[Rev.D]O MON TPP Unit No.

2 Construction - MHI
Activity ID Activity Name Original Duration 778 778 778 Effective Date of Contract Kick Off Meeting Mat Foundation Start Turbine Steel Structure Lifting Start Boiler Steel Structure Lifting Start Boiler Drum Lifting Start Condenser Erection Start Turbine on base Boiler Hydrostatic Test Power Receiving Natural Gas Supply - Confirmation by Owner (For Natural Gas Sys. Commissioning) Fuel Oil Receiving to Service Oil Tank Initial Firing Initial Steam Admission to Turbine Syncronization Reliability Test Run Performence Test Take-Over(Provisional Acceptance) Request for Site Hand Over & Construction Work Permit 1st Design Review Meeting 2nd Design Review Meeting 3D Modeling Review - 60% 3D Modeling Review - Final 0 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 3 3 6 6 536 536 536 99 20 106 78 20 187 43 20 66 43 20 15-Dec-12 21-Feb-13 22-May-13 25-Oct-13 23-Jan-14 7-Nov-12 7-Nov-12 7-Nov-12 1-Feb-13 1-Jul-13 29-Jul-13 7-Nov-12 4-Mar-13 1-Apr-13 1-Jul-14 1-Sep-14 29-Sep-14 1-Jul-14 1-Sep-14 Start Finish O -1 7-Nov-12 7-Nov-12 7-Nov-12 7-Nov-12 12-Nov-12 2-May-13 16-Nov-13 2-Dec-13 16-Apr-14 16-Apr-14 1-Jul-14 16-Sep-14 1-Oct-14 16-Jan-15 1-Feb-15 15-Feb-15 15-May-15 28-May-15 2-Sep-15 2-Oct-15 31-Oct-15* 3-Jan-13 23-Feb-13 24-May-13 31-Oct-13 29-Jan-14 31-Dec-14 31-Dec-14 31-Dec-14 28-Jun-13 26-Jul-13 31-Dec-13 28-Feb-13 29-Mar-13 31-Dec-13 29-Aug-14 26-Sep-14 31-Dec-14 29-Aug-14 26-Sep-14 Equipment Name List - IFA Equipment Name List - Client Review & Approval Equipment Name List - IFC Steam Blowing Out Procedure - IFA Steam Blowing Out Procedure - Client Review & Approval Steam Blowing Out Procedure - IFC Boiler Chemical Cleaning Procedure - IFA Boiler Chemical Cleaning Procedure - Client Review & Approval Flue Gas Material Balance Diagram - IFA Flue Gas Material Balance Diagram - Client Review & Approval Flue Gas Material Balance Diagram - IFC Request for Site Hand Over & Construction Work Permit 1st Design Review Meeting 2nd Design Review Meeting 3D Modeling Review - 60% 3D Modeling Review - Final 14-Nov-12 31-Oct-15 31-Oct-15 31-Oct-15 Effective Date of Contract Kick Off Meeting Mat Foundation Start Turbine Steel Structure Lifting Start Boiler Steel Structure Lifting Start Boiler Drum Lifting Start Condenser Erection Start Turbine on base Boiler Hydrostatic Test Power Receiving Natural Gas Supply - Confirmation by Owner (For Natural Gas Sys. Commissioni Fuel Oil Receiving to Service Oil Tank Initial Firing Initial Steam Admission to Turbine Syncronization Reliability Test Run Performence Test Take-Over(Provisional Acceptance) N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Management & Control


Common
General
2MGN00000000 2MGN00000100 2MGN00000150 2MGN00000200 2MGN00000250 2MGN00000300 2MGN00000320 2MGN00000330 2MGN00000350 2MGN00000400 2MGN00000450 2MGN00000470 2MGN00000500 2MGN00000550 2MGN00000600 2MGN00000650 2MGN00000670 2MGN00000700 2MGN00001600 2MGN00001700 2MGN00001705 2MGN00001900 2MGN00002000

Engineering
Common
Basic & General Engineering E
2EPRXXX01000 2EPRXXX0100A 2EPRXXX0100C 2EPRXXX02000 2EPRXXX0200A 2EPRXXX0200C 2EPRXXX03000 2EPRXXX0300A 2EPRXXX0300C 2EPRXXX04000 2EPRXXX0400A Flue Gas Material Balance Diagram - IFA Flue Gas Material Balance Diagram - Client Review & Approval Flue Gas Material Balance Diagram - IFC Equipment Name List - IFA Equipment Name List - Client Review & Approval Equipment Name List - IFC Steam Blowing Out Procedure - IFA Steam Blowing Out Procedure - Client Review & Approval Steam Blowing Out Procedure - IFC Boiler Chemical Cleaning Procedure - IFA Boiler Chemical Cleaning Procedure - Client Review & Approval

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 1 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 66 43 20 66 60 20 63 60 20 141 60 20 141 60 20 145 80 20 125 144 20 62 63 20 101 141 20 64 62 20 44 287 Switch Yard FDN Drawing - IFA Switch Yard FDN Drawing - Client Review & Approval Switch Yard FDN Drawing - IFC Transmission Tower FDN Drawing - IFA Transmission Tower FDN Drawing - Client Review & Approval Transmission Tower FDN Drawing - IFC Transformer Yard FDN Calculation Sheet - IFA Transformer Yard FDN Calculation Sheet - Client Review & Approval 18 20 23 18 20 23 18 20 Start Finish O -1 29-Sep-14 1-Jul-14 1-Sep-14 29-Sep-14 1-Feb-13 2-May-13 3-Jun-13 7-Nov-12 1-Feb-13 6-Mar-13 7-Nov-12 1-Feb-13 6-Mar-13 3-Dec-12 4-Mar-13 1-Apr-13 1-Feb-13 3-Jun-13 2-Jul-13 2-Jan-13 1-Aug-13 30-Aug-13 3-Jun-13 2-Sep-13 4-Oct-13 3-Dec-12 1-Jul-13 29-Jul-13 1-Jul-13 1-Oct-13 30-Oct-13 3-Dec-12 16-Sep-13 16-Oct-13 13-Nov-13 16-Sep-13 16-Oct-13 13-Nov-13 16-Sep-13 16-Oct-13 31-Dec-14 29-Aug-14 26-Sep-14 31-Dec-14 30-Apr-13 31-May-13 30-Aug-13 31-Jan-13 5-Mar-13 30-Sep-13 31-Jan-13 5-Mar-13 30-Sep-13 28-Feb-13 29-Mar-13 31-Oct-13 31-May-13 1-Jul-13 31-Dec-13 31-Jul-13 29-Aug-13 29-Nov-13 30-Aug-13 2-Oct-13 27-Feb-14 28-Jun-13 26-Jul-13 31-Oct-13 30-Sep-13 29-Oct-13 31-Dec-13 29-Jan-14 15-Oct-13 12-Nov-13 13-Dec-13 15-Oct-13 12-Nov-13 13-Dec-13 15-Oct-13 12-Nov-13 Switch Yard FDN Drawing - IFA Switch Yard FDN Drawing - Client Review & Approval Switch Yard FDN Drawing - IFC Transmission Tower FDN Drawing - IFA Transmission Tower FDN Drawing - Client Review & Approval Transmission Tower FDN Drawing - IFC Transformer Yard FDN Calculation Sheet - IFA Transformer Yard FDN Calculation Sheet - Client Review & Approval P&ID - IFA P&ID - Client Review & Approval P&ID - IFC Particular Study 1st (Condensate Pump, Steam Air Heater etc.) - IFA Particular Study 1st (Condensate Pump, Steam Air Heater etc.) - Client Review & Approval Particular Study 1st (Condensate Pump, Steam Air Heater etc.) - IFC Particular Study 2nd (Boiler Feed Pump, Deaerator Recirculation Pump etc.) - IFA Particular Study 2nd (Boiler Feed Pump, Deaerator Recirculation Pump etc.) - Client Review & Approval Particular Study 2nd (Boiler Feed Pump, Deaerator Recirculation Pump etc.) - IFC Particular Study 3rd (Auxiliary Steam, HP/LP Turbine Bypass System) - IFA Particular Study 3rd (Auxiliary Steam, HP/LP Turbine Bypass System) - Client Review & Approval Particular Study 3rd (Auxiliary Steam, HP/LP Turbine Bypass System) - IFC Specification 2nd (Motor Driven Boiler Feed Pump, Turbine Driven Boiler Feed Pump etc.) - IFA Specification 2nd (Motor Driven Boiler Feed Pump, Turbine Driven Boiler Feed Pump etc.) - Client Review & Approval Specification 2nd (Motor Driven Boiler Feed Pump, Turbine Driven Boiler Feed Pump etc.) - IFC Specification 3rd (Condenser Water Side Vaccum Pump) - IFA Specification 3rd (Condenser Water Side Vaccum Pump) - Client Review & Approval Specification 3rd (Condenser Water Side Vaccum Pump) - IFC Specification 1st (Circulating Water Pump, General Service Pump etc.) - IFA Specification 1st (Circulating Water Pump, General Service Pump etc.) - Client Review & Approval Specification 1st (Circulating Water Pump, General Service Pump etc.) - IFC Design Manual - IFA Design Manual - Client Review & Approval Design Manual - IFC List of Terminal Point of Piping - IFA List of Terminal Point of Piping - Client Review & Approval List of Terminal Point of Piping - IFC N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Boiler Chemical Cleaning Procedure - IFC Performance Test Procedure - IFA Performance Test Procedure - Client Review & Approval Performance Test Procedure - IFC

2EPRXXX0400C 2EPRXXX05000 2EPRXXX0500A 2EPRXXX0500C 2EPRXXX06000 2EPRXXX0600A 2EPRXXX0600C 2EPRXXX07000 2EPRXXX0700A 2EPRXXX0700C 2EPRXXX08000 2EPRXXX0800A 2EPRXXX0800C 2EPRXXX09000 2EPRXXX0900A 2EPRXXX0900C 2EPRXXX10000 2EPRXXX1000A 2EPRXXX1000C 2EPRXXX11000 2EPRXXX1100A 2EPRXXX1100C 2EPRXXX12000 2EPRXXX1200A 2EPRXXX1200C 2EPRXXX13000 2EPRXXX1300A 2EPRXXX1300C 2EPRXXX14000 2EPRXXX1400A 2EPRXXX1400C

Boiler Chemical Cleaning Procedure - IFC Performance Test Procedure - IFA Performance Test Procedure - Client Review & Approval Performance Test Procedure - IFC List of Terminal Point of Piping - IFA List of Terminal Point of Piping - Client Review & Approval List of Terminal Point of Piping - IFC P&ID - IFA P&ID - Client Review & Approval P&ID - IFC Particular Study 1st (Condensate Pump, Steam Air Heater etc.) - IFA Particular Study 1st (Condensate Pump, Steam Air Heater etc.) - Client Review & Approval Particular Study 1st (Condensate Pump, Steam Air Heater etc.) - IFC Particular Study 2nd (Boiler Feed Pump, Deaerator Recirculation Pump etc.) - IFA Particular Study 2nd (Boiler Feed Pump, Deaerator Recirculation Pump etc.) - Client Review & Approval Particular Study 2nd (Boiler Feed Pump, Deaerator Recirculation Pump etc.) - IFC Particular Study 3rd (Auxiliary Steam, HP/LP Turbine Bypass System) - IFA Particular Study 3rd (Auxiliary Steam, HP/LP Turbine Bypass System) - Client Review & Approval Particular Study 3rd (Auxiliary Steam, HP/LP Turbine Bypass System) - IFC Specification 2nd (Motor Driven Boiler Feed Pump, Turbine Driven Boiler Feed Pump etc.) - IFA Specification 2nd (Motor Driven Boiler Feed Pump, Turbine Driven Boiler Feed Pump etc.) - Client Review & Approval Specification 2nd (Motor Driven Boiler Feed Pump, Turbine Driven Boiler Feed Pump etc.) - IFC Specification 3rd (Condenser Water Side Vaccum Pump) - IFA Specification 3rd (Condenser Water Side Vaccum Pump) - Client Review & Approval Specification 3rd (Condenser Water Side Vaccum Pump) - IFC Specification 1st (Circulating Water Pump, General Service Pump etc.) - IFA Specification 1st (Circulating Water Pump, General Service Pump etc.) - Client Review & Approval Specification 1st (Circulating Water Pump, General Service Pump etc.) - IFC Design Manual - IFA Design Manual - Client Review & Approval Design Manual - IFC

Civil
2ECVAEA34000 2ECVAEA3400A 2ECVAEA3400C 2ECVAEA35000 2ECVAEA3500A 2ECVAEA3500C 2ECVBAT30000 2ECVBAT3000A

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 2 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 23 18 20 23 18 20 23 18 20 23 18 20 23 22 20 9 22 20 9 22 20 19 22 20 19 20 20 22 20 20 22 22 20 19 22 20 19 22 20 19 Start Finish O -1 13-Nov-13 16-Sep-13 16-Oct-13 13-Nov-13 2-Sep-13 1-Oct-13 30-Oct-13 2-Sep-13 1-Oct-13 30-Oct-13 2-Sep-13 1-Oct-13 30-Oct-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 1-Apr-13 2-May-13 3-Jun-13 1-Apr-13 2-May-13 3-Jun-13 2-May-13 3-Jun-13 2-Jul-13 2-May-13 3-Jun-13 2-Jul-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 1-Apr-13 2-May-13 3-Jun-13 13-Dec-13 15-Oct-13 12-Nov-13 13-Dec-13 30-Sep-13 29-Oct-13 29-Nov-13 30-Sep-13 29-Oct-13 29-Nov-13 30-Sep-13 29-Oct-13 29-Nov-13 14-Aug-13 12-Sep-13 30-Sep-13 14-Aug-13 12-Sep-13 30-Sep-13 30-Apr-13 31-May-13 28-Jun-13 30-Apr-13 31-May-13 28-Jun-13 31-May-13 1-Jul-13 31-Jul-13 31-May-13 1-Jul-13 31-Jul-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 30-Apr-13 31-May-13 28-Jun-13 N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Transformer Yard FDN Calculation Sheet - IFC Transformer Yard FDN Drawing - IFA Transformer Yard FDN Drawing - Client Review & Approval Transformer Yard FDN Drawing - IFC Fuel Oil Service Tank FDN Calculation Sheet - IFA Fuel Oil Service Tank FDN Calculation Sheet - Client Review & Approval Fuel Oil Service Tank FDN Calculation Sheet - IFC Fuel Oil Tank FDN & Dike Drawing - IFA Fuel Oil Tank FDN & Dike Drawing - Client Review & Approval Fuel Oil Tank FDN & Dike Drawing - IFC Reagent Feed Tank FDN Drawing - IFA Reagent Feed Tank FDN Drawing - Client Review & Approval Reagent Feed Tank FDN Drawing - IFC Condensate Storage Tank Calculation Sheet - IFA Condensate Storage Tank Calculation Sheet - Client Review & Approval Condensate Storage Tank Calculation Sheet - IFC Condensate Storage Tank FDN Drawing - IFA Condensate Storage Tank FDN Drawing - Client Review & Approval Condensate Storage Tank FDN Drawing - IFC Gas Duct Support FDN Calculation Sheet - IFA Gas Duct Support FDN Calculation Sheet - Client Review & Approval Gas Duct Support FDN Calculation Sheet - IFC Gas Duct Support FDN Drawing - IFA Gas Duct Support FDN Drawing - Client Review & Approval Gas Duct Support FDN Drawing - IFC ESP Support FDN Calculation Sheet - IFA ESP Support FDN Calculation Sheet - Client Review & Approval ESP Support FDN Calculation Sheet - IFC ESP Support FDN Drawing - IFA ESP Support FDN Drawing - Client Review & Approval ESP Support FDN Drawing - IFC ESP Drain Pit Calculation Sheet - IFA ESP Drain Pit Calculation Sheet - Client Review & Approval ESP Drain Pit Calculation Sheet - IFC ESP Drain Pit Drawing - IFA ESP Drain Pit Drawing - Client Review & Approval ESP Drain Pit Drawing - IFC FGD FDN Calculation Sheet - IFA FGD FDN Calculation Sheet - Client Review & Approval FGD FDN Calculation Sheet - IFC

2ECVBAT3000C 2ECVBAT31000 2ECVBAT3100A 2ECVBAT3100C 2ECVEGD13000 2ECVEGD1300A 2ECVEGD1300C 2ECVEGD14000 2ECVEGD1400A 2ECVEGD1400C 2ECVEGD14200 2ECVEGD1420A 2ECVEGD1420C 2ECVGHA15000 2ECVGHA1500A 2ECVGHA1500C 2ECVGHA16000 2ECVGHA1600A 2ECVGHA1600C 2ECVHNA09000 2ECVHNA0900A 2ECVHNA0900C 2ECVHNA10000 2ECVHNA1000A 2ECVHNA1000C 2ECVHQA11000 2ECVHQA1100A 2ECVHQA1100C 2ECVHQA12000 2ECVHQA1200A 2ECVHQA1200C 2ECVHQA12200 2ECVHQA1220A 2ECVHQA1220C 2ECVHQA12400 2ECVHQA1240A 2ECVHQA1240C 2ECVHRA05000 2ECVHRA0500A 2ECVHRA0500C

Transformer Yard FDN Calculation Sheet - IFC Transformer Yard FDN Drawing - IFA Transformer Yard FDN Drawing - Client Review & Approval Transformer Yard FDN Drawing - IFC Fuel Oil Service Tank FDN Calculation Sheet - IFA Fuel Oil Service Tank FDN Calculation Sheet - Client Review & Approval Fuel Oil Service Tank FDN Calculation Sheet - IFC Fuel Oil Tank FDN & Dike Drawing - IFA Fuel Oil Tank FDN & Dike Drawing - Client Review & Approval Fuel Oil Tank FDN & Dike Drawing - IFC Reagent Feed Tank FDN Drawing - IFA Reagent Feed Tank FDN Drawing - Client Review & Approval Reagent Feed Tank FDN Drawing - IFC Condensate Storage Tank Calculation Sheet - IFA Condensate Storage Tank Calculation Sheet - Client Review & Approval Condensate Storage Tank Calculation Sheet - IFC Condensate Storage Tank FDN Drawing - IFA Condensate Storage Tank FDN Drawing - Client Review & Approval Condensate Storage Tank FDN Drawing - IFC Gas Duct Support FDN Calculation Sheet - IFA Gas Duct Support FDN Calculation Sheet - Client Review & Approval Gas Duct Support FDN Calculation Sheet - IFC Gas Duct Support FDN Drawing - IFA Gas Duct Support FDN Drawing - Client Review & Approval Gas Duct Support FDN Drawing - IFC ESP Support FDN Calculation Sheet - IFA ESP Support FDN Calculation Sheet - Client Review & Approval ESP Support FDN Calculation Sheet - IFC ESP Support FDN Drawing - IFA ESP Support FDN Drawing - Client Review & Approval ESP Support FDN Drawing - IFC ESP Drain Pit Calculation Sheet - IFA ESP Drain Pit Calculation Sheet - Client Review & Approval ESP Drain Pit Calculation Sheet - IFC ESP Drain Pit Drawing - IFA ESP Drain Pit Drawing - Client Review & Approval ESP Drain Pit Drawing - IFC FGD FDN Calculation Sheet - IFA FGD FDN Calculation Sheet - Client Review & Approval FGD FDN Calculation Sheet - IFC

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 3 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 22 20 19 22 20 19 18 20 23 18 20 23 75 20 27 75 20 27 91 20 11 75 20 27 91 20 11 75 20 27 75 20 27 91 20 11 60 20 22 42 Start Finish O -1 1-Apr-13 2-May-13 3-Jun-13 1-Apr-13 2-May-13 3-Jun-13 2-Sep-13 1-Oct-13 30-Oct-13 2-Sep-13 1-Oct-13 30-Oct-13 3-Dec-12 25-Mar-13 22-Apr-13 3-Dec-12 25-Mar-13 22-Apr-13 3-Dec-12 16-Apr-13 16-May-13 3-Dec-12 25-Mar-13 22-Apr-13 3-Dec-12 16-Apr-13 16-May-13 3-Dec-12 25-Mar-13 22-Apr-13 3-Dec-12 25-Mar-13 22-Apr-13 3-Dec-12 16-Apr-13 16-May-13 3-Dec-12 4-Mar-13 1-Apr-13 3-Dec-12 30-Apr-13 31-May-13 28-Jun-13 30-Apr-13 31-May-13 28-Jun-13 30-Sep-13 29-Oct-13 29-Nov-13 30-Sep-13 29-Oct-13 29-Nov-13 22-Mar-13 19-Apr-13 31-May-13 22-Mar-13 19-Apr-13 31-May-13 15-Apr-13 15-May-13 31-May-13 22-Mar-13 19-Apr-13 31-May-13 15-Apr-13 15-May-13 31-May-13 22-Mar-13 19-Apr-13 31-May-13 22-Mar-13 19-Apr-13 31-May-13 15-Apr-13 15-May-13 31-May-13 28-Feb-13 29-Mar-13 30-Apr-13 31-Jan-13 N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

2ECVHRA06000 2ECVHRA0600A 2ECVHRA0600C 2ECVHRA08000 2ECVHRA0800A 2ECVHRA0800C 2ECVHRA08200 2ECVHRA0820A 2ECVHRA0820C 2ECVHRA08400 2ECVHRA0840A 2ECVHRA0840C 2ECVUHA44000 2ECVUHA4400A 2ECVUHA4400C 2ECVUHA46000 2ECVUHA4600A 2ECVUHA4600C 2ECVUHZ40000 2ECVUHZ4000A 2ECVUHZ4000C 2ECVUHZ41000 2ECVUHZ4100A 2ECVUHZ4100C 2ECVUHZ42000 2ECVUHZ4200A 2ECVUHZ4200C 2ECVUHZ43000 2ECVUHZ4300A 2ECVUHZ4300C 2ECVUHZ45000 2ECVUHZ4500A 2ECVUHZ4500C 2ECVUHZ47000 2ECVUHZ4700A 2ECVUHZ4700C 2ECVXTU01000 2ECVXTU0100A 2ECVXTU0100C 2ECVXTU01100

FGD Absorber FDN Drawing - IFA FGD Absorber FDN Drawing - Client Review & Approval FGD Absorber FDN Drawing - IFC FGD Yard FDN Drawing - IFA FGD Yard FDN Drawing - Client Review & Approval FGD Yard FDN Drawing - IFC Filter Feed Tank FDN Calculation Sheet - IFA Filter Feed Tank FDN Calculation Sheet - Client Review & Approval Filter Feed Tank FDN Calculation Sheet - IFC Filter Feed Tank FDN Drawing - IFA Filter Feed Tank FDN Drawing - Client Review & Approval Filter Feed Tank FDN Drawing - IFC Boiler Yard Elevator Pit & Drain Pump Pit GA Drawing - IFA Boiler Yard Elevator Pit & Drain Pump Pit GA Drawing - Client Review & Approval Boiler Yard Elevator Pit & Drain Pump Pit GA Drawing - IFC Boiler Yard EQ FDN GA Drawing - IFA Boiler Yard EQ FDN GA Drawing - Client Review & Approval Boiler Yard EQ FDN GA Drawing - IFC Boiler Steel STR FDN Calculation Sheet - IFA Boiler Steel STR FDN Calculation Sheet - Client Review & Approval Boiler Steel STR FDN Calculation Sheet - IFC Boiler Steel STR FDN Drawing - IFA Boiler Steel STR FDN Drawing - Client Review & Approval Boiler Steel STR FDN Drawing - IFC Boiler Yard FDF, GRF & Unit Drainage Pit Calculation Sheet - IFA Boiler Yard FDF, GRF & Unit Drainage Pit Calculation Sheet - Client Review & Approval Boiler Yard FDF, GRF & Unit Drainage Pit Calculation Sheet - IFC Boiler Yard FDF & GRF FDN Drawing - IFA Boiler Yard FDF & GRF FDN Drawing - Client Review & Approval Boiler Yard FDF & GRF FDN Drawing - IFC Boiler Yard Unit Drainage Pit Detail Drawing - IFA Boiler Yard Unit Drainage Pit Detail Drawing - Client Review & Approval Boiler Yard Unit Drainage Pit Detail Drawing - IFC TG FDN Calculation Sheet - IFA TG FDN Calculation Sheet - Client Review & Approval TG FDN Calculation Sheet - IFC Design Criteria - IFA Design Criteria - Client Review & Approval Design Criteria - IFC Stability Analysis For Excavation - IFI

FGD Absorber FDN Drawing - IFA FGD Absorber FDN Drawing - Client Review & Approval FGD Absorber FDN Drawing - IFC FGD Yard FDN Drawing - IFA FGD Yard FDN Drawing - Client Review & Approval FGD Yard FDN Drawing - IFC Filter Feed Tank FDN Calculation Sheet - IFA Filter Feed Tank FDN Calculation Sheet - Client Review & Approval Filter Feed Tank FDN Calculation Sheet - IFC Filter Feed Tank FDN Drawing - IFA Filter Feed Tank FDN Drawing - Client Review & Approval Filter Feed Tank FDN Drawing - IFC Boiler Yard Elevator Pit & Drain Pump Pit GA Drawing - IFA Boiler Yard Elevator Pit & Drain Pump Pit GA Drawing - Client Review & Approval Boiler Yard Elevator Pit & Drain Pump Pit GA Drawing - IFC Boiler Yard EQ FDN GA Drawing - IFA Boiler Yard EQ FDN GA Drawing - Client Review & Approval Boiler Yard EQ FDN GA Drawing - IFC Boiler Steel STR FDN Calculation Sheet - IFA Boiler Steel STR FDN Calculation Sheet - Client Review & Approval Boiler Steel STR FDN Calculation Sheet - IFC Boiler Steel STR FDN Drawing - IFA Boiler Steel STR FDN Drawing - Client Review & Approval Boiler Steel STR FDN Drawing - IFC Boiler Yard FDF, GRF & Unit Drainage Pit Calculation Sheet - IFA Boiler Yard FDF, GRF & Unit Drainage Pit Calculation Sheet - Client Review & Approval Boiler Yard FDF, GRF & Unit Drainage Pit Calculation Sheet - IFC Boiler Yard FDF & GRF FDN Drawing - IFA Boiler Yard FDF & GRF FDN Drawing - Client Review & Approval Boiler Yard FDF & GRF FDN Drawing - IFC Boiler Yard Unit Drainage Pit Detail Drawing - IFA Boiler Yard Unit Drainage Pit Detail Drawing - Client Review & Approval Boiler Yard Unit Drainage Pit Detail Drawing - IFC TG FDN Calculation Sheet - IFA TG FDN Calculation Sheet - Client Review & Approval TG FDN Calculation Sheet - IFC Design Criteria - IFA Design Criteria - Client Review & Approval Design Criteria - IFC Stability Analysis For Excavation - IFI

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 4 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 42 22 20 19 22 20 19 22 20 19 22 20 19 22 20 19 22 20 19 22 20 19 22 20 19 22 20 19 22 20 19 18 20 22 18 20 22 18 20 22 Start Finish O -1 3-Dec-12 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 16-Jul-13 16-Aug-13 13-Sep-13 1-Feb-13 4-Mar-13 1-Apr-13 1-Feb-13 4-Mar-13 1-Apr-13 1-Feb-13 4-Mar-13 1-Apr-13 31-Jan-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 14-Aug-13 12-Sep-13 15-Oct-13 28-Feb-13 29-Mar-13 30-Apr-13 28-Feb-13 29-Mar-13 30-Apr-13 28-Feb-13 29-Mar-13 30-Apr-13 N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

2ECVXTU01200 2ECVXTU17000 2ECVXTU1700A 2ECVXTU1700C 2ECVXTU18000 2ECVXTU1800A 2ECVXTU1800C 2ECVXTU19000 2ECVXTU1900A 2ECVXTU1900C 2ECVXTU20000 2ECVXTU2000A 2ECVXTU2000C 2ECVXTU21000 2ECVXTU2100A 2ECVXTU2100C 2ECVXTU22000 2ECVXTU2200A 2ECVXTU2200C 2ECVXTU23000 2ECVXTU2300A 2ECVXTU2300C 2ECVXTU24000 2ECVXTU2400A 2ECVXTU2400C 2ECVXTU25000 2ECVXTU2500A 2ECVXTU2500C 2ECVXTU26000 2ECVXTU2600A 2ECVXTU2600C 2ECVXTU27000 2ECVXTU2700A 2ECVXTU2700C 2ECVXTU28000 2ECVXTU2800A 2ECVXTU2800C 2ECVXTU29000 2ECVXTU2900A 2ECVXTU2900C

Soil Improvement (CDM) And Sheet Pile Shoring Plan - IFI Pipe Trench GA Drawing - IFA Pipe Trench GA Drawing - Client Review & Approval Pipe Trench GA Drawing - IFC Pipe & Cable Sleeper FDN Calculation Sheet - IFA Pipe & Cable Sleeper FDN Calculation Sheet - Client Review & Approval Pipe & Cable Sleeper FDN Calculation Sheet - IFC Pipe Sleeper Typical Detail Drawing - IFA Pipe Sleeper Typical Detail Drawing - Client Review & Approval Pipe Sleeper Typical Detail Drawing - IFC Storm Water Drainage System Calculation Sheet - IFA Storm Water Drainage System Calculation Sheet - Client Review & Approval Storm Water Drainage System Calculation Sheet - IFC Storm Water Drainage System GA & Detail Drawing - IFA Storm Water Drainage System GA & Detail Drawing - Client Review & Approval Storm Water Drainage System GA & Detail Drawing - IFC Cable Manhole Calculation Sheet - IFA Cable Manhole Calculation Sheet - Client Review & Approval Cable Manhole Calculation Sheet - IFC Cable Manhole GA & Detail Drawing - IFA Cable Manhole GA & Detail Drawing - Client Review & Approval Cable Manhole GA & Detail Drawing - IFC Oily water Drainage Line GA Drawing - IFA Oily water Drainage Line GA Drawing - Client Review & Approval Oily water Drainage Line GA Drawing - IFC Sewage Drainage System Calculation Sheet - IFA Sewage Drainage System Calculation Sheet - Client Review & Approval Sewage Drainage System Calculation Sheet - IFC Sewage Drainage System GA & Detail Drawing - IFA Sewage Drainage System GA & Detail Drawing - Client Review & Approval Sewage Drainage System GA & Detail Drawing - IFC CW Pipe Reinforment Work Drawing - IFA CW Pipe Reinforment Work Drawing - Client Review & Approval CW Pipe Reinforment Work Drawing - IFC CW Discharge Tunnel Calculation Sheet - IFA CW Discharge Tunnel Calculation Sheet - Client Review & Approval CW Discharge Tunnel Calculation Sheet - IFC CW Discharge Tunnel Drawing - IFA CW Discharge Tunnel Drawing - Client Review & Approval CW Discharge Tunnel Drawing - IFC

Soil Improvement (CDM) And Sheet Pile Shoring Plan - IFI Pipe Trench GA Drawing - IFA Pipe Trench GA Drawing - Client Review & Approval Pipe Trench GA Drawing - IFC Pipe & Cable Sleeper FDN Calculation Sheet - IFA Pipe & Cable Sleeper FDN Calculation Sheet - Client Review & Approval Pipe & Cable Sleeper FDN Calculation Sheet - IFC Pipe Sleeper Typical Detail Drawing - IFA Pipe Sleeper Typical Detail Drawing - Client Review & Approval Pipe Sleeper Typical Detail Drawing - IFC Storm Water Drainage System Calculation Sheet - IFA Storm Water Drainage System Calculation Sheet - Client Review & Approval Storm Water Drainage System Calculation Sheet - IFC Storm Water Drainage System GA & Detail Drawing - IFA Storm Water Drainage System GA & Detail Drawing - Client Review & Approval Storm Water Drainage System GA & Detail Drawing - IFC Cable Manhole Calculation Sheet - IFA Cable Manhole Calculation Sheet - Client Review & Approval Cable Manhole Calculation Sheet - IFC Cable Manhole GA & Detail Drawing - IFA Cable Manhole GA & Detail Drawing - Client Review & Approval Cable Manhole GA & Detail Drawing - IFC Oily water Drainage Line GA Drawing - IFA Oily water Drainage Line GA Drawing - Client Review & Approval Oily water Drainage Line GA Drawing - IFC Sewage Drainage System Calculation Sheet - IFA Sewage Drainage System Calculation Sheet - Client Review & Approval Sewage Drainage System Calculation Sheet - IFC Sewage Drainage System GA & Detail Drawing - IFA Sewage Drainage System GA & Detail Drawing - Client Review & Approval Sewage Drainage System GA & Detail Drawing - IFC CW Pipe Reinforment Work Drawing - IFA CW Pipe Reinforment Work Drawing - Client Review & Approval CW Pipe Reinforment Work Drawing - IFC CW Discharge Tunnel Calculation Sheet - IFA CW Discharge Tunnel Calculation Sheet - Client Review & Approval CW Discharge Tunnel Calculation Sheet - IFC CW Discharge Tunnel Drawing - IFA CW Discharge Tunnel Drawing - Client Review & Approval CW Discharge Tunnel Drawing - IFC

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 5 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 21 20 20 82 20 21 61 20 22 61 20 22 61 20 22 18 20 23 18 20 23 75 20 22 75 91 20 11 111 75 20 27 332 Structural Calculation for Piperack (Unit #2) - IFA Structural Calculation for Piperack (Unit #2) - Client Review & Approval Structural Calculation for Piperack (Unit #2) - IFC Structural Calculation For Technical Corridor (Gas P/R) - IFA Structural Calculation For Technical Corridor (Gas P/R) - Client Review & Approval Structural Calculation For Technical Corridor (Gas P/R) - IFC Structural Calculation For Limestone Storage Silo House (Unit #2) - IFA 21 40 62 21 40 62 54 Start Finish O -1 1-Aug-13 2-Sep-13 4-Oct-13 1-Aug-13 2-Dec-13 31-Dec-13 1-Aug-13 1-Nov-13 29-Nov-13 1-Aug-13 1-Nov-13 29-Nov-13 1-Aug-13 1-Nov-13 29-Nov-13 16-Sep-13 16-Oct-13 13-Nov-13 16-Sep-13 16-Oct-13 13-Nov-13 3-Dec-12 25-Mar-13 29-Apr-13 3-Dec-12 3-Dec-12 16-Apr-13 16-May-13 3-Dec-12 3-Dec-12 25-Mar-13 22-Apr-13 3-Dec-12 19-Jul-13 20-Aug-13 21-Oct-13 1-Oct-13 31-Oct-13 27-Dec-13 16-Oct-13 30-Aug-13 2-Oct-13 31-Oct-13 29-Nov-13 30-Dec-13 29-Jan-14 31-Oct-13 28-Nov-13 31-Dec-13 31-Oct-13 28-Nov-13 31-Dec-13 31-Oct-13 28-Nov-13 31-Dec-13 15-Oct-13 12-Nov-13 13-Dec-13 15-Oct-13 12-Nov-13 13-Dec-13 22-Mar-13 19-Apr-13 31-May-13 22-Mar-13 15-Apr-13 15-May-13 31-May-13 15-May-13 22-Mar-13 19-Apr-13 31-May-13 7-Apr-14 19-Aug-13 18-Oct-13 16-Jan-14 30-Oct-13 26-Dec-13 28-Mar-14 31-Dec-13 Structural Calculation for Piperack (Unit #2) - IFA Structural Calculation for Piperack (Unit #2) - Client Review & Approval Structural Calculation for Piperack (Unit #2) - IFC Structural Calculation For Technical Corridor (Gas P/R) - IFA Structural Calculation For Technical Corridor (Gas P/R) - Client Review & Approval Structural Calculation For Technical Corridor (Gas P/R) - IFC Structural Calculation For Limestone Storage Silo House (Unit #2) - IFA TG FDN Drawing - IFA TG FDN Drawing - Client Review & Approval TG FDN Drawing - IFC TG FDN Bar Arrangement, Embedded Metal and Detail of Support&Template - IFI Power House C/W Valve Pit Drawings - IFA Power House C/W Valve Pit Drawings - Client Review & Approval Power House C/W Valve Pit Drawings - IFC Power House C/W Valve Pit Bar Arrangement Drawings - IFI Power House FDN Arrangement Drawing - IFA Power House FDN Arrangement Drawing - Client Review & Approval Power House FDN Arrangement Drawing - IFC N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 CW Pump Pit Repair Drawing - IFA CW Pump Pit Repair Drawing - Client Review & Approval CW Pump Pit Repair Drawing - IFC Fence & Gate Drawing - IFA Fence & Gate Drawing - Client Review & Approval Fence & Gate Drawing - IFC Road & Paving Calculation Sheet - IFA Road & Paving Calculation Sheet - Client Review & Approval Road & Paving Calculation Sheet - IFC Road & Paving GA & Detail Drawing - IFA Road & Paving GA & Detail Drawing - Client Review & Approval Road & Paving GA & Detail Drawing - IFC Landscaping GA & Detail Drawing - IFA Landscaping GA & Detail Drawing - Client Review & Approval Landscaping GA & Detail Drawing - IFC Switch Yard FDN Calculation Sheet - IFA Switch Yard FDN Calculation Sheet - Client Review & Approval Switch Yard FDN Calculation Sheet - IFC Transmission Tower FDN Calculation Sheet - IFA Transmission Tower FDN Calculation Sheet - Client Review & Approval Transmission Tower FDN Calculation Sheet - IFC

2ECVXTU29100 2ECVXTU2910A 2ECVXTU2910C 2ECVXTU36000 2ECVXTU3600A 2ECVXTU3600C 2ECVXTU37000 2ECVXTU3700A 2ECVXTU3700C 2ECVXTU38000 2ECVXTU3800A 2ECVXTU3800C 2ECVXTU39000 2ECVXTU3900A 2ECVXTU3900C 2ECVXUB32000 2ECVXUB3200A 2ECVXUB3200C 2ECVXUB33000 2ECVXUB3300A 2ECVXUB3300C 2ECVXUM48000 2ECVXUM4800A 2ECVXUM4800C 2ECVXUM48100 2ECVXUM49000 2ECVXUM4900A 2ECVXUM4900C 2ECVXUM50000 2ECVXUM51000 2ECVXUM5100A 2ECVXUM5100C

CW Pump Pit Repair Drawing - IFA CW Pump Pit Repair Drawing - Client Review & Approval CW Pump Pit Repair Drawing - IFC Fence & Gate Drawing - IFA Fence & Gate Drawing - Client Review & Approval Fence & Gate Drawing - IFC Road & Paving Calculation Sheet - IFA Road & Paving Calculation Sheet - Client Review & Approval Road & Paving Calculation Sheet - IFC Road & Paving GA & Detail Drawing - IFA Road & Paving GA & Detail Drawing - Client Review & Approval Road & Paving GA & Detail Drawing - IFC Landscaping GA & Detail Drawing - IFA Landscaping GA & Detail Drawing - Client Review & Approval Landscaping GA & Detail Drawing - IFC Switch Yard FDN Calculation Sheet - IFA Switch Yard FDN Calculation Sheet - Client Review & Approval Switch Yard FDN Calculation Sheet - IFC Transmission Tower FDN Calculation Sheet - IFA Transmission Tower FDN Calculation Sheet - Client Review & Approval Transmission Tower FDN Calculation Sheet - IFC TG FDN Drawing - IFA TG FDN Drawing - Client Review & Approval TG FDN Drawing - IFC TG FDN Bar Arrangement, Embedded Metal and Detail of Support&Template - IFI Power House C/W Valve Pit Drawings - IFA Power House C/W Valve Pit Drawings - Client Review & Approval Power House C/W Valve Pit Drawings - IFC Power House C/W Valve Pit Bar Arrangement Drawings - IFI Power House FDN Arrangement Drawing - IFA Power House FDN Arrangement Drawing - Client Review & Approval Power House FDN Arrangement Drawing - IFC

Building & STL STR


2EBSCAL02000 2EBSCAL0200A 2EBSCAL0200C 2EBSCAL03000 2EBSCAL0300A 2EBSCAL0300C 2EBSCAL04000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 6 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 40 10 54 40 10 72 40 13 102 40 12 124 40 7 95 40 6 18 20 8 84 40 11 121 40 22 95 40 6 60 40 13 80 20 13 80 77 77 185 40 Start Finish O -1 2-Jan-14 4-Mar-14 16-Oct-13 2-Jan-14 4-Mar-14 2-Jan-13 17-Apr-13 18-Jun-13 2-Jan-13 3-Jun-13 30-Jul-13 3-Jun-13 2-Dec-13 29-Jan-14 1-Jul-13 18-Nov-13 15-Jan-14 1-Feb-13 4-Mar-13 1-Apr-13 2-Jan-13 7-May-13 4-Jul-13 2-Jan-13 1-Jul-13 27-Aug-13 1-Jul-13 18-Nov-13 15-Jan-14 3-Dec-12 4-Mar-13 29-Apr-13 3-Dec-12 1-Apr-13 29-Apr-13 3-Dec-12 3-Dec-12 3-Dec-12 2-May-13 3-Feb-14 3-Mar-14 17-Mar-14 31-Dec-13 3-Mar-14 17-Mar-14 16-Apr-13 17-Jun-13 4-Jul-13 31-May-13 29-Jul-13 14-Aug-13 29-Nov-13 28-Jan-14 10-Feb-14 15-Nov-13 14-Jan-14 22-Jan-14 28-Feb-13 29-Mar-13 10-Apr-13 3-May-13 3-Jul-13 18-Jul-13 28-Jun-13 26-Aug-13 30-Sep-13 15-Nov-13 14-Jan-14 22-Jan-14 28-Feb-13 26-Apr-13 20-May-13 29-Mar-13 26-Apr-13 20-May-13 29-Mar-13 26-Mar-13 26-Mar-13 29-Jan-14 31-Mar-14 Boiler Structure Drawing - IFA Boiler Structure Drawing - Client Review & Approval Boiler Structure Drawing - IFC Calculation Sheet for Boiler Structure FDN - IFA Calculation Sheet for Boiler Structure FDN - Client Review & Approval Calculation Sheet for Boiler Structure FDN - IFC Shop & Detail Drawing for Boiler Steel Structure - IFI Shop Drawings for Boiler House Elevator STR - IFI Shop Drawings for Boiler House Steel Steel Structure - IFI ESP & Ash Control And Electrical Building Structural Drawings - IFA ESP & Ash Control And Electrical Building Structural Drawings - Client Review & Approval Standard Drawings - IFA Standard Drawings - Client Review & Approval Standard Drawings - IFC Piperack (Unit #2) Framing Drawings - IFA Piperack (Unit #2) Framing Drawings - Client Review & Approval Piperack (Unit #2) Framing Drawings - IFC Technical Corridor (Gas P/R) Framing Drawings - IFA Technical Corridor (Gas P/R) Framing Drawings - Client Review & Approval Technical Corridor (Gas P/R) Framing Drawings - IFC Gas Station Shelter (Unit #1&2) Framing Drawings - IFA Gas Station Shelter (Unit #1&2) Framing Drawings - Client Review & Approval Gas Station Shelter (Unit #1&2) Framing Drawings - IFC Piperack (Unit #2) Foundation Drawings - IFA Piperack (Unit #2) Foundation Drawings - Client Review & Approval Piperack (Unit #2) Foundation Drawings - IFC Technical Corridor (Gas P/R) Foundation Drawings - IFA Technical Corridor (Gas P/R) Foundation Drawings - Client Review & Approval Technical Corridor (Gas P/R) Foundation Drawings - IFC Limestone Storage Silo House Structural Drawings - IFA Limestone Storage Silo House Structural Drawings - Client Review & Approval Limestone Storage Silo House Structural Drawings - IFC Gas Station Shelter (Unit #1&2) Foundation Drawings - IFA Gas Station Shelter (Unit #1&2) Foundation Drawings - Client Review & Approval Gas Station Shelter (Unit #1&2) Foundation Drawings - IFC N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Structural Calculation For Limestone Storage Silo House (Unit #2) - Client Review & Approval Structural Calculation For Limestone Storage Silo House (Unit #2) - IFC Structural Calculation For Gas Station Shelter (Unit #1&2) - IFA Structural Calculation For Gas Station Shelter (Unit #1&2) - Client Review & Approval Structural Calculation For Gas Station Shelter (Unit #1&2) - IFC

2EBSCAL0400A 2EBSCAL0400C 2EBSCAL05000 2EBSCAL0500A 2EBSCAL0500C 2EBSDFN06000 2EBSDFN0600A 2EBSDFN0600C 2EBSDFN08000 2EBSDFN0800A 2EBSDFN0800C 2EBSDFN17000 2EBSDFN1700A 2EBSDFN1700C 2EBSDFN18000 2EBSDFN1800A 2EBSDFN1800C 2EBSDST01000 2EBSDST0100A 2EBSDST0100C 2EBSDTE07000 2EBSDTE0700A 2EBSDTE0700C 2EBSDTE09000 2EBSDTE0900A 2EBSDTE0900C 2EBSDTE19000 2EBSDTE1900A 2EBSDTE1900C 2EBSUHA26000 2EBSUHA2600A 2EBSUHA2600C 2EBSUHA27000 2EBSUHA2700A 2EBSUHA2700C 2EBSUHA28000 2EBSUHA29000 2EBSUHA30000 2EBSUHQ13000 2EBSUHQ1300A

Structural Calculation For Limestone Storage Silo House (Unit #2) - Client Review & Approval Structural Calculation For Limestone Storage Silo House (Unit #2) - IFC Structural Calculation For Gas Station Shelter (Unit #1&2) - IFA Structural Calculation For Gas Station Shelter (Unit #1&2) - Client Review & Approval Structural Calculation For Gas Station Shelter (Unit #1&2) - IFC Piperack (Unit #2) Foundation Drawings - IFA Piperack (Unit #2) Foundation Drawings - Client Review & Approval Piperack (Unit #2) Foundation Drawings - IFC Technical Corridor (Gas P/R) Foundation Drawings - IFA Technical Corridor (Gas P/R) Foundation Drawings - Client Review & Approval Technical Corridor (Gas P/R) Foundation Drawings - IFC Limestone Storage Silo House Structural Drawings - IFA Limestone Storage Silo House Structural Drawings - Client Review & Approval Limestone Storage Silo House Structural Drawings - IFC Gas Station Shelter (Unit #1&2) Foundation Drawings - IFA Gas Station Shelter (Unit #1&2) Foundation Drawings - Client Review & Approval Gas Station Shelter (Unit #1&2) Foundation Drawings - IFC Standard Drawings - IFA Standard Drawings - Client Review & Approval Standard Drawings - IFC Piperack (Unit #2) Framing Drawings - IFA Piperack (Unit #2) Framing Drawings - Client Review & Approval Piperack (Unit #2) Framing Drawings - IFC Technical Corridor (Gas P/R) Framing Drawings - IFA Technical Corridor (Gas P/R) Framing Drawings - Client Review & Approval Technical Corridor (Gas P/R) Framing Drawings - IFC Gas Station Shelter (Unit #1&2) Framing Drawings - IFA Gas Station Shelter (Unit #1&2) Framing Drawings - Client Review & Approval Gas Station Shelter (Unit #1&2) Framing Drawings - IFC Boiler Structure Drawing - IFA Boiler Structure Drawing - Client Review & Approval Boiler Structure Drawing - IFC Calculation Sheet for Boiler Structure FDN - IFA Calculation Sheet for Boiler Structure FDN - Client Review & Approval Calculation Sheet for Boiler Structure FDN - IFC Shop & Detail Drawing for Boiler Steel Structure - IFI Shop Drawings for Boiler House Elevator STR - IFI Shop Drawings for Boiler House Steel Steel Structure - IFI ESP & Ash Control And Electrical Building Structural Drawings - IFA ESP & Ash Control And Electrical Building Structural Drawings - Client Review & Approval

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 7 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 5 165 40 5 105 40 7 126 40 6 102 80 20 15 126 40 6 116 40 15 116 40 15 116 40 15 102 20 15 122 20 16 115 115 115 82 40 7 105 40 Start Finish O -1 1-Apr-14 3-Jun-13 3-Feb-14 1-Apr-14 1-Jul-13 2-Dec-13 29-Jan-14 1-Jul-13 2-Jan-14 4-Mar-14 3-Dec-12 3-Dec-12 1-Apr-13 29-Apr-13 1-Jul-13 2-Jan-14 4-Mar-14 3-Dec-12 24-May-13 22-Jul-13 3-Dec-12 24-May-13 22-Jul-13 3-Dec-12 24-May-13 22-Jul-13 3-Dec-12 2-May-13 3-Jun-13 3-Dec-12 3-Jun-13 2-Jul-13 3-Dec-12 3-Dec-12 3-Dec-12 1-Aug-13 2-Dec-13 29-Jan-14 1-Jul-13 2-Dec-13 7-Apr-14 29-Jan-14 31-Mar-14 7-Apr-14 29-Nov-13 28-Jan-14 10-Feb-14 31-Dec-13 3-Mar-14 11-Mar-14 30-Apr-13 29-Mar-13 26-Apr-13 22-May-13 31-Dec-13 3-Mar-14 11-Mar-14 23-May-13 19-Jul-13 9-Aug-13 23-May-13 19-Jul-13 9-Aug-13 23-May-13 19-Jul-13 9-Aug-13 30-Apr-13 31-May-13 24-Jun-13 31-May-13 1-Jul-13 23-Jul-13 22-May-13 22-May-13 22-May-13 29-Nov-13 28-Jan-14 10-Feb-14 29-Nov-13 28-Jan-14 N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 ESP & Ash Control And Electrical Building Structural Drawings - IFC FGD Electrical And Control Building Structual Drawings - IFA FGD Electrical And Control Building Structual Drawings - Client Review & Approval FGD Electrical And Control Building Structual Drawings - IFC CW Intake Electrical & Chlorination Building Structural Drawings - IFA CW Intake Electrical & Chlorination Building Structural Drawings - Client Review & Approval CW Intake Electrical & Chlorination Building Structural Drawings - IFC Oxidation Air Blower House Structural Drawings - IFA Oxidation Air Blower House Structural Drawings - Client Review & Approval Oxidation Air Blower House Structural Drawings - IFC Power House / List of High Strength Bolt - IFI Civil And Architectural Finishing / Interface For Unit-2 Extension - IFA Civil And Architectural Finishing / Interface For Unit-2 Extension - Client Review & Approval Civil And Architectural Finishing / Interface For Unit-2 Extension - IFC Fuel Oil Pump House Structural Drawings - IFA Fuel Oil Pump House Structural Drawings - Client Review & Approval Fuel Oil Pump House Structural Drawings - IFC Calculation Sheet for Power House EQ FDN - IFA Calculation Sheet for Power House EQ FDN - Client Review & Approval Calculation Sheet for Power House EQ FDN - IFC Calculation Sheet for Power House Valve Pit - IFA Calculation Sheet for Power House Valve Pit - Client Review & Approval Calculation Sheet for Power House Valve Pit - IFC Calculation Sheet for Power House Concrete Deck Slab - IFA Calculation Sheet for Power House Concrete Deck Slab - Client Review & Approval Calculation Sheet for Power House Concrete Deck Slab - IFC Power House FDN Drawing - IFA Power House FDN Drawing - Client Review & Approval Power House FDN Drawing - IFC Power House Structural Drawing - IFA Power House Structural Drawing - Client Review & Approval Power House Structural Drawing - IFC Power House FDN Bar Arrangement - IFI Power House Grating Allotment Drawing - IFI Power House Wall Opening - IFI Limestone Ballmill House Structural Drawings - IFA Limestone Ballmill House Structural Drawings - Client Review & Approval Limestone Ballmill House Structural Drawings - IFC Gas Station Shelter (Unit #1&2) Finishing Drawings - IFA Gas Station Shelter (Unit #1&2) Finishing Drawings - Client Review & Approval

2EBSUHQ1300C 2EBSUHR12000 2EBSUHR1200A 2EBSUHR1200C 2EBSUPH15000 2EBSUPH1500A 2EBSUPH1500C 2EBSUTG14000 2EBSUTG1400A 2EBSUTG1400C 2EBSXCU31000 2EBSXTU26000 2EBSXTU2600A 2EBSXTU2600C 2EBSXUE11000 2EBSXUE1100A 2EBSXUE1100C 2EBSXUM21000 2EBSXUM2100A 2EBSXUM2100C 2EBSXUM22000 2EBSXUM2200A 2EBSXUM2200C 2EBSXUM23000 2EBSXUM2300A 2EBSXUM2300C 2EBSXUM24000 2EBSXUM2400A 2EBSXUM2400C 2EBSXUM25000 2EBSXUM2500A 2EBSXUM2500C 2EBSXUM27000 2EBSXUM28000 2EBSXUM29000 2EBSXUT16000 2EBSXUT1600A 2EBSXUT1600C 2EBSXXX20000 2EBSXXX2000A

ESP & Ash Control And Electrical Building Structural Drawings - IFC FGD Electrical And Control Building Structual Drawings - IFA FGD Electrical And Control Building Structual Drawings - Client Review & Approval FGD Electrical And Control Building Structual Drawings - IFC CW Intake Electrical & Chlorination Building Structural Drawings - IFA CW Intake Electrical & Chlorination Building Structural Drawings - Client Review & Approval CW Intake Electrical & Chlorination Building Structural Drawings - IFC Oxidation Air Blower House Structural Drawings - IFA Oxidation Air Blower House Structural Drawings - Client Review & Approval Oxidation Air Blower House Structural Drawings - IFC Power House / List of High Strength Bolt - IFI Civil And Architectural Finishing / Interface For Unit-2 Extension - IFA Civil And Architectural Finishing / Interface For Unit-2 Extension - Client Review & Approval Civil And Architectural Finishing / Interface For Unit-2 Extension - IFC Fuel Oil Pump House Structural Drawings - IFA Fuel Oil Pump House Structural Drawings - Client Review & Approval Fuel Oil Pump House Structural Drawings - IFC Calculation Sheet for Power House EQ FDN - IFA Calculation Sheet for Power House EQ FDN - Client Review & Approval Calculation Sheet for Power House EQ FDN - IFC Calculation Sheet for Power House Valve Pit - IFA Calculation Sheet for Power House Valve Pit - Client Review & Approval Calculation Sheet for Power House Valve Pit - IFC Calculation Sheet for Power House Concrete Deck Slab - IFA Calculation Sheet for Power House Concrete Deck Slab - Client Review & Approval Calculation Sheet for Power House Concrete Deck Slab - IFC Power House FDN Drawing - IFA Power House FDN Drawing - Client Review & Approval Power House FDN Drawing - IFC Power House Structural Drawing - IFA Power House Structural Drawing - Client Review & Approval Power House Structural Drawing - IFC Power House FDN Bar Arrangement - IFI Power House Grating Allotment Drawing - IFI Power House Wall Opening - IFI Limestone Ballmill House Structural Drawings - IFA Limestone Ballmill House Structural Drawings - Client Review & Approval Limestone Ballmill House Structural Drawings - IFC Gas Station Shelter (Unit #1&2) Finishing Drawings - IFA Gas Station Shelter (Unit #1&2) Finishing Drawings - Client Review & Approval

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 8 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 7 9 472 GA DWG for Around Boiler - IFA GA DWG for Around Boiler - Client Review & Approval GA DWG for Around Boiler - IFC GA DWG for Power House - IFA GA DWG for Power House - Client Review & Approval GA DWG for Power House - IFC GA DWG for Around Unit#2 CW Pump Area - IFA GA DWG for Around Unit#2 CW Pump Area - Client Review & Approval GA DWG for Around Unit#2 CW Pump Area - IFC GA DWG for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - IFA GA DWG for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - Client Review & Approval GA DWG for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - IFC GA DWG for Around Unit#2 ESP/FGD Area - IFA GA DWG for Around Unit#2 ESP/FGD Area - Client Review & Approval GA DWG for Around Unit#2 ESP/FGD Area - IFC GA DWG for Around Unit#2 Condensate Storage Area - IFA GA DWG for Around Unit#2 Condensate Storage Area - Client Review & Approval GA DWG for Around Unit#2 Condensate Storage Area - IFC Main Piping Arrangement Plan & Section - IFA Main Piping Arrangement Plan & Section - Client Review & Approval Main Piping Arrangement Plan & Section - IFC Piping Plan for Piperack Around Power Block Area - IFA Piping Plan for Piperack Around Power Block Area - Client Review & Approval Piping Plan for Piperack Around Power Block Area - IFC Piping Plan for Piperack Around ESP/FGD Area - IFA Piping Plan for Piperack Around ESP/FGD Area - Client Review & Approval Piping Plan for Piperack Around ESP/FGD Area - IFC Piping Plan for Piperack Around Limestone Area - IFA Piping Plan for Piperack Around Limestone Area - Client Review & Approval Piping Plan for Piperack Around Limestone Area - IFC Piping Plan for Boiler Area - IFA Piping Plan for Boiler Area - Client Review & Approval Piping Plan for Boiler Area - IFC Piping Plan for Turbine Area - IFA Piping Plan for Turbine Area - Client Review & Approval Piping Plan for Turbine Area - IFC Piping Plan for CCR Area - IFA 152 20 197 152 20 197 60 20 145 60 20 145 60 20 145 60 20 145 152 20 197 155 20 51 155 20 51 155 20 51 204 20 74 152 20 197 152 Start Finish O -1 29-Jan-14 3-Dec-12 7-Nov-12 16-Nov-12 1-Jul-13 29-Jul-13 16-Nov-12 1-Jul-13 29-Jul-13 3-Dec-12 4-Mar-13 1-Apr-13 3-Dec-12 4-Mar-13 1-Apr-13 3-Dec-12 4-Mar-13 1-Apr-13 3-Dec-12 4-Mar-13 1-Apr-13 16-Nov-12 1-Jul-13 29-Jul-13 16-Jan-13 2-Sep-13 4-Oct-13 16-Jan-13 2-Sep-13 4-Oct-13 16-Jan-13 2-Sep-13 4-Oct-13 4-Mar-13 27-Dec-13 27-Jan-14 16-Nov-12 1-Jul-13 29-Jul-13 16-Nov-12 10-Feb-14 13-Dec-12 30-Sep-14 28-Jun-13 26-Jul-13 15-May-14 28-Jun-13 26-Jul-13 15-May-14 28-Feb-13 29-Mar-13 31-Oct-13 28-Feb-13 29-Mar-13 31-Oct-13 28-Feb-13 29-Mar-13 31-Oct-13 28-Feb-13 29-Mar-13 31-Oct-13 28-Jun-13 26-Jul-13 15-May-14 30-Aug-13 2-Oct-13 13-Dec-13 30-Aug-13 2-Oct-13 13-Dec-13 30-Aug-13 2-Oct-13 13-Dec-13 26-Dec-13 24-Jan-14 15-May-14 28-Jun-13 26-Jul-13 15-May-14 28-Jun-13 Piping Plan for CCR Area - IFA Piping Plan for Turbine Area - IFA Piping Plan for Turbine Area - Client Review & Approval Piping Plan for Turbine Area - IFC GA DWG for Around Unit#2 CW Pump Area - IFA GA DWG for Around Unit#2 CW Pump Area - Client Review & Approval GA DWG for Around Unit#2 CW Pump Area - IFC GA DWG for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - IFA GA DWG for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - Client Review & Approval GA DWG for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - IFC GA DWG for Around Unit#2 ESP/FGD Area - IFA GA DWG for Around Unit#2 ESP/FGD Area - Client Review & Approval GA DWG for Around Unit#2 ESP/FGD Area - IFC GA DWG for Around Unit#2 Condensate Storage Area - IFA GA DWG for Around Unit#2 Condensate Storage Area - Client Review & Approval GA DWG for Around Unit#2 Condensate Storage Area - IFC Main Piping Arrangement Plan & Section - IFA Main Piping Arrangement Plan & Section - Client Review & Approval Main Piping Arrangement Plan & Section - IFC Piping Plan for Piperack Around Power Block Area - IFA Piping Plan for Piperack Around Power Block Area - Client Review & Approval Piping Plan for Piperack Around Power Block Area - IFC Piping Plan for Piperack Around ESP/FGD Area - IFA Piping Plan for Piperack Around ESP/FGD Area - Client Review & Approval Piping Plan for Piperack Around ESP/FGD Area - IFC Piping Plan for Piperack Around Limestone Area - IFA Piping Plan for Piperack Around Limestone Area - Client Review & Approval Piping Plan for Piperack Around Limestone Area - IFC Piping Plan for Boiler Area - IFA Piping Plan for Boiler Area - Client Review & Approval Piping Plan for Boiler Area - IFC GA DWG for Power House - IFA GA DWG for Power House - Client Review & Approval GA DWG for Power House - IFC GA DWG for Around Boiler - IFA GA DWG for Around Boiler - Client Review & Approval GA DWG for Around Boiler - IFC MR for Structural Steel N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Gas Station Shelter (Unit #1&2) Finishing Drawings - IFC

2EBSXXX2000C 2EBSXXX30000

Gas Station Shelter (Unit #1&2) Finishing Drawings - IFC MR for Structural Steel

Piping
2EPPDGA09000 2EPPDGA0900A 2EPPDGA0900C 2EPPDGA10000 2EPPDGA1000A 2EPPDGA1000C 2EPPDGA11000 2EPPDGA1100A 2EPPDGA1100C 2EPPDGA12000 2EPPDGA1200A 2EPPDGA1200C 2EPPDGA13000 2EPPDGA1300A 2EPPDGA1300C 2EPPDGA14000 2EPPDGA1400A 2EPPDGA1400C 2EPPDPA15000 2EPPDPA1500A 2EPPDPA1500C 2EPPDPA16000 2EPPDPA1600A 2EPPDPA1600C 2EPPDPA17000 2EPPDPA1700A 2EPPDPA1700C 2EPPDPA18000 2EPPDPA1800A 2EPPDPA1800C 2EPPDPA19000 2EPPDPA1900A 2EPPDPA1900C 2EPPDPA20000 2EPPDPA2000A 2EPPDPA2000C 2EPPDPA21000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 9 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 20 197 153 20 73 153 20 73 153 20 73 153 20 73 78 20 145 42 20 23 91 30 20 24 92 20 43 92 20 43 92 20 43 32 20 8 33 21 20 12 Start Finish O -1 1-Jul-13 29-Jul-13 17-Dec-12 31-Jul-13 29-Aug-13 17-Dec-12 31-Jul-13 29-Aug-13 17-Dec-12 31-Jul-13 29-Aug-13 17-Dec-12 31-Jul-13 29-Aug-13 7-Nov-12 4-Mar-13 1-Apr-13 2-Jun-14 31-Jul-14 29-Aug-14 18-Nov-13 16-May-13 1-Jul-13 29-Jul-13 16-Jan-13 3-Jun-13 2-Jul-13 16-Jan-13 3-Jun-13 2-Jul-13 16-Jan-13 3-Jun-13 2-Jul-13 17-Dec-12 1-Feb-13 6-Mar-13 16-Oct-13 2-Dec-13 2-Jan-14 23-May-13 26-Jul-13 15-May-14 30-Jul-13 28-Aug-13 13-Dec-13 30-Jul-13 28-Aug-13 13-Dec-13 30-Jul-13 28-Aug-13 13-Dec-13 30-Jul-13 28-Aug-13 13-Dec-13 28-Feb-13 29-Mar-13 31-Oct-13 30-Jul-14 28-Aug-14 30-Sep-14 31-Mar-14 28-Jun-13 26-Jul-13 30-Aug-13 31-May-13 1-Jul-13 30-Aug-13 31-May-13 1-Jul-13 30-Aug-13 31-May-13 1-Jul-13 30-Aug-13 31-Jan-13 5-Mar-13 15-Mar-13 29-Nov-13 31-Dec-13 29-Jan-14 10-Jun-13 Specialties List And Drawings - IFA Specialties List And Drawings - Client Review & Approval Specialties List And Drawings - IFC Pipe Line List - IFA Pipe Line List - Client Review & Approval Pipe Line List - IFC Terminal Point List - IFA Terminal Point List - Client Review & Approval Terminal Point List - IFC Valve List - IFA Valve List - Client Review & Approval Valve List - IFC Painting Schedule & Color List - IFA Painting Schedule & Color List - Client Review & Approval Painting Schedule & Color List - IFC Insulation Procedure - IFA Insulation Procedure - Client Review & Approval Insulation Procedure - IFC MR for Carbon Steel Seamless Pipe Overall Plot Plan - IFA Overall Plot Plan - Client Review & Approval Overall Plot Plan - IFC Hanger And Support List And Drawing - IFA Hanger And Support List And Drawing - Client Review & Approval Hanger And Support List And Drawing - IFC Piping Isometric Drawings - IFI Piping Plan for Unit#2 CW Piping - IFA Piping Plan for Unit#2 CW Piping - Client Review & Approval Piping Plan for Unit#2 CW Piping - IFC Piping Plan for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - IFA Piping Plan for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - Client Review & Approval Piping Plan for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - IFC Piping Plan for Around Unit#2 Condensate Storage Area - IFA Piping Plan for Around Unit#2 Condensate Storage Area - Client Review & Approval Piping Plan for Around Unit#2 Condensate Storage Area - IFC Piping Plan for Around Unit#2 Natural Gas Station & Piperack Area - IFA Piping Plan for Around Unit#2 Natural Gas Station & Piperack Area - Client Review & Approval Piping Plan for Around Unit#2 Natural Gas Station & Piperack Area - IFC N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Piping Plan for CCR Area - Client Review & Approval Piping Plan for CCR Area - IFC

2EPPDPA2100A 2EPPDPA2100C 2EPPDPA22000 2EPPDPA2200A 2EPPDPA2200C 2EPPDPA23000 2EPPDPA2300A 2EPPDPA2300C 2EPPDPA24000 2EPPDPA2400A 2EPPDPA2400C 2EPPDPA25000 2EPPDPA2500A 2EPPDPA2500C 2EPPDPP08000 2EPPDPP0800A 2EPPDPP0800C 2EPPDPS07000 2EPPDPS0700A 2EPPDPS0700C 2EPPISO26000 2EPPLST03000 2EPPLST0300A 2EPPLST0300C 2EPPLST04000 2EPPLST0400A 2EPPLST0400C 2EPPLST05000 2EPPLST0500A 2EPPLST0500C 2EPPLST06000 2EPPLST0600A 2EPPLST0600C 2EPPSPC01000 2EPPSPC0100A 2EPPSPC0100C 2EPPSPC02000 2EPPSPC0200A 2EPPSPC0200C 2EPPXMR27000

Piping Plan for CCR Area - Client Review & Approval Piping Plan for CCR Area - IFC Piping Plan for Unit#2 CW Piping - IFA Piping Plan for Unit#2 CW Piping - Client Review & Approval Piping Plan for Unit#2 CW Piping - IFC Piping Plan for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - IFA Piping Plan for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - Client Review & Approval Piping Plan for Around Unit#2 Fuel Oil/Gypsum/Limestone Area - IFC Piping Plan for Around Unit#2 Condensate Storage Area - IFA Piping Plan for Around Unit#2 Condensate Storage Area - Client Review & Approval Piping Plan for Around Unit#2 Condensate Storage Area - IFC Piping Plan for Around Unit#2 Natural Gas Station & Piperack Area - IFA Piping Plan for Around Unit#2 Natural Gas Station & Piperack Area - Client Review & Approval Piping Plan for Around Unit#2 Natural Gas Station & Piperack Area - IFC Overall Plot Plan - IFA Overall Plot Plan - Client Review & Approval Overall Plot Plan - IFC Hanger And Support List And Drawing - IFA Hanger And Support List And Drawing - Client Review & Approval Hanger And Support List And Drawing - IFC Piping Isometric Drawings - IFI Specialties List And Drawings - IFA Specialties List And Drawings - Client Review & Approval Specialties List And Drawings - IFC Pipe Line List - IFA Pipe Line List - Client Review & Approval Pipe Line List - IFC Terminal Point List - IFA Terminal Point List - Client Review & Approval Terminal Point List - IFC Valve List - IFA Valve List - Client Review & Approval Valve List - IFC Painting Schedule & Color List - IFA Painting Schedule & Color List - Client Review & Approval Painting Schedule & Color List - IFC Insulation Procedure - IFA Insulation Procedure - Client Review & Approval Insulation Procedure - IFC MR for Carbon Steel Seamless Pipe

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 10 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 12 12 12 12 11 11 11 13 13 13 13 13 13 13 13 10 10 11 12 12 12 12 12 10 11 13 13 11 11 11 11 13 11 11 11 40 20 22 22 20 Start Finish O -1 23-May-13 23-May-13 23-May-13 23-May-13 16-May-13 16-May-13 16-May-13 27-Jun-13 27-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 12-Jun-13 17-Dec-13 17-Dec-13 1-Apr-13 1-Apr-13 1-Apr-13 1-Apr-13 1-Apr-13 1-Apr-13 3-Dec-12 1-Jul-13 29-Aug-13 29-Aug-13 1-Oct-13 1-Oct-13 3-Feb-14 3-Feb-14 29-Aug-13 3-Feb-14 3-Feb-14 2-Jan-14 2-Jan-13 4-Mar-13 1-Apr-13 2-Jan-13 1-Feb-13 10-Jun-13 10-Jun-13 10-Jun-13 10-Jun-13 31-May-13 31-May-13 31-May-13 15-Jul-13 15-Jul-13 28-Jun-13 28-Jun-13 28-Jun-13 28-Jun-13 28-Jun-13 28-Jun-13 31-Dec-13 31-Dec-13 15-Apr-13 16-Apr-13 16-Apr-13 16-Apr-13 16-Apr-13 16-Apr-13 14-Dec-12 15-Jul-13 16-Sep-13 16-Sep-13 16-Oct-13 16-Oct-13 17-Feb-14 17-Feb-14 16-Sep-13 17-Feb-14 17-Feb-14 16-Jan-14 28-Feb-13 29-Mar-13 30-Apr-13 31-Jan-13 5-Mar-13 Overhaul Plan - IFA Overhaul Plan - Client Review & Approval Overhaul Plan - IFC GA DWG for Around N.G Burner Piping - IFA GA DWG for Around N.G Burner Piping - Client Review & Approval MR for Insulation Kit MR for Safety And Eye Shower MR for Spring Hanger Support MR for General (Rigid) Support N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 MR for Carbon Steel Welded Pipe MR for Stainless Steel Seamless Pipe MR for Stainless Steel Welded Pipe MR for Low Alloy Steel Seamless Pipe MR for Forged Steel Fitting MR for Wrought Steel Fitting MR for Flange MR for Gasket MR for Bolt/Nut MR for Forged Steel Valve MR for Cast Steel Valve (Up To 600#) MR for Cast Steel Valve (900# And Higher) MR for Ball Valve MR for Butterfly Valve MR for Bronze Valve MR for PE Lined Piping MR for Epoxy Lined Piping MR for Carbon Steel Welded Pipe For U/G MR for Forged Steel Fitting For U/G MR for Wrought Steel Fitting For U/G MR for Flange For U/G MR for Gasket For U/G MR for Bolt/Nut For U/G MR for Coating and Lining Piping for U/G MR for RTRP Piping MR for PVC / ABS Piping MR for Strainer MR for Steam/Air Trap MR for Sight Glass MR for Hose & Hose Connector MR for Expansion Joint

2EPPXMR28000 2EPPXMR29000 2EPPXMR30000 2EPPXMR31000 2EPPXMR32000 2EPPXMR33000 2EPPXMR34000 2EPPXMR35000 2EPPXMR36000 2EPPXMR37000 2EPPXMR38000 2EPPXMR39000 2EPPXMR40000 2EPPXMR41000 2EPPXMR42000 2EPPXMR43000 2EPPXMR44000 2EPPXMR46000 2EPPXMR46200 2EPPXMR47000 2EPPXMR48000 2EPPXMR48200 2EPPXMR48400 2EPPXMR48600 2EPPXMR49000 2EPPXMR50000 2EPPXMR51000 2EPPXMR52000 2EPPXMR53000 2EPPXMR54000 2EPPXMR55000 2EPPXMR56000 2EPPXMR57000 2EPPXMR58000 2EPPXMR59000 2EPPXXX26000 2EPPXXX2600A 2EPPXXX2600C 2EPPXXX27000 2EPPXXX2700A

MR for Carbon Steel Welded Pipe MR for Stainless Steel Seamless Pipe MR for Stainless Steel Welded Pipe MR for Low Alloy Steel Seamless Pipe MR for Forged Steel Fitting MR for Wrought Steel Fitting MR for Flange MR for Gasket MR for Bolt/Nut MR for Forged Steel Valve MR for Cast Steel Valve (Up To 600#) MR for Cast Steel Valve (900# And Higher) MR for Ball Valve MR for Butterfly Valve MR for Bronze Valve MR for PE Lined Piping MR for Epoxy Lined Piping MR for Carbon Steel Welded Pipe For U/G MR for Forged Steel Fitting For U/G MR for Wrought Steel Fitting For U/G MR for Flange For U/G MR for Gasket For U/G MR for Bolt/Nut For U/G MR for Coating and Lining Piping for U/G MR for RTRP Piping MR for PVC / ABS Piping MR for Strainer MR for Steam/Air Trap MR for Sight Glass MR for Hose & Hose Connector MR for Expansion Joint MR for Insulation Kit MR for Safety And Eye Shower MR for Spring Hanger Support MR for General (Rigid) Support Overhaul Plan - IFA Overhaul Plan - Client Review & Approval Overhaul Plan - IFC GA DWG for Around N.G Burner Piping - IFA GA DWG for Around N.G Burner Piping - Client Review & Approval

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 11 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 18 20 20 20 20 42 20 22 42 20 22 295 MR for ESP MR for FGD MR for CTCS & Debris Filter MR for Plate Type Heat Exchanger MR for SAH Drain Pump MR for General Service Pumps MR for Miscellaneous Fan & Blower MR for Shop Fabricated Vessel MR for Crane and Hoist MR for Elevator MR for CWP MR for Intake Facilities MR for FG Filter and FG Scrubber MR for Tubular Heat Exchanger MR for Screw Type Pumps MR for Sump Pumps MR for Field Storage Tank MR for Chemical Feed System MR for Chlorination System MR for Damper & Actuator MR for Expansion Joints MR for Ducts and Supports MR for Silencers MR for Buckstay MR for Boiler Casing MR for Anchor Bolts/Nuts and Embedded Material MR for Refractory MR for Chemicals 3 3 21 21 21 20 21 20 21 21 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 20 10 12 Start Finish O -1 6-Mar-13 17-Dec-12 4-Mar-13 4-Mar-13 4-Mar-13 1-Apr-13 3-Jun-13 2-Jul-13 1-Apr-13 3-Jun-13 2-Jul-13 7-Nov-12 7-Nov-12 7-Nov-12 7-Nov-12 7-Nov-12 7-Nov-12 4-Mar-13 7-Nov-12 4-Mar-13 7-Nov-12 7-Nov-12 6-Feb-13 6-Feb-13 11-Mar-13 11-Mar-13 11-Mar-13 11-Mar-13 11-Mar-13 11-Mar-13 11-Mar-13 10-May-13 10-May-13 10-May-13 10-May-13 10-May-13 10-May-13 3-Dec-12 2-Jan-14 16-Oct-13 29-Mar-13 15-Jan-13 29-Mar-13 29-Mar-13 29-Mar-13 31-May-13 1-Jul-13 31-Jul-13 31-May-13 1-Jul-13 31-Jul-13 15-Jan-14 9-Nov-12 9-Nov-12 5-Dec-12 5-Dec-12 5-Dec-12 29-Mar-13 5-Dec-12 29-Mar-13 5-Dec-12 5-Dec-12 28-Feb-13 28-Feb-13 29-Mar-13 29-Mar-13 29-Mar-13 29-Mar-13 29-Mar-13 29-Mar-13 29-Mar-13 31-May-13 31-May-13 31-May-13 31-May-13 31-May-13 31-May-13 31-Dec-12 15-Jan-14 31-Oct-13 MR for ESP MR for FGD MR for CTCS & Debris Filter MR for Plate Type Heat Exchanger MR for SAH Drain Pump MR for General Service Pumps MR for Miscellaneous Fan & Blower MR for Shop Fabricated Vessel MR for Crane and Hoist MR for Elevator MR for CWP MR for Intake Facilities MR for FG Filter and FG Scrubber MR for Tubular Heat Exchanger MR for Screw Type Pumps MR for Sump Pumps MR for Field Storage Tank MR for Chemical Feed System MR for Chlorination System MR for Damper & Actuator MR for Expansion Joints MR for Ducts and Supports MR for Silencers MR for Buckstay MR for Boiler Casing MR for Anchor Bolts/Nuts and Embedded Material MR for Refractory MR for Chemicals N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

2EPPXXX2700C 2EPPXXX28000 2EPPXXX29000 2EPPXXX30000 2EPPXXX31000 2EPPXXX32000 2EPPXXX3200A 2EPPXXX3200C 2EPPXXX33000 2EPPXXX3300A 2EPPXXX3300C

GA DWG for Around N.G Burner Piping - IFC Oil Piping Arrangement - IFI Oil Piping Arrangement Around Oil Purifier - IFI Gland Steam and Drain Piping Arrangement - IFI Control Oil Piping Arrangement - IFI Circulating Water Piping Arrangement (Around Condenser) - IFA Circulating Water Piping Arrangement (Around Condenser) - Client Review & Approval Circulating Water Piping Arrangement (Around Condenser) - IFC Blowing Out Piping Arrangement - IFA Blowing Out Piping Arrangement - Client Review & Approval Blowing Out Piping Arrangement - IFC

GA DWG for Around N.G Burner Piping - IFC Oil Piping Arrangement - IFI Oil Piping Arrangement Around Oil Purifier - IFI Gland Steam and Drain Piping Arrangement - IFI Control Oil Piping Arrangement - IFI Circulating Water Piping Arrangement (Around Condenser) - IFA Circulating Water Piping Arrangement (Around Condenser) - Client Review & Approval Circulating Water Piping Arrangement (Around Condenser) - IFC Blowing Out Piping Arrangement - IFA Blowing Out Piping Arrangement - Client Review & Approval Blowing Out Piping Arrangement - IFC

Mechanical
2EPRXMR17000 2EPRXMR18000 2EPRXMR19000 2EPRXMR20000 2EPRXMR21000 2EPRXMR22000 2EPRXMR23000 2EPRXMR24000 2EPRXMR25000 2EPRXMR26000 2EPRXMR27000 2EPRXMR28000 2EPRXMR29000 2EPRXMR30000 2EPRXMR31000 2EPRXMR32000 2EPRXMR33000 2EPRXMR34000 2EPRXMR35000 2EPRXMR36000 2EPRXMR37000 2EPRXMR38000 2EPRXMR39000 2EPRXMR40000 2EPRXMR41000 2EPRXMR42000 2EPRXMR44000 2EPRXMR45000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 12 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 11 369 MR for 220KV SWYD modification, Cable & Tower MR for Power Transformer MR for MV SWGR with BUS Duct, MR for LV SWGR MCC and Aux- Panel MR for DC & UPS System MR for Grounding Material MR for Lighting Fixture / panel MR for Cable Tray & accessories MR for Conduit MR for Conduit Fittings (Cable gland) MR for Power & Control Cable and Kit MR for Communication (Paging, PA, Tel, Handset) MR for Fire Alarm System MR for Cathodiic Protection Basic Plan for Electrical Equipment - IFA Basic Plan for Electrical Equipment - Client Review & Approval Basic Plan for Electrical Equipment - IFC Speficication 1st (Main TR, Unit Aux. TR etc.) - IFA Speficication 1st (Main TR, Unit Aux. TR etc.) - Client Review & Appr oval Speficication 1st (Main TR, Unit Aux. TR etc.) - IFC Speficication 2nd (6.6KV Switchboard, 400V Switchboard etc.) - IFA Speficication 2nd (6.6KV Switchboard, 400V Switchboard etc.) - Client Review & Approval Speficication 2nd (6.6KV Switchboard, 400V Switchboard etc.) - IFC Speficication 3rd (110V Battery & DC Battery Charger in CCB, 230V Safe AC Inverter) - IFA Speficication 3rd (110V Battery & DC Battery Charger in CCB, 230V Safe AC Inverter) - Client Review & Approval Speficication 3rd (110V Battery & DC Battery Charger in CCB, 230V Safe AC Inverter) - IFC Speficication 4th (Power Cable, FO Cable etc.) - IFA Speficication 4th (Power Cable, FO Cable etc.) - Client Review & Approval Speficication 4th (Power Cable, FO Cable etc.) - IFC Protection Relay List For Transformer - IFA Protection Relay List For Transformer - Client Review & Approval Protection Relay List For Transformer - IFC Key Single Line Diagram - IFA Key Single Line Diagram - Client Review & Approval Key Single Line Diagram - IFC Single Line Diagram 1st (6.6KV Switchboard, 400V Switchboard etc.) - IFA Single Line Diagram 1st (6.6KV Switchboard, 400V Switchboard etc.) - Client Review & Approval Single Line Diagram 1st (6.6KV Switchboard, 400V Switchboard etc.) - IFC Phase Diagram - IFA 22 22 22 20 19 21 22 22 22 22 21 22 20 40 20 22 40 20 22 42 20 20 41 20 20 40 20 22 41 20 20 42 20 18 38 20 22 38 Start Finish O -1 16-Dec-13 3-Dec-12 2-Jan-13 2-Jan-13 1-Apr-13 2-May-13 3-Jun-13 1-Aug-13 2-Jul-13 2-Jul-13 2-Jul-13 2-Jul-13 2-Dec-13 2-Jul-13 4-Mar-13 2-Jan-13 4-Mar-13 1-Apr-13 2-Sep-13 1-Nov-13 29-Nov-13 1-Nov-13 2-Jan-14 3-Feb-14 2-Dec-13 3-Feb-14 4-Mar-14 3-Feb-14 1-Apr-14 29-Apr-14 2-Dec-13 3-Feb-14 4-Mar-14 3-Dec-12 1-Feb-13 6-Mar-13 1-Feb-13 1-Apr-13 29-Apr-13 1-Feb-13 31-Dec-13 30-May-14 31-Jan-13 31-Jan-13 30-Apr-13 31-May-13 28-Jun-13 30-Aug-13 31-Jul-13 31-Jul-13 31-Jul-13 31-Jul-13 31-Dec-13 31-Jul-13 29-Mar-13 28-Feb-13 29-Mar-13 30-Apr-13 31-Oct-13 28-Nov-13 31-Dec-13 31-Dec-13 29-Jan-14 3-Mar-14 29-Jan-14 3-Mar-14 31-Mar-14 31-Mar-14 28-Apr-14 30-May-14 29-Jan-14 3-Mar-14 31-Mar-14 31-Jan-13 5-Mar-13 29-Mar-13 29-Mar-13 26-Apr-13 31-May-13 29-Mar-13 Key Single Line Diagram - IFA Key Single Line Diagram - Client Review & Approval Key Single Line Diagram - IFC Single Line Diagram 1st (6.6KV Switchboard, 400V Switchboard etc.) - IFA Single Line Diagram 1st (6.6KV Switchboard, 400V Switchboard etc.) - Client Review & Approval Single Line Diagram 1st (6.6KV Switchboard, 400V Switchboard etc.) - IFC Phase Diagram - IFA MR for 220KV SWYD modification, Cable & Tower MR for Power Transformer MR for MV SWGR with BUS Duct, MR for LV SWGR MCC and Aux- Panel MR for DC & UPS System MR for Grounding Material MR for Lighting Fixture / panel MR for Cable Tray & accessories MR for Conduit MR for Conduit Fittings (Cable gland) MR for Power & Control Cable and Kit MR for Communication (Paging, PA, Tel, Handset) MR for Fire Alarm System MR for Cathodiic Protection Basic Plan for Electrical Equipment - IFA Basic Plan for Electrical Equipment - Client Review & Approval Basic Plan for Electrical Equipment - IFC Speficication 1st (Main TR, Unit Aux. TR etc.) - IFA Speficication 1st (Main TR, Unit Aux. TR etc.) - Client Review & Appr oval Speficication 1st (Main TR, Unit Aux. TR etc.) - IFC Speficication 2nd (6.6KV Switchboard, 400V Switchboard etc.) - IFA Speficication 2nd (6.6KV Switchboard, 400V Switchboard etc.) - Client Review & Approval Speficication 2nd (6.6KV Switchboard, 400V Switchboard etc.) - IFC Speficication 3rd (110V Battery & DC Battery Charger in CCB, 230V Safe AC Inverter) - IFA Speficication 3rd (110V Battery & DC Battery Charger in CCB, 230V Safe AC Inverter) - Client Review & Approval Speficication 3rd (110V Battery & DC Battery Charger in CCB, 230V Safe AC Inverter) - IFC Speficication 4th (Power Cable, FO Cable etc.) - IFA Speficication 4th (Power Cable, FO Cable etc.) - Client Review & Approval Speficication 4th (Power Cable, FO Cable etc.) - IFC Protection Relay List For Transformer - IFA Protection Relay List For Transformer - Client Review & Approval Protection Relay List For Transformer - IFC N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 MR for Lubricant

2EPRXMR46000

MR for Lubricant

Electrical
2EELXMR39000 2EELXMR40000 2EELXMR41000 2EELXMR43000 2EELXMR45000 2EELXMR46000 2EELXMR47000 2EELXMR48000 2EELXMR49000 2EELXMR50000 2EELXMR51000 2EELXMR53000 2EELXMR54000 2EELXXX00500 2EELXXX0050A 2EELXXX0050C 2EELXXX01000 2EELXXX0100A 2EELXXX0100C 2EELXXX02000 2EELXXX0200A 2EELXXX0200C 2EELXXX03000 2EELXXX0300A 2EELXXX0300C 2EELXXX05000 2EELXXX0500A 2EELXXX0500C 2EELXXX07000 2EELXXX0700A 2EELXXX0700C 2EELXXX08000 2EELXXX0800A 2EELXXX0800C 2EELXXX09000 2EELXXX0900A 2EELXXX0900C 2EELXXX10000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 13 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 20 22 40 20 22 42 20 22 39 20 23 42 20 22 20 42 20 22 42 20 22 43 20 21 43 20 21 39 20 24 62 39 20 24 39 20 24 39 20 24 Start Finish O -1 1-Apr-13 29-Apr-13 2-Sep-13 1-Nov-13 29-Nov-13 1-Apr-13 3-Jun-13 2-Jul-13 1-Aug-13 1-Oct-13 30-Oct-13 1-Apr-13 3-Jun-13 2-Jul-13 2-May-13 1-Apr-13 3-Jun-13 2-Jul-13 1-Apr-13 3-Jun-13 2-Jul-13 1-Oct-13 2-Dec-13 31-Dec-13 1-Oct-13 2-Dec-13 31-Dec-13 2-May-13 1-Jul-13 29-Jul-13 1-Jul-13 2-May-13 1-Jul-13 29-Jul-13 2-May-13 1-Jul-13 29-Jul-13 2-May-13 1-Jul-13 29-Jul-13 26-Apr-13 31-May-13 31-Oct-13 28-Nov-13 31-Dec-13 31-May-13 1-Jul-13 31-Jul-13 30-Sep-13 29-Oct-13 29-Nov-13 31-May-13 1-Jul-13 31-Jul-13 31-May-13 31-May-13 1-Jul-13 31-Jul-13 31-May-13 1-Jul-13 31-Jul-13 29-Nov-13 30-Dec-13 29-Jan-14 29-Nov-13 30-Dec-13 29-Jan-14 28-Jun-13 26-Jul-13 30-Aug-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Aug-13 28-Jun-13 26-Jul-13 30-Aug-13 28-Jun-13 26-Jul-13 30-Aug-13 Cable Route Number - IFA Cable Route Number - Client Review & Approval Cable Route Number - IFC Cable Route Number (Natural Gas System) - IFI Design Document of Cable & Cable Tray - IFA Design Document of Cable & Cable Tray - Client Review & Approval Design Document of Cable & Cable Tray - IFC Cable Tray Layout & Support DWG - IFA Cable Tray Layout & Support DWG - Client Review & Approval Cable Tray Layout & Support DWG - IFC Main Cable Route Plan - IFA Main Cable Route Plan - Client Review & Approval Main Cable Route Plan - IFC Logic Diagram - IFA Logic Diagram - Client Review & Approval Logic Diagram - IFC Schematic Daigram - IFA Schematic Daigram - Client Review & Approval Schematic Daigram - IFC Electrical Equipment Layout & I/O List - IFA Electrical Equipment Layout & I/O List - Client Review & Approval Electrical Equipment Layout & I/O List - IFC Outline Drawing - IFI Panel Drawing - IFA Panel Drawing - Client Review & Approval Panel Drawing - IFC 6.6KV Busduct Drawing - IFA 6.6KV Busduct Drawing - Client Review & Approval 6.6KV Busduct Drawing - IFC Cable Schedule - IFA Cable Schedule - Client Review & Approval Cable Schedule - IFC Cable Connection Diagram - IFA Cable Connection Diagram - Client Review & Approval Cable Connection Diagram - IFC N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

2EELXXX1000A 2EELXXX1000C 2EELXXX13000 2EELXXX1300A 2EELXXX1300C 2EELXXX14000 2EELXXX1400A 2EELXXX1400C 2EELXXX15000 2EELXXX1500A 2EELXXX1500C 2EELXXX16000 2EELXXX1600A 2EELXXX1600C 2EELXXX17000 2EELXXX18000 2EELXXX1800A 2EELXXX1800C 2EELXXX20000 2EELXXX2000A 2EELXXX2000C 2EELXXX21000 2EELXXX2100A 2EELXXX2100C 2EELXXX22000 2EELXXX2200A 2EELXXX2200C 2EELXXX23000 2EELXXX2300A 2EELXXX2300C 2EELXXX23100 2EELXXX24000 2EELXXX2400A 2EELXXX2400C 2EELXXX25000 2EELXXX2500A 2EELXXX2500C 2EELXXX26000 2EELXXX2600A 2EELXXX2600C

Phase Diagram - Client Review & Approval Phase Diagram - IFC Single Line Diagram 2nd (Lighting & Misc. Power System, Communication System) IFA Single Line Diagram 2nd (Lighting & Misc. Power System, Communication System) Client Review & Approval Single Line Diagram 2nd (Lighting & Misc. Power System, Communication System) IFC Logic Diagram - IFA Logic Diagram - Client Review & Approval Logic Diagram - IFC Schematic Daigram - IFA Schematic Daigram - Client Review & Approval Schematic Daigram - IFC Electrical Equipment Layout & I/O List - IFA Electrical Equipment Layout & I/O List - Client Review & Approval Electrical Equipment Layout & I/O List - IFC Outline Drawing - IFI Panel Drawing - IFA Panel Drawing - Client Review & Approval Panel Drawing - IFC 6.6KV Busduct Drawing - IFA 6.6KV Busduct Drawing - Client Review & Approval 6.6KV Busduct Drawing - IFC Cable Schedule - IFA Cable Schedule - Client Review & Approval Cable Schedule - IFC Cable Connection Diagram - IFA Cable Connection Diagram - Client Review & Approval Cable Connection Diagram - IFC Cable Route Number - IFA Cable Route Number - Client Review & Approval Cable Route Number - IFC Cable Route Number (Natural Gas System) - IFI Design Document of Cable & Cable Tray - IFA Design Document of Cable & Cable Tray - Client Review & Approval Design Document of Cable & Cable Tray - IFC Cable Tray Layout & Support DWG - IFA Cable Tray Layout & Support DWG - Client Review & Approval Cable Tray Layout & Support DWG - IFC Main Cable Route Plan - IFA Main Cable Route Plan - Client Review & Approval Main Cable Route Plan - IFC

Phase Diagram - Client Review & Approval Phase Diagram - IFC Single Line Diagram 2nd (Lighting & Misc. Power System, Communication System) - IFA Single Line Diagram 2nd (Lighting & Misc. Power System, Communication System) - Client Review & Approval Single Line Diagram 2nd (Lighting & Misc. Power System, Communication System) - IFC

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 14 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 42 20 19 42 20 19 42 20 19 42 20 19 38 20 22 38 20 22 44 20 20 44 20 20 44 20 20 39 20 23 39 20 23 39 20 23 23 20 19 23 Start Finish O -1 3-Jun-13 1-Aug-13 30-Aug-13 3-Jun-13 1-Aug-13 30-Aug-13 3-Jun-13 1-Aug-13 30-Aug-13 3-Jun-13 1-Aug-13 30-Aug-13 1-Feb-13 1-Apr-13 29-Apr-13 1-Feb-13 1-Apr-13 29-Apr-13 1-Jul-13 2-Sep-13 4-Oct-13 1-Jul-13 2-Sep-13 4-Oct-13 1-Jul-13 2-Sep-13 4-Oct-13 1-Aug-13 1-Oct-13 30-Oct-13 1-Aug-13 1-Oct-13 30-Oct-13 1-Aug-13 1-Oct-13 30-Oct-13 1-Jul-13 1-Aug-13 30-Aug-13 1-Jul-13 31-Jul-13 29-Aug-13 30-Sep-13 31-Jul-13 29-Aug-13 30-Sep-13 31-Jul-13 29-Aug-13 30-Sep-13 31-Jul-13 29-Aug-13 30-Sep-13 29-Mar-13 26-Apr-13 31-May-13 29-Mar-13 26-Apr-13 31-May-13 30-Aug-13 2-Oct-13 31-Oct-13 30-Aug-13 2-Oct-13 31-Oct-13 30-Aug-13 2-Oct-13 31-Oct-13 30-Sep-13 29-Oct-13 29-Nov-13 30-Sep-13 29-Oct-13 29-Nov-13 30-Sep-13 29-Oct-13 29-Nov-13 31-Jul-13 29-Aug-13 30-Sep-13 31-Jul-13 N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Arrangement of Cable Manhole & Ductbank - IFA Arrangement of Cable Manhole & Ductbank - Client Review & Approval Arrangement of Cable Manhole & Ductbank - IFC Design Document of Conduit - IFA Design Document of Conduit - Client Review & Approval Design Document of Conduit - IFC Specification & Drawing for Conduit Support & Misc. Material - IFA Specification & Drawing for Conduit Support & Misc. Material - Client Review & Approval Specification & Drawing for Conduit Support & Misc. Material - IFC Arrangement of Embedded Conduit & Raceway - IFA Arrangement of Embedded Conduit & Raceway - Client Review & Approval Arrangement of Embedded Conduit & Raceway - IFC Design Document of Grounding System - IFA Design Document of Grounding System - Client Review & Approval Design Document of Grounding System - IFC Grounding Grid Drawing - IFA Grounding Grid Drawing - Client Review & Approval Grounding Grid Drawing - IFC Lightning Protection Zone Drawing - IFA Lightning Protection Zone Drawing - Client Review & Approval Lighting Protection Zone Drawing - IFC Arrangement of Road & Fence Lighting - IFA Arrangement of Road & Fence Lighting - Client Review & Approval Arrangement of Road & Fence Lighting - IFC Lighting & Misc. Power System Drawing - IFA Lighting & Misc. Power System Drawing - Client Review & Approval Lighting & Misc. Power System Drawing - IFC Communication System Drawing - IFA Communication System Drawing - Client Review & Approval Communication System Drawing - IFC Arrangement of Raceway for HVAC - IFA Arrangement of Raceway for HVAC - Client Review & Approval Arrangement of Raceway for HVAC - IFC Fire Alarm System Drawing - IFA Fire Alarm System Drawing - Client Review & Approval Fire Alarm System Drawing - IFC Shop Test Procedure of MV,LV & DC Motor - IFA Shop Test Procedure of MV,LV & DC Motor - Client Review & Approval Shop Test Procedure of MV,LV & DC Motor - IFC Instruction Manual Of MV And LV Motor (Tatung Product) - IFA

2EELXXX27000 2EELXXX2700A 2EELXXX2700C 2EELXXX28000 2EELXXX2800A 2EELXXX2800C 2EELXXX29000 2EELXXX2900A 2EELXXX2900C 2EELXXX30000 2EELXXX3000A 2EELXXX3000C 2EELXXX31000 2EELXXX3100A 2EELXXX3100C 2EELXXX32000 2EELXXX3200A 2EELXXX3200C 2EELXXX33000 2EELXXX3300A 2EELXXX3300C 2EELXXX34000 2EELXXX3400A 2EELXXX3400C 2EELXXX35000 2EELXXX3500A 2EELXXX3500C 2EELXXX36000 2EELXXX3600A 2EELXXX3600C 2EELXXX37000 2EELXXX3700A 2EELXXX3700C 2EELXXX38000 2EELXXX3800A 2EELXXX3800C 2EELXXX39000 2EELXXX3900A 2EELXXX3900C 2EELXXX40000

Arrangement of Cable Manhole & Ductbank - IFA Arrangement of Cable Manhole & Ductbank - Client Review & Approval Arrangement of Cable Manhole & Ductbank - IFC Design Document of Conduit - IFA Design Document of Conduit - Client Review & Approval Design Document of Conduit - IFC Specification & Drawing for Conduit Support & Misc. Material - IFA Specification & Drawing for Conduit Support & Misc. Material - Client Review & Approval Specification & Drawing for Conduit Support & Misc. Material - IFC Arrangement of Embedded Conduit & Raceway - IFA Arrangement of Embedded Conduit & Raceway - Client Review & Approval Arrangement of Embedded Conduit & Raceway - IFC Design Document of Grounding System - IFA Design Document of Grounding System - Client Review & Approval Design Document of Grounding System - IFC Grounding Grid Drawing - IFA Grounding Grid Drawing - Client Review & Approval Grounding Grid Drawing - IFC Lightning Protection Zone Drawing - IFA Lightning Protection Zone Drawing - Client Review & Approval Lighting Protection Zone Drawing - IFC Arrangement of Road & Fence Lighting - IFA Arrangement of Road & Fence Lighting - Client Review & Approval Arrangement of Road & Fence Lighting - IFC Lighting & Misc. Power System Drawing - IFA Lighting & Misc. Power System Drawing - Client Review & Approval Lighting & Misc. Power System Drawing - IFC Communication System Drawing - IFA Communication System Drawing - Client Review & Approval Communication System Drawing - IFC Arrangement of Raceway for HVAC - IFA Arrangement of Raceway for HVAC - Client Review & Approval Arrangement of Raceway for HVAC - IFC Fire Alarm System Drawing - IFA Fire Alarm System Drawing - Client Review & Approval Fire Alarm System Drawing - IFC Shop Test Procedure of MV,LV & DC Motor - IFA Shop Test Procedure of MV,LV & DC Motor - Client Review & Approval Shop Test Procedure of MV,LV & DC Motor - IFC Instruction Manual Of MV And LV Motor (Tatung Product) - IFA

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 15 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 20 19 23 23 20 20 22 20 21 44 20 20 496 MR for SWAS MR for Environment Gas Monitoring System MR for MOV (Gate & Globe) MR for On-Off Ball Valve MR for Control Valve MR for MOV (Butterfly) MR for Gas Detection MR for Gas Metering System MR for Gas Pressure Reducing Station MR for Orifice Assembly & Level Gauge MR for Displacement LT & LS MR for PT, PDT & Temp. Transmitter MR for PS, PG & TG MR for Ultrasonic type Flowmeter MR for Turbine type Flowmeter MR for PSV & PRV MR for Instrument Cable MR for Cable Tray Instrumentation for Machinery Package - IFA Instrumentation for Machinery Package - Client Review & Approval Instrumentation for Machinery Package - IFC Instrument Design and Installation Procedure - IFA Instrument Design and Installation Procedure - Client Review & Approval Instrument Design and Installation Procedure - IFC Instrument List - IFA Instrument List - Client Review & Approval Instrument List - IFC 19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 19 22 18 19 20 42 19 20 42 19 20 52 Start Finish O -1 1-Aug-13 30-Aug-13 1-Jul-13 1-Jul-13 4-Mar-13 1-Apr-13 29-Apr-13 2-May-13 1-Nov-13 1-Jul-13 2-Sep-13 4-Oct-13 3-Dec-12 3-Jun-13 3-Jun-13 3-Jun-13 3-Jun-13 3-Jun-13 3-Jun-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 2-May-13 3-Jun-13 1-Oct-13 2-Sep-13 3-Jun-13 1-Jul-13 29-Jul-13 3-Jun-13 1-Jul-13 29-Jul-13 3-Jun-13 1-Jul-13 29-Jul-13 29-Aug-13 30-Sep-13 31-Jul-13 31-Jul-13 29-Mar-13 26-Apr-13 31-May-13 31-May-13 29-Nov-13 30-Aug-13 2-Oct-13 31-Oct-13 28-Nov-14 28-Jun-13 28-Jun-13 28-Jun-13 28-Jun-13 28-Jun-13 28-Jun-13 31-May-13 31-May-13 31-May-13 31-May-13 31-May-13 31-May-13 31-May-13 31-May-13 31-May-13 28-Jun-13 31-Oct-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Sep-13 28-Jun-13 26-Jul-13 15-Oct-13 MR for SWAS MR for Environment Gas Monitoring System MR for MOV (Gate & Globe) MR for On-Off Ball Valve MR for Control Valve MR for MOV (Butterfly) MR for Gas Detection MR for Gas Metering System MR for Gas Pressure Reducing Station MR for Orifice Assembly & Level Gauge MR for Displacement LT & LS MR for PT, PDT & Temp. Transmitter MR for PS, PG & TG MR for Ultrasonic type Flowmeter MR for Turbine type Flowmeter MR for PSV & PRV MR for Instrument Cable MR for Cable Tray Instrumentation for Machinery Package - IFA Instrumentation for Machinery Package - Client Review & Approval Instrumentation for Machinery Package - IFC Instrument Design and Installation Procedure - IFA Instrument Design and Installation Procedure - Client Review & Approval Instrument Design and Installation Procedure - IFC Instrument List - IFA Instrument List - Client Review & Approval Instrument List - IFC N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Instruction Manual Of MV And LV Motor (Tatung Product) - Client Review & Approval Instruction Manual Of MV And LV Motor (Tatung Product) - IFC Instruction Manual Of DV Motor (Kawamata Seiki Product) - IFI Maintenance Manual Of Motors - IFI Installation Manual & Procedure - IFA Installation Manual & Procedure - Client Review & Approval Installation Manual & Procedure - IFC CCTV System - IFI Instruction Manual of CCTV System - IFI Cathodic Prortection System Drawing (Main TR, CW Intake Area) - IFA Cathodic Prortection System Drawing (Main TR, CW Intake Area) - Client Review & Approval Cathodic Prortection System Drawing (Main TR, CW Intake Area) - IFC

2EELXXX4000A 2EELXXX4000C 2EELXXX41000 2EELXXX42000 2EELXXX43000 2EELXXX4300A 2EELXXX4300C 2EELXXX44000 2EELXXX44010 2EELXXX45000 2EELXXX4500A 2EELXXX4500C

Instruction Manual Of MV And LV Motor (Tatung Product) - Client Review & Approval Instruction Manual Of MV And LV Motor (Tatung Product) - IFC Instruction Manual Of DV Motor (Kawamata Seiki Product) - IFI Maintenance Manual Of Motors - IFI Installation Manual & Procedure - IFA Installation Manual & Procedure - Client Review & Approval Installation Manual & Procedure - IFC CCTV System - IFI Instruction Manual of CCTV System - IFI Cathodic Prortection System Drawing (Main TR, CW Intake Area) - IFA Cathodic Prortection System Drawing (Main TR, CW Intake Area) - Client Review & Approval Cathodic Prortection System Drawing (Main TR, CW Intake Area) - IFC

Instrument
2EICXMR16000 2EICXMR17000 2EICXMR20000 2EICXMR21000 2EICXMR22000 2EICXMR23000 2EICXMR24000 2EICXMR25000 2EICXMR26000 2EICXMR27000 2EICXMR28000 2EICXMR29000 2EICXMR30000 2EICXMR31000 2EICXMR32000 2EICXMR33000 2EICXMR34000 2EICXMR35000 2EICXTC01000 2EICXTC0100A 2EICXTC0100C 2EICXTC02000 2EICXTC0200A 2EICXTC0200C 2EICXTC03000 2EICXTC0300A 2EICXTC0300C

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 16 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 21 20 41 21 20 41 21 20 41 21 20 41 21 20 41 19 20 42 19 20 42 19 20 42 19 20 42 19 20 42 19 20 42 19 20 42 22 20 18 22 Start Finish O -1 29-Jul-13 28-Aug-13 30-Sep-13 29-Jul-13 28-Aug-13 30-Sep-13 29-Jul-13 28-Aug-13 30-Sep-13 1-Aug-13 2-Sep-13 4-Oct-13 1-Aug-13 2-Sep-13 4-Oct-13 3-Jun-13 1-Jul-13 29-Jul-13 3-Jun-13 1-Jul-13 29-Jul-13 3-Jun-13 1-Jul-13 29-Jul-13 3-Jun-13 1-Jul-13 29-Jul-13 3-Jun-13 1-Jul-13 29-Jul-13 3-Jun-13 1-Jul-13 29-Jul-13 3-Jun-13 1-Jul-13 29-Jul-13 2-Jan-13 1-Feb-13 6-Mar-13 1-Oct-13 27-Aug-13 27-Sep-13 26-Nov-13 27-Aug-13 27-Sep-13 26-Nov-13 27-Aug-13 27-Sep-13 26-Nov-13 30-Aug-13 2-Oct-13 29-Nov-13 30-Aug-13 2-Oct-13 29-Nov-13 28-Jun-13 26-Jul-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Sep-13 28-Jun-13 26-Jul-13 30-Sep-13 31-Jan-13 5-Mar-13 29-Mar-13 31-Oct-13 N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Typical Installation Detail - IFA Typical Installation Detail - Client Review & Approval Typical Installation Detail - IFC Lead Piping Hook-up Detail - IFA Lead Piping Hook-up Detail - Client Review & Approval Lead Piping Hook-up Detail - IFC Instrument Level Sketch - IFA Instrument Level Sketch - Client Review & Approval Instrument Level Sketch - IFC Instrument Main Cable Schedule - IFA Instrument Main Cable Schedule - Client Review & Approval Instrument Main Cable Schedule - IFC Wiring & Tubing Connection List - IFA Wiring & Tubing Connection List - Client Review & Approval Wiring & Tubing Connection List - IFC Key Plan for Layout drawing - IFA Key Plan for Layout drawing - Client Review & Approval Key Plan for Layout drawing - IFC Symbol and Legend for Layout drawing - IFA Symbol and Legend for Layout drawing - Client Review & Approval Symbol and Legend for Layout drawing - IFC Control Room Layout - IFA Control Room Layout - Client Review & Approval Control Room Layout - IFC Control Room Cable Layout - IFA Control Room Cable Layout - Client Review & Approval Control Room Cable Layout - IFC Instrument Main Cable Layout - IFA Instrument Main Cable Layout - Client Review & Approval Instrument Main Cable Layout - IFC Instrument Signal Cable Layout - IFA Instrument Signal Cable Layout - Client Review & Approval Instrument Signal Cable Layout - IFC Instrument Air Piping Layout - IFA Instrument Air Piping Layout - Client Review & Approval Instrument Air Piping Layout - IFC Control Valve Particular Study & Design DWG - IFA Control Valve Particular Study & Design DWG - Client Review & Approval Control Valve Particular Study & Design DWG - IFC Cable Schedule For Natural Gas System - IFI

2EICXTC04000 2EICXTC0400A 2EICXTC0400C 2EICXTC05000 2EICXTC0500A 2EICXTC0500C 2EICXTC06000 2EICXTC0600A 2EICXTC0600C 2EICXTC07000 2EICXTC0700A 2EICXTC0700C 2EICXTC08000 2EICXTC0800A 2EICXTC0800C 2EICXTC09000 2EICXTC0900A 2EICXTC0900C 2EICXTC10000 2EICXTC1000A 2EICXTC1000C 2EICXTC11000 2EICXTC1100A 2EICXTC1100C 2EICXTC12000 2EICXTC1200A 2EICXTC1200C 2EICXTC13000 2EICXTC1300A 2EICXTC1300C 2EICXTC14000 2EICXTC1400A 2EICXTC1400C 2EICXTC15000 2EICXTC1500A 2EICXTC1500C 2EICXXX16000 2EICXXX1600A 2EICXXX1600C 2EICXXX17000

Typical Installation Detail - IFA Typical Installation Detail - Client Review & Approval Typical Installation Detail - IFC Lead Piping Hook-up Detail - IFA Lead Piping Hook-up Detail - Client Review & Approval Lead Piping Hook-up Detail - IFC Instrument Level Sketch - IFA Instrument Level Sketch - Client Review & Approval Instrument Level Sketch - IFC Instrument Main Cable Schedule - IFA Instrument Main Cable Schedule - Client Review & Approval Instrument Main Cable Schedule - IFC Wiring & Tubing Connection List - IFA Wiring & Tubing Connection List - Client Review & Approval Wiring & Tubing Connection List - IFC Key Plan for Layout drawing - IFA Key Plan for Layout drawing - Client Review & Approval Key Plan for Layout drawing - IFC Symbol and Legend for Layout drawing - IFA Symbol and Legend for Layout drawing - Client Review & Approval Symbol and Legend for Layout drawing - IFC Control Room Layout - IFA Control Room Layout - Client Review & Approval Control Room Layout - IFC Control Room Cable Layout - IFA Control Room Cable Layout - Client Review & Approval Control Room Cable Layout - IFC Instrument Main Cable Layout - IFA Instrument Main Cable Layout - Client Review & Approval Instrument Main Cable Layout - IFC Instrument Signal Cable Layout - IFA Instrument Signal Cable Layout - Client Review & Approval Instrument Signal Cable Layout - IFC Instrument Air Piping Layout - IFA Instrument Air Piping Layout - Client Review & Approval Instrument Air Piping Layout - IFC Control Valve Particular Study & Design DWG - IFA Control Valve Particular Study & Design DWG - Client Review & Approval Control Valve Particular Study & Design DWG - IFC Cable Schedule For Natural Gas System - IFI

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 17 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 21 20 20 22 20 20 20 20 20 20 20 23 20 19 40 20 19 20 22 18 20 21 22 19 19 20 266 HVAC System Particular Study of Unit-2 - IFA HVAC System Particular Study of Unit-2 - Client Review & Approval HVAC System Particular Study of Unit-2 - IFC HVAC System Load Calculation Sheet of Unit-2 - IFA HVAC System Load Calculation Sheet of Unit-2 - Client Review & Approval HVAC System Load Calculation Sheet of Unit-2 - IFC HVAC System Air Flow&Control Diagram - IFA HVAC System Air Flow&Control Diagram - Client Review & Approval HVAC System Air Flow&Control Diagram - IFC HVAC System EQ Arrangement Drawing - IFA HVAC System EQ Arrangement Drawing - Client Review & Approval HVAC System EQ Arrangement Drawing - IFC HVAC System Raceway Arrangement Drawing - IFA 72 20 94 72 20 95 71 20 116 72 20 93 53 Start Finish O -1 3-Mar-14 4-Mar-13 1-Apr-13 29-Apr-13 3-Dec-12 2-Jan-13 30-Jan-13 4-Mar-13 17-Dec-12 16-Jan-13 15-Feb-13 1-Jul-13 1-Aug-13 30-Aug-13 6-Mar-13 2-May-13 3-Jun-13 1-May-14 1-Apr-14 2-Sep-13 3-Nov-14 1-Aug-13 1-Oct-14 1-Oct-13 3-Jun-13 3-Nov-14 15-Apr-13 15-Apr-13 30-Jul-13 28-Aug-13 14-May-13 27-Aug-13 27-Sep-13 29-Apr-13 12-Aug-13 10-Sep-13 12-Aug-13 27-Nov-13 26-Dec-13 27-Nov-13 31-Mar-14 29-Mar-13 26-Apr-13 31-May-13 31-Dec-12 29-Jan-13 28-Feb-13 29-Mar-13 15-Jan-13 14-Feb-13 15-Mar-13 31-Jul-13 29-Aug-13 30-Sep-13 30-Apr-13 31-May-13 28-Jun-13 30-May-14 30-Apr-14 30-Sep-13 28-Nov-14 30-Aug-13 31-Oct-14 28-Oct-13 28-Jun-13 28-Nov-14 13-May-14 29-Jul-13 27-Aug-13 14-Jan-14 26-Aug-13 26-Sep-13 13-Feb-14 9-Aug-13 9-Sep-13 3-Mar-14 26-Nov-13 24-Dec-13 13-May-14 13-Feb-14 HVAC System Particular Study of Unit-2 - IFA HVAC System Particular Study of Unit-2 - Client Review & Approval HVAC System Particular Study of Unit-2 - IFC HVAC System Load Calculation Sheet of Unit-2 - IFA HVAC System Load Calculation Sheet of Unit-2 - Client Review & Approval HVAC System Load Calculation Sheet of Unit-2 - IFC HVAC System Air Flow&Control Diagram - IFA HVAC System Air Flow&Control Diagram - Client Review & Approval HVAC System Air Flow&Control Diagram - IFC HVAC System EQ Arrangement Drawing - IFA HVAC System EQ Arrangement Drawing - Client Review & Approval HVAC System EQ Arrangement Drawing - IFC HVAC System Raceway Arrangement Drawing - IFA Control Drive - IFI Instruction Manual Of Control Drive - IFI Communication List Of Gateway Control For BOP System - IFI Turbine Bypass Control Valve - IFI Instruction Manual Of Turbine Bypass Control Valve - IFI N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Connection Diagram For Natural Gas System - IFI Thermocouple Cable Specification And Drawing - IFA Thermocouple Cable Specification And Drawing - Client Review & Approval Thermocouple Cable Specification And Drawing - IFC Functional Specification - IFA Functional Specification - Client Review & Approval Functional Specification - IFC Basic Plan For Sequence Control And Modulating Control - IFI Central Control Room Layout - IFA Central Control Room Layout - Client Review & Approval Central Control Room Layout - IFC Burner Control Diagram - IFA Burner Control Diagram - Client Review & Approval Burner Control Diagram - IFC Control Diagram - IFA Control Diagram - Client Review & Approval Control Diagram - IFC Burner Local Control Panel - IFI Turbine Oil Pump Local Control Box - IFI Control Valve For Unit(Vender Drawing) - IFI Instruction Manual Of Control Valve - IFI

2EICXXX18000 2EICXXX19000 2EICXXX1900A 2EICXXX1900C 2EICXXX20000 2EICXXX2000A 2EICXXX2000C 2EICXXX21000 2EICXXX22000 2EICXXX2200A 2EICXXX2200C 2EICXXX23000 2EICXXX2300A 2EICXXX2300C 2EICXXX24000 2EICXXX2400A 2EICXXX2400C 2EICXXX25000 2EICXXX26000 2EICXXX27000 2EICXXX28000 2EICXXX29000 2EICXXX30000 2EICXXX31000 2EICXXX32000 2EICXXX33000

Connection Diagram For Natural Gas System - IFI Thermocouple Cable Specification And Drawing - IFA Thermocouple Cable Specification And Drawing - Client Review & Approval Thermocouple Cable Specification And Drawing - IFC Functional Specification - IFA Functional Specification - Client Review & Approval Functional Specification - IFC Basic Plan For Sequence Control And Modulating Control - IFI Central Control Room Layout - IFA Central Control Room Layout - Client Review & Approval Central Control Room Layout - IFC Burner Control Diagram - IFA Burner Control Diagram - Client Review & Approval Burner Control Diagram - IFC Control Diagram - IFA Control Diagram - Client Review & Approval Control Diagram - IFC Burner Local Control Panel - IFI Turbine Oil Pump Local Control Box - IFI Control Valve For Unit(Vender Drawing) - IFI Instruction Manual Of Control Valve - IFI Control Drive - IFI Instruction Manual Of Control Drive - IFI Communication List Of Gateway Control For BOP System - IFI Turbine Bypass Control Valve - IFI Instruction Manual Of Turbine Bypass Control Valve - IFI

HVAC
2EHVSAA01000 2EHVSAA0100A 2EHVSAA0100C 2EHVSAA02000 2EHVSAA0200A 2EHVSAA0200C 2EHVSAA03000 2EHVSAA0300A 2EHVSAA0300C 2EHVSAA04000 2EHVSAA0400A 2EHVSAA0400C 2EHVSAA05000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 18 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 20 40 53 20 40 21 267 Fire Fighting System Particular Study of Unit-2 - IFA Fire Fighting System Particular Study of Unit-2 - Client Review & Approval Fire Fighting System Particular Study of Unit-2 - IFC Outdoor Hydrant Arrangement Drawing for Unit-2 - IFA Outdoor Hydrant Arrangement Drawing for Unit-2 - Client Review & Approval Outdoor Hydrant Arrangement Drawing for Unit-2 - IFC Flow Diagram - IFA Flow Diagram - Client Review & Approval Flow Diagram - IFC F/F System EQ Arrangement Drawing - IFA F/F System EQ Arrangement Drawing - Client Review & Approval F/F System EQ Arrangement Drawing - IFC MR for Fire Fighting Equipment 49 20 74 94 20 82 51 20 136 94 20 82 54 787 787 502 Steel Structure - P/O Issue Steel Structure - Manufacturing & Ex-work Steel Structure - DTS for Power House Steel Structure - DTS for Boiler Structure Steel Structure - DTS for Piperack & Technical Corridor Steel Structure - DTS for Equipment Structure Steel Structure - DTS for Pipe Support & Misc. Steel 107 395 0 0 0 0 0 749 Carbon Steel Seamless Pipe - P/O Issue Carbon Steel Seamless Pipe - Manufacturing Carbon Steel Seamless Pipe - Shipping & DTS Carbon Steel Welded Pipe - P/O Issue Carbon Steel Welded Pipe - Manufacturing Carbon Steel Welded Pipe - Shipping & DTS Stainless Steel Seamless Pipe - P/O Issue Stainless Steel Seamless Pipe - Manufacturing Stainless Steel Seamless Pipe - Shipping & DTS 82 212 61 82 212 61 82 212 61 15-Dec-12 11-Jun-13 1-Sep-13 1-Apr-14 11-Jun-13 1-Sep-13 1-Apr-14 11-Jun-13 1-Sep-13 1-Apr-14 Start Finish O -1 14-Feb-14 17-Mar-14 27-Nov-13 14-Feb-14 17-Mar-14 2-Oct-13 4-Mar-13 4-Mar-13 14-May-13 13-Jun-13 17-Jun-13 1-Nov-13 29-Nov-13 1-Apr-13 17-Jun-13 15-Jul-13 17-Jun-13 1-Nov-13 29-Nov-13 17-Jun-13 7-Nov-12 7-Nov-12 15-Dec-12 15-Dec-12 1-Apr-13 14-Mar-14 13-May-14 13-Feb-14 14-Mar-14 13-May-14 31-Oct-13 31-Mar-14 13-May-13 12-Jun-13 30-Sep-13 31-Oct-13 28-Nov-13 31-Mar-14 14-Jun-13 12-Jul-13 29-Jan-14 31-Oct-13 28-Nov-13 31-Mar-14 30-Aug-13 2-Jan-15 2-Jan-15 30-Apr-14 31-Mar-13 30-Apr-14 15-Nov-13 30-Nov-13 28-Feb-14 28-Feb-14 30-Apr-14 2-Jan-15 31-Aug-13 31-Mar-14 31-May-14 31-Aug-13 31-Mar-14 31-May-14 31-Aug-13 31-Mar-14 31-May-14 Carbon Steel Seamless Pipe - P/O Issue Carbon Steel Seamless Pipe - Manufacturing Carbon Steel Seamless Pipe - Shipping & DTS Carbon Steel Welded Pipe - P/O Issue Carbon Steel Welded Pipe - Manufacturing Carbon Steel Welded Pipe - Shipping & DTS Stainless Steel Seamless Pipe - P/O Issue Stainless Steel Seamless Pipe - Manufacturing Stainless Steel Seamless Pipe - Shipping & DTS Steel Structure - P/O Issue Steel Structure - Manufacturing & Ex-work Steel Structure - DTS for Power House Steel Structure - DTS for Boiler Structure Steel Structure - DTS for Piperack & Technical Corridor Steel Structure - DTS for Equipment Structure Steel Structure - DTS for Pipe Support & Misc. Steel Flow Diagram - IFA Flow Diagram - Client Review & Approval Flow Diagram - IFC F/F System EQ Arrangement Drawing - IFA F/F System EQ Arrangement Drawing - Client Review & Approval F/F System EQ Arrangement Drawing - IFC MR for Fire Fighting Equipment Fire Fighting System Particular Study of Unit-2 - IFA Fire Fighting System Particular Study of Unit-2 - Client Review & Approval Fire Fighting System Particular Study of Unit-2 - IFC Outdoor Hydrant Arrangement Drawing for Unit-2 - IFA Outdoor Hydrant Arrangement Drawing for Unit-2 - Client Review & Approval Outdoor Hydrant Arrangement Drawing for Unit-2 - IFC N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 HVAC System Raceway Arrangement Drawing - Client Review & Approval HVAC System Raceway Arrangement Drawing - IFC HVAC System Control Logic Diagram - IFA HVAC System Control Logic Diagram - Client Review & Approval HVAC System Control Logic Diagram - IFC MR for HVAC Equipment & Control Devices

2EHVSAA0500A 2EHVSAA0500C 2EHVSAA06000 2EHVSAA0600A 2EHVSAA0600C 2EHVXMR07000

HVAC System Raceway Arrangement Drawing - Client Review & Approval HVAC System Raceway Arrangement Drawing - IFC HVAC System Control Logic Diagram - IFA HVAC System Control Logic Diagram - Client Review & Approval HVAC System Control Logic Diagram - IFC MR for HVAC Equipment & Control Devices

Fire Fighting
2EFFSGA01000 2EFFSGA0100A 2EFFSGA0100C 2EFFSGA02000 2EFFSGA0200A 2EFFSGA0200C 2EFFSGA03000 2EFFSGA0300A 2EFFSGA0300C 2EFFSGA04000 2EFFSGA0400A 2EFFSGA0400C 2EFFXMR05000

Procurement
Common
Steel Structure
2PSSXXX01000 2PSSXXX0100A 2PSSXXX0100B 2PSSXXX0100C 2PSSXXX0100D 2PSSXXX0100E 2PSSXXX0100F

Piping
2PPIXXX01000 2PPIXXX0100A 2PPIXXX0100B 2PPIXXX02000 2PPIXXX0200A 2PPIXXX0200B 2PPIXXX03000 2PPIXXX0300A 2PPIXXX0300B

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 19 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 82 212 61 82 212 61 92 212 61 92 212 61 92 212 61 60 212 61 60 212 61 79 212 61 79 212 61 79 212 61 79 212 61 79 212 61 79 212 61 59 Start Finish O -1 11-Jun-13 1-Sep-13 1-Apr-14 11-Jun-13 1-Sep-13 1-Apr-14 1-Jun-13 1-Sep-13 1-Apr-14 1-Jun-13 1-Sep-13 1-Apr-14 1-Jun-13 1-Sep-13 1-Apr-14 16-Jul-13 14-Sep-13 14-Apr-14 16-Jul-13 14-Sep-13 14-Apr-14 29-Jun-13 16-Sep-13 16-Apr-14 29-Jun-13 16-Sep-13 16-Apr-14 29-Jun-13 16-Sep-13 16-Apr-14 29-Jun-13 16-Sep-13 16-Apr-14 29-Jun-13 16-Sep-13 16-Apr-14 29-Jun-13 16-Sep-13 16-Apr-14 1-Jan-14 31-Aug-13 31-Mar-14 31-May-14 31-Aug-13 31-Mar-14 31-May-14 31-Aug-13 31-Mar-14 31-May-14 31-Aug-13 31-Mar-14 31-May-14 31-Aug-13 31-Mar-14 31-May-14 13-Sep-13 13-Apr-14 13-Jun-14 13-Sep-13 13-Apr-14 13-Jun-14 15-Sep-13 15-Apr-14 15-Jun-14 15-Sep-13 15-Apr-14 15-Jun-14 15-Sep-13 15-Apr-14 15-Jun-14 15-Sep-13 15-Apr-14 15-Jun-14 15-Sep-13 15-Apr-14 15-Jun-14 15-Sep-13 15-Apr-14 15-Jun-14 28-Feb-14 Bronze Vavle - P/O Issue Bronze Vavle - Manufacturing Bronze Vavle - Shipping & DTS PE Lined Piping - P/O Issue Butterfly Valve - P/O Issue Butterfly Valve - Manufacturing Butterfly Valve - Shipping & DTS Ball Valve - P/O Issue Ball Valve - Manufacturing Ball Valve - Shipping & DTS Forged Steel Valve - P/O Issue Forged Steel Valve - Manufacturing Forged Steel Valve - Shipping & DTS Cast Steel Valve (Up To 600#) - P/O Issue Cast Steel Valve (Up To 600#) - Manufacturing Cast Steel Valve (Up To 600#) - Shipping & DTS Cast Steel Valve (900# And Higher) - P/O Issue Cast Steel Valve (900# And Higher) - Manufacturing Cast Steel Valve (900# And Higher) - Shipping & DTS Bolt/Nut - P/O Issue Bolt/Nut - Manufacturing Bolt/Nut - Shipping & DTS Gasket - P/O Issue Gasket - Manufacturing Gasket - Shipping & DTS Flange - P/O Issue Flange - Manufacturing Flange - Shipping & DTS Wrought Steel Fitting - P/O Issue Wrought Steel Fitting - Manufacturing Wrought Steel Fitting - Shipping & DTS Forged Steel Fitting - P/O Issue Forged Steel Fitting - Manufacturing Forged Steel Fitting - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Stainless Steel Welded Pipe - P/O Issue Stainless Steel Welded Pipe - Manufacturing Stainless Steel Welded Pipe - Shipping & DTS Low Alloy Steel Seamless Pipe - P/O Issue Low Alloy Steel Seamless Pipe - Manufacturing Low Alloy Steel Seamless Pipe - Shipping & DTS

2PPIXXX04000 2PPIXXX0400A 2PPIXXX0400B 2PPIXXX05000 2PPIXXX0500A 2PPIXXX0500B 2PPIXXX06000 2PPIXXX0600A 2PPIXXX0600B 2PPIXXX07000 2PPIXXX0700A 2PPIXXX0700B 2PPIXXX08000 2PPIXXX0800A 2PPIXXX0800B 2PPIXXX09000 2PPIXXX0900A 2PPIXXX0900B 2PPIXXX10000 2PPIXXX1000A 2PPIXXX1000B 2PPIXXX11000 2PPIXXX1100A 2PPIXXX1100B 2PPIXXX12000 2PPIXXX1200A 2PPIXXX1200B 2PPIXXX13000 2PPIXXX1300A 2PPIXXX1300B 2PPIXXX14000 2PPIXXX1400A 2PPIXXX1400B 2PPIXXX15000 2PPIXXX1500A 2PPIXXX1500B 2PPIXXX16000 2PPIXXX1600A 2PPIXXX1600B 2PPIXXX17000

Stainless Steel Welded Pipe - P/O Issue Stainless Steel Welded Pipe - Manufacturing Stainless Steel Welded Pipe - Shipping & DTS Low Alloy Steel Seamless Pipe - P/O Issue Low Alloy Steel Seamless Pipe - Manufacturing Low Alloy Steel Seamless Pipe - Shipping & DTS Forged Steel Fitting - P/O Issue Forged Steel Fitting - Manufacturing Forged Steel Fitting - Shipping & DTS Wrought Steel Fitting - P/O Issue Wrought Steel Fitting - Manufacturing Wrought Steel Fitting - Shipping & DTS Flange - P/O Issue Flange - Manufacturing Flange - Shipping & DTS Gasket - P/O Issue Gasket - Manufacturing Gasket - Shipping & DTS Bolt/Nut - P/O Issue Bolt/Nut - Manufacturing Bolt/Nut - Shipping & DTS Forged Steel Valve - P/O Issue Forged Steel Valve - Manufacturing Forged Steel Valve - Shipping & DTS Cast Steel Valve (Up To 600#) - P/O Issue Cast Steel Valve (Up To 600#) - Manufacturing Cast Steel Valve (Up To 600#) - Shipping & DTS Cast Steel Valve (900# And Higher) - P/O Issue Cast Steel Valve (900# And Higher) - Manufacturing Cast Steel Valve (900# And Higher) - Shipping & DTS Ball Valve - P/O Issue Ball Valve - Manufacturing Ball Valve - Shipping & DTS Butterfly Valve - P/O Issue Butterfly Valve - Manufacturing Butterfly Valve - Shipping & DTS Bronze Vavle - P/O Issue Bronze Vavle - Manufacturing Bronze Vavle - Shipping & DTS PE Lined Piping - P/O Issue

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 20 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 153 61 59 153 61 46 183 62 45 183 62 45 183 62 45 183 62 45 183 62 45 183 62 107 122 31 47 153 61 45 151 61 45 181 61 107 181 61 107 150 Start Finish O -1 1-Mar-14 1-Aug-14 1-Jan-14 1-Mar-14 1-Aug-14 16-Apr-13 1-Jun-13 1-Dec-13 17-Apr-13 1-Jun-13 1-Dec-13 17-Apr-13 1-Jun-13 1-Dec-13 17-Apr-13 1-Jun-13 1-Dec-13 17-Apr-13 1-Jun-13 1-Dec-13 17-Apr-13 1-Jun-13 1-Dec-13 15-Dec-12 1-Apr-13 1-Aug-13 16-Jul-13 1-Sep-13 1-Feb-14 17-Sep-13 1-Nov-13 1-Apr-14 17-Sep-13 1-Nov-13 1-May-14 17-Oct-13 1-Feb-14 1-Aug-14 17-Oct-13 1-Feb-14 31-Jul-14 30-Sep-14 28-Feb-14 31-Jul-14 30-Sep-14 31-May-13 30-Nov-13 31-Jan-14 31-May-13 30-Nov-13 31-Jan-14 31-May-13 30-Nov-13 31-Jan-14 31-May-13 30-Nov-13 31-Jan-14 31-May-13 30-Nov-13 31-Jan-14 31-May-13 30-Nov-13 31-Jan-14 31-Mar-13 31-Jul-13 31-Aug-13 31-Aug-13 31-Jan-14 2-Apr-14 31-Oct-13 31-Mar-14 31-May-14 31-Oct-13 30-Apr-14 30-Jun-14 31-Jan-14 31-Jul-14 30-Sep-14 31-Jan-14 30-Jun-14 Sight Glass - P/O Issue Sight Glass - Manufacturing Strainer - P/O Issue Strainer - Manufacturing Strainer - Shipping & DTS Steam/Air Trap - P/O Issue Steam/Air Trap - Manufacturing Steam/Air Trap - Shipping & DTS Bolt/Nut For U/G - P/O Issue Bolt/Nut For U/G - Manufacturing Bolt/Nut For U/G - Shipping & DTS Coating and Lining Piping for U/G - P/O Issue Coating and Lining Piping for U/G - Manufacturing Coating and Lining Piping for U/G - Shipping & DTS RTRP Piping - P/O Issue RTRP Piping - Manufacturing RTRP Piping - Shipping & DTS PVC/ABS Piping - P/O Issue PVC/ABS Piping - Manufacturing PVC/ABS Piping - Shipping & DTS Gasket For U/G - P/O Issue Gasket For U/G - Manufacturing Gasket For U/G - Shipping & DTS Flange For U/G - P/O Issue Flange For U/G - Manufacturing Flange For U/G - Shipping & DTS Carbon Steel Welded Pipe For U/G - P/O Issue Carbon Steel Welded Pipe For U/G - Manufacturing Carbon Steel Welded Pipe For U/G - Shipping & DTS Forged Steel Fitting For U/G - P/O Issue Forged Steel Fitting For U/G - Manufacturing Forged Steel Fitting For U/G - Shipping & DTS Wrought Steel Fitting For U/G - P/O Issue Wrought Steel Fitting For U/G - Manufacturing Wrought Steel Fitting For U/G - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 PE Lined Piping - Manufacturing PE Lined Piping - Shipping & DTS Epoxy Lined Piping - P/O Issue Epoxy Lined Piping - Manufacturing Epoxy Lined Piping - Shipping & DTS

2PPIXXX1700A 2PPIXXX1700B 2PPIXXX18000 2PPIXXX1800A 2PPIXXX1800B 2PPIXXX20000 2PPIXXX2000A 2PPIXXX2000B 2PPIXXX20200 2PPIXXX2020A 2PPIXXX2020B 2PPIXXX21000 2PPIXXX2100A 2PPIXXX2100B 2PPIXXX22000 2PPIXXX2200A 2PPIXXX2200B 2PPIXXX22200 2PPIXXX2220A 2PPIXXX2220B 2PPIXXX22400 2PPIXXX2240A 2PPIXXX2240B 2PPIXXX22600 2PPIXXX2260A 2PPIXXX2260B 2PPIXXX23000 2PPIXXX2300A 2PPIXXX2300B 2PPIXXX24000 2PPIXXX2400A 2PPIXXX2400B 2PPIXXX25000 2PPIXXX2500A 2PPIXXX2500B 2PPIXXX26000 2PPIXXX2600A 2PPIXXX2600B 2PPIXXX27000 2PPIXXX2700A

PE Lined Piping - Manufacturing PE Lined Piping - Shipping & DTS Epoxy Lined Piping - P/O Issue Epoxy Lined Piping - Manufacturing Epoxy Lined Piping - Shipping & DTS Carbon Steel Welded Pipe For U/G - P/O Issue Carbon Steel Welded Pipe For U/G - Manufacturing Carbon Steel Welded Pipe For U/G - Shipping & DTS Forged Steel Fitting For U/G - P/O Issue Forged Steel Fitting For U/G - Manufacturing Forged Steel Fitting For U/G - Shipping & DTS Wrought Steel Fitting For U/G - P/O Issue Wrought Steel Fitting For U/G - Manufacturing Wrought Steel Fitting For U/G - Shipping & DTS Flange For U/G - P/O Issue Flange For U/G - Manufacturing Flange For U/G - Shipping & DTS Gasket For U/G - P/O Issue Gasket For U/G - Manufacturing Gasket For U/G - Shipping & DTS Bolt/Nut For U/G - P/O Issue Bolt/Nut For U/G - Manufacturing Bolt/Nut For U/G - Shipping & DTS Coating and Lining Piping for U/G - P/O Issue Coating and Lining Piping for U/G - Manufacturing Coating and Lining Piping for U/G - Shipping & DTS RTRP Piping - P/O Issue RTRP Piping - Manufacturing RTRP Piping - Shipping & DTS PVC/ABS Piping - P/O Issue PVC/ABS Piping - Manufacturing PVC/ABS Piping - Shipping & DTS Strainer - P/O Issue Strainer - Manufacturing Strainer - Shipping & DTS Steam/Air Trap - P/O Issue Steam/Air Trap - Manufacturing Steam/Air Trap - Shipping & DTS Sight Glass - P/O Issue Sight Glass - Manufacturing

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 21 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 62 77 150 62 77 181 61 137 181 61 77 120 61 77 120 61 107 150 62 724 Mechanical for MHI - P/O Issue Economizer - P/O Issue Economizer - Manufacturing Economizer - Shipping & DTS Furnace - P/O Issue Furnace - Manufacturing Furnace - Shipping & DTS Header - P/O Issue Header - Manufacturing Header - Shipping & DTS Steam Drum - P/O Issue Steam Drum - Manufacturing Steam Drum - Shipping & DTS Boiler Circulation Pump - P/O Issue Boiler Circulation Pump - Manufacturing Boiler Circulation Pump - Shipping & DTS Superheater - P/O Issue Superheater - Manufacturing Superheater - Shipping & DTS Reheater - P/O Issue 1 0 479 61 0 479 61 0 479 61 0 479 46 0 479 61 0 451 61 0 7-Nov-12 1-Feb-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 Start Finish O -1 1-Jul-14 18-Feb-14 6-May-14 3-Oct-14 18-Feb-14 6-May-14 3-Nov-14 17-Sep-13 1-Feb-14 1-Aug-14 18-Feb-14 6-May-14 3-Sep-14 18-Feb-14 6-May-14 3-Sep-14 17-Jan-14 4-May-14 1-Oct-14 7-Nov-12 7-Nov-12 31-Aug-14 5-May-14 2-Oct-14 3-Dec-14 5-May-14 2-Nov-14 2-Jan-15 31-Jan-14 31-Jul-14 30-Sep-14 5-May-14 2-Sep-14 2-Nov-14 5-May-14 2-Sep-14 2-Nov-14 3-May-14 30-Sep-14 1-Dec-14 31-Oct-14 7-Nov-12 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 15-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 31-Jan-14 2-Apr-14 7-Nov-12 Reheater - P/O Issue Superheater - P/O Issue Superheater - Manufacturing Superheater - Shipping & DTS Boiler Circulation Pump - P/O Issue Boiler Circulation Pump - Manufacturing Boiler Circulation Pump - Shipping & DTS Steam Drum - P/O Issue Steam Drum - Manufacturing Steam Drum - Shipping & DTS Header - P/O Issue Header - Manufacturing Header - Shipping & DTS Furnace - P/O Issue Furnace - Manufacturing Furnace - Shipping & DTS Mechanical for MHI - P/O Issue Economizer - P/O Issue Economizer - Manufacturing Economizer - Shipping & DTS Insulation Kit - P/O Issue Insulation Kit - Manufacturing Insulation Kit - Shipping & DTS Safety And Eye Shower - P/O Issue Safety And Eye Shower - Manufacturing Safety And Eye Shower - Shipping & DTS Spring Hanger Support - P/O Issue Spring Hanger Support - Manufacturing Spring Hanger Support - Shipping & DTS General (Rigid) Support - P/O Issue General (Rigid) Support - Manufacturing General (Rigid) Support - Shipping & DTS Expansion Joint - P/O Issue Expansion Joint - Manufacturing Expansion Joint - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Sight Glass - Shipping & DTS Hose & Hose Connector - P/O Issue Hose & Hose Connector - Manufacturing Hose & Hose Connector - Shipping & DTS

2PPIXXX2700B 2PPIXXX28000 2PPIXXX2800A 2PPIXXX2800B 2PPIXXX29000 2PPIXXX2900A 2PPIXXX2900B 2PPIXXX30000 2PPIXXX3000A 2PPIXXX3000B 2PPIXXX31000 2PPIXXX3100A 2PPIXXX3100B 2PPIXXX32000 2PPIXXX3200A 2PPIXXX3200B 2PPIXXX33000 2PPIXXX3300A 2PPIXXX3300B

Sight Glass - Shipping & DTS Hose & Hose Connector - P/O Issue Hose & Hose Connector - Manufacturing Hose & Hose Connector - Shipping & DTS Expansion Joint - P/O Issue Expansion Joint - Manufacturing Expansion Joint - Shipping & DTS Insulation Kit - P/O Issue Insulation Kit - Manufacturing Insulation Kit - Shipping & DTS Safety And Eye Shower - P/O Issue Safety And Eye Shower - Manufacturing Safety And Eye Shower - Shipping & DTS Spring Hanger Support - P/O Issue Spring Hanger Support - Manufacturing Spring Hanger Support - Shipping & DTS General (Rigid) Support - P/O Issue General (Rigid) Support - Manufacturing General (Rigid) Support - Shipping & DTS

Mechanical
2PMEHAC00000 2PMEHAC01000 2PMEHAC0100A 2PMEHAC0100B 2PMEHAD02000 2PMEHAD0200A 2PMEHAD0200B 2PMEHAD02200 2PMEHAD0220A 2PMEHAD0220B 2PMEHAG03000 2PMEHAG0300A 2PMEHAG0300B 2PMEHAG06000 2PMEHAG0600A 2PMEHAG0600B 2PMEHAH04000 2PMEHAH0400A 2PMEHAH0400B 2PMEHAJ05000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 22 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 420 61 0 466 122 0 0 466 122 0 0 510 62 0 540 61 0 540 61 0 601 61 0 479 61 0 479 61 0 571 61 0 451 59 0 510 61 0 540 61 7-Nov-12 1-May-14 7-Nov-12 1-Apr-14 7-Nov-12 1-Feb-14 7-Nov-12 1-Jun-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Jul-14 7-Nov-12 1-May-14 7-Nov-12 1-May-14 7-Nov-12 1-Apr-14 7-Nov-12 15-Dec-13 7-Nov-12 15-Dec-13 Start Finish O -1 7-Nov-12 1-Jan-14 31-Dec-13 2-Mar-14 7-Nov-12 15-Feb-14 15-Apr-14 15-Feb-14 7-Nov-12 15-Feb-14 15-Apr-14 15-Feb-14 7-Nov-12 31-Mar-14 1-Jun-14 7-Nov-12 30-Apr-14 30-Jun-14 7-Nov-12 30-Apr-14 30-Jun-14 7-Nov-12 30-Jun-14 30-Aug-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 31-May-14 31-Jul-14 7-Nov-12 31-Jan-14 31-Mar-14 7-Nov-12 31-Mar-14 31-May-14 7-Nov-12 30-Apr-14 30-Jun-14 Turbine Driven Boiler Feed Pump - P/O Issue Turbine Driven Boiler Feed Pump - Manufacturing Turbine Driven Boiler Feed Pump - Shipping & DTS Deaerator Recirculation Pump - P/O Issue Deaerator Recirculation Pump - Manufacturing Deaerator Recirculation Pump - Shipping & DTS Deaerator and Feedwater Storage Tank - P/O Issue Deaerator and Feedwater Storage Tank - Manufacturing Deaerator and Feedwater Storage Tank - Shipping & DTS Gas Recirculation Fan - P/O Issue Gas Recirculation Fan - Manufacturing Gas Recirculation Fan - Shipping & DTS Gas Air Heater - P/O Issue Gas Air Heater - Manufacturing Gas Air Heater - Shipping & DTS Steam Air Heater - P/O Issue Steam Air Heater - Manufacturing Steam Air Heater - Shipping & DTS Forced Draft Fan - P/O Issue Forced Draft Fan - Manufacturing Forced Draft Fan - Shipping & DTS Diesel Oil Igniter - P/O Issue Diesel Oil Igniter - Manufacturing Diesel Oil Igniter - Shipping & DTS Fuel And Diesel Oil Burner - P/O Issue Fuel And Diesel Oil Burner - Manufacturing Fuel And Diesel Oil Burner - Shipping & DTS Sootblower - P/O Issue Sootblower - Manufacturing Sootblower - Shipping & DTS High Pressure Piping - P/O Issue High Pressure Piping - Manufacturing High Pressure Piping - Shipping & DTS High Pressure Piping - 1st DTS Major Piping(Main Steam, Reheat Steam) - P/O Issue Major Piping(Main Steam, Reheat Steam) - Manufacturing Major Piping(Main Steam, Reheat Steam) - Shipping & DTS Major Piping(Main Steam, Reheat Steam) - 1st DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Reheater - Manufacturing Reheater - Shipping & DTS

2PMEHAJ0500A 2PMEHAJ0500B 2PMEHAJ05200 2PMEHAJ0520A 2PMEHAJ0520B 2PMEHAJ0520C 2PMEHAJ05400 2PMEHAJ0540A 2PMEHAJ0540B 2PMEHAJ0540C 2PMEHCB07000 2PMEHCB0700A 2PMEHCB0700B 2PMEHHA12000 2PMEHHA1200A 2PMEHHA1200B 2PMEHJA13000 2PMEHJA1300A 2PMEHJA1300B 2PMEHLB08000 2PMEHLB0800A 2PMEHLB0800B 2PMEHLC09000 2PMEHLC0900A 2PMEHLC0900B 2PMEHLD10000 2PMEHLD1000A 2PMEHLD1000B 2PMEHNF11000 2PMEHNF1100A 2PMEHNF1100B 2PMELAA28000 2PMELAA2800A 2PMELAA2800B 2PMELAB29000 2PMELAB2900A 2PMELAB2900B 2PMELAC30000 2PMELAC3000A 2PMELAC3000B

Reheater - Manufacturing Reheater - Shipping & DTS Major Piping(Main Steam, Reheat Steam) - P/O Issue Major Piping(Main Steam, Reheat Steam) - Manufacturing Major Piping(Main Steam, Reheat Steam) - Shipping & DTS Major Piping(Main Steam, Reheat Steam) - 1st DTS High Pressure Piping - P/O Issue High Pressure Piping - Manufacturing High Pressure Piping - Shipping & DTS High Pressure Piping - 1st DTS Sootblower - P/O Issue Sootblower - Manufacturing Sootblower - Shipping & DTS Fuel And Diesel Oil Burner - P/O Issue Fuel And Diesel Oil Burner - Manufacturing Fuel And Diesel Oil Burner - Shipping & DTS Diesel Oil Igniter - P/O Issue Diesel Oil Igniter - Manufacturing Diesel Oil Igniter - Shipping & DTS Forced Draft Fan - P/O Issue Forced Draft Fan - Manufacturing Forced Draft Fan - Shipping & DTS Steam Air Heater - P/O Issue Steam Air Heater - Manufacturing Steam Air Heater - Shipping & DTS Gas Air Heater - P/O Issue Gas Air Heater - Manufacturing Gas Air Heater - Shipping & DTS Gas Recirculation Fan - P/O Issue Gas Recirculation Fan - Manufacturing Gas Recirculation Fan - Shipping & DTS Deaerator and Feedwater Storage Tank - P/O Issue Deaerator and Feedwater Storage Tank - Manufacturing Deaerator and Feedwater Storage Tank - Shipping & DTS Deaerator Recirculation Pump - P/O Issue Deaerator Recirculation Pump - Manufacturing Deaerator Recirculation Pump - Shipping & DTS Turbine Driven Boiler Feed Pump - P/O Issue Turbine Driven Boiler Feed Pump - Manufacturing Turbine Driven Boiler Feed Pump - Shipping & DTS

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 23 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 0 510 61 0 510 61 0 451 59 0 479 61 0 451 59 0 540 61 0 479 61 0 479 61 0 479 61 0 479 61 0 494 16 0 0 451 61 0 540 62 7-Nov-12 1-May-14 7-Nov-12 1-Feb-14 7-Nov-12 16-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-May-14 7-Nov-12 1-Feb-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Feb-14 7-Nov-12 1-Apr-14 7-Nov-12 1-Apr-14 Start Finish O -1 7-Nov-12 31-Mar-14 31-May-14 7-Nov-12 31-Mar-14 31-May-14 7-Nov-12 31-Jan-14 31-Mar-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 31-Jan-14 31-Mar-14 7-Nov-12 30-Apr-14 30-Jun-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 15-Mar-14 31-Mar-14 28-Feb-14 7-Nov-12 31-Jan-14 2-Apr-14 7-Nov-12 30-Apr-14 1-Jul-14 Turning Gear - P/O Issue Turning Gear - Manufacturing Turning Gear - Shipping & DTS Condenser Vacuum Pump - P/O Issue Condenser Vacuum Pump - Manufacturing Condenser Vacuum Pump - Shipping & DTS Condenser - P/O Issue Condenser - Manufacturing Condenser - Ex-work Condenser - DTS for Intermediate Part Interceptor Valve - P/O Issue Interceptor Valve - Manufacturing Interceptor Valve - Shipping & DTS Reheat Stop Valve - P/O Issue Reheat Stop Valve - Manufacturing Reheat Stop Valve - Shipping & DTS Governing Valve - P/O Issue Governing Valve - Manufacturing Governing Valve - Shipping & DTS Main Stop Valve - P/O Issue Main Stop Valve - Manufacturing Main Stop Valve - Shipping & DTS Steam Turbine - P/O Issue Steam Turbine - Manufacturing Steam Turbine - Shipping & DTS Low Pressure Feedwater Heater - P/O Issue Low Pressure Feedwater Heater - Manufacturing Low Pressure Feedwater Heater - Shipping & DTS Condensate Pump - P/O Issue Condensate Pump - Manufacturing Condensate Pump - Shipping & DTS High Pressure Feedwater Heater - P/O Issue High Pressure Feedwater Heater - Manufacturing High Pressure Feedwater Heater - Shipping & DTS Motor Driven Boiler Feed Pump - P/O Issue Motor Driven Boiler Feed Pump - Manufacturing Motor Driven Boiler Feed Pump - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

2PMELAC31000 2PMELAC3100A 2PMELAC3100B 2PMELAC32000 2PMELAC3200A 2PMELAC3200B 2PMELAD33000 2PMELAD3300A 2PMELAD3300B 2PMELCB25000 2PMELCB2500A 2PMELCB2500B 2PMELCC27000 2PMELCC2700A 2PMELCC2700B 2PMEMAA15000 2PMEMAA1500A 2PMEMAA1500B 2PMEMAA16000 2PMEMAA1600A 2PMEMAA1600B 2PMEMAA17000 2PMEMAA1700A 2PMEMAA1700B 2PMEMAB18000 2PMEMAB1800A 2PMEMAB1800B 2PMEMAB19000 2PMEMAB1900A 2PMEMAB1900B 2PMEMAG24000 2PMEMAG2400A 2PMEMAG2400B 2PMEMAG2400C 2PMEMAJ23000 2PMEMAJ2300A 2PMEMAJ2300B 2PMEMAK20000 2PMEMAK2000A 2PMEMAK2000B

T-BFP Booster Pump - P/O Issue T-BFP Booster Pump - Manufacturing T-BFP Booster Pump - Shipping & DTS Motor Driven Boiler Feed Pump - P/O Issue Motor Driven Boiler Feed Pump - Manufacturing Motor Driven Boiler Feed Pump - Shipping & DTS High Pressure Feedwater Heater - P/O Issue High Pressure Feedwater Heater - Manufacturing High Pressure Feedwater Heater - Shipping & DTS Condensate Pump - P/O Issue Condensate Pump - Manufacturing Condensate Pump - Shipping & DTS Low Pressure Feedwater Heater - P/O Issue Low Pressure Feedwater Heater - Manufacturing Low Pressure Feedwater Heater - Shipping & DTS Steam Turbine - P/O Issue Steam Turbine - Manufacturing Steam Turbine - Shipping & DTS Main Stop Valve - P/O Issue Main Stop Valve - Manufacturing Main Stop Valve - Shipping & DTS Governing Valve - P/O Issue Governing Valve - Manufacturing Governing Valve - Shipping & DTS Reheat Stop Valve - P/O Issue Reheat Stop Valve - Manufacturing Reheat Stop Valve - Shipping & DTS Interceptor Valve - P/O Issue Interceptor Valve - Manufacturing Interceptor Valve - Shipping & DTS Condenser - P/O Issue Condenser - Manufacturing Condenser - Ex-work Condenser - DTS for Intermediate Part Condenser Vacuum Pump - P/O Issue Condenser Vacuum Pump - Manufacturing Condenser Vacuum Pump - Shipping & DTS Turning Gear - P/O Issue Turning Gear - Manufacturing Turning Gear - Shipping & DTS

T-BFP Booster Pump - P/O Issue T-BFP Booster Pump - Manufacturing T-BFP Booster Pump - Shipping & DTS

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 24 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 0 420 61 0 540 61 0 451 61 0 540 61 0 540 61 0 389 61 0 510 61 142 365 61 0 83 577 304 0 0 0 0 0 60 397 61 60 397 61 116 1-Mar-13 30-Apr-13 1-Jun-14 1-Mar-13 30-Apr-13 1-Jun-14 6-Dec-12 10-Nov-12 1-Feb-13 1-Jan-14 7-Nov-12 1-Apr-14 10-Nov-12 1-Apr-13 1-Apr-14 7-Nov-12 1-Dec-13 7-Nov-12 1-May-14 7-Nov-12 1-May-14 7-Nov-12 1-Feb-14 7-Nov-12 1-May-14 7-Nov-12 1-Jan-14 Start Finish O -1 7-Nov-12 31-Dec-13 2-Mar-14 7-Nov-12 30-Apr-14 30-Jun-14 7-Nov-12 31-Jan-14 2-Apr-14 7-Nov-12 30-Apr-14 30-Jun-14 7-Nov-12 30-Apr-14 30-Jun-14 7-Nov-12 30-Nov-13 30-Jan-14 7-Nov-12 31-Mar-14 31-May-14 31-Mar-13 31-Mar-14 31-May-14 28-Feb-14 31-Jan-13 31-Aug-14 31-Oct-14 28-Feb-14 31-Mar-14 31-May-14 31-Jul-14 31-Jul-14 29-Apr-13 31-May-14 31-Jul-14 29-Apr-13 31-May-14 31-Jul-14 31-Mar-13 CTCS & Debris Filter - P/O Issue Intake Facilities - P/O Issue Intake Facilities - Manufacturing Intake Facilities - Shipping & DTS CWP - P/O Issue CWP - Manufacturing CWP - Shipping & DTS FGD - DTS for Absorber FGD - DTS for Steel Structure FGD - DTS for Flue Gas Duct FGD - DTS for Booster Fan FGD - DTS for GGH FGD - P/O Issue FGD - Manufacturing FGD - Shipping & DTS ESP - P/O Issue ESP - Manufacturing ESP - Shipping & DTS ESP - DTS for Steel Structure Natural Gas Burner - P/O Issue Natural Gas Burner - Manufacturing Natural Gas Burner - Shipping & DTS Safety Valve - P/O Issue Safety Valve - Manufacturing Safety Valve - Shipping & DTS Boiler Feed Pump Turbine - P/O Issue Boiler Feed Pump Turbine - Manufacturing Boiler Feed Pump Turbine - Shipping & DTS Generator and Auxiliaries - P/O Issue Generator and Auxiliaries - Manufacturing Generator and Auxiliaries - Shipping & DTS Gland Steam Condenser - P/O Issue Gland Steam Condenser - Manufacturing Gland Steam Condenser - Shipping & DTS Main Oil Tank & Pump - P/O Issue Main Oil Tank & Pump - Manufacturing Main Oil Tank & Pump - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

2PMEMAN22000 2PMEMAN2200A 2PMEMAN2200B 2PMEMAV21000 2PMEMAV2100A 2PMEMAV2100B 2PMEMAW26000 2PMEMAW2600A 2PMEMAW2600B 2PMEMKA35000 2PMEMKA3500A 2PMEMKA3500B 2PMEXAA34000 2PMEXAA3400A 2PMEXAA3400B 2PMEXAA34200 2PMEXAA3420A 2PMEXAA3420B 2PMEXXX14000 2PMEXXX1400A 2PMEXXX1400B 2PMEXXX38000 2PMEXXX3800A 2PMEXXX3800B 2PMEXXX3800C 2PMEXXX39000 2PMEXXX3900A 2PMEXXX3900B 2PMEXXX3900C 2PMEXXX3900C10 2PMEXXX3900C20 2PMEXXX3900C30 2PMEXXX3900D 2PMEXXX40000 2PMEXXX4000A 2PMEXXX4000B 2PMEXXX41000 2PMEXXX4100A 2PMEXXX4100B 2PMEXXX42000

HP/LP Turbine Bypass Valve - P/O Issue HP/LP Turbine Bypass Valve - Manufacturing HP/LP Turbine Bypass Valve - Shipping & DTS Main Oil Tank & Pump - P/O Issue Main Oil Tank & Pump - Manufacturing Main Oil Tank & Pump - Shipping & DTS Gland Steam Condenser - P/O Issue Gland Steam Condenser - Manufacturing Gland Steam Condenser - Shipping & DTS Generator and Auxiliaries - P/O Issue Generator and Auxiliaries - Manufacturing Generator and Auxiliaries - Shipping & DTS Boiler Feed Pump Turbine - P/O Issue Boiler Feed Pump Turbine - Manufacturing Boiler Feed Pump Turbine - Shipping & DTS Safety Valve - P/O Issue Safety Valve - Manufacturing Safety Valve - Shipping & DTS Natural Gas Burner - P/O Issue Natural Gas Burner - Manufacturing Natural Gas Burner - Shipping & DTS ESP - P/O Issue ESP - Manufacturing ESP - Shipping & DTS ESP - DTS for Steel Structure FGD - P/O Issue FGD - Manufacturing FGD - Shipping & DTS FGD - DTS for Absorber FGD - DTS for Steel Structure FGD - DTS for Flue Gas Duct FGD - DTS for Booster Fan FGD - DTS for GGH CWP - P/O Issue CWP - Manufacturing CWP - Shipping & DTS Intake Facilities - P/O Issue Intake Facilities - Manufacturing Intake Facilities - Shipping & DTS CTCS & Debris Filter - P/O Issue

HP/LP Turbine Bypass Valve - P/O Issue HP/LP Turbine Bypass Valve - Manufacturing HP/LP Turbine Bypass Valve - Shipping & DTS

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 25 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 334 61 60 426 61 60 365 61 116 426 61 116 337 59 63 334 61 60 426 61 60 365 61 116 426 61 63 395 153 0 177 304 120 60 365 61 90 365 62 58 6-Dec-12 1-Jun-13 1-Feb-14 2-Apr-13 1-Jun-13 1-Jun-14 2-Apr-13 1-Jul-13 1-Jul-14 4-Jun-13 Start Finish O -1 1-Apr-13 1-Mar-14 2-Apr-13 1-Jun-13 1-Aug-14 2-Apr-13 1-Jun-13 1-Jun-14 6-Dec-12 1-Apr-13 1-Jun-14 6-Dec-12 1-Apr-13 4-Mar-14 30-Mar-13 1-Jun-13 1-May-14 2-Apr-13 1-Jun-13 1-Aug-14 2-Apr-13 1-Jun-13 1-Jun-14 6-Dec-12 1-Apr-13 1-Jun-14 30-Mar-13 1-Jun-13 1-Apr-14 28-Feb-14 30-Apr-14 31-May-13 31-Jul-14 30-Sep-14 31-May-13 31-May-14 31-Jul-14 31-Mar-13 31-May-14 31-Jul-14 31-Mar-13 3-Mar-14 1-May-14 31-May-13 30-Apr-14 30-Jun-14 31-May-13 31-Jul-14 30-Sep-14 31-May-13 31-May-14 31-Jul-14 31-Mar-13 31-May-14 31-Jul-14 31-May-13 30-Jun-14 31-Aug-14 31-May-14 31-May-13 31-Mar-14 31-May-14 31-May-13 31-May-14 31-Jul-14 30-Jun-13 30-Jun-14 31-Aug-14 31-Jul-13 Damper and Actuator - P/O Issue Chlorination System - P/O Issue Chlorination System - Manufacturing Chlorination System - Shipping & DTS Chemical Feed System - P/O Issue Chemical Feed System - Manufacturing Chemical Feed System - Shipping & DTS Crane and Hoist - P/O Issue Crane and Hoist - Manufacturing Crane and Hoist - Shipping & DTS Shop Fabricated Vessel - P/O Issue Shop Fabricated Vessel - Manufacturing Shop Fabricated Vessel - Shipping & DTS Blowdown Tank - DTS Miscellaneous Fan & Blower - P/O Issue Miscellaneous Fan & Blower - Manufacturing Miscellaneous Fan & Blower - Shipping & DTS Sump Pumps - P/O Issue Sump Pumps - Manufacturing Sump Pumps - Shipping & DTS Screw Type Pumps - P/O Issue Screw Type Pumps - Manufacturing Screw Type Pumps - Shipping & DTS General Service Pumps - P/O Issue General Service Pumps - Manufacturing General Service Pumps - Shipping & DTS SAH Drain Pump - P/O Issue SAH Drain Pump - Manufacturing SAH Drain Pump - Shipping & DTS Plate Type Heat Exchanger - P/O Issue Plate Type Heat Exchanger - Manufacturing Plate Type Heat Exchanger - Shipping & DTS Tublar Heat Exchanger - P/O Issue Tublar Heat Exchanger - Manufacturing Tublar Heat Exchanger - Shipping & DTS FG Filter and FG Scrubber - P/O Issue FG Filter and FG Scrubber - Manufacturing FG Filter and FG Scrubber - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 CTCS & Debris Filter - Manufacturing CTCS & Debris Filter - Shipping & DTS

2PMEXXX4200A 2PMEXXX4200B 2PMEXXX43000 2PMEXXX4300A 2PMEXXX4300B 2PMEXXX44000 2PMEXXX4400A 2PMEXXX4400B 2PMEXXX45000 2PMEXXX4500A 2PMEXXX4500B 2PMEXXX46000 2PMEXXX4600A 2PMEXXX4600B 2PMEXXX47000 2PMEXXX4700A 2PMEXXX4700B 2PMEXXX48000 2PMEXXX4800A 2PMEXXX4800B 2PMEXXX49000 2PMEXXX4900A 2PMEXXX4900B 2PMEXXX50000 2PMEXXX5000A 2PMEXXX5000B 2PMEXXX52000 2PMEXXX5200A 2PMEXXX5200B 2PMEXXX5200B10 2PMEXXX53000 2PMEXXX5300A 2PMEXXX5300B 2PMEXXX54000 2PMEXXX5400A 2PMEXXX5400B 2PMEXXX55000 2PMEXXX5500A 2PMEXXX5500B 2PMEXXX56000

CTCS & Debris Filter - Manufacturing CTCS & Debris Filter - Shipping & DTS FG Filter and FG Scrubber - P/O Issue FG Filter and FG Scrubber - Manufacturing FG Filter and FG Scrubber - Shipping & DTS Tublar Heat Exchanger - P/O Issue Tublar Heat Exchanger - Manufacturing Tublar Heat Exchanger - Shipping & DTS Plate Type Heat Exchanger - P/O Issue Plate Type Heat Exchanger - Manufacturing Plate Type Heat Exchanger - Shipping & DTS SAH Drain Pump - P/O Issue SAH Drain Pump - Manufacturing SAH Drain Pump - Shipping & DTS General Service Pumps - P/O Issue General Service Pumps - Manufacturing General Service Pumps - Shipping & DTS Screw Type Pumps - P/O Issue Screw Type Pumps - Manufacturing Screw Type Pumps - Shipping & DTS Sump Pumps - P/O Issue Sump Pumps - Manufacturing Sump Pumps - Shipping & DTS Miscellaneous Fan & Blower - P/O Issue Miscellaneous Fan & Blower - Manufacturing Miscellaneous Fan & Blower - Shipping & DTS Shop Fabricated Vessel - P/O Issue Shop Fabricated Vessel - Manufacturing Shop Fabricated Vessel - Shipping & DTS Blowdown Tank - DTS Crane and Hoist - P/O Issue Crane and Hoist - Manufacturing Crane and Hoist - Shipping & DTS Chemical Feed System - P/O Issue Chemical Feed System - Manufacturing Chemical Feed System - Shipping & DTS Chlorination System - P/O Issue Chlorination System - Manufacturing Chlorination System - Shipping & DTS Damper and Actuator - P/O Issue

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 26 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 365 61 61 365 61 61 153 59 61 365 61 61 212 61 61 365 61 90 91 31 116 426 61 59 107 62 61 181 62 59 153 61 693 220KV SWYD modification, Cable & Tower - P/O Issue 220KV SWYD modification, Cable & Tower - Manufacturing 220KV SWYD modification, Cable & Tower - Shipping & DTS Lighting Fixture / panel - P/O Issue Lighting Fixture / panel - Manufacturing Lighting Fixture / panel - Shipping & DTS Cable Tray & accessories - P/O Issue 120 304 61 92 76 59 89 Start Finish O -1 1-Aug-13 1-Aug-14 1-Jun-13 1-Aug-13 1-Aug-14 1-Jun-13 1-Aug-13 1-Jan-14 1-Jun-13 1-Aug-13 1-Aug-14 1-Jun-13 1-Aug-13 1-Mar-14 1-Jun-13 1-Aug-13 1-Aug-14 1-Jan-13 1-Apr-13 1-Jul-13 6-Dec-12 1-Apr-13 1-Jun-14 16-Jan-14 16-Mar-14 1-Jul-14 1-Nov-13 1-Jan-14 1-Jul-14 1-Jan-14 1-Mar-14 1-Aug-14 7-Nov-12 1-Feb-13 1-Jun-13 1-Apr-14 31-Aug-13 1-Dec-13 15-Feb-14 2-Aug-13 31-Jul-14 30-Sep-14 31-Jul-13 31-Jul-14 30-Sep-14 31-Jul-13 31-Dec-13 28-Feb-14 31-Jul-13 31-Jul-14 30-Sep-14 31-Jul-13 28-Feb-14 30-Apr-14 31-Jul-13 31-Jul-14 30-Sep-14 31-Mar-13 30-Jun-13 31-Jul-13 31-Mar-13 31-May-14 31-Jul-14 15-Mar-14 30-Jun-14 31-Aug-14 31-Dec-13 30-Jun-14 31-Aug-14 28-Feb-14 31-Jul-14 30-Sep-14 30-Sep-14 31-May-13 31-Mar-14 31-May-14 30-Nov-13 14-Feb-14 14-Apr-14 29-Oct-13 220KV SWYD modification, Cable & Tower - P/O Issue 220KV SWYD modification, Cable & Tower - Manufacturing 220KV SWYD modification, Cable & Tower - Shipping & DTS Lighting Fixture / panel - P/O Issue Lighting Fixture / panel - Manufacturing Lighting Fixture / panel - Shipping & DTS Cable Tray & accessories - P/O Issue Lubricant - P/O Issue Lubricant - Manufacturing Lubricant - Shipping & DTS Chemicals - P/O Issue Chemicals - Manufacturing Chemicals - Shipping & DTS Anchor Bolts/Nuts and Embedded Material - P/O Issue Anchor Bolts/Nuts and Embedded Material - Manufacturing Anchor Bolts/Nuts and Embedded Material - Shipping & DTS Elevator - P/O Issue Elevator - Manufacturing Elevator - Shipping & DTS Refractory - P/O Issue Refractory - Manufacturing Refractory - Shipping & DTS Boiler Casing - P/O Issue Boiler Casing - Manufacturing Boiler Casing - Shipping & DTS Buckstay - P/O Issue Buckstay - Manufacturing Buckstay - Shipping & DTS Silencers - P/O Issue Silencers - Manufacturing Silencers - Shipping & DTS Ducts and Supports - P/O Issue Ducts and Supports - Manufacturing Ducts and Supports - Shipping & DTS Expansion Joints - P/O Issue Expansion Joints - Manufacturing Expansion Joints - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Damper and Actuator - Manufacturing Damper and Actuator - Shipping & DTS

2PMEXXX5600A 2PMEXXX5600B 2PMEXXX57000 2PMEXXX5700A 2PMEXXX5700B 2PMEXXX58000 2PMEXXX5800A 2PMEXXX5800B 2PMEXXX59000 2PMEXXX5900A 2PMEXXX5900B 2PMEXXX60000 2PMEXXX6000A 2PMEXXX6000B 2PMEXXX61000 2PMEXXX6100A 2PMEXXX6100B 2PMEXXX62000 2PMEXXX6200A 2PMEXXX6200B 2PMEXXX64000 2PMEXXX6400A 2PMEXXX6400B 2PMEXXX65000 2PMEXXX6500A 2PMEXXX6500B 2PMEXXX66000 2PMEXXX6600A 2PMEXXX6600B 2PMEXXX67000 2PMEXXX6700A 2PMEXXX6700B

Damper and Actuator - Manufacturing Damper and Actuator - Shipping & DTS Expansion Joints - P/O Issue Expansion Joints - Manufacturing Expansion Joints - Shipping & DTS Ducts and Supports - P/O Issue Ducts and Supports - Manufacturing Ducts and Supports - Shipping & DTS Silencers - P/O Issue Silencers - Manufacturing Silencers - Shipping & DTS Buckstay - P/O Issue Buckstay - Manufacturing Buckstay - Shipping & DTS Boiler Casing - P/O Issue Boiler Casing - Manufacturing Boiler Casing - Shipping & DTS Anchor Bolts/Nuts and Embedded Material - P/O Issue Anchor Bolts/Nuts and Embedded Material - Manufacturing Anchor Bolts/Nuts and Embedded Material - Shipping & DTS Elevator - P/O Issue Elevator - Manufacturing Elevator - Shipping & DTS Refractory - P/O Issue Refractory - Manufacturing Refractory - Shipping & DTS Chemicals - P/O Issue Chemicals - Manufacturing Chemicals - Shipping & DTS Lubricant - P/O Issue Lubricant - Manufacturing Lubricant - Shipping & DTS

Electrical
2PEBXXX01000 2PEBXXX0100A 2PEBXXX0100B 2PEBXXX08000 2PEBXXX0800A 2PEBXXX0800B 2PEBXXX09000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 27 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 76 59 92 76 59 92 76 59 92 76 59 120 304 61 92 212 61 92 242 61 152 242 212 90 122 61 92 151 61 60 245 274 0 0 510 61 0 479 61 663 7-Nov-12 1-Mar-14 7-Nov-12 7-Nov-12 1-Apr-14 Start Finish O -1 30-Oct-13 14-Jan-14 1-Aug-13 1-Nov-13 16-Jan-14 1-Aug-13 1-Nov-13 16-Jan-14 1-Aug-13 1-Nov-13 16-Jan-14 1-Feb-13 1-Jun-13 1-Apr-14 1-May-13 1-Aug-13 1-Mar-14 1-Jun-13 1-Sep-13 1-May-14 2-Jul-13 1-Sep-13 1-Dec-13 1-Jan-14 1-Apr-14 1-Aug-14 1-Aug-13 1-Nov-13 1-Apr-14 2-Apr-13 1-Jun-13 1-Jul-13 13-Jan-14 13-Mar-14 31-Oct-13 15-Jan-14 15-Mar-14 31-Oct-13 15-Jan-14 15-Mar-14 31-Oct-13 15-Jan-14 15-Mar-14 31-May-13 31-Mar-14 31-May-14 31-Jul-13 28-Feb-14 30-Apr-14 31-Aug-13 30-Apr-14 30-Jun-14 30-Nov-13 30-Apr-14 30-Jun-14 31-Mar-14 31-Jul-14 30-Sep-14 31-Oct-13 31-Mar-14 31-May-14 31-May-13 31-Jan-14 31-Mar-14 30-Aug-13 7-Nov-12 31-Mar-14 31-May-14 7-Nov-12 28-Feb-14 30-Apr-14 31-Aug-14 Unit Control System - P/O Issue Unit Control System - Manufacturing Unit Control System - Shipping & DTS IPB - P/O Issue IPB - Manufacturing IPB - Shipping & DTS Cathodiic Protection - P/O Issue Cathodiic Protection - Manufacturing Cathodiic Protection - Shipping & DTS Cathodiic Protection - DTS (for CW Line) Fire Alarm System - P/O Issue Fire Alarm System - Manufacturing Fire Alarm System - Shipping & DTS DC & UPS System - P/O Issue DC & UPS System - Manufacturing DC & UPS System - Shipping & DTS Grounding Material - P/O Issue Grounding Material - Manufacturing Grounding Material - Shipping & DTS Communication (Paging, PA, Tel, Handset) - P/O Issue Communication (Paging, PA, Tel, Handset) - Manufacturing Communication (Paging, PA, Tel, Handset) - Shipping & DTS Power Transformer - P/O Issue Power Transformer - Manufacturing Power Transformer - Shipping & DTS MV SWGR with BUS Duct, MR for LV SWGR MCC and Aux. Panel - P/O Issue MV SWGR with BUS Duct, MR for LV SWGR MCC and Aux. Panel - Manufacturing MV SWGR with BUS Duct, MR for LV SWGR MCC and Aux. Panel - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Cable Tray & accessories - Manufacturing Cable Tray & accessories - Shipping & DTS Conduit - P/O Issue Conduit - Manufacturing Conduit - Shipping & DTS Conduit Fittings (Cable gland) - P/O Issue Conduit Fittings (Cable gland) - Manufacturing Conduit Fittings (Cable gland) - Shipping & DTS Power & Control Cable and Kit - P/O Issue Power & Control Cable and Kit - Manufacturing Power & Control Cable and Kit - Shipping & DTS

2PEBXXX0900A 2PEBXXX0900B 2PEBXXX10000 2PEBXXX1000A 2PEBXXX1000B 2PEBXXX11000 2PEBXXX1100A 2PEBXXX1100B 2PEBXXX12000 2PEBXXX1200A 2PEBXXX1200B 2PELXXX02000 2PELXXX0200A 2PELXXX0200B 2PELXXX03000 2PELXXX0300A 2PELXXX0300B 2PELXXX05000 2PELXXX0500A 2PELXXX0500B 2PELXXX07000 2PELXXX0700A 2PELXXX0700B 2PELXXX13000 2PELXXX1300A 2PELXXX1300B 2PELXXX15000 2PELXXX1500A 2PELXXX1500B 2PELXXX16000 2PELXXX1600A 2PELXXX1600B 2PELXXX1600C 2PELXXX17000 2PELXXX1700A 2PELXXX1700B 2PELXXX18000 2PELXXX1800A 2PELXXX1800B

Cable Tray & accessories - Manufacturing Cable Tray & accessories - Shipping & DTS Conduit - P/O Issue Conduit - Manufacturing Conduit - Shipping & DTS Conduit Fittings (Cable gland) - P/O Issue Conduit Fittings (Cable gland) - Manufacturing Conduit Fittings (Cable gland) - Shipping & DTS Power & Control Cable and Kit - P/O Issue Power & Control Cable and Kit - Manufacturing Power & Control Cable and Kit - Shipping & DTS Power Transformer - P/O Issue Power Transformer - Manufacturing Power Transformer - Shipping & DTS MV SWGR with BUS Duct, MR for LV SWGR MCC and Aux. Panel - P/O Issue MV SWGR with BUS Duct, MR for LV SWGR MCC and Aux. Panel - Manufacturing MV SWGR with BUS Duct, MR for LV SWGR MCC and Aux. Panel - Shipping & DTS DC & UPS System - P/O Issue DC & UPS System - Manufacturing DC & UPS System - Shipping & DTS Grounding Material - P/O Issue Grounding Material - Manufacturing Grounding Material - Shipping & DTS Communication (Paging, PA, Tel, Handset) - P/O Issue Communication (Paging, PA, Tel, Handset) - Manufacturing Communication (Paging, PA, Tel, Handset) - Shipping & DTS Fire Alarm System - P/O Issue Fire Alarm System - Manufacturing Fire Alarm System - Shipping & DTS Cathodiic Protection - P/O Issue Cathodiic Protection - Manufacturing Cathodiic Protection - Shipping & DTS Cathodiic Protection - DTS (for CW Line) IPB - P/O Issue IPB - Manufacturing IPB - Shipping & DTS Unit Control System - P/O Issue Unit Control System - Manufacturing Unit Control System - Shipping & DTS

Instrument

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 28 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 30 121 61 61 121 61 1 0 479 61 0 479 61 0 479 61 0 479 61 0 540 61 0 540 61 61 181 61 61 181 61 91 243 61 91 243 61 91 273 62 7-Nov-12 1-May-14 2-Jul-13 1-Sep-13 1-Mar-14 2-Jul-13 1-Sep-13 1-Mar-14 2-Jul-13 1-Oct-13 1-Jun-14 2-Jul-13 1-Oct-13 1-Jun-14 2-Jul-13 1-Oct-13 1-Jul-14 7-Nov-12 1-May-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 7-Nov-12 1-Mar-14 Start Finish O -1 1-Nov-13 1-Dec-13 1-Apr-14 1-Oct-13 1-Dec-13 1-Apr-14 7-Nov-12 30-Nov-13 31-Mar-14 31-May-14 30-Nov-13 31-Mar-14 31-May-14 7-Nov-12 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 28-Feb-14 30-Apr-14 7-Nov-12 30-Apr-14 30-Jun-14 7-Nov-12 30-Apr-14 30-Jun-14 31-Aug-13 28-Feb-14 30-Apr-14 31-Aug-13 28-Feb-14 30-Apr-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 30-Jun-14 31-Aug-14 CONTROL VALVE - P/O Issue CONTROL VALVE - Manufacturing CONTROL VALVE - Shipping & DTS ON-OFF VALVE (BALLI) - P/O Issue ON-OFF VALVE (BALLI) - Manufacturing ON-OFF VALVE (BALLI) - Shipping & DTS Balance of C&I Equipment - P/O Issue Balance of C&I Equipment - Manufacturing Balance of C&I Equipment - Shipping & DTS SWAS (STEAM & WATER ANALYSIS SISTEM) - P/O Issue SWAS (STEAM & WATER ANALYSIS SISTEM) - Manufacturing SWAS (STEAM & WATER ANALYSIS SISTEM) - Shipping & DTS ENVIRONMENT GAS MONITORING SYSTEM - P/O Issue ENVIRONMENT GAS MONITORING SYSTEM - Manufacturing ENVIRONMENT GAS MONITORING SYSTEM - Shipping & DTS Motor Operated Valve (Gate, Globe) - P/O Issue Motor Operated Valve (Gate, Globe) - Manufacturing Motor Operated Valve (Gate, Globe) - Shipping & DTS High Voltage Switchyard Control System - P/O Issue High Voltage Switchyard Control System - Manufacturing High Voltage Switchyard Control System - Shipping & DTS Turbine & Generator Auxiliary Control System - P/O Issue Turbine & Generator Auxiliary Control System - Manufacturing Turbine & Generator Auxiliary Control System - Shipping & DTS Turbine EHG Control System - P/O Issue Turbine EHG Control System - Manufacturing Turbine EHG Control System - Shipping & DTS Boiler and Auxiliaries Control System - P/O Issue Boiler and Auxiliaries Control System - Manufacturing Boiler and Auxiliaries Control System - Shipping & DTS DCS - P/O Issue Boiler/Turbine Coordinated control System - P/O Issue Boiler/Turbine Coordinated control System - Manufacturing Boiler/Turbine Coordinated control System - Shipping & DTS Cable Tray - P/O Issue Cable Tray - Manufacturing Cable Tray - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Instrument Cable - P/O Issue Instrument Cable - Manufacturing Instrument Cable - Shipping & DTS

2PIBXXX23000 2PIBXXX2300A 2PIBXXX2300B 2PIBXXX24000 2PIBXXX2400A 2PIBXXX2400B 2PICXXX00000 2PICXXX01000 2PICXXX0100A 2PICXXX0100B 2PICXXX02000 2PICXXX0200A 2PICXXX0200B 2PICXXX03000 2PICXXX0300A 2PICXXX0300B 2PICXXX04000 2PICXXX0400A 2PICXXX0400B 2PICXXX05000 2PICXXX0500A 2PICXXX0500B 2PICXXX06000 2PICXXX0600A 2PICXXX0600B 2PICXXX07000 2PICXXX0700A 2PICXXX0700B 2PICXXX08000 2PICXXX0800A 2PICXXX0800B 2PICXXX09000 2PICXXX0900A 2PICXXX0900B 2PICXXX10000 2PICXXX1000A 2PICXXX1000B 2PICXXX11000 2PICXXX1100A 2PICXXX1100B

Instrument Cable - P/O Issue Instrument Cable - Manufacturing Instrument Cable - Shipping & DTS Cable Tray - P/O Issue Cable Tray - Manufacturing Cable Tray - Shipping & DTS DCS - P/O Issue Boiler/Turbine Coordinated control System - P/O Issue Boiler/Turbine Coordinated control System - Manufacturing Boiler/Turbine Coordinated control System - Shipping & DTS Boiler and Auxiliaries Control System - P/O Issue Boiler and Auxiliaries Control System - Manufacturing Boiler and Auxiliaries Control System - Shipping & DTS Turbine EHG Control System - P/O Issue Turbine EHG Control System - Manufacturing Turbine EHG Control System - Shipping & DTS Turbine & Generator Auxiliary Control System - P/O Issue Turbine & Generator Auxiliary Control System - Manufacturing Turbine & Generator Auxiliary Control System - Shipping & DTS High Voltage Switchyard Control System - P/O Issue High Voltage Switchyard Control System - Manufacturing High Voltage Switchyard Control System - Shipping & DTS Balance of C&I Equipment - P/O Issue Balance of C&I Equipment - Manufacturing Balance of C&I Equipment - Shipping & DTS SWAS (STEAM & WATER ANALYSIS SISTEM) - P/O Issue SWAS (STEAM & WATER ANALYSIS SISTEM) - Manufacturing SWAS (STEAM & WATER ANALYSIS SISTEM) - Shipping & DTS ENVIRONMENT GAS MONITORING SYSTEM - P/O Issue ENVIRONMENT GAS MONITORING SYSTEM - Manufacturing ENVIRONMENT GAS MONITORING SYSTEM - Shipping & DTS Motor Operated Valve (Gate, Globe) - P/O Issue Motor Operated Valve (Gate, Globe) - Manufacturing Motor Operated Valve (Gate, Globe) - Shipping & DTS ON-OFF VALVE (BALLI) - P/O Issue ON-OFF VALVE (BALLI) - Manufacturing ON-OFF VALVE (BALLI) - Shipping & DTS CONTROL VALVE - P/O Issue CONTROL VALVE - Manufacturing CONTROL VALVE - Shipping & DTS

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 29 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 91 243 61 122 243 61 122 243 61 122 243 61 122 243 61 122 243 61 122 243 61 122 243 61 122 243 61 122 243 61 91 243 61 332 89 121 61 91 120 61 Start Finish O -1 2-Jul-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 1-Jun-13 1-Oct-13 1-Jun-14 2-Jul-13 1-Oct-13 1-Jun-14 3-Sep-13 3-Sep-13 1-Dec-13 1-Apr-14 2-Nov-13 1-Feb-14 1-Jun-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 30-Sep-13 31-May-14 31-Jul-14 31-Jul-14 30-Nov-13 31-Mar-14 31-May-14 31-Jan-14 31-May-14 31-Jul-14 Fire Fighting Equipments - P/O Issue Fire Fighting Equipments - Manufacturing Fire Fighting Equipments - Shipping & DTS HVAC Equipments & Control Devices - P/O Issue HVAC Equipments & Control Devices - Manufacturing HVAC Equipments & Control Devices - Shipping & DTS PSV & PRV - P/O Issue PSV & PRV - Manufacturing PSV & PRV - Shipping & DTS Turbine type flowmeter - P/O Issue Turbine type flowmeter - Manufacturing Turbine type flowmeter - Shipping & DTS Ultrasonic type flowmeter - P/O Issue Ultrasonic type flowmeter - Manufacturing Ultrasonic type flowmeter - Shipping & DTS Gas Metering system - P/O Issue Gas Metering system - Manufacturing Gas Metering system - Shipping & DTS Gas Pressure Reducing Station - P/O Issue Gas Pressure Reducing Station - Manufacturing Gas Pressure Reducing Station - Shipping & DTS Orifice plate & Restriction Orfice & Flow nozzle & Level Gauge - P/O Issue Orifice plate & Restriction Orfice & Flow nozzle & Level Gauge - Manufacturing Orifice plate & Restriction Orfice & Flow nozzle & Level Gauge - Shipping & DTS Level Transmitter(Displacement type) & Level switch - P/O Issue Level Transmitter(Displacement type) & Level switch - Manufacturing Level Transmitter(Displacement type) & Level switch - Shipping & DTS Press transmitter, Diff.press transmitter,Temp transmitter / w sensor - P/O Issue Press transmitter, Diff.press transmitter,Temp transmitter / w sensor - Manufacturing Press transmitter, Diff.press transmitter,Temp transmitter / w sensor - Shipping & DTS Press gauge, Press switch, Temp gauge w/well - P/O Issue Press gauge, Press switch, Temp gauge w/well - Manufacturing Press gauge, Press switch, Temp gauge w/well - Shipping & DTS Gas Detection - P/O Issue Gas Detection - Manufacturing Gas Detection - Shipping & DTS N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 MOTOR OPERATED VALVE (BUTTERFLY) - P/O Issue MOTOR OPERATED VALVE (BUTTERFLY) - Manufacturing MOTOR OPERATED VALVE (BUTTERFLY) - Shipping & DTS

2PICXXX12000 2PICXXX1200A 2PICXXX1200B 2PICXXX13000 2PICXXX1300A 2PICXXX1300B 2PICXXX14000 2PICXXX1400A 2PICXXX1400B 2PICXXX15000 2PICXXX1500A 2PICXXX1500B 2PICXXX16000 2PICXXX1600A 2PICXXX1600B 2PICXXX17000 2PICXXX1700A 2PICXXX1700B 2PICXXX18000 2PICXXX1800A 2PICXXX1800B 2PICXXX19000 2PICXXX1900A 2PICXXX1900B 2PICXXX20000 2PICXXX2000A 2PICXXX2000B 2PICXXX21000 2PICXXX2100A 2PICXXX2100B 2PICXXX22000 2PICXXX2200A 2PICXXX2200B

MOTOR OPERATED VALVE (BUTTERFLY) - P/O Issue MOTOR OPERATED VALVE (BUTTERFLY) - Manufacturing MOTOR OPERATED VALVE (BUTTERFLY) - Shipping & DTS Gas Detection - P/O Issue Gas Detection - Manufacturing Gas Detection - Shipping & DTS Gas Metering system - P/O Issue Gas Metering system - Manufacturing Gas Metering system - Shipping & DTS Gas Pressure Reducing Station - P/O Issue Gas Pressure Reducing Station - Manufacturing Gas Pressure Reducing Station - Shipping & DTS Orifice plate & Restriction Orfice & Flow nozzle & Level Gauge - P/O Issue Orifice plate & Restriction Orfice & Flow nozzle & Level Gauge - Manufacturing Orifice plate & Restriction Orfice & Flow nozzle & Level Gauge - Shipping & DTS Level Transmitter(Displacement type) & Level switch - P/O Issue Level Transmitter(Displacement type) & Level switch - Manufacturing Level Transmitter(Displacement type) & Level switch - Shipping & DTS Press transmitter, Diff.press transmitter,Temp transmitter / w sensor - P/O Issue Press transmitter, Diff.press transmitter,Temp transmitter / w sensor - Manufacturing Press transmitter, Diff.press transmitter,Temp transmitter / w sensor - Shipping & DTS Press gauge, Press switch, Temp gauge w/well - P/O Issue Press gauge, Press switch, Temp gauge w/well - Manufacturing Press gauge, Press switch, Temp gauge w/well - Shipping & DTS Ultrasonic type flowmeter - P/O Issue Ultrasonic type flowmeter - Manufacturing Ultrasonic type flowmeter - Shipping & DTS Turbine type flowmeter - P/O Issue Turbine type flowmeter - Manufacturing Turbine type flowmeter - Shipping & DTS PSV & PRV - P/O Issue PSV & PRV - Manufacturing PSV & PRV - Shipping & DTS

Fire Fighting & HVAC HVA


2PFFXXX01000 2PFFXXX0100A 2PFFXXX0100B 2PHVXXX01000 2PHVXXX0100A 2PHVXXX0100B Fire Fighting Equipments - P/O Issue Fire Fighting Equipments - Manufacturing Fire Fighting Equipments - Shipping & DTS HVAC Equipments & Control Devices - P/O Issue HVAC Equipments & Control Devices - Manufacturing HVAC Equipments & Control Devices - Shipping & DTS

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 30 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 916 349 349 Contract Security Company Subcontracting - Temp. Facility Subcontracting - CDM Subcontracting - Civil & Building (2 SC PKGs) Subcontracting - Firefighting & HVAC Subcontracting - Mechanical Incl. EQ Erection, STL STR, Piping, Painting (2 SC PKGs) Subcontracting - Electrical & Instrumentation Subcontracting - Insulation 10 47 47 90 78 72 75 75 208 74 13 76 61 61 10 48 10 48 48 54 50 666 666 Pipe Sleeper (Outdoor) Pipe Trench (Outdoor) Cable Trench (Outdoor) Duct Bank & Manhole U/G Pipe (Incl. Service and Drinking Water Piping) Outdoor Lighting Strom Water Drainage System Oily Water Drainage System Road & Paving Landscaping Cleaning and Handover of the Project CW Discharge Culvert 26 163 88 98 102 105 64 74 78 90 14 77 77 77 Start Finish O -1 7-Nov-12 7-Nov-12 7-Nov-12 20-Dec-12 7-Nov-12 7-Nov-12 1-Dec-12 1-Jul-13 1-Feb-13 1-Apr-13 1-Oct-13 26-Dec-12 2-Jan-13 16-Mar-13 16-Mar-13 16-Feb-13 2-Jan-13 26-Dec-12 2-Jan-13 26-Dec-12 2-Jan-13 2-Jan-13 1-Jul-13 1-Mar-13 3-Sep-13 3-Sep-13 16-Dec-13 16-Dec-13 16-Dec-13 2-Jan-14 1-Apr-14 1-Oct-14 1-Nov-14 2-Dec-13 1-Nov-14 1-Nov-14 16-Oct-15 3-Sep-13 1-Sep-14 1-Sep-14 31-Oct-15 26-Dec-13 26-Dec-13 31-Dec-12 31-Dec-12 31-Dec-12 19-Mar-13 30-Sep-13 29-Apr-13 29-Jun-13 26-Dec-13 31-Aug-13 30-Mar-13 30-Mar-13 15-Jun-13 29-Apr-13 15-Mar-13 7-Jan-13 28-Feb-13 7-Jan-13 28-Feb-13 28-Feb-13 31-Aug-13 29-Apr-13 31-Oct-15 31-Oct-15 15-Jan-14 30-Jun-14 31-Mar-14 29-Apr-14 31-Jul-14 31-Jan-15 15-Jan-15 28-Feb-14 31-Jan-15 14-Feb-15 31-Oct-15 30-Nov-13 29-Nov-14 29-Nov-14 Outdoor Hydrant CW Discharge Culvert Oily Water Drainage System Road & Paving Landscaping Cleaning and Handover of the Project Pipe Sleeper (Outdoor) Pipe Trench (Outdoor) Cable Trench (Outdoor) Duct Bank & Manhole U/G Pipe (Incl. Service and Drinking Water Piping) Outdoor Lighting Strom Water Drainage System Contractor Site Ofiice Site Office Registration Contractor Warehouse Construction Laydown Construction Road Application for Deep Well Usage Construction Water(Deep Well) Contract for Electricity with Cantho Authority Construction Power Preparation Consruction Fence, Gate & Guard House Temporary Jetty & Access Way for Heavy EQ Internet & Communication Facility Contract Security Company Subcontracting - Temp. Facility Subcontracting - CDM Subcontracting - Civil & Building (2 SC PKGs) Subcontracting - Firefighting & HVAC Subcontracting - Mechanical Incl. EQ Erection, STL STR, Piping, Painting (2 SC PKGs) Subcontracting - Electrical & Instrumentation Subcontracting - Insulation N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Construction
Common
Subcontracting
2CSC00001000 2CSC00001100 2CSC00001200 2CSC00001300 2CSC00001400 2CSC00001500 2CSC00001600 2CSC00001700

Site Pre. / Temp. Fa Facilities


2CTF00001000 2CTF00001100 2CTF00001200 2CTF00001300 2CTF00001400 2CTF00001500 2CTF00001600 2CTF00001700 2CTF00001800 2CTF00001900 2CTF00002000 2CTF00002100 Contractor Site Ofiice Site Office Registration Contractor Warehouse Construction Laydown Construction Road Application for Deep Well Usage Construction Water(Deep Well) Contract for Electricity with Cantho Authority Construction Power Preparation Consruction Fence, Gate & Guard House Temporary Jetty & Access Way for Heavy EQ Internet & Communication Facility

Outdoor Works
Civil
2CCV00101000 2CCV00101100 2CCV00101200 2CCV00101300 2CCV00101400 2CCV00101500 2CCV00101600 2CCV00101700 2CCV00101800 2CCV00101900 2CCV00102000 2CCV00102100

Fire Fighting & HVAC HVA


2CFH00101000 Outdoor Hydrant

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 31 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 131 131 Approval of CDM Subcontractor Approval of Material (Cement) Approval of Method Statement Temporary Import/Re-Export Permit Custom Clearance Transportation of Equipment Laboratory Mixing Design CDM Equipment Assembly Ground Preparation CDM Trial Mix Test CDM Work for Turbine & Boiler Area CDM Work for CW Discharge Tunnel 14 14 26 14 10 35 20 6 22 14 30 26 676 158 T/O to Comm. - HVAC System (P/H) T/O to Comm. - Drinking Water, F/F(Foam, Filtered Water) T/O to Comm. - Instument Air System, Service Air System T/O to Comm. - TBN Lube Oil System T/O to Comm. - Oil Transfer & Purification System T/O to Comm. - Condenser Vacuum System T/O to Comm. - Gland Steam System T/O to Comm. - CTCS T/O to Comm. - M-BFP Lube Oil System T/O to Comm. - BFP-T Lube Oil System T/O to Comm. - HP Feed Water System T/O to Comm. - Condensate System T/O to Comm. - Aux. Cooling Water System T/O to Comm. - Generator Seal Oil System T/O to Comm. - Service Water System 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 182 Excavation & Pile Head Treatment Condensate Pump Pit - Bottom Condensate Pump Pit - Wall Valve Pit - Bottom Valve Pit - Wall Building Foundation Cable Trench / Duct Bank Backfill 40 25 75 40 50 78 51 40 2-May-13 2-May-13 18-Jun-13 17-Jul-13 17-Jul-13 3-Sep-13 16-Aug-13 3-Sep-13 16-Oct-13 Start Finish O -1 24-Dec-12 24-Dec-12 24-Dec-12 5-Jan-13 2-Jan-13 10-Jan-13 26-Jan-13 17-Jan-13 22-Jan-13 1-Mar-13 1-Feb-13 8-Mar-13 25-Mar-13 2-May-13 2-May-13 2-Aug-14 31-May-13 31-May-13 9-Jan-13 21-Jan-13 31-Jan-13 25-Jan-13 6-Feb-13 28-Feb-13 15-Feb-13 7-Mar-13 28-Feb-13 23-Mar-13 29-Apr-13 31-May-13 11-Jul-15 5-Feb-15 30-Sep-14 30-Sep-14 31-Dec-14 30-Oct-14 29-Nov-14 5-Feb-15 4-Dec-14 31-Dec-14 15-Oct-14 11-Oct-14 15-Nov-14 15-Nov-14 25-Sep-14 11-Oct-14 2-Aug-14 30-Nov-13 17-Jun-13 16-Jul-13 12-Oct-13 31-Aug-13 30-Oct-13 15-Nov-13 31-Oct-13 30-Nov-13 Excavation & Pile Head Treatment Condensate Pump Pit - Bottom Condensate Pump Pit - Wall Valve Pit - Bottom Valve Pit - Wall Building Foundation Cable Trench / Duct Bank Backfill T/O to Comm. - HVAC System (P/H) T/O to Comm. - Drinking Water, F/F(Foam, Filtered Water) T/O to Comm. - Instument Air System, Service Air System T/O to Comm. - TBN Lube Oil System T/O to Comm. - Oil Transfer & Purification System T/O to Comm. - Condenser Vacuum System T/O to Comm. - Gland Steam System T/O to Comm. - CTCS T/O to Comm. - M-BFP Lube Oil System T/O to Comm. - BFP-T Lube Oil System T/O to Comm. - HP Feed Water System T/O to Comm. - Condensate System T/O to Comm. - Aux. Cooling Water System T/O to Comm. - Generator Seal Oil System T/O to Comm. - Service Water System Approval of CDM Subcontractor Approval of Material (Cement) Approval of Method Statement Temporary Import/Re-Export Permit Custom Clearance Transportation of Equipment Laboratory Mixing Design CDM Equipment Assembly Ground Preparation CDM Trial Mix Test CDM Work for Turbine & Boiler Area CDM Work for CW Discharge Tunnel N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

CDM Work
Civil
2CCV74001000 2CCV74001100 2CCV74001200 2CCV74001300 2CCV74001400 2CCV74001500 2CCV74001600 2CCV74001700 2CCV74001800 2CCV74001900 2CCV74002000 2CCV74002100

Power House
Taking Over
2CTO74201000 2CTO74201100 2CTO74201200 2CTO74201300 2CTO74201400 2CTO74201500 2CTO74201600 2CTO74201700 2CTO74201800 2CTO74201900 2CTO74202000 2CTO74202100 2CTO74202200 2CTO74202300 2CTO74202400

Civil
2CCV74201000 2CCV74201100 2CCV74201200 2CCV74201300 2CCV74201400 2CCV74201500 2CCV74201600 2CCV74201700

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 32 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 267 Steel Structure - Main Frame Column Roof Floor Beam Steel Structure - Girt/Purlin Steel Structure - Crane Rail Roof Cladding Door/ Window Frame Wall Cladding Equipment Foundation (BFP, Oil TK) (Ground Floor) Under Ground Utility (Ground Floor) Ground Slab / EQ FDN (Ground Floor) Finishing (Ground Floor) Misc Steel Work - After EQ Install (Ground Floor) Wall Cladding - After EQ Install (Ground Floor) Deck Plate & Con'c Pouring (Mezzanine) EQ. Foundation (Mezzanine) Grating & Handrail (Mezzanine) Partition Wall (Mezzanine) Deck Plate & Con'c Pouring (Operating Floor) EQ. Foundation (Operating Floor) Grating & Handrail (Operating Floor) Misc. Steel Work - After EQ. Insatll (Operating Floor) Wall Cladding - After EQ Install (Operating Floor) Deck Plate - Roof Parapet EQ. Foundation Roofing Motar Cover 76 0 0 0 49 13 26 26 49 50 42 50 25 25 27 48 24 25 21 50 25 14 13 14 14 14 26 20 14 409 CW Discharge Piping CW Inlet Piping (Around Power House) CW Piping (Inside Condenser Pit) L/O Piping Control Oil Piping Extracting Piping Condensate & Feed Water Piping Chemical Dosing Piping Aux. Cooling Water Piping 51 52 51 77 89 78 91 51 95 Start Finish O -1 16-Nov-13 16-Nov-13 16-Nov-13 2-Jan-14 1-Feb-14 17-Feb-14 17-Mar-14 1-Mar-14 16-May-14 17-Mar-14 8-Mar-14 8-Mar-14 5-Apr-14 6-Jun-14 1-Aug-14 30-Aug-14 7-Feb-14 22-Mar-14 21-Apr-14 4-Apr-14 7-Mar-14 21-Apr-14 8-May-14 16-Aug-14 1-Sep-14 8-May-14 29-Aug-14 5-Jun-14 6-Aug-14 29-Aug-14 3-Sep-13 3-Sep-13 4-Oct-13 31-Jul-14 1-Aug-14 1-Aug-14 1-Aug-14 1-Aug-14 1-Aug-14 6-Jun-14 15-Apr-14 31-Mar-14 31-Mar-14 14-Jun-14 15-May-14 8-May-14 26-Apr-14 5-Jun-14 4-Jul-14 29-Aug-14 1-Oct-14 3-Apr-14 19-Apr-14 21-May-14 29-Apr-14 7-May-14 21-May-14 23-May-14 30-Aug-14 17-Sep-14 23-May-14 15-Sep-14 4-Jul-14 28-Aug-14 15-Sep-14 31-Dec-14 31-Oct-13 3-Dec-13 29-Sep-14 30-Oct-14 13-Nov-14 31-Oct-14 15-Nov-14 30-Sep-14 25-Sep-14 CW Discharge Piping CW Inlet Piping (Around Power House) CW Piping (Inside Condenser Pit) L/O Piping Control Oil Piping Extracting Piping Condensate & Feed Water Piping Chemical Dosing Piping Aux. Cooling Water Piping 1-Oct-14 15-Feb-14 Column Roof Floor Beam Steel Structure - Girt/Purlin Steel Structure - Crane Rail Roof Cladding Door/ Window Frame Wall Cladding Equipment Foundation (BFP, Oil TK) (Ground Floor) Under Ground Utility (Ground Floor) Ground Slab / EQ FDN (Ground Floor) Finishing (Ground Floor) Misc Steel Work - After EQ Install (Ground Floor) Wall Cladding - After EQ Install (Ground Floor) Deck Plate & Con'c Pouring (Mezzanine) EQ. Foundation (Mezzanine) Grating & Handrail (Mezzanine) Partition Wall (Mezzanine) Deck Plate & Con'c Pouring (Operating Floor) EQ. Foundation (Operating Floor) Grating & Handrail (Operating Floor) Misc. Steel Work - After EQ. Insatll (Operating Floor) Wall Cladding - After EQ Install (Operating Floor) Deck Plate - Roof Parapet EQ. Foundation Roofing Motar Cover Steel Structure - Main Frame N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Building & STL STR


2CBD74201000 2CBD74201010 2CBD74201020 2CBD74201030 2CBD74201100 2CBD74201200 2CBD74201300 2CBD74201400 2CBD74201500 2CBD74201600 2CBD74201700 2CBD74201800 2CBD74202000 2CBD74202100 2CBD74202200 2CBD74202300 2CBD74202400 2CBD74202500 2CBD74202550 2CBD74202600 2CBD74202700 2CBD74202800 2CBD74202900 2CBD74203000 2CBD74203100 2CBD74203200 2CBD74203300 2CBD74203400 2CBD74203500

Piping
2CPP74201000 2CPP74201050 2CPP74201070 2CPP74201100 2CPP74201200 2CPP74201300 2CPP74201400 2CPP74201500 2CPP74201600

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 33 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 38 39 103 130 103 Start Finish O -1 1-Aug-14 16-Sep-14 2-Jun-14 1-Aug-14 1-Aug-14 15-Sep-14 30-Oct-14 30-Sep-14 31-Dec-14 29-Nov-14 From Purifier (2CME74203400) Oil Transfer & Purification System 2CPP74202300 Condense Vacuum System 127 5-Aug-14 31-Dec-14 From Condenser Vacuum Pump (2CME74204120) Condense Vacuum System 2CPP74202400 Gland Steam System 143 20-Jun-14 4-Dec-14 From Gland Condenser with Fan (2CME74203800) Gland Steam System 2CPP74202500 CTCS System 80 30-Sep-14 31-Dec-14 From CTCS & Debris Filter Installation (2CME74102120) CTCS System 2CPP74202600 M-BFP Lube Oil System 64 1-Aug-14 15-Oct-14 From M-BFP & Booster Pump (2CME74204140) M-BFP Lube Oil System 2CPP74202700 BFP-T Lube Oil System 88 1-Jul-14 11-Oct-14 From BFP & Turbine Drive (2CME74204300) BFP-T Lube Oil System 2CPP74203100 Generator Seal Oil System 61 1-Aug-14 11-Oct-14 From Gen. Seal Oil / H2 Gas Sys.(2CME74203500) Generator Seal Oil System N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Compressed Air Piping Gas System Piping Drinking Water, F/F (Foam, Filtered Water) Instrument Air System, Service Air System

2CPP74201700 2CPP74201800 2CPP74201900 2CPP74202000 2CPP74202200

Compressed Air Piping Gas System Piping Drinking Water, F/F (Foam, Filtered Water) Instrument Air System, Service Air System Oil Transfer & Purification System

Mechanical
2CME74201000 2CME74201100 2CME74201200 2CME74201300 2CME74201500 2CME74201700 2CME74201800 2CME74201900 2CME74202000 2CME74202100 2CME74202200 2CME74202300 2CME74202400 2CME74202500 2CME74202600 2CME74202700 2CME74202800 Hoist Beam Chipping & Sole Plate Setting MSV / GV RSV / ICV Chipping & Sole Plate Setting LP Turbine Installation Bearing Inspection LP Rotor Turning Device Crossover Pipe HP Turbine Installation HP Rotor HP-LP Pre-Alignment Grouting HP-LP Final Alignment / Coupling Chipping & Sole Plate Setting - Generator Module Install Generator

407 27 26 12 12 25 105 9 27 8 25 51 25 13 6 21 25 27

17-Mar-14 17-Mar-14 2-May-14 2-Jun-14 2-Jun-14 2-Jun-14 1-Jul-14 2-Jul-15 16-Jul-14 2-Feb-15 1-Nov-14 1-Aug-14 1-Sep-14 1-Oct-14 16-Oct-14 23-Oct-14 2-Jun-14 1-Jul-14

11-Jul-15 17-Apr-14 31-May-14 14-Jun-14 14-Jun-14 30-Jun-14 31-Oct-14 11-Jul-15 15-Aug-14 10-Feb-15 29-Nov-14 30-Sep-14 30-Sep-14 15-Oct-14 22-Oct-14 15-Nov-14 30-Jun-14 31-Jul-14 LP Rotor Turning Device Crossover Pipe HP Turbine Installation HP Rotor HP-LP Pre-Alignment Grouting HP-LP Final Alignment / Coupling Chipping & Sole Plate Setting - Generator Module Install Generator Hoist Beam Chipping & Sole Plate Setting MSV / GV RSV / ICV Chipping & Sole Plate Setting LP Turbine Installation Bearing Inspection

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 34 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 13 12 27 95 13 27 14 14 51 55 12 26 27 25 38 27 12 25 40 52 12 27 26 12 0 332 Electrical Equipment Install - Power House Cable Tray Conduit Cable Pulling & Termination Lighting & Small Power Communication Sys. Embedded Work - Grounding Grounding Electrical Test 26 101 125 103 125 100 48 130 78 182 Local Instr. Panel Local Instrument Instrument Piping Turbine Internal 78 103 103 103 2-Jan-14 2-May-14 14-Mar-14 15-Apr-14 2-Jun-14 14-May-14 1-Oct-14 2-Jan-14 1-Jul-14 1-Nov-14 2-Jun-14 2-Jun-14 1-Aug-14 1-Aug-14 1-Aug-14 Start Finish O -1 1-Aug-14 1-Sep-14 1-Dec-14 13-Oct-14 12-Dec-14 1-Jul-14 16-Jul-14 16-Jul-14 1-Aug-14 13-Oct-14 23-Jun-14 7-Jul-14 6-Aug-14 22-May-14 2-Jun-14 5-Jul-14 2-May-14 7-Jul-14 1-Jul-14 2-Jun-14 2-Jun-14 1-Jul-14 6-Aug-14 1-Apr-14 15-Aug-14 15-Sep-14 31-Dec-14 31-Jan-15 26-Dec-14 31-Jul-14 31-Jul-14 31-Jul-14 30-Sep-14 15-Dec-14 5-Jul-14 5-Aug-14 6-Sep-14 19-Jun-14 15-Jul-14 5-Aug-14 15-May-14 4-Aug-14 15-Aug-14 31-Jul-14 14-Jun-14 31-Jul-14 5-Sep-14 15-Apr-14 15-Apr-14 31-Jan-15 31-May-14 12-Jul-14 10-Sep-14 30-Sep-14 7-Oct-14 26-Jan-15 28-Feb-14 29-Nov-14 31-Jan-15 31-Dec-14 30-Aug-14 29-Nov-14 29-Nov-14 29-Nov-14 Local Instr. Panel Local Instrument Instrument Piping Turbine Internal Embedded Work - Grounding Grounding Electrical Test Electrical Equipment Install - Power House Cable Tray Conduit Cable Pulling & Termination Lighting & Small Power Communication Sys. N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 T/G Pre-Alignment T/G Final Alignment / Coupling HP/LP Turbine Bypass System Oil Flushing Removal Temp. Strainer (Oil Flushing) Main Oil Tank & Pumps (Incl. Vapor Extract Fan) Oil Cooler Purifier Gen. Seal Oil / H2 Gas Sys. Oil Flushing of Seal Oil Set on Place LP Heater - #1/#2 LP Heater - #1/#2 LP Heater - #3/#4 Gland Condenser with Fan HP Heater - #6/#7/#8 Deaerator / Storage Tank Condensate Pump Condenser Vacuum Pump M-BFP & Booster Pump T-BFP Booster Pump Deaerator Recir. Pump BFP & Turbine Drive Aux. Cooling Water System (Incl. River Water Booster Pump) O/H Crane - Rail & Cable Extention O/H Crane - Load Test

2CME74202900 2CME74203000 2CME74203020 2CME74203100 2CME74203120 2CME74203200 2CME74203300 2CME74203400 2CME74203500 2CME74203540 2CME74203550 2CME74203600 2CME74203700 2CME74203800 2CME74203900 2CME74204000 2CME74204100 2CME74204120 2CME74204140 2CME74204160 2CME74204200 2CME74204300 2CME74204600 2CME74204900 2CME74204910

T/G Pre-Alignment T/G Final Alignment / Coupling HP/LP Turbine Bypass System Oil Flushing Removal Temp. Strainer (Oil Flushing) Main Oil Tank & Pumps (Incl. Vapor Extract Fan) Oil Cooler Purifier Gen. Seal Oil / H2 Gas Sys. Oil Flushing of Seal Oil Set on Place LP Heater - #1/#2 LP Heater - #1/#2 LP Heater - #3/#4 Gland Condenser with Fan HP Heater - #6/#7/#8 Deaerator / Storage Tank Condensate Pump Condenser Vacuum Pump M-BFP & Booster Pump T-BFP Booster Pump Deaerator Recir. Pump BFP & Turbine Drive Aux. Cooling Water System (Incl. River Water Booster Pump) O/H Crane - Rail & Cable Extention O/H Crane - Load Test

Electrical
2CEL74201000 2CEL74201100 2CEL74201200 2CEL74201300 2CEL74201400 2CEL74201500 2CEL74201600 2CEL74201700 2CEL74201800

Instrument
2CIN74201000 2CIN74201100 2CIN74201200 2CIN74201300

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 35 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 79 51 51 116 51 25 38 78 496 256 Excavation & Pile Head Treatment Mat Foundation Column to Mezzanine Mezzanine Fl. Column to Top Deck Curing Removal of Support 39 25 52 26 75 21 18 144 Pump Piping Condenser Piping 51 27 302 26 62 10 12 21 14 21 10 8 14 14 28 38 51 25 9 24 52 Embedded Conduit 52 Start Finish O -1 1-Oct-14 31-Oct-14 31-Oct-14 2-Jun-14 1-Aug-14 16-Aug-14 1-Sep-14 2-Jun-14 2-May-13 2-May-13 2-May-13 17-Jun-13 16-Jul-13 16-Sep-13 16-Oct-13 13-Jan-14 8-Feb-14 16-May-14 16-May-14 1-Oct-14 16-Dec-13 16-Dec-13 16-Jan-14 21-Oct-14 1-Apr-14 16-Apr-14 13-May-14 29-May-14 23-Jun-14 4-Jul-14 14-Jul-14 30-Jul-14 15-Aug-14 18-Sep-14 31-Jul-14 1-Nov-14 1-Dec-14 1-Nov-14 16-Oct-13 16-Oct-13 31-Dec-14 29-Dec-14 29-Dec-14 15-Oct-14 30-Sep-14 15-Sep-14 15-Oct-14 30-Aug-14 10-Dec-14 28-Feb-14 15-Jun-13 15-Jul-13 14-Sep-13 15-Oct-13 11-Jan-14 7-Feb-14 28-Feb-14 31-Oct-14 14-Jul-14 31-Oct-14 10-Dec-14 15-Jan-14 31-Mar-14 31-Oct-14 15-Apr-14 12-May-14 28-May-14 21-Jun-14 3-Jul-14 12-Jul-14 29-Jul-14 14-Aug-14 17-Sep-14 31-Oct-14 29-Sep-14 29-Nov-14 10-Dec-14 28-Nov-14 14-Dec-13 14-Dec-13 Embedded Conduit Chipping & Sole Plate - Condenser Shell Skirt Connect Expansion Joint Cooling Water Chamber Lifting Fitting / Welding of Inlet Shell Condenser Shell Fitting & Welding of Shell Tube Plate Setting Water Chamber Tube Insertion Water Chamber (Inlet) Tube Expand Tube Seal Welding CTCS & Debris Filter Installation Water Fill Test Vacuum Test Air Removal System Pump Piping Condenser Piping Excavation & Pile Head Treatment Mat Foundation Column to Mezzanine Mezzanine Fl. Column to Top Deck Curing Removal of Support HVAC System P/H Roof Fan Spray Deluge System Indoor Hydrant - Power House S/T Painting & Insulation N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Calibration & Loop Check

2CIN74201400

Calibration & Loop Check

Painting & Insulatio Insulation


2CPA74201000 S/T Painting & Insulation

Fire Fighting & HVAC HVA


2CFH74201000 2CFH74201100 2CME74204800 2CME74205000 HVAC System P/H Roof Fan Spray Deluge System Indoor Hydrant - Power House

T/G Foundation
Civil
2CCV74101000 2CCV74101100 2CCV74101200 2CCV74101300 2CCV74101400 2CCV74101500 2CCV74101600

Piping
2CPP74101000 2CPP74101100

Mechanical (Condenser) (Conde


2CME74101000 2CME74101100 2CME74101200 2CME74101220 2CME74101300 2CME74101400 2CME74101500 2CME74101600 2CME74101700 2CME74101800 2CME74101900 2CME74102000 2CME74102100 2CME74102120 2CME74102200 2CME74102300 2CME74102400 Chipping & Sole Plate - Condenser Shell Skirt Connect Expansion Joint Cooling Water Chamber Lifting Fitting / Welding of Inlet Shell Condenser Shell Fitting & Welding of Shell Tube Plate Setting Water Chamber Tube Insertion Water Chamber (Inlet) Tube Expand Tube Seal Welding CTCS & Debris Filter Installation Water Fill Test Vacuum Test Air Removal System

Electrical
2CEL74101000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 36 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 17 17 Lube Oil Piping InterConnection 17 535 114 T/O to Comm. - Air & Flue Gas System T/O to Comm. - Boiler Curculation Pump System T/O to Comm. - Boiler Soot Blower System T/O to Comm. - Air & Flue Gas System (FDF) 0 0 0 0 Start Finish O -1 31-Oct-14 31-Oct-14 31-Oct-14 2-May-13 13-Sep-14 19-Nov-14 19-Nov-14 19-Nov-14 26-Jan-15 26-Jan-15 29-Oct-14 19-Dec-14 26-Nov-14 7-Nov-14 From Install Forced Draft Fan (2CME72102200) T/O to Comm. - Air & Flue Gas System (FDF) T/O to Comm. - Air & Flue Gas System T/O to Comm. - Boiler Curculation Pump System T/O to Comm. - Boiler Soot Blower System Lube Oil Piping InterConnection N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Clean & Dirty Oil O Storage Tank FDN


Piping
2CPP74501100

Boiler Area
Taking Over
2CTO72101000 2CTO72101100 2CTO72101200 2CTO72101300

2CTO72101400

T/O to Comm. - Air & Flue Gas System (GRF)

3-Dec-14 From Boiler Air Duct - GRF Vertidcal Air Duct Installation (2CME72102640) T/O to Comm. - Air & Flue Gas System (GRF)

2CTO72101500 2CTO72101600 2CTO72101700 2CTO72101800 2CTO72101900 2CTO72102000 2CTO72102100 2CTO72102200 2CTO72102300 2CTO72102400 2CTO72102500 2CTO72102600

T/O to Comm. - Steam Air Heater System T/O to Comm. - Boiler Chemical Feeding System T/O to Comm. - Fuel Oil System T/O to Comm. - NG System T/O to Comm. - Demi. Water System T/O to Comm. - Make-up Water System T/O to Comm. - Circulating Water System T/O to Comm. - Traveling Screen & Screen Wash Pump T/O to Comm. - Chlorination Plant T/O to Comm. - EP System T/O to Comm. - Ammonia System T/O to Comm. - Ash Handling System

0 0 0 0 0 0 0 0 0 0 0 0 501 2-May-13 2-May-13 17-Jun-13 17-Jul-13 17-Sep-13 1-Nov-13 17-Sep-13 17-Sep-13 3-Oct-13 1-Nov-13 17-Oct-14 15-Nov-14 17-Jul-14 1-Mar-14 1-Jul-14

13-Dec-14 10-Nov-14 22-Nov-14 30-Sep-14 13-Sep-14 19-Sep-14 7-Jan-15 26-Jan-15 31-Oct-14 25-Oct-14 5-Nov-14 13-Dec-14 16-Dec-14 15-Jun-13 30-Sep-13 30-Sep-13 30-Nov-13 30-Nov-13 15-Oct-13 2-Oct-13 31-Oct-13 31-Dec-13 14-Nov-14 16-Dec-14 30-Sep-14 31-May-14 30-Aug-14 Excavation & Pile Head Treatment Boiler Foundation EQ Foundation - FDF Backfill - Boiler FDN Area Cable M/H & Duct Bank - 1st (PWR House Side) U/G Utility - 1st (Around Boiler FDN, FDF FDN) Unit Drain Pit - Excavation Unit Drain Pit - Bottom Slab / Wall Unit Drain Pit - Top Slab / Curing

T/O to Comm. - Steam Air Heater System T/O to Comm. - Boiler Chemical Feeding System T/O to Comm. - Fuel Oil System T/O to Comm. - NG System T/O to Comm. - Demi. Water System T/O to Comm. - Make-up Water System T/O to Comm. - Circulating Water System T/O to Comm. - Traveling Screen & Screen Wash Pump T/O to Comm. - Chlorination Plant T/O to Comm. - EP System T/O to Comm. - Ammonia System T/O to Comm. - Ash Handling System

Civil
2CCV72101000 2CCV72101100 2CCV72101200 2CCV72101300 2CCV72101400 2CCV72101500 2CCV72101600 2CCV72101700 2CCV72101800 2CCV72101900 2CCV72102000 2CCV72102100 2CCV72102200 2CCV72102300 Excavation & Pile Head Treatment Boiler Foundation EQ Foundation - FDF Backfill - Boiler FDN Area Cable M/H & Duct Bank - 1st (PWR House Side) U/G Utility - 1st (Around Boiler FDN, FDF FDN) Unit Drain Pit - Excavation Unit Drain Pit - Bottom Slab / Wall Unit Drain Pit - Top Slab / Curing Unit Drain Pit - Lining Unit Drain Pit - Backfill Ground Slab / Pipe Trench(Incl. U/G Utility) - Inside Boiler Block Area Ground Slab / Pipe Trench(Incl. U/G Utility) - Outside Boiler Block Area EQ. Foundation - GRF

39 90 64 65 26 25 14 25 52 25 27 64 76 53

Unit Drain Pit - Lining Unit Drain Pit - Backfill Ground Slab / Pipe Trench(Incl. U/G Utility) - Inside Boiler Block Area Ground Slab / Pipe Trench(Incl. U/G Utility) - Outside Boiler Block Area EQ. Foundation - GRF

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 37 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 38 40 208 Boiler Main STM Piping & Feed Water Piping Steam Piping Aux. Steam Piping Water Piping Air piping Exhaust Piping Fuel Oil Piping Air & Flue Gas System Boiler Curculation Pump System 104 116 78 174 174 174 124 154 147 Start Finish O -1 2-Jun-14 16-Jul-14 2-May-14 2-May-14 2-May-14 2-May-14 2-May-14 2-May-14 2-May-14 1-Jul-14 2-May-14 1-Jul-14 15-Jul-14 30-Aug-14 31-Dec-14 30-Aug-14 15-Sep-14 31-Jul-14 21-Nov-14 21-Nov-14 21-Nov-14 22-Nov-14 29-Oct-14 19-Dec-14 From Blowdown Tank (2CME72102100) Boiler Curculation Pump System 2CPP72101900 Boiler Soot Blower System 40 11-Oct-14 26-Nov-14 From Soot Blower (2CME72102400) Boiler Soot Blower System 2CPP72102000 Boiler Chemical Feeding System 86 1-Aug-14 10-Nov-14 From Chemical Dosing Piping (2CPP74201500) Boiler Chemical Feeding System 2CPP72102100 2CPP72102200 2CPP72102300 Demi. Water System Make-up Water System Circulating Water System 115 120 130 2-May-14 2-May-14 1-Aug-14 13-Sep-14 19-Sep-14 31-Dec-14 From Install CW Pump (Incl. Pump Pit Repair Work) (2CME76601000) Circulating Water System Demi. Water System Make-up Water System Boiler Main STM Piping & Feed Water Piping Steam Piping Aux. Steam Piping Water Piping Air piping Exhaust Piping Fuel Oil Piping Air & Flue Gas System N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 BDT & Piperack FDN Cable M/H & Duct Bank - Remaining(FDF Side)

2CCV72102400 2CCV72102500

BDT & Piperack FDN Cable M/H & Duct Bank - Remaining(FDF Side)

Piping
2CPP72101000 2CPP72101100 2CPP72101120 2CPP72101200 2CPP72101300 2CPP72101400 2CPP72101600 2CPP72101700 2CPP72101800

Mechanical
2CME72101000 2CME72101010 2CME72101020 2CME72101030 2CME72101040 2CME72101100 2CME72101200 2CME72101300 2CME72101400 2CME72101500 2CME72101600 2CME72101620 2CME72101700 2CME72101720 2CME72101800 Boiler Steel Structure Erection - Main Frame (#1~#3) Tier 1 Tier 2 Tier 3 Top Girder Boiler Steel Structure Erection - AH Structure Boiler Steel Structure Erection - Platform & Handrail Boiler Steel Structure Erection - Elevator Frame Boiler Down Comer / BCP Inlet & Outlet Preparation Jack for Steam Drum Drum Lifting Down Comer 1st Lifting SH/RH Tube & Header Buckstay Lifting Furnace & Buckstay

305 112 0 0 0 0 27 149 75 62 14 12 7 91 8 78

2-Dec-13 2-Dec-13 2-Dec-13 2-Jan-14 1-Feb-14 1-Mar-14 1-Jul-14 2-Jan-14 2-Jan-14 2-May-14 29-Mar-14 16-Apr-14 22-Apr-14 2-May-14 2-May-14 12-May-14

29-Nov-14 15-Apr-14 Tier 1 Tier 2 Tier 3 Top Girder 31-Jul-14 30-Jun-14 1-Apr-14 12-Jul-14 15-Apr-14 29-Apr-14 29-Apr-14 15-Aug-14 10-May-14 9-Aug-14 Boiler Steel Structure Erection - AH Structure Boiler Steel Structure Erection - Platform & Handrail Boiler Steel Structure Erection - Elevator Frame Boiler Down Comer / BCP Inlet & Outlet Preparation Jack for Steam Drum Drum Lifting Down Comer 1st Lifting SH/RH Tube & Header Buckstay Lifting Furnace & Buckstay Boiler Steel Structure Erection - Main Frame (#1~#3)

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 38 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 38 0 12 25 58 52 27 103 52 103 27 101 30 29 6 24 18 20 52 13 52 25 53 193 Install Cable Tray Install Conduit Cabling & Termination Lighting & Small Power Communication & Fire Alarm Grounding 128 130 130 77 52 130 131 Install Local Instrument Panel Insatll Local Instrument Instrument Piping Calibration & Loop Check 78 103 103 77 78 78 52 52 249 Start Finish O -1 17-May-14 1-Jul-14 1-Sep-14 2-Jun-14 1-Sep-14 1-Sep-14 1-Sep-14 1-Aug-14 11-Aug-14 1-Aug-14 2-May-14 1-Mar-14 1-Jul-14 5-Aug-14 9-Sep-14 16-Sep-14 14-Oct-14 7-Nov-14 16-Sep-14 15-Nov-14 1-Oct-14 1-Nov-14 1-Jul-14 16-Apr-14 16-Apr-14 19-May-14 1-Jul-14 1-Sep-14 1-Oct-14 1-Jul-14 30-Jun-14 30-Jun-14 1-Aug-14 1-Aug-14 1-Sep-14 24-Oct-14 24-Oct-14 1-Oct-14 1-Oct-14 11-Apr-14 15-Sep-14 30-Jun-14 7-Nov-14 31-Oct-14 2-Oct-14 29-Nov-14 10-Oct-14 29-Nov-14 2-Jun-14 30-Jun-14 4-Aug-14 8-Sep-14 15-Sep-14 13-Oct-14 3-Nov-14 29-Nov-14 14-Nov-14 29-Nov-14 29-Nov-14 29-Nov-14 30-Aug-14 29-Nov-14 15-Sep-14 17-Oct-14 29-Nov-14 29-Nov-14 29-Nov-14 29-Nov-14 29-Nov-14 29-Sep-14 29-Nov-14 29-Nov-14 29-Nov-14 23-Jan-15 23-Jan-15 29-Nov-14 29-Nov-14 31-Jan-15 Indoor Hydrant - Boiler Area Outer Casing Insulation Install Local Instrument Panel Insatll Local Instrument Instrument Piping Calibration & Loop Check Install Cable Tray Install Conduit Cabling & Termination Lighting & Small Power Communication & Fire Alarm Grounding Steam Air Heater & Pump Boiler Air Duct - Ground Assembly Boiler Air Duct - Side Block Lifting & Installation Boiler Air Duct - Vertical Block Lifting & Installation Boiler Air Duct - GAH Outlet Lifting Boiler Air Duct - GAH Outlet Installation Boiler Air Duct - FDF GAH Outlet Lifting Boiler Air Duct - FDF GAH Outlet Installation Boiler Air Duct - GRF Vertidcal Air Duct Lifting Boiler Air Duct - GRF Vertidcal Air Duct Installation Fuel and Diesel Oil Burner Diesel Oil Igniter Natural Gas Burner 30-Jun-14 N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Economizer Tube Hopper Lifting Preparation for Hydro Test Blowdown Tank Install Forced Draft Fan Install Gas Recirculation Fan Install Cooling Air Fan Elevator Sootblower Gas Air Heater

2CME72101900 2CME72101920 2CME72102000 2CME72102100 2CME72102200 2CME72102250 2CME72102270 2CME72102300 2CME72102400 2CME72102500 2CME72102600 2CME72102603 2CME72102605 2CME72102610 2CME72102615 2CME72102620 2CME72102625 2CME72102630 2CME72102635 2CME72102640 2CME72102700 2CME72102800 2CME72102900

Economizer Tube Hopper Lifting Preparation for Hydro Test Blowdown Tank Install Forced Draft Fan Install Gas Recirculation Fan Install Cooling Air Fan Elevator Sootblower Gas Air Heater Steam Air Heater & Pump Boiler Air Duct - Ground Assembly Boiler Air Duct - Side Block Lifting & Installation Boiler Air Duct - Vertical Block Lifting & Installation Boiler Air Duct - GAH Outlet Lifting Boiler Air Duct - GAH Outlet Installation Boiler Air Duct - FDF GAH Outlet Lifting Boiler Air Duct - FDF GAH Outlet Installation Boiler Air Duct - GRF Vertidcal Air Duct Lifting Boiler Air Duct - GRF Vertidcal Air Duct Installation Fuel and Diesel Oil Burner Diesel Oil Igniter Natural Gas Burner

Electrical
2CEL72101000 2CEL72101100 2CEL72101200 2CEL72101300 2CEL72101400 2CEL72101500

Instrument
2CIN72101000 2CIN72101100 2CIN72101200 2CIN72101300

Painting & Insulatio Insulation


2CPA72101000 Outer Casing Insulation

Fire Fighting & HVAC HVA


2CFH72101000 Indoor Hydrant - Boiler Area

Central Contro Control Building


Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort Actual Work Critical Remaining Work Baseline Milestone(Rev.C) Milestone

Detailed Work Schedule


Page 39 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 51 EQ Foundation - Sampling Rack & Chemical Dosing System 51 51 Compressed Air Piping with connection work 51 26 Chemical Dosing System 26 249 Electrical Equipment Install - CCB Cable Tray - CCB Cabling & Termination - CCB Test - CCB 27 63 94 105 40 I&C Panel & Console - CCB 40 26 26 409 202 Pile Work for Piperack(Unit #2) & Technical Corridor Piperack(Unit #2) Foundation Technical Corridor Foundation 52 99 76 76 Piperack(Unit #2) Erection Technical Corridor Erection 76 76 103 Piping on Piperack(Unit #2) Piping on Technical Corridor 103 78 330 203 Excavation & Pile Head Treatment - TR Area TR Foundation Fire Wall FDN & Pit Backfill - TR Area (Disch. Tunnel) Fire Wall Steel Work, Gravel & Fence 15 25 33 10 41 38 77 CW Piping (Inlet/Disch.)- Main & Unit TR Area 77 65 IPB Installation Set on Base - Main & Unit Transformer Assembling, Cabling, Grounding & Lighting - Main & Unit TR 53 13 52 Start Finish O -1 2-May-14 2-May-14 1-Aug-14 1-Aug-14 1-Aug-14 1-Aug-14 11-Apr-14 1-Jul-14 11-Apr-14 12-Jun-14 1-Oct-14 1-Jul-14 1-Jul-14 1-Aug-14 1-Aug-14 1-Jun-13 1-Jun-13 1-Jun-13 1-Oct-13 1-Oct-13 1-Mar-14 1-Mar-14 1-Mar-14 2-Jun-14 2-Jun-14 2-Jun-14 3-Sep-13 1-Feb-14 1-Feb-14 19-Feb-14 19-Feb-14 29-Mar-14 10-Apr-14 16-Aug-14 3-Sep-13 3-Sep-13 2-Jun-14 2-Jun-14 2-Jun-14 17-Jun-14 30-Jun-14 30-Jun-14 30-Sep-14 30-Sep-14 30-Aug-14 30-Aug-14 31-Jan-15 31-Jul-14 26-Jun-14 30-Sep-14 31-Jan-15 15-Aug-14 15-Aug-14 30-Aug-14 30-Aug-14 30-Sep-14 24-Jan-14 31-Jul-13 24-Jan-14 27-Dec-13 31-May-14 31-May-14 31-May-14 30-Sep-14 30-Sep-14 30-Aug-14 30-Sep-14 30-Sep-14 18-Feb-14 19-Mar-14 28-Mar-14 9-Apr-14 30-May-14 30-Sep-14 30-Nov-13 30-Nov-13 15-Aug-14 1-Aug-14 16-Jun-14 15-Aug-14 IPB Installation Set on Base - Main & Unit Transformer Assembling, Cabling, Grounding & Lighting - Main & Unit TR CW Piping (Inlet/Disch.)- Main & Unit TR Area Excavation & Pile Head Treatment - TR Area TR Foundation Fire Wall FDN & Pit Backfill - TR Area (Disch. Tunnel) Fire Wall Steel Work, Gravel & Fence Piping on Piperack(Unit #2) Piping on Technical Corridor Piperack(Unit #2) Erection Technical Corridor Erection Pile Work for Piperack(Unit #2) & Technical Corridor Piperack(Unit #2) Foundation Technical Corridor Foundation HVAC System for Battery Room I&C Panel & Console - CCB Electrical Equipment Install - CCB Cable Tray - CCB Cabling & Termination - CCB Test - CCB Chemical Dosing System Compressed Air Piping with connection work EQ Foundation - Sampling Rack & Chemical Dosing System N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Civil
2CCV74301000

Piping
2CPP74301000

Mechanical
2CME74204700

Electrical
2CEL74301000 2CEL74301100 2CEL74301101 2CEL74301102

Instrument
2CIN74301000

Fire Fighting & HVAC HVA


2CFH74301000 HVAC System for Battery Room

Piperack & Technical Tec Corridor


Civil
2CCV74700400 2CCV74701000 2CCV74701100

Building & STL STR


2CBD74701000 2CBD74701100

Piping
2CPP74701110 2CPP74701120

Main & Unit Transformer Tra


Civil
2CCV75101100 2CCV75101200 2CCV75101300 2CCV75101400 2CCV75101500 2CCV75101600

Piping
2CPP75101000

Electrical
2CEL75100800 2CEL75101000 2CEL75101100

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 40 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 25 25 101 25 Transmission Tower FDN 25 75 Transmission Tower Erection Cabling - Between TR/Gantry/SWYD 37 38 435 104 Excavation & Pile Head Treatment - Gas Duct Foundation - Gas Duct STR. 26 78 231 Gas Duct Structure Erection Prefab.- Gas Duct Erection - Gas Duct 76 88 143 394 104 Excavation /Pile Treatment - EP FDN - EP Ground Slab - EP Back Fill - EP Lining - EP 27 24 27 13 13 216 Supporting Structure Assembly - EP Hopper Assmebly - EP Upper Column/Wall Assmebly - EP Roof Girder Assmebly - EP Inlet/Outlet Nozzle Casing Assmebly - EP DE/CE Assmebly - EP Roof Assmebly - EP Piping Work - EP Final Adjustment - EP Electrostatic Precipitator TEST Ash Handling System - EP Ammonia Injection System - EP 16 26 19 18 36 74 26 78 12 25 11 35 77 Cabling, Lighting - EP 77 77 77 Start Finish O -1 1-Aug-14 1-Aug-14 2-May-14 2-May-14 2-May-14 2-Jun-14 2-Jun-14 15-Jul-14 2-Jul-13 2-Jul-13 2-Jul-13 1-Aug-13 1-Mar-14 1-Mar-14 1-Mar-14 16-Jun-14 1-Aug-13 1-Aug-13 1-Aug-13 3-Sep-13 1-Oct-13 1-Nov-13 16-Nov-13 1-Mar-14 1-Mar-14 31-Mar-14 4-Apr-14 22-Apr-14 22-Apr-14 24-May-14 3-Jul-14 4-Jun-14 1-Oct-14 15-Oct-14 18-Sep-14 7-Aug-14 19-Jun-14 19-Jun-14 19-Jun-14 19-Jun-14 29-Aug-14 29-Aug-14 27-Aug-14 30-May-14 30-May-14 27-Aug-14 14-Jul-14 27-Aug-14 29-Nov-14 31-Oct-13 31-Jul-13 31-Oct-13 29-Nov-14 31-May-14 14-Jun-14 29-Nov-14 12-Nov-14 30-Nov-13 31-Aug-13 30-Sep-13 31-Oct-13 15-Nov-13 30-Nov-13 12-Nov-14 19-Mar-14 2-May-14 26-Apr-14 14-May-14 4-Jun-14 18-Aug-14 1-Aug-14 3-Sep-14 14-Oct-14 12-Nov-14 30-Sep-14 17-Sep-14 17-Sep-14 17-Sep-14 17-Sep-14 17-Sep-14 Insulation Work - EP Cabling, Lighting - EP Supporting Structure Assembly - EP Hopper Assmebly - EP Upper Column/Wall Assmebly - EP Roof Girder Assmebly - EP Inlet/Outlet Nozzle Casing Assmebly - EP DE/CE Assmebly - EP Roof Assmebly - EP Piping Work - EP Final Adjustment - EP Electrostatic Precipitator TEST Ash Handling System - EP Ammonia Injection System - EP Excavation /Pile Treatment - EP FDN - EP Ground Slab - EP Back Fill - EP Lining - EP Gas Duct Structure Erection Prefab.- Gas Duct Erection - Gas Duct Excavation & Pile Head Treatment - Gas Duct Foundation - Gas Duct STR. Transmission Tower Erection Cabling - Between TR/Gantry/SWYD Transmission Tower FDN Spray Deluge System N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Fire Fighting & HVAC HVA


2CFH75101000 Spray Deluge System

Transmission T Tower FDN


Civil
2CCV75201000

Electrical
2CEL75201000 2CEL75201100

Gas Duct(Boiler-EP) Duct(Boile


Civil
2CCV72301000 2CCV72301100

Mechanical
2CME72300200 2CME72301000 2CME72301100

Eletrostatic Precipitator Pre


Civil
2CCV72401000 2CCV72401100 2CCV72401200 2CCV72401300 2CCV72401400

Mechanical
2CME72401000 2CME72401100 2CME72401200 2CME72401300 2CME72401400 2CME72401500 2CME72401600 2CME72401700 2CME72401800 2CME72401900 2CME72402000 2CME72402100

Electrical
2CEL72401000

Painting & Insulatio Insulation


2CPA72401000 Insulation Work - EP

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 41 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 158 52 Piping with Connection - Ash Treatment Plant 52 158 Raceway - Ash Treatment Plant Cabling, Lighting & Communication - Ash Treatment Plant 53 105 104 Instrumentation Work - Ash Treatment Plant 104 156 156 Install SWGR, MCC Control Panel - ESP Elec. & CNTL BLDG Cable Tray - ESP Elec. & CNTL BLDG Cabling & Termination - ESP Elec. & CNTL BLDG 26 26 104 104 Instrumentation Work - ESP Elec. & CNTL BLDG 104 27 27 Breaching Duct Insulation 27 382 201 Excavation & H. Treatment - Absorber Area Foundation - Absorber Excavation - Absortber Sump Pit Bottom Slab, Wall & Top Slab - Sump Pit Foundation - Filter Feed Tank Pump Foundation & Drain Trench 25 78 24 62 50 50 40 Piping - FGD Absorber Inside 40 231 Bottom & Shell Plate - Absorber Nozzle, Misc. Supports - Absorber Lining - Absorber Erection - Absorber Internal Erection - FGD Steel Structure Tank - FGD Absorber Pump - FGD Absorber Others - FGD Absorber 128 26 52 25 101 38 38 38 103 Electrical Work(Cabling, Lighting) - Absorber 103 409 Start Finish O -1 15-Jul-14 7-Aug-14 7-Aug-14 15-Jul-14 15-Jul-14 16-Sep-14 16-Sep-14 16-Sep-14 17-Apr-14 17-Apr-14 17-Apr-14 20-May-14 19-Jun-14 19-Jun-14 19-Jun-14 1-Oct-14 1-Oct-14 1-Oct-14 3-Sep-13 3-Sep-13 3-Sep-13 2-Oct-13 2-Jan-14 1-Feb-14 1-Mar-14 1-Feb-14 16-Jul-14 16-Jul-14 1-Mar-14 1-Mar-14 1-Aug-14 1-Sep-14 1-Nov-14 2-Apr-14 1-Aug-14 16-Aug-14 16-Aug-14 2-Jun-14 2-Jun-14 3-Sep-13 16-Jan-15 7-Oct-14 7-Oct-14 16-Jan-15 15-Sep-14 16-Jan-15 15-Jan-15 15-Jan-15 18-Oct-14 18-Oct-14 19-May-14 18-Jun-14 18-Oct-14 18-Oct-14 18-Oct-14 31-Oct-14 31-Oct-14 31-Oct-14 29-Nov-14 29-Apr-14 1-Oct-13 31-Dec-13 29-Jan-14 15-Apr-14 29-Apr-14 31-Mar-14 30-Aug-14 30-Aug-14 29-Nov-14 31-Jul-14 30-Aug-14 31-Oct-14 29-Nov-14 31-Jul-14 15-Sep-14 30-Sep-14 30-Sep-14 30-Sep-14 30-Sep-14 31-Dec-14 Electrical Work(Cabling, Lighting) - Absorber Bottom & Shell Plate - Absorber Nozzle, Misc. Supports - Absorber Lining - Absorber Erection - Absorber Internal Erection - FGD Steel Structure Tank - FGD Absorber Pump - FGD Absorber Others - FGD Absorber Piping - FGD Absorber Inside Excavation & H. Treatment - Absorber Area Foundation - Absorber Excavation - Absortber Sump Pit Bottom Slab, Wall & Top Slab - Sump Pit Foundation - Filter Feed Tank Pump Foundation & Drain Trench Breaching Duct Insulation Instrumentation Work - ESP Elec. & CNTL BLDG Install SWGR, MCC Control Panel - ESP Elec. & CNTL BLDG Cable Tray - ESP Elec. & CNTL BLDG Cabling & Termination - ESP Elec. & CNTL BLDG Instrumentation Work - Ash Treatment Plant Raceway - Ash Treatment Plant Cabling, Lighting & Communication - Ash Treatment Plant Piping with Connection - Ash Treatment Plant N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Ash Traetment Plant


Piping
2CPP79301000

Electrical
2CEL79301000 2CEL79301100

Instrument
2CIN79301000

ESP Electrical & Control BLDG


Electrical
2CEL79101000 2CEL79101100 2CEL79101200

Instrument
2CIN79101000

Stack
Mechanical
2CME72501000

Flue gas Desulp Desulphurization (Absorber) Area


Civil
2CCV71601000 2CCV71601100 2CCV71601200 2CCV71601300 2CCV71601400 2CCV71601500

Piping
2CPP79401000

Mechanical
2CME71601100 2CME71601120 2CME71601200 2CME71601300 2CME79401400 2CME79401500 2CME79401600 2CME79401700

Electrical
2CEL71601000

BUF & Gas Duct(EP-Stack) Duc Area


Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort Actual Work Critical Remaining Work Baseline Milestone(Rev.C) Milestone

Detailed Work Schedule


Page 42 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 12 T/O to Comm. - FGD System T/O to Comm. - Limestone Handling System 0 0 292 Excavation & Pile Head Treatment - GGH & Around Stack Foundation - GGH Gas Duct Foundation - Around Stack Foundation - Absorber Recirculation Pump ESP Drain Pit / Drain Trench Cable M/H & Duct Bank EQ Foundation - Booster Fan 37 52 49 38 74 65 52 208 Flue Gas Duct Work Absorber Recirculation Pump Absorbing Slurry Tank Piping Gas Gas Heater Fan Test Booster Fan Expansion Joint & Damper 155 27 64 156 103 27 51 52 90 Conduit Cabling & Termination Lighting, Communication Grounding 77 65 77 77 165 49 Foundation - Reclaim Water Tank & Pipe Support 49 78 Piping Fitting & Valve Common Facility 78 64 Gypsum Filter Feed Tank Reclaim Water Tank 64 64 78 Cabling & Termination 78 52 52 283 101 Foundation - Limestone Silo 50 3-Sep-13 3-Sep-13 16-Oct-13 2-Apr-14 2-Jun-14 16-Jan-14 2-Jun-14 2-Jun-14 2-May-14 2-Jun-14 16-Jul-14 2-May-14 2-May-14 1-Aug-14 1-Dec-14 1-Aug-14 1-Oct-14 16-Aug-14 16-Aug-14 16-Sep-14 1-Sep-14 1-Sep-14 2-Apr-14 2-Apr-14 2-Apr-14 2-Jun-14 2-Jun-14 2-Jun-14 2-Jun-14 2-Jun-14 1-Jul-14 1-Jul-14 15-Aug-14 15-Aug-14 1-Mar-14 1-Mar-14 1-Mar-14 Start Finish O -1 29-Nov-14 13-Dec-14 29-Nov-14 13-Dec-14 15-Aug-14 15-Oct-13 14-Dec-13 31-May-14 15-Jul-14 15-Apr-14 15-Aug-14 31-Jul-14 31-Dec-14 29-Nov-14 15-Aug-14 15-Jul-14 31-Oct-14 29-Nov-14 31-Dec-14 30-Sep-14 29-Nov-14 29-Nov-14 14-Nov-14 29-Nov-14 29-Nov-14 29-Nov-14 15-Oct-14 31-May-14 31-May-14 30-Aug-14 30-Aug-14 14-Aug-14 14-Aug-14 14-Aug-14 30-Sep-14 30-Sep-14 15-Oct-14 15-Oct-14 30-Jan-15 30-Jun-14 29-Apr-14 Foundation - Limestone Silo Painting Work Cabling & Termination Gypsum Filter Feed Tank Reclaim Water Tank Piping Fitting & Valve Common Facility Foundation - Reclaim Water Tank & Pipe Support Conduit Cabling & Termination Lighting, Communication Grounding Booster Fan Expansion Joint & Damper Flue Gas Duct Work Absorber Recirculation Pump Absorbing Slurry Tank Piping Gas Gas Heater Fan Test Excavation & Pile Head Treatment - GGH & Around Stack Foundation - GGH Gas Duct Foundation - Around Stack Foundation - Absorber Recirculation Pump ESP Drain Pit / Drain Trench Cable M/H & Duct Bank EQ Foundation - Booster Fan T/O to Comm. - FGD System T/O to Comm. - Limestone Handling System N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Taking Over
2CTO71901000 2CTO71901100

Civil
2CCV71901300 2CCV71901400 2CCV71901500 2CCV71901600 2CCV71901700 2CCV71901800 2CCV71901900

Mechanical
2CME71901000 2CME71901100 2CME71901200 2CME71901300 2CME71901400 2CME71901420 2CME71901500 2CME71901600

Electrical
2CEL71901000 2CEL71901100 2CEL71901200 2CEL71901300

Gypsum Dewatering Dewat And Storage House


Civil
2CCV78401000

Piping
2CPP78401000

Mechanical
2CME78401000 2CME78401100

Electrical
2CEL78401000

Painting & Insulatio Insulation


2CPA78401000 Painting Work

Limestone Ball Mill House


Civil
2CCV79401000

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 43 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 51 181 Limestone Storage Silo Reagent Feed Tank 78 77 78 Cabling & Termination 78 52 52 168 168 Install Electrical Equipment - FGD E&C BLDG Cable Tray - FGD E&C BLDG Conduit - FGD E&C BLDG Cabling & Termination - FGD E&C BLDG Test - FGD E&C BLDG 38 39 51 78 51 197 51 Foundation - Oxidation Air Blower 51 51 Install Oxidation Air Blower 51 52 Cabling & Termination - OAB House 52 27 27 218 78 Limestone Conveyor 78 218 Conduit - Limestone Conveyor Cabling & Termination - Limestone Conveyor Lighting, Communication - Limestone Conveyor 75 78 103 281 103 Foundation - Condensate Storage Tank & Pipe Support 103 78 Piping - Condensate Storage Tank 78 99 Install Condensate Storage Tank Install Condensate Transfer Pump 73 26 318 Start Finish O -1 2-May-14 2-May-14 2-May-14 1-Sep-14 1-Jul-14 1-Jul-14 1-Dec-14 1-Dec-14 2-Jun-14 2-Jun-14 2-Jun-14 2-Jul-14 1-Aug-14 16-Aug-14 17-Oct-14 12-Mar-14 12-Mar-14 12-Mar-14 1-Aug-14 1-Aug-14 1-Sep-14 1-Sep-14 1-Oct-14 1-Oct-14 17-Mar-14 1-Aug-14 1-Aug-14 17-Mar-14 17-Mar-14 1-Aug-14 1-Aug-14 1-Oct-13 1-Oct-13 1-Oct-13 2-Jun-14 2-Jun-14 3-Apr-14 3-Apr-14 1-Jul-14 2-Jan-14 30-Jun-14 29-Nov-14 31-Jul-14 29-Nov-14 30-Sep-14 30-Sep-14 30-Jan-15 30-Jan-15 15-Dec-14 15-Dec-14 15-Jul-14 15-Aug-14 30-Sep-14 15-Nov-14 15-Dec-14 31-Oct-14 13-May-14 13-May-14 30-Sep-14 30-Sep-14 31-Oct-14 31-Oct-14 31-Oct-14 31-Oct-14 29-Nov-14 31-Oct-14 31-Oct-14 29-Nov-14 14-Jun-14 31-Oct-14 29-Nov-14 30-Aug-14 29-Jan-14 29-Jan-14 30-Aug-14 30-Aug-14 30-Jul-14 30-Jun-14 30-Jul-14 15-Jan-15 Install Condensate Storage Tank Install Condensate Transfer Pump Piping - Condensate Storage Tank Foundation - Condensate Storage Tank & Pipe Support Conduit - Limestone Conveyor Cabling & Termination - Limestone Conveyor Lighting, Communication - Limestone Conveyor Limestone Conveyor Painting Work - OAB House Cabling & Termination - OAB House Install Oxidation Air Blower Foundation - Oxidation Air Blower Install Electrical Equipment - FGD E&C BLDG Cable Tray - FGD E&C BLDG Conduit - FGD E&C BLDG Cabling & Termination - FGD E&C BLDG Test - FGD E&C BLDG Painting Work Cabling & Termination Limestone Storage Silo Reagent Feed Tank N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Foundation - Reagent Feed Tank

2CCV79401100

Foundation - Reagent Feed Tank

Mechanical
2CME79401000 2CME79401200

Electrical
2CEL79401000

Painting & Insulatio Insulation


2CPA79401000 Painting Work

FGD Electrical & Control Building


Electrical
2CEL71701000 2CEL71701100 2CEL71701200 2CEL71701300 2CEL71701400

Oxidation Air Blower B House


Civil
2CCV78901000

Mechanical
2CME78901000

Electrical
2CEL78901000

Painting & Insulatio Insulation


2CPA78901000 Painting Work - OAB House

Transfer Conveyor Conve


Mechanical
2CME78301100

Electrical
2CEL78301000 2CEL78301100 2CEL78301200

Condensate Sto Storage Tank


Civil
2CCV76501000

Piping
2CPP76501000

Mechanical
2CME76501000 2CME76501100

Gas Station Shelter Sh


Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort Actual Work Critical Remaining Work Baseline Milestone(Rev.C) Milestone

Detailed Work Schedule


Page 44 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 61 Foundation - Fuel Gas Reducing Station 61 77 Fuel Gas Piping 77 155 Install Fuel Gas Reducing Station Install Fuel Gas Heater Install Fuel Gas Filter Install Moisture Separator 52 26 27 25 103 Electrical Work - Fuel Gas System 103 242 49 Foundation - Fuel Oil Service TK & Pump 49 78 Fuel Oil Pump Diesel Oil Pump Install Fuel Oil Service Tank 26 26 78 78 Electrical Works - Fuel Oil Tank 78 90 90 Install Electrical Panel Cabling & Termination - SWYD CNTL BLDG Test - SWYD CNTL BLDG 25 27 38 103 103 Install Electrical Equipment Install IPB Cabling & Termination Test - 220KV SWYD (Shut Down Required) 38 52 52 13 104 77 Install Chlorination Unit 77 104 Install MCC & Panel - CW Intake Elec. & CLRN BLDG Cabling & Termination - CW Intake Elec. & CLRN BLDG 25 79 499 371 Sheet Pile 256 Start Finish O -1 2-Jan-14 2-Jan-14 17-Oct-14 17-Oct-14 2-Jun-14 2-Jun-14 17-Sep-14 1-Oct-14 1-Nov-14 17-Sep-14 17-Sep-14 16-Jan-14 16-Jan-14 16-Jan-14 1-Aug-14 1-Oct-14 1-Oct-14 1-Aug-14 1-Aug-14 1-Aug-14 2-May-14 2-May-14 2-May-14 31-May-14 2-Jul-14 2-Jun-14 2-Jun-14 2-Jun-14 2-Jun-14 16-Jul-14 16-Sep-14 1-Sep-14 1-Sep-14 1-Sep-14 1-Sep-14 1-Sep-14 1-Oct-14 1-Jun-13 1-Jun-13 1-Jun-13 15-Mar-14 15-Mar-14 15-Jan-15 15-Jan-15 29-Nov-14 31-Jul-14 16-Oct-14 31-Oct-14 29-Nov-14 15-Jan-15 15-Jan-15 31-Oct-14 15-Mar-14 15-Mar-14 31-Oct-14 30-Oct-14 30-Oct-14 31-Oct-14 31-Oct-14 31-Oct-14 14-Aug-14 14-Aug-14 30-May-14 1-Jul-14 14-Aug-14 30-Sep-14 30-Sep-14 15-Jul-14 31-Jul-14 15-Sep-14 30-Sep-14 31-Dec-14 29-Nov-14 29-Nov-14 31-Dec-14 30-Sep-14 31-Dec-14 14-Jan-15 15-Aug-14 31-Mar-14 Sheet Pile Install MCC & Panel - CW Intake Elec. & CLRN BLDG Cabling & Termination - CW Intake Elec. & CLRN BLDG Install Chlorination Unit Install Electrical Equipment Install IPB Cabling & Termination Test - 220KV SWYD (Shut Down Required) Install Electrical Panel Cabling & Termination - SWYD CNTL BLDG Test - SWYD CNTL BLDG Electrical Works - Fuel Oil Tank Fuel Oil Pump Diesel Oil Pump Install Fuel Oil Service Tank Foundation - Fuel Oil Service TK & Pump Electrical Work - Fuel Gas System Install Fuel Gas Reducing Station Install Fuel Gas Heater Install Fuel Gas Filter Install Moisture Separator Fuel Gas Piping Foundation - Fuel Gas Reducing Station N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

Civil
2CCV73401000

Piping
2CPP73401000

Mechanical
2CME73401000 2CME73401100 2CME73401200 2CME73401300

Electrical
2CEL73401000

Fuel Oil Pump H House


Civil
2CCV73301000

Mechanical
2CME73301000 2CME73301100 2CME73301200

Electrical
2CEL73301000

Switchyard Con Control Building


Electrical
2CEL75801000 2CEL75801100 2CEL75801200

220KV Switchyard Switchy


Electrical
2CEL75301300 2CEL75301310 2CEL75301400 2CEL75301500

CW Intake Elec Electrical & Chlorination BLDG


Mechanical
2CME76901000

Electrical
2CEL76901000 2CEL76901100

CW Pump Pit & CW Pipe


Civil
2CCV76601100

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 45 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 255 215 27 305 CW Piping - Intake to Condenser CW Piping - CWP Pit 252 53 78 Install CW Pump (Incl. Pump Pit Repair Work) Install Traveling Screen Install Screen Wash Pump Install Chlorination Dosing System 78 43 25 52 420 Cathodic Protection Cable Tray & Conduit Cabling & Termination Grounding Impulse Piping Lighting 252 78 105 77 52 38 78 Instrument Panel 78 304 304 304 Gas Station Commissioning FGD Plant Commissioning Preparation for Initial Firing (Boiler Interlock & Initial Firing Test) Chemical Cleaning Restoration of Chemical Cleaning Boiler Pressure Rising Blowing Out & Steam Flushing Restoration of Blowing Out Turbine Control Appratus Adjustment Turbine Interlock Test Safety Valve Test Electrical Interlock Test Unit Interlock Test Condenser Vacuum Up Test Turbine Initial Start-up Steam Admission to Turbine Turbine Generator No Load Test 16 31 14 14 7 5 21 7 5 5 7 5 7 5 1 1 7 Start Finish O -1 1-Jul-13 2-Dec-13 1-Jul-14 3-Sep-13 3-Sep-13 1-Jul-14 1-Aug-14 1-Aug-14 1-Aug-14 22-Sep-14 1-Sep-14 3-Sep-13 3-Sep-13 2-Jun-14 1-Jul-14 1-Sep-14 1-Nov-14 1-Dec-14 1-Aug-14 1-Aug-14 1-Jan-15 1-Jan-15 1-Jan-15 16-Jan-15 1-Jan-15 1-Feb-15 15-Feb-15 1-Mar-15 8-Mar-15 13-Mar-15 3-Apr-15 10-Apr-15 15-Apr-15 20-Apr-15 27-Apr-15 2-May-15 9-May-15 14-May-15 15-May-15 16-May-15 29-Apr-14 15-Aug-14 31-Jul-14 30-Aug-14 30-Jun-14 30-Aug-14 31-Oct-14 31-Oct-14 20-Sep-14 20-Oct-14 31-Oct-14 14-Jan-15 30-Jun-14 30-Aug-14 31-Oct-14 29-Nov-14 31-Dec-14 14-Jan-15 31-Oct-14 31-Oct-14 31-Oct-15 31-Oct-15 31-Oct-15 31-Jan-15 31-Jan-15 14-Feb-15 28-Feb-15 7-Mar-15 12-Mar-15 2-Apr-15 9-Apr-15 14-Apr-15 19-Apr-15 26-Apr-15 1-May-15 8-May-15 13-May-15 14-May-15 15-May-15 22-May-15 Gas Station Commissioning FGD Plant Commissioning Preparation for Initial Firing (Boiler Interlock & Initial Firing Test) Chemical Cleaning Restoration of Chemical Cleaning Boiler Pressure Rising Blowing Out & Steam Flushing Restoration of Blowing Out Turbine Control Appratus Adjustment Turbine Interlock Test Safety Valve Test Electrical Interlock Test Unit Interlock Test Condenser Vacuum Up Test Turbine Initial Start-up Steam Admission to Turbine Turbine Generator No Load Test Instrument Panel Cathodic Protection Cable Tray & Conduit Cabling & Termination Grounding Impulse Piping Lighting Install CW Pump (Incl. Pump Pit Repair Work) Install Traveling Screen Install Screen Wash Pump Install Chlorination Dosing System CW Piping - Intake to Condenser CW Piping - CWP Pit N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Excavation - CW Pipe Backfill - CW Pipe CW Pump FDN

2CCV76601200 2CCV76601300 2CCV76601400

Excavation - CW Pipe Backfill - CW Pipe CW Pump FDN

Piping
2CPP76601100 2CPP76601200

Mechanical
2CME76601000 2CME76601100 2CME79401210 2CME79401220

Electrical
2CEL76601000 2CEL76601100 2CEL76601200 2CEL76601300 2CEL76601400 2CEL76601500

Instrument
2CIN76601000

Pre-comm. & Comm. C


Commissioning Test
Commissioning
2CZZ79900100 2CZZ79900200 2CZZ79900500 2CZZ79901000 2CZZ79901100 2CZZ79901200 2CZZ79901300 2CZZ79901400 2CZZ79901420 2CZZ79901450 2CZZ79901453 2CZZ79901457 2CZZ79901470 2CZZ79901500 2CZZ79901520 2CZZ79901800 2CZZ79901900

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 46 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim

[Rev.D]O MON TPP Unit No.2 Construction - MHI


Activity ID Activity Name Original Duration 5 1 6 7 5 13 3 10 10 9 23 10 30 30 Start Finish O -1 23-May-15 28-May-15 29-May-15 4-Jun-15 11-Jun-15 16-Jun-15 29-Jun-15 2-Jul-15 12-Jul-15 22-Jul-15 31-Jul-15 23-Aug-15 2-Sep-15 2-Oct-15 27-May-15 28-May-15 3-Jun-15 10-Jun-15 15-Jun-15 28-Jun-15 1-Jul-15 11-Jul-15 21-Jul-15 30-Jul-15 22-Aug-15 1-Sep-15 1-Oct-15 31-Oct-15 N 1 D 2 J 3 F 4 M 5 A 6 M 7 2013 2014 2015 2016 J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A S Oct N D J F M A M J Jul A 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 Ash Hopper Blind Plate Removal Synchronization Turbine Overspeed Test Load Rejection Test Unit Shutdown Work Unit Start-up FCB & House Load Operation Test MSV/RSV Temporary Strainer Removal Combustion Tuning (Oil Firing) Load Swing Test Special Test Combustion Tuning (Gas Firing) Reliability Run Performance Test (Gas & Oil)

2CZZ79901920 2CZZ79902100 2CZZ79902110 2CZZ79902120 2CZZ79902130 2CZZ79902140 2CZZ79902150 2CZZ79902300 2CZZ79902400 2CZZ79902420 2CZZ79902440 2CZZ79902600 2CZZ79902900 2CZZ79903000

Ash Hopper Blind Plate Removal Synchronization Turbine Overspeed Test Load Rejection Test Unit Shutdown Work Unit Start-up FCB & House Load Operation Test MSV/RSV Temporary Strainer Removal Combustion Tuning (Oil Firing) Load Swing Test Special Test Combustion Tuning (Gas Firing) Reliability Run Performance Test (Gas & Oil)

Primary Baseline(Rev.C) Remaining Work Remaining Level of Effort

Actual Work Critical Remaining Work Baseline Milestone(Rev.C)

Milestone

Detailed Work Schedule


Page 47 of 47

Date Revision 01-Apr-13 Issue for Information(Rev.B) 03-May-13 Issue for Information(Rev.C) 4-Jun-13 Issue for Information(Rev.D)

Checked H.S.Chung H.S.Chung H.S.Chung

Approved H.H.Lim H.H.Lim H.H.Lim