Planned 2020 Gigafactory Production Exceeds 2013 Global Production!

40!

! 500,000 Vehicles!

35!

GWh/Year Production !

Global cell supply growing, but almost entirely in Asia!

30!

Gigafactory! Others! Lishen!

25!

BYD! BAK!

20!

ATL! Maxell!

15!

Sony!

10!

! 35,000 Vehicles!

Panasonic! LGC! SDI!

5!

0! 2010! 2011! 2012! 2013! 2014! 2015! 2016! 2017! 2018! 2019! 2020!

Battery pack cost/kWh reduced >30% by Gen III volume ramp in 2017!
Source: IIT Takeshita 2013!

Gigafactory Process Flow!


!

!
Raw Steel/ Aluminum!

Pack! Enclosure!

Cathode Manufacturing! Aluminum Foil!

Cathode! Electrode!

Can & Cap!

Separator! Manufacturing!

Separator!

Winding!

Anode Manufacturing! Copper! Foil!

Anode! Electrode!

Module! ! Cell! ! ! Cell! ! !! Cell ! ! ! Cell !!

Pack! ! Module! ! ! Module! ! ! ! Module ! ! ! Module ! !

Raw Materials!

Cell Assembly!

Electrolyte Manufacturing!

Battery Pack! Recycling!

Battery Pack Lifetime Usage!

Vehicle Assembly!
(Fremont, CA)!

Tesla Gigafactory!
!

! Gigafactory Projected Figures


2020 Tesla Vehicle Volume 2020 Gigafactory Cell Output 2020 Gigafactory Pack Output Space Requirement Total Land Area (acres) Employees 500,000/yr 35 GWh/yr! 50 GWh/yr! Up to 10M ft2! w/ 1-2 levels! 500-1000 6,500

New Local Renewables ! Solar and Wind!

Rendering!

Gigafactory Location Finalists!


!

Finished battery packs from the Gigafactory to Fremont, CA for vehicle assembly.! Final site selection activities are underway.!

Gigafactory Projected Timeline!


!

!
Site ! Selection! Initial Project Design! Partner! Discussions! Zoning & ! Design / Build! Facility Construction! Equipment Installation! Production Launch and Ramp! 2020! (500k Veh/Yr)!
TODAY!

ACTIVE!

Tesla and its partners will invest !$4-5 billion in the Gigafactory through 2020. CapEx will be shared by Gigafactory partners. Tesla will directly invest !$2 billion.!

2014!

2015!

2016!

2017!

Forward Looking Statements!


!

Certain statements in this communication, including statements regarding the Tesla Gigafactory and its development plans, production capacity, cost savings, costs, timeline and vehicle production estimates, are forward-looking statements that are subject to risks and uncertainties. These forward-looking statements are based on managements current expectations, and as a result of certain risks and uncertainties, actual events or results may differ materially from those contained in the forward-looking statements. Various important factors could cause actual results to differ materially from those in the forwardlooking statements, including potential difculties in nding a suitable Tesla Gigafactory site, obtaining required permits, negotiating terms with technology and other partners, maintaining implementation schedules, output and cost estimates and vehicle demand. Please refer to Teslas most recent Annual Report on Form 10-K and its other lings with the Securities and Exchange Commission. These lings contain and identify important factors that could cause actual results to differ materially from those contained in Teslas forward-looking statements. Tesla disclaims any obligation to update information contained in these forward-looking statements.!