Вы находитесь на странице: 1из 2

Meinhardt (Vietnam) Ltd Tn cng trnh/ Project M cng vic/ Job No.

Ch / Subject Thc hin/ Calculated By Kim tra/ Checked By Chp thun/ Approved By : BTC STATION : : LOAD CALCULATION : PHAN NGOC NHU MAI : ALAN UNGER : ALAN UNGER Ln hiu chnh/ Rev.No: 00 Ngy hiu chnh/Rev.Date: Mar 6, 2013 Tiu chun p dng/ Application Standard: Cibse Guide K, Guide BSRIA Rule of Thumb

Transformer load for Phase 1 - Line 1 Estimate Elec Connected load Load/ sqm ( KVA ) (KVA/m2 )

No. Level 1 1 2 3 4 5 6 7 8 1 2 3 4 Signal Box

Description

Area ( m2)

Diversity factor

Maximum Demand load ( KVA )

Remarks

300 95 420 290 180 160 3190 2,180 1,701 610 500 340

0.08 0.08 0.12 0.12 0.12 0.12 0.20 0.20 0.20 0.03 0.03 0.03

24.00 7.60 50.40 34.80 21.60 19.20 638.00 436.00 340.20 18.30 15.00 10.20

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

24.00 7.60 50.40 34.80 21.60 19.20 638.00 436.00 340.20 18.30 15.00 10.20

Season Ticket Counter Station Office Station Office Station Office Meeting Room Paid Concourse Train Crew Room Platform Substation Room 1 Substation Room 2 Warehouse

Level 2

Form: Appendix 16 MVN-DE-A5 (E04) Rev: 00 Rev.Date:

1/2

No. Mechanical load 1 2 3 4 5 6 7 8 Air Conditioning Fire pumps Pumps for P&S Escalator and lift Tunnel

Description

Area ( m2)

Estimate Elec Connected load Load/ sqm ( KVA ) (KVA/m2 )

Diversity factor

Maximum Demand load ( KVA )

Remarks

1,288 50.00 50.00 100.00 500.00 50.00 50.00 1,000.00 TOTAL CONNECTED LOAD DIVERSITY FACTOR

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

1,288 50.00 50.00 100.00 500.00 50.00 50.00 1,000.00 4,703 0.8 3,762 3 Phase

Signals and package 3 Data center and FCC Tunnel ventalation

TOTAL CONNECTED LOAD C/W DIVERSITY FACTOR HENCE SELECT TRANSFORMER OF CAPACITY AS BELOWS: 2 nos. 2000KA FOR LINE 1 PHASE 1

Form: Appendix 16 MVN-DE-A5 (E04) Rev: 00 Rev.Date:

2/2

Вам также может понравиться