Distinguishing Features
Shed established & inaugurated in 1976 by the
then honble MR Shri Kamlapati Tripathi. Initial capital cost rs.1.5 cr. Initial loco holding 34 Maximum coaching loco holding for any shed 161.
First to home 3 phase coaching locomotives. Only loco shed in INDIA homing WAP-5 locomotives. Fastest train BHOPAL SHATABDI EXPRESS running at 150 kmph is hauled by WAP-5 locomotives. Electric Locomotives maintained 184 electric locomotives comprising of 87 conventional and 97 based on State-of-the-Art three phase technology are presently being maintained at Electric loco shed, Ghaziabad. Type wise holding of locomotives as on 26/07/2011 is as under:
CONVENTIONAL WAP-1 33 WAP-4 40 WAG-5 14 THREE PHASE WAP-5 40 WAP-7 57 184 Total
The loco holding has consistently increased from 34 in 1976 to 184 in 2011 and year wise details are as under:
Year 1976-77 1980-81 1985-86 1990-91 1995-96 2000-01 2005-06 2007-08 2008-09 2009-10 2010-11 2011-12(upto July) Loco Holding 34 80 111 117 124 141 138 140 146 162 177 184
Important Rajdhani/Shatabadi/Duronto/Garib Rath trains running at 130 KMPH speed by Ghaziabad shed locomotives
Train No. 2001/02 2003/04 2259/60 2425/26 2029/30 2013/14 2011/12 2951/52 2953/54 2281/82 2909/10 2005/06 2313/14 2611/12 Train Name Bhopal Shatabadi Express (150 KMPH) Lucknow Shatabadi Express Duronto Express Rajdhani Express Amritsar Shatabadi Express Amritsar Shatabadi Express Kalka Shatabadi Express Rajdhani Express From NDLS NDLS SDAH NDLS NDLS NDLS NDLS NDLS To BPL LKO NDLS JAT ASR ASR KLK MCT MCT BBS BDTS KLK SDAH CEI
August Kranti Rajdhani HNZM Express Duronto Express Garib Rath Express Kalka Shatabadi Express Rajdhani Express Garib Rath Express NDLS HNZM NDLS NDLS HNZM
2283/84 2441/42 2423/24 2353/54 2439/40 2877/78 2421/22 2443/44 2431/32 2453/54 2033/34 2275/76
Duronto Express Rajdhani Express Rajdhani Express Garib Rath Express Rajdhani Express Garib Rath Express Rajdhani Express Rajdhani Express Rajdhani Express Rajdhani Express Shatabadi Express Duronto Express
HNZM NDLS NDLS BGP NDLS NDLS NDLS NDLS HNZM NDLS NDLS NDLS
Ernakul um BSP GHY NZMRNGR RNC RNC BBS BBS TVC RNC CNB ALD
4 5 6 7 8 9
10
Bogie
WORK FORCE SHED OFFICERS Sr.DEE - 1 DEE - 1 ADEE - 2 SHED STORES DEPOT SMM - 1
SUPERVISORS, ANCILLARY AND OTHER STAFF Electric loco shed, Ghaziabad is responsible for the maintenance of electric locomotives and also caters the requirement of supervisors and associated staff for day to day maintenance of locomotives to Divisional (Delhi) RSO organization. The availability of staff is as under:
ELS/GZB SN Category SS 1 2 3 4 Supervisor Skilled Ancillary Unskilled D 91 612 76 143 OR 59 549 71 127 SS 21 98 2 42
RSO OR 19 90 3 57 SS
Unskilled Ancillary
19
17
21
19
6 7 8 9
33 6 7 5 992
30 4 8 4 871
166
172
2 6 7 5 1166
30 4 8 4 1053
07-08
08-09
09-10
10-11
11-12
HOLDING STATISTICAL FAILURE NON-STATISTICAL FAILURE UORs TOTAL INCIDENCES PUNCTUALITY CASES UNSCHEDULED LIFTING PER 100 LOCO PER MONTH UNSCHEDULED VISIT PER 100 LOCO PER MONTH
42 6
47 5
65.41 09
82.58 08
94 04
23
23
07
570 576 9
662 667 17
927 936 50
970 977 40
250 254 19
22.5
24.4
16.56
11.81
12.76
115.8
121.2
106.6
90.21
78.36
MAINTENANCE ACTIVITIES For the reliable functioning of locomotives on line following periodical Schedules of electric locomotives based upon the norms laid down by Railway Board are undertaken in the shed. MINOR SCHEDULES
Coachin g IA IB IC 40 80 120
Freight 45 90 135
MAJOR SCHEDULES
Type of Schedule (periodicity in Months)
Conventional Locos
Freight 18 54
Coaching 18 54
* MOH for three phase locomotives Besides undertaking scheduled maintenance of locomotives, unscheduled attention to GZB based as well as other Railway owned locomotives is also being under taken as per the guidelines of Railway Board to avoid dead movement of locomotives to their home sheds.
Termination of terminated OHE on shed structure. Commissioning of dry compressed air plant for pneumatic testing in MR & LR bays.
JIB CRANE
Provision of Shunting wintches in MR & LR bays for pulling IN and OUT of locomotives.
MEETING HALL
LAUNGE
BEFORE
AFTER