CURRICULUM VITAE

Amr Kamal ElDin Hussein


Projects Coordinator

Personal Details:

B.Sc. of Civil Engineering, Cairo University, Egypt,


Educational Qualifications :
November 1994
Nationality : Egyptian

Date of Birth : 1971

Total Experience : 15 years of Professional Experience

Experience Summary:

Company : Al Ghurair Arabian Foundation Engineering LLC


Position : Projects Coordinator Manager
Period : January 2006 to date
Responsibility : Handling the following sequence of work for all projects as follows:
1) Dubai Municipality (DM) – Sewage, irrigation and drainage NOCs, Discussion
with structure engineer regarding our designs, Fencing, shoring and piling permits,
Dewatering permits, Excavation NOCs, Excavated materials shifting NOCs, Non
hazard disposals NOCs, Permission to use any adjacent plot belongs to the
authority, Demarcation Certificates, Shoring inspections, Reimbursement of the
refundable payments.
2) Road and Transportations Authority (RTA) – New projects excavation NOCs,
NOCs for using anchors in the road side, NOCs from the Metro authority for any
project near the metro course, The usage of any part of the road, Permission to use
cars parking.
3) Dubai Electricity and water authority (DEWA) – The water and electricity
construction NOCs, Shifting of any facilities such as cables, pipelines, etc..
4) TECOM – Fencing and mobilization permits, Demarcation certificates, Shoring and
piling permits, Discussion with structure engineer regarding our designs,
Coordination with infra structure consultants.
5) Jebel Ali Free Zone Authority (JAFZA) – Gate passes for our employees and
subcontractor working in the Free Zone Area, Coordinate with Civil Engineering
department to get all required approvals and permissions, Notice of Intent (NOI),
Coordinate with accounting department in order to reimburse our refundable
payments.

Page 1 of 5
CURRICULUM VITAE
Amr Kamal ElDin Hussein
Projects Coordinator

6) Environment, Health and Safety (EHS) – Gate passes for heavy vehicles and
equipments, certificate of conformity (COC), Safety inspection after handing over
the project.
7) Other Activities – Coordinate with the consultants in the post-contract stage,
Financial dealings with all authorities, Following up with the authorities regarding all
fines, Following up the submittals of permits and approved drawings from the main
office to any project, Attend the coordination meetings with the owners and the
consultants, Supporting the projects managers to get the permits required through
the mobilization and demobilization stages, Following up the filing of all official
documents sharing the document controller

Company : STROMEK EMIRATES FOUNDATIONS LLC


Position : Site Manager
Period : November 2003 to December 2005
Duties : Responsible for all the foundations operations in different types of
Projects. Tasks include full supervision and responsibility of site
preparation, surveying, drilling, steel cage installation, concrete
casting and testing work for the following:
 Board Piles – Diameters varying from 0.6m to 1.20m depths from 12m to
37m using bentonite, water, full casing (including projects containing secant and
contiguous piles
 CFA Piles – diameters varying from 05m to 0.8m & depths from 12m to 22m
 Diaphragm Walls – Widths are varying from 0.6m to 0.8m & depths from
15m to 38m
 Shoring Works – installation of I Beams & C Beams with different sizes.
 Responsible also for all testing works such as: Static Load, Dynamic Load,
Integrity & Sonic Logging Tests.

Projects : The Palm Island, Jumeirah Dubai (October 2004 to December


2004) – Offshore Residential Buildings where 1073 bored piles
were executed.
: More than 6 High Rise Residential & Commercial Buildings in
Dubai, Sharjah, Ajman, amongst is the highest towers in Sharjah
and Residential and commercial building for Dubai Ruler Office.
: Executed around 3000 bored piles, 600 CFA piles, 2 projects for
shoring work with different consultant offices (Turner, Ace, Adnan
Safarini, Al Hashemi…)

Company : RAYMONDFOUNDATIONS (EGYPT)

Page 2 of 5
CURRICULUM VITAE
Amr Kamal ElDin Hussein
Projects Coordinator

(November 1994 to November 2003)


Position : Site Manager
Period : March 2003 to November 2003
Project : Port – Saed Liquefied Natural Gas (LNG Project)
 600 Bored Piles (1.20m dia & 52.0m depth)
 Consultant : ENPPI

Project : Cairo North Power Station


Period : June 2003 to March 2003
Position : Quality Control Engineer
 400 Driven Piles (0.50m dia & 20.0m depth)
 Consultant : Egyptian Electric Ministry

Project : Dumiatt Liquefied Natural Gas (LNG Project)


Period : October 2002 to January 2003

Project : Dumiatt Liquefied Natural Gas (LNG Project)


Period : February 2002 to October 2002
Position : Quality Control Engineer
 Location: Dumiatt Port
 Contractor : KJT-ORASCOM-MRF consortium
 Scope of work: Construction of 1500 bored piles (dia: 0.80m & length: 42.00m)

Project : International Coastal Road Bridges


Period : August 2001 to February 2002

Project : International Coastal Bridges (Bridge No.8)


Period : May 2001 to August 2001
.
Project : Port-Saed Power Plant
Period : January 2001 to May 2001
Position : Quality Control Engineer
 Location: Port Saed
 Contractor : SAE (France) – Orascom JV
 Scope of Work : Construction of 700 bored piles (dia: 0.60m, 0.80m, 1.20m,
2.00m & length: 42.00m till 52.00m)

Project : Suez Power Plant


Period : May 2000 to January 2001

Page 3 of 5
CURRICULUM VITAE
Amr Kamal ElDin Hussein
Projects Coordinator

Project : International Coastal Road Bridges


Period : January 2000 to May 2000

Project : Giza Side Walk Bridge for the Metro


Period : November 1999 to January 2000
Position : Site Engineer
 Location: Giza
 Contractor: C. Brenar
 Scope of Work : Construction of CFA piles

Project : Nwaeba Port Platform


Period : June 1999 to November 1999
Position : Site Engineer
 Location: Nwaeba
 EL-NIL Company
 Scope of work : Construction of Driven Piles

Project : Bacheteel Bridge in the Ring Road


Period : February 1999 to June 1999

Project : El-Dekhalia Steel Factory


Period : August 1998 to February 1999
Position : Quality Control Engineer
 Location: Alexandria
 Contractor: Kajima
 Scope of Work: Construction of Secant piles

Project : Metro Bridge for the Giza Station


Period : June 1998 to August 1998
Position : Quality Control Engineer
 Location: Giza-upon pyramids tunnel
 Contractor: C. Brenar
 Scope of Work: Construction of Bored Piles

Project : Mubark’s Bridge


Period : May 1998 to June 1998

Project : Reached Bridge


Period : March 1998 to May 1998

Page 4 of 5
CURRICULUM VITAE
Amr Kamal ElDin Hussein
Projects Coordinator

Project : EL Dekhalia Bridge


Period : December 1997 to May 1998
Position : Site Engineer
 Location: Alexandria – El Dekhalia Steel Factory
 Contractor: Kajima
 Scope of Work : Construction of Bored Piles

Project : Eyoun Mousa Power Plant


Period : January 1997 to December 1997
Position : Site Engineer
 Location: Eyoun Mousa
 Contractor: ABB
 Scope of Work: Construction of Bored Piles

Project : Zefta Bridge


Period : August 1996 to January 1997

Project : Bibliotheca Alexandria


Period : December 1995 to August 1996
Position : Site Engineer
 Location: Alexandria
 Contractor: RTA
 Scope of Work: Soil Investigation and tests for the grout

Project : El Kurimat Power Station


Period : December 1994 to December 1995
Position : Quality Control Engineer
 Location: Beni-Suief
 Contractor : Dalim
 Scope of Work: Construction of Bored Piles

Page 5 of 5