On an average around 3200 tons of ash is generated and handled every day. The bottom ash is transferred to the ash dykes. 20% of the fly ash generated is collected through a silo and supplied to cement manufacturing plant. Balance fly ash is transferred to the ash dyke. Finance and accounting: This function looks after all the raising invoice for energy supplied, accounts payable, bank and cash, payroll of employees, capital expenditure and budgeting. Purchase and warehouse: This department caters to the requirements of the maintenance departments and are responsible for purchase of spares, consumables, bulk non-stock items, office stationary, capital assets, storage and inventory management. HR and administration: This function manages the employee administration, maintenance of land records, Rehabilitation and Relocation of land oustees, CSR, training and employee development. Contracts: This department sources and finalises outsourced jobs like job contracts, maintenance contracts, major civil works, consultancy etc. Environment Health and Safety: This function prepares the EHS policies and procedures, maintains and monitors the integrated E,H & S management system consisting of the following standards ISO 14001, OHSAS 18001 and other statutory requirements.
Confidential Page 37 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
B. Indicative List of Non SAP Interface Requirements Sr. Legacy System Name Purpose and High Level Data Description Legacy System Information Direction Frequency of Data Transfer 1 Attendance System at IBTPS Attendance Punching data(In / Out timing) Keltron make WINCDCU software with Access database From IDCU(Integrated Data Capture Units) Every 5 minutes 2 Attendance System at HO Attendance Punching data(In / Out timing) Fortuna make ID Proximity System From Proximity Device Every 5 minutes 3 CHP Gross wt & Tare wt of wagon In excel From Weigh Bridge As and when rake comes 4 Energy Management System Energy Consumption by Equipments Conzerv e-LAN EMS system From electrical equipments Continuous 5 ABB Advant System Displaying Field process parameters (generation, Frequency etc.) ABB Advant System From Field Equipments Continuous 6 RCM Software Operationl RiAssessment through Reliability Centered Maintenance Reliability Centered Maintenance Business Stream Optimization Tool from RCM Business Stream, USA User Data input As & when required 7 ABT System Will be implemented soon and require interface to SAP later on
C. List of Indicative Reports 1. Operation Sr No Report Name Frequency Recipient Purpose of Report 1 Daily Morning Report Daily All TLs, Advisors and DO Plant status 2 Parameter Excursion Daily All TLs ,Advisors & DO Equipment Status.
2. Efficiency Sr No Report Name Frequency Recipient Purpose of Report 1 Daily Generation report Daily MD,D(O),D(F),AES Advisor, F.M., Head (E&E), Head(Opr) Daily Generation, PLF, Loss of Generation, Fuel oil status & consumption 2 Ash utilization report Daily MD,D(O),D(F),AES Advisor, F.M., Head (E&E),Head(Opr) Quantity of Fly ash & bottom ash used for manufacturing ash brick, filling in low lying area & taken by M/s Ultra tech 3 Day ahead availability schedule Daily SLDC Prediction of day ahead generation schedule 4 Coal report Daily CEA Coal consumption, received & stock
Confidential Page 38 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Report Name Frequency Recipient Purpose of Report 5 Coal report Daily MCL PLF, Sp. Coal cons., No. of rake received, % of direct feeding & reclaiming 6 EMS report Daily Internal Daily monitoring of equipment wise aux consumption 7 Monthly Generation report Monthly Grid Co. Monthly gen, PLF, Peak load, Deemed PLF 8 Performance report Monthly M.D.,D(O),D(F),Sr. Manager (F) Month wise gen, PLF, availability, Deemed PLF, sp coal & oil cons., loss of generation, tripping no. & hrs, running hrs 9 Monthly Operating report Monthly CEA Monthly generation, export, peak load, gen loss details & tripping details 10 Data for incentive awards for economic & efficient Operation of Thermal Power stations for the year 2008 Monthly CEA Month wise generation, PLF, % aux consumption (Calendar year) 11 Monthly operational data of Thermal power stations for Evaluating performance, Efficiency & HR Monthly CEA Month wise generation, PLF, Aux cons. Sp coal cons., GCV & heat rate (fin year) 12 Half hourly peak generation report Monthly CEA,ERPC Daily peak load (MW) & energy meter reading (MWH) 13 Monthly operation data of TPS for Performance award Scheme Monthly CEA Month wise generation, PLF, Aux cons. Sp coal cons., sp. Oil cons., coal & oil stock GCV & heat rate (fin year) 14 Monthly secondary Fuel oil Consumption Monthly CEA Monthly coal & oil consumption, received, stock & cost of fuel 15 Efficiency report Monthly Internal Coal pipe velocity test, fineness test, loss on ignition test, condenser & cooling tower, HP Heater, BFP performance test, APH duct in- leakage test 16 Coal analysis report Monthly Internal Proximate analysis of coal with station HR 17 Ash Generation data Monthly Internal Monthly ash generation, avg ash content & GCV 18 KPI report Monthly AES Equivalent forced outage rate, Equivalent availability factor, Net plant Heat rate, Safety information, Manpower, SPM, Sox, NOx 19 Micro GADS reporting Monthly AES Derating & outage detail, gross generation, net generation, GCV & heat rate 20 Running hour report Monthly Internal Equipment wise running hour 21 Coal linkage report Quarterly CEA Generation, Sp coal consumption, stock building per month & requirement 22 Trip analysis report As & when trip occurs Internal Down time, generation loss & oil consumption per tripping & detail analysis (dept. wise)
3. HR - Training & Development
Confidential Page 39 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Report Name Frequency Recipient Purpose of Report 1 Employee wise qualification report As and when required D (O), Head (P&A), Sr. GM (P&A), MD, All TLs Manpower planning, record of qualifications of human inventory 2 Employee wise skill / competency/ potential report
Once a year D (O), Head (P&A), Sr. GM (P&A), MD, All TLs Manpower planning 3 Employee wise training report e.g. in-house trg. programmes attended, institutional training attended, seminar/ conf. Attended, no. of mandays training attended ( current year, previous years) Any time as & when required All employees, top management Preparation of training calendar, planning for imparting training to the employees, record purpose 4 Area wise training programmes attended by the employees e.g. no. of persons who have attended trg. On leadership, positive attitude, communication skill etc. Any time as & when required All employees, top management do 5 Level or grade wise (team leaders, managers, Dy. Managers, executives, Supervisors, W1, W2, W3, W4, S2, S1, SG) training programmes attended by the employees Any time as and when required All employees, top management do 6 Report with regard to training feedback submitted e.g. feedback submitted by the employee who have undergone training, by immediate superior, by team leader Any time as & when required D (O), All TLs, Head (P&A), Manager (Pers) Evaluation of effectiveness of training programmes, planning for training & retraining 7 Report with regard to training need of employees received from TLs through Performance Appraisal System Once a year D (O), All TLs, Head (P&A), Manager (Pers) Preparing training calendar & training plan 8 Report w.r.t. training budget vs. utilization, investment on training (current year, previous year, as on date etc) Any time as & when required D (O), All TLs, Head (P&A), Manager (Pers) Tracking of training budget 9 Report w.r.t. training calendar (planned vs. actual), trg. Programmes conducted and programmes to be conducted As & when required D (O), All TLs, Head (P&A), Manager (Pers) Tracking of training programmes 10 Week wise, month wise, year wise report on training programmes (in-house, institutional, seminars etc., Induction training on transfer, plant visit etc.) As & when required do do
4. HR - Performance Management Sr No Report Name Frequency Recipient Purpose of Report 1 Employee wise / year wise appraisal reports i.e. marks Once a year D (O), All TLs, Head (P&A), Sr. GM (P&A) Evaluation for promotion
Confidential Page 40 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Report Name Frequency Recipient Purpose of Report 2 Report showing how many employees performance are outstanding, very good, good, average, below average Once a year do Tracking of performance of employees and for counselling 3 Report showing areas of improvement As & when required do Counselling and planning for imparting training 4 Report showing the performance target vs. achieved of each executive Each quarter do Improving the performance of executive in other quarters 5 Report showing performance target of each executive As & when required All executives Making the targets transparent to each executive 6 Report showing the names of employees whose performance appraisal has not been submitted and the name of TL who has not submitted the Appraisal format As & when required P&A Department Tracking of receipt of Appraisal formats 7 Report showing the difference of opinion between Appraiser & Appraise and remarks of Counselor Once a year P&A Department Strengthening the counseling system
5. Environment, Health & Safety Sr No Report Name Frequency Recipient Purpose of Report 1 Inspection Test & Maintenance report of active fire protection & suppression system Daily/ Monthly Fire Officer Healthiness of Fire Fighting system 2 J ob Safety Analysis As & when required Safety Officer, Fire Officer, Factory Manager, Concerned Departments Accident Prevention 3 Monitoring healthiness of Tools & Tackles Annually Safety Officer, Fire Officer, Factory Manager, Concerned Departments Accident Prevention 4
Environment monitoring report Monthly by 10th State Pollution control board Statutory 5 Environment monitoring report Monthly State Pollution control board Statutory 6 Ash utilization report Monthly by 10th State Pollution control board Statutory 7 Ash utilization report Monthly by 10th Central electricity authority Statutory 8 Water Cess report Monthly by 5th State Pollution control board Statutory 9 Environment status report Half yearly (by J uly & J an) Ministry of Environment & Forests(MoEF) Statutory 10 Environmental audit Statement Annually by Sept State Pollution control board Statutory 11 Ash utilization statement Annually by April State Pollution control board Statutory 12 Ash utilization statement Half yearly by October Central electricity authority Statutory 13 Ash utilization statement Yearly by April Central electricity authority Statutory 13 Ash utilization compliance report Yearly by April Ministry of Environment & Forests (MoEF) Statutory
Confidential Page 41 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Report Name Frequency Recipient Purpose of Report 14 Ash utilization compliance, High Court Order Yearly by April Ministry of Environment & Forests (MoEF) Statutory 15 Annual Ash utilization plan Yearly by April Ministry of Environment & Forests (MoEF), Central electricity authority, State Pollution control board Statutory 16 Compliance to CREP guideline Yearly by April State Pollution control board Statutory 17 Hazardous waste return Yearly by J anuary State Pollution control board Statutory 18 Return statement on used/waste batteries Half yearly (by J une & Dec) State Pollution control board Statutory 19 Biomedical waste return Yearly by J anuary State Pollution control board Statutory 20 EHS News letter Monthly Internal Internal 21 AES Environmental survey report related to EHS Quarterly AES Other requirement 22 AES annual EHS report Yearly by J anuary AES Other requirement 23 Monthly EHS report Monthly by 5 th AES Other requirement
6. Finance Sr No Report Name Frequency Recipient Purpose of Report 1 Trial Balance Monthly Internal(ITPS/HO- Finance),External- Auditors For preparation of accounts 2 Bank reconciliation statement Monthly Internal- Finance/Auditors Reconciliation of account/audit 3 Fund requisition Weekly HO Finance Fund requisition 4 Fund utilization Weekly/Fortnightly HO Finance Fund management 5 Cash/bank position Daily Internal-Finance Monitoring 6 Budget variance-AES Monthly AES Analysis,monitoring&controlling expenditure 7 Budget variance-OPGC Monthly OPGC Analysis,monitoring&controlling expenditure 8 Pending bills status- contractors/suppliers/others Weekly Director (O) Monitoring/timely payment 9 Contractors bills/payment details As required Internal-Finance Record/accounting 10 Bank payment /DD abstract- Contractors/suppliers Daily Banks Payment/DD making 11
Cash /bank books Daily Internal(ITPS/HO- Finance),External- Auditors ,Tax authorities & others For recording day to day transactions 12 General ledger Daily Internal(ITPS/HO- Finance),External- Auditors ,Tax authorities & others For recording day to day transactions
Confidential Page 42 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Report Name Frequency Recipient Purpose of Report 13 Sub-ledgers Daily Internal(ITPS/HO- Finance),External- Auditors ,Tax authorities & others For recording day to day transactions 14 J ournal book Daily Internal(ITPS/HO- Finance),External- Auditors ,Tax authorities & others For recording day to day transactions 15 Schedules of receivables/payables Monthly/Annual Internal(ITPS/HO- Finance),External- Auditors ,Tax authorities & others Accounting 16 C Form utilization statement Monthly/Quarterly Sales Tax Officer-II Circle,Bhubaneswar(th rough HO Finance) Statutory 17 Entry tax statement Monthly Sales Tax Officer,Sambalpur-III Circle,J harsuguda Statutory 18 VAT statement Fortnightly Sales Tax Officer,Sambalpur-III Circle,J harsuguda Statutory 19 ITDS statement- contractors/others Fortnightly ITO,J harsuguda Statutory 20 Royalty statement Monthly Tehsildar,Lakhanpur Statutory 21 e_TDS returns-salary Quarterly/Annual Income tax deptt.(through NSDL) Statutory 22 e_TDS returns- contractors/others Quarterly/Annual Income tax deptt.(through NSDL) Statutory 23 e_TCS returns- contractors/others Quarterly/Annual Income tax deptt.(through NSDL) Statutory 24 FBT statement Quarterly/Annual HO Finance Statutory 25 TDS certificate-salary Annual/as required Employees Statutory 26 TDS certificate- contractors/others Annual Contractors/others Statutory 27 VAT/Sales tax certificate Annual Contractors/others Statutory 28 Cost center wise salary data Monthly/Annual Internal-Finance Preparation of cost records 29 Cost center wise employee benefits Monthly/Annual Internal-Finance Preparation of cost records 30 Cost center wise stores/spares consumed Monthly/Annual Internal-Finance Preparation of cost records 31 Cost center wise repairs/maintenance-land & building Monthly/Annual Internal-Finance Preparation of cost records 32 Cost center wise repairs/maintenance-plant & machineries Monthly/Annual Internal-Finance Preparation of cost records 33 Cost center wise repairs/maintenance-others Monthly/Annual Internal-Finance Preparation of cost records 34 Coal stock register Monthly/Annual Internal-Finance Preparation of cost records 35 Chemical consumption statement Monthly/Annual Internal-Finance Preparation of cost records
Confidential Page 43 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Report Name Frequency Recipient Purpose of Report 36 Fuel consumption report Monthly/Annual Internal-Finance Preparation of cost records 37 Quantitative record of raw material processed Monthly/Annual Internal-Finance Preparation of cost records 38 Cost center wise issue of raw material Monthly/Annual Internal-Finance Preparation of cost records 39 Fixed asset addition list Monthly/Annual HO-Finance Preparation of Fixed asset register 40 Fixed asset/depreciation statement-cost center wise Monthly/Annual Internal-Finance Preparation of cost records 41 Labour utilization record-cost center wise Monthly/Annual Internal-Finance Preparation of cost records 42 Machine utilization record- cost center wise Monthly/Annual Internal-Finance Preparation of cost records 43 Quantitative statement on power generation Monthly/Annual Internal-Finance Preparation of cost records 44 Salary bills Monthly Internal-Finance Salary payment/accounting 45 Pay slips Monthly Employees Salary payment 46 Allowances bills Monthly Internal-Finance Payment/accounting 47 Arrear/other bills As required Internal-Finance Payment/accounting 48 Abstract/J V Monthly Internal-Finance Accounting 49 Pay bill register Monthly Internal-Finance Record purpose 50 Credit notes-PF,bank loan recovery, others Monthly OPGC EPF Trust,banks,OPGC Ltd. Accounting&payment 51 Debit notes-PF,others Monthly OPGC EPF Trust,OPGC Ltd. Accounting&payment 52 Bank payment advices-salary Monthly SBI/CBI/AB Banharpali Payment to employees 53 Bank payment advices- allowances Monthly SBI/CBI/AB Banharpali Payment to employees 54 Bank payment advices- arrear/other bills Monthly SBI/CBI/AB Banharpali Payment to employees 55 Bank payment advices-staff claims/re-imbursements Monthly SBI/CBI/AB Banharpali Payment to employees 56 Deduction /recovery statements Monthly Banks,LIC,PLI,Union, Association,Clubs,Ma ndir,Cable TV, School and others Payment/record 57 Annual salary details Annual Employees Employee information/record 58 Other MIS reports As required Internal/External Compliance to management/external agencies
Confidential Page 44 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
7. Plant Maintenance Sr. No. Report Name Frequency Recipient Purpose of Report 1 Equivalent Planning Factor = (Planned Hours worked / Total Hours worked) * 100 As and when required. Maint. Planning & Maint. Teams Planning 2 PM : BM Ratio =[(Total PM + PdM work orders executed)/(Total work orders executed) * 100] : [(Total breakdown work orders executed) / (Total work orders executed) * 100] As and when required. Maint. Planning & Maint. Teams Overall effectiveness of PM & PdM - Result focus 3 Planned Maintenance Cost Effectiveness: [(Total Rs. spent on PM, PdM) / (Total Rs. spent on routine maintenance)] * 100 As and when required. Maint. Planning & Maint. Teams Overall cost effectiveness - Result [Planned maintenance cost considered an investment] This cost is inclusive of contractor cost 4 Backlog PM work order index = Total PM work orders that became backlog in current month / Total PM backlog work orders As and when required. Maint. Planning & Maint. Teams Planning ineffectiveness - Lagging 5 Planning Effectiveness =(PM work orders completed as scheduled / Total PM work orders scheduled) * 100 As and when required. Maint. Planning & Maint. Teams
6 Schedule compliance index = Total man-hours on all scheduled jobs / Scheduled man-hours on all scheduled jobs As and when required. Maint. Planning & Maint. Teams
7 Total backlog work order index =Total work orders that became backlog in current month / Total backlog work orders As and when required. Maint. Planning & Maint. Teams
8 Repeat work order rate? (To measure any repeat work being performed that is an indirect indicator of quality of work performed or engineering flaw). As and when required. Maint. Planning & Maint. Teams To know the workmanship quality. 9 Number of schedule break in = Number of scheduled jobs those were rescheduled to another day As and when required. Maint. Planning & Maint. Teams
10 Maintenance cost % =(Total maintenance cost / Total revenue) * 100 As and when required. Maint. Planning & Maint. Teams Maintenance Cost analysis.
Confidential Page 45 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
8. Material & Inventory Management Sr. no Report Name Frequency Recipient Purpose of Report 1 Consumption Of Consumable Item MIS 2 Gate Pass MIS 3 Material Transfer Note MIS 4 Min-Max Lavel Report Of Stock Control Item MIS 5 Owner Ship Of Material MIS 6 Return Report MIS 7 Team Wise Budget Wise Consumption Report MIS 8 Team Wise Consumption Report MIS 9 Vehicle Master Report For (HSD,LUBRICANT) MIS 10 Spl-Monthly Spl MIS 11 Detail Item A/C Wise Spl MIS 12 Detail Location Spl With OB MIS 13 Transaction Report-Receive MIS 14 Transaction Report-Issue MIS 15 Transaction Report-Return MIS 16 Transaction Report- Adjustment MIS 17 As On Stock Report Like Physical Verification Report. MIS 18 Detail Spl Any Date Any Time MIS 19 Non-Moving Report MIS 20 Freight Bill Detail Report MIS 21 Gate Pass Report MIS 22 Grn Check Report MIS 23 Issue Details MIS 24 No Of Grn MIS 25 No Of Receive MIS 26 Pending Inspection MIS 27 Physical Verification BY ZONE AND WH MIS 28 Physical Verification BY LOCATION MIS 29 Up Loadded Data For Codification MIS 30 Balance Of Po Details. MIS 31 Reject Register MIS 32 Goods Receive Note MIS 33 Item Purchase History MIS 34 Vendor Want Of Document MIS 35 Unloading Inspection Report MIS 36 Material Not Yet Inspected MIS 37 Unloading Insurance Report MIS 38 Oil Receipt Report(Unpland Receipt) MIS
Confidential Page 46 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
39 Stationery Receipt&Issue Report MIS 40 Vendor Details MIS 41 Po Details MIS 42 Pr Details MIS 43 Inventory Details MIS 44 Pr Pending Details MIS 45 PO Receipt Details MIS 46 Tender Details MIS 47 Pr-Pr Coverage Details MIS 48 Itemwise Specification Details MIS 49 Goods Receipt Details MIS 50 PO Payment Details MIS 51 Vat Details MIS 52 Oet Details MIS 53 Mateiral Unloading Details MIS 54 Budget Code /Cost Centre Details MIS 55 Material Not Received Details MIS 56 Itemwise PO Long Description Details MIS 57 Category Wise Item Details MIS 58 Way Bill Details MIS 59 In Transit Material Details MIS 60 Insurance Coverage Details MIS 61 Reminder For Due Of Material Against Order Details MIS 62 Order Balance Material Details MIS 63 Rejection Details MIS 64 Advance Outstanding Details MIS 65 Last Price Of Item Details MIS 66 Itemwise Vendor Details MIS 67 Comparative Statement MIS
B. Expected Number of Users 1. SAP Users The SAP Users number information is provided to facilitate planning and implementation. Following licenses will be separately arranged by OPGC.
SAP ERP Licenses Sr No Description of Item Unit Quantity 1 SAP ERP- Development License License 1 License 2 SAP ERP- Professional User License License 150 License 3 SAP ERP- ESS User License 400 License 4 Payroll Engine for Employees India License 550 Employees 5 RDBMS Runtime Licenses to run SAP ERP License For the above
Confidential Page 47 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
The SAP ERP Professional User License (total 150 no) can be categorized as 124 LAN users and 26 WAN/Internet users. Similarly the SAP ERP Employee Self Service (400 nos excluding Professional Users License). Users can be categorized as 343 LAN users and 57 WAN/ Internet users. Provision of increase in number of users should be considered during planning, implementation. Quality Assurance (QA) Infrastructure will be needed for conducting tests and trainings during and post implementation approximately for 30 users at any point of time. 2. Email Users High availability email solution and collaboration tools shall be provided for the following no of users. Sl No Description IB Thermal Power Plant (ITPS) Head Office 1 Named email account 190 60 1.1 Access from Web 190 60 1.2 Access mail from Black Berry 25 10 2 Email Quota for each named account (Avg) 200 Mb 200 Mb 3. PC/ Laptop Users All the PCs/Laptops will be controlled by Domain Controller, DHCP and DNS. The break up would be as follows
System Users
IB Thermal Power Plant (ITPS) Head Office (HO) PC Laptop PC Laptop Old 144 21 26 17 New 50 Nil 10 Nil
The New PCs mentioned above has to be supplied by the bidders. The final schedule for supply of PCs shall be given by OPGC. 4. Network Printers Old IB Thermal Power Plant (ITPS) Head Office (HO) Laser Line Laser Line 1 2 1 2 1
The printers mentioned above have to be supplied by the bidders. 5. Anti virus/ Anti-Spam Antivirus and Anti-Spam software license for the Gateways, Servers and Antivirus software license for all the new and old PCs and Laptops 6. VPN Users 30 VPN Clients for OPGC 7. Video Conferencing Conference room at ITPS Conference room at HO.
Confidential Page 48 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-B: Bid Support Documents
Confidential Page 49 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-B1: Letter of Undertaking by the Bidder PROFORMA OF LETTER OF UNDERTAKING TO BE SUBMITTED BY THE BIDDER ALONG WITH HIS BID. (To be executed on non-judicial stamp paper of requisite value)
Ref: Date:
To Orissa Power Generation Corporation Ltd., IB Thermal Power Station, Banharpali.
(Hereinafter referred to as the Owner)
I/We have read and examined the Bid documents relating to Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC. I/We hereby tender for execution of the works referred to in the aforesaid documents upon the terms and conditions contained or referred to therein and in accordance in all respects with the specifications, designs, drawings and other relevant details contained in Schedule of Quantities / Price schedule attached with the Bid documents and the period (s) of completion as stipulated in the Contract. In consideration of I/We being invited to Bid, I/We agree to keep the Bid open for acceptance for 180 days from the due date of opening of bid there of and not to make any modifications in its terms and conditions which are not acceptable to the Owner. A sum of Rs is hereby forwarded in shape of Demand Draft drawn in favour of Orissa Power Generation Corporation Ltd. and payable at State Bank of India (Code-9510) / Andhra Bank (Code-0662) / Central Bank of India (Code-Belpah) or Bank Guarantee issued by a ______________Bank as Earnest Money in the manner prescribed in NIT enclosed. If I/We fail to keep the Bid open as aforesaid or make any modifications in the terms and conditions of the Bid, which are not acceptable to the Owner, I/We agree that the Owner shall, without prejudice to any other remedy, be at liberty to forfeit the said earnest money absolutely. Should this Bid be accepted, I/We hereby agree to abide by and fulfil all the terms, conditions and provisions of the aforesaid documents. If, after the Bid is accepted, I/We fail to commence the execution of the works as provided in the conditions, I/We agree that the Owner shall without prejudice to any other right or remedy be at liberty to forfeit the said earnest money absolutely.
Confidential Page 50 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Signature of Bidder
Duly authorized to sign the Bid on behalf of the (in block capitals).. .. Dated Postal Address. Telegraphic Address Telephone No.. Fax No. E-mail address
Witness..
Date..
Address
Confidential Page 51 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-B2: Form for Price Bid Having examined the Bid Document Number ... dated , the receipt of which is hereby acknowledged, we, the undersigned, offer to supply, implement, commission, integrate and put into operation the Solution under the above-named Bid in full conformity with the Bidding Documents for the sum quoted in price schedule. The following is the total bid price for the scope of work described in our response to your Bid Document.
i) In figures __________________________________________
ii) In words __________________________________________
(Please quote the price in Indian Rupees only)
The break-up of the above lump sum price is given in the Price schedule attached herewith and is made part of this bid.
Thanking you, Yours faithfully,
<Seal and Signature of Authorized Signatory> <Name of Authorized Signatory> <Title of Authorized Signatory>
Note: In case of bid by a consortium, this form has to be signed by authorised signatories of all the members of the consortium.
Confidential Page 52 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
A. Price Schedule for Project
2.1 Supply of Hardware & Non-SAP Software
SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 2.1.1 Supply of Hardware Data Center Equipments 1 UPS 2 Precision Air Conditioning System (PAC) 3 Fire Suppression Systems 4 Access Control Equipments 5 Water Leak & Rodent Control Systems 6 Civil work components (give break-up) 7 Electrical Components 8 Security system including CCTV, LCD, Biometric reader, proximity control.
9 EMS / BMS Equipments 10 Data Safe 11 Any other 2.1.2 Supply of Hardware Servers, Storage, Backup Devices, Racks & Other Hardware (PCs/Printers) etc. 1 Servers 2 Rack with KVM 3 SAN Storage 4 Backup Devices 5 Other Hardware (PCs with OS / Printers etc.)
6 Any Other 2.1.3 Supply Hardware - Networking Components 1 Switches 2 Routers 3 Firewall / IPS 4 Modem 5 Fiber Optic Cable 6 UTP cable 7 Connectors 8 NMS 9 Network bandwidth cost 10 Any other item (give detailed break-up) 2.1.4 Supply Hardware - Video Conferencing Equipments 1 Video Conferencing Equipments(give
Confidential Page 53 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
detailed break-up) 2.1.5 Supply Hardware IP Telephony Equipments 1 IP Telephony Equipments (give detailed break-up)
2.1.6 Supply of Non-SAP Software Messaging & Collaboration System 1 Mailing Software 2 Blackberry enterprise software 2.1.7 Supply of Non-SAP Software Anti virus / AntiSpam / Content Filtering 1 Antivirus / Anti Spam / Content Filtering (give detailed break-up)
2.1.8 Supply of Non-SAP Software NMS/EMS/Service Desk Tools 1 NMS/EMS Software & Service Desk Tools (give detailed break-up)
2 Backup Software 2.1.9 Supply of Non-SAP Software BMS 1 BMS Software 2.1.10 Supply of Non-SAP Software Video conferencing System 1 Video Conferencing Software 2.1.11 Supply of Non-SAP Software IP Telephony System 1 IP telephony Software 2.1.12 Supply of Non-SAP Software Other Software 1 Server Operating System 2 PC Operating System 3 Any Other Software (give detailed break- up)
2.2 Design, installation & commissioning of Infrastructure
SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 2.2.1 Design, installation & commissioning of Data Center 1 Design and Engineering Charges 2 Installation and commissioning charges (including Civil & Electrical works)
2.2.2 installation & commissioning of Hardware 1 Installation and commissioning of Hardware
2.2.3 installation & commissioning of Networking Components 1 Design and Engineering Charges 2 Installation, commissioning of Network services
3 Establish Connectivity 2.2.4 installation & commissioning of Video Conferencing System 1 Installation, commissioning of Video
Confidential Page 54 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Conferencing System (give detailed break- up) 2.2.5 installation & commissioning of IP Telephony System 1 Installation, commissioning of IP Telephony System (give detailed break-up)
2.3 Implementation of SAP Application SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 1 SAP Implementation as per scope including 6 months post go live stabilization support
2.4 Implementation of Non-SAP Applications SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 2.4.1 Active Directory Implementation with SOS 2.4.2 Messaging & Collaboration Solution with Black Berry Integration
2.4.3 Anti Virus/Anti Spam/Content Filtering 2.4.4 EMS/NMS 2.4.5 BMS for Data Center 2.4.6 Video Conferencing Application 2.4.7 IP Telephony Application 2.5 Project Management in different phases, Change Management & Training SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 1 Project Management 2 Change management & Training on all the above services (with breakup)
Confidential Page 55 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
B. Price schedule for Post Implementation Support Services 2.6 Post Implementation support services for running all the SAP Application, Non-SAP applications and Infrastructure Facility Management Services.
SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 2.6.1 SAP application support 1 SAP Application Support 2.6.2 Non-SAP Application Support 1 Active Directory administration 2 Messaging & collaboration, Blackberry apps administration
4 Video Conferencing & IP Telephony solution administration
5 EMS/NMS/BMS application administration 2.6.3 Infrastructure and facility management 1 Help Desk 2 Desktop/Laptop 3 SAP App, database Servers 4 Non SAP and other servers 5 Router 6 Switch - L3 7 Firewall and other security equipments 8 Database 9 Leased Line and MPLS Links 2.6.4 Hardware and Network Equipment Maintenance 1 Maintenance Support within warranty 2 Maintenance Support after warranty including parts
Confidential Page 56 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-B3: Exclusions / Deviations Statement
DEVIATION / EXCLUSION / VARIATION STATEMENT
We confirm that the following are the only deviations / exclusions / variations to the requirements described in your Bid Document Number ..dated .and as responded in our proposal / bid Number . dated . Except for these deviations / exclusions / variations, we confirm to all the other requirements of the said Bid Document.
Sr. No. Page no. of Bid Document Serial no. of Bid Document Subject Deviation / Exclusion / Variation
We declare that any other deviations noted in other places in the bid documents / correspondences shall be ignored and construed as our unconditional acceptance of the respective tender terms, unless mutually agreed under seal and signature from both sides.
Thanking you, Yours faithfully
Name and Designation of Signatory: Name of Firm: Address
Notes: a) This form has to be signed by authorised signatories of the Bidder. b) Please use separate sheets in case the deviation / exclusion / variation that cannot be adequately described in the table above clearly mentioning the reasons). c) The Bidders must comply with all requirements of this Bid Document. However, where the Bidder is unable to comply with specific requirements listed out in this document, he must specifically indicate these in the format given above. Anything contained in this Bid Document, which has not been specifically excluded, or for which deviations have not been indicated, will be regarded as being agreed to by the Bidder.
Confidential Page 57 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-B4: Proforma for Bank Guarantee for Bid Security (Earnest Money Deposit)
PROFORMA BANK GUARANTEE IN LIEU OF DD FOR EARNEST MONEY (on Non Judicial stamp paper of appropriate value) (Applicable to Bid value more than Rs. 25 lakh only)
Ref: Date: Bank Guarantee No.
To Orissa Power Generation Corporation Ltd., Ib Thermal Power Station, At/Po- Banharpali, Dist-Jharsuguda-768234.
Dear Sir,
In consideration of Orissa Power Generation Corporation having its Registered office at 7th.Floor, Zone A, Fortune Towers, Chandrasekharpur, Bhubaneswar-751 023 (hereinafter called the Owner which expression shall unless repugnant to the subject or context include its successors and assigns) having issued Bid Specification Against NIT No_________________________________________ dt.________________ to M/s________________________________________ having its Registered / Head office at_________________________________________ (hereinafter called the Bidder) who wishes to participate in the said tender for and you, as a special favour, have agreed to accept an irrevocable and unconditional Bank Bid Guarantee for an amount of Rs.________________________________ valid up to ___________________ On behalf of the Bidder, as a condition for participation in the said tender.
We, the _____________________ Bank incorporated under ________________ law and having one of our branches at _________________ and having our Registered office/Head office at _________________ do here by unconditionally and irrevocably guarantee and under take to pay to the Owner immediately on demand without any demur reservation, protest, contest and recourse to the extent of the said sum of Rs._____________ (Rupees _______________________ only). Any such claim/demand made by the said Owner on us shall be conclusive and binding on us irrespective of any dispute or differences raised by the Bidder.
Confidential Page 58 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
This guarantee shall be irrevocable and shall remain valid up to _________________. If any further extension of this guarantee is required, the same shall be extended to such required period on receiving instructions from M/s ____________________ on whose behalf this guarantee is issued.
We, the said Bank lastly undertake not to revoke this guarantee during its currency except with the previous consent of the Owner in writing and agree that any change in the constitution of the said tenderer or the said Bank shall not discharge our liability. In witness where of the Bank, through its authorised officer, has set its hand and stamp on this ___________________________ day of _______________________20______
Witness:
(Signature) (Signature)
____________________ __________________ Name Name
_____________________ (Designation with Bank stamp) Official Address
Attorney as per Power of Attorney
No.___________________
Date__________________
Confidential Page 59 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-B5: Consortium MOU
Date:
To -------------------------------------- -------------------------------------- --------------------------------------
Dear Sir,
Sub: Notice of Intent to Respond to Bid Document (Bid Document Number ; dated ..)
We are a consortium with the following members: a) Company Name & Address b) Company Name & Address c) Company Name & Address
Having examined the Bid Document we, hereby confirm our intention to collectively respond to the described Bid Document floated by your company as members of the above consortium. by submitting a consolidated Bid number .. dated .. offering to supply, install, test, pre-commission, commission, demonstrate and establish performance guarantee parameters of the solution in full conformity with the said bidding documents.
<Company Name> will be the Lead Bidder of our consortium. They are authorized to sign all contract documents, receive instructions and incur liabilities on behalf of the consortium. A notarized copy of the duly executed Consortium Agreement to this effect is enclosed.
We hereby confirm that <Company Name>, the Lead Bidder, will responsible for execution of the contract in such a manner that the Solution delivered meets the performance requirements as described in the Bid.
We hereby confirm that information provided in this Bid is true and correct to the best of our knowledge and belief and nothing has been concealed, misrepresented, manipulated or exaggerated there from.
Confidential Page 60 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Details of primary and secondary contact persons for each consortium member are as follows:
We undertake, if our bid is accepted, to commence execution of work of the Solution and to achieve completion within the respective times stated in the bidding documents / quoted by us in our bid.
We understand that you are not bound to accept the lowest or any bid you may receive and in-turn we will not have any rights to raise any claim, whatsoever it may be, due to or arising out of rejection of our bids.
Thanking you,
Yours faithfully,
<Seal and Signature of Authorized Signatory> <Name of Authorized Signatory> <Title of Authorized Signatory>
Note: This form has to be signed by authorised signatories of all the members of the consortium <Company Name & Address> <Brief Description of Companys Key Role on the Project> Primary Secondary Name Designation Company Name Address Phone Fax Email id
Confidential Page 61 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-B6: Profile of Implementation Partner A. Organisation details A. Background Information Name of the Implementation Partner Registered Office Address Contact Person with contact details B. Financials Financial Year ( 1 st April 31 st March ) Turnover (INR Crores) Profit ( INR Crores) ERP Business (INR Crores) 2007-2008 2006-2007 2005-2006 C. Employee Strength Total No of Employees Total No of Employees in SAP Practice Total No of Employees in Infrastructure Practice Total No of SAP Functional Consultant Total No of SAP Technical Consultant Total No of SAP Certified Consultants in the area: a) Materials Management b) Finance and Controlling c) Human Resource d) Project Systems e) Plant Maintainence f) XI & Netweaver g) BASIS h) ABAP i) XMII j) EH&S List the Quality Certification like CMM Level V, ISO etc
Provide details on SAP CoE established Provide details on SAP Helpdesk
Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used.
Confidential Page 62 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
B. Global SAP Delivery Experience Customer No 1 Name of the Customer Registered Office Address
Contact Person with contact details (For reference only)
Brief about the Organisation
SAP Modules Implemented Industry Vertical Name of the Project Manager from IP Type of Engagement with the Customer New Implementation / Upgrade / Support / Custom Development Present Implementation Stage Business Blueprint/ Realisation /Go-live / Support No of SAP Users Please provide a brief remarks on the below mentioned questionnaire Sl Question Remark 1 What was the role in the implementation Prime Bidder/ Partner / staff Augmentation/ Training 2 Does the Implementation involve SAP Integration with other products like Outlook, Lotus Notes etc.
3 Does the Implementation involve usage of New Dimension products Like XMII, CPM, SEM, GRC etc
4 Does the Implementation also involve Post Go live support by your organization
5 Was the project delivered on time agreed upon initially? If No, Please state the reasons for the same.
6 What was the Value of the Contract? 7 Does the Contract also include the creation of infrastructure and Training?
8 Date of Contract Signature and Go Live dates 9 What is the Hardware Platform used in the Project?
10 Did the customer involve SAP Consulting or any third Party Organisation for Audit of the implementation?
Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used.
Confidential Page 63 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
C. Indian SAP Delivery Experience Customer No 1 Name of the Customer Registered Office Address Contact Person with contact details (For reference only)
Brief about the Organisation
SAP Modules Implemented Industry Vertical Name of the Project Manager from IP Type of Engagement with the Customer New Implementation / Upgrade / Support / Custom Development Present Implementation Stage Business Blueprint/ Realisation /Go-live / Support No of SAP Users Please provide a brief remarks on the below mentioned questionnaire Sl Question Remark 1 What was the role in the implementation Prime Bidder/ Partner / staff Augmentation/ Training 2 Does the Implementation involve SAP Integration with other products like Outlook, Lotus Notes etc.
3 Does the Implementation involve usage of New Dimension products Like XMII, CPM, SEM, GRC etc
4 Does the Implementation also involve Post Go live support by your organization
5 Was the project delivered on time agreed upon initially? If No, Please state the reasons for the same.
6 What was the Value of the Contract? 7 Does the Contract also include the creation of infrastructure and Training?
8 Date of Contract Signature and Go Live dates 9 What is the Hardware Platform used in the Project?
10 Did the customer involve SAP Consulting or any third Party Organisation for Audit of the implementation?
Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used.
Confidential Page 64 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
D. SAP Delivery Experience in Utilities Customer No 1 Name of the Customer Registered Office Address
Contact Person with contact details (For reference only)
Brief about the Organisation
Utilities value Chain Generation /Distribution /Transmission /Trading
Modules implemented Please include couple of workflow diagram for Power Generation Business
Please provide a brief remarks on the below mentioned questionnaire Sl Question Remark 1 What was the total timeframe for the implementation at the Power Plant?
2 Was the power Plant Thermal/Hydel/Nuclear? 3 Did the implementation also include machine Level integration with MES, SCADA etc.
4 Please provide any ROI case study for the Customer with relationship to SAP Implementation
5 Can we contact your customer over phone/email or any other means of communication for reference and understand the finer elements of the implementation?
Confidential Page 65 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
E. System Integration Capability Customer No 1 Name of the Customer Registered Office Address Contact Person with contact details (For reference only)
Brief about the Organisation
SAP Modules Implemented Industry Vertical Name of the Project Manager from IP Scope of Implementation LAN / WAN/ Hybrid OEM Suppliers No of Users Please provide a brief remarks on the below mentioned questionnaire Sl Question Remark 1 What was the Value of the Contract? 2 Date of Contract Signature and Go Live dates 3 What is the Hardware Platform used in the Project?
4 Does the Implementation also involve Post Go live support by your organization
5 Was the project delivered on time agreed upon initially? If No, Please state the reasons for the same.
F. Implementation Team Employee No 1 Name of the Employee Designation of the Employee Contact details SAP Modules Implemented Industry Vertical Educational Background Proposed Role in the OPGC Project team Certifications
The Implementation Partner has to deploy a specialized and trained team for the successful and timely completion of the Project. It is therefore desirable that the key personnel in the team have the following minimum work experience.
Confidential Page 66 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
a) Project Manager: Two (2) SAP implementation cycle experiences which includes Implementation experience in an integrated Utility plant b) Change Management Lead: One (1) project experience in SAP led Change management. c) Functional Integration Lead: One (1) SAP implementation cycle experience on different modules of the offered product suite which includes implementation experience in an Integrated Utility Plant. d) Functional Leads: One (1) SAP implementation cycle experience on the offered product suite which includes India localization experience in the relevant modules. e) Technical Leads Interfaces: Minimum One(1) SAP implementation cycle experience for the offered product which includes experience with implementing interfaces to Oracle based legacy applications. f) Technical Leads Database Management: Minimum One (1) full cycle experience with the same SAP product suite and localization requirements. G. IT Support & Facility Management Services Capability Customer No 1 Name of the Customer Registered Office Address Contact Person with contact details (For reference only)
Brief about the Organisation
Scope of IT service support / Facility Management service offered
Industry Vertical Name of the Vendor representative Period of Service & value of FMS Contract No of Users Please provide a brief remarks on the below mentioned questionnaire Sl Question Remark 1 The Bidder should be certified for IT service management system standard BS 15000 / ISO 20000.
2 The Bidder should be certified for Information Security Management System Standard BS 7799 part 2 Or ISO/IEC 27001
3 ISO 9001:2000 standard/certified process framework and FMS division
4 The Bidder should have an ITIL framework or any other globally recognised framework for delivery of services.
Confidential Page 67 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-B7: Profile of Hardware Partner
A. Background Information Name Head Office Address Contact Person Countries with offices Net worth as at the end of last three Financial Years internationally for Hardware business (Please attach certified annual reports)
Annual revenue in the last three Financial Years internationally for Hardware business (Please attach certified annual reports)
Countries where SAP has been installed on the hardware B. Indian Operations Head of Indian Operations Indian Head Office Address Contact Person Contact Number Email id Number of offices Net worth as at the end of last three Financial Years in India for Hardware business (Please attach certified annual reports)
Annual revenue in the last three Financial Years in India for Hardware business (Please attach certified annual reports)
Number of employees a) Support Related b) Others Details of Accreditations such as ISO 9001, etc. Alliances C. Proposed Infrastructure Infrastructure Elements e.g. Hardware (server, storage, SAN, backup), UPS, Generator, Precision Air Conditioning System, Access Control System, Fire Detection and Suppression System, etc.
Configuration in brief Other Details in brief (Please give above information for each Infrastructure element)
Note: Please use additional sheets wherever required. Please ensure proper reference between the table row and the additional sheet used.
Confidential Page 68 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Appendix-C: Contract Document
Confidential Page 69 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
AGREEMENT FOR IMPLEMENTATION OF SAP ERP, NON-SAP APPLICATIONS AND RELATED IT INFRASTRUCTURE ALONG WITH POST IMPLEMENTATION SUPPORT WITH FACILITY MANAGEMENT.
Agreement No:
Made on this day of
Between
M/s Orissa Power Generation Corporation Limited, a company incorporated under Companies Act. 1956 having its registered office at Zone-A, 7 th Floor, Fortune Towers, Gangadhar Meher Marg, Chandrasekharpur, Bhubaneswar- 751023, hereinafter referred to as the Owner (which expression shall unless repugnant to the context or meaning thereof include its administrators, successors, executors and assigns)
On the one part
And
M/s
hereinafter referred to as the Vendor ( which expression shall unless repugnant to the context or meaning thereof include its administrators, successors, executors and assigns)
On the other part
WHEREAS the Owner is desirous of executing the work comprising of supply of hardware and non-SAP software, design, installation & commissioning of infrastructure, implementation of SAP application, implementation of non- SAP applications, project management, change management and training (hereinafter referred to as the Project ).
AND WHEREAS the Owner is desirous of availing the post implementation support services for running the SAP application, non-SAP applications, the infrastructure facility management services (hereinafter referred to as the FMS)
AND WHEREAS the Owner has invited two part bids through open tender vide NIT No -ITPS/CC-22/2008/68 Dated - 03.09.2008 for both the Project and FMS (hereinafter referred to as the IT Solution)
AND WHEREAS the Vendor has submitted his offer vide No________dated______.
AND WHEREAS the Owner after evaluating the said offer and negotiating with the Vendor entered into this agreement on terms and conditions more specifically contained in this agreement and the documents & correspondences referred to therein which have been unequivocally accepted by the Vendor resulting into a concluding agreement, hereinafter referred to as the Agreement.
Witnesseth that
Confidential Page 70 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
1 Definitions & Interpretations
1.1 Definitions
The following words and expressions shall have the meanings hereby assigned to them except where the context otherwise requires.
Agreement shall have the same meaning as ascribed to it in the cover page of the Agreement.
Approval of the Owner shall mean the written approval to a document, a drawing or other particulars of matters in relation to the Agreement by the Owner or his authorized representative.
Contract Price means the price payable to the Vendor under the Agreement as per Annexure-4 for the full and proper performance of its contractual obligations.
Core SAP Product means the standard features provided by the modules of the SAP ERP application.
Delivery shall have the same meaning as ascribed to it in the Annexure-1 & Annexure-2 of Appendix-C.
Day means calendar day of the Gregorian calendar consisting of 24 hours from midnight to midnight irrespective of the number of hours worked in that day.
Effective date shall mean the date of signing the Agreement.
FMS shall have the same meaning as ascribed to it in the cover page of the Agreement.
Final Acceptance shall have the same meaning as ascribed to it in the clause-9.6.
Go-live shall have the same meaning as ascribed to it in the clause-9.5.1(a).
Go-live Acceptance shall have the same meaning as ascribed to it in the clause-9.5.1.
Hardware Manufacturer means the original manufacturer of hardware based in India or its Indian office in case the manufacturer is located outside INDIA.
IT Solution shall have the same meaning as ascribed to it in the cover page of the Agreement.
Intellectual Property Rights means any and all copyright, moral rights, trademark, patent, and other intellectual and proprietary rights, title and interests worldwide, whether vested, contingent or future including without limitation all economic rights and all exclusive rights to reproduce, fix, adapt, modify, translate, create derivative works from, extract or re-utilize data from, manufacture, introduce into circulation, publish, distribute, sell, license, sublicense, transfer, rent, lease, transmit or provide access electronically, broadcast, display, enter into computer memory, or otherwise use any portion or copy, in whole or in part, in any form, directly or indirectly, or to authorize or assign others to do so.
Infrastructure shall have the same meaning as ascribed to it in the clause-9.2
Materials means all the deliverables to be provided to Owner under the Agreement.
Month means calendar month of the Gregorian calendar.
Owner shall have the same meaning as ascribed to it in the cover page of the Agreement.
Confidential Page 71 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Offices shall mean corporate office, regional offices, branch offices and locations wherever business activities are conducted by the Owner.
Project shall have the same meaning as ascribed to it in the cover page of the Agreement.
Project Manager shall have the same meaning as ascribed to it in clause-4.1.1.
Project Plan shall have the same meaning as ascribed to it in clause-5.1.1
Project Site shall mean Ib Thermal Power Station, Banharpalli, J harsuguda.
Scope shall have the same meaning as ascribed in clause 2 of the Agreement.
Services means all technical, logistics, management, and any other services to be provided by the Vendor under the Agreement to develop, install, implement, customize, integrate, and make operational the IT Solution. Such services may include, but are not restricted to installation, commissioning, Go-live, testing, stabilization and Training.
Stabilization Acceptance shall have the same meaning as ascribed to it in clause-9.5.2.
System means any hardware component, software component, application component, developed application or module of the SAP proposed to meet the technical requirements that may be supplied, installed, tested, and commissioned individually.
Sub-contractor shall have the same meaning as ascribed to it in clause-8.2.
Tests shall have the same meaning as ascribed to it in clause-9.
Test Plan shall have the same meaning as ascribed to it in clause-9.1
Term of Agreement shall have the same meaning as ascribed to it in clause-18.1
Vendor shall have the same meaning as ascribed to it in the cover page of the Agreement.
Week means seven (7) consecutive Days, beginning the said day of the week
Year means a period of twelve (12) consecutive Months.
1.2 Interpretation
1.2.1 Language: The Agreement shall be construed and interpreted in accordance with the English language.
1.2.2 Headings: The headings are included for ease of reference and shall neither constitute a part of the Agreement nor affect its interpretation.
1.2.3 Party or Parties: The Owner and the Vendor shall be individually referred to as Party and collectively as Parties.
1.2.4 Persons: Words importing persons shall include firms, companies, corporations, associations or body of individuals whether incorporated or not. Words importing masculine gender or singular number shall also include the feminine gender and plural number and vice-versa where the Agreement so requires or permits.
Confidential Page 72 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
1.2.5 Entire Agreement: The Agreement constitutes the entire Agreement between Owner and Vendor with respect to the IT Solution and supersedes all communications, negotiations, and Agreements (whether written or oral) between the Parties with respect to the IT Solution made prior to the date of Agreement.
2 Scope of Agreement The Scope of Agreement covers work to be executed as indicated in the detail scope of work at Annexure -1 along with the supporting information provided under Annexure 2 to Annexure 7.
a) Unless otherwise expressly limited, the Vendors obligations involve supply of necessary software, requisite hardware, network hardware and services, product, implementation, integration, testing, acceptance, achieving go-live, training, change management, stabilization of the Project, provision of all the Project components and materials as well as performance of all Services, as tendered in this document & in accordance with the plans, procedures, specifications, and any other documents specified in the Agreement and the Project Plan, at no additional cost. b) The Vendor shall, unless specifically excluded in the Agreement, perform all such work and / or supply all such items, service materials not specifically mentioned in the Agreement but that can be reasonably inferred from the Agreement as being required for attaining Go-live Acceptance and stabilization acceptance of the Project as if such work and / or items and Materials were expressly mentioned in the Agreement, at no additional cost. 3 Obligation of Vendor 3.1 Obligation of Vendor towards the Project 3.1.1 The Vendor has the overall responsibility of implementing, conducting Tests, successful running and stabilization of the Project. 3.1.2 The Vendor shall be responsible for timely provision of all resources, information, and decision making under its control that are necessary to reach a mutually accepted Project Plan as per Annexure-3 and the detailed Scope of work at Annexure 1. 3.1.3 The Vendor shall appoint its representative within fourteen (14) days of signing of the Agreement after mutual discussions and written approval of Owner. The request must be accompanied by a detailed CV for the nominee, as well as a description of any responsibility other than Project responsibilities the nominee would retain while performing the duties as the Vendors representative. The Vendors representative shall have the authority to represent the Vendor on all day-to-day matters relating to the Project. 3.1.4 The Vendor shall provide the key personnel namely the project leader, module leaders, quality assurance personnel any specialist / analysts required as appropriate, and having sufficient experience in terms of relevance and number of years required to implement the Project. Should the profile of any personnel not be acceptable to Owner, Owner will require the Vendor to suitably replace such personnel. The key personnel are to be assigned to the project on full time basis and to the satisfaction of Owner. If for any reason beyond the control of the Vendor, there arises a need to replace any personnel, the Vendor shall provide a replacement person of equivalent or better qualification and experience, subject to the written approval of Owner. Further, at any time in the opinion of the Project Manager, any additional, qualified, experienced engineer is considered necessary; they shall be deployed by the Vendor without any additional charge. The Vendor shall ensure to the satisfaction of the Project Manager competent and efficient supervision in the Implementation of the Project. 3.1.5 In case project gets delayed due to any reason attributed to Vendor, the annual technical support / maintenance up to the stabilization acceptance of the project shall remain in the scope of the Vendor with no financial implication on Owner. 3.2 Obligation of Vendor towards the FMS
Confidential Page 73 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
3.2.1 The vendor has overall responsibility of providing post implementation support services for the successful running of the System(s) as per the scope outlined in this Agreement and any further terms and conditions as may be stipulated at the time of execution of the contract for FMS. 3.2.2 The vendor shall appoint a new representative after mutual discussion and written approval of the Owner or may keep the representative of the Project as a single point contact for the FMS. For new representative Vendor shall make the request which must be accompanied by a detailed CV for the nominee, as well as a description of any responsibility other than FMS responsibilities. The vendors representative shall have the authority to represent the vendor on all day-to-day matters relating to the FMS. 3.2.3 The Vendor shall ensure that the faulty network devices, servers, PCs and peripherals etc are repaired / brought back to service within specified resolution time. Vendors representative posted during the FMS period will ensure that the down time for individual node does not exceed the time of failure reporting as detailed in Annexure - 2. 3.2.4 The Vendor shall provide all the personnel required as appropriate, and having sufficient experience in terms of relevance and number of years in providing FMS. Should the profile of any personnel be not acceptable to Owner, the vendor is to suitably replace such personnel. 3.2.5 The Vendor shall provide the Services to meet or exceed the service levels specified in Annexure-2. The Vendors obligation to perform the Services to meet or exceed the service levels continues despite any increase or other variation in any Service volumes. The Vendor in consultation with the Owner shall review the Service Levels once each year and will adjust the service levels in accordance with the change control procedure to meet the continuous improvement objective. 3.2.6 Where the Vendor anticipates that there will be a significant delay to the performance of any of its services for which it considers an extension of time is required, then it must immediately notify Owner of its request, the reasons for an extension and steps taken or to be taken to minimize the delay and as soon as practicable, notify the Owner promptly in writing of the period of the delay caused and give details of the extension of time which it reasonably considers will be required. 3.2.7 The Vendor must, at its own cost obtain the relevant network connections (including redundant network connections) that are required to connect from the Vendors sites to Owners. 3.2.8 The Vendor shall ensure that all technology and equipment used to perform and deliver the Services is not obsolete and is kept in good working order at all times. 3.3 Obligation of Vendor towards the IT Solution
Confidential Page 74 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
3.3.1 The Vendors representative and staff are obliged to work closely with Project Manager / Owners representative and act within their own authority, and abide by directives issued by Owner that are consistent with the terms of the Agreement. The Vendors representative is responsible for managing the activities of its personnel. 3.3.2 In the event if any discrepancy with respect to the qualifications of the employees of the Vendor is detected by Owner then the Vendor shall appoint a replacement to such objection immediately in accordance with this clause. 3.3.3 The Vendors representative may, subject to the written approval of Owner (which shall not be unreasonably withheld), at any time delegate to any person any of the powers, functions, and authorities vested in him. Any such delegation may be revoked at any time with prior notice signed by the Vendors representative and shall specify the powers, functions, and authorities thereby delegated or revoked. No such delegation or revocation shall take effect unless and until a copy of such a notice has been delivered to the Project Manager / Owners representative. Any act or exercise by any person of powers, functions and authorities so delegated to him or her shall be deemed to be an act or exercise by the Vendors representative. 3.3.4 The Vendor shall acquire in its name all permits, approvals, and/or licenses from all local, state, or national government and other statutory authorities and/or public service undertakings that are necessary for the performance of the Agreement. 3.3.5 Neither the Vendor nor its personnel shall during the term of this Agreement, engage in any business or professional activities in India/abroad which would conflict with the activities assigned to them under this Agreement 3.3.6 The Vendor is responsible for performing and safely storing, timely and regular backups of its data and Software in accordance with accepted data management principles, except where such responsibility is clearly assigned to Owner elsewhere in the Agreement. 3.3.7 Vendors Staff and their Conduct
a) If any of the Vendors employee, in the opinion of Project Manager / Owners representative, be found guilty of any misconduct or be incompetent or insufficiently qualified or negligent in the performance of their duties or that in the opinion of the Project Manager / Owners representative, undesirable for administrative or any other reasons, for such person(s) to be employed for providing desired services, then at the directions of the Project Manager / Owners representative, the Vendor shall at once remove such person (s). Vacancy so created shall be immediately filled at the expense of the Vendor by a qualified and competent substitute. Should the Vendor be requested to repatriate any person or removed from this Agreement, he shall do so and shall bear all costs in connection therewith. b) The Vendor shall be solely responsible for the proper behaviour of his employees and staff employed by him/deputed by him to provide IT Solution. The Vendor shall exercise proper degree of control over them and in particular without prejudice to the said generality the Vendor shall be bound to prohibit/prevent any of his employees (as stipulated above) from trespassing or acting in anyway detrimental or prejudicial to the interest of the community or the properties or occupiers of land or properties in the neighbourhood. In the event of such trespassing, the Vendor shall be responsible for all consequent claims or actions for damages or injury or any other grounds whatsoever. The decision of the Project Manager / Owners representative upon any matter arising under this clause shall be final. c) If the Vendor or their employees damage, break, deface the property belonging to the Owner or others during the execution of the Agreement, the same shall be made good by the Vendor at his own expense and in default thereof, the Project Manager may cause the same to be made good by other agencies and recover expenses from the Vendor for which the certificate of the Project Manager shall be final. d) All Vendors personnel entering Owners premises shall be properly identified by badges of a type issued by Owner as per prevailing rules and must be worn at all times on Owners premises. e) It is made clear that no relationship of Owner and employee is created between Owner and the Vendors resident engineers, employees and no claim for employment of any such personnel shall be tenable or entertained.
3.3.8 Security, Statutory and Safety Regulations
Confidential Page 75 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
a) The Vendor shall abide by all the safety and security regulations of Owner in force and promulgated from time to time and other statutory requirements. The Vendor shall be responsible for the safety of all employees and/or workmen employed or engaged by them on and in connection with the work and shall report to Owner and other local authorities concerned all cases of accidents howsoever caused and wherever occurring on the works and shall make adequate arrangements for rendering immediately all possible aid to the victims of the accidents. Owners safety rules & regulations, are detailed in Annexure-7. b) Owner shall not be in any way held responsible for any accident or damages incurred and claims arising there from during the period of installation, testing, commissioning and stabilizing IT solution. The Vendor shall be responsible for following the provisions of all safety laws and rules made there- under and other statutory requirements at his own cost. c) The Vendor shall arrange to obtain from Owner the required gate pass for entry and exit to Owners plant site and other protected areas for each one of its engineers/specialists, representatives/ agents, supervisors, workmen and staff as per Owners prescribed procedure and format. Each entry and exit gate pass shall contain the photograph of the person concerned. In the event of loss and/or damage to the gate passes, the Vendor shall pay to Owner the prescribed penalty before a new entry and exit gate pass can be issued. Owners security department and the concerned officer/ engineer shall have the right to refuse the entry and exit gate passes to any worker or representatives of the Vendor without assigning any reason. d) The Vendor shall register all equipment that may be taken inside the plant area in order to facilitate the issue of exit gate permits for such items to be taken out after the completion of work. e) The Vendor shall not employ for the purpose of the Work, any person below the age of 18 years. Owner shall have the right to decide whether any person employed by the Vendor is below the age limit, and to refuse to allow any person, whom he considers to be under-aged to be employed by the Vendor. f) Factories Act, 1948: The Vendor shall follow the provisions of Indian Factories Act, Contract Labour (R&A) act 1970, workman Compensation Act 1923 and other Acts and rules made there under from time to time as applicable, and shall indemnify Owner against all claims of compensations under the provisions of the Act in respect of workmen employed by the Vendor in carrying out the works and against all costs and expenses or penalties that may be incurred by Owner in connection therewith. g) The Vendor shall submit labour license (if required). h) The Vendor shall ensure that no explosive or inflammable material are used or stored at the Project Site. In the event such material are essential as part of execution of the Project work, written permission shall be sought from the Project Manager / Owners representative and it shall be the sole responsibility of the vendor to ensure acquisition of necessary statutory permits and clearances and proper storage and handling of such material.
3.3.9 Environmental, Health & Safety clause The following environment, safety & health points are to be adhered: a) The Vendor must adhere to all the applicable statutory laws pertaining to safety, health and environment. b) The Vendor must ensure that there is no wastage of water and power at the work site c) All the motor vehicles of the Vendor used for transporting materials/machinery etc should have pollution control certificates and the same should be submitted at the time of obtaining gate passes. A copy of the same must be exhibited/pasted on the vehicle also d) The Vendor must ensure proper house keeping at work station / site by keeping the work-areas free from unwanted material. e) The Vendor must ensure that any debris generated during the work is transported safely to dump yard such that there is no spillage of debris on the road during transportation (by covering with a plastic sheet/tarpaulin) f) All the material which may be recycled / reused should be transported to the designated place for reuse/recycling.
Confidential Page 76 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
g) All supervisors/ workers of Vendor must take safety and environmental induction training and comply with the instructions given therein. h) The Vendor shall engage its human resources who are proven to be of good conduct and clean antecedents. i) Generally, it shall be the responsibility of the Vendor to complete with all the statutory enactments, regulations, directions, notifications etc. issued by the Central and State Governments or any other Pollution Control Authorities from time to time. 3.3.10 Employees Provident Funds and Miscellaneous Provisions Act 1952 & Employees State Insurance Act 1948 a) The Vendor shall ensure strict compliance of provisions of the Employees Provident Funds and Miscellaneous Provisions Act 1952 and the schemes framed there under so far as they are applicable to their establishments and agencies engaged by them. The Vendor is also required indemnifying Owner against any loss or claims or penal damages whatsoever resulting out of non-compliance on the part of the Vendor with the provisions of the aforesaid Act and the schemes framed there under.
b) The Vendor agrees to maintain all statutory records as required under various labour laws in respect of employees and payments. Any expenses incurred for the contributions, making contribution or maintaining records shall be to the Vendors account. 3.3.11 Vendor Responsibility with Other Agencies a) Without repugnance to any other condition, it shall be the responsibility of the Vendor not to divert or withdraw the people working for IT solution for any other service contract with Owner. No claim shall be entertained on account of above. b) The Vendor shall conform in all respects with the provisions of any statutory regulations, ordinances or byelaws of any local or duly constituted authorities or public bodies which may be applicable from time to time to the consulting services work. 3.3.12 All notices, instructions, information, and other communications given by the Vendor to Owner under the Agreement shall be given to the Project Manager / Owners representative, except as otherwise provided for in this Agreement. 3.3.13 The Vendor shall make its own arrangements for movement of personnel and equipment, within and outside the sites / units / offices at the various locations covered by the Agreement. 4 Obligation of Owner 4.1 Obligation of Owner towards Project 4.1.1 Owner shall appoint a Project Manager and notify the Vendor in writing the name of the Project Manager within fourteen (14) days of signing of the Agreement. Owner may also from time to time appoint some other person as the Project Manager in place of the person previously so appointed and shall give a notice of the name of such other person to the Vendor without delay. The Project Manager shall have the authority to represent Owner on all day-to-day matters relating to the Project or arising from the Agreement. All notices, instructions, orders, certificates, approvals, and all other communications under the Agreement shall be given by the Project Manager, except as otherwise provided for in this Agreement. 4.1.2 Owner shall be responsible for timely constitution of core team and provision of resources, necessary access, and information for the installation, commissioning and Go-live of the Project as identified in the Project Plan, except where provision of such items is explicitly identified in the Agreement as being the responsibility of the Vendor. 4.1.3 Unless otherwise specified in the Agreement or agreed upon by the Parties, Owner shall provide personnel, to properly carry out commissioning, Go-live (including successful running and stabilization of the system), at or before the time specified in the Project Plan. 4.1.4 Owner will designate its appropriate staff for the training courses to be given by the Vendor and shall endeavour to make all appropriate logistical arrangements for such training as specified in the Project Plan.
4.2 Obligation of Owner towards FMS
Confidential Page 77 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
4.2.1 Owner shall designate its representative responsible for the FMS. The representative so designated shall have the authority to represent Owner on all day-to-day matters relating to the FMS. 4.2.2 Owners shall provide updated contact listing as a one-time activity for use by help desk personnel in contacting Owners appropriate personnel for assistance/notification and shall provide an adequate level of system authority for all hardware, software and resources for which the Vendor has problem resolution responsibility and communications access 4.2.3 Owner shall assist the Vendor in the development of help desk operational procedures by providing input to, and review and approval of such procedures and shall allow the Vendor to utilize remote access capability to remotely diagnose problems if required. 4.2.4 Owner shall allow access by vendor maintenance personnel to Owners designated locations for purposes of problem diagnosis and repair and shall provide secured storage area for Vendors spare parts inventory. 4.3 Obligation of Owner towards IT Solution 4.3.1 Owner shall ensure the availability of all information and/or data to be supplied by Owner to the Vendor. 4.3.2 The Project Manager / Owners representative may at any time delegate/revoke to any person any of the powers, functions, and authorities vested in him or her of which due notice in writing will be given. Failure of the Project Manager to reject any part of the IT Solution viz., software modules, equipment, Materials, workmanship etc., or to disapprove any service or materials shall not prejudice the Owner to reject such software module, equipment, Materials, workmanship etc., or to disapprove such work or materials and to order re-supply of such software module, equipment & Materials or to pull down, remove or break up such disapproved service at the cost of the Vendor, provided the Vendor fails to comply with the direction and requirement of the Owner there off. The decision, opinion, certificates or valuation of the Owner in respect of any matter under this clause shall be final, binding and conclusive. If the Vendor is dissatisfied by reason of any decision, opinion, direction, certificate or valuation of the Project Manager / Owners representative, they shall be entitled to refer the matters to the Owner who shall thereupon confirm, reverse or vary such matters. 4.3.3 Owner by notice to the Vendor may object to any representative or person employed by the Vendor in the execution of the Agreement who, in the reasonable opinion of Owner, may have behaved inappropriately, be incompetent, or be negligent. Where upon the Vendor shall remove such person from work on the Project. If any representative or person employed by the Vendor is removed, the Vendor shall, where required, promptly appoint a replacement. 4.3.4 Workplace/Facilities for Vendors Site Office a) Owner shall provide the office space and other essential work facilities within its premises for the Vendors team. b) Suitable workspace in the respective sites/offices may be provided to the Vendor subject to the availability, free of charge. However, providing such space and store is for the smooth execution of Agreement and non provision of such space does not bind Owner and make Owner liable to the Vendor in any manner except as specifically provided in the Agreement terms. Owner is not liable for any loss or damage to the Vendors equipment/material as a result of variation in voltage or frequency or interruption in power supply or other loss to the Vendor arising there from. c) Owner will supply electric power 220/440V, 3 phase/single phase, 50 cycles from the nearest established substation free of cost, for the site works and approved site offices. Only one outlet will be provided from the point of supply. d) Though efforts will be made by Owner to maintain regular power supply, Owner shall not be responsible for any failure in power supply and any consequences arising there from. The Vendor shall obtain the approval of the Project Manager / Owners representative for installation of machinery and electric power supply connection to them. The Vendor shall be responsible for any defect therein. Any defects pointed out by the Owner in the distribution system shall be rectified forthwith to the satisfaction of Project Manager / Owners representative by the Vendor, failing which the power supply may be cut off by the Owner. 4.3.5 Accommodation and Transportation Residential accommodation will be provided by Owner to the staff of Vendor on chargeable basis.
Confidential Page 78 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
5 Implementation Plan 5.1 Implementation Plan for Project 5.1.1 Project Plan a) In close cooperation with Owner and based on the preliminary Project Plan included in the Vendors bid, the Vendor shall develop a project plan hereinafter referred to as Project Plan encompassing the activities specified in the Agreement. b) The Vendor shall formally present to the Owner the Project Plan in accordance with the technical requirements. The Vendor has to specify the strategy and methodology with time frame and the synchronization of various phases of the Project to ensure completion of the Project in time. The Project Plan shall also include a PERT chart describing the activities, resources required on the time for completion. The Project Plan shall also bring out the critical areas needing continuous attention of Owner. c) The Vendor shall undertake to supply, install, implement, integrate, commission and ensure the go- live and stabilization of the System in accordance with the Project Plant. d) The progress and other reports specified shall be prepared by the Vendor and submitted to Owner in the format and frequency specified in the Project Plan. e) Changes to the Project Plan, if required, shall be made with the mutual consent of Owner and the Vendor. 5.1.2 Design and Development Vendor shall execute the basic and detailed design and the implementation activities necessary for successful implementation of the Project in compliance with the provisions of the Agreement or where not so specified, in accordance with best industry practice. The Vendor shall be responsible for any discrepancies, errors or omissions in the specifications, and other technical documents that it has prepared, whether such specifications, drawings, and other documents have been approved by the Project Manager or not, provided that such discrepancies, errors, or omissions are not because of inaccurate information furnished in writing to the Vendor by or on behalf of Owner. 5.1.3 Approval/review of technical documents by Project Manager a) The Vendor shall prepare and furnish to the Project Manager the documents as specified in the technical requirements for the Project Managers approval or review. b) Within twenty one (21) days after receipt by the Project Manager of any document requiring the Project Managers approval, the Project Manager shall either return one copy of the document to the Vendor with its approval endorsed on the document or shall notify the Vendor in writing of its disapproval of the document and the reasons for disapproval and the modifications that the Project Manager proposes. c) If the Project Manager disapproves the document, the Vendor shall modify the document and resubmit it for the Project Managers approval. If the Project Manager approves the document subject to modification(s), the Vendor shall make the required modification(s), and the document shall then be deemed to have been approved. The procedure set out above shall be repeated, as appropriate, until the Project Manager approves such documents. d) The Vendor shall not depart from any approved document unless the Vendor has first submitted to the Project Manager an amended document and obtained the Project Managers approval of the document. e) The Project Managers approval, with or without modification of the document furnished by the Vendor, shall not relieve the Vendor of any responsibility or liability imposed upon it by any provisions
Confidential Page 79 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
of the Agreement except to the extent that any subsequent failure results from inaccurate information furnished in writing to the Vendor by or on behalf of Owner. 5.1.4 Packing, Protective Painting and Marking of hardware and other equipment or material a) The Vendor shall include and provide for securely protecting and packing the equipment in accordance with the best established practices so as to protect the contents from damage during transit from point of manufacture until after arrival at Project Site under conditions which may involve multiple handling, transport by ship, rail and road, reshipment, storage, exposure to heat, moisture, rain etc. and possibility of pilferage. All packing shall allow for easy removal and checking at Project Site. The Vendor shall stick/paste list of its contents on top of the Package. The Vendor shall ensure packing of all items as listed in the packing list before finally dispatching the Package. b) Fragile items shall be wrapped in crepe cellulose wadding or some equally efficient cushioning materials and floated in excelsior and packed in substantial wooden covers with special precaution against risk or breakage. c) Wherever necessary the packages shall be marked with special markings such as TOP, BOTTOM, DO NOT OVERTURN, FRAGILE, HANDLE WITH CARE, KEEP DRY, etc. as well as a special symbol indicating the top. d) Packing lists: Each package shall have inside it a detailed packing list quoting specifically the name of the Vendor member, number and date of the Agreement, the name of the Owner and the detailed list of contents packed within the package indicating the nomenclature of the Stores and a schedule of parts of each complete Equipment, giving the part numbers with reference to the assembly drawings and the quantity of each part, drawing numbers and tag numbers. A duplicate copy of the packing list shall be put in a water proof envelope and fastened securely to the outside of the package as well as to unpacked pieces or bundles. e) Notwithstanding anything stated in the clause, the Vendor shall be entirely responsible for missing, shortage, damage, loss or depreciation to the Materials occasioned by faulty, defective or insecure packing or due to improper or insufficient protective system. 5.1.5 Record Maintenance: The Vendor shall maintain accurate records of works executed as per the scope of the Agreement in a format that will permit audit. 5.1.6 Review of Progress: The work shall be executed strictly as per the time Schedule, indicated in the Bid documents. Monthly / weekly work programme will be drawn up by the Vendor before commencement of work & submitted to Project Manager for approval. The programme & progress will be reviewed from time to time and if required, the programme may be re-scheduled by Project Manager. The Vendor shall also be responsible to provide materials within his scope in time to achieve the programme. In all matters concerning the extent of programme set out weekly and monthly, the decision of the Project Manager will be final and binding on the Vendor. Both Parties shall agree to a planned review of the progress of the works executed under the scope of the Agreement, in a periodic interval with a view to, a. Review the progress b. Resolve pending issues c. Plan for resources required for ongoing and future works. d. Evaluate all escalated issues and address mechanisms to remedy them. During the term of this Agreement Owner reserves the right to formally audit and evaluate the performance of the Vendor upon reasonable notice and at reasonable times. 5.2 Implementation Plan for FMS a. The Vendor shall prepare a transition plan that sets out the steps to assume the provision of the relevant Services and ensure an effective and orderly transfer of responsibility for the management and provision of the Services to the Vendor.
Confidential Page 80 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
b. The Vendor shall prepare a detailed Schedule for preventive maintenance of all the systems of the Project. 6 Scope Change Intentionally kept blank. 7 Product Upgrades 7.1 At any point during performance of the Agreement, if any technological advances be introduced by the Vendor for Systems originally offered by the Vendor in its bid and which are still to be delivered, the Vendor shall be obligated to offer to Owner the latest versions of the available System having equal or better performance or functionality at additional cost if applicable and as mutually agreed. 7.2 Owner may at its discretion introduce all new versions, releases or updates of the software provided that the new version, release, or update does not adversely affect the operation or performance or require extensive reworking of the System. In cases where the new version, release, or update adversely affects the System operation or performance, or requires extensive reworking of the System, the Vendor shall continue to support and maintain the version or release previously in operation for as long as necessary to allow introduction of the new version, release, or update. In no case shall the Vendor stop supporting or maintaining the version or release of the software in operation for a period not less than that mentioned in clause 10. 7.3 The Vendor shall not supply any software that Owner is not licensed to use, unless the product is activated by a required license key. The Vendor shall also certify that all their products and updates as supplied to Owner shall be free from viruses, worms, Trojans, spy-ware etc. 8 Assignment and Subcontracting 8.1 Assignment The Vendor shall not transfer or assign the Agreement or any part thereof or any benefit or interest therein or there under without the written consent of the Owner. In the event of the Vendor contravening this condition, the Owner shall be entitled to place the Agreement else where on the Vendor's account and at his risk and cost, then the Vendor shall be liable for any loss or damage which the Owner may sustain in consequence or arising out of such replacing of Agreement. This shall not relieve the Vendor of any responsibility under this Agreement.
8.2 Subcontracting The Vendor shall not sub-contract the whole or any part of the Project to any person or firm or company hereinafter referred as Sub-Contractor, without the prior approval of the Owner and such approval if given shall not establish any contractual relationship between the Sub-Contractor and the Owner and shall not relieve the Vendor of any responsibility, liability or obligation under the Agreement and the Vendor shall be responsible for the acts, defaults and neglects of any Sub-Contractor or Sub-Contractors agents, servants or workmen as fully as if they were the acts, defaults or neglects of the Vendor or his agents, servants or workmen.
Notwithstanding any approval given by the Owner for sub-contract, it shall continue to be obligatory on the part of the Vendor to provide to the Owner all the details viz., drawings, specifications, technical data, detailed design, performance characteristics etc. from his Sub- Contractors. 9 Tests 9.1 After mutual consultation with the Owner, the vendor shall prepare and submit a detail plan containing test schedule, test procedures & the various performance parameters for testing as per industry standards & best practices for conducting various tests, hereinafter referred to as the Test Plan. Necessary instruments, automated testing tools, consumables, personnel and other facilities required for conducting the tests shall be arranged by the Vendor. All acceptance parameters as agreed between
Confidential Page 81 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Owner and the Vendor will be demonstrated during the tests. Some of the important performance parameters are mentioned in Annexure-2. The Tests to be carried out shall include but not be limited to the following. 9.2 Acceptance tests for installation & commissioning of infrastructure Acceptance tests shall be carried out for the following infrastructure components in line with the cl.no - 9.2.1 & 9.2.2. i. Data Center equipments. ii. Hardware equipments iii. Networking components iv. Video conferencing system v. IP telephony system.
The above infrastructure components shall be collectively referred to as Infrastructure.
9.2.1 Preliminary acceptance tests for Infrastructure components. a) Preliminary acceptance test shall be conducted individually for the Infrastructure components. b) As soon as the installation of individual components with all its auxiliary facilities including its final connections is completed, Owner, jointly with the Vendor, shall proceed with preliminary tests to check and ensure that all the units have been properly installed and are fit to be operated. The Vendor shall be responsible for any defective functioning/ workmanship, if any and the resulting damages while conducting the test. Defects found during the testing due to faulty installation shall be rectified by the Vendor at his own cost and to the satisfaction of Owner. c) All Infrastructure components will be tested for 72 hours of continuous working in confirmation to specifications of the systems. The Vendor shall conduct commissioning test and establish 100% satisfactory performance of the system supplied by him during this period. If the test is interrupted due to any reason attributable to the Vendor, the system has to be started again for 72 hours continuous testing. Any defect/malfunctioning found during this period shall be rectified and defective part if any, shall be replaced immediately without any extra cost to Owner. In such case, the commissioning test of the system shall be demonstrated again for the next 72 hours on a continuous basis. d) Should the tested Infrastructure component or its system fail to conform to the specification, Owner may reject the System, and the Vendor shall within a period of 14 (fourteen) days either replace the rejected System, or make alterations as necessary so that it meets the required performance, without any additional cost to the Owner. e) As soon as the preliminary acceptance tests have been carried out individually and the results are found to be satisfactory, Owner shall issue the preliminary acceptance certificate for the individual Infrastructure components. Such certificate however shall be deemed to be on account and shall in no way relieve the Vendor from the liabilities in respect of the work as a whole. 9.2.2 Final acceptance test for Infrastructure a) After the issue of the preliminary acceptance certificate of all the individual Infrastructure components, the Infrastructure shall be ready for the final acceptance test to ensure the integrated operation. The final acceptance test for the Infrastructure shall be carried out during the Go-live acceptance test at full load on the Infrastructure components with all the applications running so as to meet the standard of performance parameters as per Annexure-2. b) The Vendor shall use all reasonable endeavours to promptly remedy any defect and/or deficiencies and/or other reasons for the failure of the final acceptance test of Infrastructure as notified by the Owner. Once the Vendor has made such remedies, it shall notify the Owner, and shall use all reasonable endeavours to promptly carry out retesting of the System.
Confidential Page 82 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
9.3 Upon the successful final acceptance test of the Infrastructure, the Owner shall issue the final acceptance certificate for the Infrastructure. 9.4 Acceptance Tests for SAP & non-SAP application implementation 9.4.1 Conference room pilot Tests for SAP application a) Conference room pilot tests of SAP implementation shall be carried out through solution prototype to check the fulfilment of functional requirements configured as per accepted business blue print. The prototype validation will go through multiple iterations. The feedback provided to the Vendor after each round of validation / conference room pilot must be documented and signed off by the Owner nominated users. Changes to the solution must be presented to the users in next round of solution validation or conference room pilot. This will be an iterative process till the solution prototype is signed off as acceptable by the Owner. b) Conference room pilot test certificate shall be issued on successful demonstration of all critical functional requirements and at least 80 % of essential functional requirements as per agreed blue print. 9.4.2 User acceptance Tests for SAP & non-SAP applications a) User acceptance Tests of the SAP and non-SAP application implementation shall be completed by the Vendor as specified in the Test Plan. b) Owner shall deploy the operating and technical personnel and all materials and information reasonably required to enable the Vendor to carry out its obligations with respect to commissioning. Production use shall not commence prior to the formal User acceptance testing. c) The User acceptance tests (and repeats of such tests) shall be the primary responsibility of the Vendor, but shall be conducted with the cooperation of Owner before the roll out of the implementation of the SAP & non-SAP applications in production environment, to ascertain whether the System(s) conforms to the Technical Requirements and meets the standard of performance parameters as specified in the Annexure-2, including, but not restricted to, the functional and technical performance requirements. The User acceptance Tests shall be conducted in accordance with the test scenarios provided by Owner. At Owners discretion, user acceptance Tests may also be performed on upgrades and new version releases that are added or modified after user acceptance of the System. 9.4.3 User acceptance for SAP & non-SAP applications a) Subject to clause 9.4.4 below, user acceptance shall occur in respect of the implementation of SAP and non-SAP applications, when the user acceptance Tests have been successfully completed. b) At any time after any of the events set out in clause 9.4.2 have occurred, the Vendor may give a notice to the Project Manager requesting the issue of an user acceptance certificate. c) After receipt of the Vendors notice, the Project Manager shall within a reasonable period of time: I. Issue a user acceptance certificate or II. Notify the Vendor in writing of any defect for deficiencies or other reason for the failure of the user acceptance Tests. d) The Vendor shall use all reasonable endeavours to promptly remedy any defect and/or deficiencies and/or other reasons for the failure of the user acceptance Test that the Project Manager has notified the Vendor of. Once the Vendor has made such remedies, it shall notify Owner and shall use all reasonable endeavours to promptly carry out retesting of the System. Upon the successful user acceptance Tests, the Vendor shall notify Owner of its request for user acceptance certification, in accordance with clause 9.4.3(b). Owner shall then issue to the Vendor the user acceptance certification or notify the Vendor of further defects, deficiencies, or other reasons for the failure of the user acceptance test in accordance with clause 9.4.3(c).
Confidential Page 83 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
e) The procedure set out in this clause shall be repeated, as necessary, until a user acceptance certificate is issued. f) If the System fails to pass the user acceptance Test, then Owner may consider terminating the Agreement, pursuant to clause 18. 9.4.4 Partial User Acceptance a) User acceptance shall be carried out individually for each identified System of the SAP and non-SAP application. In this event, the provisions in the Agreement relating to the user acceptance Test, shall apply to each such System individually, and user acceptance certificate(s) shall be issued accordingly for each such System of the SAP and non-SAP application, subject to the limitations contained in clause 9.4.4(b) b) The issuance of user acceptance certificates for individual Systems pursuant to clause 9.4.4(a) shall not relieve the Vendor of its obligation to obtain a user acceptance certificate for the SAP and non- SAP application as a whole once all Systems have been implemented. 9.5 Go-live and Stabilization Acceptance of Project 9.5.1 Go-live Acceptance a) After the issue of the user acceptance certificates the Vendor will ensure that the Project is rolled out for production environment, hereafter referred to as Go-live, in accordance with the timelines specified in the Project Plan. b) Owner shall deploy the operating and technical personnel and all materials and information reasonably required to enable the Vendor to carry out its obligations under Go- Live as specified in the Project Plan. c) Different modules rolled out for Go-live will be operated in an integrated environment as per the Project Plan. Upon successful operation of the Project in the production environment, Go-live acceptance certificate will be issued. d) After issue of Go-live Acceptance certificate Owner shall take over the Project implemented. However, taking over by Owner shall relieve the Vendor of its obligations under this Agreement. Taking over means taking over physical possession and the Project shall be operated under the supervision and guidance of the Vendor till the Stabilization Acceptance Tests are carried out and the Stabilization Acceptance Certificate is issued as per clause No. 9.5.2 here in below. 9.5.2 Stabilization Acceptance a) During the stabilization period, the Vendor shall provide hand holding services (post Go-live support) to Owner for optimum utilization of the Project. b) The Stabilization Acceptance Tests (and repeats of such tests) shall be the primary responsibility of the Vendor, but shall be conducted with the cooperation of Owner after stabilization period of the Project, to ascertain whether the Project meets the standard of performance as specified in Annexure- 2 and functional requirements as desired by Owner. The Stabilization Acceptance Tests shall be conducted as per the Test Plan in consultation with Owner. At Owners discretion, Stabilization Acceptance Tests may also be performed on upgrades and new version, releases that are added or modified. Stabilization Acceptance Test shall be of 21 days. The Stabilization Acceptance certificate shall be issued by the Owner after achieving defined performance levels during Stabilization Acceptance Tests. c) If, for reasons entirely attributable to the Vendor, the Project does not conform to the Scope of Agreement or does not conform to all /any other aspects of the Agreement, the Vendor shall at its cost and expense make such changes, modifications, and/or additions to the Project as may be necessary
Confidential Page 84 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
to conform to the Scope of the Agreement and meet all functional and performance standards. The Vendor shall notify the Owner upon completion of the necessary changes, modifications, and/or additions and shall request the Owner to repeat the Stabilization Acceptance Tests until the Project achieves Stabilization Acceptance. d) If the Project or its System(s) fails to achieve Stabilization Acceptance, due to reasons entirely attributable to the Vendor, then Owner may consider termination of the Agreement, pursuant to clause 18, and forfeiture of the Vendors security deposit for the project in accordance with clause 12.5.2 in compensation for the extra costs and delays likely to result from this failure without prejudice to other rights of Owner available under the Agreement. 9.6 Final Acceptance of the Project Once the Owner issues the Stabilization Acceptance Certificate, the Project represents a complete solution to the Owners requirements set forth in the Scope of Agreement and it conforms to all other aspects of the Agreement and stands finally accepted by the Owner, hereinafter referred to as Final Acceptance. 10 Performance Guarantee / Warranty 10.1 The Vendor will provide the following Performance Guarantee / Warranty: a) Performance Guarantee (PG) for the implementation of SAP and non-SAP applications shall be for the period of 1 (One) Year from the date of Final Acceptance. During the performance guarantee period, the Vendor shall extend all services required including but not limited to the details given in clause 10.4. b) For Data center components including civil & electrical installations, the period of performance guarantee / warranty shall be for a period of 1 (One) Year from the date of Final Acceptance. c) For hardware, including Video Conference & IP Telephony, the period of performance guarantee / warranty shall be for a period of three years from the date of Final Acceptance. The services required are including but not limited to scope as given at clause 10.4. d) For Network hardware & installations, the period of performance guarantee / warranty will be for 3 (Three) Years from the date of Final Acceptance. The services required are including but not limited to scope as given at clause 10.4. 10.2 The Vendor will guarantee to Owner the performance of the Project for a period as stated above. This Performance Guarantee (PG) will be applicable to all components of the solution including hardware, network and implementation services. For the performance guarantee / warranty, Vendor shall provide security deposit as per clause 12.4.1. 10.3 Owner will measure the performance of the Project against the technical parameters and performance levels as indicated at Annexure -1 and Annexure-2. The Vendor should provide performance levels at normal and peak load and Owners decision in this respect shall be final and binding on Vendor. 10.4 Detailed scope of Performance Guarantee/Warranty The details provided below as part of the services to be covered under the performance guarantee / warranty, shall not be limiting in the sense that the Vendor shall endeavor to provide such services in conformation with industry best practices, which may be equal to or better than the level of services provided herein. Further, the Vendor should ensure that such services shall be exclusive of the services to be provided under FMS. 10.4.1 Annual Technical Support (ATS): The ATS should cover the services which the Vendor provides normally under technical support and shall include minimally the following support for RDBMS, EAI products and all other standard third party software wherever applicable:
Confidential Page 85 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
a) All product upgrades b) User & Technical support on a 24x7 basis. c) Technical Support for integration or installation of any patch or product upgrade for any third party software. d) Periodic site visit. e) Database software. 10.4.2 Performance Guarantee/Warranty for hardware and Network hardware: 10.4.2.1 Performance guarantee and warranty support shall be delivered directly by the OEM through Vendor. Certificate from OEM should be attached stating that the OEM will provide support directly during the warranty period and subsequent AMC including replacement of spares. The OEM supplier/vendor should undertake to a) Provide comprehensive warranty for the supplied systems/subsystems for a period of 3 years from the date of Final Acceptance. b) Warrant the tapes, Diskettes, CDs or the media to be free of defects in material and workmanship under normal case for 90 days from the date of Final Acceptance. During this period, Owner may return defective media to the Vendor and it will be replaced free of cost. c) If any document/manual supplied by the Vendor is found to be inadequate/ incomplete within the period of the Agreement, the Vendor shall replace/complete such document/manual at their cost within 15 days time. d) Warranty shall cover the following: i. Repair / replacement of hardware and other supplier items inclusive of all types of spare parts including batteries, plastic parts, sprockets, glass items, picture tubes, print heads, etc. Only consumables like printer ribbons, Ink cartridge, etc. are excluded. ii. installation / re-installation / maintenance of OS, system software and other supplied software. iii. installation of system software, patches, upgrades, service packs etc. iv. Supply of all system software upgrades and patches. v. Supply of future release of all OS and related system software vi. Supply and install security patches and bug fixes vii. 24 x 7 x 365 national telephonic support viii. Access to raise technical assistance request at hardware vendors /supplier website. 10.4.2.2 The Vendor shall be required to provide the following services based on standards and the best practices to meet or exceed the uptime/performance requirements: a) 24 x 7 x 365 Support at IBTPS, Banharaplai, J harsuguda & HO, Bhubaneswar b) Manpower at on-Site: Adequate number of competent hardware engineers to manage of all the components of the supplied hardware (for server, storage & storage Nntwork, network hardware viz., routers, switches, firewalls etc.) and software, should be available on site to provide Warranty on 24 x 7 x 365 basis. The Manpower should be always available on site during office hours 9 AM to 6 PM seven days a week. For rest of the period of the day, the manpower can either be available on site or contacted on telephone. During non-office hours the manpower should reach site within one hour. The concerned service engineers should be associated with the project from installation stage. c) Must have service to support the following: i. Maximum Two (2) hours response time for any reported fault.
Confidential Page 86 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
ii. Maximum Twelve (12) hours resolution time to all hardware and OS related issues on High Availability Clusters, SAN storage, Backup System, network hardware viz., routers, switches, firewalls etc. Maximum twenty four (24) hours resolution time to all hardware and OS related issues on all stand alone systems 10.5 Defect Liability 10.5.1 The Vendor warrants that the Project, including all the System(s) and other Services provided, shall be free from any defect or deficiency in the material, design, engineering, and performance/workmanship that prevent the Project and/or any of its Systems(s) from fulfilling the technical requirements or that limit in a material fashion the performance, reliability, or extensibility of the Project and/or any of its System(s) as per the performance guarantee / warranty period defined at clause 10.1. 10.5.2 If during the warranty period any defect or deficiency is found in the material, design and performance/workmanship of the Project and other Services provided by the Vendor, the Vendor shall promptly, in consultation and agreement with Owner, and at the Vendors sole cost repair, replace, or otherwise make good (as the Vendor shall, at its discretion, determine) such default, defect or deficiency as well as any damage to the Project caused by such default, defect or deficiency. Any defective System that has been replaced by the Vendor shall remain the property of the Vendor. 10.5.3 If the Project or any of its System cannot be used by reason of such default, defect or deficiency and/or making good of such default, defect or deficiency, the warranty period for the Project shall be extended by a period equal to the period during which the Project or any of its System could not be used by the Owner because of such defect and/or making good of such default, defect or deficiency. 10.5.4 The warranties provided herein are in lieu of all other warranties, both express and implied, and all other warranties, including without limitation that of merchantability or fitness for intended purpose is specifically disclaimed. 11 Waiver Failure of Owner to insist upon strict performance of any terms and conditions of the Agreement will not be deemed a waiver of any rights or remedies that Owner may have and will not be deemed a waiver of any subsequent default under the terms and conditions of the Agreement. No right or remedy of Owner will be exclusive of any other right or remedy and Owner will have all the rights and remedies given under the Agreement and now or hereafter, existing in law or by statute. The shipping or delivery by the Vendor or receiving of payment by Vendor for the work under this Agreement will not be deemed a waiver of any rights for any prior failure by the Vendor to comply with any of the provisions of the Agreement. 12 Price and Payment For the performance of the IT Solution, the Owner shall pay to the vendor the price as stipulated in Annexure-4 and as per the Payment Milestone given at Annexure-5. 12.1 Price 12.1.1 The FOR unit rates accepted by the Vendor as per the price schedule under Annexure-4 shall remain firm and binding during the Term of Agreement subject to the variations stipulated hereinafter. The Vendor shall perform all his works as envisaged in the Agreement. 12.1.2 Should the actual physical supplies and services are found more than those indicated by the Vendor in the price schedule, the Vendor shall not be entitled for any additional amount from Owner. However in the event of decrease in actual supplies/services/installation & commissioning, the Contract Price shall be proportionately adjusted for the decreased supplies/services/installation & commissioning based on the break-up furnished by the Vendor as annexure in the price schedule. 12.1.3 The prices are intended to provide for all the Scope duly and properly completed in accordance with the terms and conditions of Agreement. Any additional items that are essential for execution and satisfactory implementation of IT Solution shall be deemed to be included and covered but not limited to inter-alia, the following: a. The Prices shall include cost of delivery of all items for successful implementation of IT solution. Items / Materials delivered by the Vendor for which payment was made by Owner shall remain the property of Owner whether those are used or not.
Confidential Page 87 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
b. The delivery terms for all supplies/services shall be on F.O.R. at Owners site. Payment against supplies shall be released only on receipt and acceptance of material as per payment terms referred under this clause. c. The prices shall be inclusive of all Taxes, duties, levies etc. as detailed under clause 12.2.10 below. 12.1.4 The cost of all superintendence of labour, materials, tools, equipments, mobilizing and demobilizing equipment, fixtures, transport charges, insurance charges, bank guarantee charges, temporary and permanent works, testing, handling of materials, stocking and removal charges of any rejected materials, power arrangement and satisfactory maintenance of the same for the full and satisfactory completion of the works intended are all inclusive in the price. 12.1.5 All fees, duties, royalties, rent and compensation to Owner for surface damage or taxes and impositions payable to local authorities in respect of all materials supplied for the work or other duties or expenses for which the Vendor may become liable or may be put to under any provision of the law for the purpose of or in connection with the execution of the Agreement including levies payable on all transactions are all inclusive in the price. 12.2 Taxes & Duties 12.2.1 The price shall be inclusive of all taxes, duties, service tax and education cess thereon, imposed by State/Central/Local governments and includes CENVAT (Excise Duty). Service tax and education cess shall be paid subject to the Vendor complying with all the statutory requirements and furnishing the relevant documents, to facilitate Owner to claim the CENVAT credit which inter-alia include copy of Registration certificate from their jurisdiction of Superintendent of Service tax and Cenvatable invoices containing the following details:
i. Name, address and the registration number and service tax range of each Vendor member. ii. Name and address of the person receiving taxable service (Owner). iii. Description, classification and the value of taxable service provided. iv. Service tax and education cess payable thereon.
However the payment of service tax and education cess thereon shall be restricted to the total amount as indicated in the price schedule
Confidential Page 88 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
12.2.2 The Vendor has to indicate the amount of Orissa VAT and service tax for which they shall provide relevant documents for enabling Owner to claim Input Tax Credit on Orissa VAT and CENVAT credit on account of service tax. 12.2.3 Introduction/upward variation in taxes, duties, cess and levies, if any applicable shall be paid by Owner subject to production of necessary documents by the Vendor. Similarly withdrawal/downward revision in variation in taxes shall be adjusted in the price and benefit shall be passed to Owner. Fresh taxes & levies, if any, as may be applicable on this Agreement, shall be reimbursable against documentary proof to be submitted by the Vendor. The Vendor has to consider all taxes & duties applicable on this Agreement. Any omission, or non-inclusion, either declared or not declared, of any taxes and duties that are applicable at the time of submission of price bid/revised price bid /revision in prices shall not be considered as a reason for reimbursement of such taxes and duties at a later date. 12.2.4 If the work is delayed for the reasons attributable to Owner and extension of the time for completion is granted, variation in taxes and duties enacted during Contractual completion/execution period, the adjustment in contract price shall be allowed within the extended period of the Agreement. Similarly, if the work is delayed for the reasons attributable to the Vendor, variations in taxes and duties will not be paid. 12.2.5 The Vendor shall bear and pay all the liabilities in respect of non-observance of all legal requirements as per various statutory provisions. 12.2.6 VATable invoice shall be submitted by the Vendor members duly complying with the procedure and conditions stipulated by tax authorities to facilitate Owner to claim ITC on VAT for all supplies made from within the State of Orissa. Payment of Orissa VAT shall be restricted to the value of Orissa VAT in VATable invoices or the amount of Orissa VAT shown against ITC, whichever is lower. For this purpose the amount of Orissa VAT indicated against different rates in the table shall be treated separately but total amount of Orissa VAT on various items will be taken as one within the same rate category. 12.2.7 In case of bought-out items outside the state of Orissa, the Vendor shall make Sale in Transit as per Section 6(2) of Central Sales Tax Act 1956 and all formalities required shall have to be observed by the Vendor. 12.2.8 The adjustment in the Contract Price towards imposition of new taxes or abrogation of existing taxes shall be applicable only if the new tax is enacted or existing tax is abrogated within Contractual delivery/execution period. For any variation due to enactment of new tax or abrogation of existing tax after Contractual delivery / execution period, adjustment in the Contract Price shall not apply. 12.2.9 All formalities required under statutes, for availing any concessions under relevant tax laws shall be adhered to by the Vendor.
12.2.10 Deduction of Taxes At Source
12.2.10.1 Recovery at source towards income tax calculated at the rate prescribed from time to time under the Income Tax Act 1961 and other relevant sections of Income Tax Act shall be made from the bills of the Vendor and the amount so recovered shall be deposited with the Income Tax Department. Necessary TDS certificate to this effect will be issued to the Vendor in the prescribed pro-forma. 12.2.10.2 If any other taxes / duties / cess etc are to be recovered at source as per government regulations / Legislation from time to time, the same shall be recovered from the bills payable to the Vendor. Necessary receipt to this effect will be issued to the Vendor in this regard as per the applicable legislation. 12.3 Billing and Payment Terms Billing and Payments shall be carried out from IB Thermal Power Station, Banharpali, J harsuguda office of Owner. All interactions regarding the execution of the Agreement, submission of bills and correspondence on any matter shall be done with the Project Manager / Owners representative. 12.3.1 Billing
12.3.1.1 Vendor shall submit running account bills as per the payment milestone with supporting documents for having achieved the designated milestone activities. 12.3.1.2 All bills/invoices must be raised in INR only taking into account the prevailing taxes & duties with reference to the Payment milestone.
Confidential Page 89 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
12.3.2 Payment
12.3.2.1 Owner shalll release payments based on the Payment Milestones as indicated in the Annexure-5. Payment shall be released on submission of the bill with supporting documents duly certified by the Project Manager / Owners representative after deducting taxes at source as prescribed by the legislative authorities, penalty and other recoverable if any. If such payment release day falls on a holiday of Owner, payment will be released on the next working day. Against deduction of statutory taxes, tax deduction certificates where ever applicable shall be issued as per the applicable provisions of the statute. The Project Manager may recover any amount wrongly paid in excess in any previous bills certified by him. 12.3.2.2 All payments shall be made direct to the Vendor or his authorized representative in the shape of crossed A/c payee Cheque / Demand Draft less Bank Charges on certification of the Project Manager/Owners representative and on compliance of contractual terms & conditions. 12.3.2.3 In case of shortage/missing/damage/ failure of any material identified at any point of time within the period specified by the Agreement including guarantee period, the agency shall supply/replace the same without any financial implication to Owner. The taxes, duties, clearing & forwarding and other charges incurred by Owner in this regard shall be recovered from the Vendors pending bills and in case no bills are pending the same shall be made good by the Vendor. The Vendor shall accordingly submit the subsequent invoices. 12.4 Security Deposit 12.4.1 Security Deposit for Project 12.4.1.1 The Vendor shall stand guarantee for the overall performance as per clause 10 including the supplies made and work to be done by the Vendor. 12.4.1.2 The Vendor shall furnish a Performance Bank Guarantee Bond from any scheduled bank (other than cooperative Bank) in India as per the enclosed proforma at Annexure-6 before the signing of the Agreement, for an amount equivalent to 10% of the of the Contract Price towards the Project, valid for Ninety Days beyond the performance guarantee period. The issuing bank should be advised to send a direct confirmation of issue of bank guarantee to Owner. Performance Guarantee Bond will be released phase wise after satisfactory completion of respective components guarantee as defined in clause 10 -performance guarantee / warranty. The Vendor shall have to submit a fresh Performance Guarantee Bond of reduced amount proportionate to the remaining components as defined in clause 10-Performance Guarantee / Warranty in lieu of the released Performance Guarantee Bond. Owner shall not be liable to the Vendor for any matter or thing arising out of or in connection with the Agreement or the implementation of the Project unless the Vendor shall have made a claim in writing in respect there of before issue of the Stabilisation Acceptance Certificate. 12.4.1.3 The Bank Guarantee for security deposit shall be for the due and faithful performance of the Agreement and shall remain binding notwithstanding such variations, alterations or extensions of time as may be made, given, conceded or agreed to between the Vendor and Owner. 12.4.1.4 Should the extent or the object of the Agreement be altered during the execution of the Agreement in such a way as to effect an increase or decrease on the Contract Price by more than 10%, the amount in the Bank Guarantee shall be increased or decreased correspondingly. 12.4.1.5 The bank guarantee and any amendment thereto shall be executed on a non-judicial stamp paper of requisite money value as prescribed by the Statute. a) All Bank Guarantees for security deposit, interest free recoverable advance and other payments and extensions of Bank Guarantees shall be sent in a sealed envelope directly by the Bank through Registered Post to Sr.Manager(PSM), Purchase & Contracts, IB Thermal PS, Banharpali, J harsuguda. b) Bank Guarantees / extensions of Bank Guarantees submitted by the Vendor directly will not be admitted. 12.4.1.6 The Non-judicial stamp paper for the Bank Guarantee should be purchased in the name of executing Bank only.
Confidential Page 90 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
12.4.2 Security Deposit for FMS 12.4.2.1 An amount of 10% shall be retained as Security Deposit for FMS from each bill raised for FMS as per the payment milestone. This security deposit shall be refunded to the Vendor after Six months of completion of FMS. 12.5 Forfeiture Of Security Deposit 12.5.1 Whenever any claim against the Vendor for the payment of a sum of money arises out of or under the Agreement, Owner shall be entitled to recover such sum by in part or whole from the security deposits. In the event of the security deposit being insufficient or if no other security has been taken from the Vendor, then the balance or the total sum recoverable as the case may be, shall be deducted from any sum then due or which at any time thereafter may become due to the Vendor. The Vendor shall pay to Owner on demand any balance remaining due. 12.5.2 In the event of any material breach by the Vendor or any loss or damage suffered by Owner which in the opinion of Owner that the loss or damage has arisen due to reasons attributable to Vendor or in the event of the termination of the Agreement for any such breach, the security deposit is liable to be forfeited. The decision of forfeiture by Owner shall be final and binding on the Vendor. 13 Liquidated Damages 13.1 Liquidated Damages for the Project 13.1.1 Liquidated damages for failure by Vendor to meet critical techno-functional requirement specification of the Project The Vendor shall meet each functional and technical requirement specification of the Project. During the implementation phase, if the Project is found not to be meeting the requirement specifications, the liquidated damage structure as detailed below shall be applicable. The Parties hereby agree that the Liquidated damages structure herein below is a genuine pre-estimate of the damages likely to be suffered and not by way of penalty. The Liquidated damages shall be imposed without prejudice to the right of the owner to make any other recoveries/levies mentioned else where in this Agreement or in Law. a) Vendor shall meet all critical requirement specifications in the scope, in the event of any delay by Vendor in meeting the critical requirements/ specifications beyond one month from the User Acceptance Test of the Project and for not meeting 20 or more such critical requirement specifications Parties agree that maximum of 5% of Contract Price towards the head of Project will be levied as Liquidated damages. If it is less than 20 critical requirement specifications, the liquidated damages shall be levied 1/20th of 5% of Contract Price towards the head of Project multiplied by actual number of critical requirement specifications not met by the vendor. b) Vendor shall meet all non-critical requirement specifications, in the event of any delay in meeting the non-critical requirement specifications beyond three months from Go-live of the Project and for not meeting 20 or more such non-critical requirement specifications a maximum of 2% of Contract Price towards the head of Project will be levied as liquidated damages. If it is less than 20 non-critical requirement specifications, Liquidated damages shall be levied 1/20th of 2% of Contract Price towards the head of Project multiplied by actual number of non-critical requirement specifications not met by the Vendor. c) The above liquidated damages payable by the Vendor are only for delay in providing solution to the functional and technical requirement specifications in time as per schedule given in the Agreement. Even after completion of the time given as above, if the requirements are still not met by the Vendor, the requirements of Owner will be carried out by another alternative party at risk and cost of the Vendor. In such an event the entire additional cost/amount incurred by Owner in addition to the liquidated damages levied above will be recovered from the pending bills of the Vendor and if the same is not sufficient, the performance Bank Guarantee given by the Vendor shall also be invoked/used to recover the costs incurred by Owner. If the amount is still not sufficient to meet the costs incurred by Owner, the same is to be made good by the Vendor upon notification by Owner in writing to the Vendor.
Confidential Page 91 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
d) During validity of the performance guarantee, for non-performance against any of the technical parameters as per clause 10.3, Owner reserves the right to levy liquidated damages of 2.5% of Contract Price towards the head of Project for not meeting the response time and further liquidated damages of 2.5% of Contract Price towards the head of Project for not meeting the uptime requirements of technical parameters and will notify the Vendor accordingly. The decision of Owner in imposing the liquidated damages as above will be final, but in any case, the liquidated damages for 13.1.1(a) to (d) shall not exceed 5% of Contract Price towards the head of Project. 13.1.2 Liquidated Damages for failure to adhere to the timelines of the Project a) The Vendor shall stand guarantee for the performance and output as envisaged in the Agreement. b) If the Vendor fails in the due performance of the Project within the timelines fixed by the Agreement or any extension thereof and/or to fulfil its obligations in time under the Agreement or any extension thereof, Vendor shall be liable to pay Liquidated damages to the extent of a sum of 1% of Contract Price towards the head of Project per week or part thereof for which the delay has occurred, subject to a maximum of 10% of Contract Price towards the head of Project. In assessing such delays, the Project Managers decision is final and binding on the Vendor. Parties agree that this is a genuine pre-estimate of the damages and not by way of penalty. c) The recovery of Liquidated damages shall not relieve the Vendor from its obligations to complete the work or from any of its obligations and liabilities under the Agreement. d) The decision of Owner with respect to this clause is final and binding on the Vendor. 13.2 Liquidated Damages for FMS The Vendor shall ensure that the faulty network devices, servers, PCs and peripherals etc are repaired / brought back to service within specified resolution time of service level of FMS. The resolution time shall not exceed the stipulated time for mission critical networking (Criticality-I) equipment, units and components, as mentioned in the service level of FMS. Criticality-I items/calls are to be closed within the service level, irrespective of time the call is registered. In case the Vendor fails to meet the Service levels in time, an amount equal to 0.5 % of Contract Price towards the head of FMS per week of default in such services subject to a maximum of 10 % of the Contract Price towards the head of FMS shall be recovered as liquidated damages. Parties agree that this is a genuine pre-estimate of the damages and not by way of penalty. 13.3 Notwithstanding anything to the contrary in the Agreement, the overall cap of cumulative of penalty and liquidated damages shall not exceed 15% of the Contract Price. 14 Insurance a) The comprehensive insurance and safety of all men and material of the Vendor shall be the responsibility of the Vendor. The comprehensive insurance should cover for full value against loss, damage or destruction by fire, lightning, earth quake, theft, pilferage, non-delivery of package/packages and all other risks including strikes, riots and civil commotions during transit, storage, testing & commissioning and guarantee tests to protect Owner and the Vendor from any loss arising out of such condition. b) The insurance policy shall be tripartite, Owner being the beneficiary. The insurance cover shall remain in full force up to the time the Project is accepted and Stabilization Acceptance Certificate is issued by the Owner. The Vendor shall produce the insurance policy and receipts for the premium at the appropriate time. All money received under any such policy shall be applied in or towards the cost incurred for the damage/deficiency but this provision shall not affect the Vendor liabilities under the Agreement. c) The Vendor shall maintain in full force and affect all such insurances as above and required by the law for the purpose of the Agreement at the cost of the Vendor. d) The Vendor shall furnish to the Project Manager/Owners representative with evidence of such insurance a copy of the issued policy and any cancellation or termination thereof. Should the Vendor default in paying any premium when due, Owner, without prejudice to other remedies set forth in this Agreement shall be at liberty to pay such premium and recover the same from Vendor. e) The provisions contained within this clause are not intended to and do not impair or in any manner limit the liabilities or obligation assumed by Vendor as may be set forth more fully elsewhere in the Agreement.
Confidential Page 92 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
f) The Vendors services shall include the filing and pursuance of all insurance claims on behalf of Owner and the entire Work incidental thereto till realization of Claim. g) Owner shall be the principal holder of the policy along with the Vendor. Owner reserves the exclusive right to assign the policy. h) The Vendor shall be responsible for effecting insurance under the Indian Workmens Compensation Act and any other insurance in accordance with the Indian laws and regulations at his own cost. i) If any Agreement Scope including supplies and services perishes or becomes unserviceable due to any cause whatsoever, including missing, shortage, loss or damage and/or various destructions and risks as mentioned above, the Vendor shall on demand by Owner make replacement at his own cost and in such a way as to avoid disturbances in the general progress of IT Solution. This shall apply irrespective of the question whether or not the risk has passed to Owner or who shall be responsible for such unserviceable condition as aforesaid. j) Upon arrival at Project Site, all equipment, Materials, commissioning spares, special tools & tackles, all consumables, etc., the Vendor shall assume custody thereof and remain responsible therefore, until the physical possession taken by the Owner. k) The Vendor shall, as custodian, be responsible for communicating to the project manager / Owners representative any shortages, missing, breakages, damages, etc. as soon as they come to his notice without prejudice to his obligation under Agreement. l) The insurance policy obtained by the Vendor shall also cover liability for accidents resulting in death, injury, damage to property of Owner or any third party including employees of third parties and / or Owner employees within the premises and precincts of Owner. 15 Indemnity The Vendor assumes responsibility for and shall indemnify and save harmless the Owner, from all liability, claims, costs, expenses, taxes and assessments including penalties, punitive damages, attorney's fees and court cost which are, or may be required with respect to any breach of the Vendors obligations under the Agreement, or in respect of all salaries, wages or statutory dues or any other compensation or dues of whatsoever, nature of all persons employed by the Vendor in connection with performance of the Scope of this Agreement. Owner shall the vendor to take sole control of the defence of such claims. The vendor shall execute and deliver such other further instruments as may be necessary to comply with all the requirements of such laws and regulations as may be necessary there under to confirm and effectuate the Agreement and to fully protect and indemnify the Owner. The Vendor shall not indemnify Owner to the extent that such liability, damage, claims, fines, penalties, and expenses were caused or contributed to by the sole fault of the Owner. The Owner shall not be in any way held responsible for any accident or damages incurred or claims arising there from during discharge of the obligations by Vendor under this Agreement. 16 Patent Infringement The Vendor shall protect, indemnify and save harmless the Owner, his customers and users of his products, against all liability, including cost, expenses, claims, suits or proceedings at law in equity or otherwise, growing out of or in connection with any actual or alleged patent infringement (including process patents, if any) or violation of any license and will defend or settle at the Vendors own expense any such claims, suits or proceedings.
The Owner will notify the Vendor in writing of any such claim, suit, action or proceeding coming to his attention, giving authority and all available information and assistance for the Vendors defence of the same. The Vendor shall appoint a counsel at his own expenses in consultation with the Owner to collaborate in the defence of any such claim, suit, action or proceeding. 17 Settlement of Disputes The Agreement shall in all respects be construed and carried into effect and rights and liabilities of the Parties hereto shall be regulated according to the laws of India.
Confidential Page 93 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
17.1 Mutual Settlement of Disputes Except where otherwise provided for in the Agreement, other than excepted matters all questions and dispute relating to any matter directly or indirectly connected with this Agreement shall in the first place be resolved through mutual discussions, negotiations, deliberation and consultations between both the Parties. 17.2 Conciliation If the effort to resolve all or any of the disputes other than excepted matters through mutual settlement fails, such disputes shall be referred to the conciliator to be appointed by the mutual agreement of both Owner and the Vendor. The conciliator shall make the settlement agreement after the Parties reach agreement and shall give an authenticated copy thereof to each of the Parties. The settlement agreement shall be final and binding on the Parties. The settlement agreement shall have the same status and effect of an arbitration award. The venue of Conciliation shall be Owners Corporate Office, Bhubaneswar. 17.3 Arbitration In the event, the dispute can not be settled amicably, the same shall be resolved through the provisions contained in the Arbitration and Conciliation Act 1996, or any statutory modification or re-enactment thereof and the rules made there under for the time being in force. The arbitration award shall be final and binding for the Parties without appeal and shall be in writing and set forth the findings of fact and conclusion of law. The number of arbitrators shall be three, with each side of the dispute being entitled to appoint one arbitrator. The two arbitrators appointed by the Parties shall appoint a third arbitrator who shall act as chairman of the proceeding. All proceedings shall be conducted, including all documents presented in such proceedings, in the english language. The venue of arbitration shall be at Bhubaneswar only and jurisdiction for any proceedings arising out of or concerning or connected with such arbitration shall be of appropriate court at Bhubaneswar under the jurisdiction of Orissa High Court. For all disputes, appropriate court at Bhubaneswar under the jurisdiction of Orissa High Court alone shall have exclusive jurisdiction in all matters arising under this Agreement. 18 Term and Termination 18.1 Term of Agreement a) The Effective Date of the Agreement shall commence from the signing of Agreement. Time period for implementing the Project is 12 months (6 Months till Go-live and 6 months of stabilization including the 14 days of initial mobilization). b) The Time period for the FMS is 48 months from the date of Final Acceptance of the Project. The Owner has the right to extend the service term by additional periods, on at least 30 days notice before the expiry of the current service term. c) The Vendor should bear in mind that the stipulated time for completing the scope as per the Agreement is the essence of the Agreement, unless such time is extended pursuant to the provisions of this Agreement. d) The Vendor shall complete the entire work inline with this Agreement within the stipulated time frame. No extra time or extension of Agreement period is allowed unless specifically agreed to in writing by the Owner. 18.2 Extension of Time If, for any special circumstances, an extension of time is required, then the Vendor shall inform to the Project Manager/Owners representative, within 15 days from the date of occurrence of such circumstances, request with full particulars for extension of time for which it may consider itself entitled in order that such request may be examined. The decision of the Project Manager / Owners representative, shall be final and binding in this aspect and no additional remuneration shall be payable for the extended period for the scope of work covered under this Agreement.
Confidential Page 94 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
18.3 Termination of the Agreement 18.3.1 Termination of Agreement on Vendor's Default
The Owner, without prejudice to any other remedy for material breach of Agreement, by written notice of default sent to the Vendor, may terminate this Agreement in whole or in part: a) If the Vendor materially fails to complete any part of all the work or all of the goods within the period(s) specified in the Agreement, or within any extension thereof granted by the Owner. b) If the Vendor fails to perform any other obligation(s) under the Agreement. c) If the Vendor, in the judgment of the Owner has engaged in Corrupt Practices or Fraudulent Practices in competing for or in executing the Agreement. For the purpose of this clause: "Corrupt Practices" means the offering, giving, receiving or soliciting of any thing of value to influence the action of a any official, be it from the Owners organisation or any other Govt. or non-govt. body, in the procurement process or in Agreement execution. "Fraudulent Practices" means a misrepresentation of facts in order to influence a procurement process or the execution of a Agreement to the detriment of the Owner and includes collusive practice among bidders (prior to or after bid submission) designed to establish bid prices at artificial non-competitive levels and to deprive the Owner of the benefits of free and open competition". In the event the Owner terminates the Agreement in whole or in part, the Owner may procure / get repaired, upon such terms and in such manner as it deems appropriate, Goods or Services similar to those undelivered / un-repaired, and the Vendor shall be liable to the Owner for any excess costs for such similar Goods or Services. However, the Vendor shall continue performance of the Agreement to the extent not terminated.
18.3.2 Termination for Insolvency of the Vendor
The Owner may at any time terminate the Agreement by giving written notice to the Vendor if the Vendor becomes bankrupt or otherwise insolvent. In this event, termination will be without compensation to the Vendor, provided that such termination will not prejudice or affect any right of action or remedy which has accrued or will accrue thereafter to the Owner.
18.3.3 Termination of Agreement on Owner's Initiative
The Owner reserves the right to terminate the Agreement either in part or in full due to reasons other than those mentioned under clause entitled "Vendor's Default" or due to the outbreak of war. The Owner shall in such an event give thirty (30) days notice in writing to the Vendor of his decision to do so.
The Vendor upon receipt of such notice shall discontinue the work on the date and to the extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Agreement to the Owner, stop all further sub-contracting or purchasing activity related to the work terminated, and assist the Owner in storage, maintenance, protection, and disposition of the works acquired under the Agreement by the Owner.
18.3.4 In the event of termination for whatsoever reason, the Vendor shall be paid equitable and reasonable compensation, as dictated by the circumstances prevalent at the time of termination. 19 Force Majeure If at any time during the continuance of the Agreement, the performance in whole or in part by either party or any obligations under the Agreement shall be prevented or delayed by reason beyond reasonable control of the party including without limitation such as any war, hostilities, act of public enemy, civil commotion, sabotage, fire, floods, earthquake, explosions, epidemics, quarantine restrictions and acts of God (hereinafter referred to as 'Events') and provided notice of the happening of any of the above mentioned Event is given by either party to the other within 21 days from the date of occurrence thereof, the agreed timelines shall be extended by the Owner on receipt of application from the Vendor without imposition of penalty and the services under the Agreement
Confidential Page 95 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
shall be resumed after such event has come to end/ceases to exist. Should one or both the Parties be prevented from fulfilling their contractual obligations by a state of force majeure lasting continuously for a period of at least 3 months and the Owner not having terminated the Agreement by that time, the two Parties shall consult each other regarding the further implementation of the Agreement with the provision that if no mutually satisfactory arrangement is arrived at within a period of 2 months from the expiry of 3 months referred to above, the Agreement shall be deemed to have expired at the end of the 2 months referred to above. The above mentioned expiry of the Agreement will imply that both the Parties have obligations to reach an agreement regarding the winding up and financial settlement of the Agreement. 20 Ownership 20.1 Ownership of Documents and Copy Rights All study documents, data and specification prepared by the Vendor subject to the Scope of Agreement shall be the property of Owner. As and when required or upon termination of the Agreement, the aforesaid documents of all versions shall be handed over to Owner. Vendor shall take all necessary steps to ensure confidentiality in handling of all the matters pertaining to business process studies, data, specifications, methods and other information developed or acquired or furnished by Owner by means of this Agreement or in the performance thereof. Ownership and the terms of usage of the software and Materials supplied under the Agreement shall be governed by this clause. The vendor shall grant Owner a perpetual license to use the software without any additional payment or obligations to enter into a contact for maintenance or support. 20.2 Transfer of Ownership The Project and its System(s) shall be deemed to have passed onto the Owner when the Project is tested for its performance, validation and acceptance by Owner. However the Licensing rights with regard to Core SAP Product and the third party software shall be governed by the End User License Agreement (EULA) of respective OEM. 21 Limitation of Liability 21.1 Notwithstanding anything to the Contrary in the Agreement or any other document, the aggregate liability of the vendor for actual direct damage shall be limited to the Contract Price provided that this limit shall not apply to the patent infringement, bodily injury (including death) and damage to the real property and tangible personal property caused by Vendors negligence. 21.2 In no event, neither party shall be liable to the other party for any indirect, special, punitive, consequential or incidental damages including without limitation, loss of revenue, profits, business, goodwill, anticipated savings or data or third party claims. 21.3 No Director or official or employee of Owner or Vendor shall in any way be personally bound or liable for the acts or obligations of the Owner or Vendor under the Agreement or answerable for any default or omission in the observance or performance of the acts, matters or things which are herein contained. 21.4 The Vendor shall not be entitled to any increase on the scheduled rates or any other rights or claims whatsoever by reason of any representation, explanation, statement or alleged understanding, promise or guarantees given or to have been given to him by any person. 22 Time of the Essence Time is of the essence of this Agreement. The acceptance of a late performance with or without objection or reservation by Owner shall not waive any rights of Owner or constitute a waiver of the requirement of timely performance, of any obligations remaining to be performed. 23 Confidential Information In the performance of its obligations under this Agreement or in the contemplation thereof, the Vendor and its employees may have access to private or confidential information, including but not limited to information concerning costs, charges, operating procedures and technical information, which may be owned or controlled by
Confidential Page 96 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Owner or its parent or affiliates. With respect to any such information so accessed or acquired, the Vendor and Owner, mutually agree as follows:
a) all information provided by Owner shall be and shall remain the exclusive property of Owner or its parent or affiliates; b) the Vendor shall limit access to such information to its employees who have a need to know, consistent with the Vendor's authorized use of such information; c) the Vendor shall keep, and have its employees having access keep, all such information confidential; d) the Vendor shall not copy, publish or disclose to others, or permit its employees or anyone else to copy, publish or disclose to others, any such information; e) the Vendor shall return such information to Owner at its request; f) the Vendor shall use such information only for the purpose of performing its obligations hereunder;
The Vendor at all times shall maintain appropriate internal policies and procedures reasonably sufficient to satisfy its obligations under this provision.
If the Vendor is required to disclose any confidential information of Owner or its parent or affiliates pursuant to any governmental or legal proceedings, the Vendor shall not be liable for such disclosure provided that it gives Owner written notice of the proceeding and seeks an appropriate protective order at least ten (10) business days prior to its disclosure of the aforementioned confidential information. 24 Miscellaneous 24.1 The Vendor represents and warrants to the Owner that as of the effective date of this Agreement,(a) it is a corporation duly organized, validly existing and in good standing under the laws of Country of India, (b) it has all requisite power and authority to enter into and perform its obligations under this Agreement, and (c) there are no actions, suits or proceedings pending, or to the best of its knowledge threatened, which may have a material adverse effect on its ability to fulfill its obligations under this Agreement or on its operations, business, properties, assets or condition. 24.2 The Vendor shall comply with all laws in force in India. The laws will include all national, provincial, municipal, or other laws that affect the performance of the Agreement and are binding upon the Vendor. The Vendor & the Owner agree that the Courts of Orissa shall have the exclusive jurisdiction for any and all disputes, differences and claims arising out of, regarding or in relation to this Agreement or any work issued hereunder. 24.3 If any provision of this Agreement is found to be illegal or unenforceable then, notwithstanding such illegality or unenforceability, this Agreement shall remain in full force and effect and there shall be substitution for such illegal or unenforceable provision a like but legal and enforceable provision which most nearly effects the intention of the Parties. In the event a like but legal and enforceable provision cannot be substituted, the illegal or unenforceable provision shall be deemed to be deleted and the remaining provisions shall continue in full force and effect, provided that the performance, rights and obligations of the Parties under this Agreement are not materially adversely affected by such deletion. 24.4 Notwithstanding any provisions in the contrary which may be contained elsewhere herein, any stenographic, typographic or clerical errors found in this Agreement shall be deemed as automatically corrected without necessity of written amendment. 24.5 No amendment or other variation of the Agreement shall be effective unless it is in writing, is dated, expressly refers to the Agreement, and is signed by a duly authorized representative of each party to the Agreement. 24.6 Neither party shall, during the term of this Agreement and for a period of three (3) months thereafter directly or indirectly, solicit or hire the personal of the other party. 24.7 If at any time should there be any evidence or any lien, claim for which Owner might become liable, which is chargeable to the Vendor, and then the Owner may pay and discharge the same and deduct the amount so paid from any amount which may be or may become due and payable to the Vendor. If any lien or claim remains unsettled after all payments are made, the Vendor shall refund or pay to Owner the
Confidential Page 97 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
cost of such lien or claim including all payments and reasonable expenses. Owner reserves the right to the same. 24.8 This Agreement shall inure to the benefit of and be binding upon the respective successors and permitted assigns, if any, of the Parties, provided that this provision shall not be construed to permit any assignment which would be unauthorized or void pursuant to any other provision contained herein. 24.9 If a work is transferred from the jurisdiction of Owner to any Successor, while the Agreement is in subsistence, the Agreement shall be binding on the Vendor and the Successor in the same manner and take effect in all respects as if the Vendor and the Successor were parties there-to from the inception and then corresponding office of the competent authority of the Successor will exercise the same powers and enjoy the same authority as conferred to Owner under the original Agreement entered into and the Project Manager so appointed shall have the same powers as envisaged in the Agreement. 24.10 Any notice to be given to the Vendor under the terms of the Agreement shall be considered as duly served if the same shall have been delivered to, left for, or posted by registered post to the address of the Vendor at their registered office. Similarly, any notice to be given to the Owner shall be considered as duly served, if the same shall have been delivered to, left for, or posted by registered post to the Owners office. All notices shall be delivered or sent to the other party at the address(s) shown below or at any other address(s) as the party may designate subsequent to signing of this Agreement.
If to Owner: If to Vendor: ______________________ ________________________ 24.11 Changes of location of site/offices do not invalidate the Agreement and Vendor shall have no claim for any compensation for such changes.
IN WITNESS WHERE OFF, both the Owner and the Vendor through their duly authorised representatives, have executed these presents (execution thereof has been approved by the competent authority by both the Owner and Vendor) on the day, month and year mentioned herein.
For & on behalf of For & on behalf of
Orissa Power Generation Corporation Ltd. ___________________________________
In presence of In presence of
Confidential Page 98 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Annexure-1: Detailed Scope of Work The proposed project implementation will be carried out in the following geographical locations a) ITPS Plant / Works Banharpalli, J harsuguda (Orissa) b) Head Office Bhubaneshwar Further, any other offices may be established based on the requirement and expansion of the plant activities during the execution of project. 1. Supply of Hardware and Non-SAP Software 1.1. Supply of Hardware Data Center Equipments The vendor shall supply all the items necessary for the erection & commissioning of the Data Center including but not limited to the following a) Civil construction items such as partition, tiled floor, false floor, false ceiling etc. b) Electrical items such as LT Panels, Power Cables, PVC Copper cables, PVC conduict, Power Distribution board, Lighting Distribution Boards, MCCB, Earthing System for electrical installations, RF earthing for UPS & Servers. c) Dual redundant UPS system along with independent Battery Bank, UPS Distribution Boards. d) Illumination system and its accessories. e) Precision Air-conditioning System, Water Leak Detection System complete with its electrical. f) Access Control System, Rodent Repellent System, CCTV System. g) Items for Fire Detection & Protection system and VESDA system. h) Items for building management system with sensors, direct digital controllers, communication controllers etc. The number of controllers shall be based on the input / output summary given in the BMS specifications. Generic specifications for the above are provided in Table-03 & Table - 10 of Annexure-1. All bought out items shall be as per the acceptable make list given at Table-03 & Table - 10 of Annexure-1. Any other materials proposed, other than preferred makes, will require approval from Owner. 1.2. Supply of Hardware Servers, Storage, Backup Devices, Racks & Other hardware (PCs/Printers) etc. The vendor shall supply al the hardware infrastructure including but not limited to the following. a) Servers b) Racks with KVM c) SAN storage with SAN switch d) Backup Devices e) other required items 1.3. Supply of hardware Networking Equipments The vendor shall supply all the networking Equipments required for the infrastructure including but not limited to the following. a) Switches Core Switch, Distribution Switch, Access Switch, Server-firm switch etc. b) Routers c) Firewall & IPS d) Modem e) Fiber Optic Cable f) UTP cable g) Fiber & UTP Connectors & IO
Confidential Page 99 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
h) NMS equipments i) Internet Connectivity and WAN connectivity Bandwidth j) other required items
Generic specifications of key hardware and Network Equipments are provided in Table-2 of Annexure-1. All bought out items shall be as per the acceptable make list given at Table-2 of Annexure-1. Any other materials proposed, other than preferred makes, will require approval from Owner. The OEM should provide service, spares support to Owner during Warranty period and subsequent AMC period. The necessary certificate should be provided by the Vendor from the OEM as part of the bid. 1.4. Supply of Hardware Video conferencing Equipments The Vendor shall supply all the items necessary for Video Conferencing. Generic Specification of Video Conferencing equipments & software is provided in Table-5 of Annexure-1 1.5. Supply of Hardware IP Telephony Equipments The Vendor shall supply all the items necessary for IP Telephony. Generic Specification of Video Conferencing equipments & software is provided in Table-6 of Annexure-1 1.6. Supply of Non-SAP Software The Vendor shall provide Licenses for all Non-SAP application software including Operating Systems and other related software on all servers / storage broadly covering but not limited to the following. a) Supply of Non-SAP software Messaging & Collaboration System. b) Supply of Non-SAP software Anti Virus / Anti Spam /Content Filtering c) Supply of Non-SAP software EMS/NMS and Service Desk tools. d) Supply of Non-SAP software Building Management System (BMS) e) Supply of Non-SAP software Video conferencing & IP Telephony f) Supply of Non-SAP software Other software The Vendor shall provide media for the software/ applications as well as hard copy of the licences. Time to time patches, updates shall also be provided by the Vendor. 2. Design, installation and commissioning of Infrastructure The Vendors will be responsible for design, installation and commissioning of necessary infrastructure required for running the intended applications and their management. 2.1. Design, installation and commissioning of Data Center The Vendor shall design, install and commission the interior work and infrastructure for Data Center including but not limited to the following required services. The Vendor shall submit the design and drawing documents for validation of Owner before commencing the installation and commissioning work. a) Civil construction including walls, partition, tiled floor, false floor, false ceiling etc. The Vendor shall make temporary arrangements to secure the site from the regular working office area. In case the work requires demolition of part of existing structure such as walls, false ceiling, and re-routing/ dismantling of existing communication, electrical wiring, fixtures & fittings, the same shall be in the Vendors scope. b) Erection, testing and commissioning of Power Distribution board, Lighting Distribution Boards, UPS Distribution Boards. c) Laying, terminations, testing and commissioning of power cabling. This includes making of Raceways for power as well as networking cables. Design and installation of LT Panel, termination of incoming cables brought up to the Panel room, testing and commissioning. d) installation, testing and commissioning of Dual redundant UPS and independent battery bank at the Data Center. The scope includes installation of two nos. of MCCB of appropriate rating, 415 V, three phase and ly, laying, termination of FRLS, PVC copper cables in PVC conduit from UPS DB at Data Center.
Confidential Page 100 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
e) installation, testing and commissioning of Illumination system. f) Erection, testing and commissioning of Earthing System for electrical installations, RF earthing for UPS. The earthing of servers is also included in this package; along with grid for RF earthing shall be in the scope. g) installation & commissioning of Precision Air-conditioning System, Water Leak Detection System complete with its electrical for Data Center. h) installation & commissioning of Access Control System, Rodent Repellent System, CCTV System. i) installation & commissioning of Fire Detection & Protection system and VESDA system. j) installation & commissioning of Building Management System. Generic specifications for the above are provided in Table-03 & Table - 10 of Annexure-1 of this document. On completion of work, the Vendor should furnish 6 sets of hard and soft copy of complete technical documents along with as-built drawings for all the systems. The Vendor should submit all the following design & drawing documents for scrutiny of Owner.
Architectural Drawings a) Plan of Data Center indicating the proposed equipment layout. b) Sections of Data Center indicating all proposed partitions, panelling, false ceiling/ flooring etc. c) Details of ceiling and flooring. d) Material specifications.
Electrical: Drawings and Documents a) Power calculations and Single line diagrams of L.T Panel and DB. b) Make and Model of all equipment and components used along with their ratings and type.
Air conditioning: Drawings and Documents a) Make and Model of all equipment and components used along with their ratings and type. b) Single line diagram. c) Calculation for estimation of cooling load and dehumidified air quantity. d) Details of individual items like compressors, condensers, fans, air filters, controls, accessories, interlocks, insulations, ducting etc.
Associated systems a) Technical Specifications of components proposed for all the systems like Access Control and Surveillance, Fire Detection and Suppression, Rodent repellent system, Water leak Detection system, VESDA, CCTV etc., networking for the same along with catalogues. b) Write up on remote monitoring and views/ reports generation. 2.2. installation & commissioning of Hardware For running the intended applications as mentioned in the scope of Agreement, the Vendor shall design, install and commission the hardware infrastructure including but not limited to the following. The hardware shall be designed to meet the user workload and performance requirements a) Servers for SAP and Non-SAP Applications b) SAN storage, SAN switch and required cabling c) Administrative Tools d) Tape Library e) Racks with KVM and Peripherals
The Vendor shall submit the designed solution architecture of the hardware infrastructure, hardware sizing documents for validation of the owner before commencing installation and commissioning. Hardware sizing for SAP Production, Development and QA / training environment designed by Vendor shall be validated by SAP.
Confidential Page 101 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Hardware sizing for messaging and Collaboration system should be certified for the performance requirements by the OEM of Messaging software Application.
The factors/ considerations required for solution architecture and hardware sizing are as under
a) All servers shall be optimally sized in such a manner that they are able to meet the performance and availability criteria of the offered SAPs ( minuimum SAPs is mentioned bellow) and other solutions like Messaging & Collaboration with stated concurrent users at maximum 70% of installed capacity. Design provision shall be kept to double the capacity with out physically adding up boxes.
Instances SAPs Database Server 10000 Production Server 10000 Development 5000 Quality Server 5000
b) The Solution Architecture should be depicted in text and schematic to explain high availability configuration Architecture i.e. failure of any component should not fail or degrade any service. No dual port adaptor should be used in the solution architecture. c) Development infrastructure needed to support ongoing development/ upgrade needs during and post implementation. d) Quality Assurance (QA) / Training Infrastructure will be needed for conducting tests and trainings during and post implementation. e) The Disaster Recovery site will be set in future course of time. However, the recovery strategy against failure of Servers and SAN, based on RTO (Recovery Time Objective) of 2 hours and RPO (Recovery Point Objective) Zero for Synchronous and RTO (Recovery Time Objective) of 4 hours and RPO (Recovery Point Objective) 30 minutes for Asynchronous shall be given by the Vendors and the provisions shall be kept accordingly.
The Vendor will offer the development infrastructure framework, QA infrastructure framework in details.
The concept of server architecture is depicted in the diagram below (for guidance only). The Architecture should be planned keeping in mind the following design criteria a) Scalability b) Solution flexibility c) Performance d) Redundancy e) Business Continuity f) Investment protection
Confidential Page 102 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Figure 1: Schematic representation of Server Architecture (for reference purpose only)
All arrangements for loading/ unloading, movement of the equipment etc. shall be done by the Vendor. All equipment shall be designed and constructed to the highest standards as well as utilise the most recent and proven technology regarding reliability, ease of maintenance, safety of personnel and ergonomic considerations. Each module of the equipment shall be clearly labelled in English, according to its function. Each module shall include a serial number for identification purposes. All plugs, sockets and cabling shall be labelled in such a way that it eliminates any ambiguity in locating the matching connectors. All equipment shall operate on 230 volts, 50 Hz using the standard three-prong plug defined in British Standard 546.
Confidential Page 103 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
2.3. installation & commissioning of Networking Components For running the intended application as mentioned in the scope, the Vendor shall design, install and commission the network infrastructure including but not limited to the following. The network shall be designed to meet the user workload and performance requirements without single point of failure. The Vendor shall submit the designed network architecture and network drawings to the Owner for validation, before commencing installation and commissioning.
Local Area Network a) Network cabling comprising of but not limited to UTP & Fiber Optic. b) Data Center sites Gbps UTP connectivity between various components like core switch, firewall etc. c) Total Fibre Optic cable layout of approximately 7.5 km. There is existing FO Cabling of approx 3 km from Service Building to Warehouse through Time Office, Service Building to Control Room and Service Building floors. Of this Service Building to Warehouse shall be used as redundant path between the distribution switches. Additional Fiber Optic cable layout for approximately 4.5 Kms is required from Data Center to Service Building, Data Center to Ware House, Service Building to CHP & WTP, and Warehouse to MGR.While considering the above, use of existing FO cabling should be considered to the extent it is technically compatible.. d) Total network of UTP connectivity is approximately 5.5 kms. There is existing internal network of UTP connectivity of approx. 3.5 kms of Service Building, Control room and Head Office (Bhubaneswar). Additional UTP connectivity for approximately 2 Kms is required from access/ distribution switches to nodes at Coal Handling Plant (CHP), Merry Go Round (MGR), Water Treatment Plant, and Warehouse Sheds shall be required. While considering the above, use of existing UTP connectivity should be considered to the extent it is technically compatible. e) Design & installation of high availability Core switches. f) installation of Two Nos of Distribution switches at Service Building & Warehouse of IBTPS and One no of Distribution Switch at Head office Bhubaneswar. The old core switch at IBTPS shall be configured in Active Active mode as fall back arrangement with one of the distribution switch. g) installation of access switches ( No of Access Switches required shall be suggested as per detailed design proposed by Vendor) h) Termination and connectorisation of all fibre and UTP connections. Wide Area Network a) The Vendor shall procure and implement WAN connectivity at Owner. b) The Head Office at Bhubaneswar shall be connected with the primary site at IB Thermal Power Station (ITPS) through two separate 1 Mbps links in load sharing mode. c) All the links shall be from separate service providers on separate network backbone.
Internet connectivity requirements a) The Vendor shall procure and establish internet connectivity at Owner. b) Internet link should be a 2 Mbps (Upgradeable to 10 Mbps) lease line with 2 Mbps online backup link. c) Internet connectivity should be from two different service providers. One link should act as online backup. Quality of Service should be configured to prioritize traffic for optimization and efficient utilization of links.
Storage Area Network (SAN) a) The storage area network should be designed and implemented keeping in mind Owners requirement of high availability and based on high availability architecture. b) The entire SAN solution needs to be implemented comprising but not limited to components for SAN connectivity and SAN storage. Vendors should ensure availability of the following I. Details of Fiber channel SAN connectivity with appropriate topology (point to point, arbitrated loop etc.) for connection keeping in mind Owners needs. II. Documentation on topology used, ports used, backup policy, maintenance guide. III. Details of proposed login mechanism for FC login (port, process, fabric etc). IV. Routing mechanism for the fiber channel along with necessary algorithms name.
Confidential Page 104 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
V. Details of Layout and commissioning of entire cabling for SAN. VI. Details of the regular backup devices to be configured and deployed.
Network Management System (NMS) a) NMS as a part of Enterprise Management System (EMS) should be capable of providing network management services for all integrated network elements (existing as well as new). b) The major services to be provided by NMS should be fault management, configuration management, performance management, accounting Management and security management. c) The monitoring of the NMS shall be located in the Network Operations Center in the Data Center. d) LCD monitors 42 shall be installed on the IT floor for monitoring the WAN & LAN network status. Security a) Appropriate security architecture is to be recommended considering authentication and authorization services, appropriate connectivity e.g. VPN / Dialup / Internet, proxy / firewall services, etc b) Provide an intermediary between an external end-user/system on an external network and the Owner internal systems on the Owner internal networks. c) Allow only certain ports and/or protocols and block internet access to specific sites/systems. d) Firewalls in Data centre shall be configured with failover for high availability. External networks shall be connected to Owner network through a firewall. The entire traffic at interface points needs to be monitored and a traffic log needs to be maintained. e) Intrusion Protection System (IPS) including Denial of Service (DOS) detection should be used to monitor and control any malicious traffic to and from internet, Data Center, DMZ etc. f) Proxy servers should be used to distribute and log internet usage and block access to prohibited sites. g) The Vendor should conduct a Vulnerability Assessment (VA) & Penetration Testing (PT) exercise form an independent agency for all the Servers and critical network equipments and submit the report to Owner. Vendor would take appropriate counter measures to close the reported issues and submit a detailed report. On successful installation of the equipment and configuration of individual components and the solution as a whole, the Vendor shall submit the following as part of the commissioning: h) Configuration details for each server name, IP address, OS version, details of disk partitioning. i) Network diagrams/ cabling scheme. j) Cluster details. k) Details of SAN access, snapshot copy, etc. l) Details of Tape Backup systems. m) Administrators Manual for Servers, SAN, back-up solution and network. n) Line Diagram, details of various LANs, VLANs, and SANs etc. o) IP addressing scheme
The OEM should provide service, spares support to Owner or Owner designated agency during Warranty period and subsequent AMC period. Generic Specification of the network layout is provided in Table-04 of Annexure-1. The concept network is depicted in the diagram below (for guidance only). The Network Architecture should be planned keeping in mind the following design criteria a) Scalability b) Solution flexibility c) Performance d) Redundancy e) Business Continuity f) Investment protection
Confidential Page 105 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Figure 2: Proposed Network Architecture (Schematic) for reference purpose only 2.4. installation and commissioning of Video Conferencing & IP Telephony The Vendor shall design and implement suitable video conferencing solution that shall connect the conference rooms at Head Office, Bhubaneswar and IB Thermal Power Station (ITPS) with other national and international offices. The solution should have the ability to participate in conferences originating from outside the county via an IP or ISDN gateway connection. The details requirement is given in Table-05 of Annexure-1.
Confidential Page 106 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
The Vendor shall design and implement suitable IP Telephony solution for Owner. The solution should be designed to dial up or receive call from international offices across the globe. The details requirement is given in Table-06 of Annexure-1. 3. Implementation of the SAP applications 3.1. Conducting Business Process Study The Vendor will be required to study the business processes, which would be covered by the implementation. Owner will validate this list and suggest suitable changes as may be necessary. Based on the agreed business process coverage of the implementation, the Vendor will: a) Conduct a detailed Business Process Study and propose process changes/improvements that would be facilitated by / necessitated in the solution. b) Identify the workaround solutions / customizations / interfaces to be developed as part of the implementation. c) Identify information / Reports requirements for each business process. d) Identify data conversion elements for each business process. e) Identify the legacy systems that may be retained. The Business Process study will enable the project team of the Vendor to get first hand understanding of the business processes at Owner. It would also help them understand the specific role played by each module / system and identify systems, which would be retained or scrapped, post implementation of the solution. It would also enable the Project Team to see the system in operation, collect sample transactions / reports and get a better understanding of the business process. 3.2. Mapping of Business Processes as per Business Blueprinting Vendor has to design the relevant business processes with all details. This effort shall have the following important tasks: a) AS-IS process mapping to activity/ task level and current state analysis to identify areas of improvement and opportunities for standardization. b) Review the AS-IS processes and define TO-BE processes that are based on business requirements, GAP Analysis and SAP enabled best practices processes. c) Designing of the specific screens and data formats along with the process and method for entering the details. Process Improvement will be done to enable Owner to adopt some of the best practices embedded in the SAP systems. The areas that can bring maximum benefits will be identified by Vendor in close coordination with Owner process Owners. In order to do this, Vendor will also bring in knowledge of the best practices adopted by other world-class organization to the Owner implementation. Vendor shall associate in identifying KPIs for Owner and share benchmark data with Owner team so that their relevance in terms of best practices in the industry can also be ascertained. This in turn will help the implementation team to set up these KPIs in the system. The KPIs relevant to Owner will thus be identified and made to report through BW of the SAP system. Owner envisages that the proposed process improvement and process re-engineering is SAP-enabled. This will enable early completion of the implementation and will also avoid any major re-work. Accordingly process improvement exercise will be an integral part of implementation and the Project Plan for the same will be detailed as part of the overall SAP implementation plan. 3.3. Conceptualizing, Developing, Configuration and Testing the Solution The design proposed by Vendor, shall be realistic, simple, flexible enough to take care of future changes in the organizational structure and easy maintainability. The Vendor will be responsible for the following; a) Conceptualizing and developing the solution based on the business blueprint
Confidential Page 107 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
b) Identification of the fields that need to be captured for the Masters and mapping of the information with the legacy systems c) Configuring the SAP system according to the processes as well as configuring the solution including development of necessary interfaces, bolt-on / third party applications etc. d) Integration of the detailed design across modules. e) Developing the Reports requirements as identified in the Business Process Study for each business process. f) Conducting Conference Room Pilot Test & User Acceptance Test and making necessary changes to configuration / setup based on the test results. g) The SAP implementation at Owner is to be audited/ monitored in continuous basis by SAP India for ensuring smooth and timely implementation as per the requirement of Owner. While developing and configuring the system, the following features essentially, but not limited to should be considered.
User Interface The end user interfaces should be both web interface (wherever applicable) and Graphic User Interface (GUI) based. Wherever possible, data should be available for entry from a drop-down list. There should be field level validation of the data being entered. In case of an error in data type, the error message should be customized to Owner specification. It should be possible for the system administrator to restrict certain values for entry to specific users (e.g. account codes). It should also be possible for the users to retrieve data entered incorrectly and change the same subject to defined security procedure.
Single Point Data Entry avoiding Duplicate Data Entry The system should be capable of reusing the data once captured in the computer, so as to ensure integrity of data. The system should be able to automatically capture data from other legacy / process control systems through integration .There should be a single set of data which once created should be available for use by all users, thereby eliminating the need for multiple data entry and ensuring data consistency across the system. This applies not only to the transaction level data but also to all master data, which may be shared across functions. The system should support capture and storage of statutory documents like invoices, LR/ RR, etc. as part of transaction for avoiding duplicate copies of such documents and access by all concerned from a single source.
Centralized / Common Master Data The solution envisaged by Owner assumes a centralized master data repository to be shared by all the units based on their requirements. These master data would include but not be limited to the following: a) Chart of Account values b) Item / Service Master c) Vendor Master d) Customer Master e) Fixed Assets Category Master f) Employee Master g) Equipment master
Accounting Architecture There should be only one instance of the financial module of the SAP and all units should work on the same. System should be capable of generating consolidated as well as unit wise cost/financial accounts/reports with sub-ledger option. This should not, in anyway, compromise the operational flexibility, security and data access that each unit currently enjoys. Since Owner expects that all units will work on the same instance of the SAP, consolidation of accounts should be a system driven process with minimal human intervention. It should be possible to maintain multiple instances of accounts for supporting its subsidiary units, employee provident fund trust, cooperative societies, etc. from the same and single instance of the application. The system should give flexibility for maintaining the dictionary of old chart of accounts and map it with the new scheme supporting merger and/or splitting of old accounts.
Enabling Centralized Procurement
Confidential Page 108 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Owner expects the SAP to facilitate system driven consolidation of purchase requisitions raised across units into centralized purchase orders. In other words, different units could raise purchase requisition for the same item or on the same vendor which should get consolidated into a single Purchase Order. The SAP should also enable recording of rate contracts with specific vendors for specific items such that as and when purchase orders are raised on those vendors for those items, the rate will default automatically. E-Procurement (comprising of e- Tendering and e-auction) application will be a part of the procurement solution in future as per the IT Strategy.
Data Access and Security Owner believes that ensuring security of data in SAP environment is critical. This assumes greater significance in an organization like Owner where the number of users will be very high and access will be across a wide area network. Owner expects that there will be 150 named users, 1 development users and 400 self service users. The system must have proper security and maintenance facility which limit access to the system and its various functions to the users delegated with appropriate authority. It should provide log in, both by user and by terminal. The System should record date and time stamp of all transaction with details of creation, read, update, delete or print. Access should be restricted at different levels of data file, program, module, screen, record, field database table, row or column. Suitable firewall against unauthorized use, interceptions shall be provided. IT security policy shall be given by the Vendor to safeguard information against unauthorized use, disclosure or modification, damage or loss.
Data Archival In order to meet statutory requirements, archiving and easy retrieval of data is important for Owner. The Vendor must ensure that the proposed SAP Solution provides a user driven data archiving capability, with support for flexible archiving periods and select Tables. The system should also be able to restore archived data for on-line inquiry and reporting as and when required. The Vendor will also provide a data archiving procedure based on best practices.
Audit Trail The Vendors must ensure that the SAP Solution implemented by them has extensive facility with respect to maintaining audit trail. The system should be able to define audit trails, audit logs and transaction log-in requirements. It should enable audit trails on-line, tailor audit requirements by modules, call audit records to an archive based data or other recorded audit details. Any addition, deletion or modification to an existing record, whether master or transaction, must bear the date and time stamp, the name of the log-in user who made the change and the terminal from which the change was made. It should also be possible to maintain details of the original record and subsequent changes to the same. Standard audit related reports should also be available.
On Line Help Facility The SAP Solution should provide context based online help capability for every form /process. This on-line help text / facility should be customizable to make it Owner processes specific. The Vendor must indicate how he proposes to make the online help tailored to Owner requirement.
Availability of Interface Points The SAP Solution should have well defined standard interface points to facilitate integration with satellite applications to interface transaction and master data. This is crucial in Owner context as some of the Owner specific satellite/legacy applications might have to be retained.
Workflow Based Applications Owner expects the proposed SAP Solution to provide workflow-based functional capabilities. SAP Solution should be capable of replacing the current physical flow of documents across business team with the flow of electronic data. For instance, if purchase requisitions require approval based on the item or service being procured, then the workflow in the SAP Solution should forward the link of a purchase requisition electronically to a user/approver based on the criteria defined by Owner.
Modularity Owner expects the proposed SAP Solution to be modular in nature. The system will initially be required to cover a range of business process modules as mentioned above but it should allow addition of more modules as and when required, which should seamlessly integrate into the core system without encountering any technical issues.
Confidential Page 109 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Integration between such modules and the modules already implemented should be seamless and should not require any development effort.
Scalability The SAP Solution being implemented by the Vendors must be scalable both in terms of the business rules, volume of transaction and master data but also in terms of defining new entities and organization structure. Solution scalability is particularly important given the expansion projects underway which would increase production capacity of Owner. The system should be scalable to handle up to four times the number of users and volume of data load without compromising response time or efficiency of operations.
Localization Given that the taxes and other statutory requirements change from year to year, Owner expects the SAP Product vendor to provide updates / patches to cater to these changed India specific statutory requirements within an acceptable time-frame. The system should have adequate localization to handle specific requirements of Companys Act and Cost Accounting guidelines as per ICWAI, Regulatory Indian Laws (Central and State), tax and duty legislation and other regulations.
Enhancements, Upgrades and Bug Fixes Owner expects the Vendor to arrange for providing support for all future enhancements, upgrades and bug fixes. All Vendors are expected to provide description of the mechanism proposed for provision of the same. If these require additional costs, then this must be clearly indicated along with the Time and Material rates.
System Architecture The Vendor shall be entirely responsible for the architecture of the system implemented to satisfy all features, functions and performance as described in this document. The System architecture shall be developed as per following guidelines: a) The system architecture should be based on open industry standards and protocols. b) The system will be centrally deployed and globally accessed. Access should not be restricted locally. c) The application design should be Service Oriented Architecture (SOA) based for all environments. d) Client applications, if any, should be J ava/XML/HTML based thin client architecture with centralized deployment capability. e) All production application must have high availability. f) All systems must take into account appropriate security, performance, efficiency and maintainability issues. g) The system must be designed in such a way that it supports load balancing of the application, presentation and data layers of the system. h) Integration services should address requirements of integration for application to application and data integration. 3.4. SAP Application installation It is proposed to implement following modules of SAP ERP package for Owner at its plant site and Head office as a uniform Business IT solution. The application shall be installed for development, quality and production environment. The production instance shall be independent and shall not share resources from any other instances. a) SAP Financials & Costing(FICO) b) SAP Human Capital Management(HCM) c) SAP Materials Management(MM) d) SAP Plant Maintenance(PM) e) SAP Asset Management(AM) f) SAP Project Systems(PS) g) SAP Environmental Health & Safety(EH&S) h) SAP Quality Management(QM)
Confidential Page 110 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
i) SAP Analytics (BI) SAP Strategic Enterprise Management (SEM) Financial Analytics Operational Analytics Workforce Analytics j) Employee Self Service(ESS) k) India Payroll(PAYROLL) l) Country India Version(CIN) In order to support the prime functions, the SAP system shall also cover the following. However during the study of the SAP modules to be implemented, if the need for any other module is felt, the same shall be considered for implementation. m) Contracts Management n) Dashboard for Senior Management o) Document Management (DMS) p) Workflow Management q) Knowledge Management(KM) r) Content Management(CMS) s) Web portals 3.5. Data Migration All specifications that are needed to populate the data into the new SAP system need to be defined. Vendor, with the assistance of Owners Core Team, shall develop the templates and facilitate the migration of legacy and new data elements to the SAP system. This shall include the following tasks: a) Formal data migration training and facilitating the Owner core team b) Assistance in Checking data quality and Integrity c) Identification & development of the data upload/download programs d) Guidance for creating data extraction programs in the legacy systems to convert into the format as required by SAP e) Providing data migration tools to Owner f) Integration testing of the configured system using the populated master and transaction data g) Assist Owner team in Master Data management. The Vendor is expected to prepare and submit a high level Data Conversion and migration Strategy Document during the process study stage of the project describing the broad data elements to be converted, cleaned, enriched, identify source for the same, the target SAP module and the detailed form in which the same will be converted (i.e., whether at transaction level or at balance level and the coverage period). A tentative time-frame for developing the necessary scripts, testing and validating the same and eventual execution on the Production environment should also be indicated. Vendors responsibility shall be to ensure that data migration is complete in all respects, within time so that the requirements of the implementation are fulfilled. Owner shall cleanse and rationalize the data in the required format provided by the Vendor with their assistance. Vendor shall prepare and provide detailed system for Master Data management.
Owner expects Vendor to commence activity on the data conversion from the early stage of the project to prevent any kind of delay in implementation of overall project. Owner will extract and provide data required from identified
Confidential Page 111 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
existing applications at Owner .Owner acknowledges that the responsibility of efficient data conversion lies with the both, the Vendor and Owner. In this regard, Owner expects the Vendor to: a) Identifying data elements- Masters and Transactional to be converted and migrated b) Extraction of existing data from the identified legacy systems with Owner assistance c) Collection of data from other identified sources with Owner assistance d) Owner will provide assistance in cleansing, enriching and formatting of data extracted from the legacy systems e) Formatting of data collected from other sources f) Preparing and validating data mapping structure g) Preparing data migration scripts h) Running successful trial data migration i) Uploading of data to the new test and production system j) Reconciliation and validation of migrated data and status of transactional data k) Creation of new/additional data mandatory in the new system
Figure 4: Data Conversion Process Steps
The following data need to be migrated (the list may not be exhaustive and could enlist few more data types depending on requirements)
a) Opening & Closing balances for the last five years. b) Specified Transaction data of the last five years. c) All open transactions and all transactions from the start of financial year of Go-live. d) Standing or master data such as vendors/Suppliers, customers, material, work breakdown structures, equipment, preventive maintenance, work specification, defect codes, cost data, etc. e) Production Statistical Data f) Further to past 5 years Legacy data migration, important production statistics since inception such as production of main items, performance parameters are required to be migrated to meet requirements of audit and other queries. Legacy Applications ERP Production Environment Data extracted Data Cleansed / formatted Data added Data Signed off Data Conversion Tested Data Conversion executed ERP Test Environment
Confidential Page 112 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
3.6. Go-live and Stabilization Support Vendor is required to undertake the following for final preparation and Go-live at the Owner premise: a) Review readiness for cut over b) Facilitate in setting up central help desk for any queries c) Resolve Technical & functional related issues d) Define the requirements towards the phasing out of the legacy systems e) Documentation of the issues/ problems that come up and solutions thereof. f) Final configuration/ integration, volume and stress testing g) Switch over to production environment h) The Vendor should obtain a certificate / validation from SAP Product Vendor mentioning that the Solution is fit for go-live. Vendor shall be responsible for Project implementation and correct & satisfactory functioning of the SAP system. Vendor shall provide post implementation support to the Owner to ensure the efficient day-to-day functioning of the system for a period of six (6) months from Go-live. The full implementation team should be there on site during stabilization period. In addition, Vendor shall extend their support during the First quarterly, half yearly, nine monthly and annual closing (7 days for each). Vendor shall also review the health, usage and performance of the SAP system till it stabilizes. Vendor shall provide guidelines in setting up and managing a SAP Helpdesk including the processes to be followed in logging request for assistance, assigning requests to specific helpdesk individuals, recording resolution and tracking overall time frame from logging a call to its resolution. The help desk support to users shall be provided on 24 x 7 bases. Vendor response time will be the basis for end-user support response time in Owners service level agreements with the Vendor. The Vendor will follow response time as detailed below:
Support Category Criteria Maximum Response Time Resolution Critical The system is unable to be used for normal business activities. There is certainty of financial loss to Owner. 30 Minutes 90 Minutes Urgent There is a problem with part of the system, which impacts on Owners decision making. No viable workaround is available. There is a likelihood of financial loss. 1 Hour 4 Hours High The efficiency of users is being impacted, but has a viable workaround. 4 Hours Next Release based on SAP Confirmation Medium A low impact problem that affects the efficiency of users but has a simple workaround. 8 Hours Next Release based on SAP Confirmation Low A fault, which has no particular impact on processing of normal business activities. 8 Hours Next Release based on SAP Confirmation
4. Implementation of the Non-SAP applications The following non SAP applications & software shall be implemented by the Vendor 4.1. Acti ve Directory Implementation with SSO Vendor shall design and implement Active Directory Structure in the organisation with Single Sign On (SSO). Active Directory (AD) Management shall provide master operations, replication, DNS, monitoring/ mapping
Confidential Page 113 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
capabilities for all sites of Owner. AD Management shall inform the operator of Active Directory-related conditions occurring across the network on the following: a) Data is consistent across all Domain Controllers b) Replication is successfully completing in a timely manner c) Systems are able to cope with outages d) Active Directory is not experiencing capacity and fault-tolerance issues e) Active Directory global catalogue is replicating in a timely manner. f) It shall include policies for service monitoring, a tool for mapping replication connections among domain controllers, and reports and graphs for consolidating and charting the collected data. g) It shall provide policies to control the monitoring schedule and receipt of collected information in the form of service problem alerts and messages. h) AD topology viewer shall be provided for viewing the content and topology of AD domains and sites. i) AD topology viewer shall generate a tree showing the AD components as well as graphical map that shows the DC replication connections. j) Active directory set up shall be done to the policies uniformly and regular patch updates. k) Support of Lightweight Directory Access Protocol (LDAP) to allow systems access to the directory. l) Support single sign-on. 4.2. Messaging and collaboration solution The Vendor shall design and implement a high availability mailing solution for Owner users at Head Office and ITPS site. The details requirement is given in Table-07 of Annexure-1. The e-mail solution must be compatible to SAP environment and should be integrated with SAP for sending notification/ alerts etc. The mails system should be integrated with Black Berry Enterprise Servers. 4.3. Anti-Virus / Anti-SPAM / Content Filtering Solution The Vendor shall design and implement a comprehensive security solution for the entire system including suitable Antivirus and Anti-Spam solution for all PC and Laptop users as mentioned in Table-08 of Annexure-1. All the system and servers should be configured with Antivirus software to detect malicious software like Viruses, Worms, and Trojans etc and protect the system. 4.4. EMS/ NMS and Service Desk The Vendor shall design and implement suitable Enterprise Management System (EMS)/ Network Management System solution to be deployed at the Data Center for centralized monitoring of Servers and Network as mentioned in Table-09 of Annexure-1. The Vendor shall provide suitable service desk application at Owner. The application shall be ITIL compliant and support the following function and processes. a) Help Desk b) Incident Management c) Service Level Management d) Problem Management with Known Error Database (KEDB) e) Configuration Management with Configuration Management Database (CMDB) f) Change Management 4.5. BMS for Data Center The Vendor shall design and implement suitable Building Management (BMS) solution for centralized monitoring of the Data Center mentioned in Table-10 of Annexure-1.
Important features desired from BMS are: g) SMS Alerts for Alarm on GSM Mobile Network h) E-mails in the event of Alarm i) Atleast 20% Spare Capacity shall be kept while designing the configuration for Direct Digital Controllers for the scope mentioned. The 20% spares shall be applicable all types of inputs & outputs. All equipments and the interface points of Data Center should be covered in BMS based on the design approved by Owner.
Confidential Page 114 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
4.6. Video conferencing and IP Telephony The Vendor shall implement video conferencing and IP telephony software applications in the installed video conferencing and IP telephony systems as per the specifications provided in Table 05 and Table 06 of Annexure 1. 4.7. Implementation Stabilization Support Vendor shall be responsible for correct & satisfactory functioning of the Non SAP systems implemented. Vendor shall provide post implementation stabilization support to the Owner to ensure the efficient day-to-day functioning of systems till the end of stabilization support. The full implementation team should be there on site during stabilization period. Vendor shall also review the health, usage and performance of the systems till it stabilize.
5. Project Management in different Phases, Change Management and Training 5.1. Project Management Design and develop the Project Plan The detailed Project Plan for the implementation is to be prepared at the commencement of the project. The implementation of the Project as per the scope will require a strong program management activity integrating the core product implementation with software application. This ensures complete acceptability of the solution within the organization. Program management services shall aim at constantly improving the business processes, leveraging technology solutions, incorporating best-of-breed industry practices to maximize opportunities for Owners business operations and at the same time addressing growth and development of the employees.
Project Organisation To build up an effective project team, Owner suggests that an initial formal project organisation structure be created as part of the Planning Phase of the SAP implementation project. This must be so designed as to ensure that the project runs to plan and delivers Owner's project objectives. The specific project organisational structure and team roles and responsibilities will be defined by the Vendor to provide the optimal outcome to Owner. The Project implementation team shall comprise of members from Vendor. Owner shall make available its implementation team which shall work in association with the above team for assisting and to ensure proper skill transfer. Owner requires Vendor as the Lead Member to exhibit how they will effectively manage, control and contribute to the project. As a minimum criterion set up by us, Owner Vendor has to fulfil the following roles in its project team vide its own manpower: a) Project Director cum Program Manager. b) Project Manager. c) Functional and Technical Leads. d) Functional and Technical Team. e) Power utility Industry expert(s). f) Other project roles such as process improvement, change management, training etc.
Project Office The Project will be executed from a suitable location (Project Office) within Owner premises, from where the Vendors project team will operate. All activities of the project including Process documentation, development, configuration, testing etc. will be carried out from the Project Office. Visits to various departments / locations within Owner will be made as and when required.
Project Reporting The Vendors should describe the proposed project reporting methodology. At minimum, the Vendor should submit to Owner a written progress report every week. The frequency may be increased during critical phases of the
Confidential Page 115 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
project. In addition, the Vendor shall report on a continuous basis exceptions and issues that require immediate attention of Owner. The Vendor will be responsible for appraising the Steering Committee about progress of the project during Steering Committee Meetings to be held at interval of around one month. The date and time of the meetings will be finalized from time to time.
Documentation Vendor shall ensure preparation of complete documentation of all configuration settings, other activities, steps / stages involved in the implementation with the support of the Core team. Vendor in close coordination with Owners core team shall prepare the business process document, end-user manuals and training documents in the jointly agreed templates. 5.2. Organization Change Management and Training The purpose of Organization Change Management is to ensure that Owner achieves the expected results from its investment in SAP technology in a short span of time. As part of this service, Vendor will work closely with Owners SAP core team in introducing the change-processes, stressing the importance of organizational alignment, and introducing the necessary tools and techniques needed to address issues in the Organization. The Vendor will suggest to the Owner Project Management Team issues anticipated in the change management process and proposed solution to overcome the same. The Vendor is expected to conduct the change management programs on one-on-one individual basis or in groups and at different locations.
Vendor shall conduct a training need assessment of Owners SAP core team members as well as power users/ end-users as a component of the process improvement and change management process. Training needs should be continuously refined and frequently reconfirmed with the end-user community & the core team as the project progresses. Additionally, the Vendor will do the followings, a) Provide a description of the approach and tentative plan for training Owners core team members and end users along with the tentative time frame; b) Separate training programs will have to be organized for separate categories of users (e.g. core team members, senior management, middle management, junior management, non-executives, system (IT) team, etc) and for separate geographic locations. c) The Vendor will be responsible for the preparation of the training material and end user manuals. End user manuals should cover how to use concepts for all SAP modules to be implemented. Use of recommended SAP training tools / software(s) for providing various training is essential. Adequate training material which includes training manuals, quick reference cards etc should be provided during the training sessions. The recommended training material should be in paper & electronic media with courses on SAP fundamentals, business process overview, job activity training, and delivery options being on-line, CBTs, instructor led class rooms, etc. The following is a brief description of the training needs of the important (but not exhaustive) categories of users: Core Team Training Owner Core Team will comprise of representatives from different functions at Owner. This Core Team will comprise of members from all the Business Functions and IT. This training should enable the SAP core team of Owner for setting up of SAP Competency Centre and to involve in SAP implementations which are within the scope, building and managing SAP related skills and maintain the SAP system in Banharapalli.
Technical Core Team Owner Technical Core team will comprise of team having expertise in performing roles for the Application portfolio of Owner, Database Administrator, System Administrator, Report Writers, Interface Developer, Data Conversion Script Writers, any Customization development, security management etc. These representatives will bring with them knowledge of existing applications, interfaces, constraints, information requirements etc. The SAP training needs of Technical Core team members will be in areas such as BASIS, ABAP, database administration, system configuration, report customization, operating system, security management etc.
Confidential Page 116 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
End User Training Owner End Users will be the users from different functions, which are covered by SAP implementation or are likely to be impacted by the SAP implementation. These users will need to be trained before going live on SAP. Comprehensive guidelines on how to accomplish tasks in Owner specific SAP solution must be provided to these users. Sign-off by the end users about their comfort level will be a key parameter to be considered by the Management in giving the go-ahead for cut-over.
Training for Non SAP applications and infrastructure Vendor shall provide the following trainings for all the applications, tools, Data Center Management, hardware and Network management implemented as per scope. a) Extensive administrative training to core technical team b) Systems training for Non SAP applications and tools, information security etc. c) Service Desk related processes aligned with ITIL for Help Desk. d) The Vendor shall provide training materials, system manual both in hardcopy and soft copy 6. Post implementation Support Services for running SAP Applications, Non-SAP Applications and Infrastructure Facility Management Services. Considering Owners strategy of outsourcing the IT Operations, the vendor shall provide extended post implementation support for running the SAP Applications, Non-SAP Applications & Infrastructure and providing facility management services to Owner for a period of 48 (Forty eight) Months from the date of Final Acceptance of the Project. During this period, the Vendor shall ensure trouble free running of the entire system implemented as per the scope of work, broadly covering the following areas. While considering the scope outlined below, the Vendor shall ensure that there is no overlapping of services as covered under detailed scope of services under performance guarantee / warranty as per clause 10.4 of the Agreement.
1. SAP Application Support which includes but not limited to the following a) System Administration b) Database Administration c) User Management d) Backup & Restore e) Development Support
2. Support of Non SAP Applications. a) System Administration b) Database Administration c) User Management d) Backup & Restore e) Development Support
3. Infrastructure Support and Facility Management which includes but not limited to the following a) User Helpdesk b) Data Center Management c) Servers Administration d) Network Administration e) Information Security Administration f) Asset Management g) Change Management h) Configuration Management i) Service Level Management j) Capacity Mangement k) installation and maintenance support on applications, hardware and network.
4. AMC of hardware & Network Components a) Periodic preventive maintenance as per the recommended schedules.
Confidential Page 117 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
b) Repair / Replacement of hardware and other supplier items inclusive of all types of spare parts including batteries, plastic parts, sprockets, glass items, Picture tubes, Print Heads, etc. Only consumables like printer ribbons, Ink cartridge, etc. are excluded. c) installation / Re-installation / Maintenance of OS, System software and other supplied software. installation of system software, patches, upgrades, service packs etc.
The post implementation support services should include but not limited to the following a) System Management: i. Monitoring, logging and reporting of the equipment operation on 24 x 7 x 365 basis. ii. Periodic health checks of the systems and implementing proactive rectification measures. iii. Troubleshooting Servers, OS, SAN and backup related issues. iv. Analyzing and reporting all system related issues. v. Managing user, roles and passwords of all the relevant subsystems, including, but not limited to servers, OS, storage, applications etc. vi. Liaison with various vendors, OEMs, agencies and service providers for equipment maintenance & related work. b) Server Administration: Server Administration Functions include following activities. i. Operating System administration and tuning. ii. OS and software re-installation in the event of system crash/failures iii. Configuring file systems, volumes and apportioning disk space. iv. Ensure proper configuration of server parameters. v. Periodic system performance tuning. vi. Addition, deletion, re-configuration of devices, additional users and printers etc. vii. Implementing security patches on servers at all levels. viii. Orderly start-up and shutdown of servers as per laid down procedures. ix. Security management Configuring account policy, access rights, password control as per Owners security policy. x. Ensure all critical services are running properly on the servers. Schedule and optimize these services. xi. Maintain lists of all system files, root directories and volumes. xii. Resolving all server related problems. xiii. Escalating unresolved problems to ensure resolution as per the agreed uptime and performance requirements. c) Performance Monitoring and Reporting i. Ensure regular monitoring and maintain a log of the performance monitoring of servers including but not limited to monitoring CPU, disk space, memory utilization, I/O utilization, Central Storage etc. ii. Ensure regular analysis of events and logs generated in the entire sub systems including but not limited to servers, operating systems, databases, applications etc. The system administrators shall also ensure that the logs are backed up and truncated at regular intervals.
Confidential Page 118 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
iii. Undertake appropriate actions in accordance with the results of the log analysis to ensure optimal performance. d) Storage Administration i. Management of storage environment to maintain performance at optimum levels on a 24 x 7 basis. ii. To ensure that Owner is able to take regular and proper backups of all Servers & Storage to protect against data losses. iii. Management of the storage solution including, but not limited to, management of space, volume, RAID configuration, configuration and management of disk array, SAN fabric / switches, tape library etc. as per mutually agreed storage management policy. e) Backup and Restore i. 24 x 7 support for file and volume restoration requests. ii. To help Owner in regular Backup of operating system, database and application as per stipulated policies and time schedule. iii. Help Owner in conducting periodic restore operations on backed up data. iv. Assist in backups of volumes, files and database applications whenever required. v. Real-time monitoring, log maintenance and reporting of backup status on a regular basis. Shall ensure prompt problem resolution in case of failures in the backup processes. vi. Regular maintenance of all the media and the backup/storage devices. vii. Provide MIS reports such as weekly reports on backup and restoration (failed reasons), monthly report on planned backup & backups actually taken and Quarterly report on number of restoration drill performed and percentage of success, health status of media and drive. f) Network administration, Security & monitoring i. 24 X 7 support for all the network and security related infrastructure ii. Configuration of routers, switches and other security appliances ensuring backup of configuration of all network devices. iii. Trouble shooting routers, switches and security devices viz. firewalls etc. iv. Analyzing and reporting all network related issues. v. Real time monitoring, and reporting of status on regular basis. Shall ensure prompt problem resolution in case of failure of hardware. vi. Online updates of virus definitions, signature database etc. vii. Regular update of software patches provided by OEMs. viii. Monitoring of VPN, measurement of internet and VPN bandwidths on regular basis. ix. Uptime measurement of different outstation VPN circuits. x. Tuning of network parameters to ensure response times. xi. Responding/resolving the network related problems as recorded/monitored through Enterprise Management System/Network Management System. xii. Trouble shooting and resolving all passive component related problems including OFC system.
Confidential Page 119 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
T Ta ab b l l e e- - 0 01 1: : Techno-Funct i onal Requi r ement Spec i f i c at i ons Sr. No. Requirement specification Priority C-Critical NC-Non- critical Vendors Response Yes / No Remarks Data Center Architecture
1 Ability to develop the Data Center architecture following N-Tier Architecture considering the following components. (Submit detailed architecture documentation)
1.01 Web Tier C
1.02 DMZ C
1.03 Application Tier C
1.04 Database Tier C 1.05 Database Cluster C
1.06 Data Storage C
1.07 Stoarage Area Network (SAN) C
1.08 Backup Server & Tape Drive C
1.09 Configuration of Private VLAN for different component of Datacenter C
2 Ability to integrate the following applications in the data center architecture (In the architecture documents please elaborate the integration)
2.01 ERP C
2.02 Mailing Solution C
2.03 Antivirus & Anti-Spam Solution C
2.04 Active Directory Services C
2.05 Enterprise Management System (including NMS, Service Desk etc.) C
2.06 Building Management System C
2.07 VPN Client Access C
2.08 Video Conferencing & IP Telephony C
3 Separate environment for Production, Development and QA for all applications. (In the architecture documents please elaborate these environments) C
4 Ability to provisions for flexibility, scalability and investment protection (Please also refer the scalability requirement in Data Center Design) by adding physical boxes C
5 Provision to accommodate Phase2 ERP Modules and other applications that will be implemented in future. (Submit the plan to accommodate such expansion) C
6 Ability to provision for Disaster Recovery of IT applications aligned with future business need. (See the Disaster Recovery below for further details) C
Data Center Design
7 Ability to design the Data Center Layout considering UPS, Gas Bank, Management Console, EMS, BMS area. (Please provide the data center layout proposed) C
8 The detailed Data Center design the following components with justification
8.01 Server C
Confidential Page 120 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
8.02 Network Equipments C
8.03 Power Distribution, Cabling, Earthing C
8.04 Illumination C
8.05 UPS & Battery Bank C 8.06 Fire Detection & Suppression System C
8.07 Access Control C
8.08 CCTVs C
8.09 Rodent Control C
8.10 Leak Detection System C
8.11 Data Safes C 9 Integration with available Owner DG Set with Building Management System C
10 Designed provisions for High Availability/ Redundancy for different hardware & devices shall be provided C
11 Ability of the Vendor to design scalability in the following levels
11.01 The initial configuration recommended should be optimally sized to ensure the system, at full load, operates at maximum 70% of its installed capacity. C
11.02 All servers shall be planned in such a manner that they have scalability to deliver additional 100% increase in performance over and above the installed capacity. (Any expansion required by adding physical boxes shall be addressed at architecture level.) C
12 The Vendor should propose servers with latest CPU architecture offered by the hardware provider C
13 The solution should support software RAID and hardware RAID Controller C
14 The consolidated storage should meet all requirements of all solution areas. The same storage area will be used by all servers in all environment C
15 The solution shall be supported on client with Mobile Devices (palm- Top, Mobile Phones, PDA) C
16 Built-in hardware service processor for support and diagnostics NC
17 The solution shall support client machine with Pentium IV CPU and 512 MB RAM NC
18 The solution shall be supported on client with Windows Vista, Windows XP and Windows 98 SE Operating System NC
19 The solution shall be supported on client with Linux Operating System C
20 Ability of client to run the entire ERP functions through browser NC
21 The solution shall run on native browser with additional plug-in's that should be downloaded automatically NC
22 The solution shall support IE browser and Netscape browser NC
23 Ability to support Thin clients C
Sizing and Scalability 24 The initial configuration recommended should be optimally sized to ensure the system, at full load, operates at maximum 70% of its installed capacity. C
25 The Vendor should design the solution to meet scalability requirements stated below:
Confidential Page 121 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
25.01 SAP Production Infrastructure: - Support current work load of 550 users which should be scalable to 1100 in the next three years. These users can be categorized as follows: LAN users - 550 WAN/Internet users - 40 - Support 550 self service users Messaging System - Support current workload of 250 users which should increase to 1000 in the next three years. C
26 The sizing report given by the Vendor should be vetted by the ERP vendor for the hardware specification. C
Sr. No. Requirement specification Priority C-Critical NC-Non- critical Vendors Response Yes / No Remarks Development Infrastructure: 27 Development infrastructure will be needed to initiate and support ongoing development/ upgrade needs during and post implementation. The Vendor will recommend and mobilize/arrange the development hardware/infrastructure framework and details. C
Quality / Training Infrastructure
28 Quality Assurance infrastructure will be needed for conducting tests and trainings during and post implementation. The Vendor should recommend and mobilize/arrange for appropriate QA hardware/infrastructure framework and details for approximately 30 users. C
29 Training and Demonstration infrastructure will be needed for conducting trainings and demonstrations during and post implementation. The Vendor should recommend and mobilize/arrange for appropriate training hardware/infrastructure framework and details. C
Response Time Performance Criteria
30 Ability to provide Response Time Performance Criteria as prescribed in the Annexure-2 Deliverables and Performance Parameters . C
Confidential Page 122 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
31 The System shall have an availability of at least 99.90%. The availability will be calculated based on the following formula: C
A =[ { tsh - ( tud - tepd ) } / tsh ] * 100
A: Availability (percent) tsh: Total Service Hours
tud: Total Unscheduled Downtime (hours)
tepd: Total Excused Performance Downtime (hours)
Total Service Hours are the total available service hours of 24 hours, 7 days a week minus Total Scheduled Downtime
tsh = tah tsd
tah: Total Available Hours
tsd: Total Scheduled Downtime
Total Service Hours are all the Service Hours in the calendar month
Unscheduled Downtimes are where the Production Infrastructure are unavailable during Service Hours and outside the Scheduled Downtime.
Total Scheduled Downtime is (a) planned maintenance, with all such planned maintenance to be agreed in advance by the Service Provider and Owner. and (b) the scheduled back-up windows specified in the operational procedures manual or as otherwise agreed.
Excused Performance Downtime means the elapsed time for any outage that is the result of an excused performance problem.
32 The networking and infrastructure requirements to meet the performance criteria should be specified by the Vendor. NC
33 Support 100% addition to transaction volume over next three years based on expansion plans of Owner NC
34 The Enterprise Management System should be able to measure the availability of at individual component level and consolidated individual availability from service availability perspective. NC
Batch Programs
35 Number of failures while running batch requests should not be more than 2 per month, with 100% success rate for batch re-run after failure NC
User Access and Security
36 Appropriate security architecture is to be recommended considering authentication and authorization services, appropriate connectivity e.g. VPN/ Dialup/ Internet, proxy/ firewall services, disaster recovery etc. (Refer Network Architecture sheet) C
37 Implementing directory services as per Owner enterprise wide directory services strategy C
38 Ability to integrate with directory services for authentication and authorization and support the following features C
39 Support of LDAP (Lightweight Directory Access Protocol) to allow systems access to the directory. C
Confidential Page 123 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
40 Ability to allow definition of rules for password composition and password encryption C
41 Ability to define rules for password's as per Owner passsword policy C
42 Ability to configure the number of permissible log-in attempts. C
43 Ability to handle data updation/ deletion/ creation only through application layer. C
44 Users should not be allowed to access the database directly. C
45 Ability to provide a complete audit trail of transactions with time stamp and user ID stamp. C
46 Ability to support role based access control C
47 The Solution shall be compliant with the Indian Information Technology Act. C
48 Ability to provide access level security for Entry forms at Field level - allow, Read only, Hide C
49 Ability providing access level security for Entry forms at Transaction level - allow / deny C
50 Allow providing access level security for reports at Field level - show / hide C
51 Allow providing access level security for reports at Transaction level - allow / deny C
52 Ability to provide authorization by transaction type NC
53 Ability to provide authorization by user name C
54 Ability to provide automatic time out for entry transaction C 55 Ability to encrypt password while passing on wire C
56 Ability to provide automatic time out (log out) for user C
57 Ability to provide terminal soft locking facility NC
58 Ability to support 2 factor authentication for users connecting to ERP from internet NC
59 Centralized repository of all identification and access control data NC
60 Single Sign-on Support C 61 Support access control to individual or groups of applications. NC
62 Network Intrusion Prevention System (IPS) should be used to monitor any malicious traffic to and from internet, ERP center, WAN, DMZ etc. C
63 Any external connectivity to Owner network applications and any other external networks should be connected to Owner through a firewall. NC
64 VLAN's shall be configured aligned with data center architecture, network architecture and Owner's information security requirements. NC
65 All the desktops running ERP GUI should be configured with personal firewall, Antivirus software and a spyware removal. NC
66 Ability to provide multiple roles for one user NC 67 The Solution should be able to cater to ISO 27001 requirements C
68 Ability to support remote operation of Security Management NC
69 Ability to support remote operation of Diagnostic and Fine tuning tools C
70 Ability to provide time restriction on transactions NC
71 Ability to provide user login with time restriction NC
Confidential Page 124 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Back up and Restore
72 The Vendor should provide both on-line and off-line data backup and restoration capabilities C
73 The on line back up facility should be possible with all clients working C
74 The Vendor will design and implement appropriate archival policy C
75 The Vendor will recommend and implement appropriate storage solution C
76 The solution shall have in built source / application code control program C
77 Ability to allow fresh login to ERP during online data back up NC 78 The backup should be completed within 6 hours/night shift NC
79 The solution shall have a built in software to manage typical data centre like database back ups and restore NC
80 The solution shall have a built in software to manage application software back ups and restore Source Control NC
Disaster Recovery
81 The Vendor should recommend a DR strategy based the recovery strategy against failure of Servers and SAN, based on RTO (Recovery Time Objective) of 2 hours and RPO (Recovery Point Objective) Zero for Synchronous and RTO (Recovery Time Objective) of 4 hours and RPO (Recovery Point Objective) 30 minutes for Asynchronous. C
82 The solution shall support DR with asynchronous replication of data NC
83 The solution should support connectivity to the DRS from the end user system, in case of disaster at the Data Center. C
84 The DR strategy-infrastructure-processes-organization structure design should be provided by the Vendor for future implementation C
85 Please provide detailed recommendations describing the software and technical architecture of the Recovery mechanism supported by the Solution. NC
86 There should not be a single point of failure at the production infrastructure C
Network Connecti vity and Internet Service
87 The solution shall have 1 Mbps / 2Mbps connectivity from Site office to the Corporate office of Owner C
88 The solution shall have a minimum 512 Kbps backup connectivity . C
89 Internet connectivity should be from two different Service Providers. One link should act as a backup. QoS should be configured to prioritize traffic for optimization and efficient utilization of links C
90 Internet Gateway Security including Content filtering should be done for web content. C
EMS/NMS
91 The Enterprise Management System/ Network Management System should be capable of providing network management services for all integrated network elements C
92 The major services to be provided by NMS should be fault management, configuration management, performance management, accounting Management and security management C
Confidential Page 125 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
93 The monitoring of the EMS/ NMS shall be centrally located in the Network Operations Centre in the Owner Data Center. NC
Other Application
94 The mailing solution should be integrated with SAP application for seamlessly sending the alerts, notifications C
95 The mailing application should be accessible through web-mail. C
96 The mailing solution should provide the platform for collaboration. NC
97 Videoconferencing solution should be able to dial up other Videoconferencing facility of the organization across the globe. C
98 Tool should be able to monitor and manage bandwidth during videoconferencing without affecting network users of the critical applications like SAP, Email etc. C
Training
99 The Vendor should provide ERP Vendor certified training C
100 The Vendor shall provide online help and a Solution Tutorial. NC 101 The Vendor shall provide the training material documentation with the implemented solution C
102 The Vendor shall provide CBT (Computer Based Training) software. NC
103 The Vendor shall provide a demo / test solution with dummy data for user training. C
104 The Vendor shall provide details of duration of training normally required (Number of days for Users, Administrators, Technical Support Staff, etc). C
Documentation
105 The Vendor shall provide configuration documentation. C 106 The Vendor shall provide Technical Manual suitable for developers describing the Source Program, Entity Relationship Diagrams, Requirement Specs, Data Dictionary, etc. for all customized components C
107 The Vendor shall provide User Manual describing the necessary procedure to correctly operate the software solution C
108 The Vendor shall provide a System Manuals and operating procedures for the System Administrator. C
109 The documentation shall be written in English using accepted technical terms and nomenclature currently in use within the industry. C
110 The Vendor shall maintain the Versions of each Documentation set released. C
111 The Vendor shall provide appropriate documentation of Backup, Disaster Recovery policy C
112 The server shall be hardened and all the unnecessary ports shall be closed and the services should be stopped. Documentation shall be provided for the open ports and services with detailed explanations. C
Confidential Page 126 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-02: Br oad Speci f i cat i ons f or Har dwar e and Devi ces Vendor shall provide the specifications of the offered solution as detailed below with product literature and other supporting documents. Mere reference to internet site for downloading product literature is not sufficient. A. Broad Specification for Servers a) CPUs should be of RISC / EPIC for all SAP Production, QA, Development, Log shipping, and Back up offered. b) All offered servers for SAP Production, QA, Development, Log shipping, and Back up should be on UNIX unless mandated. c) Production Database Servers should be 100% vertically scalable with respect to the number of CPUs, memory and disks configured. Clustering to be provided for Database & Central Instance (CI) Servers only. d) Application Servers should meet the required SAPs for the present requirements. The solution Architecture should support horizontal scalability for Application Servers and 100% Application Load failover without degradation of performance. e) Mail server should have more than 100% vertical scalability and the proposed system should be certified as meeting the performance requirements by the OEM Mail application provider. f) All Servers except SAP Production Database Servers & Mail Servers should be consolidated in a Blade. The offered Blade can be of X86 architecture. All CPUs quoted provided for the blade should be of Server Class architecture. g) The proposed OS should be certified to run the latest versions of the offered application/ solutions and database. h) Roadmap for the Processors of the quoted servers should be presented. i) In case any upgrades need to be conducted by Owner at a later point of time for reasons attributed to load increase due to increase in user levels then the OEM should provide the same for the period of at least Six years from the date of supply. j) The servers to be supplied along with OEM racks (same as server make). Detailed technical specification shall be supplied by the Vendors in the specified format given below. Separate sheets shall be given for all the devices if specification differs.
Confidential Page 127 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
B. Technical Specifications for UNIX Servers
Sr. No. Item Specifications Offered Yes/No/ Value Deviation/ Enhancement 1 Make and Model HP/ IBM/ SUN <specify> 2 Purpose of server Quantity & Use 3 Processor Should be of Current generation & will have support for at least 6 years. Yes/No 3.1 64 bit SMP capability Yes/No 4 CPUs <Value> 4.1 Offered Specify with justification/Application OEM Certification
6 CPU Cache offered Specify <Value> 7 ECC DDR2 Memory Memory shall be provided at 6GB /1000SAPs for Database and Application server, and minimum 4GB RAM per processor core for all others. <Value>
7.1 RAM offered Specify 7.2 Max RAM To be at least twice of that offered 8 System disk Minimum capacity of 140 (+/- 10%) GB or higher, 15000 rpm internal disks in mirrored configuration (2 disks) connected through a SCSI/SAS/ Fibre Channel controller.
Suitable disk management software shall be supplied including Volume Manager to dynamically manage the logical volumes. Yes/No
8.1 In RAID 1 Specify 8.2 Without RAID Specify 8.3 SWAP space At least 4 times the size of RAM 9 DVD <Capacity> Shared/ Discrete
10 DAT72 Drive <Capacity> Shared/ Discrete
11 Adapter slots <Value>
Confidential Page 128 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specifications Offered Yes/No/ Value Deviation/ Enhancement PCIX/PCIE 12 Adapters 10/100/1000Mbps Ethernet Network ports (all adaptors should have single Ethernet port except the ports on the mother board) autosensing, in automatic fail-over/ redundant/ trunking / link aggregation and auto-switching mode. Ports for Dedicated LAN and Management LAN should be extra as per requirement.
12.1 Fibre Channel SAN adapters for SAN storage Cluster Heartbeat Adapters.
FC ports of 4 Gbps speed (for SAN connectivity) with multi-path I/o/ trunking and automatic load balancing should be provided for each server/ partition. All the compatible required hardware and software and licenses for this should be provided.
12.2 Display/ Keyboard/ Mouse 13 Partitioning Whether offered as a Partition Yes/No 14 (RAS) features - ECC in memory Yes/No
14.1 - Hot swappable disk bays 14.2 - Redundant cooling fans 14.3 - Redundant power supply 15 OS/ Compiler/ Sw Provide Details 16 Form factor Rack Model with rack mount kit 17 Documentation Yes/No 18 Whether Part of Cluster Yes/No 18.1 Cluster Heart Beat OS Cluster/ Heartbeats ports (using dual path). Vendor has to submit the detail scheme.
19 software Partition management software having dynamic configuration feature with GUI interface. Yes/No 19.1 Latest version of 64-bit OEM UNIX Operating System for each partition with unlimited user. Yes/No 19.2 The OS license shall be provided to support all servers/ partitions with separate independent instances of the OS in each server/ partition. Yes/No
Confidential Page 129 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specifications Offered Yes/No/ Value Deviation/ Enhancement 19.3 Clustering software for DB servers Cluster. Yes/No 20 Power requirement Specify 21 Heat generated by the server Specify 22 Other features If the server is part of a Partition, specify in a separate table the details of partitions in the box.
22.1 Provide Technical Specifications for UNIX Server Box, offered as Partition with details like current and maximum configuration possible in each box.
C. Technical Specifications for Windows Servers To be offered only if a particular SAP module or other Application mandates a platform other than UNIX, (Separate sheets if specification differs between servers).
Sr. No. Item Specification Offered Yes/No Deviation/ Enhancement 1 Make and Model HP/ IBM/ SUN Specify 2 Purpose of server Quantity & Use 3 Processor Should be of current generation & will have support for at least 6 years.
3.1 No of Processors Specify
3.2 Max processors To be at least twice of that offered 4 Cache Specify <Value> 5 TPC rating Specify 6 ECC DDR2 SDRAM Memory shall be provided at 6GB/1000SAPs for database and Application server, and minimum 4GB RAM per processor core for all others <Value>
7 Max RAM To be at least twice of that offered 8 Chipset Intel Chipset or equivalent 9 Hard drives Minimum capacity of 140 (+/- 10%) GB or higher, 15000 rpm, internal disks in mirrored configuration (2 disks) connected through a SCSI/SAS/ Fibre Channel controller.
Suitable disk management software shall be supplied including Volume Manager to dynamically manage the logical volumes.
Confidential Page 130 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/No Deviation/ Enhancement 10 Adapters I/O Adapters Ethernet Network Adapters with RJ 45 port
10. 1
Ultra320 SCSI adapters with external port - 1 No
10. 2
Fibre Channel SAN adapters for SAN storage. FC ports of 4 Gbps speed (for SAN connectivity) with multi-path I/o/ trunking and automatic load balancing should be provided for each server/ partition. All the compatible required hardware and software and licenses for this should be provided.
10. 3 Adapter Slots PCIX/PCIE Specify 11 Network Adapters 10/100/1000Mbps Ethernet Network ports (all adaptors should have single Ethernet port except the ports on the mother board) autosensing, in automatic fail-over/ redundant/ trunking / link aggregation and auto-switching mode. Ports for Dedicated LAN and Management LAN should be extra as per requirement.
12 DVD DVD +R/+RW 1 no per server 13 Form Factor Rack model with 19" rack mounting kit 14 (RAS) features - ECC in memory
14. 1 - Hot swappable disk bays 14. 2 - Redundant cooling fans 14. 3 - Redundant power supply 15 Operating System MicrosoftWindows2003 Server Enterprise Edition
15. 1
Edition 64 bit (licensed copy) with latest Service Pack and patches on CD Media with manuals (OEM version).
15. 2
Should provide integration with Enterprise Management software offered.
Confidential Page 131 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/No Deviation/ Enhancement 16 System manageability and diagnostics The system should have following hardware/ software capabilities :
16. 1
Pre-installed OEMs diagnostic tool for hardware diagnostics.
16. 2 System hardware Management Tool. 16. 3 Rescue and Recovery with Rapid Restore. 17 Power requirement Specify 18 Heat generated by the server Specify D. Technical Specifications for Windows Blade Servers
Sr. No. Item Specification Offered Yes/No Deviation/Enha ncement 1 Make/Model HP/ IBM/SUN 1.1 Purpose of server Quantity & Use 2 Processor Latest Intel Xeon or AMD Opteron. CPU must be of the latest generation, highest speed available for that model.
2.1 Max Processors To be at least twice of that offered 3 Memory 4 GB RAM per core . Specify. 3.1 Max Memory To be at least twice of that offered 4 Storage 2x 146GB hot plug SAS hard drive at 10K RPM speed internal to the server.
5 I/O The blade server should internally support at least 2 PCI Express I/O slot (either x4 or x8)
7 NIC Dual Gigabit Ethernet NIC port 8 OS support Windows server 2003 Enterprise Edition, Red Hat Linux, SUSE Linux etc.
9 Spare blade Server One global spare, preferably hot standby, per enclosure matching highest blade configuration within the enclosure, to be offered. Windows and UNIX blades shall be in separate enclosures.
10 SAN Connectivity The blade servers should support 2 Nos. 4Gbps Fiber Channel ports for connectivity to SAN. Two ports required for redundancy.
11 DVD/CD RW External CD/DVD RW drive for software
Confidential Page 132 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/No Deviation/Enha ncement installation. 12 Enclosure Plugs in Blade Enclosure backplane for both data and power transmission.
12.1 Industry standard suitable for housing in Standard Server Racks.
12.2 The blade chassis should support at least 8 blade servers with Interconnect devices.
12.3 Same enclosure should support Dual CPU and Four CPU blade servers.
12.4 Should support Hot Pluggable and Redundant Management Module.
12.5 Support simultaneous remote access for different servers in the enclosure.
12.6 Should support a visual display of hardware on blade enclosure to indicate health of enclosure.
13 Blade Server Interconnect to LAN/ Network Network interconnect module for routing all network cards to switch - provision for FC connectivity to SAN.
14 Power Multiple Hot Pluggable Power supplies to be provided as per Vendors Power Requirement Calculation. Power supplies should support redundancy.
15 Cooling Each blade enclosure should have each own set of hot pluggable redundant fans/blowers to ensure cooling.
16 System software System software has to be from the OEM itself. 16.1 Deployment - GUI, console-based deployment server to set up multiple OS and application configurations. Grouping of blade servers in the console by physical location of rack/enclosure/bay should be possible.
16.2 Management - Comprehensive web enabled system management tool that monitors the system health, environment, critical action etc.
17 Remote Management Complete hardware based Remote Administration from a standard web-browser with Event logging, detailed server status, Logs, Alert Forwarding, virtual control, remote graphical console, Remote Power Control/ Shutdown, Virtual Floppy and CD for Remote boot and configuration, Virtual Text and Graphical Control, Automatic IP configuration via DHCP/ DNS/ WINS, with 128 bit SSL Encryption Security. The blade system should have the capability of managing all the blades in the enclosure simultaneously.
18 FC and Ethernet connectivity should have redundant connectivity to the backplane.
Confidential Page 133 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/No Deviation/Enha ncement 19 Power requirement Specify 20 Heat generated by storage system Specify
E. Technical Specifications for Unix Blade Servers
Sr. No. Item Specification Offered Yes/No Deviation/ Enhancement 1 Make/Model HP/ IBM/ SUN 1.1 Purpose of server Quantity & Use 2 Processor 64 bit processor. CPU must be of the latest generation, highest speed available for that model.
2.1 Max Processors Expandability To be at least twice of that offered 3 Memory 4 GB RAM per core. Specify. 3.1 Max Memory To be at least twice of that offered 4 Storage 2 x 73GB hot plug SCSI hard drive or Blade Server booting from SAN
6 NIC Dual Gigabit Ethernet NIC port 7 OS support 64 bit SMP UNIX. 8 Spare blade Server One global spare, preferably hot standby, per enclosure matching highest blade configuration within the enclosure, to be offered. Windows and UNIX blades shall be in separate enclosures.
9 SAN Connectivity The blade servers should support Two Nos. 4Gbps Fiber Channel ports for connectivity to SAN. Two ports required for redundancy.
10 DVD/CD RW External CD/DVD RW drive for software installation.
11 Enclosure Plugs in Blade Enclosure backplane for both data and power transmission.
11.1 Industry standard suitable for housing in Standard Server Racks.
11.2 The blade chassis should support atleast 8 blade servers with Interconnect devices.
11.3 Same enclosure should support RISC/EPIC/Intel/AMD blade servers.
11.4 Same enclosure should support Dual CPU and Four CPU blade servers.
Confidential Page 134 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/No Deviation/ Enhancement 11.5 Should support Hot Pluggable and Redundant Management Module.
11.6 Support simultaneous remote access for different servers in the enclosure.
11.7 Should support a visual display of hardware on blade enclosure to indicate health of enclosure
12 Blade Server Interconnect to LAN/ Network Network interconnect module for routing all network cards to switch - provision for FC connectivity to SAN
13 Power Multiple Hot Pluggable Power supplies to be provided as per Vendors Power Requirement Calculation. Power supplies should support redundancy.
14 Cooling Each blade enclosure should have each own set of hot pluggable redundant fans/blowers to ensure cooling.
15 System software System software has to be from the OEM itself. 15.1 Deployment - GUI, console-based deployment server to set up multiple OS and application configurations Grouping of blade servers in the console by physical location of rack/enclosure/bay should be possible.
15.2 Management - Comprehensive web enabled system management tool that monitors the system health, environment, critical action etc.
16 Remote Management Complete hardware based Remote Administration from a standard web-browser with Event logging, detailed server status, Logs, Alert Forwarding, virtual control, remote graphical console, Remote Power Control/ Shutdown, Virtual CD for Remote boot and configuration, Virtual Text and Graphical Control, with 128 bit SSL Encryption Security. The blade system should have the capability of managing all the blades in the enclosure simultaneously.
17 FC and Ethernet connectivity should have redundant connectivity to the backplane.
18 Power requirement Specify 19 Heat generated by storage system Specify
Confidential Page 135 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
F. Technical Specifications for Administrators Console
Sr. No. Item Specification Offered Yes/No Deviation/ Enhancement 1 Make and Model HP/ IBM/ SUN 1.1 Purpose Quantity & Use 2 Processor Latest Dual Core Intel/ AMD processor 2.1 No of Processors/ Specify 2.2 Max Processors 3 DDR2 SDRAM 1 GB minimum
6 Hard drives 120GB SATA 7 I/O Adapters Specify 8 Adapter Slots 4 nos. PCI-X slots free 9 LAN connectivity 10/100/1000 BaseTx , RJ 45 10 DVD 48X CD-RW-DVD-ROM combo 11 I/O Interfaces 1 Serial; 1 parallel; PS/2 port; 4 USB 2.0 ports 12 Mouse Optical scroll Mouse 13 Keyboard 107 keys 14 Operating System MicrosoftWindowsXP professional/ Vista (licensed copy) with latest Service Pack and patches on CD Media with manuals (OEM version).
15 System manageability and diagnostics The system should have following hardware/ software capabilities :
15.1 Pre-installed OEMs diagnostic tool for hardware diagnostics+C41 15.2 System hardware Management Tool. 15.3 Rescue and Recovery software.
Confidential Page 136 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
G. Technical Specifications for SAN Storage system
Sr. No. Item/Feature Offered Yes/No Deviation/ Enhancement 1 Make/ Model : EMC/ HP/ IBM/ SUN Specify 1.1 Purpose (Quantity & Use) 2 The storage solution must have intelligent hardware based RAID support for the proposed solution.
3 The solution shall be offered in Heavy Duty OEM racks (Same as storage make).
4 The Central Storage System must support multi path and automatic load balancing with no single point-of-failure between Servers, Central Storage System and SAN. The required licenses (multi path etc) shall be provided and configured.
5 The DB Servers and Application Servers where clustering is indicated, will have access to the common single database on an external storage through a switched Fibre Channel Storage Area Network (SAN).
6 The offered solution shall have Hot-Plug feature enabled disks. 7 Shall have support for multiple Operating Systems. License requirements if any for OS access for the following operating systems shall be provided for the entire storage:
Offered Unix, Windows and Linux with support for clustering 8 Architecture 8.1 The storage array shall be an all-fibre channel technology and shall have architecture and be configured for no single point of failure.
8.2 The storage system shall be configured with minimum 4GB usable data cache per controller.
8.3 The SAN system shall provide minimum 120000 IOPS. 8.4 System shall have Intelligent hardware RAID controllers to implement hardware mirroring at storage controller level.
8.5 Shall have support for RAID levels 1, 1+0 & 5. RAID implementation shall be hardware based.
8.6 System shall have redundant hot swappable power supplies and cooling fans with no single point of failure
9 Storage Capacity 9.1 The storage system shall be configured for each server for usable storage capacities and required RAID (1, 1+0, 5) configuration.
9.2 Space under RAID 1 using 146 GB FC disks. Space under RAID 5 using 146 GB FC disks. Minimum disk speed shall be 15000 rpm for FC drives. Capacities are mentioned bellow.
9.3 The system shall be configured to make and maintain snapshot local backup, of designed capacity (of full scale usage by 150 unrestricted- full-license SAP users, 550 SAP ELSS users and other application users mentioned in the RFP) under Raid 1. The amount of Disk space required for each server for both local and SAN disks, after formatting
Confidential Page 137 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item/Feature Offered Yes/No Deviation/ Enhancement (Storage Overhead +Operating System Overhead +File System Overhead) visible to the OS shall be computed considering the master and transaction volume, requirement for online data availability of 2 years (Current and previous financial year) on SAP database and 7 years on the Business Warehouse Database. Beyond this period, data will be vaulted and depending on requirement to be selectively loaded on Business Warehouse database. All employee data will be permanent. An annual transaction growth rate of 5% can be considered. 10 SAN Host Ports 10.1 The SAN box should have 4Gbps host side ports. 11 Availability And Data Protection Features 11.1 System should support non-disruptive hot replacement of modules / components for the following:
1. Interfaces 2. Disk Controllers 3. Disk Drives 4. Cache memory cards 5. Cache memory boards 6. Power supplies & battery systems 7. Cooling Fans 11.2 The system shall have: 1. Automatic detection of errors, error logging and notification.
2. Pro-active maintenance self monitoring, self diagnosing and wherever possible, self repairing features
12 Management
GUI based Management software for total configuration & performance management of the SAN.
13 SAN license should not limit the number of servers to be connected to the SAN
14 Power requirement 15 Heat generated by storage system The minimum acceptable Storage for 250 users shall be Production Database 1.5TB Development 500GB Test 1.5TB
Confidential Page 138 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Business Copy 1.5TB BW Production 1TB BW Development 500GB For copies in ATA drives 4.5TB 30% additional space for each disk type should be configured for storage performance. All the software provided with the storage systems should have licensing for a period of Five Years.
Confidential Page 139 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
H. Technical Specification for Rack Mountable Fiber Channel SAN Switch
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1 Make/ Model : Brocade/CISCO/McData/OEM 1.1 Purpose (Quantity & Use) 1.2 Two numbers of fibre channel switches, shall be provided and configured. The switches shall be rack mountable.
2 The switch shall be guaranteed to be fully compatible for HBAs, Clustering solutions and OS offered with the servers.
3 Nos. fiber channel ports of 4Gbps (1/2/4 auto sensing) full-duplex to be configured. Sufficient ports to be available for redundant connectivity between proposed servers and the two switches with 100% scalability. Each SAN port on the switch should be 4Gbps. Breakup of port as mentioned: Mention No, of ports on each switch
Total configure d
Free 3.1 For Servers , as per SAN Network scheme 3.2 For SAN Storage, as per SAN network scheme and free ports. 3.3 The FC connects between Servers and the SAN Switch as well as the FC Connects between SAN Switches and SAN storage shall be of minimum 4 Gbps bandwidth
4.0 Shall support Error detection and fault isolation
I. Technical Specification for Tape Library (Back-up Device) Drive and Backup software
Sr. No. Item Specification Offered Yes/ No Deviation/ Enhancement A. Tape Library(Back-up device) Library Specifications The production data should get backed up in a window of 6 hours max on LTO-4 drives. Proposed Library should have cartridge slots for at least 2 sets of Production data copy & Cartridges to backup 4 copies of Production data.
Make/Model: EMC/ HP/IBM/SUN
1 Tape Drive Ultrium 4
2 Type and Nos. Specify 3 Number of drives Adequate Nos. 4 Interface 1 for each drive
4.1 Controllers 2/4 Gbps 5 PCI card slots Nos.
Confidential Page 140 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/ No Deviation/ Enhancement 6 Number of cartridges/ slots Specify 7 Maximum capacity Specify 8 Maximum throughput In TB/hr 9 RAS Features 10 Scalability 11 Interface GUI 12 Supported platforms Windows2000; Windows Server 2003; IBM AIX; Sun Solaris; HP-UX, Ent. Linux
13 Management via GUI software and command line interface 14 software Supplied Specify 15 Power consumption 15.1 Power requirement 16 Heat generated by backup system
17.5 Number of tracks 17.6 Media Type 17.7 Backward compatibility
17.8 Interface 17.9 Rewind speed 17.10 Operating Speed 17.11 The tape drives should be sharable across all servers/partitions.
B. Back-up software 18 Backup software shall have the following features:
18.1 Back-up software should be a single solution for supporting multiple operating systems and application using a single product which would take
Confidential Page 141 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/ No Deviation/ Enhancement care of Growth in future. 18.2 Should have built-in centralized, policy driven management feature.
18.3 software should provide extensive device supports for various device types and device manufactures.
18.4 software should have full command line as well as GUI support on above mention OSs.
18.5 Should support backups for clustered servers and support industry popular clusters like HP service guard, Legato cluster, HACMP and GNU Linux. i.e. should have the ability to backup data from clustered servers from the virtual client, backing up data only once and giving consistent bcakup in case of failure of nodes.
18.6 The software should able to take online backup for multiple instances of messaging or database running on single system without requiring multiple licenses for every instance.
18.7 software should support cross platform Tape Device & Media sharing with multiple clients and backup servers in SAN environment to increase the return of
Confidential Page 142 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/ No Deviation/ Enhancement investment. 18.8 Software should have true Disk Staging, wherein the backup continues to take place even when the disk space allocated is full. The backup software must be intelligent enough to flush out the data from the disk and migrate the same to the tape automatically.
18.9 Software should have the capability to virtualize the disk resources for disk staging and should have the ability to keep a copy of the active backups on the staging disks to provide quick restoration.
18.10 Should support policy-based automated migration that moves managed data from one type of media to another based on user defined thresholds. e.g automated backup from disk units to tape media or tape to worm.
18.11 Backup software shall support Synthetic backup so that Full backup can be constructed directly from the disk based incremental backups.
18.12 The Backup software must also be capable of automatically reorganizing the data from partially filled tapes to one or more tapes within the same
Confidential Page 143 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/ No Deviation/ Enhancement library to increase space utilization. The thresholds for defining the data reorganizing can be user defined. 18.13 The software must have the capability of monitoring and controlling the tape sent offsite, or data sent across by WAN through Electronic Vaulting.
18.14 The software must also provide for creating a Disaster Recovery Plan or DRP in case of the Backup server and all other servers in the backup network being destroyed in a possible disaster. This should be a scheduled and Automated activity on the backup server.
18.15 LAN free backups to tapes and disk devices on most popular OS platforms.
18.16 The Backup software must have an open API to enable integration with other enterprise applications such as EMS.
18.17 Should have the ability to store data in a hierarchy of storage that provides users with the ability to automatically move managed data from one type of media to another, including to new technology.
18.18 Should have well differentiated Archiving and DR
Confidential Page 144 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/ No Deviation/ Enhancement mechanisms. Archived Data should be tracked for a policy-determined time before deleting them. Should also have the ability to delete data from the primary system after archiving the data. 18.19 Should provide details logs on both the Clients as well as the Server to support in advanced troubleshooting without any performance implications.
18.20 Ability to perform Hot-Online backup for different type of Databases such as Oracle, MS SQL, DB2 etc. on various platforms.
18.21 Should be licensed to support multiple disk and tape drives/libraries with SAN attachments. There should be no additional licensing if the number of tape drives is increased in order to reduce backup window.
18.21 The licensing for the Backup software must be done in such a way that the migration of operating systems and/or databases/mail servers of servers/clients must not warrant a change in license. The licensing must be independent of the server processor.
19 Backup licenses are
Confidential Page 145 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specification Offered Yes/ No Deviation/ Enhancement to be provided for following: 19.1 Base License All Servers
19.2 SAN (LAN free backup) for DB
19.3 ERP online for DB 19.4 ERP from Snapshot for DB
19.5 Any other ERP Component Backup
19.6 Legacy server and common service server agents for online backup
J. Technical Specifications for Core Switch Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1 Make/ Model : CISCO/Nortel 1.1 Purpose (Quantity & Use) 1.2 Two Nos of Switches shall be provided and configured. The switches shall be rack mounted in 19 Rack.
2 Chassis based with minimum 7 payload slots including two spare slots for future needs
3 Should be loaded with 8 nos of 10 Gb ports including transceivers 4 Should be loaded with 16 nos of 1000 base FX ports. 5 Should be housed in a standard network rack with all accessories 6 Suitable uplinking and downlinking fiber patch cords are to be supplied 7 Should be loaded with redundant supervisor engine 8 Console cable to be supplied 9 Chassis with Redundant Power supply with support for hot swappable modules
10 Should be as per Indian power supply design and shall operate between 180-240 AC
11 Should provide a minimum of 720 Gbps backplane capacity. 12 Should support forwarding rate of upto 400mpps 13 Support management module redundancy in active passive mode and should be loaded with dual management modules. Failure of one supervisor should not affect throughput of the supervisor and hence reduce the performance of the switch.
14 Should support stateful failover and hitless software upgrades. 15 Switch should provide the ability to monitor events and take corrective, or any desired action when the monitored events occur or when a threshold is reached.
16 Should provide a mechanism to manage the traffic flow of control plane
Confidential Page 146 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement packets to protect the control plane against reconnaissance and Denial of Service (DoS) attacks. 17 Switch should provide a mechanism to detect connectivity issues with both fiber and copper cabling. Ensures that a partially failed link is shut down on both sides, to avoid L2/L3 protocol convergence issues
18 Should support a mechanism to provide security and isolation between switch ports, helping ensure that users cannot snoop on other users' traffic.
19 Should support remote port mirroring ie mirror ports from and to any other switch in the network
20 The Security features should support port filtering, enabling of individual ports to access only selected nodes, IP permit lists to prevent unauthorized access to the switch, Access Control Lists (ACL) to secure networks from unauthorized users, strong authentication and secure communications over un-secure channels for access to the network.
21 Switch should provide mechanism to prevent unauthorized switch from taking over as the Root bridge or causing the Spanning Tree to re- converge
22 Switch should provide a mechanism to prevent unauthorized switch from affecting core spanning tree topology, by auto-disabling access port
23 Should support VRRP for high availability. 24 Should support IPv6 in hardware, L2, L3 and L4 access control filters, L3/L4 frame classification,
25 Should support Ethernet, Fast Ethernet, Gigabit Ethernet and 10G Ethernet protocols
26 Should support for RMON, SNMP management, RIP2 etc.
K. Technical Specifications for Distribution Switch
Sr. No. Specification Offered Yes/No Deviation/ Enhancement 1 Make/ Model : CISCO/ Nortel 1.1 Purpose (Quantity & Use) 1.2 Two numbers of switches shall be provided and configured. The switches shall be rack mountable and configured in 19 racks.
2 The switch shall work as the distribution layer shall be connected with Core Switch and Access Switch.
2.1 The Management LAN switch shall be provided and configured. The switches shall be rack mountable.
2.2 The switch shall be connected to Database servers, SAN, Backup, Backup server, Legacy SAN, Legacy Backup etc. and the Administrator consoles.
3 At least 24 port 10/100/1000 Mbps ports 4 16 GBPS switching fabric 5 Advanced QoS and resiliency 6 Integrated security including network admission control
Confidential Page 147 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/No Deviation/ Enhancement 7 Minimum 6.5 Mbps using 64 byte packets 8 Chassis based with minimum 5 payload slots including two spare slots for future needs
9 Should be loaded with 4 nos of 10 Gb ports including transceivers 10 Should be loaded with 16 nos of 100 base FX ports 11 Should be housed in a standard network rack with all accessories 12 Suitable uplinking and downlinking fiber patch cords are to be supplied 13 Should be loaded with redundant supervisor engine 14 Console cable to be supplied 15 Chassis with Redundant Power supply with support for hot swappable modules
16 Should be as per Indian power supply design and shall operate between 180-240 AC
17 Should provide a minimum of 100 Gbps backplane capacity. 18 Should support forwarding rate of upto 80mpps 19 Support management module redundancy in active passive mode and should be loaded with dual management modules. Failure of one supervisor should not affect throughput of the supervisor and hence reduce the performance of the switch.
20 Should support stateful failover and hitless software upgrades. 21 Switch should provide the ability to monitor events and take corrective, or any desired action when the monitored events occur or when a threshold is reached.
22 Should provide a mechanism to manage the traffic flow of control plane packets to protect the control plane against reconnaissance and Denial of Service (DoS) attacks.
23 Switch should provide a mechanism to detect connectivity issues with both fiber and copper cabling. Ensures that a partially failed link is shut down on both sides, to avoid L2/L3 protocol convergence issues
24 Should support a mechanism to provide security and isolation between switch ports, helping ensure that users cannot snoop on other users' traffic.
25 Should support remote port mirroring ie mirror ports from and to any other switch in the network
26 The Security features should support port filtering, enabling of individual ports to access only selected nodes, IP permit lists to prevent unauthorized access to the switch, Access Control Lists (ACL) to secure networks from unauthorized users, strong authentication and secure communications over un-secure channels for access to the network.
27 Switch should provide mechanism to prevent unauthorized switch from taking over as the Root bridge or causing the Spanning Tree to re- converge
28 Switch should provide a mechanism to prevent unauthorized switch from affecting core spanning tree topology, by auto-disabling access port
29 Should support VRRP for high availability. 30 Should support IPv6 in hardware, L2, L3 and L4 access control filters, L3/L4 frame classification,
31 Should support Ethernet, Fast Ethernet, Gigabit Ethernet and 10G Ethernet protocols
32 Should support for RMON, SNMP management, RIP2 etc.
Confidential Page 148 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
L. Technical Specification for Management LAN Switch Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1 Make/ Model : CISCO/Nortel 1.1 Purpose (Quantity & Use) 1.2 The Management LAN switch shall be provided and configured. The switches shall be rack mountable.
2 The switch shall be connected to Database servers, SAN, Backup, Backup server, Legacy SAN, Legacy Backup etc. and the Administrator consoles.
3 At least 24 port 10/100/1000 Mbps ports 4 16 GBPS switching fabric 5 Advanced QoS and resiliency 6 Integrated security including network admission control 7 Minimum 6.5 Mbps using 64 byte packets
M. Heavy Duty Racks for Servers/ SAN/ Storage/ Backup/ LAN switch/ Structured cabling The Vendor should provide the no of racks with details of equipment in each rack. Sr. No. Item Specifications Offered Yes/No Deviation/ Enhancement 1 Make/ Model: VeroPresident (Rack), Valrack, OEM Make, KVM switch (Avocent, Minicom, Raritan or OEM make KVM to be offered if needed to manage multiple servers. If KVM is not offered vendors should mention how multiple servers will be managed)
1.1 Purpose Quantity & Use 2 Rack Heavy duty 42Ux600x1000 Integrated Server Rack Frame, with Power and Air Management; Depth Optimised for Multi-vendor Server Support
2.1 Recessed 19" Verticles for Server Support 2.2 Single Front glass Door with Handle and Lock 2.3 Single Back Perforated Door with Handle and Lock
2.4 Side Panels with Slam Latches - Easily Removable
Confidential Page 149 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Item Specifications Offered Yes/No Deviation/ Enhancement 2.9 Castors (2 Locking; 2 Non Locking) 3 Monitor 15 TFT flat panel colour monitor with necessary cable per rack. Resolution: SXGA
4 Keyboard Unix OS/ Windows compatible, per rack with drawer.
5 Mouse Optical USB Scroll Mouse, per rack 6 KVM switch Digital KVM switch per rack with minimum ports to connect all Unix/Windows based servers in the rack to a single TFT monitor, keyboard and mouse to carry out administrative functions of all the connected servers using the common monitor.
N. Broad Specifications for Internet/Intranet Routers
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1 Architecture 1.1 Should be chassis based & modular architecture for scalability and should be a single box configuration for ease of management.
1.2 Shall support at least 5 interface slots to accommodate the current requirement as well as for the future expansion. Should have minimum 2 slots free for future expansion
1.3 Should have hardware based IPSEC VPN (3DES/AES) Encryption card. Should have integrated/ integration capability with complete Firewall, IPS & SSL VPN features.
1.4 Should have minimum of 256MB of RAM and 64 MB of Flash Memory and should be upgradeable to 1GB and 256MB respectively.
2 Interface Requirements 2.1 2 x V.35 Serial (2 Mbps) Interfaces 2.2 2 x 10/100/1000 Interfaces 2.3 Cache engine with at least 120 GB hard disk 3 Performance 3.1 Shall support high performance traffic forwarding with concurrent features like security & voice enabled
3.2 Shall support variety of interfaces like: 3.2.1 V.35 Sync Serial (2 Mbps), Async Serial, E1 G.703, Ch-E1 for Horizontal office aggregation
3.2.2 GE as per IEEE 802.3z and 802.3ab, FE as per IEEE 802.3u, Chassis support for 802.3af.
3.2.3 ISDN BRI, PRI 3.2.4 Shall support DSL connectivity using ADSL, G.SHDSL for Horizontal office connectivity using Dead copper from Service Provider.
3.2.5 Support for 802.11a/b/g Wireless Cards for Wireless LAN or Wireless Bridging functionality.
Confidential Page 150 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 3.2.6 Should have support for high density Voice interfaces like E &M, Voice E1 for connecting Analog phones & integration to PBX / PSTN.
3.2.7 Support for high density Ethernet switch cards (8 port / 16 port) for remote offices to avoid additional switches.
3.2.8 Should have USB ports for storing OS images & secure token 3.3 Shall have support performance enhancement through hardware based encryption / compression module
3.4 Shall support other IP Services like GRE tunneling, ACLs, IPSEC VPNs, Firewalling, SSL VPN, NAT services.
3.5 Shall support MLPPP for link aggregation 3.6 Shall support Voice traffic optimization with features like LFI, cRTP 3.7 Shall support at least 160 Kpps forwarding performance 4 High Availability High Availability with NSPOF Should support Active/Active and Active/Standby failover, when two identical appliances are implemented in fail safe mode. Should have support for redundant power supply & cooling fan.
4.1 Shall support redundant connection to LAN 4.2 Shall support Non-Stop forwarding for fast re-convergence of routing protocols
4.3 Shall support boot options like booting from TFTP server, Network node
4.4 Shall support multiple storage of multiple images and configurations 4.5 Shall support link aggregation using LACP as per IEEE 802.3ad 4.6 Shall support VRRP or equivalent 5 Protocol Availability 5.1 Shall support Routing protocols like RIP ver1 (RFC1058)&2 (RFC 1722 and 1723), OSPF ver2 & ver3 (RFC2328), OSPF on demand (RFC1793), BGP4 (RFC1771), IS-IS (RFC1195). OSPF Fast hellos for faster convergence. OSPF Flooding Reduction
5.2 Support for Non-Stop Forwarding on the routing protocols NSF Awareness (BGP, OSPF, IS-IS
5.3 Multicast routing protocols support : IGMPv1,v2 (RFC 2236), PIM- SM (RFC2362) and PIM-DM, DVMRP, M-BGP
5.4 Shall support IPv6 features: DHCPv6, IPv6 QoS, IPv6 Multicast support, BiDirectional PIM, Multicast VPN, PIM SSM (Source Specific Multicast), IPv6 PIMv2 Sparse Mode, IPv6 PIMv2 Source- Specific Multicast,
5.5 Shall support RIPng and OSPFv3 for IPv6. 5.6 MPLS Features: MPLS VPN, MPLS (mVPN (Multicast VPN), VRF- Aware Services (NAT, FW, IPsec), Carrier Supporting Carrier (CsC), DiffServ Tunnel Modes, MPLS TE, DiffServ-Aware TE, Inter- AS VPNs)
5.7 Should have support for Integrated IP Telephony support to function as local IP PBX and as redundant IP PBX
5.8 Support for URL filtering & Caching of applications & videos 5.9 Support for Load balancing Protocol for better use of resources 5.10 Support unequal cost link load sharing to better utilize the alternate paths
Confidential Page 151 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 5.11 Support for TCP Acceleration mechanisms to enhance the TCP performance over the WAN links. The TCP Acceleration mechanisms should be supported over end-to-end encrypted tunnels
5.12 Support for Circuit Emulation over IP to carry PBX traffic or legacy protocols in their native form
5.13 Configuration Roll Back to recover the mis-configured router to last good configuration.
6 QoS Features (following features should be supported) 6. Classification and Marking: Policy based routing, IP Precedence, DSCP, MPLS exp bits
6.1 Congestion Management: WRED, Priority queuing, Class based weighted fair queuing
6.2 Traffic Conditioning: Committed Access Rate/Rate limiting 6.3 Signalling: RSVP 6.4 Link efficiency mechanisms: cRTP, LFI, MLPPP (necessary hardware modules to be quoted)
6.5 Per VLAN QoS. Time Based Shaping and Policing for QoS 6.6 Shall support Classifiers for Intelligent Application Identification 7 Security Features 7.1 Should have GRE Tunneling, NAT, L2TP tunneling, without any major performance impact. (necessary hardware modules to be quoted)
7.2 IPSEC Site-to-Site and Remote Access VPNs. hardware based encryption. Any Office to Any other office, dynamic establishment of VPNs so that the configuration & management of IPSEC VPNs becomes easier. IPSEC VPNs should be able to carry data, voice, video multicast traffic. Support for IPSEC Site-to-Site and Remote Access VPNs.
7.3 Firewall, IPS & SSL VPN features. Support for customized IPS signatures. Support for tunnel less VPNs for very high scalability with support for routing protocols and multicast traffic.
7.4 MD-5 route authentication for RIP, OSPF, IS-IS and BGP 7.5 Shall support multi-level of access 7.6 SNMPv3 authentication, SSHv2 7.7 AAA support using Radius and/or TACACS 7.8 PAP and CHAP authentication for P-to-P links 7.9 DoS prevention through TCP Intercept & DDoS protection 7.10 IP Access list to limit Telnet and SNMP access to router 7.11 Multiple privilege level authentications for console and telnet access through Local database or through an external AAA Server.
7.12 IEEE 802.1x support for MAC address authentication 7.13 Should have features to limit the spread of viruses & worms on the desktops / workstations.
8 Multi-media support
Shall support Voice capabilities - Voice pass-through - Codec support for G.711 and G.729
Shall support H.323, SIP, MGCP
Confidential Page 152 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement Shall support Voice call processing in the event of WAN link failure to Central call processing Engine
Shall support bandwidth optimization features like Voice Activity Detection, Silence Suppression, Echo cancellation
Should not consume more than 14-15Kbps of bandwidth (including overheads) for a single voice over IP call
9 Management 9.1 Shall have support for Web based management, CLI, Telnet and SNMPv3
9.2 Shall support Secure Shell for secure connectivity. 9.3 Shall support Out of band management through Console and external modem for remote management
10 Debug, alarms & Diagnostics: 10.1 Display of input and output error statistics on all interfaces 10.2 Display of Dynamic Arp table 10.3 Display of physical layer line status signals like DCD, DSR, DTR, RTS, CTS on all serial interfaces
10.4 Trace-route, Ping and extended Ping 10.5 Should have extensive support for SLA monitoring for metrics like delay, latency, jitter, packet loss, and MOS
O. Broad Specifications for Firewall cum VPN Concentrator Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1 The device should match or exceed the following specifications: 1.1 Firewall Throughput at least 400 Mbps from day 1 1.2 3DES/ AES VPN Throughput at least 300 Mbps from day 1 1.3 Concurrent Sessions - at least 250,000 from day 1 1.4 IPSec VPN Peers - at least 700 from day 1 1.5 SSL VPN Peers - at least 50 required from day 1, support up to at least 700 through license enhancement only
1.6 Security Contexts support up to 20 1.7 Interfaces Should have 4 Gigabit Ethernet ports and 1 Fast Ethernet port
1.8 VLAN Support as per IEEE 802.1q at least 125 1.9 Scalability should support VPN clustering and load balancing 1.10 High Availability with NSPOF Should support Active/Active and Active/Standby failover, when two identical appliances are implemented in fail safe mode.
2 Application Security Services Support 2.1 The Firewall should have Integrated specialized inspection engines for protocols like HTTP, FTP, ESMTP, DNS, SNMP, ICMP, SQL*Net, NFS, H.323 Versions 1-4, SIP, MGCP, RTSP, TAPI and J TAPI over CTIQBE protocol, GTP, LDAP, ILS, RPC
2.2 Advanced H.323 inspection services that support versions 1-4 of the protocol along with Direct Call Signaling (DCS) and Gatekeeper Router Control Signaling (GKRCS) to provide flexible security integration in
Confidential Page 153 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement a variety of H.323-driven voice-over-IP (VoIP) environments 2.3 NAT and PAT support for H.323 services, including advanced features such as fax over IP (FoIP) using the T.38 protocol, an ITU standard that defines how to transmit FoIP in real time
2.4 Fortified SIP inspection engine that secures both, UDP and TCP based SIP environments
2.5 NAT- and PAT-based address translation support for SIP-based IP phones and applications such as Microsoft Windows Messenger, while delivering advanced services such as call forwarding, call transfers, and more
2.6 Secure integration of IP telephony services while successfully connecting calls over multiprotocol VoIP environments across NAT and PAT boundaries
2.7 Rich MGCP security services and NAT- and PAT-based address translation services for MGCP-based connections between media gateways and call agents or media gateway controllers
2.8 Support multisite IP Telephony and Video Conferencing solutions 3 Support for Secure Connecti vity Services 3.1 IPSec remote-access VPN concentrator services for up to hundreds of simultaneous remote software- or hardware-based VPN clients
3.2 Should be able to Push VPN policy dynamically to Easy VPN Remote- enabled solutions upon connection, eliminating the need to manage each client separately and therefore helping ensure enforcement of the latest corporate VPN security policies
3.3 Perform VPN client security posture checks when a VPN connection attempt is received, including enforcing usage of authorized host-based security products
3.4 Should support SSL VPN-based remote-access connectivity from almost any Internet-enabled location, using only a Web browser and its native SSL encryption
3.5 Support for hundreds of simultaneous SSL VPN connections 4 Support for High-Availability Services 4.1 Support for bidirectional state sharing between Active/Active failover pair members for support of advanced network environments with asymmetric routing topologies, allowing flows to enter through one Firewall appliance and exit through the other, if required
4.2 Maximizing VPN connection uptime with Active/Standby stateful failover for VPN connections
4.3 Support for Synchronizing all security association state information and session key material between failover pair members, providing a highly resilient VPN solution
4.4 Enable geographic separation of Security appliances in a failover pair by allowing failover information to be shared over a dedicated LAN connection between failover pair members
4.5 Access control and deep inspection firewall services for native IPv6 network environments and mixed IPv4 and IPv6 network environments through dual-stack support
4.6 IPv6-enabled inspection services for applications based on HTTP, FTP, SMTP, ICMP, TCP, and UDP
4.7 Support for SSHv2, Telnet, HTTP and HTTPS, and ICMP, SNMPv3, OSPF with md5 authentication -based management over IPv6
Confidential Page 154 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 4.8 DHCP server services on one or more interfaces, allowing devices to obtain IP addresses dynamically
4.9 Support for NTPv3 to provide convenient method for synchronizing the clock on the firewall appliance with other devices on a network
5 Support for Flexible Management Solutions 5.1 Support for Built-in Management software for simple, secure remote management of the security appliances through integrated, Web-based GUI
5.2 Support for out-of-band management through a dedicated Fast Ethernet 10/100 management interface
5.3 Packet Capturing for powerful troubleshooting capabilities by providing robust packet-capturing facilities on each interface. Support for several methods of accessing captured packets, including through the console, secure Web access, or a file exported to a TFTP server
P. Technical Specification for Structured Cabling Components S No. Item Make/Model Specifications Offered Yes/ No Deviation/ Enhancement 1 Fiber Cable Specify 6 Core/ 12 Core 2 CAT6 UTP Cable Specify CAT6 3 19" Fibre Admin/ Termination Kit Specify 4 19" Patch/ J ack Panel Specify 24 Port 5 Factory fitted fibre patch chord Specify 6 Factory fitted UTP patch chord Specify 4FT/7FT 7 Information Outlet Specify Surface mount 8 All connections to be ferruled/ labeled Specify 9 Cabling Certification Specify 10 Network cabinet Specify
Confidential Page 155 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Q. Technical Specification for PCs S No. Specification Offered Yes/No Deviation/ Enhancement 1 CPU: Intel Core 2 Duo , 2 GHz, 2 MB L2 Cache and 800 MHz FSB or more
2 Memory: 2 GB DDR2 RAM minimum 3 Hard Disk: 160 GB 7200 rpm SATA HDD 4 Monitor: 17 TFT 5 Keyboard: 104 Keys 6 Mouse: Optical 7 Cabinet: Mini Tower (Black) 8 Networking: 10/100/1000 MBPS Ethernet 9 Operating System: Windows Vista OEM 10 Office: Ms Office 2007 Standard with license
R. Technical Specification for Network Printers S No. Specification Offered Yes/No Deviation/ Enhancement 1 Printing Speed minimum 25ppm 2 No of paper trays: 2 3 Print quality 1200 X 1200dpi 4 Duplex Printing 5 Media size: A4, Letter, Legal, Envelop 6 10/100 Fast Ethernet
S. Technical Specification for Line Printers S No. Specification Offered Yes/No Deviation/ Enhancement 1 Prining Speed minimum 600LPM 2 Minimum 2 tractors 3 Print quality 240 X 288dpi 4 Media Size: 132 Column 5 10/100 Fast Ethernet T. Acceptable Makes for Hardware Devices S No. Material Preferred Makes 1 High end servers HP/ IBM/ SUN/ Dell 2 Windows Servers HP/ IBM/ SUN/ Dell 3 Blade Servers HP/ IBM/ SUN/ Dell 4 SAN Storage HP/ IBM/ SUN/ EMC 5 SAN Switch Brocade/ Cisco/ Mcdata 6 Structured Cabling components Tyco/ Molex/ Systimax 7 Network Switch, firewalls, routers, IPS Cisco/ Nortel
Confidential Page 156 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
8 Backup EMC/ HP/ IBM / SUN 9 Network Rack Vero President/ Valrack /Hardware OEM Make 10 KVM Switch Avocent/ Raritan/ Minicom 11 Administrator Console/ Rack PCs HP/ IBM/ SUN 12 PC Lenovo/ Dell/ HP 13 Network Laser Printer HP 14 Network Line Printer Wipro/ Lipi
Confidential Page 157 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-03: Br oad Speci f i cat i ons f or Dat a Cent er A. Specification of Architectural & Interior works of Data Center These specifications are for work to be done, items to be supplied and materials to be used in the works for Data Center. The proposed location for Data center is at ITPS. Approximately 900 sq ft area is available for the Data Center, Management Console, BMS, Gas Bank and UPS room. The indicative design is given for conceptualization.
1. Specific Requirements in interiors The interiors shall include finishes on all walls, tiled floors, false floor, ceiling, partition, signage, displays, etc. All major finishes shall have a fire rating of 2 hrs and shall be of non-combustible, self- extinguishing or fire-retardant type. 2. Walls/Partitions For the Server-room, walls in separating zones shall be of floor to ceiling height, perimeter walls/ partitions shall have 2-hour fire-rating. The frame work of partly glazed Aluminium (Main and Cross) partitions in Data Center areas shall be from base floor to RCC roof with Fire Rating of 2 Hours. The partitions/ cladding shall be of Fire Retardant Glass and Aluminium or equivalent material. 3. Specifications for False Flooring The height of cavity floor is proposed to be 300mm in Data Center. The bottom of the proposed cavity floor shall be in line and level. The base floor of cavity floor shall be treated with epoxy paint. The base floor in Data Center needs to be thermally insulated with Armaflex or equivalent insulation. The junctions between the insulator and fixtures are to be watertight and airtight. The permissible Uniform Distributed Load (UDL) of the Data Center concrete floor is 350 -400 kg/m 2 . of live load. The Data Center false flooring, equipment, servers & storage on racks should be provided such the total live load is well with the permissible UDL stated above.
Confidential Page 158 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
4. False flooring panels a) The floor should be designed for standard load confirming to BIS 875-1987. b) Panels should be made up of 18-gauge steel of 600mm x 600mm size treated for corrosion and coated with epoxy conductive paint (minimum thickness 50 Micron). False flooring covering shall be antistatic high pressure laminate 2 mm. thick in approved shade and colour with PVC TRIM edge. c) Perforated floor panels are to be provided on the designated floor for air delivery. The placement of perforated panels shall be decided after consulting the equipment vendor. The perforated panels shall have provision for dampers. d) The interior of the panels shall be filled with non-combustible cementitious compound. e) The false floor should withstand the load of the racks with 50% safety margin. f) No obstructions of pipes, conduits, detectors shall be permitted in space immediately under equipment line-ups. The under floor space under line-ups is required for equipment frame securing, cable management and power access. g) Ramps and steps are to be provided for transitioning to elevated floor area at entrance of Data Center. Ramps are to be designed and installed to building code requirements. h) Special tools and tackles required for operation of false flooring shall be supplied in two sets. 5. Under Structure Pedestal Assembly: Pedestal assembly shall be of snap lock type consisting of base assembly 100 x 100 x 2 mm. with full bead weld to steel base plate with embossing and four numbers holes which shall be fixed to the floor with screws. Anti vibration rubber pad shall be provided below base plate. Steel pipe riveted to base plate shall engage the pedestal head assembly. Head shall be formed steel and full bead weld to stud, with four flange having shape and size as per standard approved manufacturers specifications. Pedestal head flanges shall be provided with holes for screws for fastening the G.I. Stringers. No sharp edges or corners shall be exposed from pedestal head when floor panel is removed. G.I. rod, fully threaded shall be locked to pedestal head. The entire head assembly is engaged in the base assembly by means of nut and check nut. 6. Stringer Stringer system is hot dipped galvanized sheet, construction having channel, with pre-punched counter and holes at both ends of the top face for securing the stringers on to the pedestal head to be fixed with screw ensuring maximum lateral stability in all directions. The grid formed by the pedestal and stringer assembly shall receive the floor panel. The stringer system would be earthed properly by using copper wire. This is required for some of the servers for transient grounding. 7. False ceiling, Mineral Fiber Board (Modular ceiling Tile) Providing and fixing of Mineral Fibre Ceiling tiles in true horizontal level. The ceiling in Data Center needs to be thermally insulated with Armaflex or equivalent insulation. False ceiling grid shall be of specified make of Armstrong/ Aerolite or equivalent. Using hot dipped galvanized steel section, exposed surface chemically cleaned capping pre-finished in baked polyester powder paint, Main tee of size 15 x 35 x 0.33 mm at every 1200 mm G/C max and rotary stitched cross tee of size 15 x 30 x 0.33mm at every 600 mm CIC 0.457 mm wall angle around the wall to form a grid of 600 mm x 600 mm and suspending the grid using 2 mm GI rod and 6 mm raw plug at every 1200 mm intervals at the main tee and laying the Ceiling tiles of size 595 mm x 595 mm x 15 mm over the formed grid having fire rating of 60 minutes as per BS 476/23 of 1987; Noise reduction Coefficient (NRG) of 0.50-0.60, to resist temperature and humidity conditions up to 40degree (104 deg. F) and humidity of 95% RH, weight of tile 3.5Kgs/SQ.M. The ceiling tile shall be of easy remove and install type for the access of utilities in the ceiling void. Non-combustible and dust-free plates shall be considered. The false ceiling shall serve as a plenum for lighting fixtures, fire detection and protection system. 8. Doors
Confidential Page 159 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
All doors in Data Center shall be of 2 hour fire-rating, with secure bolted hinge. Provision for remote door release is made for the electric door locks. The Data Centers are to be provided as per indicative diagram with door of size 1500 mm x 2100mm atleast for equipment movement ingress and egress for installation in and maintenance out. This would be used during the setup of the proposed Data Center facility and to move in any equipment like PAC units, electrical panels etc. into the Data Center. The doors will be kept closed and will not be used for regular access of Data Center facility. This shall also serve as Emergency exit door way with panic bar to be provided for egress from Data Center area in case of fire exigency. Suitable incline ramp for movement of the Server hardware, PAC, UPS in Data Center shall be made by supplier. The list for the same may be submitted for approval/ documentation. B. Guidelines for Electrical Work All electrical installation shall conform to the relevant Indian Standard Specifications and Indian Electricity Rules. Safety : OHSAS 18001, ISO14000 related risk and aspect mitigation system has been established especially for electrical and fire safety. 1. Source of power Power will be made available by Owner at the incoming side of existing L.T.Panel at 415v, 3 Phase and N, 50Hz from the distribution feeder. The distance between the Data Center and the distribution feeder is 50mts. Further distribution of power to different loads like A/C panels, UPS power supply to Servers through DBs, shall be designed, supplied, tested and commissioned by the supplier. Proper Incoming cable entries shall be planned with special attention to plugging of conduits. The L.T. Panel shall have AUTO CHANGE OVER facility between the generator and mains with proper interlocking. Incoming and outgoing electrical lines should have Transient Voltage Surge Suppressors (TVSS) installed, primary TVSS just after the main LT switchboard and secondary TVSS just before the UPS. The primary should take care of heavy transients (kilovolt range) caused by lightning surges or HT surges and the secondary should take care of whatever manages to pass through (several hundred volts in range) the main TVSS. 2. Power distribution All Distribution Boards shall be aesthetically built, single front, non draw out. Main L.T. Panel shall have MCCBs as incomer and outgoings with S/C withstand capacity of 35KA. L.T.Panel and all DBs shall have Digital Ammeters and volt meters, one for each source. ON, OFF and TRIPPED indications shall be provided for all incomers. For outgoings, ON indication shall be provided. All components shall be chosen from List of Preferred makes. Power distribution network for Air-conditioning and illumination shall be in the scope of the supplier which includes sub-distribution boards, concealed wiring, switch boards etc. Adequate redundancy shall be provided while designing the distribution system. Spare power distribution boards for atleast 5 Nos. Racks at Data Center should be provided. There shall be two redundant circuits from the UPS to the server racks. 3. Illumination The level of illumination, type of fixtures and wiring shall be designed/ selected, supplied and erected, commissioned and tested. However, the basis and selection of equipments shall be approved by Owner before manufacturing/ procurement. IS 1913 General and Safety requirements for luminaries. IS 3646 Code of Practice for Interior Illumination shall be followed. Illumination design shall include type of fixtures easily maintainable and available of approved makes. The level of illumination in Data Center shall be 400 Lux. The luminaries shall be glare free with optical mirror work. All ballasts for fluorescent fittings shall be high P.F. electronic ballasts. Normal lighting system shall be fed from Raw power DBs whereas 10% of lights shall be fed from emergency power. The emergency lights shall be located at Data Center, electrical panel room, including passage and emergency exit. All switchboards shall be aesthetically built, concealed and of modular design. Lighting SDB & Raw power DB shall be aesthetically built with recessed mounting consisting of MCB as incomer and ELCB as outgoing. Service power outlets of 6/16 A with 16 A switch shall be provided at skirting level for maintenance purposes. 4. Cabling
Confidential Page 160 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Raceway design shall be adopted for electrical wiring and network wiring. Both the raceways with power cables and data cables shall be separated by a distance of 400mm. To ensure unrestricted airflow of PAC crossing of cabling raceway is not permitted on the under structure. All electrical cabling shall be done with 1100V grade FRLS, PVC cable with stranded Copper Conductor. The sizing shall be based on current requirements, voltage drop and short circuit withstand. Point wiring shall be done with 1100V grade CU. Cable FRLS, PVC/PVC of size 1 X 2.5mm2. All wiring shall be concealed. Cable installation shall be as per IS:1225. 5. Earthing Earthing of electrical installation shall be done in accordance with IS:3043. There shall be three separate buses for earthing system i.e. dedicated UPS Neutral Grounding, Technical earth (Low impedance) for Equipment and Raised floor grids & panel body earthing. All the earths shall be kept equi-potential and shorted at ground level only. Earthing station, with pipe electrode, necessary Civil/ Electrical work, CI cover, alternate layers of salt and charcoal, etc. as per IS:3043 shall be provided in required numbers. Galvanized M.S. saddles shall be used for clamping earth conductor. Flats shall be supported at interval not exceeding 1000mm and stranded wires at intervals of 500mm Logic/RF earthing, grid shall be provided. All components, panels, cables, conduits shall be chosen from list of approved make. The distance between LT panel and earth pit is 100 mts. Approval of Owner shall be sought in case of any deviation from the list of preferred makes. The supplier is required to indicate the following in their offer: 6. UPS Systems It is proposed to have two UPS systems working in dual redundant mode, capable of feeding the power required for equipments at Data Center. The dual redundant UPS shall provide power to servers, SAN, network equipment, backup, other devices, Access Control System, CCTV, Smoke detection System, fire protection system, rodent repellent system, water leakage detection system, emergency lighting etc.
These systems shall have three phase incoming and three phases out going. Redundancy shall be provided up to the Server rack end by using Dual distribution system. The UPS System must operate under environmental conditions. The UPS parameters shall be monitored remotely from the Systems Department.
The power requirement for all servers, storage, backup, network solution and common services such as access control, CCTV, fire detection and suppression, emergency lighting except Precision A/C is to be estimated and provision of the total UPS power requirements to be made. Break-up of power requirement for servers, storage, backup and network devices shall be provided by Vendors for verification by Owner. 7. UPS Modes of Operation The UPS shall be designed to operate as an ON LINE reverse transfer system in the following modes: Normal The critical AC load is continuously supplied by the UPS Inverter. The rectifier/ charger derives power from AC Input source and supplies DC power to the Inverter while simultaneously load charging power reserve battery. Emergency Upon failure of AC Input power, the critical AC load is supplied by the Inverter, which without any switching obtains power from the battery. There shall be no interruption in power to the critical load upon failure or restoration of the AC input source. In case of AC power outage, the diesel generator would automatically be started to provide power to the UPS. In the event of the DG set unable to start within reasonable time, the UPS shall automatically shut down the SAP servers.
Automatic Mains Failure (AMF) control panel provided by Owner shall start up the DG set and transfer the loads on to the DG sets on mains failure after a configurable delay time without requiring any human intervention. Similarly on restoration of mains supply it shall be able to transfer the load to mains supply after a configurable delay time and switch off the DG set automatically.
Confidential Page 161 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Recharge Upon restoration of AC input power during the emergency mode of operation, the rectifier/ charger shall automatically restart, walk-in and gradually assume the inverter and battery recharge loads. Bypass If the UPS be taken out of service for maintenance or repair or should the inverter overload capacity be exceeded, static transfer switch shall perform reverse transfer of the load from the inverter to bypass source with no interruption in the power to the critical AC load.
Both the UPS modules should be operated in parallel mode with equal load sharing. However each UPS will be adequately sized to feed rated load. In case of trouble in one of the UPS section, the other UPS will continue to feed the load while the faulty section will be isolated without interruption in the output. If both the UPS fails, the load should be transferred to bypass with no interruption in power to the critical AC load. There should not be any common parts in parallel circuit, which will lead to single point failure. If parallel circuit is removed both the UPSs should be able to work independently without any modification. There should be independent battery bank connected to each UPS with facility to connect both battery banks and rectifiers in parallel and if one of the battery bank or rectifier fails, then other battery bank or rectifier should support both Inverters without interrupting the load. The UPS shall be monitored from the Administration Room. 8. UPS Specification Technical Specification A Input 1 Input voltage 415V, 3 phase, 4 wires 2 Input voltage tolerance +15%, -20 % 3 Input frequency 50 Hz 4 Input frequency tolerance +/- 5 % 5 Nominal Input current during Normal running condition 6 Input circuit IGBT based PWM rectifier 7 Input Circuit harmonic distortion <5% B Output 1 Module full load rating KVA/ KW 2 Rated voltage 415 V, 3 Ph, 4 wire 3 Rated current 4 Phase Voltage asymmetry a] Balance load b] 100% unbalanced load
120 deg. +/- 1 deg 120 deg. +/- 1 deg 6 Output power factor support capability 0.6 lag to unity
7 Internal oscillator stability +/- 0.1 % 8 Mains synchronization tracking +/- 1 Hz (settable to +/-2) 9 Max. rate of change of frequency 1 Hz. Per second 10 Output voltage harmonics a] Linear load b] Non-linear load (Crest factor of 3:1)
<2 % <5 % 11 Crest Factor 3:1 or better 12 Overload rating 110% for 60 minutes, 125% for 10 minutes, 150% for 60 seconds
Confidential Page 162 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
13 Overall Efficiency at 100 % load >90 % 14 Transient recovery time Recovery to +/- 5 % in <4 msec. C DC Characteristics 1 DC Bus voltage ripple <1 RMS D Controls 1 Charger input MCCB 2 Inverter output MCCB 3 Standard controls to be specified E Measuring Instruments 1 LCD panel for Measuring Input voltage per phase, frequency Output voltages, Output currents and Frequency, Battery Voltage and Charging/ Discharging current. Load in KVA, Load in KW, and percentage of load. 2 LCD panel should display status of the Battery capacity and backup Time in minutes. F Protections 1 RC surge suppressor, Sustained under voltage on input side, Phase loss on input side, Negative sequence on input side, Semiconductor fuses in the lines for thyristor, Snubber circuit for device dv/ dt protection, Charger input current limit, HRC fuses for filter capacitors, Battery current limit, DC over voltage, Low battery, Semiconductor fuses at inverter output, Overload, Over temperature for the inverter, HRC fuses in the control circuit. G Indications (Alarms) 1 Inverter Failure, Overload (if load exceeds 100%), Overload shutdown, Emergency shutdown, Equipment over temperature, Maintenance Bypass ON, DC over voltage, Low battery, Battery circuit breaker open, Battery on load, Mains failure, Rectifier Failed or Off, Inverter Unsynchronized, Load on bypass, Output voltage error Special features: a) UPS shall be provided with SNMP hardware and software for remote diagnostics. b) Microprocessor based digital control and redundant control power supply. c) PC based monitoring, control and reporting unit. i. Monitoring system performance with automatic generation of daily, weekly reports. ii. RS. 485 communication port. iii. Fan redundancy d) Battery management system with battery diagnostics Environnemental conditions: Temp : Max. 50C Humidity : 95% Rh (Max temp. and Humidity do not occur simultaneously).
Acoustic noise : <60dBA at 1 meter from panel front Cable Entry : From bottom Ventilation : Forced air cooling with integral fans. Battery details Battery type : Lead Acid Plante / Sealed maintenance free (SMF) Battery back up time : 30 minute with 100% load Battery Make : As mentioned in Table-03 of Annexure-1 No of batteries : To specify
Confidential Page 163 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Expected battery life : 5 Year Tests : As per IEC Documents to be provided: a) Operational and maintenance manual including card wise component details and PCB b) Drawings c) All acceptance and routine tests as per the specification and relevant standards shall be carried out. Charges for these shall be deemed to be included in the equipment price. C. Guide Lines for Air Conditioning Works This part of specification provides technical parameters for design, manufacture, supply, installation testing and commissioning of Air-conditioning system for the proposed Data Center. All items of equipment supplied shall be complete in all respects and any item/accessory not covered in this specification but essential for proper design and operation of equipment shall be included by the supplier. i. The equipments shall be designed, assembled and tested in accordance with the latest relevant Indian Standards Institution wherever applicable. In case where suitable Indian Standards are not available, the equipments shall conform to generally accepted codes and practices and copies of the relevant standards and regulations shall be submitted along with the quotation. ii. All electrical equipments shall conform to the latest IS, Indian Electricity Regulations and earthing and other provisions specified therein for installation and operation of electrical equipment. All equipments shall conform to the provision of statutory and other regulations in force, such as Indian Explosives Act and Factories Act, etc. iii. All equipment shall be of reputed make. The material used and equipments supplied shall be new and best of their respective kinds. Type and constructional features of individual equipments shall be such as to ensure long life with minimum maintenance. iv. All the name plates of the machinery as well as operating instructions shall be in English language. Calibration of all instruments, dimensions and weights shall be in metric units. v. All the equipments shall be suitably cleaned, painted and protected against corrosion and damage. Final coats of paints of appropriate colour shall be applied after erection, before handing over the plant and equipment. vi. Layout of equipment shall be such as to facilitate easy and safe operation and maintenance, at the same time ensuring maximum efficiency of the system. Suitable interlocking wherever necessary shall be done. vii. All moving assemblies like compressor, fan etc. shall be mounted on vibration proof base. 1. Proposed Air Conditioning System Following Air Conditioning Systems are proposed to be installed. As Data Centers require round the clock air conditioning to maintain a temperature of 21 C 1C and relative humidity 50 % 5 %, Precision Air conditioning units are proposed to be installed. Design Data Climate condition related data
Ambient conditions shall be assumed as follows:- a) Summer i. Dry Bulb Temperature : 44C to 19C ii. Relative Humidity : 21% to 98%
b) Monsoon
Confidential Page 164 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
i. Dry Bulb Temperature : 37C to 24C ii. Relative Humidity : 55 to 98%
c) Winter i. Dry Bulb Temperature : 37C to 10C ii. Relative Humidity : 97% to 28%
d) Heat dissipation by the servers and other common services such as access control, CCTV, fire detection and suppression, lightening shall be considered for design of Precision A/C. 2. Precision Air Conditioners Data Center requires round the clock 365 days precision cooling to maintain temperature of 21C 1C and relative humidity 50% 5%. The room air-conditioning system shall be a floor discharge unit designed specifically for high sensible heat ratio applications such as Server and Computer rooms. The solution should be scalable to address future load of servers.
For effective and uniform distribution of cooling, proper equipment layout planning with high CFM units to be considered. Each precision air-conditioning system shall have the following features: a) No. of units - N +1 (N working +1 standby). The standby will be set in automatic rotation. (Where N stands for no. of units required based on heat load calculation) b) Flow direction - Downward flow c) Filters efficiency - 95% down to 5 microns. d) Type of load - High sensible heat load. The system shall contain Scroll compressors, Evaporator, Humidifier, Condenser, and Thermostatic expansion valve which shall be contained within the cabinet of the unit. 01 Cabinet Construction The frame and panels shall be constructed of heavy gauge Zinc-anneal corrosion resistant sheet steel. The fan section shall be insulated with minimum 25 mm thick fire rated insulation. The cabinet shall be powder coated and have a textured finish 02 Evaporator coil
The units shall be fitted with large surface area cooling coil with split coil mechanism for dehumidification. The evaporator coil shall be constructed of copper tubes and slit aluminium fins with frame and drip tray fabricated from heavy gauge aluminium. 03 Compressor
Each air-conditioner shall be provided with Hermetic Scroll compressors. Compressor shall have inbuilt overloads, and shall be mounted on anti- vibration mountings. 04 Refrigeration circuit
The refrigeration circuit shall be direct expansion type and incorporate hermetic scroll compressor. The system shall include a manual reset HP and an auto reset LP switch, filter drier and charging port. A thermal expansion valve, sight glass and filter drier shall be provided for each circuit. 05 Blower
The blower shall be centrifugal type, double inlet, double width, statically and dynamically balanced. Blower shall be driven by a high efficiency motor with a self tensioning belt drive arrangement. The blower-motor assembly shall be mounted on anti vibration mountings. Each unit to be provided with multiple blowers. 06 Humidifier The unit shall be in-built with Humidifier. Humidifier shall be provided by boiling water in a high temperature polypropylene steam generator. The humidifier shall be fully serviceable with replaceable electrodes.
Confidential Page 165 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
07 Electrical heating
The electrical heating elements shall be of low watt finned tubular construction. The heating circuit shall include dual safety protection through loss of air and high temperature controls. 08 Air cooled condenser
Condenser shall be the low profile, weather-proof type incorporating high efficiency direct drive, external rotor motors with axial blade fans. The heat rejection coil shall be constructed from copper tubes and aluminium fins. The fan shall be selected for quiet operation and shall be suitable for 24 hours operation. 09 Controls
The standard controls shall be microprocessor based programmable PID (Proportional, Integral and Derivative) logic controller that monitors, displays and operates the precision cooling units, so that the environment is held within desired specifications. The controller shall have a LCD display screen, which shall be visible from the front of the unit without removing any covers/external panels. The controls shall have separate indications for a) Various modes of operation (cooling, heating, humidifying and dehumidifying) b) Alarm conditions (temperature high, wet floor and loss of air) temperature and humidity. c) Graphical displays of set temperature and humidity and achieved temperature and humidity. d) No airflow e) Low humidifier water f) Service intervals g) Low battery The system shall have a menu driven interface with supporting help screens and shall use multi-protocol data communications. Access to the controller settings shall be protected with passwords to prevent against unauthorized access. Necessary interfaces shall be provided for remote monitoring of temperature, RH and other parameters of the Air Conditioning systems from the Admin Room in Systems Department. The controls shall be integrated with the Building Management System and capable of sending notifications to concerned person. 10 Safety precautions
a) High pressure trip - Manual reset for each compressor b) Low pressure trip - Manual reset for each compressor c) Single phasing preventers d) Reverse phasing e) Phase imbalancing f) Phase failure g) Overload tripping (MPCB) of all components Air cooled condenser shall be installed by the side of the Data Center on steel frame. Condenser and air-conditioner shall be suitably connected with insulated refrigerant pipings. Condenser shall have heat rejection coil block, fan-motor assembly with all necessary automation/interlocking The PAC units shall auto start the redundant unit in case there is failure of any running PAC. The standby unit shall continue to work till the failed unit is serviced and repaired. The unit shall be serviceable with a maximum space of 1000mm from front. 3. Air Conditioning System Scope of Work / Supply
Confidential Page 166 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
The scope of work covers design, engineering, manufacture/procurement, fabrication, factory testing, assembly, and supply, storage at site, erection, testing, trial run and commissioning of air conditioning systems for proposed Data Center of Owner. Briefly scope of work shall include but not limited to the following: a) The supply, erection, testing & commissioning of precision air-conditioning units for Data Center. The precision air-conditioning units shall be complete with Scroll compressors, Evaporator, Humidifier, Condenser and Thermostatic expansion valve. b) All civil and structural work required for above installation. c) All insulation work for refrigerant piping, ducting etc. d) All electrical works. e) Supply and installation of minimum two numbers of digital humidity and temperature meters with data logger at the Data Centers with display provision in the Control Cabin at Systems Department. f) Any other job, not specified but required for the successful completion of air-conditioning job shall be in the scope of work of successful supplier. D. Fire Detection and Suppression This specification outlines the requirements for a "Total Flood" Clean Agent - non Oxygen Depletion System (ODS) & Zero Global Warming Potential (GWP), Fire Suppression System with automatic detection and control for protection of Data Center, UPS, Management Console/ BMS/ EMS area. The work described in this specification includes all engineering, labour, materials, equipment and service necessary, and required, to complete and test the suppression system. 1. Applicable Standards The design, equipment, installation, testing and maintenance of the Clean Agent Suppression System shall be in accordance with the applicable requirements set forth in the latest edition of the following codes and standards: National Fire Protection Association (NFPA) Standards: a) NFPA 2001 Clean Agent Fire Extinguishing Systems b) NFPA 70 National Electric Codes c) NFPA 72 National Fire Alarm Code
The standards listed, as well as all other applicable codes, standards, and good engineering practices, shall be used as minimum" design standards. 2. Requirements The Suppression System installation shall be made in accordance with the drawings, specifications, and applicable standards. Should a conflict occur between the drawings and specifications, the specifications shall prevail. 3. Quality Assurance The manufacturer of the suppression system hardware and detection components shall be ISO 9001 registered. a) The name of the manufacturer shall appear on all major components. b) All devices, components, and equipment shall be the products of the same manufacturer, or supplied by the same manufacturer. c) All devices, components, and equipment shall be new, standard products of the manufacturer's latest design and suitable to perform the functions intended. d) All devices and equipment shall be UL listed and/or FM approved. e) Locks for all cabinets shall be keyed alike. 4. Installer
Confidential Page 167 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
a) The installing contractor shall be trained by the supplier to design, install, test, and maintain fire suppression systems. b) When possible, the installing contractor shall employ a professional having more than 5 years of in line experience, who will be responsible for this project. c) The installing contractor shall be an experienced firm engaged in the installation of automatic clean agent, or similar, fire suppression systems, in strict accordance with all applicable codes and standards. d) The installing contractor must have a minimum of five (5) years experience in the design, installation, and testing, of clean agent, or similar fire suppression systems. 5. Submittals a) The installing contractor shall submit the following design information and drawings for approval prior to starting work on this project: i. Field installation layout drawings having a scale of not less than 1/8 in. =1 ft.- 0 in. or 1:100 detailing the location of all agent storage tanks, nozzles, pipe runs, including pipe sizes and lengths, control panel(s), detectors, manual pull stations, abort stations, audible and visual alarms, etc. ii. Auxiliary details and information such as maintenance panels, door holders, special sealing requirements, and equipment shutdown. iii. Separate layouts, or drawings, shall be provided for each level, (i.e.; room, sub floor, and above ceiling) and for mechanical and electrical work. iv. Electrical layout drawings shall show the location of all devices and include point-to-point conduit runs and a description of the method(s) used for detector mounting. v. Provide an internal control panel wiring diagram which shall include power supply requirements and field wiring termination points. vi. A complete sequence of operation shall be submitted detailing all alarm devices, shutdown functions, remote signaling, damper operation, time delay, and agent discharge for each zone or system. b) Submit drawings, calculations and system component sheets to the Owner for approval & record. 6. System Requirements System Description and Operation a) The system shall be a Total Flood non ODS & Zero GWP Fire Suppression clean agent preferably Novec 1230 Fire Protection Fluid (Sapphire). b) The system shall provide a Novec 1230 minimum design concentration of 4.2% by volume for Class A hazards and a minimum of 5.85% by volume for Class B hazards in all areas and/or protected spaces, at the minimum anticipated temperature within the protected area. System design shall not exceed 10% for normally occupied spaces, adjusted for maximum space temperature anticipated, with provisions for room evacuation before agent release. c) The system shall be complete in all ways. It shall include a mechanical and electrical installation, all detection and control equipment, agent storage containers, Novec 1230 agent, discharge nozzles, pipe and fittings, manual release and abort stations, audible and visual alarm devices, auxiliary devices and controls, shutdowns, alarm interface, advisory signs, functional checkout and testing, training and any other operations necessary for a functional UL listed Sapphire Clean Agent suppression system. d) Provide two (2) inspections during the first year of service: Inspections shall be made at 6-month intervals commencing when the system is first placed into normal service. e) The general contractor shall be responsible for sealing and securing the protected spaces against agent loss and/or leakage during the 10-minute "hold" period. f) The Very Early Smoke Detection and Alarm (VESDA) system for Data Center and cavity floor shall provide the highest sensitivity appropriate for detecting a complete range of smoke particles produced in incipient stage and real fires involving natural or synthetic materials. It comprises of an air sampling system, filter assembly, aspiration system, detector and control system. The VESDA panels shall be located in the respective protection areas. g) The system(s) shall be actuated by a combination of ionization and photoelectric detectors installed for maximum area coverage of 250 sq. ft. (23.2 sq. m) per detector, in both the room, under floor and above ceiling protected spaces. If the airflow is one air change per minute, photoelectric detectors only shall be installed for maximum area coverage of 125 sq. ft. (11.6 m) per detector. (Ref. NFPA No. 72.)
Confidential Page 168 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
h) Detectors shall be Cross-Zoned detection requiring two detectors to be in alarm before release.
Automatic operation of each protected area shall be as follows: a) Actuation of one (1) detector, within the system, shall: i. Illuminate the "Alarm" lamp on the control panel face. ii. Energize an alarm bell. iii. Transfer auxiliary contacts, which can perform auxiliary system functions such as: Operate door holder/closures on access doors; Transmit a signal to a fire alarm system; Shutdown PAC equipment. b) Actuation of a 2nd detector, within the system, shall: i. Illuminate the "Pre-Discharge lamp on the control panel face. ii. Energize a pre-discharge horn/strobe device. iii. Shut down the PAC system and/or close dampers. iv. Start time-delay sequence (not to exceed 20 seconds). v. System abort sequence is enabled at this time. c) After completion of the time-delay sequence, the Sapphire Clean Agent system shall discharge and the following shall occur: i. Illuminate a "System Fire Red" lamp on the control panel face. ii. Shutdown of all power to high-voltage equipment if any. iii. Energize a visual indicator(s) outside the hazard in which the discharge occurred. d) The system shall be capable of being actuated by manual discharge devices located at each hazard exit. Operation of a manual device shall duplicate the sequence description above except that the time delays and abort functions shall be bypassed. The manual discharge station shall be of the electrical actuation type and shall be supervised at the main control panel.
7. General Requirements of material and equipment a. The Sapphire Clean Agent system materials and equipment shall be standard products of the supplier's latest design and suitable to perform all functions intended. When one or more pieces of equipment must perform the same function(s), they shall be duplicates produced by one manufacturer. b. All devices and equipment shall be Underwriter Laboratories (U.L.) Listed and/or FM approved. c. Each system shall have its own supply of clean agent. d. The system design shall be modular type. e. The areas below the false ceiling only shall be protected and there are no sub floors. f. Systems shall be designed in accordance with the manufacturer's guidelines. g. Each supply shall be located within the hazard area, or as near as possible, to reduce the amount of pipe and fittings required to install the system. There shall be no reserve cylinders installed on to the system. However, spare cylinders of suitable quantities shall be supplied and kept ready at Owners stores for all the times. h. The clean agent shall be stored in Sapphire Clean Agent storage tanks. Tanks shall be super- pressurized with dry nitrogen to an operating pressure of 360 psi @ 70 F (24.8 bar at 21 C). Tanks shall be of high-strength low alloy steel construction and conforming to NFPA 2001. i. Tanks (master) shall be actuated by either a resetable electric actuator or by pneumatic means from a nitrogen cartridge located in the releasing device. Explosive devices shall not be permitted. j. Each tank shall have a pressure gauge and low pressure switch (optional) to provide visual and electrical supervision of the container pressure. The low-pressure switch shall be wired to the control panel to provide audible and visual "Trouble" alarms in the event the container pressure drops below 290 psi (20 bar). The pressure gauge shall be color coded to provide an easy, visual indication of container pressure. k. Tanks shall have a pressure relief provision that automatically operates before the internal nominal pressure exceeds 730 psi (50 bar). l. Engineered discharge nozzles shall be provided within the manufacturer's guidelines to distribute the Novec 1230 agent throughout the protected spaces. The nozzles shall be designed to provide proper agent quantity and distribution. Nozzles shall be available in 1/2 in. through 2 in. pipe sizes. Each size shall be available in 180 and 360 distribution patterns.
Confidential Page 169 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
m. Distribution piping and fittings shall be installed in accordance with the manufacturer's requirements, NFPA 2001, and approved piping standards and guidelines. All distribution piping shall be installed by qualified individuals using accepted practices and quality procedures. All piping shall be adequately supported and anchored at all directional changes and nozzle locations. i. All piping shall be reamed, blown clear and swabbed with suitable solvents to remove burrs, mill varnish and cutting oils before assembly. ii. All pipe joints should have grooved lock fittings for easy assembly and dismounting. 8. Agent Agent shall not contain any Hydro fluorocarbons (HFC). 9. Control Panel a) The control panel shall be an Autopulse releasing panel. b) The detection control system and its components shall be UL listed and FM approved for use as a local fire alarm system with releasing device service. c) The control system shall perform all functions necessary to operate the system detection, actuation, and auxiliary functions. d) The control system shall include battery standby power to support 24 hours in standby and 5 minutes in alarm. e) The control system shall be microprocessor based, utilizing a distributed processing concept. A single microprocessor failure shall not impact operation of additional modules in the system. f) The control system shall be capable of supporting Cross Zoned Detection. g) The control system shall supply integrated 2.0 amp (minimum) power supply circuitry. h) Each control system shall contain four (4) initiating circuits: i. Each circuit shall be capable of Class A (Style D) or Class B (Style A) operation. ii. Each circuit shall be capable of operating up to fifteen (15) approved detectors or thirty (30) detectors per system. iii. Each circuit shall be capable of monitoring contact devices configured for manual release, manual alarm, system abort, trouble input or auxiliary (non-fire) input. i) Each control system shall contain release circuits for activation of a fire suppression system(s): i. Each circuit shall be capable of Class B (Style Y) operation. ii. Each circuit shall be rated for a minimum of 1.5 amp @ 24 VDC. j) Each control system shall contain two (2) indicating appliance circuits for annunciation: i. Each circuit shall be capable of Class A (Style B) or Class B (Style Y) operation. ii. Each circuit shall be rated for a minimum of 1.5 amp @ 24 VDC. k) Each control system shall provide an auxiliary power supply rated for 2 amps @ 24 VDC. l) Each control system shall provide two (2) SPST relays: one for common alarm and one for common trouble. Four (4) additional programmable relays can be added to each control system by adding a relay module. 10. Detectors a) The detectors shall be spaced and installed in accordance with the manufacturer's specifications and the guidelines of NFPA 72. b) The ionization detector and photoelectric smoke detector must be compatible with the control panel. 11. Manual Release (Electric) a) The electric manual release shall be a dual action device which provides a means of manually discharging the suppression system when used in conjunction with the detection system. b) The manual release or manual pull station shall be a dual action device requiring two distinct operations to initiate a system actuation. c) Manual actuation shall bypass the time delay and abort functions and shall cause all release and shutdown devices to operate in the same manner as if the system had operated automatically. d) Manual release shall be located at each exit from the protected hazard.
Confidential Page 170 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
E. Access Control The Access Control System shall be used to serve the objective of allowing entry and exit to and from the premises/ restricted areas within the facility to authorized personnel only. The system employed shall be based on Biometric Technology for the Data Center, Management Console area. The readers shall be both side of each door and shall be connected to Door Controller dedicated to that door. The components inclusive of (but not limited to) the system are as follows: a) Network Server b) Card issue terminal PC c) Application software d) Controller e) Finger print reader f) Cables The scope of work involves supply, installation, testing and commissioning of Access Control system for Data Center with requisite GUI software, PC and database for monitoring the entry/exit by authorized persons. Monitoring of system/ logs shall be done from the Systems Department. F. Closed Circuit Television (CCTV) System a) Closed Circuit Television (CCTV) System shall be provided for surveillance and record for post event analysis. Products with UL listing and proven installation worldwide only shall be supplied. b) The video output from individual camera locations shall be available on high resolution monitor via Digital Video Recorder (DVR). Twisted pair telemetry shall be employed to control pan/tilt/zoom functions. Viewing/Monitoring would be done from the Systems Department. c) The Controls shall be based on Digital Video Recorders (DVR). The DVR shall combine the functions of duplex multiplexing, video storage, control of cameras, alarm/ event detection, etc. The DVRs shall be connected to the PC provided with user friendly GUI for remote monitoring. The DVR shall be capable for multiple camera displays for live viewing or play back while recording, continuous motion detection, alarm, pre alarm handling and schedule recording modes. Recording up to min. of 30 images per second, high speed searching shall be capable of backup management with external storage device. The recorder shall provide programmable motion detection. Each camera shall be customized for specific motion triggered recording with digital zoom. d) The CCTV cameras shall be located in Data Center, entry passage and battery room. e) The external DVD writer shall be used to archive the video image. PC shall be used for the management of the system. f) The scope includes provision of monitoring software, server with adequate disk space for storing video data for 30 days, DVD writer, 21 inch LCD monitor (the monitor shall be used for BMS), graphics card etc. G. Pest/Rodent repellent system Appropriate system of solution to keep away rodent/ cockroach/ pests from Data Center shall be provided by Vendor. H. Water Leak Detection System Water leak detection cable shall be provisioned in the water prone areas of Data Center. Water leak detection System shall be designed to protect the air-conditioned premises and to provide alert at the Systems Dept about
Confidential Page 171 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
the leak in the AC systems. The system shall also be designed to trip the AC when the sensor is activated. Events should be clearly reported on LCD/ LED display with full English language description of the nature of the fault in the panel. The Water leak detection system shall comprise of Tape Sensors, Water Leak detection modules, Condensation detectors, I/O modules and sounders all connected to a Control Panel. I. Data Safes Two sets of safes shall be used to keep the magnetic media, DAT drives, licenses and software media etc. The safes should be completely fire-proof, dust proof, Pilferage proof, humidity proof, Magnetic and electrostatic proof. The safes shall have facility to store the data tape backups for five years. Separate safes shall have facility to store all licenses and software. The safe should be designed to withstand temperatures of around 1000 deg C for 60 min. One set of safes shall be kept in Systems Department and the other at a separate location. The safes should have adequate capacity to store the data cartridges for the SAP System and Legacy backup for 5 years. J. Acceptable Makes-Interior/Electrical Work/AC S No. Material Preferred Makes 1 Aluminium sections Indal/ J indal/ Hindalco 2 Float Glass (Toughend) Saint Gobain/ Indo-Asahi/ Modifloat 3 Raised Access flooring United Insulations/Microtac 4 Under deck Insulation Armaduct/ Armaflex 5 Vitrified Ceramic tiles Nitco/ J ohnson/ Bell/ Asian 6 Fire Rated Door Shakthi Met door/ Godrej 7 Steel door Shakthi Met door/ Godrej 8 Fire rated glass Promat/ Schott 9 Aluminium Composite panel Alustrong/ Alucobond/ Alcopla/ Alstone 10 Panic Bar Assa abloy, Dorma, Honeywell, Europlex 11 Fire Proof Data Safe Godrej/ Methodex 12 Electrical Switches [modular] MK/ Crabtree/ Legrand/ Roma/Anchor/ Cona 13 Electrical Fittings Philips/ Bajaj/ Crompton 14 MCCB L&T/Siemens/ Legrand/ Havells 15 MCB Schneider/ Legrand/ Seimens/ Havells 16 MDS/STD Havells/ CGL/ Indokopp/ Schneider/ Legrand/ Seimens 17 HRC fuse Siemens/ L&T/ Alstom 18 Voltmeter/Ammeter [digital] AE/Meco/ IMP 19 Aux. Contactor L&T/ Siemens/ Telemechaniqe 20 Power Contactor L&T/ Siemens/Telemechaniqe 21 Push Button L&T/ Siemens/ Telemechaniqe 22 Signaling Lamp [LED type] Siemens/ L&T /Binay 23 Overload Relay L&T/Siemens/Telemechaniqe 24 Control/selector switches Siemens/ L&T/ Kaycee Industries 25 Terminal blocks Elmex Controls/ Connect Well /Phoenix 26 Control Transformers Siemens/ Indcoil Manufacturing Co/ National Engg. Corporation/ AE 27 UPS Siemens/ Emerson/ APC/ MGE/ILK/ Fuji 28 Maintenance Free Battery Excide 29 Precision Air-conditioning Emerson/ Stulz 30 VESDA and FM200 Based Fire suppression System Chemetron/ Hygood/ Siemens/ KIDDE/ Vision Systems 31 Access Control System Bosch/ Cardax/ HID/ Ramsdec/ Europlex 32 CCTV Bosch/ Europlex/ Baxal/ Panasonic 33 Digital Controllers Honeywell/ Tridium/ J ohnson Controls/ Seimens
Confidential Page 172 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-4: Br oad Speci f i cat i ons f or Net wor k Layout A. General a) In office buildings, cable should be laid through GI Pipe for Fiber Optic (FO) Cable and PVC casing and capping for UTP Cable. b) installation work shall be carried out in a neatly manner by skilled, experienced and competent workmen with experience in jointing and termination of data communication cables. c) Cable runs shall be uniformly placed, properly supported and protected in an approved manner. All bends in runs shall be well defined and made with due consideration to avoid sharp bending and kinking of cables. d) Cable installation shall be properly left at both the ends for proper termination without any tension and to allow future expansion. e) No joint shall be made at any intermediate point through runs of cables. In case of any damage during the laying of the cables, the Vendor shall replace the complete segment of the cable without any cost implication to Owner. f) Holes in walls, ceiling etc. made during cable layout shall be plugged after drawing the cable. g) Each equipment, panel and outgoing cable from the patch panels shall be ferruled and labeled. Proper labeling and numbering shall also be provided on the outlets. h) All UTP cabling within the false ceiling space or under raised flooring shall be encased inside PVC pipe of minimum 25 mm dia and suitably supported. The layout shall be designed such a way that cable does not cross. i) Flexible GI pipe of suitable size should to be used for bending. j) GI pipes carrying FO cable shall be colour coded at regular intervals of 2 Mtr. throughout the cable run for over ground cable laying. B. Surface /Concealed Fiber Optic Cable Laying a) Backbone cables shall be installed separately from horizontal distribution cables. b) Fiber slack shall be neatly coiled within the fiber termination panel. No slack loop shall be allowed external to the fiber panel(s). c) Each cable shall be individually attached to the respective termination panel by mechanical means. d) Each fiber cable shall be stripped upon entering the termination panel and individual fiber routed in the termination panel. All fiber should be terminated properly. e) Each cable shall be clearly ferruled and labeled at the entrance to the termination point. Cables labeled within the bundle shall not be acceptable. f) Dust caps shall be installed on the connectors and couplings at all times unless physically connected. g) GI pipe shall be used for routing cables embedded through concrete foundation/floor generally in plant buildings. These shall be medium gauge, hot dip galvanized electric resistance welded (ERW) screw type conforming to IS: 1239 (Part -I). All pipe fittings shall conform to IS: 1239 (Part -II). h) G.I pipe shall generally be used for exposed cabling along building wall/surface, etc. in both plant and non-plant buildings. Pipes shall be of galvanized steel, screwed type conforming to IS: 1650. The size of pipe shall be a minimum of 25 mm dia and 2 mm thickness. i) All pipe fittings, e.g. sockets, elbows, tees, bends, saddlers, locknuts, etc. as required for pipe cabling with minimum of 25 mm dia steel pipe shall be made of hot dip galvanized steel and conforming to IS: 2667 and IS: 3887. j) All GI pipe/conduits shall be provided with pull wires to facilitate cable pulling. k) GI pipes shall be firmly supported in position by means of heavy gauge saddles either screwed in concrete/brick walls using suitable plugs or screwed to MS brackets/cleats welded on to building structure. The spacing between the supports for both horizontal and vertical runs shall not be more than 1000 mm for straight runs. At bends or termination to junction/pull boxes, the nearest support shall be 300 mm from such fittings. l) Exposed GI pipes shall run parallel or perpendicular to column/building lines to match the existing architectural arrangement. Embedded GI pipes, shall, however, run in direct lines with minimum bends.
Confidential Page 173 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
C. Surface /Concealed UTP Cable Laying Cables shall be coiled in the surface-mount boxes if adequate space is present to house the cable coil without exceeding the manufacturers bend radius. No more than 12 of slack shall be stored.Each cable type shall be terminated as indicated below: a) Cables shall be dressed and terminated in accordance with the recommendations made in the TIA/EIA -568-B document, manufacturers recommendations and/or best industry practices. b) Bend radius of the cable in the termination area shall not be less than 4 times the outside diameter of the cable. c) The cable jacket shall be maintained as close as possible to the termination point. d) Cables shall be neatly bundled and dressed to their respective panels or blocks. Each panel or block shall be fed by an individual bundle separated and dressed back to the point of cable entrance into the rack or frame. e) Each cable shall be clearly labeled on the cable jacket behind the patch panel at a location that can be viewed without removing the bundle support ties. Cables labeled within the bundle, where the label is obscured from view shall not be acceptable. f) Cables shall be installed in continuous lengths from origin to destination (no splices) and the length shall not exceed 80 meters. g) Minimum of 150 mm axial spacing shall be maintained at all time between power and network cable. h) Cables shall not be attached to ceiling grid or lighting support wires. i) Any cable damaged or exceeding recommended installation parameters during installation should be replaced by the contractor prior to final acceptance at no cost to the Owner. j) A self-adhesive label or PVC marker ferules shall identify the Cables. A cable label shall be applied to the cable behind the faceplate on a section of cable that can be accessed by removing the cover plate. Similar label or marker ferrules shall also be placed on a section of the cable near to the patch panel termination. k) Pulling tension on 4-pair UTP cables shall not exceed 25-pounds for a single cable or cable bundle. The pathway shall be adequately sized so as not to exceed the 80% cross-section fill of cables. The pathway shall be securely installed in the facility. l) For surface (Indoor) cable laying, good quality PVC Casing/Capping of minimum 25 mm width and 10 mm height shall be used. Rest of the specifications shall be same as B. m) For surface (outdoor) cable laying, it is to be inserted in GI pipes and clamps on walls. n) For shop floor cable laying, good quality GI pipe shall be used for insertion of cable in it and laid along the structural columns, trusses, girders etc. with clamps fixed to the supports at all heights. D. Laying of Underground Cable (All Types) a) Underground cable shall be laid generally about 1.0 meter below finished ground level and shall be provided with atleast 75 mm and cushioning both at top and bottom with brick top cover (min. 12 bricks per meter) and sand filing for mechanical protection, where power and network cable trenches are run side by side, the axial spacing between power and network cables shall not be less than 300 mm. b) The excavation of trenches shall be executed with vertical sides and the trenches shall be kept as straight as possible. Width of trench shall be in accordance with the number of cables to be laid but in any case shall not be less than 300 mm. c) After cable laying, the trenches shall be back filled in layers with each layer being well rammed, consolidated and sufficient allowance made for settlement. In case of road crossings, if the road has to be dug for cable laying, the Vendor shall make good the damages of the road thus done. For crossing of road, railway track and other services, cables in GI pipe shall be taken through GI pipe. d) In each cable run some extra length shall be kept at a suitable point to enable one or two straight through joints to be made in case the cable develops faults at a later date. Also when numbers of cables are laid together, the cable length shall be adjusted to stagger the straight through joints. e) Underground cables shall be generally laid in the utility alley along the road and cable shall follow road layout. Where backbone cables and distribution cables are installed in a cable tray, backbone cables shall be installed first and bundled separately from the horizontal distribution cables.
Confidential Page 174 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
f) All cable crossings across railway tracks shall be done in a GI pipe that shall pass through another pipe of suitable specification and diameter and the depth of the trench will be minimum 150 Cms from ground. g) For cable laying in areas having corrosion effect, like Cold Rolling Mill (Pickling Line), Silicon Steel Mill (Pickling Line) and Coal Chemical, suitable PVC / Rubber coated GI pipe shall be used. h) Suitable cable route markers shall be provided at the distance of every 200 meters on the cable route and also at places or corners wherever the route of the cable changes.
Confidential Page 175 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-05 Br oad Speci f i cat i ons f or Vi deo Conf er enci ng Equi pment & sof t war e
S No. Specification Offered Yes/ No Deviation/ Enhancement 1 Equipment 42 Wall-Mounted Plasma Screens State-of-the Art Videoconferencing System Processor
Digital Mixer, Echo Canceller and Far End Feedback Reduction Device
Wireless Touchpad Control Panel Connection Device for PC Image Share
The E-Board system could be either a full electronic whiteboard or a system that allows conversion of a normal whiteboard into an electronic board.
Integration of Bandwidth Controller-Packet Shaper with Network Management System
2 Interoperability Standard for IP, ISDN H.323 (Multisite support enabled) H.320 (ISDN Support provision) SIP 3 Video standards H.261 H.263 + H.263 ++ H.264 4 Frame Rates (Point to point ) Minimum 30 frames per second 5 Video Inputs: Integrated Main camera Additional auxiliary camera(s) Document Camera DVDR port
PC/Laptop (SXGA) connection provision for PowerPoint presentations etc
6 Video output: DVD RW for recording For Primary Display: Plasma Multimedia Projector For Secondary Display: Plasma Multimedia Projector 7 Video format PAL, NTSC Graphics : XGA, SVGA, VGA, SXGA
Video Bandwidth (capable of operating at 256kbps onwards bandwidth)
Confidential Page 176 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
8 Integrated Main camera Ultra quite , Ultra fast action pan /tilt / zoom 60 Field view or better Tilt Range : +/- 15 (UP/ Down) or better Pan Range : +/- 90 (left /right) or better Total Field view : 180 or better 10 x zoom or better Auto focus Automatic white balance Camera Preset local and far end Standard based far end camera control (FECC) Remotely operated snap shot 9 Video Resolution Interlaced video (60 /50 field full screen video for NTSC / PAL ) NTSC: 4 SIF (704 x 480) NTSC: SIF (352 x 240) PAL: 4 CIF (704 x 576) PAL: CIF (352 x 288) Advanced Screen Layouts to display multiple locations Picture-in-picture 10 Dual Video Support/Resolution
Dual Video Support to transmit PC/VCR/External camera and presenter
XGA (1024 x 768) ,SVGA (800 x 480) for graphic display People Video support for 4 CIF and SIF on second VGA display 11 Audio protocols G.711, G.722.1, G.722, G.728 on IP or ISDN or Mixed calls G.711, G.728 on IP/ ISDN 12 Audio Feature Full duplex audio Stereo Mono CD Quality Instant Adaptation Echo Cancellation Automatic Gain Control (AGC) Voice Activated Camera Tracking Automatic Noise Suppression (ANS) Audio Mixer Mic, VCR, Telephone , Line in Ability to connect Audio calls 13 Audio input 1 x Microphone 1 x RCA inputs for stereo or mono input DVD RW 1 x RCA for mixer Support for Audio Conferencing minimum 3 mics 14 Audio output Primary Audio output Secondary Audio output DVDR (mono & stereo) 15 Digital Tabletop/Ceiling Microphone Array
Confidential Page 177 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
360 degree voice pick up ; 4.8 dB less reverberant than omni microphone
Integrated mute button (local and far end) 16 Network interface support Ethernet port : (10/100Mbps) 17 Network Features Automatic IP/ISDN calling Down speeding over IP and ISDN Auto SPID detection and configuration SNMP for enterprise management Audio and video Error Concealment over IP ,ISDN and mixed call Maximum call length digital timer IP Address Conflict Warning 18 System Management / Directory Services Software Up-gradation via ISDN, PC, LAN Downloading CDR Directory Services 19 H.323 Quality of Service Features IP DiffServ IP Precedence TOS RSVP IP Packet Loss Recovery and J itter Control 20 Security Secure password authentication Administrative password Management via HTTP, Telnet SNMP security alerts 21 Encryption on IP/ISDN/Serial Ports Software encryption on ISDN ,IP and serial / V.35 22 User Interface User friendly graphical interface 23 Firewall Support System is able to operate behind Firewall 24 Electrical Auto sensing power supply Operating voltage/power 110-240 VAC 50-60 Hz 25 Documentation
The system must come with complete documentation set involving user guides, technical specifications, operation and maintenance manuals etc.
Acceptable Makes for Video Conferencing System Polycom / Tandberg/LifeSize
Confidential Page 178 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-06: Br oad Speci f i cat i ons f or I P Tel ephony Equi pment s & sof t war e Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1 User Features 1.1 Abbreviated Dial 1.2 Answer and answer release 1.3 Autoanswer and intercom 1.4 Barge 1.5 Callback busy, no reply to station 1.6 Call connection 1.7 Call coverage 1.8 Call forwardall (off net and on net) 1.9 Call forwardbusy 1.10 Call forwardno answer 1.11 Call hold and retrieve 1.12 Call J oin 1.13 Call park and pickup 1.14 Call pickup group-universal 1.15 Call status per line (state, duration, number) 1.16 Call waiting and retrieve (with configurable audible alerting)
1.17 Calling Line Identification (CLID) 1.18 Calling Line Identification Restriction call by call (CLIR)
1.19 Calling party name identification (CNID) 1.20 Conference Barge 1.21 Conference List and Drop any party (ad-hoc conference)
1.22 Direct inward dial (DID) 1.23 Direct outward dial (DOD) 1.24 Directory dial from phonecorporate, personal
Directoriesmissed, placed, received calls list stored on selected IP phones
1.25 Distinctive ring (on net vs. off net) 1.26 Distinctive ring per line appearance 1.27 Distinctive ring per phone 1.28 Drop last conference party (ad-hoc conferences) 1.29 Extension mobility support 1.30 Hands-free, full-duplex speakerphone 1.31 Hypertext Markup Language (HTML) help access from phone
1.32 Immediate Divert to voicemail 1.33 Last number redial (off net and on net) 1.34 Malicious Call ID and Trace 1.35 Manager-assistant service (IPMA application) - Proxy line support 1.36 Manager features: Immediate divert or transfer, do not disturb, divert all calls, call intercept, call filtering on CLID, intercom, speed dials.
Confidential Page 179 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1.37 Assistant features: Intercom, immediate divert or transfer, divert all calls, manager call handling through assistant console application
- Shared Line support 1.38 Manager features: Immediate divert or transfer, do not disturb, intercom, speed dials, barge, direct transfer, join.
1.39 Assistant features: Handle calls for their managers; View manager status and calls; Create speed dials for frequently used numbers; Search for people in the Corporate/Call Manager directory, handle calls on their own lines, immediate divert or transfer, intercom, barge, privacy, multiple calls per line, direct transfer, join, send DTMF digits from console, MWI status of managers phone.
- System capabilities: Multiple managers per assistant, redundant service
1.40 Message waiting indication 1.41 Multiparty conferenceAd hoc with add-on, meet-me features
1.42 Multiple calls per line appearance 1.43 Multiple line appearances per phone 1.44 Music-on-hold 1.45 Mute capability from speakerphone and handset 1.46 On-hook dialing 1.47 Operator attendantAttendant Console - Call Queuing - Broadcast Hunting - Shared line support 1.48 Privacy 1.49 Real-time QoS statistics through HTTP browser to phone
1.50 Recent dial listCalls to phone, calls from phone, autodial, and edit dial
1.51 Service URLsingle button access to IP Phone Service
1.52 Single-button data collaboration on softphonechat, whiteboard, and application sharing
1.53 Single directory number, multiple phonesBridged line appearances
1.54 Speed dialMultiple speed dials per phone 1.55 Station volume controls (audio, ringer) 1.56 Transfer - Blind - Consultative - Direct Transfer of two parties on a line. 1.57 User-configured speed dial and call forward through Web access
1.58 Video (SCCP and H.323)
Confidential Page 180 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1.59 Web services access from phone 2 Summary of Administrative Features 2.1 Application discovery and registration to SNMP manager
2.2 AVVID XML Layer (AXL) Simple Object Access Protocol (SOAP) Application Programming Interface with performance and real-time information.
2.8 Configurable and default ringer WAV files per phone 2.9 Configurable Call Forward Display 2.10 Database automated change notification 2.11 Date and time display format configurable per phone 2.12 Debug information to common syslog file 2.13 Device addition through wizards 2.14 Device-downloadable feature upgradesPhones, hardware transcoder resource, hardware conference bridge resource, VoIP gateway resource
2.15 Device groups and pools for large system management
2.16 Device mapping toolIP address to Media Access Control (MAC) address
2.17 Dynamic Host Configuration Protocol (DHCP) block IP assignmentPhones and gateways
2.18 Dialed Number Analyzer (DNA) 2.19 Dialed number translation table (inbound and outbound translation)
2.20 Dialed number identification service (DNIS) 2.21 Enhanced 911 service 2.22 H.323-compliant interface to H.323 clients, gateways, and gatekeepers
2.23 J TAPI 2.0 computer telephony interface 2.24 Lightweight Directory Access Protocol (LDAP) Version 3 directory interface to selected vendor's LDAP directories
- Active directory 2.25 Multilevel Administration Access (MLA) 2.26 MGCP signaling and control to selected VoIP gateways
2.27 Native supplementary services support to H.323 gateways
2.28 Paperless phone DNISDisplay-driven button labels on phones
2.29 Performance-monitoring SNMP statistics from applications to SNMP manager or to operating system performance monitor
Confidential Page 181 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 2.30 QoS statistics recorded per call 2.31 Redirected DNIS (RDNIS), inbound, outbound (to H.323 devices)
2.32 Select specified line appearance to ring 2.33 Select specified phone to ring 2.34 Single CDR per cluster 2.35 Single point system and device configuration 2.36 Sortable component inventory list by device, user, or line
2.37 System event reportingto common syslog or operating system event viewer
2.38 TAPI 2.1 computer telephony interface 2.39 Time-zone configurable per phone 2.40 Tool for Auto-Registered Phones Support (TAPS) 2.41 Extended Markup Language (XML) API into IP phones (IP Phone 794x/796X)
2.42 Zero-cost automated phone moves 2.43 Zero-cost phone adds 3 IP Phones 3.1 Should have an LCD display 3.2 Multiple ring tones 3.3 A hearing-aid-compatible handset 3.4 G.711 and G.729a audio compression 3.5 H.323 compatible and Microsoft NetMeeting compatibility
3.6 An IP address assignmentDHCP client or statically configured
3.7 Comfort noise generation and voice activity detection (VAD) programming on a system basis
3.8 The phone should also includes the following settings: 3.9 Display contrast 3.10 Ring type 3.11 Network configuration 3.12 Call status 4 Calling Features 4.1 The phone should also include the followings: 4.2 Multi-line appearance 4.3 Calling name and number display 4.4 Call waiting 4.5 Call forward 4.6 Call transfer 4.7 Three-way calling (conference) 4.8 Pre-dialing before sending 4.9 Redial 4.10 Call hold / resume 4.11 Call mute 4.12 Call park
Confidential Page 182 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 4.13 Call pick-up / group pick-up 4.14 "You Have Voice Mail" message on display 4.15 Hotkey for keypad lock 4.16 Hotkey for voice-mail access 4.17 Nine speed dials configurable in the set 4.18 Programmable speed-dial hotkeys 2-9 4.19 Comfort noise generation (CNG), voice activity detection (VAD), adaptive jitter buffer, and echo cancellation
4.20 Language support: English, French, German in the first release
4.21 Local phone book 4.22 Time / date display 4.23 Keypad lock / vibration icon indicators 4.24 Idle / call state-based soft-keys 5 Network Features 5.1 Automatic IEEE 802.1q (virtual LAN [VLAN]) configuration
5.2 G.711a, G.711u, and G.729ab audiocompression coders-decoders (codecs)
5.3 Integrated Ethernet switch 5.4 10/100BASE-T Ethernet connection through an RJ -45 interface for LAN connectivity
5.5 software upgrade supported using a Trivial File Transfer Protocol (TFTP) server
5.6 Provisioning of network parameters through Dynamic Host Configuration Protocol (DHCP)
6 Protocols Supported 6.1 Terminal Control Protocol 6.2 SIP (RFC 2543) 7 Power Supply 7.1 Inline power 7.2 Power can also be supplied locally using an optional AC to 48-VDC power adapter (CP-PWR-CUBE)
Confidential Page 183 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 8.12 System Configuration Report 8.13 Transfer Billing Report 8.14 Unresolved References Report 9 IP Based Voice / Video / Web Conferencing Bridge 9.1 Appliance based solution with necessary hardware and software
9.2 Client software Compatibility 9.2.1 Operating Systems : Windows 2000 Pro (SP2 or later), Windows 2000(SP2 or later), Windows 2000 Advanced Server (SP2 or later), Windows XP (SP1 or later), or Windows Vista (Business or Enterprise), Red Hat 9 or Red Hat Enterprise Linux 3 or later, Sun Solaris9 or 10
9.2.2 Browser: Internet Explorer 5.5 or later; Netscape 7.1 or later, Mozilla 1.6 or later; or Firefox 1.0.3 or later
9.2.3 Adobe Flash Player: 8 or later 9.3 Protocol Support 9.3.1 H.323 v4 9.3.2 SIP (RFC 3261) 9.3.3 G.711 and G.729a 9.3.4 Real-Time Transport Protocol (RTP; RFC 3550) 9.3.5 RTP Payload for Dual Tone Multifrequency (DTMF]) Digits (RFC 2833)
9.3.13 Network Time Protocol (NTP) Versions 3 and 4 9.4 Network connectivity and bandwidth 9.4.1 Two 100-Mbps or faster Ethernet connections for server
9.4.2 For voice only, up to 84 Kbps in each direction 9.4.3 For Video Conference: 64 to 768 kbps (quality increases with bit rate)
9.4.4 Web conference: At least a 56-kbps or faster 9.5 Management 9.5.1 Monitoring and alarming are supported through the Simple Network Management Protocol (SNMP)
9.5.2 The appliance should be accessible through CLI / HTTP or HTTPS for configuration and management purpose
10 IP Based Voice Mail Solution 10.1 System Capability 10.1.1 Should provide intelligent voice messaging system for
Confidential Page 184 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement minimum of 300 users & 16 voicemail ports, 10.1.2 Should allow comfortable & convenient way for users to interact with the system, selectable telephone user interface , support for desktop interface with visual access to voice messages using IMAP or a dedicated Web browser,
10.1.3 Should support Session Initiation Protocol (SIP) proxy servers, designated SIP phones and clients and SIP- enabled access gateways,
10.1.4 Should leverage communications infrastructure investment by integrating with IP PBX and traditional telephone systems. Should support Intuitive browser- based system administration console and tools to simplify installation, maintenance, and daily use and enable maintenance from any PC on the network
10.1.5 Should support Innovative use of streaming media providing efficient audio delivery, Should support Fault-tolerant system tools including robust security, file replication, event logging
10.2 Message Access 10.2.1 Play and process messages (repeat, reply, forward, delete, save, mark as new, hear day or time stamp, or skip to the next message)
10.2.2 Reverse, pause, or fast-forward messages during playback
10.2.3 Control volume and speed during message playback 10.2.4 Pause or resume during message recording 10.2.5 Address messages to multiple recipients 10.2.6 Support for searching for messages by caller ID, name, or extension in saved messages
10.2.7 Record messages and mark them as regular, urgent, private, or secure/request a return receipt
10.2.8 Switch between spelling name and extension when addressing a message
10.2.9 Define rules to route incoming calls by caller 10.2.10 Define rules to route incoming calls by time of day 10.3 End User Features 10.3.1 Support for customizable message notification options 10.3.2 Support for different personal greetings (alternate, busy, internal, off-hours, standard)
10.3.3 Passwords protection for listening the message 10.3.4 Support for specifying the order in which messages are presented over the phone by message type (voice, fax, e-mail), urgency, or LIFO/FIFO
10.3.5 Create private distribution lists and address messages to them via TUI or GUI
10.3.6 Support for setting expiration date for any personal greeting
10.3.7 Support for message notification for new messages via SMTP text, pagers, and SMS text messaging for mobile users. Should Support SMPP 3.4 protocol for
Confidential Page 185 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement interoperability with all major SMS center providers 10.3.8 Support for sending additional notification types if a message is not retrieved.
10.3.9 The system should have message-waiting indicator (MWI)
10.3.10 Should support Music on Hold 10.4 System Administration Features 10.4.1 Should be able to integrate with industry standard IP PBX system
10.4.2 Should be able to provides native support for SIP proxy servers, designated SIP phones and clients, and SIP-enabled access gateways
10.4.3 Should have browser based system administration console and tools to simplify installation, maintenance, and daily use and allow maintenance from any PC on the network.
10.4.4 Should have option to enable end users to manage more of their own accounts, and thus decentralizing routine administration.
10.4.5 Should have support for Event Logging 10.4.6 Should support automatic and manual failover 10.4.7 Should provide warning when mailbox is full 10.4.8 Should support day and time stamps for messages 10.4.9 Should provide directory search facility by spelling user name
10.4.10 Once integrated with the proposed IP PBX, the system should support encrypted Skinny Client Control Protocol (SCCP) and Secure Real-Time Transport Protocol (SRTP).
10.5 The system should provide the following Reports 10.5.1 Administrative Access Activity Report 10.5.2 Call Handler Traffic Report 10.5.3 Distribution Lists Report 10.5.4 Event Log Report 10.5.5 Outcall Billing Report 10.5.6 Port Usage Report 10.5.7 Users Failed Login Report 10.5.8 User Message Activity Report 10.5.9 System Configuration Report 10.5.10 Transfer Call Billing Report 10.5.11 User Access Activity Report 10.5.12 User Lockout Report
Acceptable Makes for IP Telephony System Cisco/Nortel/Avaya
Confidential Page 186 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-07: Br oad Speci f i cat i ons f or Emai l Sol ut i on Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1 Messaging server 1.1 Should be able to support and enable users to connect using the desktop/ thick mail clients like MS Outlook, Lotus Notes, Mozilla Thunder Bird, Evolution, Netscape Communicator and Outlook Express using industry standard protocols like POP3/IMAP/HTTP/SMT
1.2 Should support multiple domains on a single system 1.3 Should support recovery or restoration of single mailbox without impacting/ downtime for other users in online and offline mode
1.4 Should support storage of any file format and should allow users to upload and download content from the messaging system.
1.5 Should support full-text search on each message store database including scheduled indexing for faster search capabilities from the messaging client (browser and rich client)
1.6 The messaging store should support Server and Client side rules. 1.7 Should be capable of scheduling message delivery by date and time both by user and administrator
1.8 Should be capable of limiting message storage space for each user by message store database
1.9 Should be able to prioritize a message sent by the user 1.10 Should support online addition of additional storage in to the System as and when required
1.11 Should support message archival and journaling on the Server to comply with security and auditing requirements
1.12 Should support shared message stores like Notice Board or Bulletin Board. Also these stores should support access control with variety of permission set.
1.13 Should support access of all mailbox folders (Inbox, Calendar, Shared Folders, etc) through the browser by providing user friendly URLs.
1.14 Should support online maintenance of message store databases which can be scheduled. Should also support restoration of mailboxes to active messaging store without the need of additional steps or servers
1.15 Should support cumulative and non-cumulative transaction logging 1.16 Should support virtual partitioning of the messaging system protocols (including POP/SMTP/IMAP/HTTP protocols) for higher scalability
1.17 Should support hosting messaging sub-systems by role (like protocol, message storage, directory database, message routing, etc.) on more than one physical server or on the same server using partitioning
1.18 Should support high availability and clustering like active-passive, active-active.
1.19 Should be able to specify data which needs to be clustered 1.20 Should support Load Balancing for the web servers that render web pages to browser based messaging client.
2 Groups/Mailing Lists 2.1 Mailing Lists application is part of (or built in to) the core messaging application being proposed
Confidential Page 187 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 2.2 The solution should be able to populate lists from Directory Server. 2.3 Automatic updates of the mail list, when a user is added to a group where the mail list has been defined for the same group.
2.4 Web based list administration for nearly all tasks. 2.5 Privacy features such as moderation, open and closed list subscription policies, private membership rosters and sender-based filters.
2.6 Automatic web based archiving built-in with support for private and public archives and hooks for external archivers.
2.7 Integrated auto-replies 2.8 Integrated bounce detection within an extensible framework. 2.9 Integrated spam detection, and MIME-based content filtering 3 Features of Message Transfer Agent (MTA) 3.1 The MTA should allow relaying mails from the authenticated users. 3.2 The MTA should allow relaying of the mails from the clients in the trusted network or to the domains that are configured as authorized relay destination.
3.3 MTA should allow a user account to have more than one email address associated with it. i.e., should have aliasing feature.
3.4 MTA should have Delivery Status Notification providing an e-mail sender ability to specify success, failure, delay or none of the message.
3.5 The MTA should have option to define the maximum message size on a global/group/user level basis.
3.6 MTA should be capable of handling bulk mailing, limiting number of recipients and message size.
3.7 The MTA should do the segregation of queues into inbound and outbound on the same server and also across servers.
3.8 MTA should be able set the parameters for controlling the queue such as concurrency delivery, queue lifetime, response timeout, connect timeout and bounce mail lifetime.
3.9 MTA should provide queue handling such as delete, redirect, flushing.
3.10 The MTA should provide scheduling of mails queue based on priority. 3.11 The MTA should be able to define the maximum recipients per mail 3.12 The MTA should support for sending mails in graphics, audio, video files and text in multilingual.
3.13 The MTA and other components proposed in the solution should be protected from the virus and spam attacks using the Anti-Virus and Anti-Spam solution proposed.
3.14 The MTA should be capable of providing SSL/TLS and S/MIME support for encrypted communication.
3.15 The MTA should be able to validate sender domain in DNS (Sender Policy Framework, Domain-Keys and RDNS look ups).
3.16 The MTA should be able to verify the local domain users exist in directory server or not.
3.17 The messaging system should provide an option to block, discard, bounced and route SPAM mails to an alternate mailbox at the server level.
3.18 The messaging system should be capable to define blacklist/ white list senders, domains at the global level to reduce SPAM and virus
Confidential Page 188 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement mails. 3.19 The messaging system should provide an option of subject rewriting, header appending in case of detection of virus or SPAM mail.
3.20 The messaging system should provide proactive blocking of SPAM by referring to Real Time Block Lists (RBLs) at the MTA level.
3.21 The messaging system should provide a facility to take action on a SPAM mail to quarantine, delete, reject or bounce.
4 Disclaimer Facility 4.1 Every outgoing mail should be appended with a Disclaimer statement preset by the Administrator at the global level.
4.2 The system administrator should be able to change the disclaimer. 4.3 Should support server side out-of-office reply capabilities. Users can customize response and select filters that determine which message senders are to receive the notification
5 Storage format 5.1 Storage Format should implement an indexing feature for quick retrieval of the mails.
5.2 Support for unlimited mailbox size. 6 Quota System 6.1 The system administrator should be able to set the quota 6.2 There should be a facility for defining the quota by the administrator at global, group and user level by the administrator for all the users.
6.3 The system administrator should have an option to define the threshold level limits for the user mailbox quota.
6.4 An email message needs to be send to user with the Quota warning on reaching defined threshold value.
6.5 Visual display of the actual usage of allocated quota for the users over the web interface.
6.6 There should be a GUI interface (Web / Console) for quota administration for the administrator.
6.7 Message De-duping: The System should not duplicate the message addressed to multiple recipients in to each mailbox in the system.
7 Desktop/Thick Mail Client 7.1 When composing message in thick mail client, addresses auto- complete as they are being typed, including a dynamically updated selection dialog when multiple addresses match.
7.2 The application should support composing of messages in major International Languages.
7.3 The Desktop mail client should be able to set priority of the messages like high, normal and low.
7.4 The desktop mail client should be able to schedule the delivery of the messages and also the expiry of the messages.
7.5 Desktop/Thick Mail Client should have following indicative features:
Support for SMTP, IMAP and POP mail protocols, as well as HTML mail formatting.
Easily import your existing email accounts and messages. Flagging Option for mails.
Powerful quick search based on senders, recipients, message, subject, data, status etc.
Spell check facility as you type.
Confidential Page 189 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement Advanced message filtering rules. J unk Mail Filters and Anti-Phishing Protection.
Enterprise and Government grade security features including S/MIME, digital signing, message encryption, support for certificates and security devices.
Attachments are never run without the express permission of the user, protecting the users system from worms and viruses.
It should have an option to get updates from the central server. Personal and global Address Book. Support for LDAP/Directory Services. Display of Quota limits. Calendar, Group Scheduling, Personal Task Management. Mail Archiving to local disk and server side. 7.6 Welcome Page should be customizable and allow users to display information they need in the way that they want.
7.7 Data sent over the network can be compressed for more efficient network utilization.
7.8 Allow multiple people to share a single PC. The thick mail client software should have features for creating multiple-user profiles on a single PC with separate message stores, allowing users to access their personal data securely while sharing common resources.
7.9 Should support multiple archive policies and destinations. Save valuable contents and retrieve them whenever they are needed.
7.10 Viewing, creating, and scheduling calendar entries and meetings. 7.11 Off-line support for all Personal Information Management (PIM) functionality.
7.12 Should allow the user to bring a copy of the servers directory catalog off-line.
7.13 Group Calendaring Allow users to manage another users calendar. Can compose and accept/decline meeting invitations. Auto Accept/Decline of invitations.
7.14 Should support Task Assignment. 7.15 Should provide for support for J ournal Entries. 7.16 Support for Drag and Drop Attachments. 7.17 Should support for Mail Box Delegation. 7.18 Should be able to tentatively accept/draft meetings. 7.19 Should provide for Calendar Preferences like Default Appointment 7.20 Duration, Calendar Entry Type, Auto processing invitations. 7.21 Should Print multiple Calendar formats: Daily Weekly Monthly Calendar List To-do List Trifold
8 Web Interface 8.1 All Web mail functionality should be accessible through all major browsers like: Internet Explorer, Mozilla Firefox and Netscape; It should be compliant to HTTP-1.0 and HTTP-1.1
8.2 Rich, interactive, web-based interface for end user functions (access
Confidential Page 190 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement via HTTP or HTTPS) 8.3 The Server should sense the available bandwidth and provide or disable the rich feature functionalities in the web interface.
8.4 The Web interface automatically updates to display messages and other updates (without refreshing the browser or users intervention).
8.5 The Web mail session idle time should be configurable by the administrator at the global level
8.6 Secure logout from Web mail client to prevent unauthorized access to mail pages after sign out.
8.7 Online end user help accessible directly from the end user interface. 8.8 Ability to customize look and feel, logo, colour themes, behaviour, etc.
8.9 Ability to use custom logos in the web interface. Customisable look and feel of the Webmail client. (This will be approved by Owner before deployment.)
8.10 Ability to display Banner Ads in the Web Mail interface in the Browser; Administrators should be able to select the Ads and display selectively to a group of users or users individually.
8.11 Users can search from within the Web Client. 8.12 Web interface should provide the capability for dragging and dropping attachments and an ability to check the size of the attached documents.
8.13 Addresses auto-complete as they are being typed, including a dynamically updated selection dialog when multiple addresses match.
8.14 Ability to assign tags/categories to To Do, Contacts, Calendar entries. Ability to assign tags to mail messages and configure alarms.
8.15 Ability to render and create messages, appointments, and web documents in HTML format and Text format.
8.16 Built-in Rich text editor for composing messages with support for colour, fonts, attributes, font size, hyperlinks, etc.
8.18 Option to check and correct spelling while composing a mail message, calendar appointment, or web Document using an interactive spell check session
8.19 Ability to delegate access to mail files and allow users to decide level of access needs to be provided.
8.20 Ability to choose from users in personal Address Books, shared Address Books, or the Global Address List.
8.21 Ability to view attachments in HTML format. 8.22 Should have support for folder nesting (folders within folders). 8.23 The user should be able to append a text signature. 8.24 Should show Public Folders/discussion databases to all users who have been granted rights to view them.
8.25 User definable Personal folders to organize mail. 8.26 Global address book for wide list of contacts, group mailing feature etc.
8.27 Built-in support for displaying complete web interface in Hindi and other major Indian languages (specify languages) with Unicode support.
8.28 Facility for automated installation of the required font and other resources on the client machine from the mail server itself or
Confidential Page 191 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement dynamic font support. 8.29 Ability to take the recipients digital certificate from a central server or from the users personal address book in case the mail is to be encrypted.
8.30 Feature to send and receive files as attachments. 8.31 Multiple POP accounts-Universal Inbox to collect mail from various dispersed POP accounts into one account.
8.32 Send multiple attachments of any file type. 8.33 Selection of multiple files as attachments in a single click. 8.34 Read receipt request - while composing a message, user can mark the message to request for a read receipt notification from the recipient and delivery status notification.
8.35 Message Priority feature to set priority of messages while composing them.
8.36 Delete (mark for deletion), Undelete (recover from errors) and Purge (permanently delete) messages.
8.37 Filtering of incoming mails based on user definable filtering rules. 8.38 Webmail user should be able to send and receive files as MIME attachments.
8.39 User of the Webmail interface should be able to see full message headers and able to expanding or collapse the Header Info view.
8.40 Webmail interface should have features for notification of new mails. 8.41 Organization wide Address lookup for Web email interface should be there.
8.42 Webmail address book should support auto completion of email address.
8.43 Webmail interface should have support for spell check at the time of composing the mail.
8.44 Webmail interface should support for composing the mail in HTML and plain text format.
8.45 User should be able to define the rules for sorting mails and moving mails to folders.
8.46 Webmail interface should have an integrated calender providing the following features: shared calendar, to-do lists, event scheduler and reminders.
8.47 The user should be able to change the password through web interface.
8.48 Forgot Password functionality should provide facility for the user to reset the password.
8.49 User should be able to login to proposed mail server, by entering user name and password one time only without entering the domain name.
8.50 User should be able to customize the look and feel of the webmail interface.
8.51 User should be able to mark mails as read or unread and maintain flags for follow ups.
8.52 Mail sorting based on fields: unread, attachments, from, subject, message, date and size.
8.53 The Webmail interface should provide feature to search messages based on: From, To ,Cc, Bcc, Subject and body but not limited to these, search in the folders and also advance search capabilities.
Confidential Page 192 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 8.54 User should able to maintain his own sender block list. 8.55 Runtime scanning of attachment for virus while composing the message.
8.56 Webmail should provide feature of auto saving of message while composing.
8.57 Should provide option to check mails during low bandwidth connection using Basic Mail client functionality.
8.58 Should provide ability to categorize the calendar based on user defined categories and colour coding.
8.59 Should provide ability to auto complete the recipient address for recent recipients.
8.60 Should provide an embedded player to play attached media files without requiring to open the attachment with a separate application.
8.61 Should provide ability to preview commonly used file attachments without requiring separate application & downloading the attachment.
8.62 Should provide ability to access delegated mailbox from the logged on Webmail client.
8.63 Should provide ability to view organizational hierarchy of the recipient from the company address book.
8.64 Should provide ability to add sender to - Blocked Sender list or Safe sender list.
8.65 Should provide ability to view Calendar details for selected dates apart from default day, week, and monthly view.
8.66 Should provide flexibility to Drag drop calendar items between different days and send the meeting updates to the recipients automatically.
8.67 Should provide ability to create Tasks & categorize them based on colour/text.
8.68 Should provide ability to import/export addresses from Global/Personal address book from/to a standard format (e.g., CSV format).
8.69 User should be able to select the priority of the follow-up (low, normal, urgent), indicated by a flag in the inbox. Additionally, user should be capable of setting an alarm as a reminder of a follow-up action, like marking an e-mail for follow-up on the
8.70 The follow-up feature should allow sorting so that all mail flagged for follow-up will appear grouped together and use the follow-up view to sort messages by priority, by due date or by date.
8.71 Should allow copying the body of a received message into a new to- do item or calendar entry with a single click.
8.72 Should specify a preference to view only unread mail in their inboxesallowing them to focus on the mail they have yet to act upon.
8.73 Should allow the user to open any major functional areawelcome, mail, calendar, to-do list, contact list or notebookin a new window.
8.74 Should allow the user to move to the next or previous message without having to return to the inbox view.
8.75 Should allow the user to open and act upon invitations directly from the calendar viewbecause new invitations automatically appear on the calendar view at the appropriate time. This function offers a visual snapshot of the new calendar entry in relation
8.76 User should be given an option to view dual time zones on the
Confidential Page 193 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement calendar view, allowing users to easily understand calendar commitments for meetings with colleagues around the world. User should be able to select a separate time zone for start and end time 8.77 User should be given the option to pencil in a meeting invitation, appointment, anniversary, event, reminder and to-do items to provide the appropriate visual reminder.
8.78 Should allow the user to delegate the scheduling and response to meeting invitations to another user, especially helpful for administrative assistants and busy executives.
8.79 Should provide the user the ability to copy a person listed in the Enterprise Directory to his/her personal contact lists from within the dialog box for addressing new e-mail messages. The browser based email software should automatically populate a record
8.80 Should allow the user to create to-do items that can be assigned to another user or group of users.
8.81 Should take advantage of advanced printing functions, like selecting and printing multiple documents in a view, adding a time stamp to calendar printouts, printing a selected view and printing contact records.
8.82 Should provide feature for printing of the message displayed in the web interface as it appears (printer friendly version).
8.83 Should support basic authentication, session authentication, secure logoff, Secure Sockets Layer encryption and active content filtering.
8.84 Should be able to send encrypted messages, signed messages and also capable of verifying the digital signaturesdirectly from the browser interface.
8.85 Users should be able to access web mail using a common URL published for the email site.
8.86 Users should be capable of viewing the total size and available space of their mail boxes.
8.87 Should provide archiving based on enterprise policies and requirements and thereby make administration more manageable.
8.88 Users should be able to import/export personal address book entries maintained on the server, through web interface.
9 Mobile Client 9.1 The EMS services should be accessible using GPRS (EDGE), CDMA, WAP enabled mobile devices for limited set of users.
9.2 Vendor should provide the list of the devices supporting the mobile client (if any).
9.3 The Mobile Access should have support for accessing mails from Blackberry, Windows Mobile Enabled Devices.
9.4 Vendor should provide the list of PDAs that can be used with the proposed messaging solution.
9.5 The solution should provide Push/Pull technology. 9.6 Should support synchronization of calendar items, contact items, and mail items between pocket pc devices and the messaging server and client over GPRS network over the Internet
9.7 Should support secured access of Mail, Calendar and Contacts from a WAP phone
9.8 Should support text based notifications of Mail & Calendar Reminder onto a Cell Phone directly from the mail server
9.9 The users should be able to synchronize tasks between their mobile
Confidential Page 194 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement devices and the messaging solution 9.10 The users should have the functionality to search through their entire mailbox from their mobile devices.
9.11 The user should be able to access internal corporate files through Mobile devices.
9.12 The user should be able to configure Out of office messages from their mobile devices.
9.13 Users should be able to reset their passwords from mobile devices. 9.14 The Mobile component of the messaging solution should support the functionality to remotely wipe all data from devices.
9.15 Details of any other feature that is not mentioned or listed in above category may please be provided. These will have added weightage.
10 Disaster Recovery 10.1 The proposed replication should be able to replicate data residing on any storage subsystems in synchronous, asynchronous modes without any distance limitations.
10.2 The proposed replication should replicate at block level or/and file level
10.3 The proposed replication should have feature to operate in synchronous and asynchronous modes and should assure 100% data consistency. Allow the administrator to schedule the data replication between the primary and the DR site.
10.4 The proposed replication should have option to integrate with High Availability clustering software.
10.5 The proposed replication should provide various methods to initialize the secondary including over the wire and via backup and restore. Both the options should be able to perform while the application is completely online.
10.6 The proposed replication should be storage independent which means that it has capability to replicate between different storage from same vendor or from different vendors. It should work on storage like DAS(J BOD) and SAN
10.7 The proposed replication should be able to replicate between any hosts connected by an IP network without requiring additional network hardware or dedicated fibre connections.
10.8 The proposed replication should support Zero RPO. 11 Reporting 11.1 Mail delivery reports generated automatically and archived for pre- defined (configurable) number of days and available to the Messaging Administrator and to the End user. Samples (not limited to only these).
General statistics about the mail delivery (total messages, rejections, bytes transferred, etc.).
List of domains with which mail was transacted. User wise successful message sends and receipts. Rejection details due to RBL, ill-formed mails etc. Rejection due to viruses (quarantined messages). Rejection due to mail policy controls. Data transferred by each user via POP. Messages fetched by each user from configured POP accounts.
Confidential Page 195 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement Count of mail marked as spam 11.2 Controls for number of days to retain the report archives, whether to show the reports to the end user, etc.
11.3 Health Monitor to generate periodic reports about the health of the system, security status, services, etc.
11.4 Set up report jobs for custom MIS reports (What to report on, where to send it, when to send it)
11.5 The items that must be logged such as identifying information about each email message that passes through the email service, including
Envelope from, Envelope recipient, Time of transaction, IP address of host sending message Size of message
Facility of displaying the extracted reports in the form of charts/graphs/tables.
12 The messaging software should provide feature for compliance to corporate policy
13 Directory services 13.1 Directory System Specifications
A centralized directory service based on LDAPv3 for user, application servers and their profiles.
System should provide support for integration / synchronization with other directory servers based on LDAPv3.
The system should support auto-tuning of data like indexing and caching.
13.2 Management & Replication Features
The Directory system should provide for replication in master-master, master-slave modes across the LAN or WAN.
The Directory system should be able to define different attributes, indexes to optimize the performance of the over all services.
The Directory system should support differential replication. 13.3 Directory Security Features
The Directory system should provide the following authentication methods Encrypted passwords, Certificates.
The Directory system should have support for implementing policy based access control for access of the directory data for every user and also should replicate the same.
The Directory system should have password policy management like retry attempts, lockout, min/ max length and password history.
The Directory system should also provide for policies which allow granular control of the Mail Client on the desktop.
Changes to an object made during business hours must be replicated to all other directory servers within defined SLA.
13.4 Directory Administration
The Directory system should support online administrative operation on the directory data such as backups, schema updates, and configuration.
Ability to support and delegate the administrative rights at different levels depending upon the server, users and task level.
Confidential Page 196 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement
The Directory system should have a GUI console and Web Based console for performing the administrative tasks.
The Directory system should allow for registration of users using the Web Based console.
The Directory system should have support for defining dynamically extensible schema and custom attributes.
The Directory system should permit monitoring of directory server in real time using the Simple Network Management Protocol (SNMP).
The Directory system should provide support for different log levels, log rotation policies and log analysis tools.
The Directory system should be capable for on line import, export, backup and restore of data.
13.5 LDAP Compliance
A LDAP search facility for filtering users including equality, sub- string, approximate (sounds like) and the boolean operators and (&), or (|) and not (!) should be available.
The Directory system should support for making a query on other directory servers over LDAP v3.
13.6 Personal and Global Address Book
LDAP support to provide access to the Global Address Book and Personal Address Book from Webmail client and any desktop email client program like Outlook, Outlook Express, Notes etc.
Search for addresses using fuzzy search logic
Integrated with the Webmail client by allowing address insertions, and use while sending messages
Sort the addresses on various fields like nickname, name, email address etc.
The user should have an option of maintaining personal address book on the server accessible through the web based clients.
There should be an option for Address book Import / Export to a personal address book on the server.
The global address book should be accessible from webmail & desktop / thick mail clients for all users.
Support for X.500 naming standards
Support for LDAPv2 and v3 as the directory access protocol for fast queries and directory updates
PKI based support for logon and authentication
Support for DNS as the locator service (service records & dynamic updates)
14 Address Book & Search Support for Multiple Address Books Search capability to query all directory objects
Search capability to query Resources by attributes (meeting room seating capacity, meeting room computing resources etc.)
Should provide Offline Address Book Support as follows:
The Directory Services should provide an interface for messaging clients to download the address book to their local machine and work offline.
The client should also offer the functionality of partial or full download of the address book locally.
The synchronization should download only the new information and
Confidential Page 197 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement not re-download the old information already present on the client end.
Should support server-side and client-side contact management including integration of contacts with word processing applications.
Should support personal directory apart from the offline address book and should support the following object types: Users, Distribution Lists.
Also, these object types should be supported in a thick messaging client as well as a browser client.
Should support vCard standard.
Users can add addresses from other organizations or individuals to their private address book.
Users should be able to import/export Contacts in .csv format (from Global/ Personal Address Book).
15 Administrative Features for Messaging Solution 15.1 The system administrator should be able to start, stop, and restart software components without the shutdown of underlying hardware component.
15.2 The messaging solution should have a detailed reporting and system usage analyzing tools.
15.3 System administrator should be able to create, delete user accounts by dedicated administrator.
15.4 System administrator should have the ability to allow/restrict users/groups to access all the services/part of services provided through the messaging system at a global level.
15.5 System Administrator should be able to control the following user related features (essential):
Configuring mail forwarding Configuring email filtering. Defining the quota limits. Resetting User Passwords Activating / Inactivating 15.6 System administrator should be able to delegate administration on the basis of users.
15.7 The messaging solution should have support for system alerts for alarms and usage statistics and administrator should be also able to set threshold values for the same.
15.8 The system administrator should be able to customize the error messages displayed or logged by the messaging system.
15.9 The System should be able to send automated message/alert to the users whose mailbox has reached the quota or to the users who are receiving/sending mails more than the threshold set or on any other parameter.
16 Collaboration Services & Features 16.1 Calendaring and Group Meeting
Calendar interface should allow end users to view one or more person's agenda, choose a meeting time.
Calendar Service must provide ability to set access control list that restrict calendar sharing.
"Should natively support server-side and client-side calendaring and scheduling, including:
Confidential Page 198 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement Checking the online availability of intended attendees for a meeting Sending of request for meetings Accept or reject meeting requests Provide conflict man"
Calendar interface should provide an option to delegate commonly used tasks like manage schedule, Accept/Reject appointment calendar on users behalf.
User should be able to View, create, and schedule calendar entries and meetings.
Calendar should support different views like Daily, Weekly, Monthly, Calendar List, To do List.
Should support sharing of calendar between users (with access control features).
Should support booking of meeting rooms and other company resources using shared calendar.
Should support tracking of responses from the meeting invitees with information on the number of accepted and rejected responses.
Should support marking appointments as private, so it will not appear when others view ones calendar.
Should support access to multiple calendars side by side to make scheduling meetings fast and more convenient.
Should support accessing a group calendar to view simultaneously the free time schedules of 2 or more users or resources
User should be able to view selected days or series of days apart from default views like Daily, Weekly, Monthly, Calendar List, to do List.
Users should be able to share their calendar information with others, enabling users to view multiple calendars simultaneously in a side- by-side view.
User Should be able to customize a work week by Days and hours.
The users should be able to view the presence information of the other users
The solution should provide support for group collaboration, Calendaring, Scheduling
16.2 Collaboration
The Messaging solution should support the ability to create shared team Calendar and tasks.
The Messaging solution should provide the ability to synchronize Shared calendar/Documents
The Messaging solution should provide the ability to send automatic alerts based on pre-defined criteria
The messaging solution should provide information gathering mechanism such as surveys and feedbacks.
The solution should provide for workflow based approval mechanism and versioning capabilities.
The solution should support streaming of web based content to be used for capabilities such as e-learning.
16.3 Instant Messaging / Chatting
The user authentication should be from the same Directory Services used with the messaging solution.
Instant messaging service should provide an ability to chat with contacts with a click of a button.
Confidential Page 199 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr. No. Specification Offered Yes/ No Deviation/ Enhancement
Instant messaging service must provide one-to-one, one-to-many and many-to-many chat and chat conference.
Instant messaging service must provide support for archiving chats. Instant messaging service should publish and notify the user status.
The Instant Messaging Service should provide an ability for Instant messaging (chat)
Users should be able to change their status (online, away, etc).
Users should be able to chat irrespective of whether they are using the full client or the web access to mails.
The chat interface should offer the facility of buddy lists on Mail and Web Mail Client
IM client should have the capability of installing separately on the client machines, integrated with the Desktop/Thick Mail client and integrated into the Web Interface
Instant messaging should support rich text, emoticons, in-line spell checking, and content filtering.
Confidential Page 200 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-08: Br oad Speci f i cat i ons Ant i vi r us/ Ant i -Spam Specification for SMTP gateway level antivirus and anti spam S No. Specification Offered Yes/ No Deviation/ Enhancement 1 General Features 1.1 The solution should be a single product integrated solution to provide SMTP AntiVirus,
1.2 Content Filtering and Heuristics based Anti Spam Solution. 1.3 The product should be software based solution 1.4 The solution should work on Windows, Linux, Solaris and/or any other Unix OS
2 Anti virus Features 2.1 The solution must support mass mailing virus detection 2.2 The solution must support mail attachment virus detection 2.3 The solution must support Malformed Mail format detection 2.4 The solution must have a built in Safe Stamp feature 2.5 The solution must have its own Updated Recommended Virus Extensions
2.6 The solution must support Compression algorithms 3 AntiSpam Features 3.1 The solution must support Heuristics-based mail header detection for Spam
3.2 The solution must support Heuristics-based scanning of the mail body for Spam
3.3 The solution must support administrator defined Anti-Spam exception list
3.4 The solution must support administrator-defined non-approved list of known spammers.
3.5 The solution should be able to detect Spam based on multiple categories (such as general, commercial email, Get rich quick, pornography, Racially insensitive content).
3.6 The solution should be able to take action based on the category in which Spam is detected.
3.7 The solution must be able to take different action based on the different sensitivity level of Spam detection.
3.8 The solution must provide alerts based on action taken on the Spam mail
4 Content Filtering Features 4.1 The solution must support Content Filtering 4.2 The solution must support Keyword search in message body 4.3 The solution must support Intelligent Keyword Search (NEAR, NOT, WILD, OCCUR N times operators)
4.4 The solution must support Attachment scanning for MS Office 4.5 The solution must be able to scan by message subject, header, body, and attachment objects
4.6 The solution must support Attachment Filtering 4.7 The solution must be able to block attachment by file name and extension
4.8 The solution must be able to block attachment by real file type (file
Confidential Page 201 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement header based checking) 4.9 The solution must be able to block attachment by number
Specification for centralized AV management console S No. Specification Offered Yes/ No Deviation/ Enhancement 1 Shall manage the anti-virus programs on the network from a single web-based console.
2 Shall provide network wide virus statistics and analysis. 3 Shall allow automatic, single point updates of virus pattern files for all the antivirus products from the same vendor.
4 Must be able to do centralized update to all anti-virus programs on the network.
5 Shall support Microsoft Internet Explorer browser, using Active X and J ava.
6 It shall be able to monitor remote locations over WAN links for anti virus activity.
7 Shall provide Incident monitoring and notification System reporting shall provide Information collected throughout network for analysis of activity; graphical report generation (templates provided)
8 Shall eliminate the need for platform-specific computer skills when administering the variety of anti-virus programs often found on the network.
9 Shall install on an NT/2000 add/or any Unix server then deploy Agent that register every anti-virus product detected on the network.
10 Shall be interactive and event-driven communication minimizes network traffic.
11 Shall allow administrators to enforce an enterprise-wide virus protection policy from one GUI monitor.
12 Shall support 3 tier deployment architecture to have better bandwidth management.
13 Example, Parent Management console ->Child Management Console ->Managed
14 AntiVirus Products 15 Shall provide proactive attack process management, focused on getting attack specific information and policy file to IT administrators before new pattern file available
16 Shall be able to perform all necessary outbreak related tasks from a single interface
17 Shall Offer a hierarchical structure for job delegation so administrators can determine access control. The management system's users shall be classified into Administrator, Power User or Operator roles.
18 It should support central deployment of Outbreak Prevention Policies to all the managed anti virus products
Confidential Page 202 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
19 Shall be able to have Different operator assigned separate access to individual location for job delegation and separation of task and responsibility
20 Shall utilize Secure communications between Management Server and managed product(s)
21 Shall be able to Customize software update deployment plans
Specification for server / desk side antivirus solution S No. Specification Offered Yes/ No Deviation/ Enhancement 1 Should be able to run a clean-up scan (damage-cleanup) on all the clients from a single console without user intervention.
2 Should be able to deploy the updates manually to all the clients with an Update now option.
3 Should provide SORT and search function on the client tree in the management console to sort the clients in the required order and search for a specific client.
4 Outbreak Prevention option to block specific shared folders, ports, and to deny write access to specified files and folders on selected clients from the central console during a virus outbreak.
5 Control Client access to the antivirus program installed by giving restricted access to the program folder and registry files thereby preventing the user from deleting and altering the files necessary for the client program to run properly.
6 Client installation - Should be able to deploy the Client software using the following mechanisms: Support MSI in Client Packager tool Notify Clients to install via E-Mail Client Packager tool for client local install Web Install via Active X control NT Remote Install Via Login Script Through disk imaging Support MS Systems Management Server (SMS)
7 Update 7.1 The server component should automatically update itself from the Internet or through a Central management server with an option to do a manual and a scheduled update.
7.2 The update component should download all components required including the pattern file, scan engine, program files, damage cleanup template/engine, spyware pattern and firewall engine instead of downloading every component separately.
7.3 Clients should automatically get updated from the Antivirus Server without user intervention.
7.4 Clients should get virus updates and personal firewall updates from a single server. Antivirus server.
7.5 Should have an option to roll-back the pattern file and scan engine separately.
8 Manageability. 8.1 Should provide with Web-based centralized management through which all the clients can be centrally managed/ configured for
Confidential Page 203 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement antivirus and firewall policies. 8.2 Secure remote access via Web browser (SSL-enabled) 8.3 Should support multiple remote installation 8.4 Notification/Logging 8.5 Customizable client alert message for virus detection 8.6 Customizable client alert message for Personal firewall 8.7 Notification through E-mail, Pager, SNMP trap or through Windows Event Log.
8.8 Should generate Virus activity log, update log, Personal firewall/intrusion detection log,
8.9 Client connection status log and Server system event log. 8.10 Notify the administrator in case of License Violation. 8.11 Notification to be sent to the infection source. 9 Platform Support 9.1 Protect the following Operating Systems. Windows Server 2007 Windows Server 2003 Windows 2000 Server Windows NT Server MS Small Business Server 2000/2003 Windows Vista Windows 2000 Professional Windows NT Workstation Windows XP Windows ME Windows 98 Windows 95
Confidential Page 204 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-09: Br oad Speci f i cat i ons EMS/ NMS S No. Specification Offered Yes/ No Deviation/ Enhancement 1 General Specification 1.1 EMS must provide a centralized point of control of all events happening across the IT systems, creating a "mission control" centre for the distributed environment.
1.2 EMS must filter, correlate, process, and respond to the thousands of events that are created daily from network devices, systems, databases, and applications.
1.3 The EMS product family must address the challenges related to providing true application quality of service to the business:
1.4 EMS technology must map the complex dependencies between managed elements. EMS must be able to immediately determine the impact of a component failure on the overall application service, because not every problem in the infrastructure impacts the business or the end user. This information must allow IT staff to prioritize problem-solving efforts.
1.5 EMS must consolidate into one management capabilities, that allow IT organization to consistently manage the various layers of an application service infrastructure, including network, systems, databases, applications.
1.6 EMS Solution must provide secure and reliable communication mechanisms, advanced local filtering, and corrective action for truly proactive management. Flexible management must allow the definition of sophisticated management hierarchies, and a powerful role-based user concept that permits the management application to scale any size. EMS must be able to manage mission-critical environments with tens of thousands of elements.
1.7 EMS must manage industry-leading applications and databases. It must also manage every major UNIXoperating system, plus MicrosoftWindows NTlegacy systems.
1.8 EMS must include very powerful event management and correlation services technology, providing correlation capabilities on the intelligent agents in addition to the central manager preferably in a graphical manner.
1.9 EMS must provide a web based user interface across the managed components.
1.10 EMS must provide an extensive set of open interfaces available for instrumentation of application, and for tight integration into existing management applications.
1.11 The EMS must provide the ability to enable hierarchical management that provides maximum scalability of the management system.
1.12 EMS must allow IT management staff to manage business- critical application services from the end-user perspective, and to be immediately aware of the business impact of lower level component failures or performance degradations.
1.13 Complex dependencies between managed elements must be
Confidential Page 205 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement captured, allowing IT management staff to interpret lower level data in terms of its importance to the higher-level service. 1.14 Simple point-and-click navigation to faulty components for further diagnostic or problem resolution must be provided in order to significantly reduces mean time to recovery (MTTR) and, therefore, system downtime.
1.15 The EMS must provide a graphical services view of the elements composing Customers complex end-to-end application services, including network elements, computer systems, databases, and the application itself are captured together with their dependencies in graphical application service views.
2 Monitoring Critical Servers and Operating Systems 2.1 Monitoring 2.1.1 The Monitoring system should use industry best practices to provide monitoring for essential system resources, detect bottlenecks and potential problems, and automatically recover from critical situations.
2.1.2 The Monitoring tool should be able to help manage large, heterogeneous implementations by continuously monitoring essential systems resources, automatically detecting bottlenecks and potential problems while proactively responding to events.
2.1.3 It should provide the underlying technology to identify application problem signatures, which can help prevent failures before they occur. Problem signatures (Situations) are key metrics and thresholds that, when combined, trigger an automated action that prevents system failure. The product should provide out-of-the-box ready to use monitors minimizing time-consuming configuration and setup. It should be possible to easily adjust the settings to reflect their unique systems.
2.1.4 It should be built on the highly scalable distributed architecture and provide efficient, centralized management of distributed and Web-based systems. It should also facilitate to proactively and automatically detect, correct and alert problems before they affect
2.1.5 It should offer an easy, consistent way to monitor and manage key distributed resources through a centralized management interface. Monitoring parameters should be able set and updated for an entire group and applied to distributed resources in a single action. Changes to hundreds of related remote systems should take place in minuteshelping provide consistency across targeted systems.
2.1.6 It should provide decision-tree logic to apply several rules to verify system health and decide whether to trigger an event. By using built-in intelligence it should relieve the administrator from having to perform mundane tasks and provide valuable information for troubleshooting critical situations.
2.1.7 The agents for monitoring should independent of the operating system they are monitoring.
2.1.8 It should provide an easy to use situation editor to
Confidential Page 206 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement modify/create custom Situations without any programming knowledge 2.1.9 It should provide a Wed based health console to view both near real time and historical data for the systems you are monitoring. It should enable to check the health rating and status of your critical resources and resource models deployed in your environment. It should provide drill down to view specific problems affecting the system or can view historical data using Netscape or Internet Explorer Web browsers. It should also provide selection of key indicators and graphing them by choosing a large variety of graph types, which allows the administrator to quickly identify trends and potential trouble spots.
2.1.10 Drag N Drop Reporting - Should provide an Enterprise Portal/Dashboard as part of the product, which can be customized to have views for individual administrators. It should be possible to create bar charts/tables/Pie charts/Online Plot charts etc using drag n drop options. Each administrator should be able to create his own custom portal view as part of the monitoring environment.
2.1.11 It should be possible to present the Portal information in any of the following views below: - Table view - Chart(Bar, Plot) view - Needle gauge view - Thermometer gauge view - Event console view - Take action view - Browser view
2.1.12 The Portal should also provide facility to create custom resource views, which can be mapped and provided to Admins. It should be easy to add area specific maps, custom network diagrams or .jpgs in the portal resource views.
2.1.13 It Should provide an inbuilt Data warehouse for storing historic data, which can be used for generating capacity planning reports. The historical data collection function should permit to specify the attribute group or groups for which data is to be collected, the interval at which data is to be collected or the interval at which data is to be warehoused and the location at which the collected data is to be stored
2.1.14 It should support all standard platforms for server monitoring including Windows, Unix (HP-UX, Solaris, AIX), Linux, AS/400 and Database like DB2, Oracle, MS-SQL, and Sybase.
2.1.15 Situation based events should be generated and same should be forwarded to the event management tool.
2.1.16 Monitoring solution should provide Workflow automation capability which allows administrators to automate detailed system process using which they can design policies to perform actions, schedule work to be done by users or automate manual task.
2.2 Windows Monitoring 2.2.1 The tool should provide detailed information about many
Confidential Page 207 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement critical Windows areas, including: - Enhanced event log monitoring - Virtual and physical memory statistics - Disk space and I/O statistics - Paging information and swap statistics - Network information - Multiple nodes and platforms from a single view - Historical data for trend analysis and capacity planning 2.2.2 It should be possible to use this data for alerts derived from situation analysis of Windows NT performance and availability metrics.
2.2.3 It should be possible to view/start/stop the Services running on all windows servers centrally.
2.2.4 It should provide performance statistics for various Windows parameters such as memory, logical disk, Physical Disk, Process, services, paging file, TCP statistics, UDP statistics, HTTP statistics, Active server pages, Network interface etc.
2.2.5 Apart from this it should also have an option to integrate the Windows NT Event log and Microsoft Active Directory Monitoring.
2.3 UNIX Monitoring 2.3.1 It should provide the following key performance statistics for Unix environment monitoring:
2.3.2 System identification and activity Configuration of systems and checks their current activity levels. Attributes include system name, type and version.
2.3.3 CPU Percentages of processor activity taking place on each monitored UNIX system; use this report to check for problems such as imbalances between user and system CPU, and long CPU waits caused by I/O bottlenecks. Attributes include system name, user and system CPU, idle CPU and wait I/O
2.3.4 System virtual memory Includes swapping and paging activity to help determine if system performance problems are caused by memory shortages; attributes include total virtual memory, processes in run queue, processes waiting, page faults and page reclaims, and pages in and pages out
2.3.4 Load average Overall picture of system activity; attributes include system name, up-time and load average
2.3.5 Disk use Includes file system location and disk space usage to identify system performance problems caused by disk space shortages and poor distribution of space usage
2.3.6 Disk inodes Monitors inode usage on each file system 2.3.7 Networks Helps identify network interfaces, determine whether they are operational and see the amount of data traffic for each
2.3.8 Processes Detailed data on each currently expanding process, including identification, priority, command and size data
2.3.9 File File attributes, paths and time information 2.3.10 UNIX disk performance Helps clearly see I/O efficiency, identify disk performance problems, get information about file
Confidential Page 208 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement system location, distribution and disk space storage, and monitor inode usage on file systems; attributes include transfer rate, busy percent and transferred bytes 2.3.11 It should also provide Unix System Log integration for alerting critical events centrally.
2.4 Database Monitoring 2.4.1 Administrators can quickly view the performance of each database through a navigational tree.
2.4.2 Automate routine administrative tasks. 2.4.3 Efficiently survey the health of databases from any browser on the network
2.4.4 The Monitoring tool should support monitoring of standard RDBMs like Oracle, MS-SQL, Sybase and DB2
2.4.5 The Database monitoring should seamlessly integrate with the same Dashboard/Portal as that of Server Monitoring and provide integration with the central event console.
2.4.6 The tool should provide you the ability to easily collect and analyze specific information, including information on: a) Buffer pools b) Databases c) Locks and other details about lock resources d) Server key events e) Tablespaces f) Database Usage g) Database State h) Errors.
3 Configuration Management
The Vendor should provide tools to perform Desktop Management functions that include software Delivery, Asset Management, Compliance, OS Management, Patch Management. This may also include Remote Desktop Capture for remote problem solving. The tool should have out of box support for Discovery based on range of IP addresses or IP subnets and Remote deployment of agents from GUI console
3.1 software Distribution 3.1.1 The software distribution function should provide flexible and scalable delivery, installation, and configuration of software both shrink-wrapped and in-house across heterogeneous environments. Pre-and post-installation steps should also be specifiable to tailor the process to the specific needs of the organization
3.1.2 The software distribution should support customisable distribution schedules and alternate fan-out methods.
3.1.3 It should support diverse operating systems such as Windows XP, 2000/2003, Unix (Linux, SUN, AIX, HP) out of box, without using any third party products
3.1.4 Support of fan-out and local servers should enable to deliver software to hundreds of systems, in a controlled and secured manner.
3.1.5 It should be independent of the Windows Domain Environment and not have multiple implementations for every Windows Domain.
Confidential Page 209 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement 3.1.6 The software distribution function should leverage the information stored in asset database for intelligent software distribution (Should seamlessly integrate with the Inventory Module). For example, it should identify which systems satisfy certain hardware and software prerequisites, ensuring delivery of the right version of software to the right system. Also the software distribution module should automatically update the inventory database.
3.1.7 The system should support uninstall of the software installed in the system with the help of software distribution.
3.1.8 It should provide Bandwidth management, Checkpoint and restart capabilities, Control of the server resources and Wake- On-LAN feature which simplifies software installation
3.1.9 The software distribution module should provide a monitoring interface (GUI) with complete status of the softwares distributed e.g. successful, failed, pending etc.
3.1.10 It should provide retry or resubmit options for failed distributions
3.1.11 It should support dependency checking and package version control while distributing a new version of the software package.
3.1.12 Should have interoperability in Firewall scenarios. It should be able to support distribution of softwares across Firewalls with minimum port configuration
3.1.13 Should support software packaging options like MSI, PDF Importer, and Install Shield
3.1.14 Should support complete Automated Patch management 3.2 Inventory & Asset management 3.2.1 The Asset Management module is necessary to maintain and keep track of the IT-Resources in the organization. There is a need for tight integration of inventory information with the software Distribution function so that conditional delivery can be performed. It should have the following features:
3.2.2 Identify software and hardware configurations from a central location. Provide complete hardware and software information from all the desktops and servers.
3.2.3 It should provide full integration with the software Distribution module to perform policy based software distribution.
3.2.4 It should provide reports on total install count of software products in the enterprise, in addition to the software and hardware inventory on individual systems.
3.2.5 Provide History capability for trouble shooting purposes 3.2.6 Provide ability to integrate third-party query and reporting tools through ODBC interfaces.
3.2.7 Should support standard RDBMSs like Oracle, SQL, Informix, and DB2 for inventory repository.
3.2.8 Should provide Scheduler to determine when the inventory scans are executed
3.2.9 Ability to return only the differences during the scan 3.2.10 Should provide out-of-the-box signatures for thousands of softwares. Should provide a graphical user interface for adding additional custom signature.
Confidential Page 210 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement 3.3 Server, Desktop Compliance management: 3.3.1 The software should have Compliance management Solution to check servers and desktop for software installed as per companys policies
3.3.2 The software shall have feature to check compliance of Screen Saver, Password, Network, organization policies for Server and Desktop etc.
3.3.3 The software should be able to send email to administrator /managers on finding non-compliance.
3.3.4 It Shall provide reports and should store the compliance data in a RDBMS database to query on the compliance as and when required besides this the software should be able to give out of the box reports and shall be customizable with reporting tools like crystal reports.
3.3.5 The software beside having out of the box policies and collectors for checking compliance of default policies should be customizable to create new collectors for checking compliance of Servers, desktops, Network and Applications.
3.3.6 The software should be able to check for compliance of version levels of Patch of applications, antivirus, hot-fixes , password policies etc and have provisions to remediate desktops and servers automatically with required patch/software levels to comply to company policies.
3.4 OS Management 3.4.1 Ability to capture, install and restore disk images 3.4.2 Should provide Operating system imaging and bare metal provisioning
3.5 Automated Patch Management 3.5.1 Provide Multiplatform Patch Management 3.5.2 Provide tools and predefined automation for patch management with Microsoft software Update Services, Microsoft Windows Server Update Services, Red Hat Network, SUMA, and Sun Update Connection Proxy as well as support for customized automation using other software update sources.
3.5.3 Provide integrated compliance & remediation functions 3.5.4 Accurate patch recommendations for each system based on vendor scan technology
3.6 Remote Control 3.6.1 This module is expected to take complete control of Remote Windows 2000, Windows 2003, Windows XP and Linux based desktops from a central location.
3.6.2 Roles should be used to restrict the level of operations an administrator can perform.
3.6.3 The enterprise-scale remote control solution must enable rapid connection to the right target with the help of an automatically updated searchable list of target system names, enabling the administrator to establish a remote control session by simply clicking the target.
3.6.4 Web Browser Interface - The Remote control module should provide authorization based Web Interface for Administrators
Confidential Page 211 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement to facilitate Remote control using a Internet Explorer or Netscape Browser. It should support all the functions i.e. Remote Control, Chat, Files Transfer etc through the Web Browser Interface. 3.6.5 It should provide automatic session logoffs due to administrative inactivity.
3.6.6 It should provide facilitates collaboration and escalation process for improved problem resolution.
3.6.7 Help desk agents/person taking the remote control should be able to give control of a problem to another agent, or revoke control as necessary. This hand-over should be done without re-opening the session, expediting problem resolution.
3.6.8 It should allow multiple help desk agents to use built-in collaboration capabilities to resolve complex problems that require input from multiple sources, providing the user with a seamless problem resolution experience.
3.6.9 It is important that sensitive data has not been compromised that unauthorized help desk personnel or the person taking the remote control have not had access to restricted data during a support session where the remote control feature was used to access a users computer. Remote Control software should support compliance efforts and helps keep access to sensitive data secure.
4 Alert/Event Management with Event Correlation 4.1 The solution should include a powerful event management and automation application. The event console should be able to process and correlate common management events from many different system and network components and automatically initiate corrective actions. Grouping and filtering capabilities should be available to reduce the number of events displayed to operations staff, enabling them to manage even the largest, most complex environments. The Event Console should be cable of: event integration, event processing, event response and notification, and automation capabilities. Key functions of the Event Console should include:
4.2 Comprehensive Event Integration provides a complete mission-control view of the health of the entire distributed environment from a single administrator desktop. It should also provide specialized views of events to different administrators displaying only those events important to their jobs, thereby optimizing the staff resources.
4.3 Cross-domain Event Correlation Should have sophisticated rules-based engine correlates event information across any resource in any management domain to determine the true cause of the problem. This ability is critical when problems within one management domain, such as the network, have ramifications across other domains, such as systems, databases, and applications.
4.4 Automated Event Notification and Response The Event Console should act on events using either automatic or operator-initiated responses.
Confidential Page 212 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement 4.5 It should offer a unique solution to the problem of managing exception events. It should correlate and filter events from all different types of IT resources, and pinpoint the root cause of a problem. In addition, it should be possible to define rules and task in a centralized database which would be activated on reporting of the exception by the intelligent agents.
4.6 Event management in the EMS should also closely integrate with the service desk function. It should automatically forwards exceptions that require human intervention to the help desk function, open a problem ticket and assigns it to the right support personnel.
4.7 This event manager should also permit integrating in-house applications with the EMS. It should be used to integrate not only management applications, but also general business applications to make them easier to manage.
4.8 With event filtering and correlation, multi-level managers and agents, automatic corrective measures, and integration with the service desk, the EMS should provide comprehensive event management capabilities. It should eliminate the clutter of spurious alarms and simplify the management of complex IT infrastructures.
4.9 It should help to notify through GSM Mobile Phone, e-mail, etc of various/selective events occurring in the enterprise.
4.10 The event management shall provide a sophisticated rules engine that can:
Correlate events Discard the event Prevent duplicate events from being displayed Execute an application or a script Generate a new event Modify the event's attributes Modify the attributes of other events Forward an event to another event server Provide event filtering and buffering at the source
Facility for developing custom events and custom event engines
Support for heterogeneous platforms and protocols
Should support standard RDBMSs like Oracle, SQL, DB2 for event repository.
5 Service Desk 5.1 The Service Desk should be based on ITIL. 5.2 The Service Desk software should provide pre-defined templates based on industry best practices for easy and quick deployment of the service desk.
5.3 It should be possible to make on-line changes to the defined processes / business rules without having to bring down or restart the service desk application.
5.5 Shall support tight integration with NMS incidents. 5.6 Shall support monitoring of the operating status of current asset inventory so that future asset needs can be effectively
Confidential Page 213 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement planned and budgeted for. 5.7 The helpdesk shall provide a graphical wizard or rule manager to create escalation, assignment, and database field update rules, without any need for programming.
5.8 Should be able to generate various customized Service Level Reports e.g. Open Call Reports, Closed Call Reports, Problem Area specific Reports.
5.9 Escalations will happen with help of E-mail Notification. 5.10 A process for creating the Knowledge Base should be provided. This knowledge base shall be having search capability.
5.11 The Service Desk should include Change Management module which should link the processes of initiating, scheduling, assessing, implementing and evaluating changes to the IT infrastructure. The Change Management module should provide complete work order management and tracking to ensure work is completed as quickly and smoothly as possible.
5.14 Release Management - The object of Release Management is to take a holistic view of a Change to an IT service and ensure that all aspects of a Release, both technical and non-technical, are considered together.
5.15 Problem Management - The object of Problem Management is to minimize the adverse effect on the business of Incidents and Problems caused by errors in the infrastructure, and to proactively prevent the occurrence of Incidents, Problems and errors.
5.16 The Service Desk should include an integrated Service Level Management.
5.17 The Service Desk should include Configuration Management Database.
5.18 Provide Self-Service Requests module to allow users to submit and view service requests. Service requests could be created automatically from sources such as email, system monitoring tools.
5.19 Ability to assign ownership via workflow or an escalation process.
5.20 Ability to automatically assign one or more SLAs via Workflow or Escalation process based on SLAs criteria
5.21 Incident could be created automatically from sources such as email, system monitoring tools.
5.22 Ability to identify a global incident which is the root cause of many other issues or that is something affecting many users.
5.23 Ability to relate a Problem to a Global record. A global record captures information about an issue affecting many people. The record might be a created for a shared asset i.e. the root cause of many other issues, such as a failed network server. Ability to relate existing service requests, incidents and problems to a global record and manage them via the global record.
5.24 Ability to apply a template to a Problem. The template contains common data such Priority, Owner or Owner Group, Service
Confidential Page 214 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement Group or Service, Classification, Vendor, and Organization. The Problem template also can contain Problem activity common data such as, Sequence number, J ob Plan, Site, Organization, Description, Owner or Owner Group, Priority, Vendor, and Classification. 5.25 Ability to create follow-up work orders. It will copy the asset, location, and GL account from the originating work order to the follow-up work order. A follow-up work order is for when you complete a job but notice that additional work is needed on the same asset or location.
5.26 It should have a Service Catalog component that allows users to select services directly from a catalog, helping to lower the cost of providing services.
5.27 Ability to define the SLAs such as Customer (SLA), Internal (OLA) and Vendor (Underpinning contract) and define SLAs at the System, Organization, or Site level. Ability to relate an SLA to another SLAs, for example if an SLA has supporting SLAs. Ability to associate specific assets, asset types, and locations to a service level agreement (SLA). Once an SLA and its associated escalation are activated, it shall apply the SLA to any listed assets, asset types, and locations.
5.28 It should provide out of the box real-time dashboards that provides insight into multiple levels of service desk operations so that support staff, managers and executives can monitor role-based key performance indicators using an intuitive, graphical display from any Web-based client.
5.29 It should have built-in remote diagnostics capabilities enabling service desk personnel to remotely take over control of the end users machine for troubleshooting, updating a file, changing a users configuration, and looking at settings. It should provide the facility to record these sessions for auditing and recordings should be available for review at a later date.
5.30 It should provide instant messenger support that provides an alternative multi-threaded mode of communication with end users.
5.31 It should have built-in survey management capabilities that allows service desk personnel to author and distribute customer surveys related to Service Desk and Service Catalog. It should enable automatic distribution of a survey via e-mail to a specific user or to all users in the system over a cyclical time period.
6 Network Management System 6.1 Network management software shall be scalable for a comprehensive, distributed networking solution and have flexibility to manage mission-critical systems and provide rapid problem solution.
6.2 It shall discover TCP/IP networks, display and build network topologies maps as soon as it is installed. Correlate and manage events and SNMP traps, monitor network health and gather performance data.
6.3 It shall be able to support all standard SNMP.v1 and SNMP.v2.And Support SNMP.v3 once it become available.
Confidential Page 215 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement 6.4 It shall have Web console facility to provide network management for a broader range of people in varied location.
6.5 The Web interface/Console for the network management shall authorization based on Web Console User, Role, and Scope. Security shall be used to validate access to the critical action like Sub-Map exploration, Object properties, Diagnostics, Event Browser and the MIB Browser. Action and areas of visibility shall be regulated for Web viewing by Roles and Scoping, which is assigned to a User. Using combination of roles and scoping, action a viewer can perform and limit the view that the user has of the network shall be fine-tuned.
6.6 It shall have support for the following Switch Management Capabilities: Switch Management: for Port View, Switch Status and MAC View. Inactive Ports: for Port Number, IP Status, and Spanning Tree Status.
6.7 The Network Monitoring tool should extend the following Web- based GUIs: Network Topology Visualization: GUI for visualizing the network topology Device Structure Browser: Drill down to see a particular device's configuration MIB Browser: GUI for viewing SNMP MIB variable values associated with devices in the topology Network Discovery GUI: For configuring and tracking the status of discoveries Monitor Configuration GUI: For configuring the active monitoring and SNMP polling functionality.
6.8 The Network monitoring tool should be designed to provide real-time network discovery, topology visualization, and root cause analysis for layer 2 and 3 networks, including IP, Ethernet, and multi protocol label switching (MPLS).
6.9 The Network monitoring tool should provide event management and monitoring for the discovered network.
6.10 The Network monitoring tool should have been designed to provide the user with the capability to automatically discover network devices and their connectivity.
6.11 It should extend its discovery engine can be configured through a Web-based graphical wizard, providing the network operator with full control of the discovery process and how the discovered data should be presented to the user.
6.12 It should support the following network technologies: IP, Ethernet, Cisco Discovery Protocol (CDP),Hot Standby Router Protocol (HSRP), Virtual Local Area Network (VLAN), and static Network Address Translation (NAT).
6.13 The network monitoring tool should support actively polling network devices to help proactively identify problems in the network.
6.14 The network visualization GUI should use the network topology and event information from the tool (and, if applicable, your event management tool) to generate graphical
Confidential Page 216 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement maps of the network topology around particular devices and send these maps to Web clients on demand. 6.15 Network operators should be able to drill down on specific problems in the event list to locate the alarmed device in the network topology view, or show a list of all outstanding alarms on a selected device in the network topology view.
6.16 It shall develop report on network trends and analysis. 6.17 It shall maintain object inventory in internal database as well as external database.
6.18 It shall quickly identify and focus on the root cause of the network error.
6.19 It shall allow users to view network information from any supported Web browser.
6.20 It shall also dynamically group resources by type, location, vendor, service offering, or other common characteristics.
6.21 It shall correct problem at the source before users are affected, enhanced facility of automated problem detection and response at local level.
6.22 It shall be capable of using rules and manage events locally, centrally or by propagating events to the enterprise event management and correlation application and diagnose root cause problems without reporting all symptomatic events.
6.23 It shall handle variety of actions when reporting events and exceeded thresholds, including GSM Mobile phone, e-mail, and problem responses to specific failure.
6.24 It shall in the event of a network problem or router failure mark affected network regions as unreachable. And in response to this the network management software shall reduce polling of the affected networks thereby reducing overall event traffic.
6.25 It shall have the facility to perform Hot Backup of network management database without stopping or restarting the production network management server or the user interface.
6.26 It shall be capable of providing with insight of network, as well as ability to perform thoughtful data analysis.
6.27 It shall be capable to proactively manage network by providing trend data and quick answering question.
6.28 The information shall be present in the multi dimensional graphical format and can be viewed interactively or posted as a snapshot through URL.
6.29 It shall provide a detailed view of overall health and behaviour of networks individual elements, such as routers, servers, end system, SNMP data, MIB expressions collected from MIB II agents.
6.30 It shall provide an overall view of network, event flow and event traffic. It shall analyze events over time, distinguishing device class and event severity.
6.31 It shall provide a view of network segment behaviour primarily determined by using RMON characteristic on network. This network analysis shall be focused on the health of the specific sections of the network rather than individual network elements.
6.32 It shall be able to monitor any MIB parameter dynamically and
Confidential Page 217 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement plot an online graph of the same using built-in utilities for any device in the network. 6.33 It shall have capability to store the network event data in the standard RDBMS for performance and historical analysis.
6.34 The Network Management function must monitor performance across heterogeneous networks from one end of the enterprise to the other
6.35 It must proactively analyze problems to improve network performance.
6.36 Identify, isolate, and helps to resolve response time problems on LANs, remote links, and servers.
6.37 The Network Management function must collect usage data. Once collected, it should automatically store data gathered by the NMS System in a database. This enterprise-wide data should be easily accessed from a central location and used to help with capacity planning, reporting, and analysis.
6.38 The Network Management function must also provide information on performance of Ethernet segments, including capacity utilization and error statistics for the segment and the top-contributing nodes, WAN links and routers.
6.39 Alerts should be shown on the Event Management map when thresholds are exceeded and should subsequently be able to inform help desk and notify concerned authority using different methods such as GSM Mobile Phone, E-mails etc..
6.40 LCD monitors 42 on the IT floor for monitoring the WAN & LAN network status.
6.41 The fault management module of NMS shall provide various functionalities such as device fault management, link fault management, network service fault management, systems and application fault management.
6.42 The Fault Management module shall raise alarms, co-relate alarms, analyze alarm and shall help in taking corrective action.
6.43 The Faults displayed shall have a mechanism whereby a link down or an interface down alarm contains information about all the affected links and associated customers/sites.
6.44 The NMS shall support SNMP Traps which trigger alarms, alarm suppression, alarm threshold setting, escalation, alarm logging, alarm email notification, alarm correlation of element level alarms to network-level alarms, correlation of network- level alarms to service-level alarms.
6.45 The Fault Management module of NMS shall support event co- relation where the correlation logic can be configured by operator.
6.46 False / transient alarms should be able to be suppressed and threshold alarm correlation needs to be supported by the NMS.
6.47 The NMS shall keep a list of all active faults of the managed Network Elements and based upon certain filter conditions, appropriate messages/command can be sent to alarm notifier, which in turn could send notification to appropriate destination defined in the escalation policy.
6.48 The operator should be able to define filtered views of alarms.
Confidential Page 218 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement 6.49 The NMS shall support acknowledgement of faults and clear the alarms in active alarm list automatically and manually and same should be notified by alarm notification module.
6.50 The Fault Manager shall provide statistics on number of alarms generated per element, number of alarms attended by operator, number of alarms cleared, number of critical alarms generated and escalated as a minimum requirement.
6.51 Provides reports for network administrators and business managers from engineering and management perspective respectively.
6.52 Provides Near time and historical reports on the availability of devices and links.
6.53 Daily, weekly, monthly and custom period reporting for both regular and business hours.
6.54 Near time and historical reports on the performance parameters of devices and links such as reliability, utilization, input, output traffic, and CRC errors etc.
6.55 Option to receive configured reports through e-mail on daily, weekly, and monthly basis.
6.56 Auto-emailing of reports at defined intervals. 6.57 Consolidation of daily performance data into weekly and monthly performances, to facilitate performance analysis over a longer time frame.
6.58 The following device availability reports should be provided as part of the best practice / standards: Summary reports on discovered assets. Bandwidth utilization, Real time MIB graphing, Top N reports. Availability reports showing current status of devices and their ports and interfaces. Availability reports showing devices with root cause problems sorted by age.
7 Application Transaction Monitoring & Management 7.1 Support simulation of the different types of transactions that are currently being deployed.
7.2 Provide page and component breakdowns of user transaction monitored.
7.3 It should track transactions from end to end across multiple systems to quickly isolate and resolve the cause of bottlenecks or other issues.
7.4 It should provide response time tracking for Web and Microsoft Windows environments using real-time techniques.
7.5 It should track Web services transactions to help isolate problems in service oriented architecture (SOA) applications.
7.6 It should help save administrator time with an easy-to-use portal that unites key performance and availability metrics and presents contextual, resource-based views and diagnostic tools.
7.7 It should allow drilling down each step that the transaction
Confidential Page 219 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
S No. Specification Offered Yes/ No Deviation/ Enhancement takes as it travels across multiple enterprise systems and should allows to measure how each component of a transaction contributes to the overall response time regardless of geographic locations and without requiring customers to install software on their workstations or modify application code. 7.8 It should perform the discovery process dynamically rather than relying on static definitions. The starting point can be a particular URL, a J 2EE component, a synthetic transaction or a Web services request. It should automatically set baselines for transaction response times as the system learns transaction flows and analyzes the response time characteris- tics of unique environment.
7.9 It should provide or integrate with a portal-based interface to observe multiple response time metrics and resource-based views to speed analysis of performance issues.
7.10 It should provide a graphical user interface (GUI) transaction simulation capability to reproduce end-user behavior and monitor a transactions health.
7.11 It should provide response times of real end users at the client to help isolate the root cause of a problem, breaking down information into overall response time, server time and network time.
7.11 Provide reports for location analysis & transaction analysis. 7.12 Provide reports to view raw data collected for deeper analysis of individual transactions.
7.13 Provide triage diagnostics starting from end user process, breaking down time spent between backend components, application components and methods to pin-point the areas at fault.
7.14 Provide capability to identify the top performance hotspots in the applications.
7.15 Provide capability to perform server request breakdown to identify where time and CPU is spent in an application.
7.16 Provide capability to identify the slowest server request or application entry points for non-Web-fronted applications.
7.17 Provide capability to view individual requests and selective arguments to help diagnose intermittent problems.
7.18 Provide capability to perform SQL diagnostics to identify slowest SQL query and report query information.
7.19 Provide capability to pinpoint latency for consumer and providers of web services.
7.20 Offers application programming interfaces (APIs) to export data.
7.21 Provides an easy way to generate HTML reports for cross- teams.
Suitable solution should be proposed by the Vendor to support the following in addition to the EMS/NMS.
8 Compliance 8.1 Should determine if the installed software and security settings match desired policies.
Confidential Page 220 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
8.2 Compliance reporting and remediation 8.3 Generate reports of the noncompliant issues and recommend corrective actions. Should provide the following compliance reports:
8.4 Security Compliance Check Antivirus Endpoint Agent Hard Disk Password Linux System Logging Operating System Patches and Updates Power-On Password Remote Root Login Restrict Other software Screen Saver UNIX File Permissions UNIX Services Unauthorized Guest Access User Defined Check User Password Windows Event Logging Windows File Permissions Windows Firewall Windows Services Windows System Audit 8.5 Software Compliance Checks Check individual software products Required installation Prohibited installation Optional installation Check software groups Minimum of one member of the group is required All other members are considered optional
Confidential Page 221 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Tabl e-10: Br oad Speci f i cat i ons of Bui l di ng Management Syst em
Building Management System (BMS) shall be a Data Center automation system for monitoring, total integration and managing devices and systems, including Precision AC, UPS, Diesel Generator, Fire Detection & suppression, Access Control Systems, Water Leak Detection System etc.
A Sample schematic of the BMS is shown below
General Requirements Sr. No. Specification Offered Yes/ No Deviation/ Enhancement 1 General Specification 1.1 The Supervisory/Direct Digital Controllers in BMS shall be with minimum 32 bit microprocessor & real time clock.
1.2 Integration with a diverse range of devices, enterprise systems, Internet and intranet sources allowing intelligent management of key facility information
1.3 Shall be available on industry-standard hardware and Windows XP, 2000 and 2003 operating systems
1.4 Shall support the leading open standards: BACnet, LonMark, Modbus , ODBC, OPC, etc
Confidential Page 222 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
1.5 UL Listed to Standards UL864 (Fire), UL2017 (Signaling Systems), UL916 (Energy Management Systems), UL1017, UL1076 (Security), UL1610 (Central Station) and UL294 (Access Control)
1.6 Shall provide Easy-to-use Web-based user interface with unified system with centralized database storage, data logging & archiving, and alarm reporting.
1.7 The BMS System shall meet Precision AC control needs by providing interfaces to Precision AC devices. The PAC units shall be integrated with BMS unit for time sequential operations and also auto start the redundant unit in case there is failure of any running PAC. The standby unit shall continue to work till the failed unit is serviced & repaired.
1.8 The BMS System shall collect information from security, access control and surveillance devices, ensuring protection of people and assets.
1.9 The BMS System shall perform monitoring and control of fire alarm systems for fire protection and smoke control. Fire Suppression by FM-200 automatic gas suppression
1.10 The BMS System shall facilitate surveillance of facility using cameras for enabling flexible event based recording and viewing.
1.11 The BMS System shall perform monitoring of the UPS and DG set.
1.12 BMS shall have facility to enable remote support over dial-up links.
2 System Architecture 2.1 The BMS System shall support client/server and distributed system architecture. The BMS System shall support open system architecture which combines a variety of controllers, standard hardware devices, and communications interfaces. The BMS System shall integrate with the following subsystems:
- Access controllers - Precision AC monitoring and control - Water Leak Detection System - UPS Monitoring & Control - Interfacing with the Building DG Set - Life safety monitoring and control - Digital CCTV systems - Digital Video Manager - Mobile Phone and SNMP notification systems 3 Open Systems Support 3.1 The BMS shall support open systems Standards such as
MODBUS: Support general-purpose interface and de facto standard communications protocol that can be used to integrate different controllers.
LonWorks: LonWorks Interface is based on Echelons LNS Database to provide compatibility with third-party LON tools and shall support the latest version of LNS (3.2) available from Echelon.
BACnet: Supports ASHRAE Standard for the BACnet Protocol, implementing both BACnet Operator Workstation and BACnet
Confidential Page 223 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Gateway functionality. It supports BACnet over Ethernet and IP communications. A BACnet PICS document is available on request which details It support for BACnet Standard Objects and Application Services.
OPC: Supports OLE for Process Control (OPC) 2.0 Data Access. This interface allows reading and writing to an OPC Data Server as an OPC client. This capability provides access to a wide range of third-party OPC Data Servers.
ODBC: Support read-only ODBC access to its real-time database , card holder database etc
4 Supervisor/ Operator Interface 4.1 The operator/supervisor interface shall enable two concurrent administrators to perform the following tasks:
- Display and control field equipment - Acknowledge alarms on a priority basis - Display point status and history information - Status / parameter display on Data Center system mimic - Initiate printing of reports - View, archive and retrieve event logs - Monitor data communications channels - Configure system parameters - Select and control CCTV cameras - Create colour graphic displays - Record and play back digital video 4.2 Operator Security and Levels: Shall offer sophisticated methods for controlling access to sensitive data. It shall restrict and control activities to be performed by operators by giving them different security levels.
5 Video Integration 5.1 Video surveillance is essential for monitoring activity in Data Center vicinity enabling one operator to view many parts of the Data Center from a central location. Video may be integrated from CCTV systems or from Digital Video Manager product.
6 Web Enabled System 6.1 Remote monitoring of equipment, performance analysis, adjustment of control parameters, response to alarms using PC based web browser.
7 Alarm Management 7.1 The comprehensive alarm management facilities shall ensure that operators are immediately notified of any attempted security violations. This action will automatically be recorded in the system event file.
7.2 It shall offer alarms as follows: - Audible Tone. The audible tone on each Station.
- Alarm Indicator. An alarm indicator to appear on all displays and to flash when there are any unacknowledged alarms.
- Alarm Summary Display. An alarm summary display to show all alarms in the system with colour-codes to indicate priority and severity.
7.3 Alarms to drive external communicator such as a hooter locally as well as in Systems Department. Alarms shall be associated with different point states for digital points or special conditions such as high or low values or rates of change for analog points.
Confidential Page 224 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
7.4 An Alarm Broadcaster shall be provided to route alarms to mobile phones and email.
8 Event Management 8.1 Events include alarms, point changes of state, cardholder movements, changes in system status and all operator actions. As system events occur, a journal of the events to be created in an event file. J ournalized event entries include a description, condition, message, time of occurrence, and responsible operator. The system event file shall store event data in an on- line buffer. It shall be possible to store as many events as necessarysubject only to disk space on the server. When the on-line buffer becomes full, the event data shall be transferred to an archived buffer and notify the operator to save the file to external media. The on-line buffer shall continue to store events without interruption. An operator shall retrieve current or archived system event data for use on-line or in the reports.
9 Historical Data 9.1 Shall provide continuous history about behaviour of points in the system over time.
9.2 Shall support a range of different history collection rates. 9.3 Ability to collect both snapshots and averages, allowing operator to view activity data on the system at any instant in time or over a longer period. This historical data shall be viewed as graphical trends (such as line or bar charts) and as lists of numeric values. Historical data can also be used in reports, exported to Microsoft Excel and archived to offline media for long term storage.
10 Reporting 10.1 Shall provide comprehensive reporting facilities including a range of standard reports. Standard reports shall be provided, which shall be operator selectable to appear on the operator station. Point summary reports shall include the value/status and condition for any defined period such as
10.2 Some examples of reporting are as follows: - All points in alarm over a configurable time period - All activities by a certain operator - All activities for a certain group of points - All movements of cardholders through certain doors - All movements through any doors by a specified cardholder - All information pertaining to access configuration information - Temperature and Humidity figures over a period of time.
- Number and duration of mains power failure over a configurable time period
Confidential Page 225 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
I/O Summary for Data Center POINT FUNCTION SNo Description QTY AI DI AO DO Monitor Control Alarm By BMS Vendor
1 Precision ACs
Temperature x x x Humidity x x x On/Off Control x On/Off Status x x Alarm Status x Trip Status x
2 Environment Monitoring:
Monitoring of Temp in Data Center x x
Monitoring of Humidity in Data Center x x
3 UPS
Incoming Voltage x
Outgoing Voltage x Battery on load x Frequency x Phase Current x
UPS ON/OFF Status x
UPS ON/OFF Command x Power Factor x
4 Multifunction Meters
LT R, Y, B phase voltage Monitoring
Through Modbus Output of Energy Meters x x
LT R, Y, B phase Current Monitoring x x
LT Frequency Monitoring x x
LT Kilowatt Monitoring x x
LT kWH Monitoring x x
Confidential Page 226 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
POINT FUNCTION SNo Description QTY AI DI AO DO Monitor Control Alarm By BMS Vendor 5 Diesel Generator x x x
6 Fire Alarm System x x x
7 Water Leakage System
Zone wise alarm Alarm x x
8 Safety & Security Systems
a Access Control System - Opening of all doors in case of fire x x x b CCTV System x x x
Confidential Page 227 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Annexure-2: Deliverables & Performance Parameters
A. Deliverables & Technical Response Parameter for the Project
A1. Deliverables
Vendor shall be required to follow milestone based deliverables for the Project. The methodology, detailed project activities, deliverables and responsibilities, which are to be followed during implementation should be based on ASAP Methodology.
The following table lists out the deliverables in pertaining to individual phases of the project
Sr No Acti vity Deli verable Deli verable Schedule 2.1 Supply of Hardware & Non-SAP software 1. Supply of hardware- Data center equipments Physical delivery of equipments and accessories at Project Site. Vendor to suggest suitable time line considering the dependency of Application implementations. 2. Supply of hardware- servers, storage, backup device, racks & other hardware. 3. Supply of hardware- Networking components 4. Supply of video conferencing equipments 5. Supply of IP telephony equipments 6. Supply of Non-SAP software Messaging & Collaboration System. Physical delivery of application software, tools, media and necessary user licenses etc. at Project Site. 7. Supply of Non-SAP software Anti Virus / Anti Spam /Content Filtering. 8. Supply of Non-SAP software EMS/NMS and Service Desk tools. 9. Supply of Non-SAP software Building Management System(BMS) 10. Supply of Non-SAP software Video conferencing system. 11. Supply of Non-SAP software IP Telephony System. 12. Supply of Non-SAP software Other software. 2. 2 Design, installation and commissioning of Infrastructure 2.2.1 Design, installation & commissioning of Data Center 1. The Vendor shall design the data center architecture, civil construction, date center equipments layout, electrical system including power supply distribution with earthing system, UPS system, cable layout, illumination system, air conditioning system, fire protection system, access control system, building management system etc . as per the detail scope and techno- functional requirement specification . Design document including architectural drawing, electrical drawing, air conditioning drawing, equipment layout drawing, BMS drawing etc. Vendor to suggest suitable time line considering the dependency of Application implementations. 2. Services covering installation & commissioning of Data Center after validation of design document as above by owner. Completed Data center as per the design. The Vendor shall submit 6 sets of hard & soft copy of complete technical documents & as building drawing of all the systems of data center.
Confidential Page 228 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Acti vity Deli verable Deli verable Schedule 3. Preliminary acceptance test Preliminary acceptance test report
2.2.2 Installation & commissioning of Hardware 1. The Vendor shall design the solution architecture for the hardware infrastructure of the Project and perform the Server Sizing for SAP application & non-SAP applications. solution architecture & hardware sizing document Vendor to suggest suitable time line considering the dependency of Application implementations. 2. Services covering installation & commissioning of various hardware components after the validation of solution architecture by the owner and hardware sizing by OEM. Completed hardware infrastructure setup as per the solution architecture 3. Preliminary acceptance Test. Preliminary acceptance test report 2.2.3 Installation & commissioning of Networking components 1. The Vendor shall prepare the Network design i.e. identification of network equipment requirements and other parameter e.g. QoS, IP addressing etc for different environments Network architecture and design document. Vendor to suggest suitable time line considering the dependency of Application implementations. 2. Services covering installation and commissioning of local area network, wide area network, internet connectivity, storage area network & security after the validation of the network architecture & design document as above by the Owner. Completed network infrastructure 3. Preliminary acceptance Test. Preliminary acceptance test report 2.2.4 Installation & commissioning of video conferencing system 1. Design, installation & commissioning of video conferencing system Completed Video conferencing infrastructure Vendor to suggest suitable time line considering the dependency of Application implementations 2. Preliminary acceptance Test Preliminary acceptance test report 2.2.5 Installation & commissioning of IP Telephony system 1. Design, installation & commissioning of IP Telephony system Completed IP telephony infrastructure Vendor to suggest suitable time line considering the dependency of Application implementations 2. Preliminary acceptance Test Preliminary acceptance test report 2.3 Implementation of SAP Applications 2.3.1 Conducting Business Process Study 1. The Vendor shall conduct As-is business process & information requirement study As-is business process & information requirement document
2. Once the As-is business process information requirement study is complete, the Vendor will prepare a To-be business process document. This document will describe how existing processes will be executed post going live with the SAP Application. The changes in the To-be processes from the As-is process will be highlighted. Where an existing process cannot be mapped directly to any SAP functionality (i.e. there is a gap), the Vendor must propose solutions, in terms of process changes, workarounds, custom To-be process with gap analysis & resolution document Vendor to suggest suitable time line based on the Project Plan and Methodology.
Confidential Page 229 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Acti vity Deli verable Deli verable Schedule development, interface with legacy systems, etc. This document must be prepared in a format which allows easy reference to the As-Is Process Document. The To-Be Processes along with the Gap Analysis and resolution must be vetted by the Project Management Team. 3. Once the To-Be Process and the Gap Analysis & Resolution Document is finalized and the custom developments/enhancements identified, the Vendor will prepare a customization strategy report for approval of project Management Team Customization strategy report 4. The interfaces to be developed between the SAP System and the legacy applications or satellite application based on the To- Be Process document must be documented by the Vendor and signed off by the project management team. Interface strategy document 5. Based on the revised information requirements in the context of To-be business processes and standard reports available in the SAP System, the specific information / reporting requirements (including the form, parameters, access and content) will be documented by the Vendor and signed off by the Project Management Team. Custom Report requirements document 2.3.2 Mapping of business processes as per Business Blueprinting 6. Development & approval of business blueprint document mapping all the To-be processes. The business blueprint document Vendor to suggest suitable time line based on the SAP Solution, Project Plan and Methodology 2.3.3 Conceptualizing, Developing, Configuration and Testing the Solution 7. Based on the approved business blueprint, the Vendor shall prepare a prototype of the solution (including all customization, interfaces etc). Solution prototype with necessary documentation Vendor to suggest suitable time line based on the Project Plan and Methodology. 8. The solution prototype should be made available for validation by the Owner nominated users and the project management team. The prototype validation will go through multiple iterations. The prototype validation must be conducted in a formal set up with proper test scripts prepared by the Vendor and approved by the Owner. Solution Prototype / validation of Conference room pilot scripts 9. The feedback provided to the Vendor after each round of validation / conference room pilot must be documented and signed off by the Owner nominated users. Conference room pilot Test report 10. Changes to the solution must be presented to the users in next round of solution validation or conference room pilot. This will be an iterative process till the solution prototype is signed off as acceptable by the project management team. 11. The Vendor must deliver all custom development as has been described in the business blueprint. Custom development 12. The Vendor must provide relevant documentation about the business case for the custom development, description of the code etc Relevant documentation 13. The Vendor must integrate the SAP system with certain retained legacy applications or new bolt-on applications. The detailed is only an indicative list and the complete list will depend on the final solution proposed by the Vendor and accepted by Owner. Integration document between ERP Systems and other satellite systems 14. Process and methodology adopted for Quality Assurance must be documented and periodic reports submitted to the project management team. Quality assurance process document 15. User acceptance test. User acceptance certificate
Confidential Page 230 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Acti vity Deli verable Deli verable Schedule 16. Submit the Access control matrix template to Owner, after the template is filled up, Configure the access control matrix in the application. Access control matrix Template and the configured application print of the user access. 17. Based on the report and the feedback received from the users, project management team may recommend additional tests to be conducted in specific areas. Conduct of such additional tests and the result must be documented by the Vendor. Additional tests conducted in specific areas and test results documented 2.3.4 SAP Application installation 18. SAP will be installed in development, test and production instances Three instances up and running Vendor to suggest suitable time line based on the Project Plan and Methodology. 2.3.5 Data migration to SAP system 19. The Vendor will provide the template in which each data element to be converted must be provided by Owner. Template for data to be converted Vendor to suggest suitable time line based on the Project Plan and Methodology. 20. The Vendor must validate the data provided in terms of format. Validate data provided in terms of format 21. The Vendor will prepare the necessary data conversion scripts and document the same. He will also identify/provide necessary reports to facilitate verification of data converted. Data conversion scripts & necessary documentation 22. The Vendor will execute complete / sample data conversion on test instance for each data element and get sign off from users in terms of adequacy and correctness. Data conversion test results for each data element 23. The data conversion test will also be conducted and signed off by the users with assistance of the Vendor in terms of format, completeness and correctness. Data conversion Test Certificate 24. The Vendor will execute data conversion on production instance and obtain signoff. Data conversion executed on production instance 25. The Vendor will provide a scheme for archival of old data required to be maintained for statutory and other reporting purposes and retrieval of the same in the new ERP environment. Archival and retrieval document 2.3.6 Go-live and Stabilization Support 26. The Vendor will configure production instance of the SAP solution with assistance from the Owners core team. Fully configured Production Instance Vendor to suggest suitable time line based on the Project Plan and Methodology. 27. The Vendor will present a cut-over strategy to the Project Management Team for their validation and approval. Cut-over strategy 28. Executing the cut-over from the legacy applications to the ERP solution in accordance with the approved cut-over strategy. Executing cut-over 29. In case the cut over does not synchronize with the accounting period (such as beginning of the financial year etc), the Vendor will suggest and provide the required strategy for building data for the prior period. Strategy for prior period data build-up 30. The Vendor will provide stabilization support for six months (including six month-end closing and one quarter closing) after go-live. Post go-live stabilisation support for six months. After going live 31. The Vendor is expected to transfer knowledge to Owner and provide guidelines in setting up and managing an SAP Helpdesk. The knowledge and guidelines will encompass all aspects of the help desk such as configuration, report writing, database administration, system administration etc. Knowledge transfer During Stabilisation Support 32. The Vendor will be responsible for providing detailed back-up policy to the Owner. Back-up Policy During Stabilisation Support
Confidential Page 231 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Acti vity Deli verable Deli verable Schedule 33. The Vendor will also provide a disaster recovery plan including remote DR site for Owner keeping in mind the specific operational requirements. Disaster recovery plan 34. The Vendor will be responsible for providing a detailed upgrade policy for the upgrade (minor as well as major) of all applications being implemented as a part of this Project implementation. Application upgrade policy During Stabilisation Support 35. The Vendor will also provide a patch application guideline based on the best practices in this regard Patch application guidelines 2.4. IMPLEMENTATION OF NON SAP APPLICATIONS 2.4.1 Acti ve Directory Control with SSO 1. Implementation of Active Directory with single sign on All machines of Owners network on Active Directory At least two month prior to go-live date
2. All the machines on active directory must be configured in such a way that software maintenance, patch updating, maintenance and monitoring are done from remote/ centralized location. Centralized patch updating, monitoring and management of the machines on Active Directory 3. User acceptance Test User acceptance test report 2.4.2 Messaging and collaboration solution 1. Implementation of messaging solution along with the web interface Integrated messaging backbone As soon as possible. Expected within two months after starting the project. 2. Implementation of the other collaboration tools for Collaboration tools 3. Integration of messaging solution with Black Berry. Availability of messaging services on Black Berry 4. Centralized back up and restoration process for the messaging solution High reliability and zero data loss 5. User acceptance Test User acceptance test report 2.4.3 Anti virus/Anti-spam/Content Filtering 1. Configuration of Antivirus solution in all the users desktop, and Windows servers Protected PC, Laptops and servers from potential Virus, Malware, Trojan etc. At least two month prior to go-live date 2. Configuration of the anti-spam & content filtering solution in all the relevant servers/ equipments. Messaging solution protected with anti spam 3. Configuring auto update for the servers, clients. Special configuration for the mobile users for auto update from internet. Regular automatic update of the patterns, engines etc 4. User acceptance Test User acceptance test report 2.4.4 Enterprise Management System/ Network Management System & Service Desk 5. Installation, configuration and testing of GSM based alert system. EMS will send alarms and status through email/ GSM based Alert system to at least ten designated mobile phones. GSM Alert System with installation and configuration document. At least one month prior to go-live date 6. installation and configuration of the EMS software with setting up of major policies, monitoring parameters on Central Server EMS Server installation and configuration document.
Confidential Page 232 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Acti vity Deli verable Deli verable Schedule 7. Installation of necessary agents on monitored servers and desktops EMS Agent installation and configuration document. 8. Documentation and installation of the EMS on central server, activation of user licenses etc. The documentation will cover: a) Features of the EMS application, database, related software and necessary licenses being supplied; b) The process to be followed in installation of the EMS application , database and the related software; at Central server and monitored Servers, Desktops etc Installation of the EMS Application, database, related software and tools, activation of user licenses etc. and submitting documentation 9. Detailed patch/upgrade procedure for the modules being implemented at central server and monitored servers, desktops etc EMS patch/ upgrade procedure 10. Implementation of service desk tool with the associated processes a) Help Desk b) Incident Management c) Service Level Management d) Problem Management with Known Error Database (KEDB) e) Configuration Management with Configuration Management Database (CMDB) f) Change Management Tool integrated with function and processes. 11. User acceptance Test User acceptance test report 2.4.5 Building Management System for data center 12. Supply, installation, configuration and testing of GSM based alert system. BMS will send alarms and status through email/ GSM based Alert system to atleast ten designated mobile phones. GSM Alert System with installation and configuration document. At least one month prior to go-live date 13. RF earthing for BMS. RF Earthing 14. Installation and configuration of the BMS software with setting up of major policies, monitoring parameters on Central Server. The BMS system shall be concurrently monitored by two administrators. BMS Server installation and configuration document. 15. Documentation and installation of the BMS on central server, activation of user licenses etc. The documentation will cover: a) Features of the BMS Application, database, related software and necessary licenses being supplied; b) The process to be followed in installation of the BMS Application , database and the related software; at Central server c) Network diagram of the BMS d) Schematic Electrical diagrams indicating interlocks and interface with BMS. installation of the BMS System, database, related software and tools, activation of user licenses etc. and submitting documentation
16. Detailed patch/upgrade procedure for the modules being implemented at Central server BMS patch/ upgrade procedure 17. User acceptance Test User acceptance test report 2.4.6 Video Conferencing and IP Telephony 18. Implementation of Video conferencing applications Video conferencing capability among the Owner and other facilities By go-live date 19. Implementation of IP Telephony applications IP Telephony communication
Confidential Page 233 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Acti vity Deli verable Deli verable Schedule among the Owner and other facilities 20. User acceptance Test User acceptance test report 2.5 Project Management in different phases, Change Management & Training 1. The Vendor will study the scope of the Agreement with respect to existing processes, requirements, legacy applications, data availability, integration, customization etc. He will present his conclusions in the form of a Report and a presentation to the Project management team Project initiation report & presentation Vendor to suggest suitable time line based on Project Plan and Methodology
2. Once the above has been discussed and changes, if any, incorporated, the Vendor will prepare the Project Plan in MS Project and indicate the proposed approach towards key phases / activities of the project such as process study, legacy applications integration, data conversion, change management, training etc. The Project Plan and the high-level approach will be discussed with / presented to the Project management team, which may suggest changes if necessary. Project Plan 3. The Vendor will carry out a detailed study to fine tune the specific requirements with respect to the hardware & networking components. This will be spelt out in the hardware requirement report Hardware & network requirement report 1. The Vendor will give a report /presentation to the Project management team on anticipated change management related issues and proposed solution to overcome them. Change management approach report / presentation Vendor to suggest suitable time line based Project Plan and Methodology
2. The Vendor will provide guidelines in setting up an SAP helpdesk including development of Service level agreements (SLA). SAP helpdesk guidelines 3. The Vendor will conduct change management programs on one- on-one individual basis or in groups and at different locations. Tentative schedule and approach document 4. The Vendor will propose effectiveness measurement criteria on change management and its monitoring. Effectiveness measurement document 5. Identify training requirements for Owner s core / system team members and end-users. Training requirement Report Vendor to suggest suitable time line based on Project Plan and Methodology 6. A detailed Training Plan giving details of content, duration and training material to be provided to different categories of participants as identified by the Owner Project Management Team. Training Plan for Owner Users 7. Specific training to Owner core team from product Vendor followed by the Vendor and project management team to prepare them for testing and accepting fully configured solution prototype. Training plan for solution prototype Validation 8. Hands-on training to Owner s core team member on SAP configurations, the processes and other applications. SAP Training for Owners core team members 9. Hands-on training to Owners technical team member on SAP and other applications, including training to Owner database administrators, system administrators including backup & restoration, system executives for development including reports and maintenance of package. . SAP training for Owner s system team members 10. Training to IT team on administration of servers, storage, SAN and backup systems Hardware training to Owners system team members 11. A fully configured solution prototype for training Owner end- users. Configured solution prototype for training 12. Extensive system administrative training to IT team for all the
Confidential Page 234 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Sr No Acti vity Deli verable Deli verable Schedule Non SAP applications and tools, information security, Data center management, hardware and network management, service desk related processes aligned with ITIL for help desk. 13. Hands-on training to Owner end-users on SAP and Non-SAP Applications. SAP training for Owners end-users. 14. Preparation of Owners ERP solution training manual and end user manuals keeping in mind the specific requirements of processes and users at Owner. Owners ERP solution training and end user manuals along with online documentation 15. Preparation of Owner ERP systems management manual keeping in mind the specific configuration of solution implemented at Owner. Owner ERP systems management manual
Confidential Page 235 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
A2. Performance Parameters
Response Time for Tests:
User Activity to be guaranteed by the vendor All ERP Users Direct Connect Remote Connect Menu Navigation Displaying the appropriate menu as per defined user role and profile <1 sec
<2 sec
Screen Opening Display of the selected data entry screen from the menu <2 sec <5 sec Field Navigation Navigation between different data entry fields in the Screen <1 sec
<3 sec
Look up response Display of items from a List of Values <1 sec <10 sec Look up response To display items from table <5 sec <15 sec Screen Navigation Navigation between different data entry screens (from one to another) <1 sec <13 sec
Transaction Commit Transaction saving after completing the data entry <2 sec <20 sec
Query retrieval Online query entered by the user Simple query Medium Complexity query High Complexity query
<5 sec <8 sec <15 sec
<12 sec <15 sec <20 sec Reports response Report fired by the user from the Report Generator Simple Report Medium Complexity report High Complexity report
<5 sec <30 sec <1 min
<12 sec <25 sec <3 min
The Response time mentioned above should be measured by using standard automated testing tools. The Vendor should provide the details of tools & methodology to be used in measuring the response time mentioned above. The response time will be tested for all users consisting 100% concurrent user.
Uptime Requirement:
The System shall have an availability of at least 99.90%. The formula for arriving at uptime figures is given in Table-01 of Annexure-1. The Uptime includes the following infrastructural / System uptime collectively: a) Database uptime, b) Local area/Intranet network Uptime c) SAP & Non SAP server uptime, d) Portal Uptime, e) VPN network uptime, f) Branch offices application uptime g) SAP and Non SAP software uptime h) Other systems effecting SAP uptime.
Performance parameters of the Data Center
Performance parameters of the Data Centers shall be judged against the following major parameters: a) Average illumination of the Data Center shall be 400 Lux. b) UPS output shall be as follows, tested over a period of 72 Hours
Confidential Page 236 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
i. Output Phase asymmetry for 100% imbalance load - <1% ii. Output voltage harmonics for Non-linear load -<5% iii. Battery backup duration testing for half an hour with load. c) Automatic failover to DG set upon interruption of power and automatic shutdown of DG upon resumption of power will be tested. d) The Precision Air Conditioning system shall be tested at peak load conditions for a period of 72 hours. The temperature shall be maintained at 21C 1C. The relative humidity shall be maintained 50% 5%. e) The Fire Detection and suppression system shall tested by simulating various test scenarios proposed by Owner. f) Other tests as may be appropriate will also be conducted for the various components of the Data Center.
Confidential Page 237 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
B. Deliverables & Service Level for the FMS B1. Deliverables Sr No Acti vity Deli verable Deli verable Schedule 7. POST IMPLEMENTATION SUPPORT / AMC of hardware & Network Component 1. The Vendor will provide SAP application support which would include but not limited to monitoring, incident, problem, custom development, change, release, configuration management, system setup/ rebuild, data, backup, print management, coordination with SAP support team. Complete SAP application support by the Vendor For 4 years from the date of Final Acceptance of the Project. 2. The vendor will provide Non-SAP application support which would include but not limited to monitoring, incident, problem, custom development, change, release, configuration management, system setup/ rebuild, data, backup, print management, coordination with Non-SAP support team. Complete Non- SAP application support by the Vendor For 4 years from the date of Final Acceptance of the Project. 3. The vendor will provide Infrastructure and Facility Management which would include but not limited to help desk support, user management, data center management, server, storage administration, network administration. Complete infrastructure and facility management by the vendor For 4 years from the date of Final Acceptance of the Project. 4. The bidder would coordinate with the hardware and Network equipment manufacturer for any warranty related issues and provide equipment maintenance including spare parts required after post warranty period. Complete Maintenance Support for hardware & Network equipments within & after Warranty by the Vendor For 4 years from the date of Final Acceptance of the Project.
B2. Service Level of FMS
1. Criticality of Services: Criticality level-1 Any server related issues like hardware failure, OS failure etc. A critical problem, which affects large number of users / prioritised users / networks / servers e.g. Server UPS, Gateway Routers, Layer-3 and Layer-2 core switches, networked printers, messaging servers, domain servers and other mission critical server, including their power supplies for servers, routers and L-3 and L-2 core switches etc. A critical problem, affecting any segment of the LAN / WAN network or connectivity between any two segments including security breach. Criticality level-2 A major problem, which affects the individual user, e.g. PCs, desktop printers, UPS, Access switches, hubs etc. Criticality level-3 Other problems not covered in criticality-1 and criticality-2 items.
Confidential Page 238 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
2. Criticality Level Classification
Component affected Criticality Level-1, which affects large number of users/prioritized users/Network/ server Criticality Level-2, which affects the individual user Criticality Level-3 Server Server not booting up, Cannot login to server, Database has stopped . Server upgrades, Bug fixes, patch installations Preventive maintenance. Desktop PCs and laptops Desktops and Laptops of prioritized users. Slowing down of PC, No display, Not able to boot , Not able to login, Keyboard / mouse not working, Virus problem , Local printing problems Windows and MS Office problems. Hardware software installation and upgrades, New software installation, Moves, adds, changes, profile maintenance etc. Network Failure of core switches, L-3 switches, routers. distribution switches, Access Switches, Hubs Configuration change of router Software OS problem on Server, OS corruption Performance tuning/response time New software installation UPS Failure of Server, Core switches, router, Centralised UPS, Failure of UPS connected to Access switches, Hubs, network printers
Failure of UPS connected to end users
IT Peripherals and other activities Any call of prioritized users, Networked printers, L-3 and L-2 switches, Centralized printers Desktop printers, UPS Problems in scanners, peripherals and devices etc. not covered in criticality II, installation of Desktops, reconfiguration, creation of profiles and movement of equipment etc. A list of other prioritized users shall be given to the Vendor at the time of commencement of the Agreement by the Owner.
3. RESOLUTION / RESPONSE TIME:
Resolution time is the total time taken by the Vendor between registering the complaint at help desk of the site and rectifying the fault. This time includes time taken to, diagnose, repair / replace the faulty component/module/device and network equipment.
Confidential Page 239 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Criticality Levels I II III Desk side support SLA for remote resolution calls Response Time Within 15 minutes Within 30 minutes Within 60 minutes Resolution Time Within 30 minutes Within 60 minutes Within 90 minutes Desk side support SLA for On-site call resolution Response Time Within 30 minutes Within 60 minutes Within 120 minutes Resolution Time Within 60 minutes Within 120 minutes Within 240 minutes Data Centre equipment support SLA Response Time Within 15 minutes Within 60 minutes Within 120 minutes Resolution Time Within 60 minutes Within 120 minutes Within 240 minutes
4. SAP & Non-SAP Application Helpdesk Support
The help desk support to users shall be provided on 24 x 7 bases. The Vendor will follow response time as detailed below:
Support Category Criteria Maximum Response Time Resolution Critical The system is unable to be used for normal business activities. 30 Minutes 90 Minutes Urgent There is a problem with part of the system, which impacts on Owners decision making. No viable workaround is available. There is a likelihood of financial loss. 1 Hour 4 Hours High The efficiency of users is being impacted, but has a viable workaround. 4 Hours 8 Hours Medium A low impact problem that affects the efficiency of users but has a simple workaround. 8 Hours Based on OEM confirmation Low A fault, which has no particular impact on processing of normal business activities. 8 Hours Based on OEM confirmation
Confidential Page 240 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Annexure-3: Preliminary Implementation Plan Implementation Plan Vendor shall provide detailed time schedule for all items as per scope of work matching with the preliminary implementation plan. Vendors shall have to submit a detailed Project Plan (which should be updated regularly) indicating the key phases / activities of the project and the expected time lines for each phase / activity. The Vendor shall further detail the Project Plan in early stages of the project and get the same validated from Owner. Owners Project management team may suggest changes to the plan where necessary. The Project Plan should include the following at minimum: a) The project broken up into logical phases and sub-phases; b) Activities making up the sub-phases and phases; c) Key milestones and deliverables along with their dates; d) Start date and end date for each activity; e) The dependencies among activities; f) Resources / consultants to be assigned to each activity; g) Resources (core team, business team and process Owners) expected from Owner for each activity.
Implementation plan for the Project
Acti vities M0 M1 M2 M3 M4 M6 M7 M8 M9 10 11 12 Order release Infrastructure Design Data Center Setup Hardware Setup Network Setup SAP Analyze Phase SAP Design Phase SAP Build Phase SAP Integrate Phase Deploy or Go-live phase Stabilization Support Active Directory (SSO) Messaging Solution Antivirus, Anti-Spam Video Conf, IP Telephone EMS/NMS,BMS ** M denotes calendar month.
Confidential Page 241 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Annexure-4: Price Schedule
A. Price Schedule for Project
2.1 Supply of Hardware & Non- SAP Software
SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 2.1.1 Supply of Hardware Data Center Equipments 1 UPS 2 Precision Air Conditioning System (PAC) 3 Fire Suppression Systems 4 Access Control Equipments 5 Water Leak & Rodent Control Systems 6 Civil work components (give break-up) 7 Electrical Components 8 Security system including CCTV, LCD, Biometric reader, proximity control.
9 EMS / BMS Equipments 10 Data Safe 11 Any other 2.1.2 Supply of Hardware Servers, Storage, Backup Devices, Racks & Other Hardware (PCs/Printers) etc. 1 Servers 2 Rack with KVM 3 SAN Storage 4 Backup Devices 5 Other hardware (PCs with OS / Printers etc.)
Confidential Page 242 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
10 Any other item (give detailed break-up) 2.1.4 Supply Hardware - Video Conferencing Equipments 1 Video Conferencing Equipments(give detailed break-up)
2.1.5 Supply Hardware IP Telephony Equipments 1 IP Telephony Equipments (give detailed break-up)
2.1.6 Supply of Non-SAP Software Messaging & Collaboration System 1 Mailing Software 2 Blackberry enterprise software 2.1.7 Supply of Non-SAP Software Anti virus / AntiSpam / Content Filtering 1 Antivirus / Anti Spam / Content Filtering (give detailed break-up)
2.1.8 Supply of Non-SAP Software NMS/EMS/Service Desk Tools 1 NMS/EMS Software & Service Desk Tools (give detailed break-up)
2 Backup Software 2.1.9 Supply of Non-SAP Software BMS 1 BMS Software 2.1.10 Supply of Non-SAP Software Video conferencing System 1 Video Conferencing Software 2.1.11 Supply of Non-SAP Software IP Telephony System 1 IP telephony Software 2.1.12 Supply of Non-SAP Software Other Software 1 Server Operating System 2 PC Operating System 3 Any Other Software (give detailed break- up)
2.2 Design, installation & commissioning of Infrastructure
SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 2.2.1 Design, installation & commissioning of Data Center 1 Design and Engineering Charges 2 Installation and commissioning charges (including Civil & Electrical works)
2.2.2 installation & commissioning of Hardware 1 Installation and commissioning of Hardware
2.2.3 installation & commissioning of Networking Components 1 Design and Engineering Charges 2 Installation, commissioning of Network services
Confidential Page 243 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
3 Establish Connectivity 2.2.4 installation & commissioning of Video Conferencing System 1 Installation, commissioning of Video Conferencing System (give detailed break- up)
2.2.5 installation & commissioning of IP Telephony System 1 Installation, commissioning of IP Telephony System (give detailed break-up)
2.3 Implementation of SAP Application SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 1 SAP Implementation as per scope including 6 months post go live stabilization support
2.4 Implementation of Non-SAP Applications SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 2.4.1 Active Directory Implementation with SOS 2.4.2 Messaging & Collaboration Solution with Black Berry Integration
2.4.3 Anti Virus/Anti Spam/Content Filtering 2.4.4 EMS/NMS 2.4.5 BMS for Data Center 2.4.6 Video Conferencing Application 2.4.7 IP Telephony Application 2.5 Project Management in different phases, Change Management & Training SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 1 Project Management 2 Change management & Training on all the above services (with breakup)
Confidential Page 244 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
B. Price Schedule for FMS 2.6 Post Implementation support services for running SAP Application, Non-SAP Applications and Infrastructure Facility Management Services.
SN Description UOM Qty. FOR Unit Rate in INR exclusi ve of Taxes & Duties Amount in INR Taxes & Duties in INR Taxes & Duties in INR Taxes & Duties in INR Total Amount in INR 2.6.1 SAP application support 1 SAP Application Support 2.6.2 Non-SAP Application Support 1 Active Directory administration 2 Messaging & collaboration, Blackberry apps administration
4 Video Conferencing & IP Telephony solution administration
5 EMS/NMS/BMS application administration 2.6.3 Infrastructure and facility management 1 Help Desk 2 Desktop/Laptop 3 SAP App, database Servers 4 Non SAP and other servers 5 Router 6 Switch - L3 7 Firewall and other security equipments 8 Database 9 Leased Line and MPLS Links 2.6.4 Hardware and Network Equipment Maintenance 1 Maintenance Support within warranty 2 Maintenance Support after warranty including parts
Confidential Page 245 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Annexure-5: Payment Milestone A. Payment Milestone for Project Item Ref. Item Description Payment Milestone Payment % 2.1 Supply of Hardware and non-SAP Software 2.1.1 Supply of Hardware - Data Center Equipments On supply of all Data center equipments and physical verification by Owner at Project Site. 50% of Total Cost under 2.1.1 of price schedule On completion of installation, commissioning & issue of final acceptance certificate for Infrastructure 40% of Total Cost under 2.1.1 of price schedule On issue of Stabilization Acceptance Certificate. 10% of Total Cost under 2.1.1 of price schedule 2.1.2 Supply of Hardware - Servers, Storage, Backup device, racks & other hardware (PC/Printers) etc. On supply of all hardware equipments and physical verification by Owner at Project Site 50% of Total Cost under 2.1.2 of price schedule On completion of installation, commissioning & issue of final acceptance certificate for Infrastructure 40% of Total Cost under 2.1.2 of price schedule On issue of Stabilization Acceptance Certificate. 10% of Total Cost under 2.1.2 of price schedule 2.1.3 Supply of Hardware Network Components On supply of all networking components and physical verification by Owner at Project Site 50% of Total Cost under 2.1.3 of price schedule On completion of installation, commissioning & issue of final acceptance certificate for Infrastructure 40% of Total Cost under 2.1.3 of price schedule On issue of Stabilization Acceptance Certificate. 10% of Total Cost under 2.1.3 of price schedule 2.1.4 Supply of Hardware Video Conferencing System On supply of all video conferencing equipments and physical verification by Owner at Project Site 50% of Total Cost under 2.1.4 of price schedule On completion of installation, commissioning & issue of final acceptance certificate for Infrastructure 40% of Total Cost under 2.1.4 of price schedule On issue of Stabilization Acceptance Certificate. 10% of Total Cost under 2.1.4 of price schedule 2.1.5 Supply of Hardware IP Telephony System On supply of all IP telephony equipments and physical verification by Owner at Project Site 50% of Total Cost under 2.1.5 of price schedule On completion of installation, commissioning 40% of
Confidential Page 246 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
& issue of final acceptance certificate for Infrastructure Total Cost under 2.1.5 of price schedule On issue of Stabilization Acceptance Certificate. 10% of Total Cost under 2.1.5 of price schedule 2.1.6 Supply of Non-SAP Software Messaging & Collaboration System On supply of software license and physical verification by Owner at Project Site 50% of Total Cost under 2.1.6 of price schedule On issue of Go-live Acceptance Certificate 40% of Total Cost under 2.1.6 of price schedule On issue of Stabilization Acceptance Certificate 10% of Total Cost under 2.1.6 of price schedule 2.1.7 Supply of Non-SAP Software Anti Virus / Anti Spam/ Content Filtering On Supply of software license and physical verification by Owner at Project Site 50% of Total Cost under 2.1.7 of price schedule On issue of Go-live Acceptance Certificate 40% of Total Cost under 2.1.7 of price schedule On issue of Stabilization Acceptance Certificate 10% of Total Cost under 2.1.7 of price schedule 2.1.8 Supply of Non-SAP Software EMS/NMS/Service Desk Tool On Supply of software license and physical verification by Owner at Project Site 50% of Total Cost under 2.1.8 of price schedule On issue of Go-live Acceptance Certificate 40% of Total Cost under 2.1.8 of price schedule On issue of Stabilization Acceptance Certificate 10% of Total Cost under 2.1.8 of price schedule 2.1.9 Supply of Non-SAP Software BMS Software On Supply of software license and physical verification by Owner at Project Site 50% of Total Cost under 2.1.9 of price schedule On issue of Go-live Acceptance Certificate 40% of Total Cost under 2.1.9 of price schedule On issue of Stabilization Acceptance Certificate 10% of Total Cost under 2.1.9 of price schedule 2.1.10 Supply of Non-SAP Software Video Conferencing & IP telephony Software On Supply of software license and physical verification by Owner at Project Site 50% of Total Cost under 2.1.10 of price schedule On issue of Go-live Acceptance Certificate 40% of Total Cost
Confidential Page 247 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
under 2.1.10 of price schedule On issue of Stabilization Acceptance Certificate 10% of Total Cost under 2.1.10 of price schedule 2.1.11 Supply of Non-SAP Software IP telephony Software On Supply of software license and physical verification by Owner at Project Site 50% of Total Cost under 2.1.11 of price schedule On issue of Go-live Acceptance Certificate 40% of Total Cost under 2.1.11 of price schedule On issue of Stabilization Acceptance Certificate 10% of Total Cost under 2.1.11 of price schedule 2.1.12 Supply of Non-SAP Software Other Software On Supply of software license and physical verification by Owner at Project Site 50% of Total Cost under 2.1.12 of price schedule On issue of Go-live Acceptance Certificate 40% of Total Cost under 2.1.12 of price schedule On issue of Stabilization Acceptance Certificate 10% of Total Cost under 2.1.12 of price schedule 2.2 Design, installation & commissioning of Infrastructure 2.2.1 Design, installation & commissioning of Data Center On completion of installation, commissioning & issue of final acceptance certificate for Infrastructure 80% of Total Cost under 2.2.1 of price schedule On issue of Stabilization Acceptance Certificate 20% of Total Cost under 2.2.1 of price schedule 2.2.2 Installation & commissioning of Hardware On completion of installation, commissioning & issue of final acceptance certificate for Infrastructure 80% of Total Cost under 2.2.2 of price schedule On issue of Stabilization Acceptance Certificate 20% of Total Cost under 2.2.2 of price schedule 2.2.3 Installation & commissioning of Networking Component On completion of installation, commissioning & issue of final acceptance certificate for Infrastructure 80% of Total Cost under 2.2.3 of price schedule On issue of Stabilization Acceptance Certificate 20% of Total Cost under 2.2.3 of price schedule Providing network services As per charges levied by Network Bandwidth provider. 2.2.4 Installation & commissioning of On completion of installation, commissioning 80% of
Confidential Page 248 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Video Conferencing System & issue of final acceptance certificate for Infrastructure Total Cost under 2.2.4 of price schedule On issue of Stabilization Acceptance Certificate 20% of Total Cost under 2.2.4 of price schedule 2.2.5 Installation & commissioning of IP Telephony System On completion of installation, commissioning & issue of final acceptance certificate for Infrastructure 80% of Total Cost under 2.2.5 of price schedule On issue of Stabilization Acceptance Certificate 20% of Total Cost under 2.2.5 of price schedule 2.3 Implementation of SAP Application 2.3.1 2.3.2
2.3.3
2.3.4
2.3.5 2.3.6 Conducting Business Process Study Mapping Businesses Process as per Business Blueprinting Conceptualising, developing, Configuration and Testing of Solution SAP Application installation on development, quality and production instances. Data Migration to SAP System Go-live and Stabilization Support Completion of business process study & business blueprinting and respective sign- offs 15% of Total Cost under 2.3 of price schedule After issue of conference room pilot Test certificate. 15% of Total Cost under 2.3 of price schedule After user acceptance certification. 15% of Total Cost under 2.3 of price schedule Data migration, data conversion executed on production instance and signoff by Owner. 20% of Total Cost under 2.3 of price schedule After Go-live Acceptance certification 20% of Total Cost under 2.3 of price schedule On issue of Stabilization Acceptance Certificate 15% of Total Cost under 2.3 of price schedule 2.4 Implementation of Non-SAP Application 2.4.1 Active Directory Implementation with Single Sign On(SOS) After Go-live Acceptance certification 75% of Total Cost Under 2.4.1 of price schedule On issue of Stabilization Acceptance Certificate 25% of Total Cost Under 2.4.1 of price schedule 2.4.2 Messaging and Collaboration Solution with Black Berry integration After Go-live Acceptance certification 75% of Total Cost Under 2.4.2 of price schedule On issue of Stabilization Acceptance Certificate 25% of Total Cost Under 2.4.2 of price schedule 2.4.3 Anti Virus/Anti Spam/content Filtering Solution After Go-live Acceptance certification 75% of Total Cost Under 2.4.3 of price schedule On issue of Stabilization Acceptance Certificate 25% of Total Cost Under 2.4.3 of price schedule 2.4.4 EMS/NMS and service Desk Tools After Go-live Acceptance Certification 75% of Total Cost
Confidential Page 249 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Under 2.4.4 On issue of Stabilization Acceptance Certificate 25% of Total Cost Under 2.4.4 of price schedule 2.4.5 BMS for Data Center After Go-live Acceptance Certification 75% of Total Cost Under 2.4.5 of price schedule On issue of Stabilization Acceptance Certificate 25% of Total Cost Under 2.4.5 of price schedule 2.4.6 Video Conferencing Application After Go-live Acceptance Certification 75% of Total Cost Under 2.4.6 of price schedule On issue of Stabilization Acceptance Certificate 25% of Total Cost Under 2.4.6 of price schedule 2.4.7 IP telephony Application After Go-live Acceptance Certification 75% of Total Cost Under 2.4.7 of price schedule On issue of Stabilization Acceptance Certificate 25% of Total Cost Under 2.4.7 of price schedule 2.5 Project Management in different phases, Change Management and Training 2.5.1
Project management in different Phases Change Management & Training Resource mobilisation, kick-off, core team finalisation, and detailed Project Plan and Test Plan. 15% of the total cost under 2.5 of price schedule Completion of business process study & business blueprinting and respective sign- offs 15% of the total cost under 2.5 of price schedule After User Acceptance Certification 15 % of the total cost under 2.5 of price schedule After Go-live Acceptance Certification 40% of the total cost under 2.5 of price schedule On issue of Stabilization Acceptance Certificate 15% of the total cost under 2.5 of price schedule
B. Payment Milestone for FMS Item Ref. Item Description Payment Milestone Payment % 2.6 Post Implementation Support Services for running SAP Application, Non SAP Applications and Infrastructure Facility Management Services 2.6.1 2.6.2 2.6.3 2.6.4 SAP Application Support Non-SAP Application Support Infrastructure Facility Management Hardware & network Equipment Maintenance On completion of each quarter of Service Pro-rata quarterly basis of 85% of the Total Cost under 2.6 of the price schedule On completion of the FMS. 15% of the Total Cost under 2.6
Confidential Page 250 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Annexure-6: Proforma for Performance Bank Guarantee (PBG)
PERFORMANCE BANK GUARANTEE IN LIEU OF SECURITY DEPOSIT (On Non-Judicial Stamp Paper)
To Orissa Power Generation Corporation Ltd., Ib Thermal Power Station, At/Po-Banharpali, Dist-Jharsuguda-768 234.
In consideration of the Orissa Power Generation Corporation Ltd. (Ib Thermal Power Station) having registered office at 7 th. Floor, Zone A, Fortune Towers, Chandrasekharpur, Bhubaneswar-751 023 (hereinafter called the Owner which expression shall unless repugnant to the subject or context include its administrators successors and assigns) having agreed to the price, terms and conditions of Tender and Letter of Intent bearing no._____________ dated _____________ issued which has been unequivocally accepted by the Vendor ***M/s ____________________________ for the work of ______________________________ (hereinafter called the said contract) to accept a performance Guarantee as herein provided for Rs. __________(Rupees ____________________________ only ) from a Nationalized bank in lieu of the security deposit to be made by the Vendor or in lieu of the deduction to be made from the Vendors bills, for the due fulfillment of the terms and conditions contained in the said Agreement by the said Vendor, We the _______________________ Bank (hereinafter referred to as the said Bank and having our registered office at __________________________ do hereby undertake and agree to indemnify and keep indemnified Owner from time to time to the extent of Rs.________ (Rupees __________________________ only) against any loss or damage, costs, charges and expenses caused to or suffered by or that may be caused to or suffered by Owner by reason of any breach or breaches by the said Vendor of any of the terms and conditions contained in the said Agreement and to unconditionally pay the amount claimed by Owner on demand and without demur to the extent aforesaid. 2. We______________________ Bank, further agree that Owner shall be the sole judge of and as to whether the said Vendor has committed any breach or breaches of any of the terms and conditions of the said Agreement and the extent of loss, damage, costs, charges and expenses caused to or suffered by or that may be caused to or suffered by Owner on account thereof and the decision of Owner that the said Vendor has Committed such breach or breaches and as to the amount or
Confidential Page 251 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
amount of loss, damage, costs charges and expenses caused to or suffered by or that may be caused to or suffered by Owner from time to time shall be final and binding on us. 3. We the said Bank further agree that the Guarantee herein contained shall remain in full force and effect during the period that would be taken for the performance of the said Agreement and till all the dues of Owner under the said Agreement or by virtue of any of the terms and conditions governing the said Agreement have been fully and properly carried out by the said Vendor and accordingly discharges this Guarantee, subject, however, that Owner shall have no claim under the Guarantee after 90 (Ninety) days from the date of expiry of the Defects Liability period as provided in the said Agreement i.e. (Date) or from the date of cancellation of the said Agreement, as the case may be, unless a notice of the claim under this Guarantee has been served on the Bank before the expiry of the said period in which case the same shall be enforceable against the Bank not with standing the fact, that the same is enforced after the expiry of the said period. 4. Owner shall have the full liberty without affecting in any way the liability of the Bank under this Guarantee or indemnity, from time to time to vary any of the terms and conditions of the said Agreement or to extend time of performance by the said Vendor or to postpone for any time and from time to time any of the powers exercisable by it against the said Vendor and either to enforce or forbear from enforcing any of the terms and conditions governing the said Agreement and either securities available to Owner and the said Bank shall not be released from its liability under these presents by any exercise by Owner or of the liberty with reference to the matters aforesaid or by reason of time being given to the said Vendor or any other forbearance, act or omission on the part of Owner or any indulgence by Owner to the said Vendor or any other matter or thing whatsoever which under the law relating to sureties would but for this provision have effect of so releasing the Bank from its such liability 5. It shall not be necessary for Owner to proceed against the Vendor before proceeding against the Bank and the Guarantee herein contained shall be enforceable against the Bank notwithstanding any security, which Owner may have retained or obtained from the Vendor shall at the time when proceedings are taken against the Bank hereunder be outstanding or unrealized. 6. We, the said Bank, lastly undertake not to revoke this Guarantee during its currency except with the prior consent of Owner in writing and agree that any change in the Constitution of the said Vendor or the said Bank shall not discharge our liability hereunder. If any further extension of this Guarantee is required the same shall be extended to such required periods on receiving instructions from M/s_________________________________________ on whose behalf this guarantee is issued.
In presence of
Confidential Page 252 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
WITNESS For and on behalf of (Bank) 1. Signature____________________ 2. Name & Designation___________ Authorisation No._____________ Date and Place ________________ Banks Seal__________________
*** NOTES: FOR PROPRIETARY CONCERNS: Shri___________________________ S/o_______________________________ resident of ______________________________ carrying on business under the name and style of _________________________ at __________________________________ (hereinafter called the said Vendor which expression shall unless the context requires otherwise include his heirs, executors, administrators and legal representatives). FOR PARTNERSHIP CONCERNS: M/s ______________________________ a partnership firm with its office at _______________ __________ (hereinafter called the said Vendor which expression shall unless the context requires otherwise include their heirs, executors, administrators and legal representatives); the names of their partners being (I) Shri ___________________________ S/o ________________________________________ (II) Shri ____________________ S/o ________________________________________ etc. FOR COMPANIES M/s _______________________ a company registered under the Companies Act, 1956 and having its registered office in the state of __________________ (hereinafter called the said Vendor which expression shall unless the context requires otherwise include its administrators, successors and assigns).
Confidential Page 253 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
Annexure-7: Owner Safety Rules
The Vendor shall provide Personal Protective Equipments (like helmet, shoes, safety glass, nose mask and earplug etc.) as many as required to all his workmen & ensure safety policy of Owner strictly otherwise they will not be allowed to work. Standard of personal protective equipments to be provided by the Vendor to their employees are indicated below.
1. Industrial safety helmet conforming IS: 2925 2. Safety shoes conforming IS: 9473-1993 3. Dust mask conforming IS: 9473-1983 4. Full body Harness along with Lifeline with fall arrestor 5. Safety glasses for dust protection (Lightweight safety glasses with side shield to protect against wind & ultraviolet ray with adjustable side arms for personalized fit). 6. (i) Ear muff conforming IS:6229 (ii) Ear plug or Ear seal Unique closed cell polyester from smooth tapered surface similar to ear canal, swells slowly to fit individual Ear canal. (Any one item out of three types of ear protection device should be issued) 7. Flame-Water-Oil-Acids & alkali resistant work wear (made of 100% cotton fabric) 8. Safety gloves of Kevlar or equivalent (high temp. resistance) 9. Face shield (conforming IS: 8521 part I type-I) 10. Electrical hand gloves 440v & 33 KV conforming IS: 4770 11. Hand gloves for chemical laboratory made from pure latex Acid and Alkali proof 12. Hand gloves for concentrated chemicals made from superior PVC inside cotton reinforce for better grip 13. Split chrome leather hand gloves for handling rough object. 14. Canvas hand gloves for handling smooth object & doing light work with it. 15. Flip up goggles with stationery frame fitted with ophthalmic grade zero power toughened lens and fitting frame, Blue lens for furnace, Green shade No.4 for gas cutting, dark green No.11 for glasses for ARC welding whenever is required. 16. Panoramic type safety goggles for acid & alkali whenever is required. Vendor shall ensure proper use of personal protective equipment by their workmen and supervisor on duty.
Before issue of the above PPEs depending on the need of the area of work the sample of the same must be provided to Owner Safety Officer for inspection & approval.
The Vendor shall be issued entry pass for their employees after due verification of the quality of the standard PPEs and imparting necessary training well in advance (i.e. before 7 days of commencement of work) by Project Manager / Safety Officer.
a) None of the Vendors employees shall be allowed inside the plant premises without valid gate pass, safety shoes, helmet & safety glasses. b) Vendor shall ensure that all his employees use proper PPEs inside the plant premises as per the work & site requirement. c) During the course of execution of the work the Vendor must ensure use of appropriate tested tools by their workmen. Safe working practice must strictly be followed, e.g. use of proper plug & socket for electrical connections, right size & standard spanner, right capacity and tested lifting & pulling equipment etc. d) The Vendor must ensure tidiness of the work place during & after completion of the work. e) In case of any doubt relating to safety guidelines, the Vendor should seek advice of Project Manager / Safety Officer immediately for clarification. f) The Vendor must provide adequate first aid boxes at different locations and maintain a register to this effect. g) The Vendor should follow proper fire fighting procedure while executing the work.
Confidential Page 254 Implementation of SAP ERP, Non-SAP Applications and related IT Infrastructure along with Post-Implementation support with Facility Management at OPGC.
h) The Vendor must provide proper barricades for excavations & other hazardous areas with proper marking even during nighttime. i) The Vendor should use proper & safe scaffoldings wherever required. j) The Vendor should take utmost care & precaution while handling inflammable gases, compressed gases & explosives. k) The Vendor should use proper fall protection equipments while working at height and guard the bottom area. l) The Vendor should not use any metallic ladders inside ITPS premises. m) The Vendor should use proper electrical & lifting tools having periodic testing & . n) The Vendor should follow Owner policy for PTW, Hot work permit & confined space. Before starting any work the Vendor should obtain the required clearance from the concerned authority. o) The Vendor should follow all safety standards, codes, rules, regulations & acts as in force. p) The Vendor must engage only experienced and qualified manpower to prevent any safety lapses during execution of the work.
ANY DEFICIENCY IN SAFETY ASPECTS SHALL BE VIEWED SERIOUSLY BY OWNER. THE VENDOR WILL BE PENALISED UP TO THE EXTENT OF Rs.10, 000/- (RUPEES TEN THOUSAND ONLY) PER EACH LAPSE AS DETERMINED BY THE PROJ ECT MANAGER. OWNER RESERVES THE RIGHT TO TERMINATE THE AGREEMENT AND DEBAR THE VENDOR TO PARTICIPATE ANY FUTURE BIDDING IN CASE OF CONTINUED FLOUTING OF THE SAFETY NORMS PRESCRIBED BY OWNER.