Вы находитесь на странице: 1из 7

CE 521L 5CE-A Beltran, Francheska P. Gamo, Anatoly M. Olalo, Leonardo T. Pablo, Paul Ian N. Wong, Otto Hongsan T.

CONCRETE ESTIMATE

Page 1 of 7

CONCRETE
A. COLUMN FOOTING

Thickness Width Length Quantity Total Volume (m3)

F1 0.4 1.45 1.45 8 6.728

F2 0.4 1.85 1.85 6 8.214

CONCRETE ESTIMATE

CE 521L 5CE-A Beltran, Francheska P. Gamo, Anatoly M. Olalo, Leonardo T. Pablo, Paul Ian N. Wong, Otto Hongsan T. B. COLUMN

CONCRETE ESTIMATE

Page 2 of 7

LG-UG UG-2F TERRACE 2F-ROOF Depth from NGL = 0.15m

Thickness 0.2 0.2 0.2 0.2

Width 0.4 0.4 0.4 0.4

Height 3.1 3.1 1 3.1 No. of Columns = 14

Quantity 6 14 6 9

Total Volume = 7.672 m3

CONCRETE ESTIMATE

CE 521L 5CE-A Beltran, Francheska P. Gamo, Anatoly M. Olalo, Leonardo T. Pablo, Paul Ian N. Wong, Otto Hongsan T.

CONCRETE ESTIMATE

Page 3 of 7

C. BEAM

a. TB Width, B Depth, D Length Total Volume (m3) b. CB Width, B Depth, D Length Total Volume (m3) LG UG 0.2 0.4 38.5 48 6.44

UG

0.2 0.4 1.2 0.096

CONCRETE ESTIMATE

CE 521L 5CE-A Beltran, Francheska P. Gamo, Anatoly M. Olalo, Leonardo T. Pablo, Paul Ian N. Wong, Otto Hongsan T. c. B-1 Width, B Depth, D Length Total Volume (m3) d. B-2 Width, B Depth, D Length Total Volume (m3) e. B-3 Width, B Depth, D Length Total Volume (m3) f. RB Width, B Depth, D Length Total Volume (m3) UG 2F 0.2 0.4 11 13 1.92 UG 2F 0.2 0.4 33 70 8.24

CONCRETE ESTIMATE

Page 4 of 7

2F

0.2 0.4 7.5 0.6

ROOF

0.2 0.4 58.4 4.672

TOTAL VOLUME OF BEAM BEAM TB CB B-1 B-2 B-3 RB TOTAL VOLUME VOLUME 6.44 0.096 8.24 1.92 0.6 4.672 21.968

CONCRETE ESTIMATE

CE 521L 5CE-A Beltran, Francheska P. Gamo, Anatoly M. Olalo, Leonardo T. Pablo, Paul Ian N. Wong, Otto Hongsan T.

CONCRETE ESTIMATE

Page 5 of 7

D. SLAB
a. S-1 Thickness Area Total Volume (m3) b. S-2 Thickness Area Total Volume (m3) c. S-3 Thickness Area Total Volume (m3) d. S-4 Thickness Area Total Volume (m3) e. CS Thickness Area Total Volume (m3) 2F 0.1 1.079 0.1079 TOTAL VOLUME OF SLAB SLAB S-1 S-2 S-3 S-4 CS TOTAL VOLUME VOLUME 26.8125 7.651 2.835 0.468 0.1079 37.8744 UG 0.1 4.68 0.468 UG 2F 0.1 14.173 14.173 2.835 UG 2F 0.125 33.139 28.068 7.651 LG UG 2F 0.125 54.86 76.63 83.01 26.8125

CONCRETE ESTIMATE

CE 521L 5CE-A Beltran, Francheska P. Gamo, Anatoly M. Olalo, Leonardo T. Pablo, Paul Ian N. Wong, Otto Hongsan T.

CONCRETE ESTIMATE

Page 6 of 7

E. RETAINING WALL

Length Thickness Height TOTAL VOLUME

10.4 0.25 3.5 9.1

CONCRETE ESTIMATE

CE 521L 5CE-A Beltran, Francheska P. Gamo, Anatoly M. Olalo, Leonardo T. Pablo, Paul Ian N. Wong, Otto Hongsan T.

CONCRETE ESTIMATE

Page 7 of 7

CONCRETE COLUMN FOOTING COLUMN BEAM SLAB RETAINING WALL TOTAL VOLUME VOLUME 14.942 7.672 21.968 37.874 9.1 91.556

Mixture Class AA A B C

Proportion 1:1 :3 1:2:4 1:2 :5 1:3:6

CONCRETE PROPORTION Cement in Bag 40 kg 50 kg 12.0 9.5 9.0 7.0 7.5 6.0 6.0 5.0

Sand (m3) 0.50 0.50 0.50 0.50

Gravel (m3) 1.0 1.0 1.0 1.0

*Reference: Max B. Fajardo Jr., Simplified Construction Estimate 2000 Ed.

Using Class A mixture: 40kg Cement Bag

= 91.556 x 9.0 = 824.004 825 bags = 91.556 x 0.5 = 45.778 46 m3 = 91.556 x 1.0 = 91.556 92 m3 SUMMARY OF ORDER

Sand

Gravel

40 KG CEMENT BAG SAND GRAVEL

825 BAGS 46 m3 92 m3

CONCRETE ESTIMATE

Вам также может понравиться